Loading...
HomeMy WebLinkAbout2019-4074 - Ordinance - 02/25/2019ORDINANCE NO. 2019-4074 AN ORDINANCE (BUDGET AMENDMENT #1) AMENDING ORDINANCE NO. 2018-4048 WHICH WILL AMEND THE BUDGET FOR THE 2018-2019 FISCAL YEAR AND AUTHORIZING AMENDED EXPENDITURES AS THEREIN PROVIDED. WHEREAS, on September 27, 2018, the City Council of the City of College Station, Texas, adopted Ordinance No. 2018-4048 approving its Budget for the 2018-2019 Fiscal Year; and WHEREAS, this amendment was prepared and presented to the City Council and a public hearing held thereon as prescribed by law and the College Station City Charter, after notice of said hearing having been first duly given; now, therefore, BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF COLLEGE STATION, TEXAS: PART 1: That Ordinance No. 2018-4048 is hereby amended by amending the 2018-2019 Budget adopted thereto by a net amount of $13,872,957 as further detailed in Exhibit A attached hereto and incorporated herein for all purposes. PART 2: That this Budget Amendment #1 shall be attached to and made a part of the 2018-2019 Budget. PART 3: That except as amended hereby, Ordinance No. 2018-4048 shall remain in effect in accordance with its terms. PART 4: That this Ordinance shall become effective immediately after passage and approval. PASSED and APPROVED this 25th day of February, 2019. ATTEST: APPROVED: ____________________________ ________________________________ City Secretary Mayor APPROVED: _________________________ City Attorney Exhibit A - FY19 Budget Amendment #1 Detail Listing 1. Encumbrance Roll - $7,995,063 (Budget Amendment) A number of expenditures were not completed in FY18 due to timing issues. These goods and services were budgeted and encumbered in FY18, but were not or will not be received until FY19. The encumbrance roll increases the FY19 budget appropriation in each applicable fund for the eligible items. Included in the encumbrance roll is amounts from the Hotel Tax and Fun For All Playground special revenue funds related to completion of construction that begun in FY18. $4,220,590 from the Hotel Tax Fund is for the completion of the Veteran’s Park synthetic fields and $958,547 from the Fun for All Playground Fund is for the completion of phase one of that park. The encumbrance roll also includes $1,895,471 from the Equipment Replacement Fund for vehicles that were ordered in FY18, but not yet delivered including $1,172,746 for a Ladder Truck for the Fire Department. 2. Electric CIP – Transmission Poles and Optical Ground Wire (OPGW) - $770,817 (Budget Amendment and Interfund Transfer) An additional $770,817 appropriation is needed for Electric’s transmission pole and OPGW project because bids came in higher than originally anticipated. Work on this project began in FY18 and will continue throughout FY19. This additional appropriation will be funded by increasing the FY19 transfer from the Electric Fund to the Electric CIP Fund. 3. Wastewater CIP – East Side FM158 Sewer Line - $927,000 (Budget Amendment) An additional $927,000 needs to be appropriated for the East Side FM 158 Sewer Line CIP project. The East Side Lift Station needs to be constructed further south to increase service area and to avoid the construction of a secondary lift station. This change resulted in additional design and survey work as well as added construction for the force main and gravity lines. The funding increase was discussed during late FY18 but the appropriation was not included in time for the FY19 Wastewater CIP budget. There are available resources in the Wastewater CIP Fund to fund this additional appropriation. 4. Water CIP – Lincoln Avenue Rehab - $18,900 (Budget Amendment) An additional $18,900 appropriation is needed for the Water portion of the Lincoln Avenue Rehab CIP project because the anticipated design cost was not fully appropriated during the proposed budget process. The design expense was anticipated and there are available resources in the Water CIP Fund to fund this additional appropriation. Work on this project began in FY18 and is expected to continue through FY20. 5. Library Expenses - $57,177 (Budget Amendment) When the FY19 budget was created for the library, an oversite occurred and only the expenses paid to the City of Bryan where included in the Budget. Expenses paid to vendors directly by the City of College Station were inadvertently omitted. Therefore, a shortage resulted and the FY19 Library budget was underfunded by $57,177. The general fund Fund Balance has capacity of absorb the additional expense. 6. Water CIP – Veterans Park Reclaimed System Improvements - $67,000 (Budget Amendment) An additional $67,000 appropriation is needed for the Veterans Park Reclaimed System Improvements project. This project was originally established and appropriated as a Wastewater CIP project. However, the project should have been created as a Water CIP project. The Wastewater CIP Fund will retain the original appropriation, while a new appropriation is needed for the Water CIP Fund. The new Water CIP appropriation will be financed by existing Fund balance and budget savings from other Water CIP projects. Work on this project is expected to start in FY19. ORDINANCE NO. 2019-4074 2 of 3 Exhibit A - FY19 Budget Amendment #1 Detail Listing 7. Water Event at City Hall - $350,000 (Budget Amendment) In October 2018, a heavy rain event caused widespread leaking and damage to City Hall and its annex. This rain event resulted extensive remediation efforts that remain ongoing. The requested amount will be used to supplement the Property & Casualty Fund where the costs will be consolidated. A second rain event in December 2018 resulted in additional damage, remediation and repairs and will be brought forward with Budget Amendment #2 later this year. 8. Wastewater CIP – Lick Creek Wastewater Treatment Plant (LCWWTP) Expansion - $3,687,000 (Budget Amendment) An additional $3,687,000 appropriation is needed for the LCWWTP Expansion project given the submitted construction contracts’ anticipated costs. These costs are higher than estimated due to broad macroeconomic factors (e.g., increased commodity prices, tariffs, possible trade conflicts, and increasing labor costs) and local circumstances (e.g., competing with Hurricane Harvey repair projects throughout Texas). The additional expense will be funded via debt issuances over FY19-FY22. Construction is expected to commence in FY19 and will last through FY22. 9. Trailhead Parking Lot at Lick Creek - $20,000 (Interfund Transfer) To begin the project to allow for the Lick Creek Trailhead parking lot to be located closer to the greenway trail the Planning and Development O&M budget will be moved to Parks CIP. Additional funding from the Electric CIP fund and Parkland dedication will be requested later on in FY19 as costs solidify. The additional amounts will be utilized to add a gate for the substation, and increase flexibility for the lot configuration of the Midtown Business Park at the corner of Lakeway Drive and Pebble Creek Parkway. 10. Fire Department – Increase of Co-Medical Director’s contracted amount - $4,300 (Interfund Transfer) The Fire Department was approved for FY19 to contract a Co-Medical Director to assist the existing Medical Director in overseeing the EMT services of the department. The approved amount for the new Co-Medical Director was $8,000 per year in the Fire budget for his services plus an additional $4,300 in Property & Casualty to cover liability insurance associated with the services. In the process of contracting with the new Co-Medical Director, it was discovered that the additional liability insurance was not needed. The Fire Department is requesting that the funds budgeted for that insurance coverage be transferred from the Property & Casualty Fund to the Fire Department’s budget within the General Fund so that the funds can be redirected to receive additional services from the Co-Medical Director. ORDINANCE NO. 2019-4074 3 of 3