Loading...
HomeMy WebLinkAbout08/16/2018 - Agenda Packet - Planning & Zoning CommissionPlanning and Zoning Commission Workshop College Station, TX Meeting Agenda - Final City Hall 1101 Texas Ave College Station, TX 77840 The City Council may or may not attend the Planning & Zoning Commission Workshop Meeting. City Hall Council Chambers6:30 PMThursday, August 16, 2018 1. Call the meeting to order. 2. Discussion of consent and regular agenda items. 3. Discussion of new development applications submitted to the City. New Development Link: www.cstx.gov/newdev Presentation, possible action, and discussion regarding the consideration of the 2018 P&Z Plan of Work. 18-05314. Sponsors:Golbabai 2018 Plan of WorkAttachments: Presentation, possible action, and discussion regarding a quarterly update on economic development efforts. 18-05295. Sponsors:Ruiz Presentation, possible action, and discussion regarding the P&Z Calendar of Upcoming Meetings: *Thursday, August 23, 2018 ~ City Council Meeting ~ Council Chambers ~ Workshop 5:00 p.m. Regular 6:00 p.m. (Liaison - Oldham) *Thursday, September 6, 2018 ~ P&Z Meeting ~ Council Chambers ~ Workshop 6:00 p.m. Regular 7:00 p.m. *Thursday, September 13, 2018 ~ City Council Meeting ~ Council Chambers ~ Workshop 5:00 p.m. Regular 6:00 p.m. (Liaison - Vessali) *Thursday, September 20, 2018 ~ P&Z Meeting ~ Council Chambers ~ Workshop 6:00 p.m. Regular 7:00 p.m. 18-05326. Presentation, possible action, and discussion regarding an update on the following item: *A Rezoning for approximately 21 acres located at 15135 FM 2154 from PDD Planned Development District to WRS Wellborn Restricted Suburban. The Planning & Zoning Commission heard this item on July 19, 2018, and voted (6-0) to recommend approval. The City Council heard this item on August 9, 2018, and voted (7-0) to approve the request. 18-05417. Page 1 College Station, TX Printed on 8/10/2018 August 16, 2018Planning and Zoning Commission Workshop Meeting Agenda - Final 8. Discussion, review and possible action regarding the following meetings: Design Review Board, BioCorridor Board. 9. Discussion and possible action on future agenda items - A Planning & Zoning Member may inquire about a subject for which notice has not been given. A statement of specific factual information or the recitation of existing policy may be given. Any deliberation shall be limited to a proposal to place the subject on an agenda for a subsequent meeting. 10. Adjourn. The Commission may adjourn into Executive Session to consider any item listed on this agenda if a matter is raised that is appropriate for Executive Session discussion. An announcement will be made of the basis for the Executive Session discussion. I certify that the above Notice of Meeting was posted at College Station City Hall, 1101 Texas Avenue, College Station, Texas, on August 10, 2018 at 5:00 p.m. _____________________ City Secretary This building is wheelchair accessible. Persons with disabilities who plan to attend this meeting and who may need accommodations, auxiliary aids, or services such as interpreters, readers, or large print are asked to contact the City Secretary’s Office at (979) 764-3541, TDD at 1-800-735-2989, or email adaassistance@cstx.gov at least two business days prior to the meeting so that appropriate arrangements can be made. If the City does not receive notification at least two business days prior to the meeting, the City will make a reasonable attempt to provide the necessary accommodations. Penal Code § 30.07. Trespass by License Holder with an Openly Carried Handgun. "Pursuant to Section 30.07, Penal Code (Trespass by License Holder with an Openly Carried Handgun) A Person Licensed under Subchapter H, Chapter 411, Government Code (Handgun Licensing Law), may not enter this Property with a Handgun that is Carried Openly." Codigo Penal § 30.07. Traspasar Portando Armas de Mano al Aire Libre con Licencia. “Conforme a la Seccion 30.07 del codigo penal (traspasar portando armas de mano al aire libre con licencia), personas con licencia bajo del Sub-Capitulo H, Capitulo 411, Codigo de Gobierno (Ley de licencias de arma de mano), no deben entrar a esta propiedad portando arma de mano al aire libre.” Page 2 College Station, TX Printed on 8/10/2018   Page 1 of 4    2018 Planning & Zoning Commission Plan of Work Comprehensive Plan Items UDO & Comprehensive Plan Annual Review Summary: Review of adopted UDO amendments and a summary of the implementation of adopted master plans and neighborhood, district, and corridor plans, namely: Central College Station, Eastgate, Southside Area, Wellborn Community, and South Knoll Area neighborhood plans, and Bicycle, Pedestrian & Greenways, Parks and Recreation, Water, Waste Water, Medical District, and Economic Development master plans. Project Dates: Staff Assigned: P&DS Staff Anticipated Completion: On-Going 2018 Existing Conditions Report Summary: Develop and adopt the 2018 Existing Conditions Report in preparation of the 10-Year Comprehensive Plan Update Project Dates: Staff Assigned: Justin Golbabai, P&DS Staff Anticipated Completion: Fall 2018 10-Year Comprehensive Plan Update Summary: Begin the first phases of updating the 2009 Comprehensive Plan. This phase will include forming a joint City Council-P&Z Comprehensive Plan Subcommittee, selecting consultants, and planning for community outreach efforts. Project Dates: Staff Assigned: Justin Golbabai, P&DS Staff Anticipated Initiation: Bicycle, Pedestrian and Greenways Master Plan Update Summary: Bring additional updates to the Planning and Zoning Commission as the Master Plan update moves forward. Project Dates: 4/19/18: P&Z Commission recommended approval of a Comprehensive Plan Amendment updating the Bicycle, Pedestrian, and Greenways Master Plan. 5/14/18: City Council adopted the Comprehensive Plan Amendment updating the Bicycle, Pedestrian, and Greenways Master Plan. Staff Assigned: Venessa Garza Completed: May 14, 2018   Page 2 of 4    Neighborhood Integrity Items Neighborhood Conservation Overlay and Student Housing in Established Single- Family Neighborhoods Community Meeting Summary: Conduct a community outreach meeting to obtain neighborhood, developer, and community feedback on potential options to provide more options and flexibility to the Neighborhood Conservation Overlay (NCO), as well as obtain feedback on other options to manage student housing in single-family neighborhoods, such as more flexibility for Accessory Dwelling Units (ADUs) and changing the off-street parking and drainage requirements. Report findings to P&Z and Council for direction on possible ordinance amendments. Project Dates: 4/30/18: Two community meeting to be held discussing possible changes to accessible living quarters, single-family on-site parking, single- family height protection, the Neighborhood Conservation Overlay, and a middle housing zoning district. An online survey covering these same topics will also open from April 30th – May 14th. 6/21/18: Anticipated P&Z Presentation of neighborhood workshop survey results for accessory living quarters, single-family on-site parking, and single-family height protection (LS & PAZ). 6/28/18: Anticipated City Council Presentation of neighborhood workshop survey results for accessory living quarters, single-family on-site parking, and single-family height protection (LS & PAZ). 7/5/18: P&Z Presentation of neighborhood workshop survey results for the neighborhood conservation overlay and middle housing (JG). 7/12/18: City Council Presentation of neighborhood workshop survey results for the neighborhood conservation overlay and middle housing (JG). 8/2/18: Ordinance amendment presentation to P&Z Commission on SF Height Protection (LS). 8/9/18: Follow-up City Council Presentation of neighborhood workshop survey results for the neighborhood conservation overlay and middle housing (JG). 8/16/18: Anticipated ordinance amendments to P&Z for Single-Family Parking (RL). 9/6/18: Anticipated ordinance amendments to P&Z for Accessory Living Quarters (RL). 9/13/18: Anticipated ordinance amendments to City Council for Accessory Living Quarters and Single-Family Parking (RL). 9/20/18: Anticipated revised ordinance amendment presentation to P&Z Commission on SF Height Protection (MH). 10/11/18: Anticipated ordinance amendment presentation to City Council on SF Height Protection (MH). Staff Assigned: Justin Golbabai, Jenifer Paz, Lance Simms, Molly Hitchcock, Rachel Lazo Anticipation Initiation: April 30, 2018   Page 3 of 4    UDO Regulatory Items Evaluation of UDO Regulations Summary: Project Dates: Continue review of UDO requirements that add minimal value as identified by staff and consider opportunities to reduce regulations and streamline processes. Staff Assigned: P&DS Staff Anticipated Initiation: Sign Ordinance Revisions Summary: Review and update the City’s sign ordinance in light of the recent Supreme Court decision regarding sign regulations based upon content. Project Dates: Staff Assigned: Molly Hitchcock, Rachel Lazo & Legal Anticipated Completion: Winter 2018 Non-Residential Landscaping Requirements Summary: Adopt an ordinance updating the city’s landscaping requirements (including streetscaping and buffer standards) and include options for water-conserving landscaping. Project Dates: 5/17/18: P&Z Commission consideration of an ordinance amendment updating the City’s landscaping requirements. 6/14/18: City Council adopted an ordinance amendment updating the City’s landscaping requirements. Staff Assigned: Rachel Lazo and Jade Broadnax Completed: June 14, 2018 On-Going Items Economic Development Updates Summary: Receive regular updates from the Economic Development Department. Receive a presentation and discussion on “fast-tracking” reviews for Economic Development projects that have a significant economic impact. Project Dates: 4/19/2018: Economic Development update given on Spring Creek Business Park (JP). 8/16/2018: Economic Development Update Staff Assigned: Economic Development Anticipated Completion: On-Going   Planning Performance Measures Summary: Develop and regularly report on the “top three” performance indicators. Project Dates: Staff Assigned: Justin Golbabai Anticipated Completion: On-Going     Page 4 of 4    Semi-Annual Review of Pre-Application Conference Surveys Summary: Provide an update on the survey results from the Pre-Application Conference process. Project Dates: 6/7/18: Provide an update on the status of the PAC meeting process and implementation of the PAC survey. (JG) Staff Assigned: Justin Golbabai Anticipated Completion: On-Going   Impact Fees Summary: Provide a semi-annual update on impact fees, to include impact fee collections and planned projects. Project Dates: 5/3/2018: P&Z Presentation on the Impact-Fee Semi-Annual Report. 5/24/2018: City Council Presentation the Impact-Fee Semi-Annual Report. Staff Assigned: Carol Cotter Anticipated Completion: On-Going   Educational/Informational Items City of Bryan Update Summary: Hear a presentation from the City of Bryan to discuss areas of mutual concern and partnership opportunities across jurisdictional boundaries. Project Dates: Staff Assigned: Anticipated Completion: October 2018   Planning and Zoning Commission Regular College Station, TX Meeting Agenda - Final - Amended City Hall 1101 Texas Ave College Station, TX 77840 The City Council may or may not attend the Planning & Zoning Commission Regular Meeting. City Hall Council Chambers7:00 PMThursday, August 16, 2018 1. Call meeting to order. 2. Pledge of Allegiance. 3. Hear Citizens. At this time, the Chairman will open the floor to citizens wishing to address the Commission on issues not already scheduled on tonight's agenda. The citizen presentations will be limited to three minutes in order to accommodate everyone who wishes to address the Commission and to allow adequate time for completion of the agenda items. The Commission will receive the information, ask city staff to look into the matter, or will place the matter on a future agenda for discussion. (A recording is made of the meeting; please give your name and address for the record.) All matters listed under Item 4, Consent Agenda, are considered routine by the Commission and will be enacted by one motion. These items include preliminary plans and final plats, where staff has found compliance with all minimum subdivision regulations. All items approved by Consent are approved with any and all staff recommendations. There will not be separate discussion of these items. If any Commissioner desires to discuss an item on the Consent Agenda it will be moved to the Regular Agenda for further consideration. 4. Consent Agenda Consideration, possible action, and discussion to approve meeting minutes. *August 2, 2018 ~ Workshop *August 2, 2018 ~ Regular 18-05274.1 August 2 2018 Workshop August 2 2018 Regular Attachments: Consideration, possible action, and discussion on Absence Requests from meetings. *Bill Mather ~ August 16, 2018 18-05284.2 Bill MatherAttachments: Regular Agenda Page 1 College Station, TX Printed on 8/13/2018 August 16, 2018Planning and Zoning Commission Regular Meeting Agenda - Final - Amended 5. Consideration, possible action, and discussion on items removed from the Consent Agenda by Commission action. Presentation, possible action, and discussion regarding waiver requests to the Unified Development Ordinance Section 8.8 Requirements for Park Land Dedication and a presentation, possible action, and discussion regarding a Preliminary Plan for Southern Pointe Subdivision consisting of 1,994 single-family lots, two commercial lots, one urban lot, a school site, a fire station site, and parkland lots on approximately 553 acres located at 17529 State Highway 6 South, generally located north of Peach Creek Cut-Off Road and west of Pipeline Road in the City's Extra-Territorial Jurisdiction, more generally known as Texas World Speedway. Case #PP2018-000012 18-05246. Sponsors:Hovde Staff Report waiver request 2 Vicinity Map, SAM, and Aerial Application Phasing Exhibit Preliminary Plan Attachments: Presentation, possible action, and discussion regarding waiver requests to the Unified Development Ordinance Section 8.3.H.2 'Platting and Replatting in Older Subdivsions' and a public hearing, presentation, possible action, and discussion on a Final Plat for Woodson Village Third Installment Block 7 Lots 16R & 17R being a replat of Woodson Village Third Installment Block 7 Lots 16 - 17 & 4' of 18 consisting of 2 single family lots on approximately 0.47 acres located at 1200 Goode Dr. Case #FP2018-000002. 18-05237. Sponsors:Broadnax Staff Report Waiver Request Vicinity, Aerial, and SAM Application Replat Attachments: Public hearing, presentation, possible action, and discussion regarding an ordinance amendment to Appendix A, “Unified Development Ordinance,” Section 7.3.H “Number of Off-Street Parking Spaces Required”. Case #ORDA2018-000010. (Final action on this item is scheduled for the September 13, 2018 City Council meeting- 18-05338. Page 2 College Station, TX Printed on 8/13/2018 August 16, 2018Planning and Zoning Commission Regular Meeting Agenda - Final - Amended subject to change) Sponsors:Lazo Memo Section 7.3.H Redlines Attachments: 9. Discussion and possible action on future agenda items – A Planning & Zoning Member may inquire about a subject for which notice has not been given. A statement of specific factual information or the recitation of existing policy may be given. Any deliberation shall be limited to a proposal to place the subject on an agenda for a subsequent meeting. 10.Adjourn The Commission may adjourn into Executive Session to consider any item listed on this agenda if a matter is raised that is appropriate for Executive Session discussion. An announcement will be made of the basis for the Executive Session discussion. I certify that the above Notice of Meeting was posted at College Station City Hall, 1101 Texas Avenue, College Station, Texas, on August 13, 2018 at 12:00 p.m. _____________________ City Secretary This building is wheelchair accessible. Persons with disabilities who plan to attend this meeting and who may need accommodations, auxiliary aids, or services such as interpreters, readers, or large print are asked to contact the City Secretary’s Office at (979) 764-3541, TDD at 1-800-735-2989, or email adaassistance@cstx.gov at least two business days prior to the meeting so that appropriate arrangements can be made. If the City does not receive notification at least two business days prior to the meeting, the City will make a reasonable attempt to provide the necessary accommodations. Penal Code § 30.07. Trespass by License Holder with an Openly Carried Handgun. "Pursuant to Section 30.07, Penal Code (Trespass by License Holder with an Openly Carried Handgun) A Person Licensed under Subchapter H, Chapter 411, Government Code (Handgun Licensing Law), may not enter this Property with a Handgun that is Carried Openly." Codigo Penal § 30.07. Traspasar Portando Armas de Mano al Aire Libre con Licencia. “Conforme a la Seccion 30.07 del codigo penal (traspasar portando armas de mano al aire libre con licencia), personas con licencia bajo del Sub-Capitulo H, Capitulo 411, Codigo de Gobierno (Ley de licencias de arma de mano), no deben entrar a esta propiedad portando arma de mano al aire libre.” Page 3 College Station, TX Printed on 8/13/2018 August 2, 2018 P&Z Workshop Meeting Minutes Page 1 of 2 MINUTES PLANNING & ZONING COMMISSION Workshop Meeting August 2, 2018 6:30 p.m. CITY HALL COUNCIL CHAMBERS College Station, Texas COMMISSIONERS PRESENT: Jane Kee, Casey Oldham, Johnny Burns, Bill Mather, Jeremy Osborne, Elianor Vessali and Dennis Christiansen CITY COUNCIL MEMBERS PRESENT: John Nichols CITY STAFF PRESENT: Lance Simms, Molly Hitchcock, Carol Cotter, David Coleman, Alaina Helton, Rachel Lazo, Laura Gray, Alma Guerra, Adam Falco, Troy Rother, Eric Chafin and Kristen Hejny 1.Call the meeting to order. Chairperson Kee called the Workshop Meeting to order at 6:31 p.m. 2.Discussion of consent and regular agenda items. There was general discussion on Regular Agenda Item #9. 3. Discussion of new development applications submitted to the City. New Development Link: www.cstx.gov/newdev There was no discussion. 4.Discussion of Minor and Amending Plats approved by Staff. *Final Plat ~ Minor Replat ~ Redmond Terrace Subdivision Block 4, Lot 21-R ~ Case #FPCO2018- 000004 There was no discussion. 5. Presentation, possible action, and discussion regarding the consideration of the 2018 P&Z Plan of Work. Planning Administrator Golbabai was available to give updates on such items as the 2:1 Height Restriction, Middle Housing and the Neighborhood Conservation Overlay. 6. Presentation, possible action, and discussion regarding the P&Z Calendar of Upcoming Meetings. *Thursday, August 9, 2018 ~ City Council Meeting ~ Council Chambers ~ Workshop 5:00 p.m. and Regular 6:00 p.m. (Liaison – Kee) *Thursday, August 16, 2018 ~ P&Z Meeting ~ Council Chambers ~ Workshop 6:00 p.m. and Regular August 2, 2018 P&Z Workshop Meeting Minutes Page 2 of 2 7:00 p.m. *Thursday, August 23, 2018 ~ City Council Meeting ~ Council Chambers ~ Workshop 5:00 p.m. and Regular 6:00 p.m. (Liaison – Oldham) *Thursday, September 6, 2018 ~ P&Z Meeting ~ Council Chambers ~ Workshop 6:00 p.m. and Regular 7:00 p.m. 7.Presentation, possible action, and discussion regarding an update on the following item: *An Ordinance Amendment amending Appendix A, Membership and Terms for the Bicycle, Pedestrian & Greenways Advisory Board, Planning & Zoning Commission and Design Review Board. The Planning & Zoning Commission heard this item on July 19, 2018, and voted (6-0) to recommend approval. The City Council heard this item on July 26, 2018, and voted (6-0) to approve the request. 8. Discussion, review and possible action regarding the following meetings: Design Review Board, Bio Corridor Board. There was no discussion. 9. Discussion and possible action on future agenda items - A Planning & Zoning Member may inquire about a subject for which notice has not been given. A statement of specific factual information or the recitation of existing policy may be given. Any deliberation shall be limited to a proposal to place the subject on an agenda for a subsequent meeting. Commissioner Mather asked for an update on utility infrastructure in aging areas. Chairperson Kee asked for an update on Regular Agenda Item #8 regarding impact fee credits. 10. Adjourn. The meeting was adjourned at 6:50 p.m. Approved: Attest: ______________________________ ________________________________ Jane Kee, Chairman Kristen Hejny, Admin. Support Specialist Planning & Zoning Commission Planning & Development Services August 2, 2018 P&Z Regular Meeting Minutes Page 1 of 5 MINUTES PLANNING & ZONING COMMISSION Regular Meeting August 2, 2018 7:00 p.m. CITY HALL COUNCIL CHAMBERS College Station, Texas COMMISSIONERS PRESENT: Jane Kee, Casey Oldham, Johnny Burns, Bill Mather, Jeremy Osborne, Elianor Vessali and Dennis Christiansen CITY COUNCIL MEMBERS PRESENT: John Nichols CITY STAFF PRESENT: Lance Simms, Molly Hitchcock, Carol Cotter, David Coleman, Alaina Helton, Rachel Lazo, Laura Gray, Alma Guerra, Adam Falco, Troy Rother, Eric Chafin and Kristen Hejny 1. Call Meeting to Order Chairperson Kee called the meeting to order at 7:02 p.m. 2. Pledge of Allegiance 3. Hear Citizens Ken Tripp, Nantucket Subdivision, College Station, was available to address the Commission regarding flooding, drainage issues, stagnant water conditions, and running water under FM 2154 (Wellborn Road). 4. Consent Agenda 4.1 Consideration, possible action, and discussion to approve meeting minutes. *July 19, 2018 ~ Workshop *July 19, 2018 ~ Regular Commissioner Christiansen motioned to approve the Consent Agenda. Commissioner Osborne seconded the motion, motion passed (7-0). Regular Agenda 5. Consideration, possible action, and discussion on items removed from the Consent Agenda by Commission Action. No items were removed. 6. Public hearing, presentation, possible action, and discussion regarding an ordinance amending Appendix A, “Unified Development Ordinance,” Article 4, “Zoning Districts,” Section 4.2 “Official Zoning Map,” of the Code of Ordinances of the City of College Station, Texas by changing the zoning district boundaries from R Rural and GS General Suburban to GC General Commercial on approximately 16.9 acres of land generally located at the southeast intersection of General Parkway and Holleman Drive South, along Old Wellborn Road. Case #REZ2018-000011 (Note: Final action August 2, 2018 P&Z Regular Meeting Minutes Page 2 of 5 regarding this item will be considered at the August 23, 2018 City Council meeting – subject to change.) Staff Planner Lazo presented the Rezoning to the Commission and recommended approval with the condition that the development does not exceed 198 trips in the P.M. peak hour, until a second point of access is provided. Commissioner Christiansen asked where the capacity restraint intersection control area is for this property. Graduate Engineer II Armstrong stated that the control area used for the Traffic Impact Analysis (TIA) was the intersection of General Parkway and Holleman Drive. Commissioner Mather asked if the trip generation would increase with the rezoning. Chairperson Kee stated that the trip generation would increase based upon the use of the property. Commissioner Oldham asked for the penalty for the breach of trips per day. Staff Planner Lazo stated the TIA would be reassessed at each site plan submitted for the development. Applicant, Joe Schultz, Schultz Engineering, was available to elaborate on the TIA for the development. Chairperson Kee opened the public hearing. Teresa Hopkins, Holleman Drive South, College Station, asked for clarification on the trip generation and where the extra outage of traffic would be placed once the trip max was reached. Chairperson Kee closed the public hearing. Staff Planner Lazo stated that a second point of access would be acquired once the 198 threshold of trips is met for the development. Commissioner Vessali asked for clarification on the mitigation of traffic once the 198 trips threshold is met. Staff Planner Lazo stated that there is a thoroughfare shown in this area that could be utilized along with utilizing public ways. Commissioner Oldham motioned to recommend approval of the Rezoning with the listed condition of trip generation. Commissioner Burns seconded the motion, motion passed (7-0). 7.Public hearing, presentation, possible action, and discussion regarding an ordinance amending the Comprehensive Plan – Future Land Use & Character Map from Suburban Commercial to Urban for approximately 11.1 acres located on the west side of Turkey Creek Road, approximately 500 feet south of HSC Parkway. Case #CPA2018-000002 (Note: Final action regarding this item will be considered at the August 23, 2018 City Council meeting – subject to change.) August 2, 2018 P&Z Regular Meeting Minutes Page 3 of 5 Senior Planner Helton presented the Comprehensive Plan Amendment to the Commission and recommended approval. Chairperson Kee opened the public hearing. Don Gilman, 1205 Brunswick, College Station spoke with concerns about road development and upkeep in the area. Chairperson Kee closed the public hearing. Senior Engineer II Rother was available to speak on Capital Projects for the area. Mr. Rother stated that there are currently no plans for this area through the City of College Station or Texas Department of Transportation. Mr. Rother further explained that areas are owned by TXDOT, Texas A&M University and the City of College Station. Commissioner Oldham asked if this tract lies within the Inter-Local Agreement (ILA) area. Director of Planning & Development Simms stated that this property is not located within the ILA. Commissioner Oldham motioned to recommend approval of the Comprehensive Plan Amendment. Commissioner Christiansen seconded the motion, motion passed (7-0). 8. Public hearing, presentation, possible action, and discussion regarding an ordinance amending Appendix A, “Unified Development Ordinance,” Section 12-4.2, “Official Zoning Map,” of the Code of Ordinances of the City of College Station, Texas, by changing the zoning district boundaries from Rural to Multi-Family on approximately 11.1 acres located on the west side of Turkey Creek Road, approximately 500 feet south of HSC Parkway. Case #REZ2018-000009 (Note: Final action regarding this item will be considered at the August 23, 2018 City Council meeting – subject to change) Senior Planner Helton presented the Rezoning to the Commission and recommended approval with the condition that a right turn lane be constructed on the east bound approach of the F&B Road and FM 2818 intersection, to help mitigate traffic added. Commissioner Mather inquired about a turn lane. Senior Planner Helton stated that a turn lane would be required within the right-of-way. Senior Engineer II Rother stated that a turn lane will be constructed by the developer. Applicant Joe Schultz, Schultz Engineering, was available to speak on the Rezoning and requested that the recommendation from the Commission does not include the TIA condition. Chairperson Kee opened the public hearing Don Gillman, 1205 Brunswick, College Station, spoke with concerns of traffic and roadways in the area. August 2, 2018 P&Z Regular Meeting Minutes Page 4 of 5 Chairperson Kee closed the public hearing. Chairperson Kee asked about impact fee collection on the development. City Engineer Cotter stated there are no planned CIP projects for this area. Senior Engineer II Rother was available to present additional areas that have made similar intersection improvements. There was general discussion regarding the turn lane and impact fees for the development. Commissioner Osborne motioned to recommend approval of the Rezoning without the condition suggested by staff. Commissioner Burns seconded the motion, motion passed (5-2). 9. Public hearing, presentation, possible action, and discussion regarding an ordinance amending Appendix A, “Unified Development Ordinance,” Article 2, “Development Review Bodies,” Section 2.8, “Administrator”; Article 3, “Development Review Procedures,” Section 3.12, “Building Permit” and Section 3.13, “Certificate of Occupancy”; Article 5, “District Purpose Statements and Supplemental Standards”, Section 5.2 “Residential Dimensional Standards”; Article 7, “General Development Standards”, Section 7.3 “Off-Street Parking Standards”, Section 7.6 “Landscaping and Tree Protection”, and Section 7.10 “Non-Residential Architectural Standards; and Article 8, “Subdivision Design and Improvements,” Section 8.3. “General Requirements and Minimum Standards of Design for Subdivisions within the City Limits”, of the Code of Ordinances of the City of College Station, Texas, to correct minor text omissions, correct an outdated reference, and address clerical errors. Case #ORDA2018-000007. (Note: Final action regarding this item will be considered at the August 23, 2018 City Council meeting - subject to change) Staff Planner Gray presented the Ordinance Amendment to the Commission and recommended approval. Chairperson Kee opened the public hearing No one spoke. Chairperson Kee closed the public hearing. Commissioner Christiansen motioned to recommend approval of the Ordinance Amendment. Commissioner Vessali seconded the motion, motion passed (5-0). Item #10 was heard before item #9. 10. Public hearing, presentation, possible action, and discussion regarding an ordinance amending Appendix “A”, “Unified Development Ordinance,” Section 7.2.H, “Height,” of the Code of Ordinances of the City of College Station, Texas. Case #ORDA2018-000008 (Note: Final action regarding this item will be considered at the August 23, 2018 City Council meeting – subject to change) Director of Planning & Development Services Simms presented the Ordinance Amendment to the Commission and recommended approval. August 2, 2018 P&Z Regular Meeting Minutes Page 5 of 5 Chairperson Kee asked for clarification on partial exceptions. Director Simms stated that only the structures near the setbacks have to meet the requirement. Commissioner Mather asked for the reason why the house is not measured by eave height. Director Simms stated that there is a definition of building height and eave height. Chairperson Kee opened the public hearing. Veronica Morgan, Mitchell & Morgan Engineers, presented concerns about complex roofing and setbacks, to the Commission. Commissioner Oldham left the meeting at 8:45 p.m. Chairperson Kee closed the public hearing. Commissioner Mather motioned to defer action on this item to the second Planning & Zoning meeting in September. Commissioner Christiansen seconded the motion. Commissioner Mather stated that staff continue the protection of the single family home using a simplified 2:1 slope that the height would fall under. Commissioner Osborne suggested an overriding setback greater than 20’ be included. The motion passed (6-0). Commissioner Mather left the meeting at 8:54 p.m. 11. Discussion and possible action on future agenda items – A Planning & Zoning Member may inquire about a subject for which notice has not been given. A statement of specific factual information or the recitation of existing policy may be given. Any deliberation shall be limited to a proposal to place the subject on an agenda for a subsequent meeting. There was no discussion. 12. Adjourn The meeting adjourned at 9:01 p.m. Approved: Attest: ______________________________ ________________________________ Jane Kee, Chairman Kristen Hejny, Admin Support Specialist Planning & Zoning Commission Planning & Development Services Absence Request Form For Elected and Appointed Officers Name William R. Mather Request Submitted on 8/3/18 I will not be in attendance at the meeting on 8/16/2018 for the reason specified: (Date) Out of Town Signature Planning & Zoning Commission August 16, 2018 Scale 1,994 single-family lots, two commercial lots, one urban lot, a school and fire station site and parkland on approximately 553 acres. Location 17529 SH-6 S, generally located north of Peach Creek Cut- Off Road and west of Pipeline Road in the City’s Extra- Territorial Jurisdiction (ETJ), more generally known as Texas World Speedway. Applicant Jones & Carter Project Manager Lauren Hovde, AICP Senior Planner lhovde@cstx.gov Project Overview This plan is for the redevelopment of the Texas World Speedway property, the first Municipal Utility District in Brazos County, for a master planned community. It is a revision of the previous Preliminary Plan approved in December 2017. The revision is specifically to revise the phasing of the subdivision and seek a waiver to the dedication of parkland. The previously approved waivers for UDO Section 8.3.E.3.a ‘Street Projections’; Section 8.3.G.2.a ‘Block Length’; Section 8.3.G.2.b ‘Block Length’; Section 8.3.G.2.c ‘Block Length’; Section 8.3.G.4.b ‘Block Perimeter’; Section 8.3.J.2 ‘Access Ways’; and Section 8.3.W ‘Single-Family Residential Parking Requirements for Platting’ will carry with this plan given that changes do not affect the previously approved waivers. Parkland Dedication At the November 8, 2016 Parks & Recreation Advisory Board meeting, the Board recommended approval for the dedication of 31.98 acres of neighborhood parkland and 18.62 acres of community park land. This parkland will be deeded to the City at the time of annexation. Additionally, the Board has approved the use of park development fees to be used for development of trails throughout the subdivision and the development of parkland that is proposed to be dedicated. The Planning & Zoning Commission approved the dedication of the parkland with the approval of the previous Preliminary Plan at their January 5, 2017 meeting. With this Preliminary Plan submittal, the applicant is requesting a waiver to Section 8.8 Requirements to Park Land Dedication, Section 2.A.1, 3-4 regarding the timing of land dedication and financial surety. The applicant has requested that the dedication of land take place with the final platting of ease phase within which the parkland is Preliminary Plan for Southern Pointe PP2018-000012 Planning & Zoning Commission August 16, 2018 contained. In addition, the developer has requested relief from providing a bond, letter of credit, or financial guarantee which is the alternative provided by ordinance. The Park & Recreation Advisory Board recommended approval of this request during their June 2018 meeting. Traffic Impact Analysis Not required Compliant with Comprehensive Plan (including Master Plans) and Unified Development Ordinance Yes Compliant with Subdivision Regulations Yes with the exception of previously approved waivers and the requested waiver mentioned in the overview. Staff Recommendation Staff recommends approval of the Preliminary Plan and requested waiver. The Park & Recreation Advisory Board recommends approval of the parkland dedication request as presented. Supporting Materials 1. Waiver Request 2. Vicinity Map, SAM & Aerial 3. Application 4. Phasing Exhibit 5. Copy of Preliminary Plan SOUTHERN POINTE SUBDIVISION WAVIER REQUEST The proposed Preliminary Plan is in compliance with the applicable Subdivision Regulations contained in the UDO except for the following waiver requests to UDO Section 8.8.C.2.a.1, 3 &4 Land Dedication shown in bold: Section 8.8.C.2. Land Dedication. a. The amount of land to be dedicated for neighborhood park land purposes and for community park purposes shall be as set forth in Appendix I. The total amount of land dedicated for the development shall be dedicated to the City in fee simple: 1) Prior to the issuance of any building permits for multi-family development, 2) Concurrently with the final plat for a single phase development. 3) For a phased development the entire park shall be either platted concurrently with the plat of the first phase of the development or 4) The developer may provide the City with financial security against the future dedication by providing a bond, irrevocable letter of credit, or other alternative financial guarantee suc h as a cash deposit in the amount equal to the number of acres park land required and in a form acceptable to the City. The amount of the financial guarantee shall be the amount of fee in lieu of land dedication as set forth in Appendix I. The financial guarantee will be released to the developer, without interest, upon the filing of the final plat for the subsequent phase that dedicates the required park land. In accordance with the Subdivision Regulations, when considering a waiver the Planning and Zoning Commission should make the following findings to approve the waiver: 1) That there are special circumstances or conditions affecting the land involved such that strict application of the provisions of this chapter will deprive the applicant of the reasonable use of his land; Being located within the City of College Station Extraterritorial Jurisdiction, the park land will not be owned and maintained by the City until the property is annexed. This annexation is not anticipated to occur prior to the full development of Southern Pointe at which time all dedication will be complete. In addition, due to the size of the developing property, it is highly anticipated that Southern Pointe will require additional reconfigurations and revised Preliminary Plans prior to its completion. Delaying the dedication of parkland will allow them greater flexibility for the project as a whole which could be hindered by strict application of the ordinance due to the expansiveness of the property. 2) That the waivers are necessary for the preservation and enjoyment of a substantial property right of the applicant; The request is being made so the developer may make adjustments to the phasing and lot layout of Southern Pointe as the development progresses. If land is dedicated in the beginning, it restricts the ability of the developer to make adjustments to ensure the success of the project. 3) The granting of the waiver will not be detrimental to the public health, safety, or welfare, or injurious to other property in the area, or to the City in administering this chapter; and The granting of the waivers for this development will not be detrimental to the public health, safety, or welfare, or injurious to other property as the development will comply with all other standards and requirements. 4) That the granting of the waivers will not have the effect of preventing the orderly subdivision of other land in the area in accordance with the provisions of this chapter. The requested waivers have no effect on surrounding properties as the development layout is not being changed or impacted. It is intended to provide increased flexibility for the subdivision of land within this development. Texas Board of Professional Engineers Registration No. F 439 | Texas Board of Professional Surveyors Registration No. 10046107 Preliminary Plan Waiver of Subdivision Regulations Project Name: Southern Pointe Preliminary Plan Applicant Info: Jones|Carter Alex Pfefferkorn DATE: June 20, 2018 PRELIMINARY PLAN REQUESTED WAIVER TO SUBDIVISION REGULATIONS SECTION 8.8 – REQUIREMENTS FOR PARKLAND DEDICATION. 2. LAND DEDICATION. A. 3 AND 4 AS STATED BELOW: 2. Land Dedication. a. The amount of land to be dedicated for neighborhood park land purposes and for community park purposes shall be as set forth in Appendix I. The total amount of land dedicated for the development shall be dedicated to the City in fee simple: 3) For a phased development the entire park shall be either platted concurrently with the plat of the first phase of the development or 4) The developer may provide the City with financial security against the future dedication by providing a bond, irrevocable letter of credit, or other alternative financial guarantee such as a cash deposit in the amount equal to the number of acres park land required and in a form acceptable to the City. The amount of the financial guarantee shall be the amount of fee in lieu of land dedication as set forth in Appendix I. The financial guarantee will be released to the developer, without interest, upon the filing of the final plat for the subsequent phase that dedicates the required park land. JUSTIFICATION FOR WAIVER: The requested waiver allows for the parkland dedication to be dedicated by developed section(s) as per the approved Preliminary Plan of Southern Pointe, instead of all of Southern Pointe’s parkland dedication dedicated with the first development section or the developer providing financial security for future undeveloped section’s parkland dedication. Per the development agreement with the City of College Station, Southern Pointe is to be treated similar as an in-city development. However, Southern Pointe’s parkland will not be owned or maintained by the City of College Station until annexation of Southern Pointe by the City of College Station. Per agreements with the City of College Station, the potential annexation is not to commence until certain conditions have occurred; which is not expected to occur until after full development of Southern Pointe. These conditions are stated below: 1. At least 90% of the Facilities and roads to serve all the developable acreage at full development has been constructed including the water, wastewater treatment, and drainage Facilities and roads. Developable acreage means the total acreage in the District less acreage associated with land uses for roads, utility easements, drainage easements, levee easements, lakes, creaks, rivers, recreational areas, schools, and open space; and 2. The Developer has been reimbursed by the District to the maximum extent permitted by the rules of the TCEQ or the City assumes any obligation for such reimbursement of the District under such rules. 1. There are special circumstances or conditions affecting the land involved such that strict application of the subdivision regulations will deprive the applicant of the reasonable use of his land. The waiver is necessary for the preservation and enjoyment of substantial property rights of the applicant. This development is unique in that it is in Brazos County Municipal Utility District #1 and in the City of College Station ETJ. The City will not take ownership of these parks until annexation occurs. Annexation is not anticipated to occur until the conditions defined in the Special Partnership Agreement (SPA) between the City of College Station and Brazos County MUD #1 occur; which we expect will not occur until after full development. If all the parkland shown on the Preliminary Plan were to be dedicated with the first phase and significant changes were made to the land plan it is likely the location of previously dedicated parkland would hinder changing the land plan and would require the developer to request that some of the parkland be relocated so the land could be used to accommodate the proposed development. Southern Pointe Waiver Request Page 2 Texas Board of Professional Engineers Registration No. 439 | Texas Board of Professional Land Surveying Registration No. 10046101 2. The granting of the waiver will not be detrimental to the public health, safety, or welfare, or injurious to other property in the area, or to the City in administering subdivision regulations. The granting of the waivers for this development will not be detrimental to the public health, safety, or welfare, or injurious to other property as the development will comply with all other standards and requirements, and the developer is required to dedicate all Parkland through the course of this master planned community. No negative impact to the future parkland use for College Station residents is expected by approving this request. 3. The granting of the waiver will not have the effect of preventing the orderly subdivision of other land in the area in accordance with the previsions of the Unified Development Ordinance. The plan for this development has no negative impact and does not affect how the surrounding properties can develop. MAJOR COLLECTORKATIE LOOPSOUTHERN POINTE PARKWAYCOLBERT LANEPETAL LANESHUBATA DRIVECAMDEN LANEAMORY DRIVECHATOM DRIVECONOLE COURTKINNEY DR I V E CHATOM DRIVECHATOM D R I V E MATHER PARKWAY BRAXTON DRIVEWEDDINGTON ROADGUNN RIDGE DRIVECROSBY DRIVERISI DRIVEROCKFORD DRIVE SEABRING DRIVE BALDWYN DRIVE LAUREL RIDGE LANE MARIETTA DRIVE GUNN RIDGE DRIVE ROXIE LANE MARIETTA DRIVEQUINLAN DRIVESAMANTHA LANEROCKFORD DRIVE DAYTONA DRIVE SOUTHERN CROSS DRIVE TALLADEGA DRIVE WILKESBORO DRIVE POCONO DRIVE ELDORA DRIVE ELDORA DRIVE ELDORA DRIVEPATRIOT DRIVEDARLINGTON AVENUESPARTAN DRIVECANTON DRIVEVERONA DRIVEPATRIOT DRIVEKENNESAW DRIVEDARLINGTON AVENUEPATRIOT DRIVEKENNESAW DRIVENATCHEZ DRIVEGREENVILLE DRIVERALEI G H D R I V E TIRA D O D R I V E RA L E I G H D R I V ERALEIGH LOOPRA L E I G H C O U R T PR O M E N A D E D R I V EDURANT DRIVEFUL T O N D R I V E ELD O R A D R I V E DAYTONA D R I V E ROCKFOR D D R I V E SOUTHER N C R O S S D R I V E TALLADEGA DRIVE ELDORA DRIVE SOUTHERN POINTE PARKWAYM A T H E R P A R K W A Y KINNEY LOOPPOND A2POND A1POND FPOND EPOND B1POND B2POND CMI N O R C O L L E C T O R POND DTexas Board of Professional Engineers Registration No. F-439150 Venture Dr., Suite 100 • College Station, Texas 77845 • 979.731.8000SOUTHERN POINTEOVERALL PHASING EXHIBITBRAZOS COUNTY, TEXASJULY 25, 2018SECTION 1 (103 LOTS):1. STREET ACCESS: MATHER PARKWAY (1) & ELDORADRIVE (2)2. GRAVITY SEWER TO LIFT STATION.3. STORM SEWER TO POND D4. WATER SUPPLY 12" FROM 8" ON NORTHWESTCORNER OF PROPERTY.5. NO TRACK DEMO.SECTION 1 MAJORTHOROUGH FARESSECTION BOUNDARYCoCS UDO Adequate Street Access.1. One (1) external street connection is required for a street serving asroadway access for thirty (30) or fewer lots.2. When there are more than thirty (30) lots to be served by external streetconnections, a minimum of two (2) street connections to external pavedpublic streets shall be required. The Commission may allow a RemoteEmergency Access where development phasing or constraints of the landprevent the provision of a second street connection. Notwithstandingthe foregoing, two (2) street connections to external paved public streetsshall be required when one hundred (100) or more lots are served.3. Three (3) street connections to external paved public streets may berequired by the Commission when two hundred (200) or more lots areserved.4. Where more than one (1) external street connection is required, at leastone (1) external street connection shall not be located over a potentialhazard such as a high-pressure gas line or a creek where the onehundred-year floodplain overtops the street, regardless of itsclassification.Phasing Alternatives:1. Section 1B can be constructed any time after Section 1A.2. Sections 6 & 7 can be constructed any time after Section 2.3. Sections 3B & 3C can be constructed any time after Section 3A.4. Sections 9A & 9B can be combined to form Section 9.5. Section 10B & 10C can be constructed any time after Section 10A.6. Sections 9A and 10A can be constructed any time after Section 3A as longas they are combined and the temporary access road from SH 6 FrontageRd to Chatom Drive is constructed with this phase.7. Section 11 can be constructed any time after Section 8.8. Sections 9B, 12 & 14 can be constructed any time after Section 3A as longas Detention Pond F, the north end of Mather Parkway, and the sanitarythat runs through Section 11, 16 & 20 are constructed beforehand.9. Section 16 can be constructed any time after Section 11.10. Sections 18, 19 & 20 can be constructed in any order as long as thedetention pond for this drainage area is constructed with the firstsection.11. School Site can be constructed any time after Section 5. School Site canbe constructed after Section 3A as long as the adjacent roads androundabout are constructed before the School Site is constructed.SECTION100SECTION101SECTION400SECTION401SECTION301SECTION300SECTION200SECTION701SECTION700SECTION201SECTION202SECTION203SECTION500SECTION600SECTION802SECTION801SECTION800SECTION601SECTION503SECTION501SECTION502SECTION505SECTION504SECTION602SECTION803LOT COUNTSECTION 100 - 150SECTION 101 - 57SECTION 200 - 154SECTION 202 - 112SECTION 301 - 136SECTION 300 - 98SECTION 400 - 84SECTION 401 - 56SECTION 500 - 104SECTION 501 - 100SECTION 502 - 35SECTION 503 - 54SECTION 504 - 88SECTION 600 - 85SECTION 601 - 102SECTION 602 - 51SECTION 700 - 89SECTION 800 - 51SECTION 701 - 117SECTION 801 - 99SECTION 802 - 110SECTION 803 - 62TOTAL - 1,994Phasing Notes:1. All hundred series sections are to be platted in sequential order. I.e.Section 100 is to be platted before Section 200. Section 200 is to beplatted before Section 300.2. Once a certain hundred series section is platted, all subsequent sectionswithin that same hundred series can be platted any time there after. I.e.Section 101 does not need to be platted before Section 200 and Section201 does not need to be platted before Section 300.3. Mather Parkway from Peach Creek Cut-Off Road to Darlington Avenuecan be constructed any time after Section 200 has been platted.4. Section 203 and Section 204 commercial sites can be platted at any time.5. The current footnotes apply.SECTION204 FU T U R E M A J O R C O L L E C T O R R O W ( 8 0 ' ) COMMON AREA 8D (8.32 ACRE DETENTION POND) COMMON AREA 4G (4.32 ACRE DETENTION POND) COMMON AREA 2E (2.65 ACRE DETENTION POND) COMMON AREA 2D (2.49 ACRE DETENTION POND) COMMON AREA 9E (8.70 ACRE DETENTION POND) COMMON AREA 2F (2.57 ACRE DETENTION POND) COMMON AREA 2G (2.90 ACRE DETENTION POND) COMMON AREA 7C (5.32 ACRE DETENTION POND) COMMON AREA 2A 30' PUE/PAE COMMON AREA 2H 15' PAE COMMON AREA 2J 30' PUE/PAE COMMON AREA 6A 15' PAE COMMON AREA 6B 15' PAE COMMON AREA 7B 15' PAE COMMON AREA 7A 15' PAE COMMON AREA 11A 15' PAE COMMON AREA 5B 15' PAE COMMON AREA 5A 15' PAE COMMON AREA 4H 15' PAE COMMON AREA 8F 15' PAE COMMON AREA 3A 15' PAE COMMON AREA 8A 15' PAE COMMON AREA 8E VARIABLE WIDTH PAE COMMON AREA 2C 15' PAE COMMON AREA 6C 30' PUE/PAE COMMON AREA 3B VARIABLE WIDTH PUE/PAE COMMON AREA 8B VARIABLE WIDTH PUE/PAE COMMON AREA 9D 30' PUE/PAE COMMON AREA 9C 30' PUE/PAE COMMON AREA 9B 30' PUE/PAE COMMON AREA 9A 30' PUE/PAE COMMON AREA 4F 30' PUE/PAE COMMON AREA 4E 30' PUE/PAE COMMON AREA 2B 30' PUE/PAE PARKLAND A NEIGHBORHOOD PARK 8.71 ACRES PARKLAND B COMMUNITY PARK 18.62 ACRES PARKLAND D NEIGHBORHOOD PARK 8.58 ACRES P A R K L A N D F N E I G H B O R H O O D P A R K 1 0 . 5 6 A C R E S P A R K L A N D J N E I G H B O R H O O D P A R K 1. 4 1 A C R E S PARKLAND E NEIGHBORHOOD PARK 1.65 ACRES COMMON AREA 4A 15' PAE COMMON AREA 8G 15' PAE COMMON AREA 4B 15' PAE COMMON AREA 4D 15' PAE COMMON AREA 4C 15' PAE COMMON AREA 8H 30' PUE/PAE COMMON AREA 8C 30' PUE/PAE PARKLAND C NEIGHBORHOOD PARK 1.07 ACRES S 48°42'01" WN 13°22'46" WN 48°06'49" E N 07° 0 9' 0 7 " E N 10° 3 1' 1 4 " E S 10° 3 1 ' 1 4 " W S 07° 0 9' 0 7 " W S 48°06'49" W S 13°22'46" ECLAJON GAS COMPANYVOL. 473, PG. 8760' WIDE EASEMENTCONOLE C O U R T CRO S B Y D R I V E SOUTHERN POINTE PARKWAY DARLINGTON AVENUEKATIE LOOP WEDDINGTON ROAD GUNN RIDGE DRIVEQUI N L A N D R I V E PAT R I O T D R I V E RALEIGH DRIVER A L E I G H L O O P G A I N E S V I L L E D R I V E NE V E U D R I V E SPARTAN DRIVE CANT O N D R I V E SHUBATA DRIVE CAMDEN LANE AMORY DRIVE CHATO M D R I V ECHATOM DRIVEKINNEY DRIVEMATHER PARKWAYKEN N E S A W D R I V E NAT C H E Z D R I V E VERO N A D R I V E RALEIGH COURTELDORA DRIVEPOCONO DRIVEWILKESBORO DRIVETALLADEGA DRIVESOUTHERN CROSS DRIVEROCKFORD DRIVEDAYTONA DRIVEELDORA DRIVEGREENVILLE DRIVEELDORA DRIVE MARIETTA DRIVELAUREL RIDGE LANEBALDWYN DRIVESEBRING DRIVEROCKFORD DRIVERISI DRIVE SAM A N T H A L A N E GUN N R I D G E D R I V E PAT R I O T D R I V E KEN N E S A W D R I V E ELDORA DRIVEPOCONO DRIVEWILKESBORO DRIVETALLADEGA DRIVESOUTHERN CROSS DRIVEROCKFORD DRIVEDAYTONA DRIVEELDORA DRIVEPATRIOT DRIVE DARLINGTON AVENUEDARLINGTON AVENUE MARIETTA DRIVELAUREL RIDGE LANEBALDWYN DRIVEWEDDINGTON ROAD MATHER PARKWAYSOUTHERN POINTE PARKWAY ELDORA DRIVEFULTON DRIVEPROMENADE DRIVESOUTHERN CROSS DRIVEROCKFORD DRIVEDAYTONA DRIVEPETA L L A N E SHUB A T A D R I V E CAM D E N L A N E AMOR Y D R I V E MATCHLINEMATCHLINE MATCHLINE MATCHLINE MATCHLINEMATCHLINEMATCHLINEKINNEY LOOP ROXIE LANEBRAXTON DRIVE SYMBOL & LINE LEGEND PROPERTY/ROW LINE PROPERTY BOUNDARY CITY LIMITS PHASE LINE EASEMENT LINE SHEET MATCHLINE CENTERLINE OF ROAD CONTOUR LINES BLOCK NUMBER LOT NUMBER PHASE NUMBER ACCESS WAY PROPOSED TRAIL SYSTEM Texas Board of Professional Engineers Registration No. F-439 150 Venture Dr., Suite 100 • College Station, Texas 77845 • 979.731.8000 PRELIMINARY PLAN NOT FOR RECORD OF SOUTHERN POINTE o.b.o BRAZOS COUNTY MUD NO.1 552.905 ACRES BRAZOS COUNTY, TEXAS 0 07-01-2016 ORIGINAL SUBMITTAL KEY MAP DEVELOPER: GRID RACEPLEX HOLDINGS, LTD. P.O. BOX 11962 COLLEGE STATION, TEXAS 77842 PROPERTY OWNERS: McALISTER OPPORTUNITY FUND 2012, L.P. 2211 NORFOLK STREET, SUITE 803 HOUSTON, TEXAS 77098 2015 SOPO, LTD. P.O. BOX 11962 COLLEGE STATION, TEXAS 77842 HUNTER GOODWIN ETAL. 1011 LYCEUM CT. COLLEGE STATION, TEXAS 77840GUNN RIDGE DRIVETIRADO DRIVEPETAL LANE COLBERT L A N E NOTES: 1. ACCORDING TO FEMA FLOOD INSURANCE RATE MAPS FOR BRAZOS COUNTY, TEXAS, MAP NUMBER 48041C0350E HAVING A DATE OF 05/16/2012, THIS TRACT IS NOT LOCATED IN A 100-YEAR FLOOD HAZARD AREA. 2. BASIS OF BEARING: NORTH ORIENTATION IS BASED ON GRID NORTH AS ESTABLISHED FROM GPS OBSERVATION. 3. EXISTING GROUND CONTOURS ARE BASED ON CITY OF COLLEGE STATION LIDAR 2012. 4. EXISTING USE OF THIS TRACT IS FOR TEXAS WORLD SPEEDWAY AND ITS FACILITIES. 5. PROPOSED USES ARE COMMERCIAL, INSTITUTIONAL, MULTI-FAMILY, SINGLE-FAMILY, AND OPEN SPACE IN COMPLIANCE WITH THE SIGNED DEVELOPMENT AGREEMENT BETWEEN THE CITY OF COLLEGE STATION AND MCALISTER OPPORTUNITY FUND 2012, L.P. DATED MARCH 12, 2015 (AMENDED NOVEMBER 10, 2016). 6. THE DEVELOPMENT PLAN AGREEMENT BETWEEN THE CITY AND THE DEVELOPER HAS ESTABLISHED AN EFFECTIVE DATE OF MARCH 12, 2015. BASED ON ARTICLE II OF THE DEVELOPMENT AGREEMENT (DA), THE PROPOSED DEVELOPMENT WILL COMPLY WITH THE UNIFIED DEVELOPMENT ORDINANCE OF THE CITY OF COLLEGE STATION AS OF THE "EFFECTIVE" DATE OF THE DA. THEREFORE, THE EFFECTIVE UDO IS THE FEBRUARY 10, 2015, SUPPLEMENT 4 (EFFECTIVE UDO). 7. SETBACK AND BUILDING SEPARATION STANDARDS FOR THE FOLLOWING ZONING DISTRICTS ARE ESTABLISHED PER SECTION 12-5.4 OF THE EFFECTIVE UDO. THE APPLICABLE ZONING DISTRICTS PER THE DEVELOPMENT AGREEMENT ARE AS FOLLOWS: a. COMMERCIAL (GENERAL COMMERCIAL) b. INSTITUTIONAL (SCHOOL) c. MULTI-FAMILY (URBAN) 8. SETBACK AND BUILDING SEPARATION FOR GENERAL SUBURBAN IS BASED ON THE DEVELOPMENT AGREEMENT, ARE NOTED BELOW: a. FRONT SETBACK = 20 FEET b. REAR SETBACK = 20 FEET c. SIDE SETBACK = 5 FEET; THE SIDE SETBACK SHALL BE A MINIMUM OF 15 FEET WHEN THE SIDE LOT LINE IS USED FOR THE PURPOSE OF EXTENDING PUBLIC UTILITIES WITHIN AN EASEMENT. d. SIDE STREET SETBACK = 15 FEET 9. PER THE EXECUTED STRATEGIC PARTNERSHIP AGREEMENT (SPA) BETWEEN THE CITY OF COLLEGE STATION AND BRAZOS COUNTY MUNICIPAL UTILITY DISTRICT NO. 1, EXECUTED AUGUST 21, 2015 AND AMENDED NOVEMBER 10, 2016, WATER AND WASTE WATER SERVICE ARE TO BE PROVIDED BY CITY OF COLLEGE STATION. 10. PER THE EXECUTED STRATEGIC PARTNERSHIP AGREEMENT (SPA) BETWEEN THE CITY OF COLLEGE STATION AND BRAZOS COUNTY MUNICIPAL UTILITY DISTRICT NO. 1, EXECUTED AUGUST 21, 2015 AND AMENDED NOVEMBER 10, 2016, THE CITY OF COLLEGE STATION WILL, UPON ACCEPTANCE, OWN AND OPERATE ALL PUBLIC WATER AND PUBLIC SANITARY SEWER FACILITIES IN BRAZOS COUNTY MUNICIPAL UTILITY DISTRICT NO. 1. 11. WATER, SEWER, DRAINAGE AND STREETS WILL BE DESIGNED AND CONSTRUCTED TO THE 2012 EDITION OF THE B/CS UNIFIED DEVELOPMENT GUIDELINES, STANDARDS, AND SPECIFICATIONS. 12. PER THE EXECUTED DEVELOPEMENT AGREEMENT (DA) BETWEEN THE CITY OF COLLEGE STATION AND MCALISTER OPPORTUNITY FUND 2012, LP, EFFECTIVE MARCH 12, 2015, AS AMENDED, STREETS WILL BE CONSTRUCTED BASED ON THE THOROUGHFARE ROAD STANDARDS AS OF THE DATE OF THE AGREEMENT AND THE PROPOSED STREET SECTIONS ON THE PRELIMINARY PLAN ARE SHOWN ACCORDINGLY. 13. STORM WATER RUNOFF WILL BE CAPTURED AND CONVEYED BY A STORM SEWER SYSTEM AND DISCHARGED INTO PROPOSED DRAINAGE SYSTEMS. DETENTION FACILITIES WILL BE CONSTRUCTED TO CONTROL THE PEAK RUNOFF DISCHARGE TO PRE-DEVELOPMENT FLOW RATES PER THE REQUIREMENTS OF THE 2012 EDITION OF THE B/CS UNIFIED DEVELOPMENT GUIDELINES, STANDARDS, AND SPECIFICATIONS. 14. STORM SEWER SYSTEM, INCLUDING DRAINAGE CHANNELS, UNDERGROUND STORMWATER CONVEYANCE SYSTEMS, AND DETENTION PONDS WILL BE MAINTAINED BY BRAZOS COUNTY MUD NO. 1. UPON ANNEXATION, THE MAINTENANCE OF THE DETENTION PONDS WILL BE THE RESPONSIBILITY OF THE HOA UNLESS THE CITY REQUESTS A CONTINUATION OF THE MUD TAXING AUTHORITY FOR THE PURPOSE OF DETENTION POND MAINTENANCE AS SET FORTH IN THE DA. 15. THE OPERATION AND MAINTENANCE OF THE LOCAL STREETS WILL BE BASED ON AN EXECUTED INTER-LOCAL AGREEMENT BETWEEN BRAZOS COUNTY AND BRAZOS COUNTY MUNICIPAL UTILITY DISTRICT NO. 1. 16. THE OPERATION AND MAINTENANCE OF THE MAJOR STREETS WILL BE BASED ON AN EXECUTED INTER-LOCAL AGREEMENT BETWEEN BRAZOS COUNTY AND BRAZOS COUNTY MUNICIPAL UTILITY DISTRICT NO. 1. 17. SIDEWALK MAINTENANCE IS THE RESPONSIBILITY OF THE HOMEOWNERS ASSOCIATION. 18. COMMON AREAS AND PARKLAND WILL BE OWNED AND MAINTAINED BY THE HOMEOWNERS ASSOCIATION. UPON ANNEXATION, THE PARKLAND OWNERSHIP AND MAINTENANCE WILL BE TRANSFERRED TO THE CITY. THE REMAINING COMMON AREAS WILL CONTINUE TO BE OWNED AND MAINTAINED BY THE HOMEOWNERS ASSOCIATION. 19. ALL UTILITY ALIGNMENTS FOR WATER, SANITARY SEWER, AND STORM SEWER ARE SHOWN FOR REFERENCE ONLY AND SUBJECT TO CHANGE. A MASTER HYDRAULIC ANALYSIS FOR EACH SYSTEM WILL BE PROVIDED AT THE FINAL PLATTING STAGE OF EACH PHASE THAT WILL DETERMINE LINE SIZE. 20. ELECTRICAL SERVICE FOR THIS DEVELOPMENT IS PROVIDED BY ENTERGY. 21. COMMON AREAS RESERVED FOR HOMEOWNERS ASSOCIAION WITH A TRAIL SYSTEM WILL BE PLACED IN AN ACCESS EASEMENT IF NOT WHOLLY CONTAINED BY A PUBLIC ACCESS EASEMENT. 22. HOMEOWNERS ASSOCIATION EASEMENT ACTIVITIES AND/OR INFRASTRUCTURE WILL BE REFERENCED IN THE COVENANTS, CONDITIONS, AND RESTRICTIONS OF THE SUBDIVISION. 23. DIMENSIONS SHOWN INTERIOR TO THE LOT, ALONG CURVES, ARE ARC LENGTHS. 24. SIDEWALKS SHOWN ARE BASED ON CITY OF COLLEGE STATION STREET SECTIONS FOR EACH ROAD CLASSIFICATION AS OF THE DATE OF THE DEVELOPMENT AGREEMENT. 25. STREETS TERMINATING AT A FUTURE PHASE SHALL BE CONSTRUCTED WITH A TEMPORARY CUL-DE-SAC IF THE STREET EXCEEDS 100' IN LENGTH OR EXTENDS PAST MORE THAN ONE LOT. 26. SOME UTILITY EXTENSIONS WILL BE NECESSARY THROUGH FUTURE PHASES IN ORDER TO SERVE EARLIER PHASES. 27. PURSUANT TO THE UTILITY AGREEMENT BETWEEN THE CITY FO COLLEGE SATION, TEXAS AND BRAZOS COUNTY MUNICIPAL UTILITY DISTRICT NO. 1, AS AMENDED, SANITARY AND WATER WILL EXTEND OFFSITE TO SERVE DEVELOPMENT. a. OFFSITE SANITARY SEWER WILL BE INSTALLED FOR SERVICE AT LICK CREEK WWTP. b. PUBLIC WATER SUPPLY WILL TIE AT TWO LOCATIONS PER THE JULY 8TH, 2015 FREESE AND NICHOLS SOUTHEAST AREA WATER AND WASTEWATER SYSTEM EVALUATION. THE SOUTHERN POINTE DEVELOPMENT IS PLANNED TO TIE INTO THE EXISTING 12” WATERLINE AT THE CURRENT END OF PEBBLE CREEK PARKWAY AND AN ADDITONAL CONNECTION WILL BE MADE TO THE EXISITNG 8” WATERLINE ON THE EAST SIDE OF SH 6. THE FINAL SIZING OF THIS WATERLINES WILL BE PROVIDED WITH THE WATER DESIGN REPORT TO BE SUBMITTED IN CONJUNCTION WITH THE PHASE 1 PLATTING DOCUMENTS. 28. THE PROPOSED DEVELOPMENT IS LOCATED IN THE CITY OF COLLEGE STATION ETJ. THIS DEVELOPMENT IS BEING REVIEWED AS AN "IN CITY" DEVELOPMENT PER LETTER AGREEMENT SUBMITTED BY DEVELOPER TO THE CITY. 29. PER THE FIRST AMENDMENT TO DEVELOPMENT AGREEMENT DESIGNATING FIRE STATION SITE (DATED NOVEMBER 10, 2016), THE TWO ACRE FIRE STATION OPTION SITE WILL BE GENERALLY LOCATED AS SHOWN ON THIS PRELIMINARY PLAN. 30. TEMPORARY BARRIERS WILL BE INSTALLED ON SOUTHERN POINTE PARKWAY AND LOCATED ON THE EAST SIDE OF THE INTERSECTION OF SOUTHERN POINTE PARKWAY AND ROXIE LANE. THESE BARRIERS ARE TO BE REMOVED WITH THE OFFSITE EXTENSION OF SOUTHERN POINTE PARKWAY. END ROAD SIGNAGE AND BARRIERS IN ACCORDANCE WITH 2011 MUTCD WILL BE INSTALLED AND MAINTAINED BY DEVELOPER/HOA. 31. SIDEWALK WIDTHS WITHIN ACCESS WAYS IS PER THE EFFECTIVE UDO. 32. THE DESIGN OF THE ROUNDABOUT AND LEFT TURN LANES IN MEDIANS WILL BE FINALIZED WITH THE FINAL PLAT. 33. THE ALIGNMENT AND ANGLE OF THE INTERSECTION OF SOUTHERN POINTE PARKWAY AND STATE HIGHWAY 6 WILL BE FINALIZED AT FINAL PLAT. 34. THE FIRE ACCESS EASEMENT ON LOT 5, BLOCK 14, PHASE 2 MUST BE ABANDONED PRIOR TO DEVELOPMENT OF LOT 5. 35. A PIP APPLICATION WILL BE REQUIRED FOR PROPOSED PRIVATE IMPROVEMENTS WITHIN A PUBLIC ROW 1 01-05-2017 PRELIMINARY PLAN APPROVED BY P&Z 2 10-13-2017 REVISION - CITY SUBMITTAL 3 06-25-2018 REVISION - CITY SUBMITTAL (2.65 ACRE DETENTION POND) COMMON AREA 2D (2.49 ACRE DETENTION POND) COMMON AREA 2A 30' PUE/PAE COMMON AREA 2H 15' PAE COMMON AREA 2J 30' PUE/PAE COMMON AREA 2B 30' PUE/PAE PARKLAND A NEIGHBORHOOD PARK 8.71 ACRES SHUBATA DRIVE 27' B-B 50' ROW PETAL LANE 27' B-B 50' ROW CAMDEN LANE 27' B-B 50' ROW AMORY DRIVE 27' B-B 50' ROW CHATOM DRI V E 27' B-B 50' R O W CONOLE C O U R T 27' B-B 50 ' R O W CHATOM DRIVE27' B-B 50' ROWSYMBOL & LINE LEGEND 6" SANITARY SEWER 8" SANITARY SEWER 12" SANITARY SEWER 18" SANITARY SEWER 6" WATERLINE 8" WATERLINE 12" WATERLINE STORM SEWER FORCE MAIN FIRE HYDRANT STORM SEWER CURB INLET STORM SEWER MANHOLE SANITARY SEWER MANHOLE PROPERTY LINE PHASE LINE EASEMENT LINE SHEET MATCHLINE CENTERLINE OF ROAD CONTOUR LINES CONTOUR ELEVATION BLOCK NUMBER LOT NUMBER PHASE NUMBER PROPERTY BOUNDARY CITY LIMITS PROPOSED TRAIL SYSTEM MATCHLINE SHEET 5 MATCHLINE SHEET 3MATCHLINE SHEET 6 Texas Board of Professional Engineers Registration No. F-439 150 Venture Dr., Suite 100 • College Station, Texas 77845 • 979.731.8000 PRELIMINARY PLAN NOT FOR RECORD OF SOUTHERN POINTE o.b.o BRAZOS COUNTY MUD NO.1 552.905 ACRES BRAZOS COUNTY, TEXAS KEY MAP MATCHLINE SHEET 3 DEVELOPER: GRID RACEPLEX HOLDINGS, LTD. P.O. BOX 11962 COLLEGE STATION, TEXAS 77842 PROPERTY OWNERS: McALISTER OPPORTUNITY FUND 2012, L.P. 2211 NORFOLK STREET, SUITE 803 HOUSTON, TEXAS 77098 2015 SOPO, LTD. P.O. BOX 11962 COLLEGE STATION, TEXAS 77842 HUNTER GOODWIN ETAL. 1011 LYCEUM CT. COLLEGE STATION, TEXAS 77840 0 07-01-2016 ORIGINAL SUBMITTAL 1 01-05-2017 PRELIMINARY PLAN APPROVED BY P&Z 2 10-13-2017 REVISION - CITY SUBMITTAL 0 07-01-2016 ORIGINAL SUBMITTAL 1 01-05-2017 PRELIMINARY PLAN APPROVED BY P&Z 2 10-13-2017 REVISION - CITY SUBMITTAL 3 06-25-2018 REVISION - CITY SUBMITTAL COMMON AREA 2E (2.65 ACRE DETENTION POND) COMMON AREA 2D (2.49 ACRE DETENTION POND) COMMON AREA 3A 15' PAE COMMON AREA 8A 15' PAE COMMON AREA 8E VARIABLE WIDTH PAE COMMON AREA 2C 15' PAE COMMON AREA 2B 30' PUE/PAE PARKLAND A NEIGHBORHOOD PARK 8.71 ACRES PETAL LANE 27' B-B 50' RO W KINNEY DRIVE27' B-B 50' ROWCOLBER T L A N E 27' B-B 5 0 ' R O W MATHER PARKWAY54' B-B 80' ROWCHATOM DRIVE27' B-B 50' ROWKATIE LOOP27' B -B 50 ' ROW WEDDINGTON ROAD 27' B-B 50' ROW QUI N L A N D R I V E 27' B - B 5 0 ' R O WGUNN RIDGE DRIVE27' B-B 50' ROWSHUBATA DRI V E 27' B-B 50' RO W CAMDEN LAN E 27' B-B 50' RO W AMORY DRIV E 27' B-B 50' R O W CHATOM DR I V E 27' B-B 50' R O W RISI DRIVE 27' B-B 50' ROW CROS B Y D R I V E 27' B- B 5 0 ' R O W AMO R Y D R I V E 27' B- B 5 0 ' R O W SHU B A T A D R I V E 27' B - B 5 0 ' R O W PETA L L A N E 27' B- B 5 0 ' R O W BRAXTON DRIVE 27' B-B 50' ROW MATCHLINE SHEET 6MATCHLINE SHEET 2MATCHLINE SHEET 4Texas Board of Professional Engineers Registration No. F-439 150 Venture Dr., Suite 100 • College Station, Texas 77845 • 979.731.8000 PRELIMINARY PLAN NOT FOR RECORD OF SOUTHERN POINTE o.b.o BRAZOS COUNTY MUD NO.1 552.905 ACRES BRAZOS COUNTY, TEXAS KINNEY LOOP 27' B-B 50' ROW KEY MAP DEVELOPER: GRID RACEPLEX HOLDINGS, LTD. P.O. BOX 11962 COLLEGE STATION, TEXAS 77842 PROPERTY OWNERS: McALISTER OPPORTUNITY FUND 2012, L.P. 2211 NORFOLK STREET, SUITE 803 HOUSTON, TEXAS 77098 2015 SOPO, LTD. P.O. BOX 11962 COLLEGE STATION, TEXAS 77842 HUNTER GOODWIN ETAL. 1011 LYCEUM CT. COLLEGE STATION, TEXAS 77840 SYMBOL & LINE LEGEND 6" SANITARY SEWER 8" SANITARY SEWER 12" SANITARY SEWER 18" SANITARY SEWER 6" WATERLINE 8" WATERLINE 12" WATERLINE STORM SEWER FORCE MAIN FIRE HYDRANT STORM SEWER CURB INLET STORM SEWER MANHOLE SANITARY SEWER MANHOLE PROPERTY LINE PHASE LINE EASEMENT LINE SHEET MATCHLINE CENTERLINE OF ROAD CONTOUR LINES CONTOUR ELEVATION BLOCK NUMBER LOT NUMBER PHASE NUMBER PROPERTY BOUNDARY CITY LIMITS PROPOSED TRAIL SYSTEM 0 07-01-2016 ORIGINAL SUBMITTAL 1 01-05-2017 PRELIMINARY PLAN APPROVED BY P&Z 2 10-13-2017 REVISION - CITY SUBMITTAL 0 07-01-2016 ORIGINAL SUBMITTAL 1 01-05-2017 PRELIMINARY PLAN APPROVED BY P&Z 2 10-13-2017 REVISION - CITY SUBMITTAL 3 06-25-2018 REVISION - CITY SUBMITTAL COMMON AREA 8D (8.32 ACRE DETENTION POND) COMMON AREA 4G (4.32 ACRE DETENTION POND) COMMON AREA 8F 15' PAE COMMON AREA 8E VARIABLE WIDTH PAE COMMON AREA 4F 30' PUE/PAE COMMON AREA 4E 30' PUE/PAE PARKLAND B COMMUNITY PARK 18.62 ACRES COMMON AREA 4A 15' PAE COMMON AREA 8G 15' PAE COMMON AREA 4B 15' PAE COMMON AREA 4D 15' PAE COMMON AREA 4C 15' PAE COMMON AREA 8H 30' PUE/PAE COMMON AREA 8C 30' PUE/PAE S 48°42'01" W S 13°22'46" EKATIE LOOP27' B -B 50 ' ROW WEDDINGTON ROAD 27' B-B 50' ROW QUI N L A N D R I V E 27' B - B 5 0 ' R O W RISI DRIVE 27' B-B 50' ROW SAM A N T H A L A N E 27' B- B 5 0 ' R O W ROCKFORD DRIVE27' B-B 50' ROWSEBRING DRIVE27' B-B 50' ROWBALDWYN DRIVE27' B-B 50' ROWLAUREL RIDGE LANE27' B-B 50' ROWMARIETTA DRIVE27' B-B 50' ROWGUNN RIDGE DRIVE27' B-B 50' ROWBALDWYN DRIVE27' B-B 50' ROWLAUREL RIDGE LANE27' B-B 50' ROWMARI E T T A D R I V E 27' B- B 5 0 ' R O W MATCHLINE SHEET 7MATCHLINE SHEET 3MATCHLINE SHEET 6Texas Board of Professional Engineers Registration No. F-439 150 Venture Dr., Suite 100 • College Station, Texas 77845 • 979.731.8000 PRELIMINARY PLAN NOT FOR RECORD OF SOUTHERN POINTE o.b.o BRAZOS COUNTY MUD NO.1 552.905 ACRES BRAZOS COUNTY, TEXAS KEY MAP DEVELOPER: GRID RACEPLEX HOLDINGS, LTD. P.O. BOX 11962 COLLEGE STATION, TEXAS 77842 PROPERTY OWNERS: McALISTER OPPORTUNITY FUND 2012, L.P. 2211 NORFOLK STREET, SUITE 803 HOUSTON, TEXAS 77098 2015 SOPO, LTD. P.O. BOX 11962 COLLEGE STATION, TEXAS 77842 HUNTER GOODWIN ETAL. 1011 LYCEUM CT. COLLEGE STATION, TEXAS 77840 SYMBOL & LINE LEGEND 6" SANITARY SEWER 8" SANITARY SEWER 12" SANITARY SEWER 18" SANITARY SEWER 6" WATERLINE 8" WATERLINE 12" WATERLINE STORM SEWER FORCE MAIN FIRE HYDRANT STORM SEWER CURB INLET STORM SEWER MANHOLE SANITARY SEWER MANHOLE PROPERTY LINE PHASE LINE EASEMENT LINE SHEET MATCHLINE CENTERLINE OF ROAD CONTOUR LINES CONTOUR ELEVATION BLOCK NUMBER LOT NUMBER PHASE NUMBER PROPERTY BOUNDARY CITY LIMITS PROPOSED TRAIL SYSTEM 0 07-01-2016 ORIGINAL SUBMITTAL 1 01-05-2017 PRELIMINARY PLAN APPROVED BY P&Z 2 10-13-2017 REVISION - CITY SUBMITTAL 0 07-01-2016 ORIGINAL SUBMITTAL 1 01-05-2017 PRELIMINARY PLAN APPROVED BY P&Z 2 10-13-2017 REVISION - CITY SUBMITTAL 3 06-25-2018 REVISION - CITY SUBMITTAL COMMON AREA 2F (2.57 ACRE DETENTION POND) COMMON AREA 2G (2.90 ACRE DETENTION POND) COMMON AREA 2J 30' PUE/PAE COMMON AREA 6A 15' PAE COMMON AREA 6B 15' PAE COMMON AREA 6C 30' PUE/PAE ROAD D27' B-B 50' ROWNATC H E Z D R I V E 27' B- B 5 0 ' R O WDARLINGTON AVENUE27' B-B 50' ROWSOUTHERN P O I N T E P A R K W A Y 63' B-B 105' R O W KENNESA W D R I V E 27' B-B 5 0 ' R O W CHATOM DRI V E 27' B-B 50' RO W MATCHLINE SHEET 2 WAVERYLY W A Y 27' B-B 50' R O W MATCHLINE SHEET 8 Texas Board of Professional Engineers Registration No. F-439 150 Venture Dr., Suite 100 • College Station, Texas 77845 • 979.731.8000 PRELIMINARY PLAN NOT FOR RECORD OF SOUTHERN POINTE o.b.o BRAZOS COUNTY MUD NO.1 552.905 ACRES BRAZOS COUNTY, TEXASMATCHLINE SHEET 6KEY MAP DEVELOPER: GRID RACEPLEX HOLDINGS, LTD. P.O. BOX 11962 COLLEGE STATION, TEXAS 77842 PROPERTY OWNERS: McALISTER OPPORTUNITY FUND 2012, L.P. 2211 NORFOLK STREET, SUITE 803 HOUSTON, TEXAS 77098 2015 SOPO, LTD. P.O. BOX 11962 COLLEGE STATION, TEXAS 77842 HUNTER GOODWIN ETAL. 1011 LYCEUM CT. COLLEGE STATION, TEXAS 77840 SYMBOL & LINE LEGEND 6" SANITARY SEWER 8" SANITARY SEWER 12" SANITARY SEWER 18" SANITARY SEWER 6" WATERLINE 8" WATERLINE 12" WATERLINE STORM SEWER FORCE MAIN FIRE HYDRANT STORM SEWER CURB INLET STORM SEWER MANHOLE SANITARY SEWER MANHOLE PROPERTY LINE PHASE LINE EASEMENT LINE SHEET MATCHLINE CENTERLINE OF ROAD CONTOUR LINES CONTOUR ELEVATION BLOCK NUMBER LOT NUMBER PHASE NUMBER PROPERTY BOUNDARY CITY LIMITS PROPOSED TRAIL SYSTEM 0 07-01-2016 ORIGINAL SUBMITTAL 1 01-05-2017 PRELIMINARY PLAN APPROVED BY P&Z 2 10-13-2017 REVISION - CITY SUBMITTAL 0 07-01-2016 ORIGINAL SUBMITTAL 1 01-05-2017 PRELIMINARY PLAN APPROVED BY P&Z 2 10-13-2017 REVISION - CITY SUBMITTAL 3 06-25-2018 REVISION - CITY SUBMITTAL COMMON AREA 6B 15' PAE COMMON AREA 11A 15' PAE COMMON AREA 3B VARIABLE WIDTH PUE/PAE COMMON AREA 8B VARIABLE WIDTH PUE/PAE P A R K L A N D J N E I G H B O R H O O D P A R K 1. 4 1 A C R E SKINNEY DRIVE27' B-B 50' ROWMATHER PARKWAY54' B-B 80' ROWELDORA DRIVE27' B-B 50' ROWDAYTONA DRIVE27' B-B 50' ROWRALEIGH DRIVE27' B-B 50' ROWRISI DRIVE27' B-B 50' ROWSOUT H E R N P O I N T E P A R K W A Y 63' B- B 1 0 5 ' R O W PAT R I O T D R I V E 27' B - B 5 0 ' R O W KEN N E S A W D R I V E 27' B - B 5 0 ' R O W NAT C H E Z D R I V E 27' B - B 5 0 ' R O W GUN N R I D G E D R I V E 27' B - B 5 0 ' R O W SAM A N T H A L A N E 27' B - B 5 0 ' R O W QUI N L A N D R I V E 27' B- B 5 0 ' R O W AMO R Y D R I V E 27' B- B 5 0 ' R O W VER O N A D R I V E 27' B - B 5 0 ' R O W CAN T O N D R I V E 27' B - B 5 0 ' R O W PROMENADE DRIVE27' B-B 50' ROWMATHER PARKWAY38' B-B 60' ROWPAT R I O T D R I V E 27' B - B 5 0 ' R O W PATRIOT DRIVE 27' B-B 50' ROW SOU T H E R N P O I N T E P A R K W A Y 63' B - B 1 0 5 ' R O W CHAT O M D R I V E 27' B-B 5 0 ' R O W KEN N E S A W D R I V E 27' B - B 5 0 ' R O W GUNN RIDGE DRIVE27' B-B 50' ROWMATCHLINE SHEET 8MATCHLINE SHEET 5MATCHLINE SHEET 7ELD O R A D R I V E 27' B - B 5 0 ' R O W MATCHLINE SHEET 3 Texas Board of Professional Engineers Registration No. F-439 150 Venture Dr., Suite 100 • College Station, Texas 77845 • 979.731.8000 MATCHLINE SHEET 9 KEY MAP CROS B Y D R I V E 27' B- B 5 0 ' R O W PRELIMINARY PLAN NOT FOR RECORD OF SOUTHERN POINTE o.b.o BRAZOS COUNTY MUD NO.1 552.905 ACRES BRAZOS COUNTY, TEXAS DEVELOPER: GRID RACEPLEX HOLDINGS, LTD. P.O. BOX 11962 COLLEGE STATION, TEXAS 77842 PROPERTY OWNERS: McALISTER OPPORTUNITY FUND 2012, L.P. 2211 NORFOLK STREET, SUITE 803 HOUSTON, TEXAS 77098 2015 SOPO, LTD. P.O. BOX 11962 COLLEGE STATION, TEXAS 77842 HUNTER GOODWIN ETAL. 1011 LYCEUM CT. COLLEGE STATION, TEXAS 77840 SYMBOL & LINE LEGEND 6" SANITARY SEWER 8" SANITARY SEWER 12" SANITARY SEWER 18" SANITARY SEWER 6" WATERLINE 8" WATERLINE 12" WATERLINE STORM SEWER FORCE MAIN FIRE HYDRANT STORM SEWER CURB INLET STORM SEWER MANHOLE SANITARY SEWER MANHOLE PROPERTY LINE PHASE LINE EASEMENT LINE SHEET MATCHLINE CENTERLINE OF ROAD CONTOUR LINES CONTOUR ELEVATION BLOCK NUMBER LOT NUMBER PHASE NUMBER PROPERTY BOUNDARY CITY LIMITS PROPOSED TRAIL SYSTEM 0 07-01-2016 ORIGINAL SUBMITTAL 1 01-05-2017 PRELIMINARY PLAN APPROVED BY P&Z 2 10-13-2017 REVISION - CITY SUBMITTAL 0 07-01-2016 ORIGINAL SUBMITTAL 1 01-05-2017 PRELIMINARY PLAN APPROVED BY P&Z 2 10-13-2017 REVISION - CITY SUBMITTAL 3 06-25-2018 REVISION - CITY SUBMITTAL COMMON AREA 5B 15' PAE COMMON AREA 5A 15' PAE COMMON AREA 4H 15' PAE COMMON AREA 8F 15' PAE COMMON AREA 4A 15' PAE COMMON AREA 8G 15' PAE COMMON AREA 4B 15' PAE COMMON AREA 4D 15' PAE COMMON AREA 4C 15' PAE PARKLAND C NEIGHBORHOOD PARK 1.07 ACRES ELDORA DRIVE27' B-B 50' ROWPOCONO DRIVE27' B-B 50' ROWWILKESBORO DRIVE27' B-B 50' ROWTALLADEGA DRIVE27' B-B 50' ROWSOUTHERN CROSS DRIVE27' B-B 50' ROWROCKFORD DRIVE27' B-B 50' ROWDAYTONA DRIVE27' B-B 50' ROWROCKFORD DRIVE27' B-B 50' ROWSEBRING DRIVE27' B-B 50' ROWBALDWYN DRIVE27' B-B 50' ROWLAUREL RIDGE DRIVE27' B-B 50' ROWMARIETTA DRIVE27' B-B 50' ROWGUNN RIDGE DRIVE27' B-B 50' ROWGUNN RIDGE DRIVE 27' B-B 50' ROW PATRIOT DRIVE 27' B-B 50' ROW SOUTHERN POINTE PARKWAY 63' B-B 105' ROW SAMANTHA L A N E 27' B-B 50' R O W QUINLAN DRIVE 27' B-B 50' ROW MATCHLINE SHEET 9 MATCHLINE SHEET 4 MATCHLINE SHEET 6Texas Board of Professional Engineers Registration No. F-439 150 Venture Dr., Suite 100 • College Station, Texas 77845 • 979.731.8000 PRELIMINARY PLAN NOT FOR RECORD OF SOUTHERN POINTE o.b.o BRAZOS COUNTY MUD NO.1 552.905 ACRES BRAZOS COUNTY, TEXAS KEY MAP ROXIE LANE63' B-B 105' ROWDEVELOPER: GRID RACEPLEX HOLDINGS, LTD. P.O. BOX 11962 COLLEGE STATION, TEXAS 77842 PROPERTY OWNERS: McALISTER OPPORTUNITY FUND 2012, L.P. 2211 NORFOLK STREET, SUITE 803 HOUSTON, TEXAS 77098 2015 SOPO, LTD. P.O. BOX 11962 COLLEGE STATION, TEXAS 77842 HUNTER GOODWIN ETAL. 1011 LYCEUM CT. COLLEGE STATION, TEXAS 77840 SYMBOL & LINE LEGEND 6" SANITARY SEWER 8" SANITARY SEWER 12" SANITARY SEWER 18" SANITARY SEWER 6" WATERLINE 8" WATERLINE 12" WATERLINE STORM SEWER FORCE MAIN FIRE HYDRANT STORM SEWER CURB INLET STORM SEWER MANHOLE SANITARY SEWER MANHOLE PROPERTY LINE PHASE LINE EASEMENT LINE SHEET MATCHLINE CENTERLINE OF ROAD CONTOUR LINES CONTOUR ELEVATION BLOCK NUMBER LOT NUMBER PHASE NUMBER PROPERTY BOUNDARY CITY LIMITS PROPOSED TRAIL SYSTEM 0 07-01-2016 ORIGINAL SUBMITTAL 1 01-05-2017 PRELIMINARY PLAN APPROVED BY P&Z 2 10-13-2017 REVISION - CITY SUBMITTAL 0 07-01-2016 ORIGINAL SUBMITTAL 1 01-05-2017 PRELIMINARY PLAN APPROVED BY P&Z 2 10-13-2017 REVISION - CITY SUBMITTAL 3 06-25-2018 REVISION - CITY SUBMITTAL F U T U R E M A J O R C O L L E C T O R R O W ( 8 0 ' ) COMMON AREA 2G (2.90 ACRE DETENTION POND) COMMON AREA 7C (5.32 ACRE DETENTION POND) COMMON AREA 7B 15' PAE COMMON AREA 7A 15' PAE COMMON AREA 11A 15' PAE NEIGHBORHOOD PARK P A R K L A N D F N E I G H B O R H O O D P A R K 1 0 . 5 6 A C R E S PARKLAND E NEIGHBORHOOD PARK 1.65 ACRES RALEIGH DRIVE27' B-B 50' ROWRALEIGH COURT27' B-B 50' ROWPROMENADE DRIVE27' B-B 50' ROWFULTON DRIVE27' B-B 50' ROWELDORA DRIVE27' B-B 50' ROWDARLINGTON AVENUE 38' B-B 60' ROW NAT C H E Z D R I V E 27' B - B 5 0 ' R O W KEN N E S A W D R I V E 27' B - B 5 0 ' R O W R A L E I G H L O O P 2 7 ' B - B 5 0 ' R O W G A I N E S V I L L E D R I V E 27 ' B - B 5 0 ' R O W NE V E U D R I V E 27' B - B 5 0 ' R O W DA R L I N G T O N A V E N U E 27' B - B 5 0 ' R O W GREENVILLE DRIVE27' B-B 50' ROWRALEIGH DRIVE27' B-B 50' ROWMATHER PARKWAY38' B-B 60' ROWELDORA DRIVE27' B-B 50' ROWMATCHLINE SHEET 5 MATCHLINE SHEET 6 MATCHLINE SHEET 9Texas Board of Professional Engineers Registration No. F-439 150 Venture Dr., Suite 100 • College Station, Texas 77845 • 979.731.8000 PRELIMINARY PLAN NOT FOR RECORD OF SOUTHERN POINTE o.b.o BRAZOS COUNTY MUD NO.1 552.905 ACRES BRAZOS COUNTY, TEXAS KEY MAP DEVELOPER: GRID RACEPLEX HOLDINGS, LTD. P.O. BOX 11962 COLLEGE STATION, TEXAS 77842 PROPERTY OWNERS: McALISTER OPPORTUNITY FUND 2012, L.P. 2211 NORFOLK STREET, SUITE 803 HOUSTON, TEXAS 77098 2015 SOPO, LTD. P.O. BOX 11962 COLLEGE STATION, TEXAS 77842 HUNTER GOODWIN ETAL. 1011 LYCEUM CT. COLLEGE STATION, TEXAS 77840TIRADO DRIVE27' B-B 50' ROWSYMBOL & LINE LEGEND 6" SANITARY SEWER 8" SANITARY SEWER 12" SANITARY SEWER 18" SANITARY SEWER 6" WATERLINE 8" WATERLINE 12" WATERLINE STORM SEWER FORCE MAIN FIRE HYDRANT STORM SEWER CURB INLET STORM SEWER MANHOLE SANITARY SEWER MANHOLE PROPERTY LINE PHASE LINE EASEMENT LINE SHEET MATCHLINE CENTERLINE OF ROAD CONTOUR LINES CONTOUR ELEVATION BLOCK NUMBER LOT NUMBER PHASE NUMBER PROPERTY BOUNDARY CITY LIMITS PROPOSED TRAIL SYSTEM 0 07-01-2016 ORIGINAL SUBMITTAL 1 01-05-2017 PRELIMINARY PLAN APPROVED BY P&Z 2 10-13-2017 REVISION - CITY SUBMITTAL 0 07-01-2016 ORIGINAL SUBMITTAL 1 01-05-2017 PRELIMINARY PLAN APPROVED BY P&Z 2 10-13-2017 REVISION - CITY SUBMITTAL 3 06-25-2018 REVISION - CITY SUBMITTAL N 1 3° 5 3' 1 3 " E S 76°06 '47 " E S 1 3° 5 3' 1 3" W COMMON AREA 9E (8.70 ACRE DETENTION POND) COMMON AREA 5B 15' PAE COMMON AREA 9D 30' PUE/PAE COMMON AREA 9C 30' PUE/PAE COMMON AREA 9B 30' PUE/PAE COMMON AREA 9A 30' PUE/PAE PARKLAND D NEIGHBORHOOD PARK 8.58 ACRES ELDORA DRIVE27' B-B 50' ROWSPARTAN DRIVE 27' B-B 50' ROW DARLINGTON AVENUE 38' B-B 60' ROW POCONO DRIVE27' B-B 50' ROWWILKESBORO DRIVE27' B-B 50' ROWTALLADEGA DRIVE27' B-B 50' ROWSOUTHERN CROSS DRIVE27' B-B 50' ROWROCKFORD DRIVE27' B-B 50' ROWDAYTONA DRIVE27' B-B 50' ROWELDORA DRIVE27' B-B 50' ROWNE V E U D R I V E 27' B - B 5 0 ' R O W SYMBOL & LINE LEGEND 6" SANITARY SEWER 8" SANITARY SEWER 12" SANITARY SEWER 18" SANITARY SEWER 6" WATERLINE 8" WATERLINE 12" WATERLINE STORM SEWER FORCE MAIN FIRE HYDRANT STORM SEWER CURB INLET STORM SEWER MANHOLE SANITARY SEWER MANHOLE PROPERTY LINE PHASE LINE EASEMENT LINE SHEET MATCHLINE CENTERLINE OF ROAD CONTOUR LINES CONTOUR ELEVATION BLOCK NUMBER LOT NUMBER PHASE NUMBER PROPERTY BOUNDARY CITY LIMITS DAYTONA DRIVE27' B-B 50' ROWSOUTHERN CROSS DRIVE27' B-B 50' ROWROCKFORD DRIVE27' B-B 50' ROWMATCHLINE SHEET 7 Texas Board of Professional Engineers Registration No. F-439 150 Venture Dr., Suite 100 • College Station, Texas 77845 • 979.731.8000 PRELIMINARY PLAN NOT FOR RECORD OF SOUTHERN POINTE o.b.o BRAZOS COUNTY MUD NO.1 552.905 ACRES BRAZOS COUNTY, TEXAS MATCHLINE SHEET 8KEY MAP DEVELOPER: GRID RACEPLEX HOLDINGS, LTD. P.O. BOX 11962 COLLEGE STATION, TEXAS 77842 PROPERTY OWNERS: McALISTER OPPORTUNITY FUND 2012, L.P. 2211 NORFOLK STREET, SUITE 803 HOUSTON, TEXAS 77098 2015 SOPO, LTD. P.O. BOX 11962 COLLEGE STATION, TEXAS 77842 HUNTER GOODWIN ETAL. 1011 LYCEUM CT. COLLEGE STATION, TEXAS 77840 0 07-01-2016 ORIGINAL SUBMITTAL 1 01-05-2017 PRELIMINARY PLAN APPROVED BY P&Z 2 10-13-2017 REVISION - CITY SUBMITTAL 0 07-01-2016 ORIGINAL SUBMITTAL 1 01-05-2017 PRELIMINARY PLAN APPROVED BY P&Z 2 10-13-2017 REVISION - CITY SUBMITTAL 3 06-25-2018 REVISION - CITY SUBMITTAL Texas Board of Professional Engineers Registration No. F-439 150 Venture Dr., Suite 100 • College Station, Texas 77845 • 979.731.8000 PRELIMINARY PLAN NOT FOR RECORD OF SOUTHERN POINTE o.b.o BRAZOS COUNTY MUD NO.1 552.905 ACRES BRAZOS COUNTY, TEXAS DEVELOPER: GRID RACEPLEX HOLDINGS, LTD. P.O. BOX 11962 COLLEGE STATION, TEXAS 77842 PROPERTY OWNERS: McALISTER OPPORTUNITY FUND 2012, L.P. 2211 NORFOLK STREET, SUITE 803 HOUSTON, TEXAS 77098 2015 SOPO, LTD. P.O. BOX 11962 COLLEGE STATION, TEXAS 77842 HUNTER GOODWIN ETAL. 1011 LYCEUM CT. COLLEGE STATION, TEXAS 77840 PROPOSED COMMON AREA TABLE PROPOSED PARKLAND AREA TABLE 0 07-01-2016 ORIGINAL SUBMITTAL 1 01-05-2017 PRELIMINARY PLAN APPROVED BY P&Z 2 10-13-2017 REVISION - CITY SUBMITTAL 0 07-01-2016 ORIGINAL SUBMITTAL 1 01-05-2017 PRELIMINARY PLAN APPROVED BY P&Z 2 10-13-2017 REVISION - CITY SUBMITTAL 3 06-25-2018 REVISION - CITY SUBMITTAL Planning & Zoning Commission August 16, 2018 Scale 2 single family lots on approximately 0.47 acres Location 1200 Goode Dr Applicant Adam Wallace, ATM Surveying Project Manager Jade Broadnax, Staff Planner jbroadnax@cstx.gov Project Overview This replat will establish 1 additional single-family lot within the Woodson Village Subdivision. The two single-family lots (16 -17 & 4’ of 18) are considered one building plot and are required to meet the UDO standards for Platting and Replatting in Older Residential Subdivisions. Both lots are seeking a waiver to the lot width requirement for older residential subdivisions. The average lot width for this block is 96.2 feet, and the applicant is requesting a lot width of 79.9 feet for lot 16R and width of 84.1 feet for lot 17R, requiring a variance of 16.3 feet (16.9%) and 12.1 feet (12.6%) respectively. Preliminary Plan The property was originally part of the third installment of the Woodson Village plat, filed in 1964. Parkland Dedication Parkland dedication fee in lieu for 1 additional single-family lot, totaling $1,261, will be due prior to filing of the plat. Impact Fees Subject to citywide impact fees—water, sanitary sewer, and roadway. Impact fees will be dependent upon timing of the building permit application date. Traffic Impact Analysis A TIA was not required. Compliant with Comprehensive Plan (including Master Plans) and Unified Development Ordinance Yes Compliant with Subdivision Regulations Yes, with the exception of the requested waivers. Staff Recommendation Approval Supporting Materials 1. Waiver Request 2. Vicinity, Aerial, and Small Area Maps 3. Application 4. Copy of Final Plat Final Plat of Woodson Village Third Installment Block 7, Lots 16R and 17R Being a Replat of Woodson Village Third Installment Block 7, Lots 16, 17, and 4’ of Lot 18 FP2018-000002 SUBDIVISION WAVIER REQUESTS The proposed Final Plat is in compliance with the applicable Subdivision Regulations contained in the UDO except for the following waiver request: UDO Section 8.3.H.2. Platting and Replatting in Older Residential Subdivisions– This section requires that a plat which does create an additional lot must meet or exceed the average width of the lots along the street frontage for all of the lots in the block including the subject lot and contain at least eight thousand five hundred (8500) square feet of space for each dwelling unit. In accordance with the Subdivision Regulations, no waiver shall be granted unless the Planning and Zoning Commission finds that all criteria have been met: 1) That there are special circumstances or conditions affecting the land involved such that strict application of the provisions of this chapter will deprive the applicant of the reasonable use of his land; The subject property was originally platted as two lots, but has historically been used as one, and is therefore considered one building plot. Ownership, improvements, and miscellaneous factors were used to determine that this property is considered a building plot. The lot had remained in common ownership until late 2017 (and had been combined for tax purposes until that time), features one driveway, one utility meter, and the open space was occupied by a large residential garden. When computing the average lot width, the subject property’s 164-foot width significantly skews the average to 96.2 feet for all lots facing Goode Dr. The majority of existing lots in this block would not be meeting the average lot width requirement. If the waiver is granted, the subdivision would legally subdivide one historically large lot and create two individual lots, 16R and 17R. If replatted, lot 16R will be 9,970 square feet and 79.9 feet wide, and lot 17R will be 10,515 square feet and 84.1 feet wide, which fits within the surrounding context of the site. The proposed lot widths for lots 16R and 17R result in a variance of 16.3 feet (16.9%) and 12.1 feet (12.6%) respectively, and closely resemble the original plat filed in 1964. 2) That the waivers are necessary for the preservation and enjoyment of a substantial property right of the applicant; If the waiver is not granted, the building plot cannot be subdivided, and development on the proposed additional lot may not occur. Construction of a single family home was started prematurely by the applicant but was halted on this site when comments were returned in the review of the building permit. 3) The granting of the waiver will not be detrimental to the public health, safety, or welfare, or injurious to other property in the area, or to the City in administering this chapter; Granting this wavier would not be detrimental or injurious to other property. The granting of the waiver would allow for a single family detached home on a single lot in General Suburban zoning that otherwise meets the standards of the UDO. 4) That the granting of the waivers will not have the effect of preventing the orderly subdivision of other land in the area in accordance with the provisions of this chapter. The granting of the waiver will not prevent the orderly subdivision of other land in the area. Summary of staff recommendations Staff is recommending approval of the waiver. $600 (minimum) Development Permit Application / Public Infrastructure Review and Inspection Fee. Fee is 1% of acceptable Engineer's Estimate for public infrastructure, $600 minimum (if fee is > $600, the balance is due prior to the issuance of any plans or development permit). Application completed in full. This application form provided by the City of College Station must be used and may not be adjusted or altered. Please attach pages if additional information is provided. $700-$932 Final Plat Application Fee (see above). $233 Waiver Request to Subdivision Regulations Fee (if applicable). Title report for property current within ninety (90) days or accompanied by a Nothing Further Certificate current within ninety (90) days. The report must include applicable information such as ownership, liens, encumbrances, etc. Fourteen (14) folded copies of plat. (A signed mylar original must be submitted after approval.) Copy of original deed restrictions/covenants for replats (if applicable). FINAL PLAT APPLICATION (Check one) Minor Amending Final Vacating Replat Is this plat in the ETJ? MINIMUM SUBMITTAL REQUIREMENTS: NOTE: A mylar of the approved preliminary plan must be on file before a final plat application will be considered complete. If the mylar is submitted with the final plat application, it shall be considered a submittal for the preliminary plan project and processed and reviewed as such. Until the mylar has been confirmed by staff to be correct, the final plat application will be considered incomplete. Is this plat Commercial Yes No ($700)($700)($932)($932)($932) Paid tax certificates from City of College Station, Brazos County and College Station I.S.D. The attached Final Plat checklist with all items checked off or a brief explanation as to why they are not. APPLICANT/PROJECT MANAGER'S INFORMATION (Primary contact for the project): Name E-mail Street Address City State Zip Code Phone Number Fax Number 1/11 Page 1 of 9 Date of Optional Preapplication or Stormwater Management Conference SPECIFIED LOCATION OF PROPOSED PLAT: ADDRESS NAME OF PROJECT FOR OFFICE USE ONLY CASE NO.: DATE SUBMITTED: TIME: STAFF: Two (2) copies of the Public infrastructure plans and supporting documents (if applicable). Two (2) copies of the grading, drainage, and erosion control plans with supporting drainage report. or Residential ARCHITECT OR ENGINEER'S INFORMATION: Is there a temporary blanket easement on this property? If so, please provide the Volume and Page No. Do any deed restrictions or covenants exist for this property? Total Acreage Total No. of Lots R-O-W Acreage Existing Use Proposed Use Average Acreage Of Each Residential Lot By Zoning District: / / / / Number of Lots By Zoning District / / / Floodplain Acreage Name E-mail Street Address City State Zip Code Phone Number Fax Number Yes No 1/11 Page 2 of 9 Street Address PROPERTY OWNER'S INFORMATION (All owners must be identified. Please attach an additional sheet for multiple owners): Name E-mail City State Zip Code Phone Number Fax Number NoYesIs there Special Flood Hazard Area (Zone A or Zone AE on FEMA FIRM panels) on the property? This information is necessary to help staff identify the appropriate standards to review the application and will be used to help determine if the application qualifies for vesting to a previous ordinance. Notwithstanding any assertion made, vesting is limited to that which is provided in Chapter 245 of the Texas Local Government Code or other applicable law. Is this application a continuation of a project that has received prior City platting approval(s) and you are requesting the application be reviewed under previous ordinance as applicable? If yes, provide information regarding the first approved application and any related subsequent applications (provide additional sheets if necessary): Yes No Project Name: Date / Timeframe when submitted: City Project Number (if known): Page 3 of 9 1/11 Page 4 of 9 Requested Oversize Participation Total Linear Footage of Proposed Public: Streets Sidewalks Sanitary Sewer Lines Water Lines Channels Storm Sewers Bike Lanes / Paths Parkland Dedication due prior to filing the Final Plat: ACREAGE: No. of acres to be dedicated + $ development fee No. of acres in floodplain No. of acres in detention No. of acres in greenways OR FEE IN LIEU OF LAND: No. of SF Dwelling Units X $ = $ (date) Approved by Parks & Recreation Advisory Board NOTE: DIGITAL COPY OF PLAT MUST BE SUBMITTED PRIOR TO FILING. The applicant has prepared this application and certifies that the facts stated herein and exhibits attached hereto are true, correct, and complete. IF THIS APPLICATION IS FILED BY ANYONE OTHER THAN THE OWNER OF THE PROPERTY, this application must be accompanied by a power of attorney statement from the owner. If there is more than one owner, all owners must sign the application or the power of attorney. If the owner is a company, the application must be accompanied by proof of authority for the company's representative to sign the application on its behalf. LIEN HOLDERS identified in the title report are also considered owners and the appropriate signatures must be provided as described above. DateSignature and title Detailed explanation of condition identified above: NOTE: A waiver to the sidewalk requirements and fee in lieu of sidewalk construction shall not be considered at the same time by the Planning & Zoning Commission. The proposed development is within an older residential subdivision meeting the criteria in Platting and Replatting within Older Residential Subdivisions Section of the UDO; or The proposed development contains frontage on a Freeway / Expressway as designated by Map 6.6, Thoroughfare Plan - Functional Classification, in the City's Comprehensive Plan. 7. 6. 12-29-2017 CERTIFICATIONS REQUIRED FOR ALL DEVELOPMENT Owner Certification: 1. No work of any kind may start until a permit is issued. 2. The permit may be revoked if any false statements are made herein. 3. If revoked, all work must cease until permit is re-issued. 4. Development shall not be used or occupied until a Certificate of Occupancy is issued. 5. The permit will expire if no significant work is progressing within 24 months of issuance. 6. Other permits may be required to fulfill local, state, and federal requirements. Owner will obtain or show compliance with all necessary State and Federal Permits prior to construction including NOI and SWPPP. 7. If required, Elevation Certificates will be provided with elevations certified during construction (forms at slab pre- pour) and post construction. 8. Owner hereby gives consent to City representatives to make reasonable inspections required to verify compliance. 9. If, stormwater mitigation is required, including detention ponds proposed as part of this project, it shall be designed and constructed first in the construction sequence of the project. 10. In accordance with Chapter 13 of the Code of Ordinances of the City of College Station, measures shall be taken to insure that all debris from construction, erosion, and sedimentation shall not be deposited in city streets, or existing drainage facilities. All development shall be in accordance with the plans and specifications submitted to and approved by the City Engineer for the above named project. All of the applicable codes and ordinances of the City of College Station shall apply. 11. The information and conclusions contained in the attached plans and supporting documents will comply with the current requirements of the City of College Station, Texas City Code, Chapter 13 and associated BCS Unified Design Guidelines Technical Specifications, and Standard Details. All development has been designed in accordance with all applicable codes and ordinances of the City of College Station and State and Federal Regulations. 12. Release of plans to (name or firm) is authorized for bidding purposes only. I understand that final approval and release of plans and development for construction is contingent on contractor signature on approved Development Permit. 13. I, THE OWNER, AGREE TO AND CERTIFY THAT ALL STATEMENTS HEREIN, AND IN ATTACHMENTS FOR THE DEVELOPMENT PERMIT APPLICATION, ARE, TO THE BEST OF MY KNOWLEDGE, TRUE, AND ACCURATE. Page 5 of 91/11 Property Owner(s) Date Engineer Certification: 1. The project has been designed to ensure that stormwater mitigation, including detention ponds, proposed as part of the project will be constructed first in the construction sequence. 2. I will obtain or can show compliance with all necessary Local, State and Federal Permits prior to construction including NOI and SWPPP. Design will not preclude compliance with TPDES: i.e., projects over 10 acres may require a sedimentation basin. 3. The information and conclusions contained in the attached plans and supporting documents comply with the current requirements of the City of College Station, Texas City Code, Chapter 13 and associated BCS Unified Design Guidelines. All development has been designed in accordance with all applicable codes and ordinances of the City of College Station and State and Federal Regulations. 4. I, THE ENGINEER, AGREE TO AND CERTIFY THAT ALL STATEMENTS HEREIN, AND IN ATTACHMENTS FOR THE DEVELOPMENT PERMIT APPLICATION, ARE, TO THE BEST OF MY KNOWLEDGE, TRUE, AND ACCURATE. Engineer Date 1/11 Page 6 of 9 The following CERTIFICATIONS apply to development in Special Flood Hazard Areas. , certify to the following: B. I, Engineer Date Required for Site Plans, Final Plats, Construction Plans, and Fill / Grading Permits: Required for Site Plans, Final Plats, Construction Plans, Fill / Grading Permits, and Clearing Only Permits:* permit shall not increase the base flood elevation. I will apply for a variance to the Zoning Board of Adjustments. , certify that the construction, improvement, or fill covered by this C. I, DateEngineer Additional certification for Floodway Encroachments: A. I, certify, as demonstrated in the attached drainage study, that the alterations or development covered by this permit, shall not: (i) increase the Base Flood elevation; (ii) create additional areas of Special Flood Hazard Area; (iii) decrease the conveyance capacity to that part of the Special Flood Hazard Area that is not in the floodway and where the velocity of flow in the Base Flood event is greater than one foot per second. This area can also be approximated to be either areas within 100 feet of the boundary of the regulatory floodway or areas where the depth of from the BFE to natural ground is 18 inches or greater; (iv) reduce the Base Flood water storage volume to the part of the Special Flood Hazard Area that is beyond the floodway and conveyance area where the velocity of flow in the Base Flood is equal to and less than one foot per second without acceptable compensation as set forth in the City of College Station Code of Ordinances, Chapter 13 concerning encroachment into the Special Flood Hazard Area; nor (v) increase Base Flood velocities. beyond those areas exempted by ordinance in Section 5.11.3a of Chapter 13 Code of Ordinances. Engineer Date * If a platting-status exemption to this requirement is asserted, provide written justification under separate letter in lieu of certification. (i) that any nonresidential or multi-family structure on or proposed to be on this site as part of this application is designed to prevent damage to the structure or its contents as a result of flooding from the 100-year storm. Initial , certify that all new construction or any substantial improvement of any residential structure shall have the lowest floor, including all utilities, ductwork and any basement, at an elevation at least one foot above the Base Flood Elevation. Required Elevation Certificates will be provided with elevations certified during construction (forms at slab pre-pour) and post construction. D. I, Engineer / Surveyor Date Conditions or comments as part of approval: Required for all projects proposing structures in Special Flood Hazard Area (Elevation Certificate required). Page 7 of 91/11 E. I, , certify that all new construction or any substantial improvement Commercial Structures: Residential Structures: of any commercial, industrial, or other non-residential structure are designed to have the lowest floor, including all utilities, ductwork and basements, elevated at least one foot above the Base Flood Elevation DateEngineer / Surveyor OR basement and sanitary facilities is designed to be flood-proofed so that the structure and utilities, ductwork, basement and sanitary facilities are designed to be watertight and impermeable to the intrusion of water in all areas below the Base Flood Elevation, and shall resist the structural loads and buoyancy effects from the hydrostatic and hydrodynamic conditions. Required Elevation Certificates will be provided with elevations certified during construction (forms at slab pre- pour) and post construction. DateEngineer / Surveyor I, , certify that the structure with its attendant utility, ductwork, If submitting a replat where there are existing improvements, submit a survey of the subject property showing the improvements to ensure that no encroachments will be created. FINAL PLAT MINIMUM REQUIREMENTS (ALL CITY ORDINANCES MUST BE MET) INCLUDING BUT NOT LIMITED TO THE FOLLOWING: (Requirements based on field survey and marked by monuments and markers.) North Arrow. Subdivision boundary indicated by heavy lines. If more than 1 sheet, an index sheet showing entire subdivision at a scale of 500 feet per inch or larger. If using private septic systems, add a general note on the plat that no private sewage facility may be installed on any lot in this subdivision without the issuance of a license by the Brazos County Health Unit under the provisions of the private facility regulations adopted by the Commissioner's Court of Brazos County, pursuant to the provisions of Section 21.084 of the Texas Water Code. Location of the 100-Year Floodplain and floodway, if applicable, according to the most recent available data. Lot corner markers and survey monuments (by symbol) and clearly tied to basic survey data. Matches the approved preliminary plan or qualifies as minor amendments (UDO Section 3.3.E.2). The location and description with accurate dimensions, bearings or deflection angles and radii, area, center angle, degree of curvature, tangent distance and length of all curves for all of the following: (Show existing items that are intersecting or contiguous with the boundary of or forming a boundary with the subdivision, as well as, those within the subdivision). Existing Proposed Streets. Continuous or end in a cul-de-sac, stubbed out streets must end into a temp turn around unless they are shorter than 100 feet. Public and private R.O.W. locations and widths. (All existing and proposed R.O.W.'s sufficient to meet Thoroughfare Plan.) Street offsets and/or intersection angles meet ordinance. 1/11 Page 8 of 9 Ownership and Dedication Surveyor and/or Engineer City Engineer (and City Planner, if a minor plat) Planning and Zoning Commission (delete if minor plat) Brazos County Clerk Brazos County Commissioners Court Approval (ETJ Plats only) All applicable certifications based on the type of final plat. Vicinity map which includes enough of surrounding area to show general location of subject property in relationship to College Station and its City Limits. No scale required but include north arrow. Drawn on 24" x 36" sheet to scale of 100' per inch. Title Block with the following information: Proposed name of subdivision. (Subdivision name & street names will be approved through Brazos County 911.) Name and address of subdivider, recorded owner, planner, engineer and surveyor. Date of preparation. Engineer's scale in feet. Total area intended to be developed. NOTE: 1. We will be requesting the corrected Final Plat to be submitted in digital form if available prior to filing the plat at the Courthouse. 2. If the construction area is greater than 5 acres, EPA Notice of Intent (NOI) must be submitted prior to issuance of a development permit. Alleys. Easements. A number or letter to identify each lot or site and each block (numbered sequentially). Parkland dedication/greenbelt area/park linkages. All proposed dedications must be reviewed by the Parks and Recreation Advisory Board and documentation of their recommendation provided prior to being scheduled for P&Z Commission consideration. Construction documents for all public infrastructure drawn on 24" x 36" sheets and properly sealed by a Licensed Texas Professional Engineer that include the following: Street, alley and sidewalk plans, profiles and sections. One sheet must show the overall street, alley and/or sidewalk layout of the subdivision. (may be combined with other utilities). Sewer Design Report. Sanitary sewer plan and profile showing depth and grades. One sheet must show the overall sewer layout of the subdivision. (Utilities of sufficient size/depth to meet the utility master plan and any future growth areas.) Water Design Report and/or Fire Flow Report. Water line plan showing fire hydrants, valves, etc. with plan and profile lines showing depth and grades. One sheet must show the overall water layout of the subdivision. (Utilities of sufficient size/depth to meet the utility master plan and any future growth areas.) Storm drainage system plan with contours, street profile, inlets, storm sewer and drainage channels, with profiles and sections. Drainage and runoff areas, and runoff based on 5, 10, 25, 50 and 100 year rain intensity. Detailed drainage structure design, channel lining design & detention if used. One sheet must show the overall drainage layout of the subdivision. Detailed cost estimates for all public infrastructure listed above sealed by Texas P.E. Drainage Report with a Technical Design Summary. Erosion Control Plan (must be included in construction plans). All off-site easements necessary for infrastructure construction must be shown on the final plat with a volume and page listed to indicate where the separate instrument easements were filed. Separate instrument easements must be provided in recordable form to the City prior to being scheduled for P&Z Commission consideration. Are there impact fees associated with this development? Impact fees must be paid prior to building permit. Will any construction occur in TxDOT rights-of-way? If yes, TxDOT permit must be submitted along with the construction documents. Yes No Yes No Letter of completion for public infrastructure or guarantee / surety in accordance with UDO Section 8.6. Existing Proposed 1/11 Page 9 or 9 Planning & Development Services  1101 Texas Avenue, PO Box 9960  College Station, TX 77840 Office 979.764.3570 / Fax 979.764.3496 MEMORANDUM Au gust 16, 2018 TO: Members of the Planning & Zoning Commission FROM: Rachel Lazo, Staff Planner SUBJECT: UDO Amendment – Single-Family Parking Requirements. Item: Public hearing, presentation, possible action, and discussion regarding an ordinance amendment to Appendix A, “Unified Development Ordinance,” Section 7.3.H “Number of Off- Street Parking Spaces Required”. Case# ORDA2018-000010. (Final action on this item is scheduled for the September 13, 2018 City Council Meeting- subject to change) Background: As part of the 2017 Plan of Work, two community engagement meetings were held on April 30th to gather input on various neighborhood protection proposals, including UDO Section 7.3, Off- Street Parking Standards. Attendees were able to provide feedback via paper surveys at both community engagement meetings and an online survey was also open for a period of two weeks following the meetings. At the Planning & Zoning Commission Workshop meeting on June 21, 2018, the Commission recommended to remove the cap of requiring no more than four parking spaces for a single family dwelling unit in in areas designated Neighborhood Conservation on the Future Land Use Map, but to keep this cap in place for all other areas. On June 28, 2018, City Council concurred with this direction and directed staff to bring back the following ordinance amendment. Supporting Materials: 1. Section 7.3.H Off-Street Parking Standards Ordinance Redline H. Number of Off-Street Parking Spaces Required . In computing the number of parking spaces required, the following rules shall govern: 1. Parking requirements based on square footage shall be based upon the gross floor area, unless otherwise stated. Service areas such as mechanical rooms, restrooms, and closets shall be included in the calculation of "gross floor area" for determining required parking spaces; 2. Where fractional spaces result in computing required parking spaces, the required number of spaces must be increased to the nearest whole number. At least one (1) parking space must be provided unless otherwise specified in this UDO; 3. The parking space requirements for a use not specifically listed shall be the same as those for the most similar to the proposed use, as determined by the Administrator; 4. Whenever a building or use constructed or established after the effective date of this UDO is changed or enlarged in floor area, number of employees, number of dwelling units, seating capacity, or otherwise, parking requirements shall be met on the basis of the enlargement or change. Whenever a building or use existing prior to the effective date of this UDO is enlarged, the enlarged building or increased use shall then and thereafter comp ly with the parking requirements set forth herein; 5. Where requirements are established on the basis of the number of seats, such requirements shall be based on the seating capacity as determined by the Building Official; 6. Where a manufacturing/industrial use has more than one (1) working shift of em ployees, parking shall be provided to accommodate overlap requirements during transition periods; and 7. The Design Review Board may waive parking space requirements in the Northgate and Wolf Pen Creek districts if the development meets the goals of the master plan for the respective district. MINIMUM OFF-STREET PARKING REQUIREMENTS Use Unit Spaces/Unit Plus Spaces For: Assisted Living/Residential Care Facility As determined by the Administrator ***** Airport As determined by the Administrator ***** Banks 250 s.f. Floor area over 500 s.f.: 1.0 Bowling Alley As Determined by the Administrator ***** Bus Depot As Determined by the Administrator ***** Car Wash (Self-Serve) Wash Bay 1.0 1.0 space per vacuum bay Church Seat 0.33 * Convalescent Home/Hospital Bed 0.5 Duplex Dwelling: 1 & 2 Bedroom DU 2.0 3+ Bedroom BR 1.0 Dormitory Bed 0.75 Day Care Center 250 s.f. Floor area over 500 s.f.: 1.0 Fraternal Lodge 75 s.f. Floor area over 150 s.f.: 1.0 Fraternity/Sorority House Person 1.0 1/30 s.f. meeting room Freight Station As Determined by the Administrator ***** Funeral Parlor Seat 0.33 Furniture Sales, Freestanding 350 s.f. Floor area over 700 s.f.: 1.0 Golf Driving Range Tee Station 1.0 Health Club/Sports Facility As Determined by the Administrator ***** Gasoline and Fuel Service 300 s.f. 1.0 Group Housing BR 2.0 As Determined by the Administrator Health Studio 150 s.f. Floor area over 300 s.f.: 1.0 Hospital As Determined by the Administrator ***** Hotel/Motel DU 1.0 1/200 s.f. meeting room HUD-Code Manu. Home DU 2.0 Laundry 150 s.f. Floor area over 300 s.f.: 1.0 Live-Work Unit 250 s.f. of non- residential portion of structure Floor area over 250 s.f.: 1.0 1/BR, Residential DU Motor Vehicle Sales/Service: Office/Sales Area 250 s.f. 1.0 Service Area 200 s.f. 1.0 Medical or Dental Clinic < 20,000 s.f. 200 s.f. Floor area over 400 s.f: 1.0 Mixed-Use Structure **** 250 s.f. of non- residential portion of structure Floor area over 500 s.f.: 1.0 1/BR, including residential DU and hotel/motel DU Multi-Family Dwelling: 1 Bedroom BR 1.5 2+ Bedroom BR 1.0 Night Club 50 s.f. 1.0 Office Building 250 s.f. Floor area over 500 s.f.: 1.0 Personal Service Shop 250 s.f. Floor area over 500 s.f.: 1.0 Priv. School or Comm. 100 s.f. Floor area over 200 s.f.: 1.0 Studio Retail Sales & Service: GC, SC, WC, C-3 250 s.f. Floor area over 500 s.f.: 1.0 CI 350 s.f. Floor area over 700 s.f.: 1.0 Restaurant (w/o drive- through) 65 s.f. Floor area over 130 s.f.: 1.0 Restaurant (w/drive- through) 100 s.f. Floor area over 200 s.f.: 1.0 Rooming/Boarding House Person 1.0 Sales Display 250 s.f. Floor area over 500 s.f.: 1.0 Single-Family Dwelling *** BR 1.0 *** Single-Unit Dwelling BR 1.0 Shopping Center ** : GC, SC, WC, C-3 250 s.f. 1.0 CI 350 s.f. 1.0 Townhouse *** BR 1.0 *** Theater Seat 0.25 Truck Terminal As Determined by the Administrator ***** Two-Dwelling Unit BR 1.0 Veterinary Clinic 300 s.f. Floor area over 600 s.f.: 1.0 Warehouse 1,000 s.f. 1.0 "s.f." = square footage. "DU" = Dwelling Unit. "BR" = Bedroom. * Overflow parking above required parking spaces may be grassed rather than paved. All unpaved spaces shall be shown on site plan and organized for efficient traffic circulati on using wheel stops and other appropriate measures as required by the Administrator. ** The minimum number of parking spaces for a shopping center shall be calculated at a rate of 1:250 in GC SC, or WC, and 1:350 in CI regardless of the composing uses u nless otherwise determined by the Administrator that such composing uses require a modification to the applicable requirements. *** All single-family and townhouse uses shall have a minimum of two (2) required parking spaces. These uses at the time of construction, redevelopment, or when an addition to the number of existing bedrooms is completed, shall come into compliance with the minimum off-street parking requirements. Garages that meet minimum dimensional standards may be counted towards parking req uirements. For areas not designated Neighborhood Conservation on the Comprehensive Plan’s Future Land Use and Character Map, no more than four (4) total spaces shall be required per dwelling. **** Mixed-Use structures in the MU Mixed-Use and MF Multi-Family districts. ***** When determining the required off -street parking requirements for the uses noted above, the Administrator shall consider the anticipated traffic demand, traffic circulation, and surrounding conditions. The Administrator may also consider information provided by the applicant that demonstrates the proposed number of off-street parking spaces is adequate for the proposed use and has been successfully employed in other locations.