HomeMy WebLinkAbout02/05/2002 - Special Agenda Packet - Parks Board AGENDA
College Station Parks and Recreation Advisory Board
Special Meeting
Tuesday, February 5, 2002, at 6:00 p.m.
Parks and Recreation Conference Room
1000 Krenek Tap Road
College Station, Texas
1. Call to order.
2. Pardon —possible action regarding requests for absences of members
from meeting.
3. Discussion, consideration, and possible action regarding potential
capital improvement projects for park facilities.
4. Hear visitors.
5. Adjourn.
The building is wheelchair accessible. Handicap parking spaces are
available. Any request for sign interpretive services must be made 48 hours
before the meeting. To make arrangements call
(979) 764-3517 or (TDD) 1-800-735-2989.
,i
S ty,
., ti/6-
.:.-- t, 4/(J Parks and Recreation Department
AN (3.
Potential Future CIP Project Summary
FY2003-2008
1,.y-11i Neighborhood Park Development
Steeplechase Park $315,000
Shenendoah Park....-- k--)41., re... - •- 'VA, -5'" .1- L',./ - - 3 a'S Ct'"f4"1- '"'"` -- 315,000
Pebble Creek Park II ' L/S S.:to i 1,,,, 40`, f,r,c..-bee‘,_ ,
f 150,000 --e.
Woodland Hills rt,34--- crwi k......,,' , - 150,000
cCypress Grove Park/Westfield — 415,000 -
Spring Loop Park — 315,000
Total $1,660,000
IL Support Facilities
l''''Nr*i„A...Forestry Shop ' ..1 $670,000
Veterans Park and Athletic Complex Shop — Iv'L,L).64.... .-.4•fi,C.-
v4c) 500,000
,
CentralPark Office Expansion...........................................................................................................................615,000 L 1
South District Satellite Operations Shop . 360,000
Renovate Central Park Shop .......c........:?..Y:-.k,Y.A.„,C..A...424.‘4,gal... 200,000
Total
III. Nei!_hborhood Plan Implementation C
rAV East Bypass Plan
fICki ?k..A Sandstone Park
Raintree(Basketball) $47,000
30,000 L ( -c)
vr4 r.
1/4}pr B. Eastgate Plan
Richard Carter Park Improvements...........................................................................................................$217,000
Thomas and Merry Oaks Parks Shade Stnictures...................................................................................._0.20,000
EastgatePark............................................................................................................................................_150,000
.-- Thomas Jogging Track...............................................................................................................................100,000
ParkBenches................................................................................................................................ 21,000
TotalNeighborhood Plan Implementation......................—___—___..................................................$508,000
IV. Community Facilities
„,...... New"South"Community Park.Phase -................................__............................................................_.$2,000,000
t ./ it 0
Neighborhood Pool for the new"South"Community Park........................................................._..................1,000,000--IP
eterans Park and Athletic Complex,Phase II 3,500,000
New Cemetery-Phase I Development 300,000 1 ..„....0-1
Lincoln Center Expansion 570,000
Cypress Grove Recreation Center 1--e.S.-......Cf,..+:.,....;‘::1,:i..S-.'.'.1.'''' 750,000
i
,.'"' ick Creek,Phase II......4%,-A- Cr.in-f4-. -.”...,....v.:,kJ-4.0.d..1.z..:-6,.,..:. . ,,. 1..... , .578,000
if N. (Q5 4'41-F 'ti
Luther Jones Landfill .“..0t..1k-A...... (‘-. 1-..‘-.C...A/St at.0...--.1'. ,u4( 4239 a-4- lkuv..L-t , ,000
Potential Tennis Court Project with the new high school.A-:M...tatm.1.47.-....0,-.‘,....--.}'Ar.,.......... ......................................?
Total.......................................---------ooe....... ..IASww:N400gL—b . ....ASMV................$4,937,000
----Y c.,
V. Park Improvements
tir Intergenerational upgrades for existing parks. $309,000
Batting Cages and Backstops at Bee Creek Park...._.....................“......................._,..........................................25,000 • 1 _ ;.--,,„
, Cover Basketball Courts at Southwood Valley Athletic Complex 330,000 L-1
Emerald Forest Park Lights, . . 30,000
0, V Woodcreek Park Lights \--A4- r-,*.1/4,-1 i?cl.b.te.-...‘,1 '' ' .1.4......) 35,000
Provide Playground Equipment Shade *144,000
TotalW. Pool Improvements
Adamson Shotgun Slide
15, r A't.'"'.f.re
Adamson Bathhouse Pitched Roof r "H. ki 1-10,,,,-6. -t-.0-A-- iN ''''t. ,
Additional Shelter at Adamson Lagoon
Total..............--7,..........-.—........—................—....-.......—............—....................—....---.....:..l7....T...
Thomas Pool Bathhouse Renovation
54- VII. Park Acquisition
1( rit
-Northgate Park 1 Ci-if-rv---t-vi rb,v eptrAL.i, 4.- INA, t,i 4,4c... . i k . ( C i
$1,000,000 ,
\-1 I
v A
Nevi-
vIPA 0/Projects/CIP/Future CW—PARD.doc
Updated:February 4,2002 $$31 4582:0055 1 000:00000 00000
CAPITAL PROJECT REQUEST
REQUEST FOR INFO ' ATION
NAME: Eric Ploeger
PHONE #: 3415
PROJECT NAME: (Neighborhood Park Development) Steeplechase Park Development.
PROJECT DESCRIPTION: Development of a neighborhood park.
PROJECT JUSTIFICATION:
PROJECT BUDGET: $315,000
OTHER INDIVIDUALS TO BE INCLUDED IN PROEJCT SCOPING ETINGS:
Pete Vanecek
Steve Beachy
0/Projects/CIP/Capital Project Request.doc
CAPITAL PROJECT REQUEST
REQUEST FOR INFO • TION
NAME: Eric Ploeger
PHONE #: 3415
PROJECT NAME: (Neighborhood Park Development) Shenendoah Park Development.
PROJECT DESCRIPTION:
PROJECT JUSTIFICATION:
PROJECT BUDGET: $315,000
OTHER INDIVIDUALS TO BE INCLUDED IN PROEJCT SCOPING ETINGS:
Pete Vanecek
Steve Beachy
0/Projects/CIP/Capital Project Request.doc
Page 2 of 37
CAPITAL PROJECT REQUEST
REQUEST FOR INFO ' ATION
N• E: Eric Ploeger
PHONE #: 3415
PROJECT NAME: (Neighborhood Park Development) Pebble Creek Park, Phase II
development.
PROJECT DESCRIPTION: Development of a donated 4-acre park in Pebble Creek.
PROJECT JUSTIFICATION:
PROJECT BUDGET: $150,000
OTHER INDIVIDUALS TO BE INCLUDED IN PROEKT SCOPING MEETINGS:
Pete Vanecek
Steve Beachy
0/Projects/CEP/Capital Project Request.doc
Page 3 of 37
CAPITAL PROJECT REQUEST
REQUEST FOR INFORMATION
NAME: Eric Ploeger
PHONE #: 3415
PROJECT NAME: (Neighborhood Park Development) Woodland Hills Park Development.
PROJECT DESCRIPTION:
PROJECT JUSTIFICATION:
PROJECT Bt I GET: $150,000
OTHER INDIVIDUALS TO BE INCLUDED IN PROEICT SCOPING MEETINGS:
Pete Vanecek
Steve Beachy
OfProjects/CIP/Capital Project Request.doc
Page 4 of 37
CAPITAL PROJECT REQUEST
REQUEST FOR INFO TION
NAME: Eric Ploeger
PHONE #: 3415
PROJECT NAME: (Neighborhood Park Development) Cypress Grove/Westfield Park
Development.
PROJECT DESCRIPTION: Funding for neighborhood park amenities for a park located on
CSISD property between Cypress Grove Middle School and the new Elementary School to be
built on the south end of the property. Westfield Park is small and very close. It will receive
minimal development
PROJECT JUSTIFICATION: $415,000
PROJECT BUDGET: $315,000 for Cyress Grove
$100,000 for Westfield
Total $415,000
OTHER lIVIDUALS TO BE INCLUDED IN PROEJCT SCOPING MEETINGS:
Pete Vanecek
Steve Beachy
0/Projects/CIP/Capital Project Request.doc
Page 5 of 37
CAPITAL PROJECT REQUEST
REQUEST FOR INFOR TION
NAME: Eric Ploeger
PHONE #: 3415
PROJECT NAME (Neighborhood Park Development) Spring Loop Park
PROJECT DESCRIPTION® Development of the neighborhood park.
PROJECT JUSTIFICATION® The northern portion of Park Zone 2 is underserved.
PROJECT BUDGET: $315,000
OTHER INDIVIDUALS TO BE INCLUDED IN PROEJCT SCOPING MEETINGS:
Steve Beachy
Pete Vanecek
0/Projects/CIP/Capital Project Request.doc
Page 6 of 37
CAPITAL PROJECT REQUEST
REQUEST FOR INFOR ATION
NAME: Eric Ploeger
PHONE #: 3415
PROJECT NAME: (Support Facilities) Forestry Shop
PROJECT DESCRIPTION: New Forestry Shop
PROJECT JUSTIFICATION: Shop needed for added staff and equipment and to provide
additional space for the Central Operations District.
PROJECT BUDGET: $670,000
5,000 SF Shop Space, office space, restrooms,break rooms and storage, including design
fees $520,000
Paving for perimeter 25,000
Soil and mulch storage 40,000
Fencing 15,000
Equipment Storage 50,000
Utilities 20,000
Total
OTHER INDIVIDUALS TO BE INCLUDED IN PROEJCT SCOPING ETINGS:
Pete Vanecek
Steve Beachy
0/Projects/CIP/Capital Project Request.doc
Page 7 of 37
CAPITAL PROJECT REQUEST
REQUEST FOR INFOR TION
NAME: Eric Ploeger
PHONE #: 3415
PROJECT NAME: (Support Facilities) Veterans Park and Athletic Complex Shop.
PROJECT DESCRIPTION: Expand the Veterans Park Shop.
PROJECT JUSTIFICATION: Additional space for a growing park and expansion into an
additional operations district.
PROJECT BUDGET: $500,000
OTHER INDIVIDUALS TO BE INCLUDED IN PROUCT SCOPING MEETINGS:
Pete Vanecek
Steve Beachy
0/Projects/CIP/Capital Project Request.doc
Page 8 of 37
CAPITAL PROJECT REQUEST
REQUEST FOR INFORMATION
NAME: Eric Ploeger
PHONE #: 3415
PROJECT NAME: (Support Facilities) Central Park Office Expansion.
PROJECT DESCRIPTION: Additional office building behind the Central Park Office.
PROJECT JUSTIFICATION:.Additional space needed for staff now located at other sites,
additional meeting and storage space.
PROJECT BUDGET: —$615,000
5-Year Need Square Feet
Five (5) Offices for 1,125 SF
Two (2) Kids Klub Employees
Two (2) Senior Program Employees
—One(1) Volunteer Coordinator
Kids Klub Workroom 375
Aquatics Workroom 375
InternWork Area...............................................................................400
Additional Conference/Meeting Area(for Parks Board, etc.)........1,200
Restrooms ..........................................................................................500
Enlarge current PARD meeting and provide vending area 400
Total Square Footage Needed: 4,375 SF
Cost
4,375 SF X $125 =
ArchFees......................................................................................55,000
Utilities 10,000
Total 5-Year Need $611,875
10 to 20-Year Need Cost
Eight(8) Additional Offices (1,800 SF)
Renovate existing office .....................................................................50,000
Fees
22,500
Total 10 to 20-Year Need ...............................................................$297,500
OTHER INDIVIDUALS TO BE INCLUDED IN PROEJCT SCOPING MEETINGS:
Pete Vanecek
Steve Beachy
0/Projects/OP/Capital Project Request.doc
Page 9 of 37
CAPITAL PROJECT REQUEST
REQUEST FOR INFOR TION
NAME: Eric Ploeger
PHONE #: 3415
PROJECT NAME: (Support Facilities) South District Satellite Operations Shop.
PROJECT DESCRIPTION: Small shop located in southern portion of the City.
PROJECT JUSTIFICATION: Shop for maintenance personnel that cover the parks added to
the City South of Rock Prairie Road.
PROJECT BUDGET: $360,000
3,000 SF, including design fees..........................................$325,000
Pavingand Fencing..................................................._........_25,000
Utilities.................................................................._...............10,000
Total: $360,000
OTHER INDIVIDUALS TO BE INCLUDED IN PROEJCT SCOPING MEETINGS:
Pete Vanecek
Steve Beachy
0/Projects/CIP/Capital Project Request.doc
Page 10 of 37
CAPITAL PROJECT REQUEST
REQUEST FOR INFO TION
NAME: Eric Ploeger
PHONE #: 3415
PROJECT NAME: (Support Facilities) Central Park Shop Renovation.
PROJECT DESCRIPTION:
PROJECT JUSTIFICATION: Renovate the Central Park Shop after the new Forestry Shop is
built. This will become completely the Central District Shop.
PROJECT BUDGET: $200,000
• Renovate restrooms for H.C. access;
• Electrical;
• Enlarge/move break room;
• Plumbing;
• Charge walls;
• Add concrete paving for driveways and parking; and
• Fill in pit.
OTHER INDIVIDUALS TO BE INCLUDED IN PROEJCT SCOPING ETINGS:
Pete Vanecek
Steve Beachy
0/Projects/CLP/Capital Project Request.doc
Page 11 of 37
CAPITAL PROJECT REQUEST
REQUEST FOR INFOR TION
NAME: Eric Ploeger
PHONE #: 3415
PROJECT NAME: (Neighborhood Plan Implementation) Sandstone Park Improvements.
PROJECT DESCRIPTION:
PROJECT JUSTIFICATION: Improvements listed in the East Bypass Plan.
PROJECT BUDGET: $47,000
Swing Set 000
Shade Cover for Playground...................................................10,000
Three (3) Shaded Benches @ $3,000 9,000
Larger Shelter 20,000
StaffCost @ 5% .......................................................................2 000
Total 000
OTHER INDIVIDUALS TO BE INCLUDED IN PROEJCT SCOPING ETINGS:
Pete Vanecek
Steve Beachy
OiProj ects/CIP/Capital Project Request.doc
Page 12 of 37
CAPITAL PROJECT REQUEST
REQUEST FOR INFOR TION
NAME: Eric Ploeger
PHONE #: 3415
PROJECT NAME: (Neighborhood Plan Implementation) Raintree Basketball Court Addition.
PROJECT DESCRIPTION: Bond funds to augment existing bond and dedication funds to
build a basketball court.
PROJECT JUSTIFICATION: Court requested during a neighborhood park meeting regarding
park improvements.
PROJECT BUDGET: $30,000
OTHER INDIVIDUALS TO BE INCLUDED IN PROEJCT SCOPING MEETINGS:
Pete Vanecek
Steve Beachy
0/Projects/CEP/Capital Project Request.doc
Page 13 of 37
CAPITAL PROJECT REQUEST
REQUEST FOR INFOR ATION
NAME: Eric Ploeger
PHONE #: 3415
PROJECT NAME: (Neighborhood Plan Implementation) Richard Carter Park Improvements.
PROJECT DESCRIPTION:
PROJECT JUSTIFICATION: Improvements listed in the Eastgate Plan.
PROJECT BUDGET: —$217,000
Two (2) shaded playgrounds and jogging trail
Swing Set
Take out brick walks and add concrete walks 70,000
Addition of a 1/4 mile jogging tract with rubber cushioning .........................80,000
Two (2) benches 3,000
H.C. fountains 3,500
Staff cost @ 5% 10,000
Total
OTHER INDIVIDUALS TO BE INCLUDED IN PROUCT SCOPING MEETINGS:
Pete Vanecek
Steve Beachy
0/Projects/C1P/Capital Project Request.doc
Page 14 of 37
CAPITAL PROJECT REQUEST
REQUEST FOR INFO ' ATION
NAME: Eric Ploeger
PHONE #: 3415
PROJECT NAME: (Neighborhood Plan Implementation) Thomas and Merry Oaks Playground
Shade Structures.
PROJECT DESCRIPTION: Shade covers at the playgrounds.
PROJECT JUSTIFICATION: Item listed in the Eastgate Plan.
PROJECT B 1 GET: $20,000
Two (2) shade covers for Thomas
Shade cover for Merry Oaks
Total
OTHER INDIVIDUALS TO BE INCLUDED IN PROEJCT SCOPING MEETINGS:
Pete Vanecek
Steve Beachy
0/Projects/CIP/Capital Project Request.doc
Page 15 of 37
CAPITAL PROJECT REQUEST
REQUEST FOR INFO ATION
NAME: Eric Ploeger
PHONE #: 3415
PROJECT NAME: (Neighborhood Plan Implementation) Eastgate Park Improvements.
PROJECT DESCRIPTION:
PROJECT JUSTIFICATION: Improvements listed in the East Bypass Plan.
PROJECT BI IGET: $150,000
OTHER I IVIDUALS TO BE INCLUDED IN PROUCT SCOPING I I ETINGS:
Pete Vanecek
Steve Beachy
0/Projects/CIP/Capital Project Request.doc
Page 16 of 37
CAPITAL PROJECT REQUEST
REQUEST FOR INFORMATION
NAME: Eric Ploeger
PHONE #: 3415
PROJECT NA : (Neighborhood Plan Improvements) Thomas Park jogging tract
improvement.
PROJECT DESCRIPTION: Convert the Thomas Park jogging tract to a concrete tract with
rubberized surfacing.
PROJECT JUSTIFICATION: Project listed in the Eastgate Neighborhood Plan.
PROJECT B 1 GET: $100,000
Remove existing red dog and steel edging ............ $2,000
New concrete (1,420 SF X 6'= 8,520 SF X$5.00).........................................42,600.....................
Rubberized cushioning(1,740 SF X 6'= 10,440 SF X $5.00) .......................52,200
Staff cost @ 5% 3,200
Total .................$100,000
OTHER INDIVIDUALS TO BE INCLUDED IN PROEJECT SCOPING ETINGS:
Pete Vanecek
Steve Beachy
0/Proj ects/C LP/Capital Project Request.doc
Page 17 of 37
CAPITAL PROJECT REQUEST
REQUEST FOR INFOR TION
NAME: Eric Ploeger
PHONE #: 3415
PROJECT NAME: (Neighborhood Plan Implementation) Additional park benches in the
Eastgate area.
PROJECT DESCRIPTION: Add ten (10)park benches in the Eastgate Plan Area.
PROJECT JUSTIFICATION: Item listed in the Eastgate Neighborhood Plan.
PROJECT BUDGET: $21,000
Park Bench(s)
Lions 1
Thomas 6
Parkway 1
Eastgate 2
Merry Oaks 2
Oaks 2
Total 14
14 benches X $1,500 = $21,000
OTHER DIVIDUALS TO BE INCLUDED IN PROEJCT SCOPING MEETINGS:
Pete Vanecek
Steve Beachy
0/Projects/CIP/Capital Project Request.doc
Page 18 of 37
CAPITAL PROJECT REQUEST
REQUEST FOR INFOR A TION
NAME: Eric Ploeger
PHONE #: 3415
PROJECT NAME: (Community Facilities) New "South" Community Park
PROJECT DESCRIPTION: Partial development of new park located on Rock Prairie Road
next to the landfill.
PROJECT JUSTIFICATION: Potential development for athletic practice fields including
parking and restrooms. Utilities and irrigation systems to be included.
PROJECT BUDGET: $2,000,000 for initial development of athletic facilities, including
restrooms and parking.
OTHER INDIVIDUALS TO .E INCLUDED IN PROEJECT SCOPING ETINGS:
Steve Beachy
Pete Vanecek
Peter Lamont
0/Projects/CIP/Capital Project Request.doc
Page 19 of 37
CAPITAL PROJECT REQUEST
REQUEST FOR INFO' ATION
NAME: Eric Ploeger
PHONE #: 3415
PROJECT NAME: (Community Facilities) Neighborhood Pool for the new "South"
Community Park.
PROJECT DESCRIPTION: Pool and bathhouse.
PROJECT JUSTIFICATION: Pool to serve the future needs of the south part of College
Station.
PROJECT B 1 GET: $1,000,000.
OTHER INDIVIDUALS TO BE INCLUDED IN PROEJCT SCOPING MEETINGS:
Steve Beachy
Vera Solis
0/Projects/CIP/Capital Project Request.doc
Page 20 of 37
CAPITAL PROJECT REQUEST
REQUEST FOR INFORMATION
NAME: Eric Ploeger
PHONE #: 3415
PROJECT NAME: (Community Facilities) Veterans Park and Athletic Complex, Phase II
Development.
PROJECT DESCRIPTION: Addition to Veterans Park and Athletic Complex.
PROJECT JUSTIFICATION: Further additions toward completion of Veterans Park master
plan.
PROJECT BUDGET: $3,500,000 to complete the 5-field softball complex with restrooms and
activity building. This includes parking, storm drainage and utilities.
OTHER INDIVIDUALS TO BE INCLUDED IN PROEJCT SCOPING MEETINGS:
Pete Vanecek
Steve Beachy
',,,,,
-c----
'
,
\.‘
\A\''
,
k:'
",-
7
\`',—..•LN\C
(C,
,..-'
,,,
0/Projects/CIP/Capital Project Request.doc
Page 21 of 37
CAPITAL PROJECT REQUEST
REQUEST FOR INFO ' ATION
NAME: Eric Ploeger
PHONE #: 3415
PROJECT NAME: (Community Facilities) New Cemetery Phase I Development.
PROJECT DESCRIPTION: Development of the first phase of the new cemetery..
PROJECT JUSTIFICATION:
PROJECT BUDGET: $300,000
OTHER INDIVIDUALS TO BE INCLUDED IN PROEJCT SCOPING MEETINGS:
Pete Vanecek
Steve Beachy
Ross Albrecht
0/Projects/CIP/Capital Project Request.doc
Page 22 of 37
CAPITAL PROJECT REQUEST
REQUEST FOR INFORMATION
NAME: Eric Ploeger
PHONE #: 3415
PROJECT NAME: (Community Facilities) Lincoln Center Expansion.
PROJECT DESCRIPTION: Approximately 3,500 SF expansion to include activity room,
weight/fitness room, and dressing rooms.
PROJECT JUSTIFICATION: Teams using the gym have no dressing facilities. The use of
the center is very high and expansion is needed to ease overcrowding. Requests have been made
for a weight room.
PROJECT BUDGET: $570,000
3,500 SF at $150
Weight room equipment
Remodel of Lincoln office space
Total
OTHER INDIVIDUALS TO BE INCLUDED IN PROEJCT SCOPING MEETINGS:
Pete Vanecek
Lance Jackson
David Gerling
0/Projects/CIP/Capital Project Request.doc
Page 23 of 37
CAPITAL PROJECT REQUEST
REQUEST FOR INFO ATION
NAME: Eric Ploeger
PHONE 3415
PROJECT NAME: (Community Facilities) Cypress Grove Recreation Center
PROJECT DESCRIPTION: Participation with CSISD in the development of a recreation
center adjoining the new Cypress Grove Elementary. This is a joint-use project with possibilities
of a TPWD grant.
PROJECT JUSTIFICATION: This joint-use facility will benefit CSISD and the City of
College Station. The facility will be used by the School District during the day and the City at
nights and weekends.
PROJECT BUDGET: $750,000 match from City of College Station
THER INDIVIDUALS TO BE INCLUDED IN PROEJCT SCOPING MEETINGS:
Steve Beachy
Peter Lamont
0/Projects/CIP/Capital Project Request.doc
Page 24 of 37
CAPITAL PROJECT REQUEST
REQUEST FOR INFORMATION
NAME: Eric Ploeger
PHONE #: 3415
PROJECT NAME: (Park Development) Lick Creek Park Phase II Development.
PROJECT DESCRIPTION: Continuation of development to complete the approved master
plan.
PROJECT JUSTIFICATION:
PROJECT BUDGET: $578,000
OTHER INDIVIDUALS TO BE INCLUDED IN PROEJCT SCOPING MEETINGS:
Pete Vanecek
Steve Beachy
0/Projects/C1P/Capital Project Request.doc
Page 25 of 37
CAPITAL PROJECT REQUEST
REQUEST FOR INFO TION
NAME: Eric Ploeger
PHONE #: 3415
PROJECT NAME: (Neighborhood Park Development) Luther Jones Landfill Park
Development.
PROJECT DESCRIPTION: Development of the closed landfill on Texas Avenue to match the
Parks and Recreation Advisory Board's approved master plan.
PROJECT JUSTIFICATION: Utilization of landfill for recreational purpose including
greenbelt linkage.
PROJECT BUDGET: $239,000
OTHER INDIVIDUALS TO BE INCLUDED IN PROEJCT SCOPING MEETINGS:
Pete Vanecek
Steve Beachy
O/Projects/CIP/Capital Project Request.doc
Page 26 of 37
CAPITAL PROJECT REQUEST
REQUEST FOR INFORMATION
NAME: Eric Ploeger
PHONE #: 3415
PROJECT NAME: (Park Improvements) Intergenerational Enhancements
PROJECT DESCRIPTION: Addition of intergenerational features to existing parks.
PROJECT JUSTIFICATION: City Council Vision Statement VS4S3a.
PROJECT BUDGET: $309,000
Anderson (drink fountains and playground cover)
Bee Creek(drink fountains, tot playground, and four benches)...............w...30,000
Brothers (drink fountain, five benches, six lights, trees, playground cover)_60,000
Central (four benches).......................................................................................6,000
Cy Miller(two benches) ____________________________________3,000
Emerald Forest(two benches) ..........................................................................3,000
Georgie K. Fitch(drink fountain).........................................._______ ..._.....3,500
J.D. Miller(two benches, trees, and jogging13,000
Lemontree (four benches and seven lights) ....................................................41,000
Lincoln Center(four benches) 6,000
Parkway(Sidewalks and two
Pebble Creek(four benches).............................................................................6,000
Raintree (drink3,500
Sandstone(two
Woodcreek(four benches)
Longmire (concrete sidewalks and two benches)
Staffcost @ 5%___________________________________________15,000
Total............................................................................................................$309,000
OTHER INDIVIDUALS TO BE INCL lED IN PROEJCT SCOPING ETINGS:
Steve Beachy
Pete Vanecek
Curtis Bingham
0/Projects/CIP/Capital Project Request.doc
Page 27 of 37
CAPITAL PROJECT REQUEST
REQUEST FOR INFORMATION
NAME: Eric Ploeger
PHONE #: 3415
PROJECT NAME: (Park Improvements) Batting cages and backstops at Bee Creek Park.
PROJECT DESCRIPTION: Install batting cages and backstops at Bee Creek Park.
PROJECT JUSTIFICATION: Request made by Girls Softball Program.
PROJECT BUDGET: $25,000
OTHER INDIVIDUALS TO BE INCLUDED IN PROEJCT SCOPING MEETINGS:
Pete Vanecek
Steve Beachy
0/Projects/C1P/Capital Project Request.doc
Page 28 of 37
CAPITAL PROJECT REQUEST
REQUEST FOR INFO k TION
NAME: Eric Ploeger
PHONE #: 3415
PROJECT NAME: (Park Improvements) Cover for basketball courts at Southwood Valley
Athletic Complex.
PROJECT DESCRIPTION: Covered roof with lights for basketball courts at Southwood
Valley Athletic Complex.
PROJECT JUSTIFICATION: Provide an all-weather area for increased programming at the
"Exit" Teen Center, and provide an additional amenity for the community.
PROJECT BUDGET: $330,000, including design fees.
OTHER INDIVIDUALS TO BE INCLUDED IN PROEJCT SCOPING MEETINGS:
Pete Vanecek
Steve Beachy
0/Projects/CLP/Capital Project Request.doc
Page 29 of 37
CAPITAL PROJECT REQUEST
REQUEST FOR INFOR A TION
NAME: Eric Ploeger
PHONE #: 3415
PROJECT NAME: (Park Improvements) Emerald Forest Park Lights.
PROJECT DESCRIPTION: Area lights for Emerald Forest Park.
PROJECT JUSTIFICATION: Intergenerational and safety features for the park.
PROJECT BUDGET: Six lights on 12poles X $5,000 = $30,000
OTHER INDIVIDUALS TO BE INCLUDED IN PROEJCT SCOPING MEETINGS:
Pete Vanecek
Steve Beachy
0/Projects/CIP/Capital Project Request.doc
Page 30 of 37
CAPITAL PROJECT REQUEST
REQUEST FOR INFORMATION
NAME: Eric Ploeger
PHONE #: 3415
PROJECT NAME: (Park Improvements) Woodcreek Park Lights.
PROJECT DESCRIPTION: Addition of area lights for Woodcreek Park.
PROJECT JUSTIFICATION: Intergenerational and safety feature for the park.
PROJECT BUDGET: Seven 12' light poles X $5,000 = $35,000
OTHER INDIVIDUALS TO BE INCLUDED IN PROEJCT SCOPING MEETINGS:
Pete Vanecek
Steve Beachy
0/Projects/CEP/Capital Project Request.doc
Page 31 of 37
CAPITAL PROJECT REQUEST
REQUEST FOR INFORMATION
NAME: Eric Ploeger
PHONE #: 3415
PROJECT NAME: (Park Improvements) Playground Equipment Shade Covers
PROJECT DESCRIPTION: Addition of shade covers in parks that lack shade in the open
playground areas.
PROJECT JUSTIFICATION:
PROJECT BUDGET: $144,000
OTHER INDIVIDUALS TO BE INCLUDED IN PROEJCT SCOPING MEETINGS:
Pete Vanecek
16 Playgrounds @ $9,000 each.
Parks
Anderson
Brothers Pond
Georgie K. Fitch
Gabbard
Jack and Dorothy Miller(2)
Lemontree
Lincoln Center
Pebble Creek(2)
Sandstone
Southwood (2)
Thomas
W.A. Tarrow
Wolf Pen Creek
0/Projects/CW/Capital Project Request.doc
Page 32 of 37
CAPITAL PROJECT REQUEST
REQUEST FOR INFORMATION
NAME: Eric Ploeger
PHONE #: 3415
PROJECT NAME: (Pool Improvements) Adamson Lagoon Shotgun Slide.
PROJECT DESCRIPTION: Add slide at Adamson Lagoon.
PROJECT JUSTIFICATION: This slide will replace the diving board removed during the last
renovation at the pool in the deep end.
PROJECT BUDGET: $50,000
OTHER INDIVIDUALS TO BE INCLUDED IN PROEJCT SCOPING MEETINGS:
Pete Vanecek
Steve Beachy
Vera Solis
O/Projects/CIP/Capital Project Request.doc
Page 33 of 37
CAPITAL PROJECT REQUEST
REQUEST FOR INFO' ATION
NAME: Eric Ploeger
PHONE #: 3415
PROJECT NAME: (Pool Improvements) Adamson Lagoon bathhouse roof.
PROJECT DESCRIPTION: New pitched roof for the bathhouse at Adamson Lagoon. The
building is approximately 2,200 SF.
PROJECT JUSTIFICATION: This project will correct chronic leaks and improve air
circulation in the bathhouse.
PROJECT B I GET: $85,000, including architect fees.
OTHER INDIVIDUALS TO BE INCLUDED IN PROEJCT SCOPING MEETINGS:
Steve Beachy
Vera Solis
0/Projects/CIP/Capital Project Request.doc
Page 34 of 37
CAPITAL PROJECT REQUEST
REQUEST FOR INFO ATION
NAME: Eric Ploeger
PHONE #: 3415
PROJECT NAME: (Pool Improvements) Additional shelter at Adamson Lagoon.
PROJECT DESCRIPTION: Add shelter(approximately 1,500 SF) to the South side of the
pool.
PROJECT JUSTIFICATION: Provide needed shade for the growing number of customers at
the facility.
PROJECT BUDGET: $40,000
OTHER INDIVIDUALS TO BE INCLUDED IN PROEJCT SCOPING MEETINGS:
Steve Beachy
Vera Solis
0/Projects/OP/Capital Project Request.doc
Page 35 of 37
CAPITAL PROJECT REQUEST
REQUEST FOR INFOR TION
NAME: Eric Ploeger
PHONE #: 3415
PROJECT NAME: (Pool Improvements) Thomas Pool bathhouse renovation.
PROJECT DESCRIPTION: Renovate bathhouse that was built in 1980, and the addition of an
office.
PROJECT JUSTIFICATION: The bathhouse needs renovation to improve ventilation,
storage, and guard facilities. An additional office also needs to be added.
PROJECT BUDGET: $150,000
• Upgrade restrooms for H.C. access;
• Add on for larger office area;
• Repair wood beams;
• Repair roof; and
+ Concrete, electrical, and plumbing expenses.
OTHER INDIVIDUALS TO BE INCL tED IN PROEJCT SCOPING MEETINGS:
Steve Beachy
Vera Solis
0/Projects/CIP/Capital Project Request.doc
Page 36 of 37
CAPITAL PROJECT REQUEST
REQUEST FOR INFO ' ATION
NAME: Eric Ploeger
PHONE #: 3415
PROJECT NAME: (Park Acquistion)Northgate Park Acquisition.
PROJECT DESCRIPTION: Acquisition of property for a Northgate Park. Some parkland
dedication funds will also be available.
PROJECT JUSTIFICATION: Northgate is an undeserved area in te s of park land.
PROJECT Br I GET: —$1,000,000
OTHER INDIVIDUALS TO BE INCLUDED IN PROEJCT SCOPING MEETINGS:
Pete Vanecek
Steve Beachy
Charles Wood
Kim Foutz
Gary Balmain
0/Projects/CIP/Capital Project Request.doc