HomeMy WebLinkAbout03/26/2015 - Workshop Agenda Packet - City CouncilCity Council Workshop
College Station, TX
Meeting Agenda - Final
City Hall
1101 Texas Ave
College Station, TX 77840
City Hall Council Chambers4:30 PMThursday, March 26, 2015
1. Call meeting to order.
2. Executive Session will be held in the Administrative Conference Room.
Consultation with Attorney {Gov ’t Code Section 551.071}; possible action. The City
Council may seek advice from its attorney regarding a pending or contemplated
litigation subject or settlement offer or attorney -client privileged information. Litigation is
an ongoing process and questions may arise as to a litigation tactic or settlement offer,
which needs to be discussed with the City Council. Upon occasion the City Council
may need information from its attorney as to the status of a pending or contemplated
litigation subject or settlement offer or attorney -client privileged information. After
executive session discussion, any final action or vote taken will be in public. The
following subject(s) may be discussed:
Litigation
a. Deluxe Burger Bar of College Station, Inc. D/B/A Café Eccell v. Asset Plus Realty
Corporation, City of College Station, Texas and the Research Valley Partnership, Inc .,
Cause No. 13 002978 CV 361, In the 361st Judicial District Court, Brazos County,
Texas
b. Margaret L. Cannon v. Deputy Melvin Bowser, Officer Bobby Williams, Officer
Tristan Lopez, Mr. Mike Formicella, Ms. Connie Spence, Cause No. 13 002189 CV
272, In the 272nd District Court of Brazos County, Texas
c. Bobby Trant v. BVSWMA, Inc., Cause No. 33014, In the District Court, Grimes
County, Texas, 12th Judicial District
d. Juliao v. City of College Station, Cause No. 14-002168-CV-272, In the 272nd District
Court of Brazos County, Texas
5:30 P.M.
3. Take action, if any, on Executive Session.
4. Presentation, possible action and discussion on items listed on the consent agenda.
Presentation, possible action, and discussion relating to receiving 15-01435.
Page 1 College Station, TX Printed on 3/20/2015
March 26, 2015City Council Workshop Meeting Agenda - Final
the annual audit reports and Comprehensive Annual Financial
Report (CAFR) for the fiscal year ended September 30, 2014.
Sponsors:Kersten
Presentation, possible action, and discussion regarding the
Veteran’s Park and Athletic Complex Build-Out.
15-01346.
VPAC_OVERALL_3-26-15.pdf
VPAC_Build-out OPCC (3 26 15).pdf
Veterans Park Build-out OM 3-2015.docx
Attachments:
7. Council Calendar - Council may discuss upcoming events.
8.Presentation, possible action, and discussion on future agenda items and review of
standing list of Council generated agenda items: A Council Member may inquire about
a subject for which notice has not been given. A statement of specific factual
information or the recitation of existing policy may be given. Any deliberation shall be
limited to a proposal to place the subject on an agenda for a subsequent meeting.
9.Discussion, review and possible action regarding the following meetings: Animal
Shelter Board, Arts Council of Brazos Valley, Arts Council Sub-committee, Audit
Committee, Bicycle, Pedestrian, and Greenways Advisory Board, Bio-Corridor Board of
Adjustments, Blinn College Brazos Valley Advisory Committee, Brazos County Health
Dept., Brazos Valley Council of Governments, Bryan/College Station Chamber of
Commerce, Budget and Finance Committee, BVSWMA, BVWACS, Compensation and
Benefits Committee, Convention & Visitors Bureau, Design Review Board, Economic
Development Committee, Gigabit Broadband Initiative, Historic Preservation
Committee, Interfaith Dialogue Association, Intergovernmental Committee, Joint Relief
Funding Review Committee, Landmark Commission, Library Board, Metropolitan
Planning Organization, Parks and Recreation Board, Planning and Zoning
Commission, Research Valley Partnership, Research Valley Technology Council,
Regional Transportation Committee for Council of Governments, Sister Cities
Association, Transportation and Mobility Committee, TAMU Student Senate, Texas
Municipal League, Twin City Endowment, Youth Advisory Council, Zoning Board of
Adjustments, (Notice of Agendas posted on City Hall bulletin board).
10. Adjourn
The City Council may adjourn into Executive Session to consider any item listed on this
agenda if a matter is raised that is appropriate for Executive Session discussion. An
announcement will be made of the basis for the Executive Session discussion.
APPROVED
_____________________
City Manager
Page 2 College Station, TX Printed on 3/20/2015
City Hall
1101 Texas Ave
College Station, TX 77840
College Station, TX
Legislation Details (With Text)
File #: Version:115-0143 Name:CAFR & Audit 2014
Status:Type:Presentation Agenda Ready
File created:In control:3/10/2015 City Council Workshop
On agenda:Final action:3/26/2015
Title:Presentation, possible action, and discussion relating to receiving the annual audit reports and
Comprehensive Annual Financial Report (CAFR) for the fiscal year ended September 30, 2014.
Sponsors:Jeff Kersten
Indexes:
Code sections:
Attachments:
Action ByDate Action ResultVer.
Presentation, possible action, and discussion relating to receiving the annual audit reports and
Comprehensive Annual Financial Report (CAFR) for the fiscal year ended September 30, 2014.
Recommendation(s): On March 24th the Council Audit Committee reviewed the reports. Staff
recommends that Council accept the 2014 audit reports and CAFR.
Summary: The City's Charter and Fiscal and Budgetary Policies along with State law require that not
less than thirty (30) days prior to the end of each fiscal year, the City Council shall designate a qualified
public accountant or accountants who, as of the end of the fiscal year, shall make an independent audit of
accounts and other evidences of financial transactions of the City government and shall submit the report
to the City Council. Also, the City's budgetary policies require that the auditor jointly review the
management letter/audit results with the City Council within 30 days of receipt by the staff.
Mr. Jimmy Ingram of Ingram, Wallis & Associates will present the results of the fiscal year 2014 audit and
present, along with staff, the 2014 CAFR. Mr. Ingram will also be available to answer any questions the
City Council may have.
This item was presented to the Audit Committee on March 24th.
Budget & Financial Summary: The reports provide a summary of the City's financial position as of
September 30, 2014.
Legal Review:
Attachments:
1. Comprehensive Annual Financial Report for the Fiscal Year ended September 30, 2014
(Delivered to Council under separate cover)
2. Single Audit Reports (Delivered to Council under separate cover)
College Station, TX Printed on 3/20/2015Page 1 of 2
powered by Legistar™
File #:15-0143,Version:1
3. Management Letter (Delivered to Council under separate cover)
4. Staff response to Management Letter (Delivered to Council under separate cover)
College Station, TX Printed on 3/20/2015Page 2 of 2
powered by Legistar™
City Hall
1101 Texas Ave
College Station, TX 77840
College Station, TX
Legislation Details (With Text)
File #: Version:315-0134 Name:Veteran’s Park and Athletic Complex Build-Out.
Status:Type:Presentation Agenda Ready
File created:In control:3/9/2015 City Council Workshop
On agenda:Final action:3/26/2015
Title:Presentation, possible action, and discussion regarding the Veteran’s Park and Athletic Complex
Build-Out.
Sponsors:
Indexes:
Code sections:
Attachments:VPAC_OVERALL_3-26-15.pdf
VPAC_Build-out OPCC (3 26 15).pdf
Veterans Park Build-out OM 3-2015.pdf
Action ByDate Action ResultVer.
Presentation, possible action, and discussion regarding the Veteran's Park and Athletic Complex
Build-Out.
Recommendation(s): Staff recommends approval.
Summary: The Veteran's Park and Athletic Complex build-out consists of adding four additional full
size athletic fields, lighting, 750+ parking spaces, and amenities throughout the park such as shade,
playgrounds, and splash pads. Located on the University Drive side of the park, the multi-use
athletic fields will be constructed of synthetic turf, similar to the recently installed synthetic turf fields
adjacent to the American Pavilion. One of the fields will be designed as a championship field with
seating for approximately 1,710 spectators with room to add portable bleachers and berms to take
the capacity to approximately 2,856. Restrooms, locker rooms, storage , and a press box are also
included to make the facility attractive to the many different sports organizations that we expect to
utilize Veteran's Park for their events. Events expected include soccer, football, lacrosse, and a
myriad of other sports events that can play on these types of facilities.
Budget & Financial Summary: This project carries with it an estimate of $10,971,700 for
construction, $1,097,177 for professional design services, geotechnical reporting and testing, and a
20% contingency of $2,194,345. Total project cost is $14,263,301. The intent is to utilize Hotel
Occupancy Tax funds for the project. The project can be bid so as to allow for several of the items,
such as the splash pads, to be add alternates that can be completed at a later date should the funds
be limited at this time. Staff estimates operations and maintenance costs of $124,000, which
includes one additional grounds worker position. A budget amendment will be needed to appropriate
funds for this project.
Attachments:
College Station, TX Printed on 3/20/2015Page 1 of 2
powered by Legistar™
File #:15-0134,Version:3
1) Veteran's Park and Athletic Complex Build-Out map
2) Project design and construction estimate.
3) Staff estimate of operations and maintenance costs.
College Station, TX Printed on 3/20/2015Page 2 of 2
powered by Legistar™
VETERANS PARK ATHLETIC COMPLEX
BUILD-OUT MASTER PLAN
CLIENT |CITY OF COLLEGE STATION
DESIGN| BAKER-AICKLEN & ASSOC.
250'125'0'
3.26.15
13
12
11
15
14
9
7
8
10
4
3
6
5
2
1
PROPOSED CHAMPIONSHIP
SYNTHETIC FIELD
EXISTING SYNTHETIC FIELD
PROPOSED PARKING
LOT H (260)
PROPOSED PARKING
LOT G (225)
PROPOSED PARKING
LOT F (160)
EXISTING SYNTHETIC FIELD
EXISTING GRASS FIELD
EXISTING GRASS FIELD
EXISTING GRASS FIELD
PROPOSED SYNTHETIC FIELD
PROPOSED SYNTHETIC FIELD
EXISTING GRASS FIELD
EXISTING GRASS FIELD
EXISTING GRASS FIELD
EXISTING GRASS FIELD
EXISTING GRASS FIELD
EXISTING GRASS FIELD
PROPOSED DETENTION POND
EXISTING DETENTION POND
PROP. SPLASH PAD
PROP. PLAYGROUND
EXISTING PARKING
EXISTING PARKING
EXISTING PARKING
EXISTING SOFTBALL COMPLEX
EXISTING PARKING
EXISTING PARKING
EXIST. RESTROOM
EXIST. RESTROOM
EXIST. RESTROOM/PAVILION
PLAYGROUND
EXISTING PARKING
OPTIONAL SYNTHETIC
PRACTICE FIELD
PROP. SPECTATOR
SHADE AREA
PROP. SPECTATOR
SHADE AREAPROP. SPECTATOR
SHADE AREA
PROP. SPECTATOR
SHADE AREA
PROP. SPECTATOR
SHADE AREA
PROP. SPECTATOR
SHADE AREA
PROP. PLAYGROUND/
SPLASH PAD
PROP. SPECTATOR
SHADE AREAUNIVERSITY DR. / HWY. 60HARVEY ROAD / HWY. 30100 YR. FLOODPLAIN
100 YR. FLOODPLAIN
OPTIONAL SYNTHETIC
PRACTICE FIELD
EXISTING WAR MEMORIALS
EXIST. PARK
MAINTENANCE FACILITY
PROPOSED DETENTION POND
PROPOSED PARKING
LOT I (100)
NORTH
3.26.15
Item Quantity Unit Unit Price Amount Running Total
Championship Field Pavilion | Spectator Area $2,513,500.00
Ground Level: (2) 3,000 sf. locker rooms with shower/restroom, trainer and office, (3) tunnels.6,000 SF 200.00 1,200,000.00
Upper Level: (1) 2,000 sf. concession, (2)1,000 sf. restrooms approx. 20 stalls/side 4,000 SF 200.00 800,000.00
Terrace Seating: 580 seats, aisles, rails 1 LS 145,000.00 145,000.00
Terrace Seating Fabric Shade: USA Shade structure and (2) 40ft w x 60 ft l fabric sections 1 LS 84,000.00 84,000.00
Entry Plaza Fabric Shade: USA Shade structure and (1) 40ft w x 30 ft l fabric section 1 LS 21,000.00 21,000.00
Entry Plaza Walkway & Accessible Route: concrete 6,700 SF 5.00 33,500.00
Concourse Walkway: concrete 9,000 SF 5.00 45,000.00
Perimeter Walkways: at north and south spectator areas, in between fields. 11,500 SF 5.00 57,500.00
Scoreboard Allowance: wireless board, digital display screen, structure 1 LS 50,000.00 50,000.00
Perimeter Fencing & Gates: 8 ft. ht. black vinyl coat chainlink, gates 1,500 LF 45.00 67,500.00
Sliding Gates: 30 ft. each, manual roll type 4EA 2,500.00 10,000.00
Championship Field - Optional Spectator Areas $530,000.00
Northwest Terrace Seating: 565 seats, aisles, rails, embankment 1 LS 133,000.00 133,000.00
Northwest Terrace Fabric Shade: USA Shade structure and (1)40 ft w x 150 ft l fabric sections 1 LS 105,000.00 105,000.00
Southwest Terrace Seating: 565 seats, aisles, rails, embankment 1 LS 133,000.00 133,000.00
Southwest Terrace Fabric Shade: USA Shade structure and (1)40 ft w x 150 ft l fabric sections 1 LS 105,000.00 105,000.00
North Terrace Seating: 75 seats, aisles, rails, embankment 1 LS 27,000.00 27,000.00
South Terrace Seating: 75 seats, aisles, rails, embankment 1 LS 27,000.00 27,000.00
Championship Field #15 (Synthetic Field)$1,095,000.00
Synthetic Turf Field: includes subgrade prep, drainage system, turf, HydroChill infill 113,000 SF 7.00 791,000.00
Field Lighting : 75 fc - including primary electrical distribution 1 LS 275,000.00 275,000.00
Covered Team Bench: Kwik-Goal, Semi-permanent, aluminum bench with 10 seats, pair 1 LS 22,000.00 22,000.00
Field Equipment: (2) Kwik-Goal Fusion, net, corner flags 1 LS 7,000.00 7,000.00
Field #14 (Synthetic Field)$1,038,000.00
Synthetic Turf Field: includes subgrade prep, drainage system, turf, HydroChill infill 108,000 SF 7.00 756,000.00
Field Lighting : 75 fc - including primary electrical distribution 1 LS 275,000.00 275,000.00
Team Bench: Kwik-Goal - 15 ft. aluminum bench with back, 10 seats 1 LS 2,000.00 2,000.00
Field Equipment: (2) Kwik-Goal Euro Club Goal, net, corner flags 1 LS 5,000.00 5,000.00
Field #14 (Option Spectator Area/Amenities)$93,500.00
Perimeter Fencing & Gates: 8 ft. ht. black vinyl coat chainlink, gates 1,100 LF 45.00 49,500.00
Perimeter Walkway/Bleacher Pad: concrete 3,200 SF 5.00 16,000.00
Fabric Shade: USA Shade structure 18 ft w x 36 ft l 2 EA 14,000.00 28,000.00
Optional Practice Areas (Synthetic Fields)$750,400.00
Synthetic Turf Field: includes subgrade prep, drainage system, turf, HydroChill infill 100,000 SF 7.00 700,000.00
Perimeter Fencing & Gates: 8 ft. ht. black vinyl coat chainlink, gates 1,120 LF 45.00 50,400.00
Championship Play Area | Amenities $537,375.00
Restroom: multi-function for public and private event use, includes 200 sf. for splash pad equipment 1,000 SF 200.00 200,000.00
Perimeter Fencing & Gates: 8 ft. ht. black vinyl coat chainlink, gates 375 LF 45.00 16,875.00
Walkways/Plaza: concrete 3,400 SF 5.00 17,000.00
Seatwalls (Masonry 36" wide x 18" ht.)200 LF 100.00 20,000.00
Playscape: PlayworldSystem - Luxo 1 LS 50,000.00 50,000.00
Playscape Surfacing: Rubber tile 5.25" thick on 4" reinf. Conc. Subgrade 1,500 SF 24.00 36,000.00
Splash Pad: Vortex Spraypoint (2,500 sf. with recirc system) 1 LS 175,000.00 175,000.00
Splash Pad Slab: 6" reinf.concrete with TuffCoat finish 2,500 SF 9.00 22,500.00
Field #12,13 (Synthetic Field)$1,814,870.00
Synthetic Turf Field: includes subgrade prep, drainage system, turf, HydroChill infill 215,410 SF 7.00 1,507,870.00
Field Lighting : 75 fc - including primary electrical distribution; no poles between fields. 1 LS 300,000.00 300,000.00
Team Bench: (2) Kwik-Goal - 15 ft. aluminum bench with back, 10 seats 1 LS 2,000.00 2,000.00
Field Equipment: (2) Kwik-Goal Euro Club Goal, net, corner flags 1 LS 5,000.00 5,000.00
Field #12,13 (Optional Spectator Areas/Amenities)$215,975.00
Perimeter Fencing & Gates: 8 ft. ht. black vinyl coat chainlink, gates 1,855 LF 45.00 83,475.00
Perimeter Walkway/Bleacher Pads: concrete 15,300 SF 5.00 76,500.00
Fabric Shade: USA Shade structure 18 ft w x 36 ft l 4 EA 14,000.00 56,000.00
Field #7,8 (Synthetic Field)$216,000.00
HydroChill conversion 216,000 SF 1.00 216,000.00
Field #9,10,11 (Optional Spectator Areas/Amenitites)$194,750.00
Walkways/Bleacher Pads: concrete 7,400 SF 5.00 37,000.00
Fabric Shade: USA Shade structure 18 ft w x 36 ft l 6 EA 14,000.00 84,000.00
Fabric Shade for Playground: USA Shade structure 35 ft w x 50 ft l 1 EA 35,000.00 35,000.00
Playscape: PlayworldSystem - Unity Dome & Slide Climber 1 LS 32,000.00 32,000.00
Playscape Surfacing: EWF 1,700 SF 3.00 5,100.00
Playscape Curb: concrete 165 LF 10.00 1,650.00
Field #1,2,3,4,5,6 (Optional Spectator Areas/Amenitites)$404,500.00
Walkways/Bleacher Pads: concrete 16,600 SF 5.00 83,000.00
Fabric Shade: USA Shade structure for double bleacher area 36 ft w x 36 ft l 6 EA 19,000.00 114,000.00
Splash Pad: Vortex Spraypoint (2,500 sf. with recirc system, enclosure) 1 LS 185,000.00 185,000.00
Splash Pad Slab: 6" reinf.concrete with TuffCoat finish 2,500 SF 9.00 22,500.00
Parking Lot 'F' (160 spaces) $195,500.00
Curb & Gutter : concrete 2,400 LF 15.00 36,000.00
Paving: 2" asphalt, 6" CLB, 8" depth lime stabilized subgrade 6,300 SY 25.00 157,500.00
Striping & Signage Allowance 1 LS 2,000.00 2,000.00
Parking Lot 'G' (225 spaces added) $327,500.00
Curb & Gutter : concrete 2,750 LF 15.00 41,250.00
Paving: 2" asphalt, 6" CLB, 8" depth lime stabilized subgrade 9,300 SY 25.00 232,500.00
Striping & Signage Allowance 1 LS 3,000.00 3,000.00
Walkways: concrete 10,150 SF 5.00 50,750.00
Parking Lot 'H' (260 spaces) $389,500.00
Curb & Gutter : concrete 3,800 LF 15.00 57,000.00
Paving: 2" asphalt, 6" CLB, 8" depth lime stabilized subgrade 12,700 SY 25.00 317,500.00
Striping & Signage Allowance 1 LS 4,000.00 4,000.00
Walkways: concrete 2,200 SF 5.00 11,000.00
Parking Lot 'I' (100 spaces) $195,400.00
Curb & Gutter : concrete 1,200 LF 15.00 18,000.00
Paving: 2" asphalt, 6" CLB, 8" depth lime stabilized subgrade 3,800 SY 25.00 95,000.00
Striping & Signage Allowance 1 LS 1,200.00 1,200.00
Walkways: concrete 5,000 SF 5.00 25,000.00
Media Staging Drive: 6" conc. 7,700 SF 6.00 46,200.00
Media Staging Bollard Allowance 1 LS 10,000.00 10,000.00
Misc. Items/Allowances $460,000.00
Park Wide Speaker System Allowance 1 LS 100,000.00 100,000.00
Signage/Wayfinding Allowance 1 LS 360,000.00 360,000.00
SUBTOTAL CONSTRUCTION COST $10,971,770.00
OTHER PROJECT COSTS
*Construction Contingency (20%)1 LS 20% 2,194,354.00
Estimated Soft Costs (Professional Design Services, Geotechnical reporting & testing)1 LS 10% 1,097,177.00
TOTAL $14,263,301.00
Assumptions/Disclaimers:
4) Water, sanitary sewer, electric and communication utility lines and distribution to the site are not accounted for in this OPCC.
5) OPCC does not include portable/semi-permanent bleachers.
2) Unit pricing is based on average cost statewide and do not account for any site specific determinates that would effect costs of constuction (i.e.- unknown subsurface
conditions, etc.)
Veterans Park Athletic Complex Build-out
Budget Opinion of Probable Construction Costs
1) All Opinion of Probable Construction Costs(OPCC) represent the Consultant and their Sub-Consultant(s) best judgement as professionals, familiar with the
construction industry and current available unit pricing; Consultant/Sub-Consultant(s) do not guarantee that proposals, bids or actual project costs will not vary from its
Opinion of Probable Construction Costs. Quantities are estimates only and the actual amount of work and/or materials are contingent upon final design of these
facilities.
3) *20% Construction Contingency covers but is not limited to: general conditions, mobilization, wet/dry utilities, site lighting, demolition, erosion/sed. controls, reveg.,
drainage appurtenances, unclassified earthwork, etc.
Page 1 of 1
CITY OF COLLEGE STATION PARKS AND RECREATION
VETERAN’S PARK AND ATHLETIC COMPLEX BUILD-OUT
OPERATIONS AND MAINTENANCE ESTIMATE
With the anticipated build-out of Veteran’s Park and Athletic Complex, the following is an estimate of
the additional operations and maintenance expenses that are expected once the project is complete and
the facility is being used.
Staff: 1 grounds worker (includes salary and benefits) $ 35,000
Utilities: electricity, water, waste water, communications $ 50,000
Materials & Supplies: $ 10,000
Purchased Services: $ 24,000
Other: $ 5,000
TOTAL: $124,000