Loading...
HomeMy WebLinkAbout03/28/2013 - Regular Agenda Packet - City CouncilTable of Contents Agenda 3 Consent No. 2a - Minutes Coversheet Revised 7 Workshop 8 Regular 14 Consent No. 2b - Bee Creek Sanitary Sewer Trunk Line Rehabilitation Phase 1 and a Resolution Declaring Intention to Reimburse Certain Expenditures with Proceeds From Debt Project Number WF1369909 Coversheet Revised 18 Map 19 Bid Tabulation 20 Debt Reimbursement Resolution 22 Consent No. 2c - Construction Contract for the Bird Pond Road Rehabilitation Project Coversheet Revised 25 Bid Tabulation 26 Location Map 28 Consent No. 2d - Jones-Butler Road Extension (ST0905) Construction Contract Award Coversheet Revised 29 Bid Tab 31 Map 45 Consent No. 2e - TAMUS Ground Lease/Interlocal Cooperation Agreement/Easement Release Coversheet revised 46 Consent No. 2f - Substation Transformer Bid 13-047 Coversheet updated 47 Bid Tab 48 Consent No. 2g - University Drive Pedestrian Improvements Project (ST1206) Resolution Determining Need and Necessity for Right-of-Way Acquisition Coversheet Revised 49 Location Map 50 Needs Resolution 52 Consent No. 2h - The Plaza at College Station – City Participation Agreement Coversheet Revised 55 Vicinity Map 56 City Participation Contract 57 Description of Property 65 Description of Project 66 Engineer's Estimate 67 Affadavit 69 Ordinance 70 1 Participation Agreement 72 Consent No. 2i - Chapter 2- Animal Control Ordinance Update Coversheet updated 81 Modified Ordinance- Chapter 2- Animal 82 Consent No. 2j - Reclaimed Water Purchase Agreement with Pebble Creek Country Club Coversheet revised 104 Agreement 105 Consent No. 2k - ILA to Transfer Surplus Radio Equipment to City of Brenham Coversheet updated 113 ILA for Transfer of Surplus Radio Equipment 114 Consent No. 2L - Purchase of Public Safety Equipment and Supplies Coversheet 118 Smith & Wesson Quote 119 GT Distributors 120 GT Distributors 121 GT Distributors 122 GT Distributors 123 Bulletproofme 124 Regular No. 1 - Public Hearing and Consideration of Budget Amendment #2 Coversheet updated 126 List 127 Ordinance 129 Regular No. 2 - Public Hearing on 4080 State Highway 6 South Rezoning Coversheet updated 130 Background 135 Photos and maps 136 Draft P&Z Minutes 138 Rezoning Map 140 Concept Plan 141 Ordinance 143 Regular No. 3 - Public Hearing on the Right-of-Way Abandonment College Heights, Block B, Lots 3-6 & 7-10 Coversheet Revised 150 Vicinity Map 151 Location Map 152 Ordinance 153 2 vr Crrv OF COUI",G-E STATION H()11U qfli:xAs Ad-M Univrnity' Mayor Council members Nancy Berry Blanche Brick Mayor Pro Tern Jess Fields Karl Mooney John Nichols Interim City Manager Julie M. Schultz Frank Simpson James Benham Agenda College Station City Council Regular Meeting Thursday, March 28, 2013 at 7:00 PM City Hall Council Chamber, 1101 Texas Avenue College Station, Texas 1. Pledge of Allegiance, Invocation, Consider absence request. Presentation: • Presentation of appreciation and recognition of the retirement of Texas A&M University Police Chief Elmer Schneider. • Presentation by the Aggieland Humane Society regarding their donation of Dog Park Equipment. Hear Visitors: A citizen may address the City Council on any item which does not appear on the posted Agenda. Registration forms are available in the lobby and at the desk of the City Secretary. This form should be completed and delivered to the City Secretary by 5:30 pm. Please limit remarks to three minutes. A timer alarm will sound after 2 112 minutes to signal thirty seconds remaining to conclude your remarks. The City Council will receive the information, ask staff to look into the matter, or place the issue on a future agenda. Topics of operational concerns shall be directed to the City Manager. Comments should not personally attack other speakers, Council or staff. Consent Agenda At the discretion of the Mayor, individuals may be allowed to speak on a Consent Agenda Item. Individuals who wish to address the City Council on a consent agenda item not posted as a public hearing shall register with the City Secretary prior to the Mayor's reading of the agenda item. Registration forms are available in the lobby and at the desk of the City Secretary. 2. Presentation, possible action and discussion of consent agenda items which consists of ministerial or "housekeeping" items required by law. Items may be removed from the consent agenda by majority vote of the Council. a. Presentation, possible action, and discussion of minutes for: • March 14,2013 Workshop • March 14, 2013 Regular Council Meeting b. Presentation, possible action, and discussion regarding construction contract 13-144 with Elliott Construction, LLC, in the amount of $2,269,045.00 for Phase 1 of the Bee Creek Sanitary Sewer Trunk Line City Council Regular Meeting Page 2 Thursday, March 28, 2013 Rehabilitation, and approval of a resolution declaring intention to reimburse certain expenditures with proceeds from debt. c. Presentation, possible action, and discussion regarding approval of a contract, # 13-156, between the City of College Station and Glenn Fuqua, Inc. in the amount of $1,447,902.83 to construct the Bird Pond Road Rehabilitation Project. d. Presentation, possible action, and discussion regarding award of a construction contract with Dudley Construction, Ltd. in the amount of $2,975,669.11 for the Jones Butler Road Extension project. e. Presentation, possible action and discussion concerning approval of: (1) a ground lease from T AMUS to College Station for property located generally northeast of the intersection of Wellborn Road and University Drive for the purpose of constructing an electrical substation, (2) an interIocal agreement between College Station and T AMU providing the tenns and conditions necessary for the construction of an electrical substation on the ground lease site, and (3) a release of an existing right-of-way easement conveyed from TAMUS to College Station by instrument dated August 8, 2006, recorded in Volume 7572, Page 179, of the Real Property Records of Brazos County, Texas. f. Presentation, possible action, and discussion regarding the award of Bid Tab 13-047 and approval of a contract between the City of College Station and WEG Electric Corp, as bid by KD Johnson in the amount of $735,545 for the purchase of 25/33/46.6 MV A substation transfonner for the new Northgate Substation to be built at the existing T AMU 138 kV Switchyard. This action would authorize the City Manager to execute the contract on behalf of the City Council. g. Presentation, possible action, and discussion regarding approval of a Resolution that will authorize City staff to negotiate for the purchase of right-of-way needed for the University Drive Pedestrian Improvements Project. h. Presentation, possible action, and discussion for a City Participation Agreement for water line improvements in the Northpoint Crossing Ph. 1 Subdivision being made per City Code of Ordinances, Chapter 12, Unified Development Ordinance, Section 8.5, Responsibility for Payment for Installation Costs for a total requested City participation of$67,101.59. 1. Presentation, possible action and discussion regarding proposed changes to Chapter 2 -Animal Control of the City of College Station Ordinances. J. Presentation, possible action, and discussion to approve an agreement for the City to sell reclaimed water to the Pebble Creek Country Club. k. Presentation, possible action, and discussion regarding approval of an ILA transferring surplus radio equipment from the City of College Station to the City of Brenham. l. Presentation, possible action, and discussion regarding the approval of police safety equipment and supplies to Smith & Wesson for $56,551.35, to GT Distributors for $100,560.32 for rifle accessories and ammunition, and tactical vests for SWAT, and to AnnorUp, dba Bulletproofme for $23,220.00 for tactical vests for Patrol. City Council Regular Meeting Page 3 Thursday, March 28, 2013 Regular Agenda At the discretion of the Mayor, individuals may be allowed to speak on a Regular Agenda Item. Individuals who wish to address the City Council on a regular agenda item not posted as a public hearing shall register with the City Secretary prior to the Mayor's reading of the agenda item. Registration forms are available in the lobby and at the desk of the City Secretary. Individuals who wish to address the City Council on an item posted as a public hearing shall register with the City Secretary prior to the Mayor's announcement to open the public hearing. The Mayor will recognize individuals who wish to come forward to speak for or against the item. The speaker will state their name and address for the record and allowed three minutes. A timer alarm will sound at 2 112 minutes to signal thirty seconds remaining to conclude remarks. After a public hearing is closed, there shall be no additional public comments. If Council needs additional information from the general public, some limited comments may be allowed at the discretion of the Mayor. If an individual does not wish to address the City Council, but still wishes to be recorded in the official minutes as being in support or opposition to an agenda item, the individual may complete the registration form provided in the lobby by providing the name, address, and comments about a city related subject. These comments will be referred to the City Council and City Manager. 1. Public Hearing, presentation, possible action, and discussion on an ordinance Budget Amendment #2 amending ordinance number 3443 which will amend the budget for the 2012-2013 Fiscal Year in the amount of $961,834; increase the number of regular full-time positions in the budget by two (2.0); and presentation, possible action and discussion on one interfund transfer. 2. Public Hearing, presentation, possible action, and discussion regarding an amendment to Chapter 12, "Unified Development Ordinance", Section 4.2, "Official Zoning Map" of the Code of Ordinances of the City of College Station, Texas by rezoning 7.547 acres located at 4080 State Highway 6 South from PDD Planned Development District to PDD Planned Development District to amend the Concept Plan. 3. Public Hearing, presentation, possible action, and discussion approving an ordinance vacating and abandoning a 0.10 acre right-of-way, which is located on Lots 3-10 of Block B of the College Heights Subdivision according to the plat recorded in Volume 7623, Page 231 of the Deed Records of Brazos County, Texas. 4. Adjourn. If litigation issues arise to the posted subject matter ofthis Council Meeting an executive session will be held. APPROVED: -Cit-~-an~a~~-?,,~===-.r-:.~::--/--1t Notice is hereby given that a Regular Meeting of the City Council of the City of College Station, Texas will be held on the Thursday, March 28, 2013 at 7:00 PM at the City Hall Council Chambers, 1101 Texas Avenue, College Station, Texas. The following subjects will be discussed, to wit: See Agenda. Posted this 22nd day of March, 2013 at 5:00 p.m. City Council Regular Meeting . Page 4 ~~~~tfihf---L-I-oICvi~3~'u:cf=-l--~ I, the undersigned, do hereby certify that the above Notice of Meeting of the Governing Body of the City of College Station, Texas, is a true and correct copy of said Notice and that I posted a true and correct copy of said notice on the bulletin board at City Hall, 1101 Texas Avenue, in College Station, Texas, and the City'S website, www.cstx.gov.TheAgendaandNoticearereadilyaccessibletothegeneralpublicatalltimes.Said Notice and Agenda were posted on March 22; 2013 at 5:00 p.m. and remained so posted continuously for at least 72 hours proceeding the scheduled time of said meeting. This public notice was removed from the official posting board at the College Station City Hall on the following date and time: by ___________ Dated this __day of_______, 2013 By________________ Subscribed and sworn to before me on this the __day of _______" 2013. Notary Public -Brazos County, Texas My commission expires: _____ The building is wheelchair accessible. Handicap parking spaces are available. Any request for sign interpretive service must be made 48 hours before the meeting. To make arrangements call (979) 764-3517 or (TDD) 1-800-735-2989. Agendas may be viewed on www.cstx.gov. Council meetings are broadcast live on Cable Access Channel 19. March 28, 2013 City Council Consent Agenda No. 2a City Council Minutes To: Frank Simpson, Interim City Manager From: Sherry Mashburn, City Secretary Agenda Caption: Presentation, possible action, and discussion of minutes for: • March 14, 2013 Workshop • March 14, 2013 Regular Council Meeting Attachments: • March 14, 2013 Workshop • March 14, 2013 Regular Council Meeting 7 WKSHP031413Minutes Page 1 MINUTES OF THE CITY COUNCIL WORKSHOP CITY OF COLLEGE STATION MARCH 14, 2013 STATE OF TEXAS § § COUNTY OF BRAZOS § Present: Nancy Berry, Mayor Council: Blanche Brick Jess Fields Karl Mooney John Nichols Julie Schultz James Benham, arrived after roll call City Staff: Frank Simpson, Interim City Manager Kathy Merrill, Deputy City Manager Carla Robinson, City Attorney Sherry Mashburn, City Secretary Ian Whittenton, Records Management Coordinator 1. Call to Order and Announce a Quorum is Present With a quorum present, the Workshop of the College Station City Council was called to order by Mayor Nancy Berry at 4:34 p.m. on Thursday, March 14, 2013 in the Council Chambers of the City of College Station City Hall, 1101 Texas Avenue, College Station, Texas 77842. 2. Presentation, possible action, and discussion on the update to the City Council Strategic Plan. Bob Cowell, Executive Director of Planning and Development Services, stated that at the January Retreat, the Council identified seven key initiatives: good governance, financially sustainable City, core services and infrastructure, neighborhood integrity, diverse growing economy, improving mobility, and sustainable City. Staff needs direction as to what Council wishes to see more of in future workshops, or that need to go in a different direction. Councilmember Fields would like to see more detail for good governance, sustainability, and more economic detail. 8 WKSHP031413Minutes Page 2 Councilmember Nichols asked where in the strategic plan would we have more workshop discussion in the future? Sub-committees have been formed to address some of the initiatives, and he would like to see updates. Mayor Berry noted that our strategic goals have not changed. She envisions the sub-committees expanding their scope to include review of some of the master plans. She also wants to see if our pay plan is where it needs to be. Councilmember Brick hopes that the committees will coordinate with the Chamber as well. She remembers that for sustainability we refined that goal to state “where fiscally responsible”. She noted that we are not looking at doing away with any of these initiatives, but are looking to see where emphasis needs to be focused. Councilmember Mooney said this is a living document, but more importantly, this is a working document. If we look at the similarities among these issues, we can narrow the plan down and solidify the effort. When we take steps to address one strategy, we need to look at how that impacts other strategies. We can prioritize and channel our resources better. He referred to #52, promoting job growth through diversification. Councilmember Schultz said we are doing a good job in many of the areas. What jumped out to her was #6; she feels we have come a long way, but there is a lot more to be done. Another item is #56, how our regulations and standards affect business. Councilmember Nichols stated he likes the citizen surveys. The feedback received is very important. He asked how do we want to be compared to other cities? We can only do some of these things at any one time. There are some fundamental discussions that need to be held. Councilmember Fields suggested it is equally important to set one’s own benchmarks as to what Council expects of itself. An action-oriented thing he would like to see is in the ordinance a requirement to show the impact of an ordinance or the cost to a business because of the ordinance. 3. Executive Session In accordance with the Texas Government Code §551.071-Consultation with Attorney, §551.074-Personnel, and §551.087-Economic Development Negotiations, the College Station City Council convened into Executive Session at 5:11 p.m. on Thursday, March 14, 2013 in order to continue discussing matters pertaining to: A. Consultation with Attorney to seek advice regarding pending or contemplated litigation; to wit: • City of Bryan's application with TCEQ for water & sewer permits in Westside/Highway 60 area, near Brushy Water Supply Corporation to decertify City of College Station and certify City of Bryan. • Chavers et a1 v. Tyrone Morrow et al, No. 10-20792; Chavers v. Randall Hall et al, Case No. 10 CV-3922. 9 WKSHP031413Minutes Page 3 • College Station v. Star Insurance Co., Civil Action No. 4:11-CV-02023. • Patricia Kahlden, individ. and as rep. of the Estate of Lillie May Williams Bayless v. Laura Sue Streigler, City of College Station and James Steven Elkins, No. 11-003172- CV-272, in the 272ndDistrict Court of Brazos County, TX • Tom Jagielski v. City of College Station, Cause No. 12-002918-CU-361, In the 361 st • State v. Carol Arnold, Cause Number 11-02697-CRF-85, In the 85th District Court, Brazos County, Texas District Court of Brazos County, Texas B. Deliberation on the appointment, employment, evaluation, reassignment, duties, discipline, or dismissal of a public officer; to wit: • City Attorney • Internal Auditor C. Deliberation on economic development negotiations regarding an offer of financial or other incentives for a business prospect; to wit: • Discuss economic development incentive negotiations with TAMUS The Executive Session adjourned at 6:03 p.m. 4. Take action, if any, on Executive Session. No action was required from Executive Session. 5. Presentation, possible action, and discussion on items listed on the consent agenda. Items 2f and 2h was pulled for discussion. 2h: Chuck Gilman, Director of Capital Projects, clarified the objective is to provide a more unbiased update, rating each and every street and providing a maintenance strategy, as well as having street maintenance employees doing what they were hired to do. 2f: Carla Robinson, City Attorney, explained that the language is necessary to reference those specific statutes. Frank Simpson, Interim City Manager, stated that before any action for eminent domain happens, it would come before Council to authorize the condemnation. 6. Presentation and discussion regarding an update from the Arts Council of Brazos Valley. Chris Dyer, CEO with the Arts Council, reported the core activities for FY 13 included marketing regional arts programs to local, statewide and national audiences, administering and managing grant programs, administering artistic programs, fundraising and grant writing, increasing revenue generating classes and programs, and rebranding and logo development. FY13 funding from College Station was broken down as: • $270,000 Affiliate Subgranting (HOT); • $100,000 Marketing, Programs & Operations (General Fund); 10 WKSHP031413Minutes Page 4 • $30,000 Arts Marketing (HOT); and • In-kind (use of building). Accountability measures include: three City-appointed Board Members, monthly distribution of Board packets, quarterly reporting, affiliate reporting, an independent Annual Audit, and all records are open to inspection by the City and the public. Fundraising is done through various means: annual memberships, various events, grants, and service revenue programs and accounts for 30% of their annual budget. College Station support accounts for about 19% of the budget. Operations support includes $30,000 in HOT fund marketing contribution in addition to $100,000 cash support. Granting programs utilized include the Annual Marketing & Program Grant (College Station HOT), a Rural Sub-Grant Program (TCA and private donors), a Navasota Marketing and Program Grant (City of Navasota HOT), the College Arts Scholarship Program (private donors), and grants through private donors. The Arts Council has seen a 30% increase in grant demand over the past three fiscal years. Highlights of the first quarter grant funded program were presented. Eleven affiliates received funding in the first quarter. 755 hotel rooms were booked, 6,210 meals were consumed in local restaurants, and 28,383 persons attended the events. As a result of marketing activities, the Arts Council has received 6,000 visitors since October, over 70% of which are unique visitors. The “Events Calendar” is the most visited page on the Arts Council website, with 780+ visits from the US outside of Texas, reaching 44 states. Marketing plans for the third and fourth quarters include a media campaign with KBTX and Bryan Broadcasting and other venues. He requested direction on how the Council wanted to be updated throughout the year. No action was required by Council. Mayor Berry recessed the Workshop at 7:00 p.m. The Workshop reconvened at 7:24 p.m. 7. Presentation, possible action, and discussion on the update to the City Council Strategic Plan. Councilmember Benham asked for an additional initiative to address broadband access for businesses and residents. 8. • Council Calendar • March 18 JGC Meeting at BVCOG, 12:00 p.m. • March 20 RVP Meeting at RVP, 3:00 p.m. • March 21 Chamber Day 2013 at the Chamber, 8:00 a.m. March 21 Business After Hours - Allen Honda, 2450 Earl Rudder Frwy, 5:30 p.m. 11 WKSHP031413Minutes Page 5 • • March 21 P&Z Workshop/Meeting, Council Chambers, 6:00 p.m. (Jess Fields, Liaison) • March 26 GB Foundation - The GI's of Comedy, Rudder Auditorium, 6:00 p.m. • March 28 Executive Session/Workshop/Regular Meeting at 4:30, 6:00 & 7:00 p.m. March 29 City Offices Closed – HOLIDAY Council reviewed the Council calendar. Councilmember Benham announced a tentative date of April 11 for discussion on broadband. 9. Presentation, possible action, and discussion on future agenda items: a Council Member may inquire about a subject for which notice has not been given. A statement of specific factual information or the recitation of existing policy may be given. Any deliberation shall be limited to a proposal to place the subject on an agenda for a subsequent meeting. There were no items requested. 10. Discussion, review and possible action regarding the following meetings: Animal Shelter Board, Arts Council of the Brazos Valley, Arts Council Sub-committee, Audit Committee, Bicycle, Pedestrian, and Greenways Advisory Board, Blinn College Brazos Valley Advisory Committee, Brazos County Health Dept., Brazos Valley Council of Governments, Bryan/College Station Chamber of Commerce, BVSWMA, BVWACS, Convention & Visitors Bureau, Design Review Board, Historic Preservation Committee, Interfaith Dialogue Association, Intergovernmental Committee, Joint Neighborhood Parking Taskforce, Joint Relief Funding Review Committee, Landmark Commission. Library Board, Metropolitan Planning Organization, National League of Cities, Parks and Recreation Board, Planning and Zoning Commission, Research Valley Partnership, Regional Transportation Committee for Council of Governments, Sister City Association, TAMU Student Senate, Texas Municipal League, Youth Advisory Council, Zoning Board of Adjustments. Councilmember Nichols reported on the Brazos County Health Department. Councilmember Mooney announced the Sister Cities delegation from Salamanca will be coming to College Station next Monday. Councilmember Benham reported on broadband as it relates to the RVP. A final meeting will happen on March 25 with the City of Bryan and the County. Councilmember Fields announced it’s a girl! 12 WKSHP031413Minutes Page 6 11. Adjournment MOTION: There being no further business, Mayor Berry adjourned the workshop of the College Station City Council at 7:38 p.m. on Thursday, March 14, 2013. ________________________ Nancy Berry, Mayor ATTEST: _______________________ Sherry Mashburn, City Secretary 13 RM031413 Minutes Page 1 MINUTES OF THE REGULAR CITY COUNCIL MEETING CITY OF COLLEGE STATION MARCH 14, 2013 STATE OF TEXAS § § COUNTY OF BRAZOS § Present: Nancy Berry Council: Blanche Brick Jess Fields Karl Mooney John Nichols Julie Schultz James Benham City Staff: Frank Simpson, Interim City Manager Kathy Merrill, Deputy City Manager Carla Robinson, City Attorney Sherry Mashburn, City Secretary Ian Whittenton, Records Management Coordinator Call to Order and Announce a Quorum is Present With a quorum present, the Regular Meeting of the College Station City Council was called to order by Mayor Nancy Berry at 7:00 p.m. on Thursday, March 14, 2013 in the Council Chambers of the City of College Station City Hall, 1101 Texas Avenue, College Station, Texas 77842. 1. Pledge of Allegiance, Invocation, consider absence request . Citizen Comments Cora Rogers, 7472 Old Jones Road, voiced her opposition to the proposed dump site in the Brushy community. They do not want the dust or water contamination. They just want to live and be happy. A hearing is set for April 3 at the Brazos County courthouse. She asked the Council to attend and show its support. CONSENT AGENDA 2a. Presentation, possible action, and discussion of minutes for: 14 RM031413 Minutes Page 2 • • February 28, 2013 Workshop February 28, 2013 Regular Council Meeting 2b. Presentation, possible action and discussion concerning approval of: (1) a ground lease from TAMUS to College Station for property located generally northeast of the intersection of Wellborn Road and University Drive for the purpose of constructing an electrical substation, (2) an interlocal agreement between College Station and T AMU providing the terms and conditions necessary for the construction of an electrical substation on the ground lease site, and (3) a release of an existing right-of-way easement conveyed from TAMUS to College Station by instrument dated August 8, 2006, recorded in Volume 7572, Page 179, of the Real Property Records of Brazos County, Texas. 2c. Presentation, possible action, and discussion regarding approval of the Owner Agreement for the Home Reconstruction Loan Program activity at 3385 Barron Cutoff Rd. and 1022 Crested Point. 2d. Presentation, possible action and discussion regarding award of a construction contract with Brazos Paving, Inc. in the amount of $1,169,504.48 for the HSC Parkway Waterline Extension. 2e. Presentation, possible action, and discussion regarding water meter purchase contract WM08-10 with AquaMetric Sales Co. in the amount of$133,639. 2f. Presentation, possible action, and discussion regarding approval of Resolution 03-14-13- 2f, authorizing City staff to negotiate for the purchase of easements needed for the FM 2154 Sidewalk Improvements Project and public utilities. 2g. Presentation, possible action and discussion regarding the first renewal of Bid No. 12- 048 with ProSTAR Industries for the purchase of janitorial supplies in an amount not to exceed $58,654.66. 2h. Presentation, possible action, and discussion regarding approval of a contract between the City of College Station and Gessner Engineering, LLC in the amount of $57,200 for a roadway condition analysis and pavement management plan update. 2i. Presentation, possible action and discussion on bid awards for annual street maintenance agreements for asphalt pavement repair with Brazos Paving, Inc in the amount of $79,000; resealing concrete joints with Larry Young Paving, Inc in the amount of $30,000; crack sealing with Kuntz Contracting Corp in the amount of $162,500; and microsurfacing with Viking Construction, Inc in the amount of $342,000. Item 2b was pulled from the agenda. Item 2f was pulled for a separate vote. MOTION: Upon a motion made by Councilmember Fields and a second by Councilmember Benham, the City Council voted seven (7) for and none (0) opposed, to approve the Consent Agenda, less items 2b and 2f. The motion carried. 15 RM031413 Minutes Page 3 (2f)MOTION: Upon a motion made by Councilmember Mooney and a second by Councilmember Fields, the Council voted two (2) for and five (5) against, with Mayor Berry and Councilmembers Brick, Nichols, Schultz, and Benham voting against, to amend the language in a couple of sections to strike “acquire” and substitute “negotiate for the purchase of property . . .”. The motion failed. (2f)MOTION: Upon a motion made by Councilmember Brick and a second by Councilmember Nichols, the City Council voted six (6) for and one (1) opposed, with Councilmember Fields voting against, to adopt Resolution 03-14-13-2f, authorizing City staff to negotiate for the purchase of easements needed for the FM 2154 Sidewalk Improvements Project and public utilities. The motion carried. REGULAR AGENDA 1. Public Hearing, presentation, possible action, and discussion approving Ordinance 2013- 3485, vacating and abandoning a 0.0201 acre right-of-way, which is located on Lot 15 of Block 1 of the College Park Addition according to the plat recorded in Volume 38, Page 602 of the Deed Records of Brazos County, Texas. At approximately 7:16 p.m., Mayor Berry opened the Public Hearing. There being no comments, the Public Hearing was closed at 7:16 p.m. MOTION: Upon a motion made by Councilmember Fields and a second by Councilmember Mooney, the City Council voted seven (7) for and none (0) opposed, to adopt Ordinance 2013- 3485, vacating and abandoning a 0.0201 acre right-of-way, which is located on Lot 15 of Block 1 of the College Park Addition according to the plat recorded in Volume 38, Page 602 of the Deed Records of Brazos County, Texas. The motion carried unanimously. 2. Public Hearing, presentation, possible action, and discussion approving Ordinance 2013- 3486, vacating and abandoning a 0.55 acre portion of a 20 foot Utility Easement, which is located in the 324.83 acre tract in the J. H. Jones Survey, Abstract No. 26 according to the deed recorded in Volume 4023, Page 91 of the Deed Records of Brazos County, Texas. At approximately 7:23 p.m., Mayor Berry opened the Public Hearing. There being no comments, the Public Hearing was closed at 7:23 p.m. MOTION: Upon a motion made by Councilmember Mooney and a second by Councilmember Nichols, the City Council voted six (6) for and none (0) opposed, with Councilmember Schultz abstaining, to adopt Ordinance 2013-3486, vacating and abandoning a 0.55 acre portion of a 20 foot Utility Easement, which is located in the 324.83 acre tract in the J. H. Jones Survey, Abstract No. 26 according to the deed recorded in Volume 4023, Page 91 of the Deed Records of Brazos County, Texas. The motion carried. 16 RM031413 Minutes Page 4 3. Adjournment. MOTION: There being no further business, Mayor Berry adjourned the Regular Meeting of the City Council at 7:24 p.m. on Thursday, March 14, 2013. ________________________ Nancy Berry, Mayor ATTEST: ___________________________ Sherry Mashburn, City Secretary 17 March 28, 2013 Consent Agenda Item No. 2b Bee Creek Sanitary Sewer Trunk Line Rehabilitation Phase 1 and a Resolution Declaring Intention to Reimburse Certain Expenditures with Proceeds From Debt Project Number WF1369909 To: Frank Simpson, Interim City Manager From: Chuck Gilman, P.E., PMP Public Works Director Agenda Caption: Presentation, possible action, and discussion regarding construction contract 13-144 with Elliott Construction, LLC, in the amount of $2,269,045.00 for Phase 1 of the Bee Creek Sanitary Sewer Trunk Line Rehabilitation, and approval of a resolution declaring intention to reimburse certain expenditures with proceeds from debt. Relationship to Strategic Goals: 1. Core Services and Infrastructure Recommendation(s): Staff recommends approval of this construction contract and recommends approval of the resolution declaring intention to reimburse certain expenditures with proceeds from debt. Summary: This project includes the installation of approximately 7,300 linear feet of 42- inch, 36-inch, and 30-inch sanitary sewer main along Bee Creek from Bee Creek Park west of Texas Avenue to approximately 1,000 feet west of Welsh Avenue. This is the first of four phases to replace the Bee Creek Trunk Line which runs from Carters Creek Wastewater Treatment Plant to approximately 1,100 feet west of Jones Butler Road. Much of the existing Bee Creek Trunk line was constructed in 1973 and was shown to have several surcharging line segments in the 2011 Wastewater Master Plan prepared by HDR, Inc. This project will install a gravity line to increase the system capacity of the Bee Cree Trunk Line to accept the ultimate build-out demand anticipated. Budget & Financial Summary: Funds in the amount of $14,703,625 are budgeted for this project in the Wastewater Capital Improvement Projects Fund. A total of $1,530,535 has been expended or committed to date, leaving a balance of $13,173,090 for construction and remaining expenditures. The “Resolution Declaring Intention to Reimburse Certain Expenditures with Proceeds from Debt” is necessary for this item because the majority of the long term debt has not been issued for the project. The debt for the project is scheduled to be issued this fiscal year and in the future fiscal years. Attachments: 1. Construction Contract – On File in City Secretary’s Office 2. Map 3. Bid tabulation 4. Resolution Declaring Intention to Reimburse Certain Expenditures with Proceeds from Debt 18 WELSH AVSOUTH W OOD DR SO U T H W E S T P W DEACON DRRIO G RANDE BLNUECES DRBALCONES DRNAVARRO DRIVES O U T H WO O D D RIV E L A U R A L A N E L A N G F O R D S T R E E T H A RV E Y M IT C H E L L P A R K W A Y S O U T H S O U T H W E S T P A R K W A Y D EACON DRIVEL A W YER STRE E T NU E CES DRI VEW E L S H A V E N U E AIRLINE DRIVETODD TRAILSAN SABA DRIVERI O GR A ND E B O U LEVARD B A L CONES DRIVEVALLEY VIEW DRIVEWEST RIDGE DRIVEAUSTIN A V E N U EFM 2818 SERVICE RDHAW K T R E E D R IV E VAL VERDE DRIVEG L A DE STREETHAINES D R IV E HALEY PLACES A N PEDRO DRIVEBEE CREEK DRIVEG U A D A LU P E D RIVEP E D E R NALES DRIVE L EONA DRIVE H ONDO D RIV E S AN M ARIO COURTME DINA DRIV E CARMEL PLA CESAN BENITO DRIVEO N R A M P ANGELINA CIRCL E C A M I L L E D RIV E C A U DIL L S TR E E T PINTAIL LANE LON G MIR E D RIV E PHEASANT LANEBOSWELL STREETSH A DOWWOO D DRIVEANTELOPE LANE M A D E R A C IR C LEPRONGHORN LANE ANGELINA COURTB O S Q U E D R I V ECHRISTINE LANEHIL L T O P D RIV E BL ANCO DRI V E PINT A IL L O O P C O M A L CIR C L E CI M A R R O N C O U R T M E S C A L E R O C O U R TLANCELOT C IR C L E R ID G E F IE L D C IR C L E N O R T H RIDGEFIELD CIRCLE SOUTHL A R E D O C O U R T SAN SABA COURTN O R T H B A R D E L L C O U R T WELSH AVENUEME DI NA D RI V E SAN BENITO DRIVE4 Bee Creek Sanitary Sewer Trunk Line Rehabilitation Phase 1 19 City of College Station - Purchasing DivisionBid Tabulation for #13-043"Bee Creek Sanitary Sewer Line Rehab - Phase 1"Open Date: Thursday, February 7, 2013 @ 2:00 p.m.ITEM QTY UNIT DESCRIPTION UNIT PRICETOTAL PRICE UNIT PRICE TOTAL PRICE UNIT PRICETOTAL PRICE UNIT PRICETOTAL PRICE UNIT PRICETOTAL PRICE UNIT PRICETOTAL PRICE UNIT PRICETOTAL PRICE UNIT PRICETOTAL PRICE UNIT PRICETOTAL PRICE UNIT PRICETOTAL PRICE1 1 LS Mobilization$84,000.00 $84,000.00 $250,000.00 $250,000.00 $80,000.00 $80,000.00 $0.00 $115,000.00 $115,000.00 $110,000.00 $110,000.00 $300,000.00 $300,000.00 $150,000.00 $150,000.00 $250,000.00 $250,000.00 $165,000.00 $165,000.002 1 LS Traffic Control$2,300.00 $2,300.00 $15,300.00 $15,300.00 $5,000.00 $5,000.00 $5,000.00 $5,000.00 $5,500.00 $5,500.00 $10,000.00 $10,000.00 $10,000.00 $10,000.00 $5,000.00 $5,000.00 $7,500.00 $7,500.00 $25,000.00 $25,000.003 5 AC Clearing and Grubbing$450.00 $2,250.00 $4,900.00 $24,500.00 $1,000.00 $5,000.00 $6,500.00 $32,500.00 $3,000.00 $15,000.00 $5,000.00 $25,000.00 $3,000.00 $15,000.00 $2,500.00 $12,500.00 $3,750.00 $18,750.00 $4,500.00 $22,500.004 1 LS Erosion and Sedimentation Control$43,500.00 $43,500.00 $42,600.00 $42,600.00 $39,000.00 $39,000.00 $38,000.00 $38,000.00 $51,520.00 $51,520.00 $30,000.00 $30,000.00 $18,000.00 $18,000.00 $15,000.00 $15,000.00 $65,000.00 $65,000.00 $25,000.00 $25,000.005 7,302 LF Trench Safety$1.13 $8,251.26 $1.00 $7,302.00 $1.00 $7,302.00 $1.00 $7,302.00 $2.00 $14,604.00 $1.00 $7,302.00 $1.00 $7,302.00 $0.50 $3,651.00 $2.00 $14,604.00 $50.00 $365,100.006 1 LS Bypass Pumping$8,500.00 $8,500.00 $55,786.00 $55,786.00 $8,000.00 $8,000.00 $27,000.00 $27,000.00 $22,500.00 $22,500.00 $14,000.00 $14,000.00 $1,000.00 $1,000.00 $4,000.00 $4,000.00 $15,000.00 $15,000.00 $99,000.00 $99,000.007375 LF54" Steel Casing Pipe by Dry Mechanical Bore (Excludes Carrier Pipe)$868.71 $325,766.25 $1,043.00 $391,125.00 $833.00 $312,375.00 $942.00 $353,250.00 $775.00 $290,625.00 $800.00 $300,000.00 $855.00 $320,625.00 $850.00 $318,750.00 $1,100.00 $412,500.00 $1,134.47 $425,426.258130 LF54" Steel Casing Pipe on Piers by Open Cut (Exludes Carrier Pipe)$594.76 $77,318.80 $1,377.00 $179,010.00 $646.00 $83,980.00 $840.00 $109,200.00 $800.00 $104,000.00 $750.00 $97,500.00 $800.00 $104,000.00 $500.00 $65,000.00 $850.00 $110,500.00 $884.47 $114,981.109265 LF42" Steel Casing Pipe by Dry Mechanical Bore (Excludes Carrier Pipe)$418.60 $110,929.00 $846.00 $224,190.00 $590.00 $156,350.00 $545.00 $144,425.00 $585.00 $155,025.00 $600.00 $159,000.00 $650.00 $172,250.00 $700.00 $185,500.00 $800.00 $212,000.00 $885.09 $234,548.8510155 LF42" Steel Casing Pipe by Open Cut (Excludes Carrier Pipe)$232.98 $36,111.90 $367.00 $56,885.00 $249.00 $38,595.00 $234.00 $36,270.00 $275.00 $42,625.00 $320.00 $49,600.00 $200.00 $31,000.00 $200.00 $31,000.00 $500.00 $77,500.00 $610.09 $94,563.951150 LF42" Steel Casing Pipe on Piers by Open Cut (Excludes Carrier Pipe)$447.92$22,396.00$1,094.00$54,700.00$560.00$28,000.00$918.00$45,900.00$520.00$26,000.00$1,000.00$50,000.00$800.00$40,000.00$440.00$22,000.00$775.00$38,750.00$825.00$41,250.00S&J Construction Co, Inc.dba Jerry Allen Smith Construction Co, Inc.(Jacksonville, AR)$701,600.00Garney Companies, Inc.(Kansas City, MO)$370,854.00Lewis Contractors, Inc.(Georgetown, TX)$190,151.00Huff & Mitchell, Inc.(Cypress, TX)$351,302.00North Texas Contracting, Inc.(Keller, TX)$196,302.00Doughtie Construction Co., Inc(Huntsville, TX)$224,124.00S.J. Louis Constructionof Texas(Houston, TX)A. GENERAL CONSTRUCTION ITEMSTOTAL SECTION A - GENERAL CONSTRUCTION ITEMS$148,801.26 $395,488.00Dudley Construction, Ltd.(College Station, TX)BRH-Garver Construction, LP(Houston, TX)B. SEWER LINE CONSTRUCTION ITEMSElliott Construction, LLC(Wellborn, TX)$144,302.00 $109,802.0050gp yp ( p)$7.9$ ,396.00$,09.00$5 ,700.00$560.00$ 8,000.00$9 8.00$ 5,900.00$5 0.00$ 6,000.00$ ,000.00$50,000.00$800.00$ 0,000.00$0.00$ ,000.00$775.00$38,750.00$8 5.00$ , 50.00125LF27" Dia. ASTM F679 PVC Pipe, by Open Cut$600.00 $3,000.00 $328.00 $1,640.00 $215.00 $1,075.00 $370.00 $1,850.00 $125.00 $625.00 $130.00 $650.00 $400.00 $2,000.00 $325.00 $1,625.00 $130.00 $650.00 $100.00 $500.001310 LF24" Dia. ASTM F679 PVC Pipe, by Open Cut$300.00 $3,000.00 $208.00 $2,080.00 $118.00 $1,180.00 $160.00 $1,600.00 $110.00 $1,100.00 $115.00 $1,150.00 $250.00 $2,500.00 $170.00 $1,700.00 $100.00 $1,000.00 $100.00 $1,000.001441 LF18" Dia. ASTM F679 PVC Pipe, by Open Cut$141.00 $5,781.00 $67.00 $2,747.00 $78.00 $3,198.00 $120.00 $4,920.00 $81.00 $3,321.00 $105.00 $4,305.00 $80.00 $3,280.00 $70.00 $2,870.00 $85.00 $3,485.00 $100.00 $4,100.00155LF15" Dia. SDR-26 PVC Pipe, by Open Cut$152.00 $760.00 $88.00 $440.00 $75.00 $375.00 $165.00 $825.00 $65.00 $325.00 $90.00 $450.00 $100.00 $500.00 $120.00 $600.00 $75.00 $375.00 $100.00 $500.001612 LF6" Dia. SDR-35 PVC Pipe, by Open Cut$59.50 $714.00 $5.00 $60.00 $70.00 $840.00 $65.00 $780.00 $45.00 $540.00 $65.00 $780.00 $80.00 $960.00 $40.00 $480.00 $50.00 $600.00 $100.00 $1,200.00172EAStandard 6' Dia. Sanitary Sewer Manhole (Up to 12' Depth)$7,500.00 $15,000.00 $12,760.00 $25,520.00 $8,733.00 $17,466.00 $11,500.00 $23,000.00 $6,850.00 $13,700.00 $10,000.00 $20,000.00 $11,000.00$22,000.00 $11,000.00 $22,000.00 $15,500.00 $31,000.00 $9,426.00 $18,852.001812 EAStandard 6' Dia. Sanitary Sewer Manhole (Over 12' Depth)$9,340.00 $112,080.00 $12,760.00 $153,120.00 $10,066.00 $120,792.00 $11,100.00 $133,200.00 $7,500.00 $90,000.00 $12,000.00 $144,000.00 $12,000.00 $144,000.00 $11,500.00 $138,000.00 $16,000.00 $192,000.00 $9,776.00 $117,312.00193EAStandard 5' Dia. Sanitary Sewer Manhole (Up to 12' Depth)$29,500.00 $88,500.00 $10,330.00 $30,990.00 $6,370.00 $19,110.00 $8,700.00 $26,100.00 $5,250.00 $15,750.00 $8,000.00 $24,000.00 $8,000.00 $24,000.00 $8,700.00 $26,100.00 $12,500.00 $37,500.00 $7,014.00 $21,042.00206EAStandard 5' Dia. Sanitary Sewer Manhole (Over 12' Depth)$18,100.00 $108,600.00 $10,330.00 $61,980.00 $7,751.00 $46,506.00 $8,700.00 $52,200.00 $5,750.00 $34,500.00 $9,000.00 $54,000.00 $9,000.00 $54,000.00 $9,000.00 $54,000.00 $12,000.00 $72,000.00 $7,314.00 $43,884.002114 EA4" Lateral Stubout$709.00 $9,926.00 $2,650.00 $37,100.00 $550.00 $7,700.00 $785.00 $10,990.00 $1,200.00 $16,800.00 $1,000.00 $14,000.00 $500.00 $7,000.00 $100.00 $1,400.00 $1,300.00 $18,200.00 $550.00 $7,700.00226EASanitary Sewer Manhole Vent$2,900.00 $17,400.00 $3,950.00 $23,700.00 $2,330.00 $13,980.00 $3,800.00 $22,800.00 $3,420.00 $20,520.00 $3,000.00 $18,000.00 $3,500.00 $21,000.00 $2,500.00 $15,000.00 $4,750.00 $28,500.00 $800.00 $4,800.00233EAStandard External Drop Connection for Sanitary Sewer Manhole$4,400.00 $13,200.00 $5,230.00 $15,690.00 $3,120.00 $9,360.00 $3,200.00 $9,600.00 $2,560.00 $7,680.00 $3,000.00 $9,000.00 $3,500.00 $10,500.00 $3,400.00 $10,200.00 $7,000.00 $21,000.00 $6,500.00 $19,500.00243EAVertical External Drop Connection for Sanitary Sewer Manhole$4,400.00 $13,200.00 $5,230.00 $15,690.00 $2,200.00 $6,600.00 $3,200.00 $9,600.00 $2,450.00 $7,350.00 $3,000.00 $9,000.00 $3,000.00 $9,000.00 $600.00 $1,800.00 $6,500.00 $19,500.00 $7,500.00 $22,500.00251EA6' Dia. Sanitary Sewer Manhole Installed On Existing Main$7,450.00 $7,450.00 $24,880.00 $24,880.00 $9,355.00 $9,355.00 $6,700.00 $6,700.00 $7,750.00 $7,750.00 $12,000.00 $12,000.00 $12,000.00 $12,000.00 $11,500.00 $11,500.00 $25,000.00 $25,000.00 $11,776.00 $11,776.00262EA5' Dia. Sanitary Sewer Manhole Installed On Existing Main$5,200.00 $10,400.00 $22,450.00 $44,900.00 $7,200.00 $14,400.00 $4,400.00 $8,800.00 $6,500.00 $13,000.00 $9,000.00 $18,000.00 $10,000.00 $20,000.00 $9,400.00 $18,800.00 $20,000.00 $40,000.00 $9,564.00 $19,128.002729 SYRemoval of Existing Concrete - Pavement, Sidewalk, & Driveways$6.00 $174.00 $11.00 $319.00 $12.00 $348.00 $6.00 $174.00 $95.00 $2,755.00 $110.00 $3,190.00 $10.00 $290.00 $3.00 $87.00 $14.00 $406.00 $100.00 $2,900.002829 SYReplace Concrete Multi-Use Trail$113.00 $3,277.00 $109.00 $3,161.00 $53.00 $1,537.00 $68.00 $1,972.00 $80.00 $2,320.00 $110.00 $3,190.00 $200.00 $5,800.00 $100.00 $2,900.00 $85.00 $2,465.00 $100.00 $2,900.0029380SRdRlCRBlk$11 2$4 2 00$11 00$43 00 00$3 00$13 300 00$00$20 900 00$12 00$4 00 00$000$19 000 00$4 00$1 100 00$100 00$38 000 00$40 00$1 200 00$00$28 00 0029380SYRemove and Replace Concrete Revetment Blocks$11.25$4,275.00$115.00$43,700.00$35.00$13,300.00$55.00$20,900.00$125.00$47,500.00$50.00$19,000.00$45.00$17,100.00$100.00$38,000.00$40.00$15,200.00$75.00$28,500.003025 SYRemove and Replace Concrete Rip-Rap$56.00 $1,400.00 $109.00 $2,725.00 $71.00 $1,775.00 $190.00 $4,750.00 $30.00 $750.00 $130.00 $3,250.00 $40.00 $1,000.00 $125.00 $3,125.00 $40.00 $1,000.00 $85.00 $2,125.003160 LFRemove and Replace 36" RCP$141.00 $8,460.00 $109.00 $6,540.00 $100.00 $6,000.00 $200.00 $12,000.00 $160.00 $9,600.00 $120.00 $7,200.00 $100.00 $6,000.00 $90.00 $5,400.00 $185.00 $11,100.00 $140.00 $8,400.003280 LFRemove and Replace 18" RCP (Includes Headwall)$73.25 $5,860.00 $134.00 $10,720.00 $66.00 $5,280.00 $110.00 $8,800.00 $92.00 $7,360.00 $75.00 $6,000.00 $91.00 $7,280.00 $100.00 $8,000.00 $150.00 $12,000.00 $160.00 $12,800.00Page 1 of 220 City of College Station - Purchasing DivisionBid Tabulation for #13-043"Bee Creek Sanitary Sewer Line Rehab - Phase 1"Open Date: Thursday, February 7, 2013 @ 2:00 p.m.ITEM QTY UNIT DESCRIPTION UNIT PRICETOTAL PRICE UNIT PRICE TOTAL PRICE UNIT PRICETOTAL PRICE UNIT PRICETOTAL PRICE UNIT PRICETOTAL PRICE UNIT PRICETOTAL PRICE UNIT PRICETOTAL PRICE UNIT PRICETOTAL PRICE UNIT PRICETOTAL PRICE UNIT PRICETOTAL PRICES&J Construction Co, Inc.dba Jerry Allen Smith Construction Co, Inc.(Jacksonville, AR)Garney Companies, Inc.(Kansas City, MO)Lewis Contractors, Inc.(Georgetown, TX)Huff & Mitchell, Inc.(Cypress, TX)North Texas Contracting, Inc.(Keller, TX)Doughtie Construction Co., Inc(Huntsville, TX)S.J. Louis Constructionof Texas(Houston, TX)Dudley Construction, Ltd.(College Station, TX)BRH-Garver Construction, LP(Houston, TX)Elliott Construction, LLC(Wellborn, TX)3340 LFRemove 24" CMP and Replace With 24" RCP$84.50 $3,380.00 $77.00 $3,080.00 $80.00 $3,200.00 $144.00 $5,760.00 $105.00 $4,200.00 $70.00 $2,800.00 $70.00 $2,800.00 $60.00 $2,400.00 $170.00 $6,800.00 $100.00 $4,000.00341EARemove and Replace Storm Sewer Junction Box$3,380.00 $3,380.00 $3,432.00 $3,432.00 $3,120.00 $3,120.00 $2,500.00 $2,500.00 $2,800.00 $2,800.00 $4,000.00 $4,000.00 $8,000.00 $8,000.00 $2,000.00 $2,000.00 $5,000.00 $5,000.00 $3,500.00 $3,500.00351EARemove and Replace Concrete Apron$2,250.00 $2,250.00 $1,313.00 $1,313.00 $1,825.00 $1,825.00 $3,800.00 $3,800.00 $3,200.00 $3,200.00 $1,000.00 $1,000.00 $6,500.00 $6,500.00 $500.00 $500.00 $5,000.00 $5,000.00 $3,500.00 $3,500.003625 SYRemove and Replace Gravel Driveway$56.00 $1,400.00 $109.00 $2,725.00 $10.00 $250.00 $25.00 $625.00 $22.00 $550.00 $20.00 $500.00 $40.00 $1,000.00 $25.00 $625.00 $35.00 $875.00 $20.00 $500.00375ACHydromulch Seeding$1,500.00 $7,500.00 $1,700.00 $8,500.00 $1,770.00 $8,850.00 $1,700.00 $8,500.00 $2,250.00 $11,250.00 $1,000.00 $5,000.00 $1,300.00 $6,500.00$1,100.00 $5,500.00 $1,800.00 $9,000.00 $1,650.00 $8,250.0038707 CYCement Stabilized Sand Backfill$30.50 $21,563.50 $40.00 $28,280.00 $50.00 $35,350.00 $50.00 $35,350.00 $75.00 $53,025.00 $65.00 $45,955.00 $42.00 $29,694.00 $35.00 $24,745.00 $60.00 $42,420.00 $130.00 $91,910.00397,302 LFPre-Construction Television Inspection$1.69 $12,340.38 $2.00 $14,604.00 $4.50 $32,859.00 $3.00 $21,906.00 $2.65 $19,350.30 $2.00 $14,604.00 $3.00 $21,906.00 $2.00 $14,604.00 $1.25 $9,127.50 $4.00 $29,208.00407,302 LFPost-Construction Television Inspection$3.38 $24,680.76 $2.00 $14,604.00 $3.00 $21,906.00 $3.00 $21,906.00 $2.85 $20,810.70 $1.00 $7,302.00 $2.00 $14,604.00 $1.00 $7,302.00 $2.25 $16,429.50 $4.00 $29,208.00414,154 LF42" Dia. Ductile Iron Pipe (Class 200)$263.55 $1,094,786.70No Bid No Bid$270.00 $1,121,580.00 $393.00 $1,632,522.00 $300.00 $1,246,200.00 $331.00 $1,374,974.00 $340.00 $1,412,360.00 $300.00 $1,246,200.00 $353.00$1,466,362.00 $332.32 $1,380,457.2842257 LF36" Dia. Ductile Iron Pipe (Class 200)$211.50 $54,355.50No Bid No Bid$229.00 $58,853.00 $329.00 $84,553.00 $230.00 $59,110.00 $285.00 $73,245.00 $300.00 $77,100.00 $260.00 $66,820.00 $286.00 $73,502.00 $287.12 $73,789.84432,818 LF30" Dia. Ductile Iron Pipe (Class 200)$162.71 $458,516.78No Bid No Bid$189.00 $532,602.00 $268.00 $755,224.00 $190.00 $535,420.00 $243.00 $684,774.00 $245.00 $690,410.00 $225.00 $634,050.00 $264.00 $743,952.00 $248.50 $700,273.00$1,432,265.15$2,154,520.12$1,478,883.00$2,283,816.00$1,043,513.00$1,947,070.00$1,129,089.00$2,179,870.00$1,108,426.00$2,132,993.00$1,036,707.00$1,840,730.00$1,026,837.00 $1,150,953.00$1,081,473.59 $1,490,150.00C. ALTERNATIVE ITEM #1 - DUCTILE IRON PIPE$1,607,658.98No BidD. ALTERNATIVE ITEM #2 - FIBERGLASS PIPETOTAL SECTION B - SEWER LINE CONSTRUCTION ITEMSTOTAL SECTION C - ALTERNATIVE ITEM #1 - DUCTILE IRON PIPE$1,713,035.00 $2,472,299.00444,154 LF42" Dia. Fiberglass-Reinforced Polymer Mortar Pipe (SN 72)$180.81 $751,084.74 $270.00 $1,121,580.00 $168.00 $697,872.00 $228.00 $947,112.00 $235.00 $976,190.00 $225.00 $934,650.00 $224.00 $930,496.00 $200.00 $830,800.00 $240.00 $996,960.00 $262.33 $1,089,718.8245257 LF36" Dia. Fiberglass-Reinforced Polymer Mortar Pipe (SN 72)$148.00 $38,036.00 $268.00 $68,876.00 $164.00 $42,148.00 $193.00 $49,601.00 $190.00 $48,830.00 $189.00 $48,573.00 $200.00 $51,400.00 $170.00 $43,690.00 $223.00 $57,311.00 $229.40 $58,955.80462,818 LF30" Dia. Fiberglass-Reinforced Polymer Mortar Pipe (SN 72)$116.14 $327,282.52 $217.00 $611,506.00 $127.00 $357,886.00 $165.00 $464,970.00 $160.00 $450,880.00 $144.00 $405,792.00 $168.00 $473,424.00 $160.00 $450,880.00 $204.00 $574,872.00 $203.07 $572,251.26474,154 LF42" Dia. ASTM F1803 Closed Profile PVC Pipe (PS 75)$149.75 $622,061.50No Bid No Bid$148.00 $614,792.00 $191.00 $793,414.00 $200.00 $830,800.00 $210.00 $872,340.00 $208.00 $864,032.00 $200.00 $830,800.00 $228.00 $947,112.00 $233.18 $968,629.7248257 LF36" Dia. ASTM F1803 Closed Profile PVC Pipe (PS 75)$143.50 $36,879.50No Bid No Bid$136.00 $34,952.00 $168.00 $43,176.00 $185.00 $47,545.00 $164.00 $42,148.00 $185.00 $47,545.00 $170.00 $43,690.00 $200.00 $51,400.00 $216.25 $55,576.25492,818 LF30" Dia. ASTM F1803 Closed Profile PVC Pipe (PS 75)$79.09 $222,875.62No Bid No Bid$100.00 $281,800.00 $124.00 $349,432.00 $150.00 $422,700.00 $122.00 $343,796.00 $136.00 $383,248.00 $130.00 $366,340.00 $183.00 $515,694.00 $190.06 $535,589.0850 7302 LF Aggregate Grade 4 Crushed Stone Embedment$7.00 $51,114.00 $56.92 $415,629.84 $34.00 $248,268.00 $28.00 $204,456.00 $37.00 $270,174.00 $19.00 $138,738.00 $16.50 $120,483.00 $20.00 $146,040.00 $7.00 $51,114.00 $15.00 $109,530.00TOTAL BASE BID (Section A + Section B)TOTAL BASE BID + ALTERNATIVE #1TOTAL BASE BID + ALTERNATIVE #2TOTAL BASE BID + ALTERNATIVE #3Dudley Construction, Ltd.»Bidder miscalculated the total for Bid Item 8 Total Section B Total Base Bid and Total Base Bid + each Alternate The highlighted totals above are correct$1,559,795.05$2,133,865.15$4,288,385.27$3,854,791.03$3,693,660.20$3,478,880.00$3,363,943.00$1,720,925.88$1,629,143.00$1,514,206.00$1,849,737.00$4,133,553.00$1,240,830.00$1,233,664.00$3,180,734.00$2,559,034.00$2,474,494.00$2,935,711.00$2,775,216.00$1,325,370.00$1,455,320.00$1,294,825.00$1,480,391.00$3,660,261.00$1,258,284.00$1,304,728.00$3,437,721.00$2,693,743.00$2,563,012.00$2,736,731.00$2,561,876.00$1,389,015.00$2,269,045.00 $2,722,438.00$1,475,900.00$1,301,045.00$1,260,831.00$3,101,561.00$2,112,091.47No Bid$2,102,683.00 $2,446,777.00TOTAL SECTION D - ALTERNATIVE ITEM #2 - FIBERGLASS PIPE$1,116,403.26 $1,801,962.00E. ALTERNATIVE ITEM #3 - CLOSED PROFILE PVC PIPECertification of Bid Bid BondAcknowledged Addendums$1,461,683.00$931,544.00 $1,186,022.00$2,884,174.00 $3,733,054.00NOTES:TOTAL SECTION E - ALTERNATIVE ITEM #3 - CLOSED PROFILE PVC PIPE$881,816.62No Bid$1,097,906.00F. ADD ALTERNATE - CRUSHED STONE EMBEDMENT$1,230,274.85 $1,885,638.00 $1,171,139.00 $1,260,755.00$2,837,933.83No Bid$2,346,678.11 $3,687,600.00»Bidder miscalculated the total for Bid Item 8, Total Section B, Total Base Bid and Total Base Bid + each Alternate. The highlighted totals above are correct.BRH-Garver Construction, LP»"NO BID" Alternative Items #1 & #2, resulting in "NO BIDS" for Total Base Bid + Alternative #1 and Total Base Bid + Alternative #2.SJ Louis Construction , LTD»Bidder did not bid a unit cost for Bid Item 1 - Mobilization. Bid prices cannot be added or changed after the opening of bids. Bidder miscalculated Bid Item 3, Bid Item 11, Total Section B, Total Base Bid and Total Base Bid + each Alternate. The highlighted totals above are correct.Page 2 of 221 22 23 24 March 28, 2013 Consent Agenda Item No. 2c Construction Contract for the Bird Pond Road Rehabilitation Project To: Frank Simpson, Interim City Manager From: Chuck Gilman, P.E., PMP, Public Works Director Agenda Caption: Presentation, possible action, and discussion regarding approval of a contract, #13-156, between the City of College Station and Glen Fuqua, Inc. in the amount of $1,447,902.83 to construct the Bird Pond Road Rehabilitation Project. Relationship to Strategic Goals: 1. Improving Transportation Recommendation(s): Staff recommends approval of the City’s Standard Construction Services Contract for the contractor in the amount of $1,447,902.83. Summary: This project rehabilitates the pavement of Bird Pond Road from Rock Prairie Road to the existing creek crossing at the City limits. The pavement cross section calls for 12-foot travel lanes with 2-foot shoulders. Slight modification to the alignment will occur within the existing right-of-way and adjacent drainage ditches will be re-graded and existing culverts replaced to improve drainage along the corridor. Budget & Financial Summary: Budget in the amount of $1,800,000 is included in the Streets Capital Improvement Projects Fund for this project. Funds in the amount of $188,353 have been expended or committed to date, leaving a balance of $1,611,647 for construction and remaining expenditures. Review and Approved by Legal: Yes Attachments: 1. Contract #13-156: On file with City Secretary’s Office 2. Bid Tab: Bid #13-046 3. Project Location Map 25 City of College Station - Purchasing DivisionBid Tabulation for #13-046"Bird Bond Road Rehabilitation Project"Open Date: Thursday, February 21, 2013 @ 2:00 p.m.ITEM QTY UNIT DESCRIPTION UNIT PRICETOTAL PRICE UNIT PRICETOTAL PRICE UNIT PRICETOTAL PRICE UNIT PRICETOTAL PRICE UNIT PRICETOTAL PRICE1 1 LS Mobilization$118,000.00 $118,000.00 $91,000.00 $91,000.00 $34,584.49 $34,584.49 $120,000.00 $120,000.00 $98,200.00 $98,200.002 1 LS Demolition$2,000.00 $2,000.00 $22,000.00 $22,000.00 $5,582.88 $5,582.88 $15,000.00 $15,000.00 $23,120.00 $23,120.003 1 LS Construction Staking$5,000.00 $5,000.00 $28,500.00 $28,500.00 $8,374.33 $8,374.33 $15,000.00 $15,000.00 $13,650.00 $13,650.004 1 LS Traffic Control$14,000.00 $14,000.00 $48,500.00 $48,500.00 $27,914.42 $27,914.42 $9,000.00 $9,000.00 $175,000.00 $175,000.005 1 LS Clearing and Grubbing Existing Trees$7,500.00 $7,500.00 $21,000.00 $21,000.00 $2,791.44 $2,791.44 $44,000.00 $44,000.00 $12,500.00 $12,500.0061,800 CYEmbankment for Street Construction (complete in place)$12.00 $21,600.00 $17.40 $31,320.00 $11.17 $20,106.00 $12.00 $21,600.00 $9.55 $17,190.0074,300 CYExcavation Street Construction (includes removal/stockpiling topsoil)$5.00 $21,500.00 $10.25 $44,075.00 $11.17 $48,031.00 $13.00 $55,900.00 $12.50 $53,750.0083,300 CYExcavation and Removal of Existing Asphalt Paving$8.00 $26,400.00 $20.70 $68,310.00 $5.58 $18,414.00 $17.00 $56,100.00 $12.60 $41,580.008a500 CYRepair Subgrade$12.00 $6,000.00 $25.50 $12,750.00 $55.83 $27,915.00 $30.00 $15,000.00 $14.40 $7,200.00923,489 SY8" Crushed Limestone Cement Treated Base (Special Section 32 11 15)$15.97 $375,119.33 $17.70 $415,755.30 $16.75 $393,440.75 $21.00 $493,269.00 $21.70 $509,711.301024,560 SYTriAx® TX5 Geogrid or approved Equal$3.25 $79,820.00 $2.85 $69,996.00 $3.12 $76,627.20 $2.60 $63,856.00 $3.75 $92,100.0010a44,360 SYChip Seal with RC250 & Grade 5 Uncoated Rock (Section 32 12 36.13)$2.15 $95,374.00 $1.50 $66,540.00 $6.70 $297,212.00 $1.00 $44,360.00 $3.20 $141,952.0010b44,360 SYTack Coat (Section 32 12 13.16)$0.30 $13,308.00 $0.25 $11,090.00 $0.28 $12,420.80 $0.40 $17,744.00 $1.00 $44,360.001122,180 SY2" HMAC Type D (Material=TxDOT Item 340, Construction=BCS Section 32 12 16)$9.00 $199,620.00 $10.00 $221,800.00 $10.89 $241,540.20 $12.00 $266,160.00 $11.30 $250,634.001222,180 SY2" HMAC Type C (Material=TxDOT Item 340, Construction=BCS Section 32 12 16)$9.50 $210,710.00 $9.00 $199,620.00 $10.61 $235,329.80 $11.00 $243,980.00 $11.00 $243,980.0012a2,960 SYCompacted Recycled Asphalt Shoulder$3.00 $8,880.00 $4.05 $11,988.00 $13.40 $39,664.00 $7.00 $20,720.00 $23.60 $69,856.00131,364 SY6" Chemically Stabilized Subgrade (Driveways)$8.00 $10,912.00 $14.50 $19,778.00 $8.93 $12,180.52 $22.00 $30,008.00 $17.65 $24,074.60141,164 SY6" Reinforced Concrete Pavement (4,000 psi) (Driveways)$35.00 $40,740.00 $43.50 $50,634.00 $37.96 $44,185.44 $46.00 $53,544.00 $34.35 $39,983.4015200 SY6" Reinforced Quick-Setting Concrete Pavement (4,000 psi)(Driveways)$40.25 $8,050.00 $56.50 $11,300.00 $42.43 $8,486.00 $58.00 $11,600.00 $46.56 $9,312.0016333,800 SFHydromulch$0.05 $16,690.00 $0.04 $13,352.00 $0.07 $23,366.00 $0.03 $10,014.00 $0.06 $20,028.0017340 SFConcrete Retaining Wall Section C$12.00 $4,080.00 $24.50 $8,330.00 $27.91 $9,489.40 $68.00 $23,120.00 $23.00 $7,820.0018510 LFMetal Beam Guard Fence “GF (31)-11”$18.50 $9,435.00 $18.25 $9,307.50 $54.04 $27,560.40 $25.00 $12,750.00 $23.00 $11,730.00192EASingle Guardrail Terminal “ET-31” or “SKT-31”$1,750.00 $3,500.00 $1,950.00 $3,900.00 $2,791.44 $5,582.88 $1,800.00 $3,600.00 $2,710.00 $5,420.00202EAMetal Beam Guard Fence (Downstream Anchor Terminal) “GF (31) DAT-11"$2,250.00 $4,500.00 $950.00 $1,900.00 $1,674.87 $3,349.74 $1,000.00 $2,000.00 $1,420.00 $2,840.00211LSStriping and Signing$15,000.00 $15,000.00 $11,500.00 $11,500.00 $13,803.12 $13,803.12 $13,000.00 $13,000.00 $14,542.00 $14,542.00$79,247.56A.L. Helmcamp, Inc.(Buffalo, TX)$203,000.00SITE PREPARATION$146,500.00 $211,000.00PAVING CONSTRUCTIONPAVING CONSTRUCTION SUBTOTAL $1,171,238.33 $1,283,245.80SITE PREPARATION SUBTOTALGlen Fuqua, Inc.(Navasota, TX)Knife River Corp.-South(Bryan, TX)Dudley Construction, Ltd.(College Station, TX)$1,558,704.25 $1,458,325.00Brazos Paving, Inc.(Bryan, TX)$322,470.00$1,608,063.30Page 1 of 226 City of College Station - Purchasing DivisionBid Tabulation for #13-046"Bird Bond Road Rehabilitation Project"Open Date: Thursday, February 21, 2013 @ 2:00 p.m.ITEM QTY UNIT DESCRIPTION UNIT PRICETOTAL PRICE UNIT PRICETOTAL PRICE UNIT PRICETOTAL PRICE UNIT PRICETOTAL PRICE UNIT PRICETOTAL PRICEA.L. Helmcamp, Inc.(Buffalo, TX)Glen Fuqua, Inc.(Navasota, TX)Knife River Corp.-South(Bryan, TX)Dudley Construction, Ltd.(College Station, TX)Brazos Paving, Inc.(Bryan, TX)2280 LF36" RCP Pipe, (ASTM C-76, CL III) (Structural Backfill)$90.00 $7,200.00 $215.00 $17,200.00 $225.55 $18,044.00 $115.00 $9,200.00 $133.70 $10,696.0023242 LF30" RCP Pipe, (ASTM C-76, CL III) (Structural Backfill)$85.00 $20,570.00 $130.00 $31,460.00 $111.66 $27,021.72 $91.00 $22,022.00 $118.50 $28,677.002440 LF24" RCP Pipe, (ASTM C-76, CL III) (Structural Backfill)$60.00 $2,400.00 $120.00 $4,800.00 $94.91 $3,796.40 $65.00 $2,600.00 $86.95 $3,478.0025355 LF18" RCP Pipe, (ASTM C-76, CL III) (Structural Backfill)$45.00 $15,975.00 $54.00 $19,170.00 $66.99 $23,781.45 $54.00 $19,170.00 $64.85 $23,021.752666 LF3'x2' RCB Culvert, (ASTM C1433) (Structural Backfill)$160.00 $10,560.00 $180.00 $11,880.00 $234.48 $15,475.68 $220.00 $14,520.00 $236.00 $15,576.00272EA36" RCP 6:1 Precast S.E.T.$3,750.00 $7,500.00 $2,400.00 $4,800.00 $3,908.02 $7,816.04 $2,000.00 $4,000.00 $2,095.00 $4,190.00286EA30" RCP 6:1 Precast S.E.T.$1,850.00 $11,100.00 $1,700.00 $10,200.00 $1,674.87 $10,049.22 $1,500.00 $9,000.00 $1,970.00 $11,820.00292EA24" RCP 6:1 Precast S.E.T.$1,200.00 $2,400.00 $915.00 $1,830.00 $1,395.72 $2,791.44 $850.00 $1,700.00 $1,520.00 $3,040.003014 EA18" RCP 6:1 Precast S.E.T.$825.00 $11,550.00 $650.00 $9,100.00 $949.09 $13,287.26 $750.00 $10,500.00 $1,200.00 $16,800.00312EA3'x2' RCBC Precast S.E.T.$3,600.00 $7,200.00 $3,100.00 $6,200.00 $3,908.02 $7,816.04 $3,200.00 $6,400.00 $7,140.00 $14,280.00323EAType “H” Grate Inlet for 36" RCP$3,250.00 $9,750.00 $3,400.00 $10,200.00 $3,908.02 $11,724.06 $3,300.00 $9,900.00 $4,152.00 $12,456.00331EAType “H” Grate Inlet for 30" RCP$3,250.00 $3,250.00 $4,500.00 $4,500.00 $3,908.02 $3,908.02 $3,300.00 $3,300.00 $4,351.00 $4,351.0034595 SFConcrete Retaining Wall for Headwall – Section A$10.10 $6,009.50 $67.00 $39,865.00 $27.91 $16,606.45 $94.00 $55,930.00 $37.20 $22,134.0035250 SFConcrete Retaining Wall for Headwall – Section B$26.00 $6,500.00 $85.00 $21,250.00 $27.91 $6,977.50 $102.00 $25,500.00 $49.00 $12,250.0036475 SYRock Rip-Rap Channel Lining$12.00 $5,700.00 $22.00 $10,450.00 $33.50 $15,912.50 $42.00 $19,950.00 $40.50 $19,237.50371LSErosion Control Plan & Sedimentation Control (includes silt fencing, construction exits, straw bale barriers, inlet protection, grass seeding, and any other sedimentation control devices)$2,500.00 $2,500.00 $9,000.00 $9,000.00 $5,582.88 $5,582.88 $15,000.00 $15,000.00 $30,715.00 $30,715.00TOTAL BID AMOUNT (All Sections)$1,447,902.83 $1,706,150.80 $1,828,542.47 $1,890,017.00NOTES:Certification of Bid Bid BondAcknowledged AddendumsDRAINAGE CONSTRUCTIONDRAINAGE CONSTRUCTION SUBTOTAL $127,664.50 $202,905.00 $185,007.78 $213,692.00Brazos Paving, Inc.»Bidder miscalculated Bid Items 29 & 30, Drainage System Subtotal and the Total Bid Amount. The highlighted totals above are correct.$202,007.25$2,163,255.55EROSION CONTROL CONSTRUCTIONPage 2 of 227 Rock Prairie Rd F r o s t D r Longmi r e DrSebesta RdW o o d c r e e k D rGraham RdE m e ra ld PkwyF o x fire DrEa g le AveJ Bird Pond Road Rehabilitation Project Location Map 28 March 28, 2013 Consent Agenda Item No. 2d Jones-Butler Road Extension (ST0905) Construction Contract Award To: Frank Simpson, Interim City Manager From: Chuck Gilman, P.E., PMP, Public Works Director Agenda Caption: Presentation, possible action, and discussion regarding award of a construction contract with Dudley Construction, Ltd. in the amount of $2,975,669.11 for the Jones Butler Road Extension project. Relationship to Strategic Goals: 1. Core Services and Infrastructure 2. Improving Transportation Recommendation(s): Staff recommends approval of the contract with Dudley Construction, Ltd. in the amount of $2,975,669.11. Summary: The extension of Jones-Butler is one of the transportation projects included in the 2008 Bond Authorization. The project will construct a concrete major collector with storm sewer, sidewalks, bike lanes, and street lighting from the intersection of Luther Street & Jones-Butler Drive to the intersection of George Bush Drive & Penberthy Road within an 80’ roadway easement across TAMUS property. Additional improvements, requested by TAMUS, include widening a portion of Penberthy north of George Bush Dr., a livestock crossing under Jones Butler, access improvements at Pearce Pavilion, and associated infrastructure. The project will also include a traffic signal and median improvements at George Bush Dr and electrical conduit for future expansion of CSU infrastructure. The City of College Station will be responsible for the cost of Jones Butler including the traffic signal, and TAMUS will participate in the cost of improvements to Penberthy Dr. The Texas Department of Transportation (TxDOT) is planning a grade separation at the intersection of George Bush & Wellborn Road to help facilitate automobile and pedestrian traffic through that intersection and the railroad crossing. Once the grade separation is constructed, Marion Pugh Road will be right-in and right-out only, with no left-turn onto George Bush. This will limit access for residents to the West Campus of Texas A&M University and for commuters that utilize Holleman and Jones Butler, causing additional traffic congestion on Wellborn Road and/or Harvey Mitchell Parkway. Therefore, this roadway extension is an important component to our transportation network to help improve mobility. Budget & Financial Summary: The total bid for Dudley Construction, Ltd. was for $2,975,669.11. The construction cost for the roadway portion of this project is $2,787,774.26. Funds in the amount of $3,375,092 are currently budgeted in the Streets Capital Improvement Projects Fund for the Streets portion of the project. The amount expended or committed to date is $373,437.42, leaving a balance of $3,001,654.58 for 29 construction. TAMUS participation in the project is approximately $187,019.60. The final cost will be actual construction costs at the project close out. The construction cost for the electrical portion of this project is $187,894.85. Funds in the amount of $250,000 are currently budgeted in the Electrical Capital Improvement Projects Fund for construction of the Electric portion of this project. Attachments: 1. Construction Contract (on file in the City Secretary’s Office) 2. Bid Tab 3. Project Map 30 City of College Station - Purchasing DivisionBid Tabulation for #13-044"Jones-Butler Road Extension"Open Date: Friday, February 22, 2012 @ 2:00 p.m.ITEM QTY UNIT DESCRIPTION UNIT PRICETOTAL PRICE UNIT PRICETOTAL PRICE UNIT PRICETOTAL PRICE UNIT PRICETOTAL PRICE UNIT PRICETOTAL PRICE11LSGeneral Overhead for all Work including Mobilization, Bonds, Insurance and Related Items$200,500.00 $200,500.00 $162,000.00 $162,000.00 $110,000.00 $110,000.00 $278,000.00 $278,000.00 $60,000.00 $60,000.0021LSErosion and Sedimentation Controls including silt fencing, rock filter dams, Stabilized Construction Entrance/Exit, Phase II Inlet Protection, post-construction Hydromulch seeding as required, with SWPPP development & notices as required by TCEQ$26,900.00 $26,900.00 $37,890.00 $37,890.00 $36,600.00 $36,600.00 $36,000.00 $36,000.00 $40,000.00 $40,000.0036,560 SYBiodegradable Erosion Control Blanket Installed with Sod Staples per Manufacturer's Recommendations (North American Green SC150BN or Approved Equal)$1.37 $8,987.20 $1.30 $8,528.00 $1.37 $8,987.20 $1.30 $8,528.00 $1.50 $9,840.0041,295 SYTurf Reinforcement Mat Installed with Sod Staples per Manufacturer's Recommendations (Land Lok 300 TRM or Approved Equal)$10.44 $13,519.80 $13.15 $17,029.25 $13.75 $17,806.25 $13.30 $17,223.50 $14.00 $18,130.0051LSTraffic Control (Excluding Penberthy Drive Traffic Control)$12,080.00 $12,080.00 $4,600.00 $4,600.00 $6,500.00 $6,500.00 $24,000.00 $24,000.00 $32,000.00 $32,000.0061LSLivestock Control including temporary construction fencing, phasing and coordination with TAMU Agrilife as required$24,185.00 $24,185.00 $39,750.00 $39,750.00 $25,000.00 $25,000.00 $29,000.00 $29,000.00 $70,000.00 $70,000.00721 STAPreparing Right of Way per TxDot Item 100 for Jones-Butler Right of Way$67.00 $1,407.00 $1,021.33 $21,447.93 $750.00 $15,750.00 $1,000.00 $21,000.00 $6,000.00 $126,000.00816,631 CYRoadway Excavation (unfactored)$2.74 $45,568.94 $1.30 $21,620.30 $4.50 $74,839.50 $2.70 $44,903.70 $7.00 $116,417.00913,118 CYRoadway Embankment (unfactored)$2.74 $35,943.32 $6.35 $83,299.30 $3.50 $45,913.00 $2.40 $31,483.20 $8.00 $104,944.0010130 SYSaw cut & remove existing concrete sidewalk $5.50 $715.00 $10.00 $1,300.00 $9.00 $1,170.00 $5.00 $650.00 $20.00 $2,600.00GENERAL ITEMSDudley Construciton, Ltd.(College Station, TX)Brazos Paving, Inc.(Bryan, TX)Knife River Corp. - South(Bryan, TX)Larry Young Paving, Inc.(College Station, TX)A.L. Helmcamp, Inc.(Buffalo, TX)GENERAL ITEMS - SUBTOTAL $200,500.00 $162,000.00 $110,000.00 $278,000.00 $60,000.00PAVEMENT & DRAINAGE ITEMS11200 SYSaw cut & remove existing HMAC pavement (Luther Street)$5.50 $1,100.00 $5.30 $1,060.00 $5.00 $1,000.00 $5.50 $1,100.00 $20.00 $4,000.00121,076 LFSaw cut & remove existing concrete curb$5.50 $5,918.00 $6.25 $6,725.00 $10.00 $10,760.00 $8.00 $8,608.00 $10.00 $10,760.0013145 LFExcavate & remove existing 18" storm sewer (TxDOT ROW)$22.00 $3,190.00 $10.80 $1,566.00 $12.00 $1,740.00 $36.00 $5,220.00 $20.00 $2,900.00141EAExcavate & remove existing storm sewer junction box (TxDOT ROW)$1,094.00 $1,094.00 $1,835.00 $1,835.00 $750.00 $750.00 $1,100.00 $1,100.00 $1,000.00 $1,000.001515,048 SY8" Thick Reinforced Concrete Pavement with #4 bars at 12" OCEW with 3,500 psi Minimum Concrete$34.36 $517,049.28 $35.00 $526,680.00 $33.25 $500,346.00 $36.00 $541,728.00 $46.00 $692,208.0016755 SY6" Thick Reinforced Textured Concrete per sheet PD7.2 (Livestock Crossing Approaches) with #4 bars at 18" OCEW with 3,500 psi Minimum Concrete$35.00 $26,425.00 $28.75 $21,706.25 $31.00 $23,405.00 $35.50 $26,802.50 $44.00 $33,220.001716,945 SY6" Thick Lime Stabilized Subgrade$4.20 $71,169.00 $4.85 $82,183.25 $4.25 $72,016.25 $4.20 $71,169.00 $5.30 $89,808.5018940 SY9" Thick Concrete Pavement Contraction Design (per TxDOT Detail CPCD-94) for George Bush Drive$52.50 $49,350.00 $37.75 $35,485.00 $40.00 $37,600.00 $46.50 $43,710.00 $56.00 $52,640.0019940 SY8" Thick Type "B" HMAC (Black Base) per TxDOT Item 340 for George Bush Drive$52.50 $49,350.00 $41.00 $38,540.00 $45.00 $42,300.00 $33.00 $31,020.00 $46.00 $43,240.0020200 SY6" Thick HMAC Pavement Repair per B/CS Detail ST4-04$43.77 $8,754.00 $42.15 $8,430.00 $45.00 $9,000.00 $43.75 $8,750.00 $65.00 $13,000.0021803 LF6" Monolithic Concrete Curb (per TxDOT Detail CCCG-10A) for George Bush Drive$5.50 $4,416.50 $4.60 $3,693.80 $4.00 $3,212.00 $3.00 $2,409.00 $8.00 $6,424.00225,034 LF6" Monolithic Concrete Curb (B/CS Detail ST1-02)$3.28 $16,511.52 $3.20 $16,108.80 $3.75 $18,877.50 $2.10 $10,571.40 $6.00 $30,204.00232,937 SY4" Thick Reinforced Concrete Sidewalk (B/CS Detail SW1-02)$28.00 $82,236.00 $29.70 $87,228.90 $29.00 $85,173.00 $33.50 $98,389.50 $33.00 $96,921.00Page 1 of 1431 City of College Station - Purchasing DivisionBid Tabulation for #13-044"Jones-Butler Road Extension"Open Date: Friday, February 22, 2012 @ 2:00 p.m.ITEM QTY UNIT DESCRIPTION UNIT PRICETOTAL PRICE UNIT PRICETOTAL PRICE UNIT PRICETOTAL PRICE UNIT PRICETOTAL PRICE UNIT PRICETOTAL PRICEDudley Construciton, Ltd.(College Station, TX)Brazos Paving, Inc.(Bryan, TX)Knife River Corp. - South(Bryan, TX)Larry Young Paving, Inc.(College Station, TX)A.L. Helmcamp, Inc.(Buffalo, TX)242,429 SF8" Wide Sidewalk Paver Section per BCS Detail SW1-02, including all concrete, forming, doweling into curb, and pavers complete in-place$3.28 $7,967.12 $11.90 $28,905.10 $3.50 $8,501.50 $7.25 $17,610.25 $11.00 $26,719.00252EA6' Wide Sidewalk Ambulatory Ramps at Street Intersection per B/CS Detail SW3-00$875.00 $1,750.00 $110.00 $220.00 $800.00 $1,600.00 $1,400.00 $2,800.00 $1,100.00 $2,200.00262EA6' Wide Sidewalk Ambulatory Ramp per B/CS Detail SW3-04$437.00 $874.00 $220.00 $440.00 $450.00 $900.00 $950.00 $1,900.00 $650.00 $1,300.00276EA8' Wide Sidewalk Ambulatory Ramp per B/CS Detail SW3-03$437.00 $2,622.00 $108.00 $648.00 $475.00 $2,850.00 $1,100.00 $6,600.00 $850.00 $5,100.00282EAMedian Concrete Bullet Nose (George Bush Dr only)$437.00 $874.00 $945.00 $1,890.00 $400.00 $800.00 $1,300.00 $2,600.00 $450.00 $900.0029204 SY4" Thick Reinforced Concrete Median Pavement with #4 bars at 18" OCEW, including all subgrade preparation, Cement Sand course & doweling into curbs, per sheets PD2.2 & D-04 (George Bush Drive & Jones-Butler RD only)$52.00 $10,608.00 $44.10 $8,996.40 $45.00 $9,180.00 $61.00 $12,444.00 $60.00 $12,240.00304EAStandard Flush Curb Inlet - 10' Opening (B/CS Detail D1-00) with 24" Diameter Ring & Cover$3,282.00 $13,128.00 $3,175.00 $12,700.00 $3,300.00 $13,200.00 $3,900.00 $15,600.00 $5,400.00 $21,600.00314EARecessed Curb Inlet - 10' Opening (B/CS Detail D1-00) with 24" Diameter Ring & Cover$3,830.00 $15,320.00 $3,550.00 $14,200.00 $3,300.00 $13,200.00 $4,200.00 $16,800.00 $5,600.00 $22,400.00327EAStorm Sewer Junction Box (B/CS Detail D1-02) with 24" Diameter Ring & Cover$3,447.00 $24,129.00 $2,780.00 $19,460.00 $3,800.00 $26,600.00 $3,600.00 $25,200.00 $5,200.00 $36,400.00331LS10'x20' Storm Sewer Juction Box including removal of existing flared wing wall headwall & tie-in of existing storm sewer lines$21,338.00 $21,338.00 $14,370.00 $14,370.00 $14,500.00 $14,500.00 $29,500.00 $29,500.00 $35,000.00 $35,000.008' 4' ASTM C 850 P C t C t B C l t ith C t34205 LF8'x4' ASTM C-850 Pre-Cast Concrete Box Culvert with Cement Stabilized Sand Bedding & Haunching with Structural Backfill $459.60 $94,218.00 $491.25 $100,706.25 $561.00 $115,005.00 $400.00 $82,000.00 $573.00 $117,465.003542 LF8'x4' ASTM C-850 Pre-Cast Concrete Box Culvert with Cement Stabilized Sand Bedding & Haunching with Non-Structural Backfill $459.60 $19,303.20 $480.00 $20,160.00 $561.00 $23,562.00 $390.00 $16,380.00 $570.00 $23,940.003626 LF30" Diameter ASTM C-76 Class III Gasketed RCP Storm Sewer Pipe with Cement Stabilized Sand Bedding & Haunching with Structural Backfill $87.54 $2,276.04 $86.00 $2,236.00 $100.00 $2,600.00 $140.00 $3,640.00 $93.00 $2,418.003725 LF30" Diameter ASTM C-76 Class III Gasketed RCP Storm Sewer Pipe with Cement Stabilized Sand Bedding & Haunching with Non-Structural Backfill $87.54 $2,188.50 $74.30 $1,857.50 $67.00 $1,675.00 $55.00 $1,375.00 $92.00 $2,300.00381,032 LF24" Diameter ASTM C-76 Class III Gasketed RCP Storm Sewer Pipe with Cement Stabilized Sand Bedding & Haunching with Structural Backfill $74.41 $76,791.12 $55.20 $56,966.40 $92.00 $94,944.00 $77.00 $79,464.00 $66.00 $68,112.003915 LF24" Diameter ASTM C-76 Class III Gasketed RCP Storm Sewer Pipe with Cement Stabilized Sand Bedding & Haunching with Non-Structural Backfill $56.90 $853.50 $56.90 $853.50 $67.00 $1,005.00 $69.00 $1,035.00 $65.00 $975.0040422 LF18" Diameter ASTM C-76 Class III Gasketed RCP Storm Sewer Pipe with Cement Stabilized Sand Bedding & Haunching with Structural Backfill $67.57 $28,514.54 $48.75 $20,572.50 $55.00 $23,210.00 $61.00 $25,742.00 $54.00 $22,788.004152 LF18" Diameter ASTM C-76 Class III Gasketed RCP Storm Sewer Pipe with Cement Stabilized Sand Bedding & Haunching with Non-Structural Backfill $49.24 $2,560.48 $48.65 $2,529.80 $50.00 $2,600.00 $58.00 $3,016.00 $52.00 $2,704.00Page 2 of 1432 City of College Station - Purchasing DivisionBid Tabulation for #13-044"Jones-Butler Road Extension"Open Date: Friday, February 22, 2012 @ 2:00 p.m.ITEM QTY UNIT DESCRIPTION UNIT PRICETOTAL PRICE UNIT PRICETOTAL PRICE UNIT PRICETOTAL PRICE UNIT PRICETOTAL PRICE UNIT PRICETOTAL PRICEDudley Construciton, Ltd.(College Station, TX)Brazos Paving, Inc.(Bryan, TX)Knife River Corp. - South(Bryan, TX)Larry Young Paving, Inc.(College Station, TX)A.L. Helmcamp, Inc.(Buffalo, TX)421,794 LFTV Inspection of Storm Sewer System (18"-30" diameter pipes)$3.28 $5,884.32 $2.50 $4,485.00 $2.20 $3,946.80 $2.60 $4,664.40 $3.20 $5,740.80432EAConcrete Headwall with Flared Wingwalls and Dissipator Blocks for 24" Diameter Storm Sewer Pipe (B/CS Detail D3-00)$1,641.42 $3,282.84 $1,390.00 $2,780.00 $1,000.00 $2,000.00 $4,900.00 $9,800.00 $2,200.00 $4,400.0044100 LF12'x12' ASTM C-850 Pre-Cast Concrete Box Culvert per TxDOT Detail SCP-12 (Livestock Crossing) - complete in place with Cement Stabilized Sand Bedding & Haunching with Structural Backfill $1,201.52 $120,152.00 $1,266.20 $126,620.00 $1,650.00 $165,000.00 $1,100.00 $110,000.00 $1,500.00 $150,000.00452EAConcrete Headwall with Flared Wingwalls (at 4:1 slope) for 12'x12' Pre-Cast Box Culvert per TxDOT Detail FW-0$38,737.59 $77,475.18 $27,370.00 $54,740.00 $39,600.00 $79,200.00 $50,000.00 $100,000.00 $50,000.00 $100,000.00461LSConcrete Wingwall with Parallel Wings for Skewed 8'x4' Box Culvert - complete in place$12,447.46 $12,447.46 $22,500.00 $22,500.00 $17,000.00 $17,000.00 $25,000.00 $25,000.00 $22,000.00 $22,000.00471LS7'x16' Pre-Cast Reinforced Concrete Arch Span Bridge with natural channel bottom, skewed end sections, footings and/or foundation and backfill as required to complete in place $184,642.00 $184,642.00 $161,910.00 $161,910.00 $240,000.00 $240,000.00 $184,000.00 $184,000.00 $250,000.00 $250,000.00481LSConcrete Wingwalls for the upstream and downstream ends of the 7'x16' Arch Span Bridge$50,800.00 $50,800.00 $75,058.00 $75,058.00 $48,400.00 $48,400.00 $100,000.00 $100,000.00 $142,000.00 $142,000.00491,994 LFTrench Safety System (Storm Sewer, 8x4 Box Culvert, 7x16 Arch Span Bridge & 12x12 Livestock Crossing)$1.09 $2,173.46 $1.10 $2,193.40 $3.00 $5,982.00 $3.50 $6,979.00 $5.00 $9,970.0050400 SY18" Thick Rock Rip-Rap (50 lb minimum stone pieces) with Geotextile Fabric Underlayment per TxDOT Item 432 Common Stone Rip-Rap, complete-in-place$43.77 $17,508.00 $44.75 $17,900.00 $45.00 $18,000.00 $57.00 $22,800.00 $50.00 $20,000.0051555 LFCombination Rail Texas Classic per TxDOT Detail (Type C411) $131.00 $72,705.00 $110.00 $61,050.00 $131.00 $72,705.00 $135.00 $74,925.00 $127.00 $70,485.0052300 LFTraffic Rail Foundation for Texas Classic Combination Rail (per TxDOT Details TRF)$43.77 $13,131.00 $44.85 $13,455.00 $42.00 $12,600.00 $42.00 $12,600.00 $88.00 $26,400.00534,452 LFWoven Wire Horse Fence with 1 7/8" OD Welded Steel Pipe Top Rail and Line Posts, and 4 1/2" OD Welded Steel Corner Posts with brace per Sheet D-05$15.40 $68,560.80 $23.37 $104,043.24 $13.75 $61,215.00 $14.75 $65,667.00 $14.00 $62,328.00542EADouble-10' Wide 6 Rail Heavy Duty Galvanized Pipe Gates$580.00 $1,160.00 $225.00 $450.00 $1,500.00 $3,000.00 $720.00 $1,440.00 $2,200.00 $4,400.00552EA16' Wide 6 Rail Heavy Duty Galvanized Pipe Gate$460.00 $920.00 $800.00 $1,600.00 $1,000.00 $2,000.00 $1,000.00 $2,000.00 $1,600.00 $3,200.00561LS36' Wide Cattle Guard Assembly per sheet PD6.3 - complete in place$10,265.00 $10,265.00 $8,520.00 $8,520.00 $13,750.00 $13,750.00 $7,600.00 $7,600.00 $12,000.00 $12,000.00571LS36' Wide Electric Roller Gate with typical TAMU post mounted control pad per sheet PD6.2 - complete in place$15,400.00 $15,400.00 $14,962.50 $14,962.50 $33,000.00 $33,000.00 $12,400.00 $12,400.00 $6,300.00 $6,300.00581LS5' Wide Pedestrian Chain Link Gate with spring loaded hinges & self-catching latch per sheet PD6.1 - complete in place$700.00 $700.00 $315.00 $315.00 $1,500.00 $1,500.00 $720.00 $720.00 $530.00 $530.0059212 LF24" Wide Solid White Stop Line (Type I Thermoplastic)$7.60 $1,611.20 $11.24 $2,382.88 $11.50 $2,438.00 $7.10 $1,505.20 $11.20 $2,374.4060784 LF8" Wide Solid White Turn Lane Line (Type I Thermoplastic) with Type I-C RPM spaced at 20' Typical$1.00 $784.00 $3.78 $2,963.52 $3.96 $3,104.64 $0.95 $744.80 $3.80 $2,979.2061264 LF24" Wide Solid White Type I Thermoplastic Stripes for 6' Wide Continental Style Crosswalk Striping at George Bush Dr intersection (stripes separated by a 3' Wide Gap)$6.57 $1,734.48 $11.24 $2,967.36 $11.80 $3,115.20 $6.10 $1,610.40 $11.20 $2,956.80PAVEMENT & DRAINAGE ITEMS - SUBTOTAL $1,988,392.12 $2,047,000.37 $2,173,977.00 $2,147,667.45 $2,890,571.30STRIPING & SIGNAGE ITEMSPage 3 of 1433 City of College Station - Purchasing DivisionBid Tabulation for #13-044"Jones-Butler Road Extension"Open Date: Friday, February 22, 2012 @ 2:00 p.m.ITEM QTY UNIT DESCRIPTION UNIT PRICETOTAL PRICE UNIT PRICETOTAL PRICE UNIT PRICETOTAL PRICE UNIT PRICETOTAL PRICE UNIT PRICETOTAL PRICEDudley Construciton, Ltd.(College Station, TX)Brazos Paving, Inc.(Bryan, TX)Knife River Corp. - South(Bryan, TX)Larry Young Paving, Inc.(College Station, TX)A.L. Helmcamp, Inc.(Buffalo, TX)62330 LF12" Wide Solid White Lines (Type I Thermoplastic) for 8' Wide Standard Crosswalk at Luther Street intersection$4.41 $1,455.30 $6.09 $2,009.70 $6.38 $2,105.40 $4.35 $1,435.50 $6.10 $2,013.00633,920 LF4" Wide Solid White Bike Lane Line (Type I Thermoplastic)$0.54 $2,116.80 $1.23 $4,821.60 $1.30 $5,096.00 $0.50 $1,960.00 $1.30 $5,096.00641,250 LFDouble 4" Wide Solid Yellow Line (Type I Thermoplastic) with Type II-A-A RPM Spaced at 80' Typical$0.94 $1,175.00 $1.47 $1,837.50 $1.54 $1,925.00 $0.90 $1,125.00 $1.50 $1,875.0065600 LFDouble 4" Wide Solid Yellow Line (Type I Thermoplastic) with Type II-A-A RPM Spaced at 20' Typical$0.94 $564.00 $1.58 $948.00 $1.65 $990.00 $0.90 $540.00 $1.60 $960.00661,000 LF4" Wide Broken White Line (Type I Thermoplastic), 10' Long with a 30' Gap$0.63 $630.00 $0.59 $590.00 $0.62 $620.00 $0.60 $600.00 $0.60 $600.0067123 LF24" Wide Solid Yellow Chevron Lines (Type I Thermoplastic) at 45 degree angle, Spaced at 20' intervals, Typical$6.84 $841.32 $12.81 $1,575.63 $13.32 $1,638.36 $6.40 $787.20 $13.00 $1,599.00684EALeft Turn Lane Pavement Marking Letters "ONLY" (Type I Thermoplastic)$98.49 $393.96 $294.00 $1,176.00 $308.00 $1,232.00 $92.00 $368.00 $300.00 $1,200.00698EALeft Turn Lane Pavement Marking Arrows (Type I Thermoplastic)$87.54 $700.32 $231.00 $1,848.00 $242.00 $1,936.00 $82.00 $656.00 $230.00 $1,840.00703EABike Lane Pavement Marking with Directional Arrow (Type I Thermoplastic)$306.40 $919.20 $186.90 $560.70 $189.00 $567.00 $290.00 $870.00 $190.00 $570.00712EAR2-1 SPEED LIMIT Sign & R8-3A No Parking Sign mounted on 3" diameter Anodized Bronze post with TxDOT's Triangular Slip Base Assembly$492.43 $984.86 $411.60 $823.20 $432.00 $864.00 $460.00 $920.00 $410.00 $820.00722EAR3-17 BIKE LANE Sign mounted on 3" diameter Anodized Bronze post with TxDOT's Triangular Slip Base Assembly$492.43 $984.86 $385.35 $770.70 $403.00 $806.00 $460.00 $920.00 $390.00 $780.00R3-17 BIKE LANE Sign & R3-17b ENDS sign mounted on 3" diameter Anodized Bronze post with TxDOT's Triangular Slip 731EApgpBase Assembly$493.00 $493.00 $385.35 $385.35 $403.00 $403.00 $460.00 $460.00 $390.00 $390.00743EAW3-1a STOP AHEAD Sign with Temporary Flags mounted on 3" diameter Anodized Bronze post with TxDOT's Triangular Slip Base Assembly$493.00 $1,479.00 $409.50 $1,228.50 $429.00 $1,287.00 $460.00 $1,380.00 $410.00 $1,230.00753EA36"x36" R1-1 STOP Sign & R1-4 ALL WAY sign with Temporary Flags mounted on 3" diameter Anodized Bronze post with TxDOT's Triangular Slip Base Assembly$493.00 $1,479.00 $409.50 $1,228.50 $429.00 $1,287.00 $460.00 $1,380.00 $410.00 $1,230.00761EAMount R1-4 ALL WAY sign on existing stop sign post at Luther Street & Jones-Butler Road Intersection$55.00 $55.00 $26.25 $26.25 $27.50 $27.50 $51.00 $51.00 $40.00 $40.00771LSStreet Name Signs (for Luther Street intersection)$600.00 $600.00 $621.60 $621.60 $651.20 $651.20 $560.00 $560.00 $650.00 $650.00782EATie into Existing Waterline including all required fittings, adapters, etc, to complete in-place$1,750.00 $3,500.00 $1,165.00 $2,330.00 $1,650.00 $3,300.00 $2,200.00 $4,400.00 $3,338.00 $6,676.007970 LFRemove Existing 6" Waterline & Replace with 6" AWWA C-906 IPS Class 200 HDPE Water Line with Bank Sand Bedding & Haunching, and Non-Structural Backfill by Open Cut, All Depths$24.00 $1,680.00 $27.75 $1,942.50 $28.00 $1,960.00 $94.00 $6,580.00 $56.00 $3,920.008025 LFRemove Existing 6" Waterline & Replace with 6" AWWA C-906 IPS Class 200 HDPE Water Line with Bank Sand Bedding & Haunching, and Structural Backfill by Open Cut, All Depths$32.00 $800.00 $34.40 $860.00 $93.00 $2,325.00 $64.00 $1,600.00 $67.00 $1,675.00STRIPING & SIGNAGE ITEMS - SUBTOTALWATERLINE ITEMS$19,001.30 $28,764.99 $30,093.30 $17,873.10 $29,203.40Page 4 of 1434 City of College Station - Purchasing DivisionBid Tabulation for #13-044"Jones-Butler Road Extension"Open Date: Friday, February 22, 2012 @ 2:00 p.m.ITEM QTY UNIT DESCRIPTION UNIT PRICETOTAL PRICE UNIT PRICETOTAL PRICE UNIT PRICETOTAL PRICE UNIT PRICETOTAL PRICE UNIT PRICETOTAL PRICEDudley Construciton, Ltd.(College Station, TX)Brazos Paving, Inc.(Bryan, TX)Knife River Corp. - South(Bryan, TX)Larry Young Paving, Inc.(College Station, TX)A.L. Helmcamp, Inc.(Buffalo, TX)81125 LFRemove Existing 6" Waterline & Replace with 12" x 3/8" thick Steel Casing by Open Cut with Structural Backfill, Including Casing Spacers, End Seals and 6" AWWA C-906 IPS Class 200 HDPE Water Line, All Depths$67.00 $8,375.00 $121.70 $15,212.50 $138.60 $17,325.00 $63.00 $7,875.00 $113.00 $14,125.0082220 LFTrench Safety System (Waterline Construction)$1.09 $239.80 $1.10 $242.00 $1.10 $242.00 $4.55 $1,001.00 $7.00 $1,540.00831EA"P" style NEMA traffic cabinet w/ detector rack, including NEMA loadswitches and EDI Conflict Monitor (MMU-16LE)$13,131.00 $13,131.00 $12,600.00 $12,600.00 $13,200.00 $13,200.00 $12,200.00 $12,200.00 $13,350.00 $13,350.00841EASiemens 8-Phase Controller, Model M-52 w/ Fiber Ports$7,660.00 $7,660.00 $7,350.00 $7,350.00 $7,700.00 $7,700.00 $7,200.00 $7,200.00 $7,790.00 $7,790.00858EA3-Section (Red-Yellow-Green Balls) polycarbonate black color w/ 12" LED lens signal heads and Louvered Black Aluminum Backplates$655.00 $5,240.00 $630.00 $5,040.00 $660.00 $5,280.00 $615.00 $4,920.00 $670.00 $5,360.00864EA4-Section (Red Arrow-Yellow Arrow-Flashing Yellow Arrow-Green Arrow) polycarbonate black color w/ 12" LED lens signal heads and Louvered Black Aluminum Backplates$957.00 $3,828.00 $918.75 $3,675.00 $960.00 $3,840.00 $895.00 $3,580.00 $970.00 $3,880.00878EA1-Section LED, 16-inch Dual Pedestrian Countdown signal heads with 9-inch Full Symbol Hand/Man, Leotek Model No. TP16H-CD, or equivalent$820.00 $6,560.00 $787.50 $6,300.00 $825.00 $6,600.00 $765.00 $6,120.00 $840.00 $6,720.00888EAAstro-Brac Cable Mount Assembly AS-0125-3-84-PNC$181.00 $1,448.00 $173.25 $1,386.00 $182.00 $1,456.00 $169.00 $1,352.00 $184.00 $1,472.00894EAAstro-Brac Cable Mount Assembly AS-0125-4-84-PNC$181.00 $724.00 $173.25 $693.00 $182.00 $728.00 $169.00 $676.00 $184.00 $736.00908EAPedestrian pushbutton assemblies w/ educational sign, "Push Button to Cross Street", Texas MUTCD Sign R10-3e, 9"x15"$219.00 $1,752.00 $210.00 $1,680.00 $220.00 $1,760.00 $205.00 $1,640.00 $225.00 $1,800.00Streetscape signal poles for 50-ft long mast arm, 18-ft long WATERLINE ITEMS - SUBTOTAL $14,594.80 $20,587.00 $25,152.00 $21,456.00 $27,936.00TRAFFIC SIGNAL ITEMS912EApgp g glength, bronze color, powdered finish over galvanized steel w/ flanged base$13,131.00 $26,262.00 $12,600.00 $25,200.00 $13,200.00 $26,400.00 $12,200.00 $24,400.00 $13,600.00 $27,200.00922EAStreetscape signal poles for 50-ft long mast arm, 30-ft long length, bronze color, powdered finish over galvanized steel w/ flanged base$13,679.00 $27,358.00 $13,125.00 $26,250.00 $13,750.00 $27,500.00 $12,800.00 $25,600.00 $13,900.00 $27,800.00934EAStreetscape Mast Arm, 50-ft long length, bronze color, powdered finish over glavanized steel w/ flanged base, w/ dampers$7,660.00 $30,640.00 $7,350.00 $29,400.00 $7,700.00 $30,800.00 $7,100.00 $28,400.00 $7,800.00 $31,200.00942EALuminaires, 250 watt HPS w/ 15-ft long streetscape support arms, bronze color$2,188.00 $4,376.00 $2,100.00 $4,200.00 $2,200.00 $4,400.00 $2,050.00 $4,100.00 $2,230.00 $4,460.00952EAPull Box w/ locking cover, Type D (see specs)$766.00 $1,532.00 $735.00 $1,470.00 $770.00 $1,540.00 $715.00 $1,430.00 $800.00 $1,600.00962EAPull Box w/ locking cover, Type B (see specs)$711.00 $1,422.00 $682.50 $1,365.00 $715.00 $1,430.00 $665.00 $1,330.00 $730.00 $1,460.00971EAMeter Pedestal Pole, 4-Terminal, 125-amp, Twin Link Connectors, for Direct Burial, including conduit to power source$1,641.00 $1,641.00 $1,575.00 $1,575.00 $1,650.00 $1,650.00 $1,550.00 $1,550.00 $1,670.00 $1,670.00981EAConcrete signal controller foundation$2,735.00 $2,735.00 $2,625.00 $2,625.00 $2,750.00 $2,750.00 $2,600.00 $2,600.00 $2,790.00 $2,790.00994EA48" diameter Signal Pole Foundation. 22' deep$3,830.00 $15,320.00 $3,675.00 $14,700.00 $3,850.00 $15,400.00 $3,550.00 $14,200.00 $3,900.00 $15,600.00100710 LF2" Dia Gray PVC Sched. 40 Conduit$14.23 $10,103.30 $13.65 $9,691.50 $14.30 $10,153.00 $13.30 $9,443.00 $14.50 $10,295.00101110 LF3" Dia Gray PVC Sched. 40 Conduit$16.41 $1,805.10 $15.75 $1,732.50 $16.50 $1,815.00 $15.35 $1,688.50 $16.70 $1,837.00102450 LF4" Dia Gray PVC Sched. 40 Conduit$27.36 $12,312.00 $26.25 $11,812.50 $27.50 $12,375.00 $25.55 $11,497.50 $27.90 $12,555.001032,220 LF7/C #14 AWG stranded signal cable IMSA 19-1 or equivalent$2.74 $6,082.80 $2.63 $5,838.60 $2.75 $6,105.00 $2.55 $5,661.00 $2.80 $6,216.001041,650 LF5/C #14 AWG stranded signal cable IMSA 19-1 or equivalent$2.19 $3,613.50 $2.10 $3,465.00 $2.20 $3,630.00 $2.05 $3,382.50 $2.25 $3,712.50Page 5 of 1435 City of College Station - Purchasing DivisionBid Tabulation for #13-044"Jones-Butler Road Extension"Open Date: Friday, February 22, 2012 @ 2:00 p.m.ITEM QTY UNIT DESCRIPTION UNIT PRICETOTAL PRICE UNIT PRICETOTAL PRICE UNIT PRICETOTAL PRICE UNIT PRICETOTAL PRICE UNIT PRICETOTAL PRICEDudley Construciton, Ltd.(College Station, TX)Brazos Paving, Inc.(Bryan, TX)Knife River Corp. - South(Bryan, TX)Larry Young Paving, Inc.(College Station, TX)A.L. Helmcamp, Inc.(Buffalo, TX)105200 LF3/C #4 power cable$3.28 $656.00 $3.15 $630.00 $3.30 $660.00 $3.05 $610.00 $3.35 $670.00106660 LFTHHN 3-1/C #10 luminaire cable$1.64 $1,082.40 $1.58 $1,042.80 $1.65 $1,089.00 $1.50 $990.00 $1.70 $1,122.001071,260 LFBare Electrical Conductor #6 Wire (Stranded) for Grounding$1.64 $2,066.40 $1.58 $1,990.80 $1.65 $2,079.00 $1.50 $1,890.00 $1.70 $2,142.001084EARadar Presence Detector (RPD), Wavetronix Smart Sensor Matrix w/ Smart Sensor Mount$4,924.27 $19,697.08 $4,725.00 $18,900.00 $4,950.00 $19,800.00 $4,600.00 $18,400.00 $5,000.00 $20,000.001094EARadar Advance Detection Device (RADD), Wavetronix Smart Sensor Advance w/ Smart Sensor Mount$4,924.27 $19,697.08 $4,725.00 $18,900.00 $4,950.00 $19,800.00 $4,600.00 $18,400.00 $5,000.00 $20,000.001108EAWavetronix Detector Rack Cards (2-/4-Channel)$547.00 $4,376.00 $525.00 $4,200.00 $550.00 $4,400.00 $510.00 $4,080.00 $560.00 $4,480.001118EAWavetronix Sensor Cable Junction Box$547.00 $4,376.00 $525.00 $4,200.00 $550.00 $4,400.00 $510.00 $4,080.00 $560.00 $4,480.001122EAWavetronix Intersection Pre-Assembled Backplate - AC$2,188.00 $4,376.00 $2,100.00 $4,200.00 $2,200.00 $4,400.00 $2,050.00 $4,100.00 $2,225.00 $4,450.001131,500 LFWavetronix Smart Sensor 6-Conductor Cable for RADD and RPD Detectors$3.28 $4,920.00 $3.15 $4,725.00 $3.30 $4,950.00 $3.05 $4,575.00 $3.40 $5,100.001144EAPriority Control System Detector (GTT Opticom Model 721)$930.00 $3,720.00 $892.50 $3,570.00 $935.00 $3,740.00 $870.00 $3,480.00 $950.00 $3,800.001151EAOpticom Model 764 Multi-Mode Phase Selector$4,377.00 $4,377.00 $4,200.00 $4,200.00 $4,400.00 $4,400.00 $4,100.00 $4,100.00 $4,450.00 $4,450.001161EAOpticom Infrared system Model 760 Card Rack$328.00 $328.00 $315.00 $315.00 $330.00 $330.00 $305.00 $305.00 $333.00 $333.001171,100 LFModel 138 Detector Cable (for GTT Opticom Model 721)$2.19 $2,409.00 $2.10 $2,310.00 $2.20 $2,420.00 $2.05 $2,255.00 $2.25 $2,475.001184EAConfirmation Lights, w/ Power Cable$383.00 $1,532.00 $367.50 $1,470.00 $385.00 $1,540.00 $360.00 $1,440.00 $390.00 $1,560.001194EAHigh Intensity Street Name Sign for Installations on Mast Arms (2-"George Bush Dr.", 2 -"Jones-Butler Rd./Penberthy Rd") and Mount$875.00 $3,500.00 $840.00 $3,360.00 $880.00 $3,520.00 $820.00 $3,280.00 $900.00 $3,600.001204EA"LEFT TURN SIGNAL - YIELD ON FLASHING ARROW" Sign (18"x24") and mount$602.00 $2,408.00 $577.50 $2,310.00 $605.00 $2,420.00 $565.00 $2,260.00 $600.00 $2,400.001211LSBC100HZ Battery Backup System$8,754.00 $8,754.00 $8,400.00 $8,400.00 $8,800.00 $8,800.00 $8,200.00 $8,200.00 $8,900.00 $8,900.00TRAFFIC SIGNAL ITEMS - SUBTOTAL $273,820.66 $262,772.70 $275,260.00 $255,415.50 $279,465.50CSU ELECTRICAL ITEMS122528 LFTrench Detail "N": Consists of Labor and Materials necessary to install one (1) lineal foot of trenching in soil, measured parallel to the surface of the ground, including the excavation, backfilling and compacting. This unit includes all materials and labor required in the repair and/or replacement of streets, roads, drives, fences, lawns, shrubbery, water mains, pipes, pipelines, and contents, underground power and telephone facilities, buried sewage and drainage facilities, and any other property damaged by the trenching, except as specifically provided for in other units. This unit does not include underground cable or conduit facilities installed in the trench, when required. Caution tape is to be installed twelve to eighteen inches above conduits, and the last six (6) inches of trench backfill, plus 4-6" of mounding backfill for settling allowance, shall be sandy loam topsoil. See MEI-9375 for number and size of conduits which will be installed in the trench. See 'Bedding and Trench for DI Pipe and PVC Pipe' Detail S2-02 for all trenches under pavement areas (including sidewalks) for additional requirements (B/CS Unified Standard Detail).$28.00 $14,784.00 $38.85 $20,512.80 $40.70 $21,489.60 $37.90 $20,011.20 $54.50 $28,776.00Page 6 of 1436 City of College Station - Purchasing DivisionBid Tabulation for #13-044"Jones-Butler Road Extension"Open Date: Friday, February 22, 2012 @ 2:00 p.m.ITEM QTY UNIT DESCRIPTION UNIT PRICETOTAL PRICE UNIT PRICETOTAL PRICE UNIT PRICETOTAL PRICE UNIT PRICETOTAL PRICE UNIT PRICETOTAL PRICEDudley Construciton, Ltd.(College Station, TX)Brazos Paving, Inc.(Bryan, TX)Knife River Corp. - South(Bryan, TX)Larry Young Paving, Inc.(College Station, TX)A.L. Helmcamp, Inc.(Buffalo, TX)1231,853 LFTrench Detail "Q": Consists of Labor and Materials necessary to install one (1) lineal foot of trenching in soil, measured parallel to the surface of the ground, including the excavation, backfilling and compacting. This unit includes all materials and labor required in the repair and/or replacement of streets, roads, drives, fences, lawns, shrubbery, water mains, pipes, pipelines, and contents, underground power and telephone facilities, buried sewage and drainage facilities, and any other property damaged by the trenching, except as specifically provided for in other units. This unit does not include underground cable or conduit facilities installed in the trench, when required. Caution tape is to be installed twelve to eighteen inches above conduits, and the last six (6) inches of trench backfill, plus 4-6" of mounding backfill for settling allowance, shall be sandy loam topsoil. See MEI-9375 for number and size of conduits which will be installed in the trench. See 'Bedding and Trench for DI Pipe and PVC Pipe' Detail S2-02 for all trenches under pavement areas (including sidewalks) for additional requirements (B/CS Unified Standard Detail).$32.00 $59,296.00 $33.60 $62,260.80 $35.20 $65,225.60 $32.75 $60,685.75 $49.00 $90,797.00Trench Detail "R": Consists of Labor and Materials necessary to install one (1) lineal foot of trenching in soil, measured parallel to the surface of the ground, including the excavation, backfilling and compacting. This unit includes all materials and labor required in the repair and/or replacement of streets, roads, drives, fences, lawns, shrubbery, water mains, pipes, pipelines, and contents, underground power and telephone facilities, buried d d i f ili i d h d d12439 LFsewage and drainage facilities, and any other property damaged by the trenching, except as specifically provided for in other units. This unit does not include underground cable or conduit facilities installed in the trench, when required. Caution tape is to be installed twelve to eighteen inches above conduits, and the last six (6) inches of trench backfill, plus 4-6" of mounding backfill for settling allowance, shall be sandy loam topsoil. See MEI-9375 for number and size of conduits which will be installed in the trench. See 'Bedding and Trench for DI Pipe and PVC Pipe' Detail S2-02 for all trenches under pavement areas (including sidewalks) for additional requirements (B/CS Unified Standard Detail).$32.00 $1,248.00 $33.60 $1,310.40 $35.20 $1,372.80 $32.75 $1,277.25 $49.00 $1,911.001254EACSUM-K2: Consists of Labor and Materials necessary to install one (1) 4' W x 8' L x 6' D (interior dimensions) polymer concrete pull box. See Unit Drawing on MEI-9375 for installation guide.$4,237.00 $16,948.00 $8,610.00 $34,440.00 $9,000.00 $36,000.00 $9,400.00 $37,600.00 $9,130.00 $36,520.001264,865 LFUM50-P-2: Consists of Labor and Materials necessary to install one (1) lineal foot of one (1) two (2) inch, electrical grade schedule 40 PVC conduit, installed in place in a trench. This unit includes all PVC fittings, PVC 90 degree long sweep conduit elbows, connection materials, etc. required for installation of the conduit. This unit also includes the installation of a flat polyester pull rope for installation of the cable or conductor.$3.09 $15,032.85 $2.23 $10,848.95 $2.33 $11,335.45 $2.15 $10,459.75 $2.95 $14,351.75Page 7 of 1437 City of College Station - Purchasing DivisionBid Tabulation for #13-044"Jones-Butler Road Extension"Open Date: Friday, February 22, 2012 @ 2:00 p.m.ITEM QTY UNIT DESCRIPTION UNIT PRICETOTAL PRICE UNIT PRICETOTAL PRICE UNIT PRICETOTAL PRICE UNIT PRICETOTAL PRICE UNIT PRICETOTAL PRICEDudley Construciton, Ltd.(College Station, TX)Brazos Paving, Inc.(Bryan, TX)Knife River Corp. - South(Bryan, TX)Larry Young Paving, Inc.(College Station, TX)A.L. Helmcamp, Inc.(Buffalo, TX)12714,520 LFUM50-P-4: Consists of Labor and Materials necessary to install one (1) lineal foot of one (1) four (4) inch, electrical grade schedule 40 PVC conduit, installed in place in a trench. This unit includes all PVC fittings, PVC 90 degree long sweep conduit elbows, connection materials, etc. required for installation of the conduit. This unit also includes the installation of a flat polyester pull rope for installation of the cable or conductor.$5.55 $80,586.00 $4.04 $58,660.80 $4.24 $61,564.80 $3.95 $57,354.00 $5.40 $78,408.00128103 LFURTB2: Consists of Labor and Materials necessary to install one (1) lineal foot of boring in soil, measured parallel to the surace of the ground, including the excavation, backfilling and compacting sufficient for installation of a two (2) inch PVC conduit to be placed in a three (3) inch steel pipe. This unit includes all materials and labor required in the repair and/or replacement of streets, roads, drives, fences, lawns, shrubbery, water mains, pipes, pipelines, and contents, underground power and telephone facilities, buried sewage and drainage facilities, and any other property damaged by the boring, except as specifically provided for in other units. This unit does not include underground cable or conduit facilities installed in the bore, when required.$43.54 $4,484.62 $27.30 $2,811.90 $28.60 $2,945.80 $26.75 $2,755.25 $29.00 $2,987.00Meter Rack: Consists of Labor and Materials necessary to install one (1) meter can rack See Signal Layouts for installation guideCSU ELECTRICAL ITEMS - SUBTOTAL $187,894.85 $188,033.75 $196,988.25 $187,387.95 $250,763.75STREETLIGHTING ITEMS1291EAone (1) meter can rack. See Signal Layouts for installation guide.$969.00 $969.00 $1,575.00 $1,575.00 $1,650.00 $1,650.00 $1,535.00 $1,535.00 $1,670.00 $1,670.0013025 LFTrench Detail "O": Consists of Labor and Materials necessary to install one (1) lineal foot of trenching in soil, measured parallel to the surface of the ground, including the excavation, backfilling and compacting. This unit includes all materials and labor required in the repair and/or replacement of streets, roads, drives, fences, lawns, shrubbery, water mains, pipes, pipelines, and contents, underground power and telephone facilities, buried sewage and drainage facilities, and any other property damaged by the trenching, except as specifically provided for in other units. This unit does not include underground cable or conduit facilities installed in the trench, when required. Caution tape is to be installed twelve to eighteen inches above conduits, and the last six (6) inches of trench backfill, plus 4-6" of mounding backfill for settling allowance, shall be sandy loam topsoil. See MEI-9375 for number and size of conduits which will be installed in the trench. See 'Bedding and Trench for DI Pipe and PVC Pipe' Detail S2-02 for all trenches under pavement areas (including sidewalks) for additional requirements (B/CS Unified Standard Detail). $21.00 $525.00 $38.85 $971.25 $40.70 $1,017.50 $37.90 $947.50 $42.00 $1,050.00131628 LFUD#1/0 Al TPLX: Consists of Labor and Materials necessary to install one (1) foot of #1/0 Al Triplex.$3.34 $2,097.52 $4.15 $2,606.20 $4.35 $2,731.80 $4.00 $2,512.00 $5.00 $3,140.00132654 LFUD#1/0 Al TPLX-Remove: Consists of Labor and Materials necessary to remove one (1) foot of #1/0 Al Triplex.$0.80 $523.20 $1.58 $1,033.32 $1.65 $1,079.10 $1.55 $1,013.70 $1.70 $1,111.80Page 8 of 1438 City of College Station - Purchasing DivisionBid Tabulation for #13-044"Jones-Butler Road Extension"Open Date: Friday, February 22, 2012 @ 2:00 p.m.ITEM QTY UNIT DESCRIPTION UNIT PRICETOTAL PRICE UNIT PRICETOTAL PRICE UNIT PRICETOTAL PRICE UNIT PRICETOTAL PRICE UNIT PRICETOTAL PRICEDudley Construciton, Ltd.(College Station, TX)Brazos Paving, Inc.(Bryan, TX)Knife River Corp. - South(Bryan, TX)Larry Young Paving, Inc.(College Station, TX)A.L. Helmcamp, Inc.(Buffalo, TX)1332EAUK6: Consists of Labor and Materials necessary to install one (1) 11.5" W x 21" L x 16" D (interior dimensions) flush mount secondary hand hole. Box to be TxDOT approved, Type "E", Hubbell Catalog # PG1324$550.07 $1,100.14 $682.50 $1,365.00 $715.00 $1,430.00 $665.00 $1,330.00 $730.00 $1,460.001343EAUK6-Remove: Consists of Labor and Materials necessary to remove one (1) flush mount secondary hand hole.$68.00 $204.00 $157.50 $472.50 $165.00 $495.00 $155.00 $465.00 $167.00 $501.00135158 LFUM50-P-2: Consists of Labor and Materials necessary to install one (1) lineal foot of one (1) two (2) inch, electrical grade schedule 40 PVC conduit, installed in place in a trench. This unit includes all PVC fittings, PVC 90 degree long sweep conduit elbows, connection materials, etc. required for installation of the conduit. This unit also includes the installation of a flat polyester pull rope for installation of the cable or conductor.$3.00 $474.00 $2.75 $434.50 $2.88 $455.04 $2.70 $426.60 $3.00 $474.00136103 LFUM50-S-3: Consists of Labor and Materials necessary to install one (1) lineal foot of one (1) three (3) inch, steel pipe, installed in place in a trench. This unit includes all fittings, connection materials, etc. required for installation of this pipe.$23.00 $2,369.00 $15.23 $1,568.69 $16.00 $1,648.00 $14.85 $1,529.55 $16.00 $1,648.001379EASL-CF-C: Consists of Labor and Materials necessary to install one (1) streetlight foundation. See Unit Drawing on MEI-9375 for installation guide.$340.00 $3,060.00 $945.00 $8,505.00 $990.00 $8,910.00 $920.00 $8,280.00 $1,000.00 $9,000.00SL-30: Consists of Labor and Materials necessary to install one (1) aluminum streetlight pole with a 4' mast arm, 315 watt metal halide fixture, and a 30' mounting height. Bronze anodized fixture to be a Gardco Catalog # ED19-1-4X-315MCE-277-BRA. 1389EA29'-8" Bronze anodized aluminum pole to be a Gardco Catalog # TAMU-TRA B 30L D1 BRA-311.$5,361.00 $48,249.00 $5,651.10 $50,859.90 $5,920.20 $53,281.80 $5,500.00 $49,500.00 $6,000.00 $54,000.0013999 LFTrench Detail "P": Consists of Labor and Materials necessary to install one (1) lineal foot of trenching in soil, measured parallel to the surface of the ground, including the excavation, backfilling and compacting. This unit includes all materials and labor required in the repair and/or replacement of streets, roads, drives, fences, lawns, shrubbery, water mains, pipes, pipelines, and contents, underground power and telephone facilities, buried sewage and drainage facilities, and any other property damaged by the trenching, except as specifically provided for in other units. This unit does not include underground cable or conduit facilities installed in the trench, when required. Caution tape is to be installed twelve to eighteen inches above conduits, and the last six (6) inches of trench backfill, plus 4-6" of mounding backfill for settling allowance, shall be sandy loam topsoil. See MEI-9375 for number and size of conduits which will be installed in the trench. See 'Bedding and Trench for DI Pipe and PVC Pipe' Detail S2-02 for all trenches under pavement areas (including sidewalks) for additional requirements (B/CS Unified Standard Detail).$21.62 $2,140.38 $38.85 $3,846.15 $40.00 $3,960.00 $37.90 $3,752.10 $41.20 $4,078.80Page 9 of 1439 City of College Station - Purchasing DivisionBid Tabulation for #13-044"Jones-Butler Road Extension"Open Date: Friday, February 22, 2012 @ 2:00 p.m.ITEM QTY UNIT DESCRIPTION UNIT PRICETOTAL PRICE UNIT PRICETOTAL PRICE UNIT PRICETOTAL PRICE UNIT PRICETOTAL PRICE UNIT PRICETOTAL PRICEDudley Construciton, Ltd.(College Station, TX)Brazos Paving, Inc.(Bryan, TX)Knife River Corp. - South(Bryan, TX)Larry Young Paving, Inc.(College Station, TX)A.L. Helmcamp, Inc.(Buffalo, TX)140194 LFTrench Detail "U": Consists of Labor and Materials necessary to install one (1) lineal foot of trenching in soil, measured parallel to the surface of the ground, including the excavation, backfilling and compacting. This unit includes all materials and labor required in the repair and/or replacement of streets, roads, drives, fences, lawns, shrubbery, water mains, pipes, pipelines, and contents, underground power and telephone facilities, buried sewage and drainage facilities, and any other property damaged by the trenching, except as specifically provided for in other units. This unit does not include underground cable or conduit facilities installed in the trench, when required. Caution tape is to be installed twelve to eighteen inches above conduits, and the last six (6) inches of trench backfill, plus 4-6" of mounding backfill for settling allowance, shall be sandy loam topsoil. See MEI-9375 for number and size of conduits which will be installed in the trench. See 'Bedding and Trench for DI Pipe and PVC Pipe' Detail S2-02 for all trenches under pavement areas (including sidewalks) for additional requirements (B/CS Unified Standard Detail).$19.61 $3,804.34 $38.85 $7,536.90 $40.00 $7,760.00 $37.90 $7,352.60 $41.20 $7,992.80141495 LFUD#12-2 Cu: Consists of Labor and Materials necessary to install one (1) foot of (2) runs of #12 Cu THHN (to run up streetlight poles).$1.14 $564.30 $0.26 $128.70 $0.28 $138.60 $0.25 $123.75 $0.30 $148.501422,267 LFUD#4-3 Cu: Consists of Labor and Materials necessary to install one (1) foot of (3) runs of #4 Cu Stranded.$4.81 $10,904.27 $1.79 $4,057.93 $1.87 $4,239.29 $1.75 $3,967.25 $2.00 $4,534.00UK6: Consists of Labor and Materials necessary to install one (1) 11.5" W x 21" L x 16" D (interior dimensions) flush mount 1432EA()secondary hand hole. Box to be TxDOT approved, Type "E", Hubbell Catalog # PG1324$245.04 $490.08 $682.50 $1,365.00 $715.00 $1,430.00 $665.00 $1,330.00 $730.00 $1,460.00144138 LFUM50-P-1: Consists of Labor and Materials necessary to install one (1) lineal foot of one (1) one (1) inch, electrical grade schedule 40 PVC conduit, installed in place in a trench. This unit includes all PVC fittings, PVC 90 degree long sweep conduit elbows, connection materials, etc. required for installation of the conduit. This unit also includes the installation of a flat polyester pull rope for installation of the cable or conductor.$22.78 $3,143.64 $2.10 $289.80 $2.20 $303.60 $2.05 $282.90 $2.30 $317.401452,047 LFUM50-P-2: Consists of Labor and Materials necessary to install one (1) lineal foot of one (1) two (2) inch, electrical grade schedule 40 PVC conduit, installed in place in a trench. This unit includes all PVC fittings, PVC 90 degree long sweep conduit elbows, connection materials, etc. required for installation of the conduit. This unit also includes the installation of a flat polyester pull rope for installation of the cable or conductor.$3.28 $6,714.16 $2.75 $5,629.25 $2.88 $5,895.36 $2.70 $5,526.90 $3.00 $6,141.001461LSErosion and Sedimentation Controls including silt fencing, inlet protection, and post-construction Hydromulch seeding as required, SWPPP development and notices as required by TCEQ$2,735.71 $2,735.71 $1,940.00 $1,940.00 $4,500.00 $4,500.00 $4,300.00 $4,300.00 $6,500.00 $6,500.00PENBERTHY ROADWAY & DRAINAGE ITEMSSTREETLIGHTING ITEMS - SUBTOTAL $91,816.65 $95,056.99 $99,370.89 $92,630.10 $101,714.30Page 10 of 1440 City of College Station - Purchasing DivisionBid Tabulation for #13-044"Jones-Butler Road Extension"Open Date: Friday, February 22, 2012 @ 2:00 p.m.ITEM QTY UNIT DESCRIPTION UNIT PRICETOTAL PRICE UNIT PRICETOTAL PRICE UNIT PRICETOTAL PRICE UNIT PRICETOTAL PRICE UNIT PRICETOTAL PRICEDudley Construciton, Ltd.(College Station, TX)Brazos Paving, Inc.(Bryan, TX)Knife River Corp. - South(Bryan, TX)Larry Young Paving, Inc.(College Station, TX)A.L. Helmcamp, Inc.(Buffalo, TX)1471LSTraffic Control (Penberthy Drive only)$12,080.00 $12,080.00 $4,600.00 $4,600.00 $7,500.00 $7,500.00 $7,800.00 $7,800.00 $13,000.00 $13,000.001481,450 CYRoadway Excavation (unfactored)$5.47 $7,931.50 $4.45 $6,452.50 $10.00 $14,500.00 $1.60 $2,320.00 $11.00 $15,950.001492,337 SY8" Thick Reinforced Concrete Pavement with #4 bars at 12" OCEW with 3,500 psi Minimum Concrete$34.36 $80,299.32 $35.00 $81,795.00 $34.25 $80,042.25 $44.45 $103,879.65 $46.00 $107,502.001502,589 SY6" Thick Lime Stabilized Subgrade$4.23 $10,951.47 $4.86 $12,582.54 $4.25 $11,003.25 $5.60 $14,498.40 $5.30 $13,721.701511,162 LF6" Monolithic Concrete Curb (B/CS Detail ST1-02)$3.28 $3,811.36 $3.10 $3,602.20 $3.75 $4,357.50 $2.10 $2,440.20 $6.00 $6,972.00152124 SY4" Thick Reinforced Concrete Median Pavement with #4 bars at 18" OCEW, including all subgrade preparation & doweling into curbs, per sheet D-04 (Penberthy Dr only)$52.53 $6,513.72 $44.70 $5,542.80 $40.00 $4,960.00 $62.00 $7,688.00 $59.00 $7,316.0015385 SY4" Thick Reinforced Concrete Sidewalk (B/CS Detail SW1-02)$29.00 $2,465.00 $32.25 $2,741.25 $32.00 $2,720.00 $29.50 $2,507.50 $38.00 $3,230.0015484 SYSaw cut & remove existing concrete sidewalk$5.50 $462.00 $8.10 $680.40 $10.00 $840.00 $5.00 $420.00 $35.00 $2,940.00155486 LFSaw cut & remove existing concrete curb$5.50 $2,673.00 $7.80 $3,790.80 $10.00 $4,860.00 $8.00 $3,888.00 $21.00 $10,206.001562EAStandard Curb Inlet - 5' Opening with 2 - 5' Wing Extensions (Per TxDOT Detail) including removal of existing area inlets and tieing in exsting 18" storm sewer$3,282.00 $6,564.00 $3,250.00 $6,500.00 $5,000.00 $10,000.00 $3,800.00 $7,600.00 $5,500.00 $11,000.001572EA6' Wide Sidewalk Ambulatory Ramps at Street Intersection per B/CS Detail SW3-00$875.00 $1,750.00 $137.70 $275.40 $750.00 $1,500.00 $1,400.00 $2,800.00 $1,100.00 $2,200.0015837 LF24" Wide Solid White Stop Line (Type I Thermoplastic)$7.61 $281.57 $11.24 $415.88 $11.80 $436.60 $7.10 $262.70 $12.00 $444.00159194 LF8" Wide Solid White Turn Lane Line (Type I Thermoplastic) with Type I-C RPM spaced at 20' Typical$1.00 $194.00 $3.78 $733.32 $3.96 $768.24 $0.95 $184.30 $4.00 $776.0024" Wide Solid White Type I Thermoplastic Stripes for 6' Wide Continental Style Crosswalk Striping at George Bush Dr $160,141.75 $200,537.70PENBERTHY STRIPING & SIGNAGE ITEMSPENBERTHY ROADWAY & DRAINAGE ITEMS - SUBTOTAL $138,237.08 $130,502.89 $146,783.0016090 LFintersection (stripes separated by a 3' Wide Gap)$6.57 $591.30 $11.24 $1,011.60 $11.80 $1,062.00 $6.10 $549.00 $11.00 $990.00161230 LF18" Wide Solid White Type I Thermoplastic Stripes for 20' Wide Ladder Style Crosswalk Striping at parking lot crosswalk on Penberthy Dr (stripes separated by a 3' Wide Gap)$6.30 $1,449.00 $9.35 $2,150.50 $9.79 $2,251.70 $5.90 $1,357.00 $10.00 $2,300.001621,250 LF4" Wide Solid White Bike Lane Line (Type II Paint)$0.93 $1,162.50 $0.57 $712.50 $0.59 $737.50 $0.90 $1,125.00 $0.60 $750.00163550 LFDouble 4" Wide Solid Yellow Line (Type II Paint) with Type II-A-A RPM Spaced at 20' Typical$1.15 $632.50 $1.16 $638.00 $1.21 $665.50 $1.08 $594.00 $1.20 $660.00164160 LF4" Wide Broken White Line (Type II Paint), 10' Long with a 30' Gap$0.98 $156.80 $0.50 $80.00 $0.53 $84.80 $0.95 $152.00 $0.60 $96.00165105 LF24" Wide Solid Yellow Chevron Lines (Type I Thermoplastic) at 45 degree angle, Spaced at 20' intervals, Typical$6.84 $718.20 $12.81 $1,345.05 $13.42 $1,409.10 $6.40 $672.00 $13.00 $1,365.001661EALeft Turn Lane Pavement Marking Letters "ONLY" (Type I Thermoplastic)$98.49 $98.49 $294.00 $294.00 $308.00 $308.00 $92.00 $92.00 $295.00 $295.001672EALeft Turn Lane Pavement Marking Arrows (Type I Thermoplastic)$88.00 $176.00 $231.00 $462.00 $242.00 $484.00 $82.00 $164.00 $230.00 $460.001682EABike Lane Pavement Marking with Directional Arrow (Type I Thermoplastic)$306.00 $612.00 $186.90 $373.80 $195.00 $390.00 $290.00 $580.00 $190.00 $380.001691EAR3-17 BIKE LANE Sign mounted on 3" ID Square Aluminum Post Anodized to Duranodic Bronze 313 with vadal-proof anchoring per TAMU Typical Sign Post Specifications $493.00 $493.00 $384.30 $384.30 $402.00 $402.00 $613.80 $613.80 $385.00 $385.00Page 11 of 1441 City of College Station - Purchasing DivisionBid Tabulation for #13-044"Jones-Butler Road Extension"Open Date: Friday, February 22, 2012 @ 2:00 p.m.ITEM QTY UNIT DESCRIPTION UNIT PRICETOTAL PRICE UNIT PRICETOTAL PRICE UNIT PRICETOTAL PRICE UNIT PRICETOTAL PRICE UNIT PRICETOTAL PRICEDudley Construciton, Ltd.(College Station, TX)Brazos Paving, Inc.(Bryan, TX)Knife River Corp. - South(Bryan, TX)Larry Young Paving, Inc.(College Station, TX)A.L. Helmcamp, Inc.(Buffalo, TX)1701EAR3-17 BIKE LANE Sign & R3-17a AHEAD sign mounted on 3" ID Square Aluminum Post Anodized to Duranodic Bronze 313 with vadal-proof anchoring per TAMU Typical Sign Post Specifications $493.00 $493.00 $406.35 $406.35 $425.00 $425.00 $613.80 $613.80 $410.00 $410.0017150 LFURTB2: Consists of Labor and Materials necessary to install one (1) lineal foot of boring in soil, measured parallel to the surace of the ground, including the excavation, backfilling and compacting sufficient for installation of a two (2) inch PVC conduit. This unit includes all materials and labor required in the repair and/or replacement of streets, roads, drives, drives, fences, lawns, shrubbery, water mains, pipes, pipelines, and contents, underground power and telephone facilities, buried sewage and drainage facilities, and any other property damaged by the boring, except as specifically provided for in other units. This unit does not include underground cable or conduit facilities installed in the bore, when required.$23.00 $1,150.00 $27.30 $1,365.00 $28.60 $1,430.00 $26.75 $1,337.50 $29.00 $1,450.001724EASL-CF-C: Consists of Labor and Materials necessary to install one (1) streetlight foundation. See Unit Drawing on MEI-9720 for installation guide.$340.00 $1,360.00 $945.00 $3,780.00 $990.00 $3,960.00 $920.00 $3,680.00 $1,000.00 $4,000.00SL-30: Consists of Labor and Materials necessary to install one (1) aluminum streetlight pole with a 4' mast arm, 315 watt metal halide fixture, and a 30' mounting height. Bronze anodized PENBERTHY STRIPING & SIGNAGE ITEMS - SUBTOTAL $7,058.36 $9,007.30 $9,424.44 $6,959.60 $9,311.00PENBERTHY ELECTRICAL & STREETLIGHTING ITEMS1734EAfixture to be a Gardco Catalog # ED19-1-4X-315MCE-277-BRA. 29'-8" Bronze anodized aluminum pole to be a Gardco Catalog # TAMU-TRA B 30L D1 BRA-311.$5,361.00 $21,444.00 $5,651.10 $22,604.40 $5,920.20 $23,680.80 $5,500.00 $22,000.00 $6,000.00 $24,000.001741EASL-RETIRE: Consists of Labor necessary to remove one (1) streetlight as specified on construction drawing. Contractor will also be responsible for removing wire that feeds streetlight.$238.00 $238.00 $1,883.70 $1,883.70 $1,973.40 $1,973.40 $1,840.00 $1,840.00 $2,000.00 $2,000.00Page 12 of 1442 City of College Station - Purchasing DivisionBid Tabulation for #13-044"Jones-Butler Road Extension"Open Date: Friday, February 22, 2012 @ 2:00 p.m.ITEM QTY UNIT DESCRIPTION UNIT PRICETOTAL PRICE UNIT PRICETOTAL PRICE UNIT PRICETOTAL PRICE UNIT PRICETOTAL PRICE UNIT PRICETOTAL PRICEDudley Construciton, Ltd.(College Station, TX)Brazos Paving, Inc.(Bryan, TX)Knife River Corp. - South(Bryan, TX)Larry Young Paving, Inc.(College Station, TX)A.L. Helmcamp, Inc.(Buffalo, TX)175618 LFTrench Detail "U": Consists of Labor and Materials necessary to install one (1) lineal foot of trenching in soil, measured parallel to the surface of the ground, including the excavation, backfilling and compacting. This unit includes all materials and labor required in the repair and/or replacement of streets, roads, drives, fences, lawns, shrubbery, water mains, pipes, pipelines, and contents, underground power and telephone facilities, buried sewage and drainage facilities, and any other property damaged by the trenching, except as specifically provided for in other units. This unit does not include underground cable or conduit facilities installed in the trench, when required. Caution tape is to be installed twelve to eighteen inches above conduits, and the last six (6) inches of trench backfill, plus 4-6" of mounding backfill for settling allowance, shall be sandy loam topsoil. See MEI-9720 for number and size of conduits which will be installed in the trench. See 'Bedding and Trench for DI Pipe and PVC Pipe' Detail S2-02 for all trenches under pavement areas (including sidewalks) for additional requirements (B/CS Unified Standard Detail). $19.61 $12,118.98 $38.85 $24,009.30 $40.00 $24,720.00 $37.90 $23,422.20 $41.20 $25,461.60176180 LFUD#12-2 Cu: Consists of Labor and Materials necessary to install one (1) foot of (2) runs of #12 Cu THHN (to run up streetlight poles).$1.14 $205.20 $0.26 $46.80 $0.28 $50.40 $0.25 $45.00 $0.30 $54.00177841 LFUD#6-3 Cu: Consists of Labor and Materials necessary to install one (1) foot of (3) runs of #6 Stranded Cu.$3.34 $2,808.94 $3.34 $2,808.94 $3.50 $2,943.50 $3.25 $2,733.25 $3.60 $3,027.60UK6: Consists of Labor and Materials necessary to install one (1) 11.5" W x 21" L x 16" D (interior dimensions) flush mount 1781EA()secondary hand hole. Box to be TxDOT approved, Type "E", Hubbell Catalog # PG1324$245.04 $245.04 $682.50 $682.50 $715.00 $715.00 $665.00 $665.00 $725.00 $725.00179718 LFUM50-P-2: Consists of Labor and Materials necessary to install one (1) lineal foot of one (1) two (2) inch, electrical grade schedule 40 PVC conduit, installed in place in a trench. This unit includes all PVC fittings, PVC 90 degree long sweep conduit elbows, connection materials, etc. required for installation of the conduit. This unit also includes the installation of a flat polyester pull rope for installation of the cable or conductor.$3.00 $2,154.00 $2.75 $1,974.50 $2.88 $2,067.84 $2.70 $1,938.60 $3.00 $2,154.0018025 LF 24” Wide Solid White Stop Line (Type I Thermoplastic) $7.61 $190.25 $9.98 $249.50 $10.45 $261.25 $7.10 $177.50 $10.00 $250.00181108 LF12” Wide Solid White Lines (Type I Thermoplastic) for 8’ Wide Standard Crosswalk at Holleman Intersection $4.65 $502.20 $5.78 $624.24 $6.05 $653.40 $4.35 $469.80 $6.00 $648.001822,100 LF4” Wide Broken White Line (Type I Thermoplastic), 10’ Long with a 30’ Gap $0.63 $1,323.00 $0.53 $1,113.00 $0.55 $1,155.00 $0.60 $1,260.00 $0.60 $1,260.001836EABike Lane Pavement Marking with Directional Arrow (Type I Thermoplastic) $306.00 $1,836.00 $147.00 $882.00 $154.00 $924.00 $286.00 $1,716.00 $150.00 $900.001842,124 LF Install 6” Wide Solid Bike Lane Line (Type 1 Thermoplastic) $0.77 $1,635.48 $0.90 $1,911.60 $0.95 $2,017.80 $0.75 $1,593.00 $1.00 $2,124.0018526 EA Install TY I-C RPM Spaced at 80’ Typical $21.89 $569.14 $6.30 $163.80 $6.60 $171.60 $20.45 $531.70 $6.50 $169.00PENBERTHY ELECTRICAL & STREETLIGHTING ITEMS - SUBTOTAL $41,724.16 $59,155.14 $61,540.94 $57,661.55 $62,872.20EXISTING JONES-BUTLER RESTRIPING ITEMSPage 13 of 1443 City of College Station - Purchasing DivisionBid Tabulation for #13-044"Jones-Butler Road Extension"Open Date: Friday, February 22, 2012 @ 2:00 p.m.ITEM QTY UNIT DESCRIPTION UNIT PRICETOTAL PRICE UNIT PRICETOTAL PRICE UNIT PRICETOTAL PRICE UNIT PRICETOTAL PRICE UNIT PRICETOTAL PRICEDudley Construciton, Ltd.(College Station, TX)Brazos Paving, Inc.(Bryan, TX)Knife River Corp. - South(Bryan, TX)Larry Young Paving, Inc.(College Station, TX)A.L. Helmcamp, Inc.(Buffalo, TX)18610 EAInstall 6” Wide Dot Bike Lane Line (Type 1 Thermoplastic), 2’ Long with 6’ Gap $1.42 $14.20 $5.78 $57.80 $6.05 $60.50 $1.30 $13.00 $6.00 $60.001872,204 LFInstall Double 4” Wide Solid Yellow Line (Type 1 Thermoplastic) $0.94 $2,071.76 $0.84 $1,851.36 $0.88 $1,939.52 $0.90 $1,983.60 $1.00 $2,204.0018830 EA Install Two Type II-A-A RPM Spaced at 80’ Typical $21.89 $656.70 $11.03 $330.90 $11.65 $349.50 $20.45 $613.50 $11.00 $330.001892,240 LF Eliminate Existing 4” Wide Broken White Line $1.71 $3,830.40 $0.65 $1,456.00 $0.69 $1,545.60 $1.60 $3,584.00 $0.70 $1,568.00Larry Young Paving»Bidder miscalculated Bid Items 27, 37, 106 and 167. The highlighted totals above are correct.»Bidder miscalculated Pavement & Drainage Items Subtotal, Traffic Signal Items Subtotal, Penberthy Striping & Signage Subtotal and the Grand Title. The hilighted items above are correct.Brazos Paving, Inc.»Bidder miscalculated Bid Items 103, 106, 107, 126, 127, 131, 132, 135, 136, 142, 145, 176, 177, 179 and 186. The highlighted totals above are correct.»Bidder miscalculated Traffic Signal Items Subtotal, CSU Electrical Items Subtotal, Streetlighting Items Subtotal, Penberthy Electrical & Streetlighting Items Subtotal, Existing Jones-Butler Restriping Items Subtotal and the Grand Total. The highlighted totals above are correct.Bid Bond$2,975,669.11 $3,011,521.33Dudley Construction , Ltd.»Bidder miscaculated the subtotal for Traffic Signal Items. The highlited total above is correct.NOTES:Certification of Bid GRAND TOTAL $3,137,667.99 $3,237,135.10$3,921,888.15Acknowledged Addendums (3)$9,513.00EXISTING JONES-BUTLER RESTRIPING ITEMS - SUBTOTAL $12,629.13 $8,640.20 $9,078.17 $11,942.10Page 14 of 1444 LUTHERWE L L B O R N HOLLEMANWELSH GEORGE BUSHDEXTER OLS E N FAIRVIEWJOHN KIMBROUGHMARI ON PUGHMONTCLAIR P E N B E RTH Y HARVEY MITCHELL CHRISTINESOUTHWESTHEREFORD P E R S H I N G JONES-BUTLER HIGHLANDS FIDELITYDISCOVERY NEVADATIMMKERRYTHOMASD E T R OIT A RIZ O N A P H O E NIXBAR BARA BUSHG E O R GIAGROVEMARYEM W IN D IN G VILLAGEC A R O LIN A ELEANOR AYRSHIRE GOODELEE HORTICULTUREANGUSBURTSUFFOLK TOM CHANDLERM A R I N E R O N E Y H E R V E Y SOUTHLANDHAINESOLD JERSEYCORREGIDORSI ENNALEGACYPARK PLACEWOODWAY TA U R U S LONNIESWISSCHALETJOHN KIMBROUGHOLSE N WINDINGPARK PLACEJones-Butler Extension Project Location Map $ Legend Jones-Butler 1 inch = 1,000 feet 45 March 28, 2013 Consent Agenda Item No. 2e TAMUS Ground Lease/Interlocal Cooperation Agreement/Easement Release To: Frank Simpson, Interim City Manager From: Timothy Crabb, Director of Electric Utilities Agenda Caption: Presentation, possible action and discussion concerning approval of: (1) a ground lease from TAMUS to College Station for property located generally northeast of the intersection of Wellborn Road and University Drive for the purpose of constructing an electrical substation, (2) an interlocal agreement between College Station and TAMU providing the terms and conditions necessary for the construction of an electrical substation on the ground lease site, and (3) a release of an existing right-of-way easement conveyed from TAMUS to College Station by instrument dated August 8, 2006, recorded in Volume 7572, Page 179, of the Real Property Records of Brazos County, Texas. Relationship to Strategic Goals: 1. Core Services and Infrastructure Recommendation(s): Staff recommends Council approve the above described ground lease, interlocal agreement, and release. Summary: The Northgate Substation will serve future load in the Northgate and Biocorridor areas. The original placement for this substation has been relocated to a new location on TAMU property adjacent to their substation which serves the campus. This site will require a new 50 year lease of property from TAMU and various easements for electric distribution feeder routes from this site. In consideration for these concessions, COCS will relinquish the use of an easement along FM 2818 and reimburse TAMU $300,000.00 for the relocation of parking area displaced by the substation site. Budget & Financial Summary: Funds are available as budgeted and approved in the Electric Utility Capital Improvement Projects Fund. Reviewed and Approved by Legal: Yes Attachments: The ILA between the City of College Station and Texas A&M University- Northgate Electric Substation, the Ground Lease Agreement, and the Release of Right-of- Way Easement will be available at the City Council meeting. 46 March 28, 2013 Consent Agenda Item No. 2f Substation Transformer Bid 13-047 To: Frank Simpson, Interim City Manager From: Timothy Crabb, Director of Electric Utilities Agenda Caption: Presentation, possible action, and discussion regarding the award of Bid Tab 13-047 and approval of a contract between the City of College Station and WEG Electric Corp, as bid by KD Johnson in the amount of $735,545 for the purchase of 25/33/46.6 MVA substation transformer for the new Northgate Substation to be built at the existing TAMU 138 kV Switchyard. This action would authorize the City Manager to execute the contract on behalf of the City Council. Relationship to Strategic Goals: 1. Financially Sustainable City 2. Core Services and Infrastructure 3. Diverse Growing Economy 4. Sustainable City Recommendation(s): Staff recommends approval of the contract with WEG Electric Corp in the amount of $735,545 to provide the substation transformer at the lowest evaluated equivalent first cost to the City as shown by the attached Bid Tab 13-047. Summary: The substation transformer is necessary to meet the power requirements of the rapidly growing Northgate area presently served out of Post Oak Substation. Budget & Financial Summary: Fifteen (15) sealed competitive bids and two (2) no bids were received and opened on February 19, 2013. Bids were evaluated on the cost to provide and deliver, assemble, fill with oil, and test a transformer along with the calculated operation cost and losses over the life of the transformer. Of the fifteen sealed competitive bids, two (2) were non-compliant with the NAFTA requirement, six (6) were non-compliant with the required delivery date, one (1) bidder was non-compliant with supplying loss data and one (1) bidder was non-compliant with Warranty Terms. The five (5) remaining bidders were ranked according to equivalent first cost. Funds for this project are presently budgeted in the FY13 Budget, the Electric Capital Improvement Projects Fund. The expenditure for this item is covered by the Northgate Substation Debt Reimbursement Resolution that was approved by Council on 9/27/12. Reviewed and Approved by Legal: NA Attachments: 1. Bid Tab 13-047 47 City of College Station - Purchasing Division Bid Tabulation for #13-047 "Purchase of Substation Transformer" Open Date: Tuesday, February 19, 2013 @ 2:00 p.m. CG Power Texas Elect Coop VT Keasler KD Johnson Transformer Manufacturer CG Power Prolec Virginia Transf SPX (Waukesha)WEG Factory Point of Origin USA-MO Mexico USA- ID USA-NC Mexico Washington Apodaca Pocatello Goldsboro Huehuetoca Status Compliant Compliant Compliant Compliant Compliant Bid Summary Transformer Unit Cost 725,500.00$ 623,785.00$ 763,412.00$ 840,330.00$ 700,545.00$ Cost to Place upon Foundation, Assembly, Oil Filling, etc.20,000.00$ 64,125.00$ included 54,580.00$ 25,700.00$ Cost of Service Engineer/Testing 38,000.00$ included included included 9,300.00$ As Bid Price 783,500.00$ 687,910.00$ 763,412.00$ 894,910.00$ 735,545.00$ Adder(s) for Foundation Placement, Assembly, Oil Filling -$ 20,000.00$ -$ -$ -$ Adder(s) for Service Engr / Testing -$ 10,000.00$ 10,000.00$ -$ -$ Sub-Total Adjusted Cost 783,500.00$ 717,910.00$ 773,412.00$ 894,910.00$ 735,545.00$ Equivalent First Cost of Losses (A and B Factors combined)289,782.00$ 353,793.00$ 299,854.05$ 308,781.00$ 285,885.42$ Grand Total Equivalent First Cost of Transformer 1,073,282.00$ 1,071,703.00$ 1,073,266.05$ 1,203,691.00$ 1,021,430.42$ Final Ranking Based on Lowest 1st Cost 4 2 3 5 1 Total Bidders 17 Bidders Non-Compliant with NAFTA requirement 2 Shihlin USA (Shihlin), Iljin USA (Iljin) Bidders Non-Compliant with required delivery date 6 Butler & Land (Hyundai), Howard(Howard),JH Davidson(ABB), V&S Schulir(HICO),EB Robertson(Pennsylvania Tran), Delta Star(Delta Star) Bidders Non-Compliant with 3 Year Warranty 1 HD Supply (Prolec/GE) Bidders Non-Compliant with Loss Data 1 FAPCo (Siemens) Bidders declaring No Bid 2 Dis-Tran, Priester-Mell & Nicolson Total Compliant Bidders 5 See above tabulation AWARD RECOMMENDATION: Purchase Lowest Equivalent First Cost Unit supplied by K D Johnson, WEG Manufacturing, Huehuetoca, Mexico Dealer/Agent 48 March 28, 2013 Consent Agenda Item No. 2g University Drive Pedestrian Improvements Project (ST1206) Resolution Determining Need and Necessity for Right-of-Way Acquisition To: Frank Simpson, Interim City Manager From: Chuck Gilman, P.E., PMP, Public Works Director Agenda Caption: Presentation, possible action, and discussion regarding approval of a Resolution that will authorize City staff to negotiate for the purchase of right-of-way needed for the University Drive Pedestrian Improvements Project. Relationship to Strategic Goals: Improving Mobility – Plan for infrastructure necessary to meet projected growth and physical development Recommendation(s): Staff recommends Council approval of the Resolution Determining Public Need and Necessity. Summary: As part of the University Drive Pedestrian Improvements Project and the MOU between the City and the Northgate District Association, parking along University Drive between FM 2154 and Tauber Street was removed to improve safety in the area. In the MOU, it was also agreed that a loading zone would be provided in the section of University Drive between the pedestrian plaza (formerly College Main) and Lodge Street to replace the on-street parallel parking. The proposed loading zone will enhance pedestrian safety in the Northgate District by providing a designated area for delivery vehicles to make deliveries that are necessary for area merchants to provide their respective goods and services to area patrons. The proposed loading zone extends across two properties. The section of the loading zone adjacent to the pedestrian plaza was dedicated to the City prior to the start of the project. The acquisition of this second and final piece of right-of-way will allow the City to create a loading zone in this block once an ordinance is passed by the City Council. Approval of the Resolution Determining Need and Necessity will authorize staff to negotiate for the purchase of the right-of-way needed to complete the project and enforce the loading zone. Budget & Financial Summary: Funds in the amount of $7,055,000 are budgeted for this project in the Streets Capital Improvement Projects Fund. A total of $247,064 has been expended or committed to date, leaving a balance of $6,807,936 for remaining expenditures. Reviewed and Approved by Legal: Yes Attachments: 1. Project Map 2. Resolution Determining Public Need and Necessity with Exhibit “A” 49 50 51 52 53 54 March 28, 2013 Consent Agenda Item No. 2h The Plaza at College Station – City Participation Agreement To: Frank Simpson, Interim City Manager From: Bob Cowell, Director of Planning & Development Services Agenda Caption: Presentation, possible action, and discussion for a City Participation Agreement for water line improvements in the Northpoint Crossing Ph.1 Subdivision being made per City Code of Ordinances, Chapter 12, Unified Development Ordinance, Section 8.5, Responsibility for Payment for Installation Costs for a total requested City participation of $67,101.59. Relationship to Strategic Initiatives: Core Services and Infrastructure, and a Diverse Growing Economy Recommendation(s): Staff recommends approval of the City Participation Agreement. Summary: Associated with the development of Northpoint Crossing Ph.1 the City required the construction of a 12 inch water line for the larger City system. The developer’s engineer demonstrated an 8 inch waterline is sufficient for this development. This city participation request is the construction cost difference for upsizing an 8 inch water line to a 12 inch water line for an approximately 436 linear feet section through Northpoint Crossing Ph.1. Budget & Financial Summary: Budget is included in the Water Capital Improvement Projects Fund for this Oversize Participation request. Attachments: 1. Vicinity Map 2. City Participation Agreement 3. Exhibit A (Description of Property) 4. Exhibit B (Description of Project) 5. Exhibit C (Engineer’s Estimate for the Project and Request Letter) 6. Exhibit D (Affidavit of All Bills Paid Form) 7. Ordinance approving the Agreement 55 NAGLE ST NIMITZ ST H E N S E L A V FOSTER AV F O U R T H S T FRONT STINWOOD DRS ROSEMARY DRHENSEL DRCOONER STPOLO RDMILNER DR CULPEPPER NEW MAIN DRHOLICK MILAM ST INLOW BLED GEWOOD CROSS STCOLLEGE VIEW DRBRO O K S IDE DR EBALL ST CHERRY STCRESCENT DRNICOLAS AVPASLER STDAY AVASH STPURYEAR DR EISENHOWER ST CHIMNEY HILL DRSTASNEY ST CALVIN MOORE AVJANE ST MEADOWLAND ST ASPEN ST MILAM AVREDBUD STENFIELD STCHURCH A V HARRINGTON AVDUNN STBANKS STS H A D Y L N POPLAR STFOCH STMAYW OOD DR OAKLAW N ST LIVE OAK STCULPEPPER DR TAUBER ST VASSAR CTEDGEMOREW-X ROW TURNER STHENSEL STJ A MES PW U-V ROW B IZ Z ELL STSPRUCE STCHARLES HALTOM AVSUNNY LNSPE N C E ST PEYTON STTARR O W ST AVENUE A DOGWOOD ST WELLESLEY CTOAKW OOD ST PRESTON STAVENUE B MACARTHUR ST LOOP ST ARGUELLO DR RIDGEW OOD ST PEARCE STFIRESIDE CR FOCH STNUNN STCOLUMBUS STFLORIC U L TURE RD OFFICE STINLOW BLFOCH STBIZZELL STAVENUE ATEXAS AV S TEXAS AV LINCOLN AVUNIVERSITY DR ETARROW ST UNIVERSITY DRCOLLEGE AV S COLLEGE AV COLLEGE AV WALTON DRN ROSEMARY DRE NORTH AVS P R I N G L O FRANCIS DRCOLLEGE MAIN ST± Vicinity Map Proposed 12" Waterline 56 1 Revised 5-11-12 Contract No.________________ CITY PARTICIPATION AGREEMENT This Agreement is entered into this ______ day of ____________________, 200__, by and between the City of College Station, a Texas home rule municipal corporation (hereinafter “CITY”), and _________________, a Texas ____________________ (hereinafter “DEVELOPER”). WHEREAS, DEVELOPER is developing property within the City of College Station, more particularly described as ____________________________________ College Station, Brazos County, Texas (hereinafter “Property”) a description of which is attached hereto as Exhibit A; and WHEREAS, DEVELOPER is required to construct certain public infrastructure, such as roadways, utilities, sidewalks, drainage facilities, water and sewer facilities, etc. that relate to DEVELOPER’S proposed development; and WHEREAS, CITY is required or desirous of assuming some or all responsibility for construction of certain public infrastructure affecting DEVELOPER’S development; and WHEREAS, because of this and in order to comply with CITY’s overall development scheme both DEVELOPER and CITY agree that it is in the best interests of the public to jointly construct certain identified public infrastructure; and WHEREAS, the City Engineer has reviewed the data, reports and analysis, including that provided by DEVELOPER’s engineers, and determined that such public improvement qualifies for joint CITY -DEVELOPER participation; and WHEREAS, both parties agree as to the nature and proportion of joint participation as further recited herein and as may be required in accordance with section 212.071 et seq and Chapter 252 Texas Local Government Code; NOW, THEREFORE, for and in consideration of the recitations above and the promises and covenants herein expressed, the parties hereby agree as follows: I. DEFINITIONS 1.1 Approved Plans means the plans and specifications that meet the requirements of this Participation Agreement, the City of College Station Codes and Ordinances and any other applicable laws and that have been submitted to, reviewed and approved by the City of College Station relating to the Project. 57 2 Revised 5-11-12 Contract No.________________ 1.2 CITY or College Station means the City of College Station, a Texas home rule municipal corporation located at 1101 Texas Avenue, College Station, Texas 77840. 1.3 DEVELOPER means _____________________________, a Texas _____________________ whose principal office is located at ______________, __________________, Texas 778___. 1.4 Effective Date. The date on which this Agreement is signed by the last party whose signing makes the Agreement fully executed. 1.5 Final Completion. The term "Final Completion" means that all the work on the Project has been completed, a written guarantee of performance for a one year maintenance period has been provided, all final punch list items have been inspected and satisfactorily completed, all payments to materialmen and subcontractors have been made, all documentation, and all closeout documents have been executed and approved by the DEVELOPER as required, all Letters of Completion and other CITY documentation have been issued for the Project, all reports have been submitted and reporting requirements have been met, and DEVELOPER has fully performed any other requirements contained herein. 1.6 Letter of Completion : A letter issued by the City Engineer stating that the construction of public improvements conforms to the plans, specifications and standards contained in or referred to in the CITY OF COLLEGE STATION UNIFIED DEVELOPMENT ORDINANCE. 1.7 Property means that one certain tract of land _____________________(describe by ref. to plat, subdivision, etc. as appropriate) and as further described in Exhibit A attached hereto and incorporated herein made a part hereof. 1.8 Project means the construction of ___________________________ improvements as detailed in Exhibit B attached hereto and incorporated herein by reference. II. CITY COST PARTICIATION 2.1 Agree to Participate. CITY agrees to cost participate in the Project in the maximum amount estimated as set forth in Exhibit C, which is attached hereto and incorporated herein by reference. CITY’S actual rate of participation will be based upon the final actual cost of the Project as reflected by the breakdown of costs required pursuant to this Agreement but in no event shall exceed the maximum amount estimated in Exhibit C. 2.2 Public Bidding. The total estimated cost of the Project is as set forth in Exhibit C. If CITY’s cost participation exceeds 30% of the total cost of the Project or is located within the extraterritorial jurisdiction of the CITY, then the Project must be competitively bid 58 3 Revised 5-11-12 Contract No.________________ pursuant to Chapter 252 Texas Local Government Code, as amended. If CITY participation exceeds 30% of the total cost of the Project, CITY shall be responsible for advertising and obtaining bids or negotiating proposals for the construction of the Project. DEVELOPER shall pay for all costs associated with advertising, printing, and distributing plans and specifications for the Project. If CITY’s cost participation is 30% or less of the total cost of the Project and is located within the boundaries of the CITY, the Project need not be competitively bid. 2.3 Cost of Project. DEVELOPER’s engineer’s detailed cost estimate of the Project is attached hereto and incorporated herein as Exhibit C. 2.4 Application for Payment. Application for payment by the DEVELOPER to the CITY for payment to the DEVELOPER pursuant to the terms of this Agreement must include the following in a form acceptable to CITY: (1) Final Completion of the Project in accordance with the Approved Plans; (2) issuance of all Letters of Completion relating to the Project; (3) DEVELOPER’s compliance with all CITY Codes, Ordinances and standards relating to the Project, the Property and its subdivision and development; (4) dedication of the land for the right-of-way either by plat or by deed relating to the Project; (5) a current title report as of the date of such land dedication and updated within sixty (60) days of the date of this Agreement; (6) lien releases or subordinations from all lenders as required by CITY; (7) Proof that all guarantees of performance and payment as set forth in this Agreement have been met, including all bond requirements when applicable; and (8) A breakdown of actual costs of the Project with supporting documentation, including all payment receipts. 2.5 City Participation Payment. DEVELOPER shall submit the written application for CITY participation payment within thirty (30) days after issuance of all Letters of Completion relating to the Project or DEVELOPER shall be ineligible to receive the CITY participation payment specified in this Agreement and CITY’s obligation to cost participate shall terminate without any liability. Applications may not be submitted prior to Final Completion. CITY will pay its participation funds in one payment within thirty (30) days after receipt of a complete written application for participation payment from DEVELOPER. 2.6 Reports, books and other records. DEVELOPER shall make its books and other records related to the project available for inspection by CITY. DEVELOPER shall submit to CITY any and all information or reports requested to verify the expenditures 59 4 Revised 5-11-12 Contract No.________________ submitted for CITY participation eligibility including but not limited to bid documents, payment applications, including any supporting information, cancelled checks, copies of construction and engineering documents, as determined by the City Engineer in his sole discretion, for the verification of the cost of the Project detailed in Exhibit B and C of this Agreement. The submission of these reports and information shall be the responsibility of DEVELOPER and shall be certified by DEVELOPER’s Licensed Professional Engineer at DEVELOPER’s expense and signed by an authorized official of the entity. III. GOVERNMENTAL IMMUNITY, INDEMNIFICATION AND RELEASE CITY is a political subdivision of the state and enjoys governmental immunity. By entering into this Agreement, CITY does not consent to suit, waive its governmental immunity, or the limitations as to damages under the Texas Tort Claims Act. DEVELOPER agrees to and shall indemnify, hold harmless, and defend CITY and its officers, agents, and employees from and against any and all claims, losses, damages, causes of action, suits, and liability of every kind, including all expenses of litigation, court costs, expert fees and attorney's fees, for injury to or death of any person, or for damage to any property, or for breach of contract, arising out of or in connection with the work done by DEVELOPER under this Agreement, regardless of whether such injuries, death, damages or breach are caused in whole or in part by the negligence of CITY, any other party indemnified hereunder, or the DEVELOPER. DEVELOPER shall indemnify and hold CITY harmless from any claims of suppliers or subcontractors of DEVELOPER for improvements constructed or caused to be constructed by DEVELOPER. DEVELOPER shall indemnify and hold CITY harmless from any and all injuries to or claims of adjacent property developers resulting from or relating to their performance under this Agreement. DEVELOPER assumes full responsibility for the work to be performed hereunder, and releases, relinquishes and discharges CITY, its officers, agents and employees, from all claims, demands, and causes of action of every kind and character, including the cost of defense therefore, for any injury to or death of any persons and any loss of or damage to any property that is caused by, alleged to be caused by, arising out of, or in connection with, DEVELOPER's work to be performed hereunder. This release shall apply whether or not said claims, demands, and causes or action are covered in whole or in part by insurance and regardless of whether or not said claims, demands, and causes of action were caused in whole or in part by the negligence of CITY, any other party released hereunder, or DEVELOPER. IV. 60 5 Revised 5-11-12 Contract No.________________ PROJECT AND CONSTRUCTION 4.1 Right to Inspect the Work. CITY may inspect the improvements for compliance with the Approved Plans during construction. In the event that it is determined by CITY that any of the work or materials furnished is not in strict accordance with the Approved Plans, CITY may withhold funds until the nonconforming work conforms to the Approved Plans or terminate this Agreement at CITY’s election without any further liability. 4.2 Independent Contractor. DEVELOPER shall be solely responsible for selecting, supervising, and paying the construction contractor(s) or subcontractors and for complying with all applicable laws, including but not limited to all requirements concerning workers compensation and construction retainage. The parties to this Agreement agree and understand that all employees, volunteers, personnel and materials furnished or used by DEVELOPER in the installation of the specified improvements shall be the responsibility of DEVELOPER and shall not be deemed employees or agents of CITY for any purpose. 4.3 Payment for materials and labor. DEVELOPER shall be solely and exclusively responsible for compensating any of its contractors, employees, subcontractors, materialmen and/or suppliers of any type or nature whatsoever and insuring that no claims or liens of any type will be filed against any property owned by CITY arising out of or incidental to the performance of any service performed pursuant to this Agreement. In the event a statutory lien notice is sent to CITY, DEVELOPER shall, where no payment bond covers the work, upon written notice from the CITY, immediately obtain a bond at its expense and hold CITY harmless from any losses that may result from the filing or enforcement of any said lien notice. 4.4 Affidavit of bills paid. Prior to the issuance of a Letter of Completion of the improvements, DEVELOPER shall provide CITY a notarized affidavit stating that all bills for labor, materials, and incidentals incurred have been paid in full, that any claims from manufacturers, materialmen, and subcontractors have been released, and that there are no claims pending of which DEVELOPER has been notified. Such affidavit shall be in a form as substantially set forth in Exhibit D which is attached hereto and incorporated by reference. 4.5 Requirements of Applicable rules remain. This Agreement does not alter, amend modify or replace any other requirements contained in the Code of Ordinances, Unified Development Code, or other applicable law. V. GUARANTEE OF PERFORMANCE AND PAYMENT 61 6 Revised 5-11-12 Contract No.________________ 5.1 Bonding Requirements of Developer. Where CITY participation is 30% or less of the total value of the Project, DEVELOPER shall execute a performance bond to ensure construction of the Project and shall ensure that its contractor performing the Project executes a payment bond to ensure payment to subcontractors, if any. The bonds must be executed by a corporate surety in accordance with CHAPTER 2253, TEXAS GOVERNMENT CODE. The bonds shall be in the total amount of the contract price as approved by CITY. 5.2 Bonding Requirements of City. Where CITY participation is greater than 30% of the total value of the Project or when the Project is located within the extraterritorial jurisdiction of the CITY, the CITY shall ensure that the prime contractor of the Project execute to the CITY a performance bond and/or a payment bond as may be required pursuant to chapter 2253 Texas Government Code. VI. GENERAL PROVISIONS 6.1 Amendments. No amendment to this Agreement shall be effective and binding unless and until it is reduced to writing and signed by duly authorized representatives of both parties. 6.2 Choice of law and Venue. This Agreement has been made under and shall be governed by the laws of the State of Texas. Performance and all matters related thereto shall be in Brazos County, Texas, United States of America. 6.3 Authority to enter into Agreement. Each party represents that it has the full power and authority to enter into and perform this Agreement. The person executing this Agreement on behalf of each party has been properly authorized and empowered to enter into this Agreement. The person executing this Agreement on behalf of DEVELOPER represents that he or she is authorized to sign on behalf of DEVELOPER and agrees to provide proof of such authorization to the CITY upon request. 6.4 Agreement read. The parties acknowledge that they have read, understand and intend to be bound by the terms and conditions of this Agreement. 6.5 Notice. Any notice sent under this Agreement (except as otherwise expressly required) shall be hand delivered, written and mailed, or sent by electronic or facsimile transmission confirmed by mailing written confirmation at substantially the same time as such electronic or facsimile transmission, or personally delivered to an officer of the receiving party at the following addresses: _______________________. City of College Station _______________________ City Engineer _______________________ P.O. Box 9960 62 7 Revised 5-11-12 Contract No.________________ _______________________ College Station, TX 77842 With copies to: City Attorney and City Manager 1101 Texas Avenue College Station, TX 77842 Each party may change its address by written notice in accordance with this section. Any communication addressed and mailed in accordance with this section shall be deemed to be given when so mailed, any notice so sent by electronic or facsimile transmission shall be deemed to be given when receipt of such transmission is acknowledged, and any communication so delivered in person shall be deemed to be given when receipted for by, or actually received by, the party. 6.6 Assignment. This Agreement and the rights and obligations contained herein may not be assigned by DEVELOPER without the prior written approval of the CITY. 6.7 Default. In the event of a breach of this Agreement by DEVELOPER, CITY may terminate this Agreement and exercise any and all legal remedies available to it. Executed this _______day of _________________________________, 200__. List of Exhibits: A A description of the Property B A description of the Project C Engineer’s estimate of the costs of the Project D Affidavit of All Bills Paid form [INSERT COMPANY NAME] CITY OF COLLEGE STATION BY: _____________________________ BY: ________________________________ Printed Name:_____________________ Mayor Title:_____________________________ ATTEST: ___________________________________ City Secretary 63 8 Revised 5-11-12 Contract No.________________ APPROVED: ____________________________________ City Manager ____________________________________ City Attorney ____________________________________ Executive Director Business Services 64 65 ! ! ! ! ! ! ! ! !!! ! !!!! !! ! !!! ! ! ! !! !!!!!!! ! !! ! ! !! ! !! ! !! ! ! ! !! ! ! ! ! ! &É !(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(G!. G!. G!. G!. G!. G!. G!. G!. G!. G!. G!. G!. G!. G!. G!. G!. G!. G!. G!. G!. G!. G!. FRONT ST COONER STJANE ST MEADOWLAND STHENSEL STPOPLAR STS H A D Y L N NICOLAS AVW-X ROW HENSEL DR NIMITZ ST CALVIN M O O RE AVEISENHOWER ST CHARLES HALTOM AVLIVE OAK STU-V ROW AVENUE ATEXAS AV S TEXAS AV UNIVERSITY DRUNIVERSITY DR E± The Plaza at College Station - Northpoint Crossing Ph.1 12" Waterline Replacement 66 67 68 THE STATE OF TEXAS ) ) AFFIDAVIT OF BILLS PAID COUNTY OF BRAZOS ) Before me, the undersigned authority, personally appeared ____________________________________ (“Affiant”), _________________________ of ___________________________ (“Contractor”), who being first duly sworn, deposed and state the following: “My name is __________________________. I am over 18 years of age, of sound mind, capable of making this affidavit, and personally acquainted with the facts stated in it, which facts are true and correct. Pursuant to that certain _____________________ contract, dated as of ____________, 200__ (the “Contract”) by and between the City of College Station, Texas, and ____________________________________, Contractor furnished labor and materials to construct _____ ____________________________________________________________ on the real property known as ___________________________ (more particularly described in the Contract) the “Project”. To the extend that Contractor constructed or contracted for the construction of such __________________________________________, Contractor has paid each of its sub-contractors, laborers and materialmen in full (except for statutory retainage) for all labor and/or materials provided to Contractor on the Project. To the best of Affiant’s knowledge, Contractor has not received notice of any claims pending against the Project in connection with the ______________________________ described in the Contract. Further, Affiant saith not. Executed this ________ day of _____________________, 200__. AFFIANT: ______________________________ Printed Name:__________________ SUBSCRIBED AND SWORN TO before me on this _____ day of ___________, 200__. ______________________________ Notary Public, State of Texas 69 70 71 72 73 74 75 76 77 78 79 80 March 28, 2012 Consent Agenda Item No. 2i Chapter 2 – Animal Control Ordinance Update To: Frank Simpson, Interim City Manager From: Jeffrey Capps, Chief of Police Agenda Caption: Presentation, possible action and discussion regarding proposed changes to Chapter 2 – Animal Control of the City of College Station Ordinances. Relationship to Strategic Goals: Core Services and Infrastructure Recommendation(s): Staff recommends adoption of the proposed changes. Summary: Approximately three years ago this ordinance was updated after a lengthy review by a subcommittee of the Inter-governmental Committee that was formed to review the Animal Control Ordinance. Since this update, a number of operational issues and citizen requests for consideration have arisen that require further modification of our current ordinance. The proposed changes to the ordinance address these issues. • Exclusion of falcons and hawks from the definition of Fowl or Poultry. The intent is to allow possession of raptors in the City if appropriately permitted through the State. • Added definition of Hybrid to address hybrid wolf issues. • Added agent to account for those caring for animals on a temporary basis. • Better defined secure enclosure for dangerous dogs. • Eliminated wild animals section and instead created a prohibited animals section. • Better defined offense of leaving an animal in a hot vehicle. • Expanded tethering of animals based on State law. • Prohibited use of steel jaw or leg-hold traps except for mouse and rat control. • Removed the inspection component from permitting of more than 4. Inspection has not been a needed enforcement component. • Better defined Dangerous Dog section. This was fashioned from Ft. Worth ordinance. Budget & Financial Summary: n/a Attachments: • Modified version of Chapter 2 – Animal Control Ordinance 81 82 83 84 85 86 87 88 89 90 91 92 93 94 95 96 97 98 99 100 101 102 103 March 28, 2013 Consent Agenda Item No. 2j Reclaimed Water Purchase Agreement with Pebble Creek Country Club To: Frank Simpson, Interim City Manager From: David Coleman, Director of Water Services Agenda Caption: Presentation, possible action and discussion to approve an agreement for the City to sell reclaimed water to the Pebble Creek Country Club. Relationship to Strategic Goals: Financially Sustainable City Providing Response to Core Services and Infrastructure. Recommendation: Staff recommends Council approval. Summary: The Pebble Creek Country Club (PCCC) was recently purchased by Pebble Creek Interests (PCI). The new owner has requested to reinstate the agreement whereby the City will provide reclaimed water to PCCC when they are ordered to cease withdrawals under their own water rights permit. Background: PCCC has a permit from the Texas Commission on Environmental Quality (TCEQ) to withdraw water from Carters Creek to irrigate their golf course, issued in 1991. But during drought, the TCEQ can order PCCC to cease withdrawing water under this permit, if the "senior" water users downstream, such as Dow Chemical, are unable to withdraw adequate amounts of water, which is called a “Priority Call.” When this occurs, PCCC is able to use potable water from the City for irrigation; however, staff would prefer to not have this demand on our potable water system. Under our "Bed & Banks" permit, the City has the authority to sell reclaimed water (treated wastewater effluent) that we discharge into the creek. On August 11th , 2011, City Council approved an agreement which stipulates the terms and conditions for the sale of the reclaimed water to PCCC at the Brazos River Authority standard rate of $62.50 per acre-foot, which is approximately $0.19 per thousand gallons. Today, staff proposes a new contract with PCI that will retain the BRA rate, but only for the first 75 acre-feet of water, which provides approximately a one-month supply of water for irrigation. Beyond this amount, the rate triples, to $187.50 per acre-foot. In addition, the agreement limits the rate and amount of water that can be withdrawn, provides a ten year term with one renewal, stipulates methods to measure the water quantity, and various other protections for the City. Staff recommends approval of this agreement. Budget & Financial Summary: None, this agreement will be a minor revenue source. Reviewed and Approved by Legal: Yes. Attachment: Agreement 104 105 106 107 108 109 110 111 112 March 28, 2013 Consent Agenda Item No. 2k ILA to Transfer Surplus Radio Equipment to City of Brenham To: Frank Simpson, Interim City Manager From: Ben Roper, IT Director Agenda Caption: Presentation, possible action, and discussion regarding approval of an ILA transferring surplus radio equipment from the City of College Station to the City of Brenham. Relationship to Strategic Goals: Core Services and Infrastructure Recommendation(s): Staff recommends approval of the Interlocal Agreement. Summary: The Brazos Valley Wide Area Communications System replaced voice side of the city’s obsolete 800 MHz radio system in 2008. In 2011 the data side of the system was replaced. The old 800MHz radio components are obsolete and considered surplus by the city. The City of Brenham has a need for some of these radio components to meet State Interoperability Communications requirements. This ILA transfers four (4) pieces of equipment to the City of Brenham. Budget & Financial Summary: There is no cost to the City of College Station. The City of Brenham will pay $1.00 for the surplus equipment. Reviewed and Approved by Legal: Yes Attachments: ILA 113 INTERLOCAL AGREEMENT BETWEEN THE CITY OF COLLEGE STATION AND CITY OF BRENHAM WHEREAS, Chapter 791 of the Texas Government Code, also known as the Interlocal Cooperation Act, authorizes all local governments to contract with each other to perform governmental functions or services including administrative functions normally associated with the operation of government such as purchasing of necessary equipment and supplies; and WHEREAS, the City of College Station (hereinafter referred to as "College Station"), and City of Brenham (hereinafter referred to as "City of Brenham") desire to enter into this Agreement for the purpose of fulfilling and implementing their respective public and governmental purposes, needs, objectives, programs, functions, and services; and WHEREAS, the City of College Station, City of Brenham and other local governmental entities entered into an interlocal agreement in 2008 (Resolution No. 6-26-08-08) for the construction, acquisition, implementation, operation, and maintenance of an interoperable radio and data communications system, known as the Brazos Valley Wide Area Communications System ("BVWACS"); and WHEREAS, College Station has surplus 800 MHz radio equipment; and WHEREAS, City of Brenham is in need of such radio communications equipment to facilitate better usage of the interoperable radio system and meet state interoperability requirements for public safety; and WHEREAS, radio interoperability between local governmental entities accomplishes a valid public purpose and enhances public safety; and WHEREAS, it is deemed in the best interest of the participating governments that said governments do enter into a mutually satisfactory agreement for the transfer of the radio equipment; NOW THEREFORE, the parties hereto, in consideration of the mutual covenants and conditions contained herein, promise and agree as follows: 1. Within thirty (30) days of the effective date of this Agreement and for the consideration contained in paragraph 4 of this agreement, City of Brenham shall receive surplus radio equipment in "as is condition" from College Station. 2. College Station shall transfer to City of Brenham the following radio equipment: Chassis SN: CAEVWVOP3C Model: T5365A Radio SN: 448CWF0090 Chassis SN: CAEVWVOP3B Page 1 of4 Contract No. 13-204 114 Model: T5365A Radio SN: 448CWF0091 Chassis SN: CAEVWVOP3H Model: T5365A Radio SN: 225CWF0269 Duplexer No SN or part number on item. City of Brenham and College Station shall schedule a date and time convenient to both parties for a City of Brenham representative to collect the equipment. Delivery will be F.O.B. College Station, Texas. 3. Effective Date. This Agreement shall be effective when signed by the last party whose signing makes the Agreement fully executed. Notwithstanding this provision, any party may modify or terminate this Agreement as provided in Paragraph(s) 5 or 6. 4. Consideration. Upon College Station's receipt of a written request from City of Brenham for surplus radio equipment, College Station will sell to City of Brenham, and City of Brenham will pay ONE AND NO/tOO DOLLARS ($1.00), for available surplus radio equipment identified in paragraph 2. City of Brenham agrees to use the surplus radio equipment for the purposes established in this Agreement. 5. Modification. The terms and conditions of this Agreement may be modified upon the mutual consent of both parties. Mutual consent will be demonstrated approval of the governing body of each party hereto. No modification to this Agreement shall be effective and binding unless and until it is reduced to writing and signed by duly authorized representatives of both parties. 6. Termination. Either party may terminate this Agreement at any time, with or without cause, upon thirty (30) days written notice to the other party in accordance with Paragraph 10 herein. 7. Hold Harmless. College Station and City of Brenham agree to hold each other harmless from and against any and all claims, losses, damages, causes of action, suits, and liabilities of every kind, including all expenses of litigation, court costs, and attorney's fees, for injury or death of any person, for damage to any property, or for any breach of contract, arising out of or in connection with this Agreement. 8. Disclaimer of Warranty. The transfer of the radio equipment is as is, where is and without warranty, express or implied, as to quality, condition, fitness for known purpose, or of any other kind. City of Brenham understands and agrees that the goods are provided "as is." 9. Invalidity. If any provision of this Agreement shall be held to be invalid, illegal, or unenforceable by a court or other tribunal of competent jurisdiction, the validity, legality, and enforceability of the remaining provisions shall not in any way be affected or Page 2 of4 Contract No. 13-204 115 impaired thereby. The parties shall use their best efforts to replace the respective provision or provisions of this Agreement with legal terms and conditions approximating the original intent of the parties. 10. Written Notice. Unless otherwise specified, written notice shall be deemed to have been duly served if delivered in person or sent by certified mail to the last business address as listed herein. City of Brenham: City of Brenham Attn: Pam Ruemke, Brenham Communications Manager 30 I N. Baylor P.O. Box 2258 Brenham, TX 77834-2258 (979) 337-7274 College Station: City of College Station, Department of Information Technology Attn: Ben Roper, IT Director 310 Krenek Tap Rd P.O. Box 9960 College Station, Texas 77842 (979)764-3538 11. Entire Agreement. It is understood that this Agreement contains the entire agreement between the parties and supercedes any and all prior agreements, arrangements, or understandings between the parties relating to the subject matter. No oral understandings, statements, promises, or inducements contrary to the terms of this Agreement exist. This Agreement cannot be changed or terminated orally. No verbal agreement or conversation with any officer, agent, or employee of any party before or after the execution of this Agreement shall affect or modify any of the terms or obligations hereunder. 12. Amendment. No Amendment to this Agreement shall be effective and binding unless and until it is reduced to writing and signed by duly authorized representatives of both parties. 13. Texas Law. This Agreement has been made under and shall be governed by the laws of the State of Texas. 14. Place of Performance. Performance and all matters related thereto shall be in Brazos County, Texas, United States of America. 15. Authority to Enter Contract. Each party has the full power and authority to enter into and perform this Agreement, and the person signing this Agreement on behalf of each party has been properly authorized and empowered to enter into this Agreement. The persons executing this Agreement hereby represent that they have authorization to sign on behalf oftheir respective corporations. 16. Waiver. Failure of either party, at any time, to enforce a provision of this Agreement, shall in no way constitute a waiver of that provision, nor in anyway affect the validity of Page 3 of4 Contract No. 13-204 116 this Agreement, any part hereof, or the right of either party thereafter to enforce each and every provision hereof. No term of this Agreement shall be deemed waived or breach excused unless the waiver shall be in writing and signed by the party claimed to have waived. Furthermore, any consent to or waiver of a breach will not constitute consent to or waiver of or excuse of any other different or subsequent breach. 17. A2reement Read. The parties acknowledge that they have read, understand and intend to be bound by the terms and conditions of this Agreement. 18. Assignment. This Agreement and the rights and obligations contained herein may not be assigned by any party without the prior written approval of the other parties to this Agreement. 19. Multiple Originals. It is understood and agreed that this Agreement may be executed in a number of identical counterparts, each of which shall be deemed an original for all purposes. CITY OF BRENHAM Milton Y. Tate, Jr. Mayor Date:_________ ATTEST: Jeana Bellinger, TRMC _______ City Secretary ___________ Date:_________ CITY OF COLLEGE STATION By:_____________ Nancy Berry, Mayor Date:_________ ATTEST: Sherry Mashburn, City Secretary Date:_________ APPROVED: Frank Simpson, Interim City Manager Date:;..---,--__-:-____ ~iUj Jeff Kersten, Executive Director of Business Services Page 4 of 4 Contract No. 13-204 117 March 28, 2013 Consent Agenda Item No. 2L Purchase of Public Safety Equipment and Supplies To: Frank Simpson, Interim City Manager From: Jeffrey Capps, Police Chief Agenda Caption: Presentation, possible action, and discussion regarding the approval of police safety equipment and supplies to Smith & Wesson for $56,551.35, to GT Distributors for $100,560.32 for rifle accessories and ammunition, and tactical vests for SWAT, and to ArmorUp, dba Bulletproofme for $23,220.00 for tactical vests for Patrol. Relationship to Strategic Goals: Core Services; Neighborhood Integrity Recommendation(s): Staff recommends purchase of the equipment and supplies. Summary: These purchases are for rifles, accessories, ammunition and protective vests. These purchases will be made utilizing interlocal cooperative agreements with the Texas Smart Buy Term Contract (TPASS) and Texas Local Government Cooperative (BuyBoard). Purchases made from these programs satisfy our requirement for competitive bidding. On August 13, 2012, Constable Brian Bachmann was shot and killed in the line of duty in College Station. Officers with our department responded and found themselves in an active shooter situation. As a result of this incident, equipment needs have been identified. Access to rifles and heavy body armor by our officers and SWAT team will provide the added protection they would need should the same type of incident occur again. Budget & Financial Summary: A budget amendment will be brought forward to appropriate these funds into the police department budget. Attachments: 1. Smith & Wesson Quote 2. GT Distributors 3. GT Distributors 4. GT Distributors 5. GT Distributors 6. Bulletproofme 118 TxSmartBuy Term Contract 680-A1 Description Supplier Name Supplier Part # Price Currency Unit Qty Total 311008: RIFLES S&W, M&P15, 5.56 CALIBER, ONE MAGPUL 30 ROUND MAGAZINE (OTHER OPT), 6 POSITION ADJ STOCK, FLIP UP REAR SIGHT, FXD POST FRONT, 7" QUAD RAIL HDGRD, 16" BARREL Smith & Wesson Corp. 68052791321 $844.05 USD EA 67 $56,551.35 Contractor: Smith and Wesson Corp. Contact: Ian O'Donnell 2100 Roosevelt Avenue Springfield, MA 01104 Phone: 413-747-3627 Fax: 413-731-8980 iodonnell@smith-wesson.com 119 000094 Master No. 0/0/0000 GT Distributors - Austin U NET 15 College Station (TX) 1 QTE0061441 College Station (TX) 12/19/2012 943,573 Purchase Order No. Customer ID Salesperson ID Shipping Method Payment Terms Req Ship Date Quantity Item Number Description UOM Unit Price Ext. Price Ship To:Bill To: Quote Date Page: Attn: Accounting Department P.O. Box 9973 College Station TX 77842-9973 2611 Texas Ave. S. Attn: Christopher Brannan College Station TX 77840 AP (512) 451-8298 P.O. Box 16080 Austin TX 78761 $458.25 $14,664.00 PTA-PLT-III-2120-10X12 Protech-III+ Multi Curve Ceramic-PolyethyleneP EA 32 Quotation reflects Buyboard Contract 363-10. Contract period 04/01/11-03/31/14. Fax BuyBoard PO's to 1-800-211-5454 only. Your sales person is Doriane Pissonier. Thank $14,664.00 $0.00 $0.00 $14,664.00 $0.00 you. jarnold@cstx.gov Subtotal Misc Tax Freight Total All returns must be authorized by GT Distributors. Interest charges on past due invoices at the maximum rate allowed by law. 120 000094 Master No. 0/0/0000 GT Distributors - Austin U NET 15 College Station (TX) 1 QTE0063028 College Station (TX) 2/11/2013 MISC EQUIP 2.11.13 971,268 Purchase Order No.Customer ID Salesperson ID Shipping Method Payment Terms Req Ship Date Quantity Item Number Description UOM Unit Price Ext. Price Ship To:Bill To: Quote Date Page: Attn: Accounting Department P.O. Box 9973 College Station TX 77842-9973 2611 Texas Ave. S. Attn: Christopher Brannan College Station TX 77840 AP (512) 451-8298 P.O. Box 16080 Austin TX 78761 $366.00 $24,522.00 AP-12841*Aimpoint Patrol Rifle Sight W/ Mount & Lense cov EA 67 $231.75 $15,527.25 SF-X300U-A*Surefire X300U Ultra Led Handgun Light 500 Lumen EA 67 $12.11 $1,622.74 MAGPUL-MAG557-BLK*Magpul PMag 30AR/M4 Gen M3 EA 134 $48.10 $3,222.70 BFG-VCAS-200-AA-BK*Blue Force Gear Vickers Sling BLK EA 67 $342.48 $15,582.84 CCI-24459*CCI-5.56 Lawman-55Gr-Rifle Ammo M 45.50 $876.80 $6,137.60 FC-T223F*Federal Cartridge .223 55 gr TRU M 7.00 $310.68 $2,174.76 CCI-53955*CCI-Lawman-.40 Cal-165 GR-TMJ M 7.00 Quotation reflects Buyboard Contract 363-10. Contract period 04/01/11-03/31/14. Fax BuyBoard PO's to 1-800-211-5454 only. Your sales person is Doriane Pissonier. Thank $68,789.89 $0.00 $0.00 $68,789.89 $0.00 you. Subtotal Misc Tax Freight Total All returns must be authorized by GT Distributors. Interest charges on past due invoices at the maximum rate allowed by law. 121 000094 Master No. 0/0/0000 GT Distributors - Austin FACTORY DIRECT NET 15 College Station (TX) 1 QTE0062817 College Station (TX) 2/5/2013 PTA 02/2013 968,091 Purchase Order No.Customer ID Salesperson ID Shipping Method Payment Terms Req Ship Date Quantity Item Number Description UOM Unit Price Ext. Price Ship To:Bill To: Quote Date Page: Attn: Accounting Department P.O. Box 9973 College Station TX 77842-9973 2611 Texas Ave. S. Attn: Christopher Brannan College Station TX 77840 AP (512) 451-8298 P.O. Box 16080 Austin TX 78761 $1,155.00 $4,620.00 PTA-TITAN-MR01-MOLLE*Protech Titan Vest with MR01 Panels MOLLE EA 4 $227.78 $911.12 PTA-TITAN-MR01-YOKE*Protech MR01 Titan Yoke EA 4 $222.22 $888.88 PTA-TITAN-MR01-BICEP*Protech MR01 Titan Biceps EA 4 $150.00 $600.00 PTA-TITAN-MR01-GROIN*Protech MR01 Titan Groin Protection EA 4 $133.33 $533.32 PTA-MPS*Protech 6 Pouch Set EA 4 TP21A/ TP10A TP19/ TP18 TP-16/ TP20 $12.22 $48.88 PTA-POL2-AS3-WTY6*Protech ID panel Small POLICE MultiCam White let Each 4 $17.18 $68.72 PTA-POL2-AL4-WTY6*Protech ID panel Large POLICE MultiCam White let Each 4 $433.33 $3,466.64 PTA-PLT-III-2120-10X12*Protech-III+ Multi Curve Ceramic-PolyethylenePla EA 8 $116.67 $466.68 PTA-SIDEPANNEL-6X10*Protech SM01 Side Ballistic Protection 6X10 EA 4 $88.89 $355.56 PTA-OSM*Protech Optional Spacer Mesh EA 4 $0.00 $0.00 NOTES Notes:EA 1 MultiCam ID panels Mulitcam w/White lettering Your sales person is Doriane Pissonier. Thank $11,959.80 $0.00 $0.00 $11,959.80 $0.00 you. Chris Brannan-cbrannan@cstx.gov Subtotal Misc Tax Freight Total All returns must be authorized by GT Distributors. Interest charges on past due invoices at the maximum rate allowed by law. 122 000094 Master No. 0/0/0000 GT Distributors - Austin FACTORY DIRECT NET 15 College Station (TX) 1 QTE0059475 College Station (TX) 10/24/2012 PTA MISC 10.5.2012 910,772 Purchase Order No.Customer ID Salesperson ID Shipping Method Payment Terms Req Ship Date Quantity Item Number Description UOM Unit Price Ext. Price Ship To:Bill To: Quote Date Page: Attn: Accounting Department P.O. Box 9973 College Station TX 77842-9973 2611 Texas Avenue S Attn: Christopher Brannan College Station TX 77840 AP (512) 451-8298 P.O. Box 16080 Austin TX 78761 $200.00 $3,200.00 PTA-TAC-PR-MOLLE*Protech-Plate Holder-Molle EA 16 $12.22 $195.52 PTA-E1-POLICE*Protech 1" Police ID Patch EA 16 $17.78 $284.48 PTA-E2-POLICE*Protech-2 Inch Police ID Patch EA 16 $0.00 $0.00 NOTES Notes:EA 1 Color: Multicam ID panels: Mulitcam w/ white text $133.33 $1,466.63 PTA-MPS*Protech 6 Pouch Set EA 11 16 ea TP10,TP6A 17 ea TP21,TP16 $0.00 $0.00 NOTES Notes:EA 1 Quotation reflects Buyboard Contract 363-10. Contract period 04/01/11-03/31/14. Fax BuyBoard PO's to 1-800-211-5454 only. Your sales person is Doriane Pissonier. Thank $5,146.63 $0.00 $0.00 $5,146.63 $0.00 you. Jimbob jarnold@cstx.gov Subtotal Misc Tax Freight Total All returns must be authorized by GT Distributors. Interest charges on past due invoices at the maximum rate allowed by law. 123 ArmorUP, L.P. dba BulletProofME.com Body Armor “Put the Odds in YOUR Favor ” ArmorUP, L.P. dba BulletProofME • Phone: 512-922-1503 • 800-374-7029 armor@bulletproofme.com • www.bulletproofme.com 6705 Hwy. 290 West, Suite #502 • Austin, TX 78735 3-09-2013 PRO-FORMA INVOICE Page 1 of 2 Lisa D. Davis, C.P.M City of College Station Thank you for your inquiry. We look forward to working with you. For a minimum quantity of 60 sets of armor, we can quote as follows. Lead time to ship complete would be ~ 60 days from receipt of firm order. Quantity Ordered Qty. Shipped Description Unit Price $ Total Price $ 120 Level IV Stand-Alone Standard Ceramic Rifle Plate, 10" by 12", NIJ Certified, 0101.05 http://bulletproofme.com/RP-Level-4-Stand-Alone.html 112 13,440 60 Banshee Rifle Plates Carrier – NO CUMMERBUND, Black http://bulletproofme.com/Plate-Carriers.htm http://bulletproofme.com/Plate-Carriers.htm 108 6,480 60 POLICE Patches, 2 by 4” for Front, Velcro attached 6 360 60 POLICE Patches, 4 by 11” for Back, Velcro attached 6 360 60 Side Armor Patrol Bag, Padded main center compartment 20” x 11” x 9” http://www.unclemikesle.com/products/index.cfm?ClassID=9 &ClassCategoryID=10&FamilyID=296 43 2,580 Shipping, Handling & Insurance, FOB Destination 0 TOTAL Net 30 23,220 See Terms of Sale on Page 2 124 ArmorUP, L.P. dba BulletProofME.com Body Armor “Put the Odds in YOUR Favor ” ArmorUP, L.P. dba BulletProofME • Phone: 512-922-1503 • 800-374-7029 armor@bulletproofme.com • www.bulletproofme.com 6705 Hwy. 290 West, Suite #502 • Austin, TX 78735 TERMS OF SALE Page 2 of 2 • Net 30, subject to credit approval. Add 3.5% for any amounts paid by credit card. • FOB Destination. Quoted before shipping. • Sizes or lengths longer than standard may incur an upcharge. • Quote valid for 30 days. Goods in inventory subject to prior sale. • For quantity as noted. Any change in quantities must be requoted Legal Terms of Sale: http://www.bulletproofme.com/Legal_Terms_of_Sale.shtml WARNING: U.S. EXPORT CONTROL LAWS Level III and IV armor fall under the jurisdiction of the International Traffic in Arms Regulations (ITAR), and is subject to the export control laws of the U.S. Government. Export, or retransfer of Rifle Plates by any means to any foreign end user, or for any other end use, whether in the U.S. or abroad, without the written approval of the U.S. Department of State, is prohibited. See: http://www.pmddtc.state.gov Level III-A, Level II, and Level II-A vests often have an export license exemption for friendly countries, but may require a license to some countries from the Bureau of Industry & Security (BIS). Kevlar Helmets, Shields, Riot Shields, Faceshields, and other sensitive items generally require an export license from the BIS. See: http://www.bis.doc.gov/licensing/exportingbasics.htm Thanks, Nick Taylor Manager 125 March 28, 2013 Regular Agenda Item No. 1 Public Hearing and Consideration of Budget Amendment #2 To: Frank Simpson, Interim City Manager From: Jeff Kersten, Executive Director, Business Services Agenda Caption: Public Hearing, presentation, possible action, and discussion on an ordinance Budget Amendment #2 amending ordinance number 3443 which will amend the budget for the 2012-2013 Fiscal Year in the amount of $961,834; increase the number of regular full-time positions in the budget by two (2.0); and presentation, possible action and discussion on one interfund transfer. Recommendation(s): Staff recommends the City Council hold the public hearing on Budget Amendment #2 and approve the budget amendment ordinance and interfund transfer. Summary: The proposed budget amendment is to increase the appropriations for the items listed below by $961,834. Included in this amount is an interfund transfer for $50,000. The charter of the City of College Station provides for the City Council to amend the annual budget in the event there are revenues available to cover increased expenditures and after holding a public hearing on such budget amendment. A number of items have been identified that need to be considered in a budget amendment. Attached is a list of the items in the proposed budget amendment. Budget & Financial Summary: The City has resources or can reasonably expect resources to cover each of the appropriations in this budget amendment. The attached list has the complete description of the items included in the proposed budget amendment. Attachments: 1. Budget Amendment #2 Detail List, 2. Ordinance 126 FY13 Budget Amendment #2 Detail Listing 1 The proposed budget amendment is to increase the appropriations for the items listed below by $911,834. Also included is one interfund transfer in the amount of $50,000 and an increase by 2.0 to the overall number of full-time equivalent (FTE) personnel. Increases to personnel and interfund transfers require Council approval. 1. Police Department Personnel and Equipment Needs - $451,781 (budget amendment, 2.0 FTE’s) Additional Personnel - This item includes a proposed increase of 2.0 sworn Police Officer positions to the Police Department personnel. The addition of these positions will allow the department to meet optimal staffing levels needed for the Northgate Unit. The estimated cost of these officers is $190,867. Rifle Buy-Back Program - An analysis and review of the August 13th shooting has shown a need for additional equipment in the Police Department. The Police Department has identified the need to equip the sworn officers with patrol rifles (and requisite ammunition) and level III bulletproof vests. A number of officers have signed up to participate in a rifle buy-back program that will allow the officers to purchase a rifle through payroll-deduction with the City incurring the up-front cost of the purchase. The officer will then be able to take the weapon with them upon retirement or separation from the City. In addition, the department has identified the need to purchase level III bulletproof vest for the officers. Finally, the SWAT Team members need to be outfitted with new Ballistic Carriers and Plates and tactical vests. The combined total for these equipment purchases is approximately $199,467. These are the upfront costs for the City, a portion of which would be reimbursed by the officers through the buyback program over a period of a year. The estimated reimbursement total is $80,248. Grant Purchases – The Police Department has been awarded grant funds for the purchase of several items that were identified as needed by the department following the August 13th shooting. These include Self Aid/Buddy Aid Kits ($21,406), cameras ($9,083), an ATV and accessories ($13,429), and a payment to the City of Bryan for their assistance during the August 13th shooting ($3,784). Grant funds have also been awarded for various office supplies, vehicle supplies and computer software ($13,745). The cost of these items will be reimbursed with federal and state grant funds. Budget for these expenditures is available and will be appropriated in the General Fund Police Department budget. 2. Workers’ Compensation Claims Cost - $325,000 (budget amendment) Due to higher than projected claims cost in the Workers’ Compensation Fund, an additional budget amount of $325,000 is requested to cover the current and projected claims cost. The current budget is $175,000, and an increase of $325,000 would increase the FY13 budget for claims to $500,000. Current claims cost to date is over $216,000 with estimated ongoing claims costs. Funds are available in the Workers’ Compensation Fund balance for this appropriation. 3. Public Works Service Center Security Enhancement & Closed Circuit Monitoring - $66,959 (budget amendment) A risk assessment to review the security of all vehicle and equipment related assets in the Public Works Service Center and surrounding Fleet storage yard was recently conducted. This assessment concluded that additional security is needed at the facility and the surrounding area. Staff from Public Works, the Kids Klub and Extra Education programs associated with Parks and Recreation utilize the Public Works Operation Building for office space and meeting space. The security improvements include building access card reader controls ($49,940) for access doors and closed-circuit video monitoring of the surrounding parking areas and fuel area ($17,019). These upgrades are comparable to the security 127 FY13 Budget Amendment #2 Detail Listing 2 system installed in other City facilities. The contract for this item was approved by Council on February 28, 2013 (consent item 2d). Funds are available for this appropriation in the General Fund balance. 4. Education and Government Access (EG) funds for equipment replacement in the Council Chambers - $18,094 (budget amendment) Education and Government Access (EG) grant funds are collected in addition to the cable franchise fee in an amount equal to $0.15 per cable services customer per month. The City of College Station uses these funds for EG Channel(s) administered by City. Funds in the amount of $18,094 are requested for the replacement of twelve microphones and the replacement of failing Digital Signal Processors and amplifiers in the Council Chambers. EG funds have been collected and are available in the General Fund balance for this purchase. 5. Royder Road – Wellborn Service Plan – $50,000 (budget amendment) & $50,000 (interfund transfer) On February 14, 2013, Council approved a contract for the installation of a two course seal coat on McCullough Road, Live Oak Street, Madison Street, Church Street, and Royder Road in the Wellborn Area. The construction contract exceeded the amount budgeted for the project. The budget for this project originated from the General Fund as the project does not support the use of debt. This item will appropriate funds in the General Fund to be transferred to the Streets Capital Improvement Projects Fund for expenditure on the project. Budget for the expenditure in the Streets Capital Improvement Projects Fund will also be appropriated. 6. Replace Slinger Truck with Dump Truck – (No budget impact) This item is for the replacement of a slinger truck (vehicle # 9534) in the Wastewater Department with a dump truck. The useful life of the slinger truck has been surpassed and the truck now needs to be refurbished or replaced. Refurbishment is not recommended as it is nearly as costly as replacement. Furthermore, due to changes in how the Wastewater Department is now handling sludge, the replacement of the slinger truck with a dump truck is preferred. The cost of the dump truck is expected to be about half of the cost of a slinger truck. Budget for the purchase is available in the Equipment Replacement Fund as several vehicles that were included on the FY13 replacement schedule will not be replaced in FY13; so this item will not require an increase in budget. Rather, this item is for the authorization for the purchase the dump truck as it was not included on the FY13 replacement schedule. Funds for the purchase are available in the Equipment Replacement Fund balance. 128 129 March 28, 2013 Regular Agenda Item No. 2 4080 State Highway 6 South Rezoning To: Frank Simpson, Interim City Manager From: Bob Cowell, AICP, CNU-A, Executive Director of Planning & Development Services Agenda Caption: Public Hearing, presentation, possible action, and discussion regarding an amendment to Chapter 12, “Unified Development Ordinance”, Section 4.2, “Official Zoning Map” of the Code of Ordinances of the City of College Station, Texas by rezoning 7.547 acres located at 4080 State Highway 6 South from PDD Planned Development District to PDD Planned Development District to amend the Concept Plan. Relationship to Strategic Goals: Diverse Growing Economy Recommendation(s): The Planning and Zoning Commission considered this item at their March 7, 2013 meeting and voted 6-0 to recommend approval of the rezoning request with the modifications previously approved by City Council and the following conditions: allow a freestanding sign on State Highway 6 that is in accordance with General Commercial standards, allow a freestanding sign on Longmire Drive that is in accordance with Suburban Commercial standards, and not require streetscape trees if 21,000 landscape points are provided in Phase 1 of the development. Summary: This request is to revise the previously approved PDD Planned Development District to amend the Concept Plan. The Unified Development Ordinance provides the following review criteria for zoning map amendments: REVIEW CRITERIA 1. Consistency with the Comprehensive Plan: The subject tract is designated as Suburban Commercial on the Comprehensive Plan Future Land Use and Character Map. The proposed development is consistent with this designation in addition to the land use designations surrounding the subject tract which include Suburban Commercial and General Suburban. Phase 2 and 3 (closest to Longmire Drive) will allow neighborhood- compatible uses meeting Suburban Commercial and Office zoning districts that are compatible with the surrounding neighborhoods. 2. Compatibility of the proposed request with the present zoning and conforming uses of nearby property and with the character of the neighborhood: The proposed PDD will enable the development of Suburban Commercial and Office type uses, with the addition of a funeral home in Phase 1 closest to State Highway 6. The funeral home is more intense than typically appropriate for a Suburban Commercial land use designation, but the location and situation of this phase make the land use more suitable. The adjacent land uses are a self-storage complex with outdoor storage facilities and a construction office/design studio for residential construction. Both adjacent properties are zoned GC General Commercial, which does allow for the use of a funeral home. The portion of the proposed development that abuts residential uses will be restricted in both land use and height to ensure compatibility with the neighborhood. 130 3. Suitability of the property affected by the amendment for uses permitted by the district that would be made applicable by the proposed amendment: The proposed land uses permitted through the proposed PDD include those allowed in the SC Suburban Commercial district and O Office district. In addition, Phase 1, located adjacent to State Highway 6, will also include the ability to have a funeral home. This addition does not include the use of a crematorium. Generally funeral homes are not a neighborhood-oriented land use, but due to its proximity to State Highway 6 and the existing GC General Commercial land uses directly north and south, the use is suitable by adding additional architectural features to assist the structure in blending with the nearby residences. Phases 2 and 3 will include neighborhood-oriented commercial and office uses that will also have a residential-style of architecture. These land uses are suitable adjacent to single-family and are appropriate placed along Longmire Drive (Major Collector). 4. Suitability of the property affected by the amendment for uses permitted by the district applicable to the property at the time of the proposed amendment: The property is currently zoned PDD Planned Development District, which allows for the development of a funeral home in Phase 1 and Suburban Commercial and Office uses in Phases 2 and 3. The current zoning district is suitable for the property due to the close presence of State Highway 6 and Longmire Drive. In addition, the property is located between two existing commercial sites and a vacant property zoned for commercial uses. 5. Marketability of the property affected by the amendment for uses permitted by the district applicable to the property at the time of the proposed amendment: The property can currently be marketed under the existing PDD Planned Development District zoning. However, the applicant is requesting a modification to increase the maximum size of buildings in order to prepare for anticipated future expansion. 6. Availability of water, wastewater, stormwater, and transportation facilities generally suitable and adequate for the proposed use: When the proposed development proceeds through the platting process, 3.5-feet of right-of-way (ROW) dedication will be required along Longmire Drive in order for the site to be in compliance with the Thoroughfare Plan. A proposed driveway to State Highway 6 would need approval from the Texas Department of Transportation. There are existing 8-inch and 24-inch water mains available to serve this property. There are also existing 8-inch sanitary sewer lines which may provide service to the site. Drainage is mainly to the southeast within the Lick Creek Drainage Basin. Drainage and other infrastructure required with site development shall be designed and constructed in accordance with the BCS Unified Design Guidelines. Existing infrastructure appears to be adequate for the proposed use. Access to the site will be available via the State Highway 6 Frontage Road and Longmire Drive. REVIEW OF CONCEPT PLAN The applicant has provided the following information related to the purpose and intent of the proposed zoning district: “The purpose of the PDD is to allow the development of the subject property in accordance with the City’s Comprehensive Plan providing commercial activities along the Earl Rudder Freeway frontage and stepping down commercial development intensity closer to Longmire Drive and the residential neighborhoods.” 131 The proposed Concept Plan includes uses permitted through SC Suburban Commercial for Phases 1 and 2 and O Office for Phase 3. Crematoriums, fuel sales, and commercial amusements are expressly prohibited. The estimated building plot square footage is 50,000 with maximum building sizes of 15,000 square feet for Phase 1, 8,000 square feet for Phase 2, and 6,000 square feet for Phase 3. The maximum building height is two stories and a 24-foot eave height for a two story structure and the overall height maximum is 35-feet to the peak of the roof. Base Zoning and Meritorious Modifications The applicant is proposing to develop the PDD in three phase areas. Phase 1 shown on the Concept Plan is based on SC Suburban Commercial standards and uses and will allow the additional land use of a funeral home. Phase 2 is based on SC Suburban Commercial standards and uses. For both Phase 1 and 2 commercial amusements, fuel sales, and crematoriums are prohibited. Phase 3 is based on O Office standards and uses. At the time of plat and site plan, the project will need to meet all applicable site development standards and platting requirements of the UDO for the SC Suburban Commercial and O Office zoning classifications, except where meritorious modifications are granted with the PDD zoning. The applicant is requesting the following meritorious modifications: 1. UDO Section 7.6.D.1-2 “Streetscape Requirements” - Longmire Street trees are required to be located within 50 feet of a public right-of-way. On the subject tract, overhead power lines interfere with this requirement causing the applicant to seek the meritorious modification. The request is to increase the allowable distance from the Longmire Drive right-of-way up to 60 feet. Council approved this modification with the previous PDD rezoning. 2. UDO Section 7.6.D.1-2 “Streetscape Requirements” – Phase 1 Street trees are required to be located within 50 feet of a public right-of-way. For Phase 1, the applicant is requesting streetscape trees be distributed throughout Phase 1 as designed by a registered landscape architect with the condition that the site contain a minimum of 21,000 landscaping points. This is a new modification being requested through this PDD rezoning. 3. UDO Section 8.3.G.2 “Blocks” According to subdivision regulations, block lengths over 900 linear feet must be broken along a street that abuts land designated as Suburban Commercial in the Comprehensive Plan Future Land Use and Character Map. Block length is required to be broken by the extension of a public street or a public way. The applicant is requesting modification of this requirement for both State Highway 6 and Longmire Drive. The applicant is proposing an alternate connection between the rights-of-way through their private parking lots. This connection will be provided through a private cross access easement and will be determined at platting or site plan submittal. This drive is proposed for construction with Phase 1. Council approved this modification with the previous PDD rezoning. 4. UDO Section 8.3.E.3 “Street Projections” When a property is platted that abuts other unplatted tracts, the property is required to project a public street or Pubic Way to the tracts to enable future vehicular connections. The subject property abuts unplatted tracts on its northern side that are not conducive to a new public connection particularly if a public street or public 132 way is not being extended through the tract. Council approved this modification with the previous PDD rezoning. 5. UDO Section 7.5 “Signs” Signs are permitted according to the applicable zoning districts in order to promote an attractive community, foster traffic safety, and enhance the effective communication and exchange of ideas and commercial information. In lieu of signage allowed under SC Suburban Commercial standards, the applicant is requesting modifications to sign allowances for the 7.5 acre property. The proposal includes one freestanding sign oriented to State Highway 6 in accordance with GC General Commercial standards and one freestanding sign oriented to Longmire Drive in accordance with SC Suburban Commercial standards (the maximum height of the sign may not exceed the eave height of the structure to which it most closely relates and the sign must be adjacent to and orient to the freeway). This is a new modification being requested through this PDD rezoning. The Unified Development Ordinance provides the following review criteria for PDD Concept Plans: 1. The proposal will constitute an environment of sustained stability and will be in harmony with the character of the surrounding area: The proposed development will consist of structures that are compatible with the surrounding neighborhoods by using materials commonly used within the residential area. Under the SC Suburban Commercial zoning district each building is required by ordinance to provide architectural relief elements. The proposed land uses being neighborhood-oriented, with the exception of a funeral home, will provide a variety of land uses within an easy distance to nearby residential units for vehicle and pedestrian traffic. The proposal will be in harmony with the character of the surrounding area as presented. 2. The proposal is in conformity with the policies, goals, and objectives of the Comprehensive Plan, and any subsequently adopted Plans, and will be consistent with the intent and purpose of this Section: The Concept Plan reflects the policies, goals and objectives of the Comprehensive Plan as it relates to land use and character, connectivity, and neighborhood integrity. The Suburban Commercial designation in the Comprehensive Plan Future Land Use and Character Map is intended for development that is compatible with surrounding residential uses, as proposed with this PDD. Upon platting, the subject property will be required to provide additional right-of-way along Longmire Drive in order to comply with the Thoroughfare Plan. In addition, several components are proposed to promote and protect neighborhood integrity: a) Buildings within Phase 1 will have 35-percent masonry (stone, brick, tile, or a concrete product simulating one of these materials) on the primary entrance façade and 15- to 20-percent on other facades visible from a right-of-way. No percentages have been specified for Phases 2 and 3. There are increased minimum percentages from Non - Residential Architectural Standards which require 25-percent on façades facing a right- of-way and 10-percent on all other facades visibl e from a right-of-way. b) The dumpster will be located away from residential uses. c) Maximum building height is 2 stories and 24-foot eave height for a 2 story structure. Overall height maximum is 35-feet to the peak of the roof. 3. The proposal is compatible with existing or permitted uses on abutting sites and will not adversely affect adjacent development: The proposed land use with the addition of some compatibility components is consistent with the level of development 133 occurring in the immediate vicinity. The development abutting State Highway 6 on the northern and southern sides include self storage and office. Development has not occurred on the northern side of the subject tract on the Longmire Drive side, though this area is zoned O Office and GC General Commercial. As proposed, the Suburban Commercial and Office uses will be compatible adjacent to the abutting single-family residences and add a variety of land uses in the area which increases the interest and versatility of the area. 4. Every dwelling unit need not front on a public street but shall have access to a public street directly or via a court, walkway, public area, or area owned by a homeowners association: There are no residential uses proposed for this development. 6. The development includes provision of adequate public improvements, including, but not limited to, parks, schools, and other public facilities: The development includes a proposed Access Way, which will be dedicated during the platting process. The applicant is proposing the sidewalk within the Access Way be constructed with Phase 1. A public sidewalk currently exists along Longmire Drive. Private cross access will be provided for traffic to go between each phase of development and to adjacent properties. In addition, right-of-way will be dedicated along Longmire Drive when the applicable phases are platted. Meritorious modifications are being requested for street projections. 7. The development will not be detrimental to the public health, safety, welfare, or materially injurious to properties or improvements in the vicinity: This development will not be detrimental to the public health, safety, welfare, or materially injurious to properties or improvements in the vicinity as proposed. 8. The development will not adversely affect the safety and convenience of vehicular, bicycle, or pedestrian circulation in the vicinity, including traffic reasonably expected to be generated by the proposed use and other uses reasonably anticipated in the area considering existing zoning and land uses in the area: The dedication of an Access Way, applicable when platted, will provide pedestrian and bicycle accommodations through the subject tract which would also be accommodated through the provision of the required public street/Public Way. A vehicular access point may be accommodated on State Highway 6 through the use of a deceleration lane. Budget & Financial Summary: N/A Reviewed and Approved by Legal: Yes Attachments: 1. Background Information 2. Aerial & Small Area Map (SAM) 3. Rezoning Map 4. Concept Plan 5. Ordinance 134 BACKGROUND INFORMATION NOTIFICATIONS Advertised Commission Hearing Date: March 7, 2013 Advertised Council Hearing Dates: March 28, 2013 The following neighborhood organizations that are registered with the City of College Station’s Neighborhood Services have received a courtesy letter of notification of this public hearing: Springbrook HOA and Bridle Gate Estates HOA Property owner notices mailed: 22 Contacts in support: None Contacts in opposition: 1 Inquiry contacts: 2 ADJACENT LAND USES Direction Comprehensive Plan Zoning Land Use North Suburban Commercial GC General Commercial Self Storage South Suburban Commercial and General Suburban R-1 Single-Family Residential and GC General Commercial Single-Family and Office East (across SH 6) General Commercial GC General Commercial Office West (across Longmire Drive) Suburban Commercial R-1 Single-Family Residential Single-Family DEVELOPMENT HISTORY Annexation: October 1983 Zoning: A-O Agricultural-Open upon annexation PDD Planned Development District in July 2012 Final Plat: Unplatted Site development: Vacant 135 136 137 March 7, 2013 P&Z Regular Meeting Minutes Page 1 of 2 PLANNING & ZONING COMMISSION MINUTES Regular Meeting March 7, 2013, 7:00 p.m. City Hall Council Chambers College Station, Texas COMMISSIONERS PRESENT: Mike Ashfield, Jodi Warner, Jim Ross, Vergel Gay, Brad Corrier, and Bo Miles COMMISSIONERS ABSENT: Jerome Rektorik CITY COUNCIL MEMBERS PRESENT: None CITY STAFF PRESENT: Bob Cowell, Alan Gibbs, Jason Schubert, Matt Robinson, Teresa Rogers, Joe Guerra, Carla Robinson, Jennifer Pate, and Brittany Caldwell 1. Chairman Ashfield called the meeting to order at 7:00 p.m. Call Meeting to Order 6. Public hearing, presentation, discussion, and possible action regarding an amendment to Chapter 12, “Unified Development Ordinance”, Section 4.2, “Official Zoning Map” of the Code of Ordinances of the City of College Station, Texas by rezoning approximately 7.5 acres located at 4080 State Highway 6 South from PDD Planned Development District to PDD Planned Development District, with amendments to the previously approved concept plan. Case # 13-00900020 (T. Rogers) Regular Agenda Staff Planner Rogers presented the rezoning and recommended approval with the condition the rezoning maintain compliance with the base zoning district standards for all building plot signage, for streetscaping along State Highway 6, and for construction of the Access Way with Phase 2 of the development. There was general discussion amongst the Commission and Staff regarding the proposed modifications. Natalie Ruiz, IPS Group, gave a presentation regarding the applicant’s proposed changes to the previously approved concept plan. Chairman Ashfield opened the public hearing. Gary Ives, President of Springbrook HOA, stated there were some members that had strong concern about the development, but the HOA did not take a position on the rezoning. 138 March 7, 2013 P&Z Regular Meeting Minutes Page 2 of 2 Lin Jun-Chih Gisela, 3904 Puffin Way, College Station, Texas, spoke in opposition to the rezoning. Chairman Ashfield closed the public hearing. There was general discussion amongst the Commission and the applicant regarding the modifications. Chairman Ashfield motioned to recommend approval of the rezoning and the previously modifications approved by City Council with the addition of the following: allow a freestanding sign on State Highway 6 that is in accordance with General Commercial, allow a freestanding sign on Longmire Drive that is in accordance with Suburban Commercial, and allow the applicant’s request to move the streetscaping by requiring that 21,000 landscape points be provided in Phase 1. Commissioner Warner seconded the motion, motion passed (6-0). 8. Adjourn. The meeting was adjourned at 8:08 p.m. 139 140 141 142 143 144 145 146 147 148 149 March 28, 2013 Regular Agenda Item No. 3 Right-of-Way Abandonment College Heights, Block B, Lots 3-6 & 7-10 To: Frank Simpson, Interim City Manager From: Bob Cowell, AICP, CNU-A, Executive Director - Planning & Development Services Agenda Caption: Public Hearing, presentation, possible action, and discussion approving an ordinance vacating and abandoning a 0.10 acre right-of-way, which is located on Lots 3- 10 of Block B of the College Heights Subdivision according to the plat recorded in Volume 7623, Page 231 of the Deed Records of Brazos County, Texas. Relationship to Strategic Initiatives: Core Services and Infrastructure, and a Diverse Growing Economy Recommendation(s): Staff recommends approval of the ordinance. Summary: This right-of-way abandonment eliminates an unimproved section of alley which has no access to a public right-of-way. Another portion of the alley had been abandoned previously, creating an island section of right-of-way with no access from a public right-of-way. There is a public sanitary sewer line in the subject portion of right-of- way to be abandoned. As a condition of this abandonment, an easement will need to be maintained with this ordinance. The 0.10 acre, 15-foot wide unimproved public alley to be abandoned is located on Lots 3- 10 of Block B of the College Heights Subdivision according to the plat recorded in Volume 7623, Page 231 of the Deed Records of Brazos County, Texas. Budget & Financial Summary: N/A Attachments: 1. Attachment 1 - Vicinity Map 2. Attachment 2 - Location Map 3. Attachment 3 - Ordinance - Ordinance Exhibit "A" (Metes and Bounds) 4. Application for Abandonment (On file at the City Engineer’s Office) 150 Proposed ROW AbandonmentDOMINIK DRIVEFRANCIS DRIVEHARVEY ROADTEXAS AVENUELINCOLN AVENUEMUNSON AVENUEPARK PLACEUNIVERSITY DRIVESPRING LOOPMANUEL DRIVEUNIVERSITY DRIVE EASTPURYEAR DRIVEUNIVERSITY OAKS BOULEVARDFOSTER AVENUEGEORGE BUSH DRIVETEXAS AVENUE SOUTHASHBURN AVENUEMILNER DRIVEHOLLEMAN DRIVE EASTGLENHAVEN DRIVERICHARDS STREETW ELLBO RN RDDARTMOUTH STREETSTERLING STREETCHURCH AVENUETARROW STREETREDMOND DRIVEBIZZELL STREETPOLO ROADHENSEL DRIVEFRONT STREETNEW MAIN DRIVENAGLE STREETCORNELL DRIVECOONER STREETBERKELEY STREETLEWIS STREETCO KE STREETHOLIK STREETGEORGE BUSH DRIVE EASTTHRO CKM O RTO N STWESTOVER STREETMOORE AVENUEFRO N TAG E 6 R O AD W ESTRAMPHARDWOOD LANEALLEYSTASNEY STREETLUBBOCK STREETCHIMNEY HILL DRIVEHALTOM AVENUENICOLAS AVENUEROSS STREETJONES STREETHOLT STREETLAMAR STREETTIMBER STREETCOLLEGE AVENUESPENCE STREEETROSE CIRCLEIRELAND STREETINLOW BOULEVARDMEADOWLAND STREETASBURY STREETATHENS DRIVESHADY DRIVEJAMES PARKWAYOLD MAIN DRIVEMERRY OAKS DRIVEMILAM AVENUENEAL PICKETT DRIVEVILLAGE DRIVEMILLIFF ROADCLARK STREETT A R R O W S T R E E T E A S T WOLF RUNCREST STREETMAGNOLIA DRIVEMOSS STREETWOODHAVEN CIRCLEAURORA COURTBIZZELL STREETALLEYRAMPBIZZELL STREETMERRY OAKS DRIVE[VICINITY MAP151 $1!(!(!(!(!(!(!!!!!!!!!!!!!(!(!(!(!(!(!(!(!(!(!(!(G!.G!.0.10 Acre Alley Abandonment15' PUE to Remain6"1"2"6"6"2"6"1"6"1"6"2"6"6"1"6"6"6"6"1"2"8"6"4"12"4"6"4"6"6"6"12"6"6"8"8"6"6"6"6"6"O33A2C010NIMITZ STREETEISENHOWER STREETUNIVERSITY DRIVE EASTCOONER STREET6"12[LOCATION MAP152 153 154 155 156