Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
12/21/2017 - Agenda Packet - Planning & Zoning Commission
Planning and Zoning Commission Workshop College Station, TX Meeting Agenda - Final City Hall 1101 Texas Ave College Station, TX 77840 The City Council may or may not attend the Planning & Zoning Commission Workshop Meeting. City Hall Council Chambers6:00 PMThursday, December 21, 2017 1. Call the meeting to order. 2. Discussion of consent and regular agenda items. 3. Discussion of new development applications submitted to the City. New Development Link: www.cstx.gov/newdev Discussion of Minor and Amending Plats approved by Staff. *Final Plat ~ Minor Replat ~ L.O. Ball Memorial Subdivision Phase 2 Block 3, Lot 8R and 9R ~ Case #FPCO2017-000015 *Final Plat ~ Minor Replat ~ CSISD Greens Prairie Subdivision Block 1, Lot 1R ~ Case #FPCO2017-000016 17-07514. Sponsors:Broadnax and Paz Presentation, possible action, and discussion regarding the consideration of the 2017 P&Z Plan of Work. 17-07645. Sponsors:Golbabai 2017 Plan of WorkAttachments: Presentation, possible action, and discussion regarding non -residential landscaping as described in the 2017 P&Z Plan of Work. 17-07576. Sponsors:Lazo Memo - landscapingAttachments: Presentation, possible action, and discussion regarding an overview of current community notification requirements and practices for cases involving a public hearing as identified in the 2017 P&Z Plan of Work. 17-07427. Sponsors:Simms Memo Required Public Notices Required Hearings and Reviewing Body Attachments: Presentation, possible action, and discussion regarding the P&Z Calendar of Upcoming Meetings: *Thursday, January 4, 2017 ~ P&Z Meeting ~ Council Chambers ~ 17-07528. Page 1 College Station, TX Printed on 12/15/2017 December 21, 2017Planning and Zoning Commission Workshop Meeting Agenda - Final Workshop 6:00 p.m. and Regular 7:00 p.m. *Thursday, January 11, 2017 ~ City Council Meeting ~ Council Chambers ~ Workshop 4:00 p.m. and Regular 6:00 p.m. (Liaison - Kee) Presentation, possible action, and discussion regarding an update on the following items: *A Comprehensive Plan Amendment for approximately 11 acres located at 8822 Burgess Lane from Business Park to Urban. The Planning & Zoning Commission heard this item on November 16, 2017, and voted (6-0) to recommend approval. The City Council heard this item on December 14, 2017, and voted (5-2) to approve the request. *A Rezoning for approximately 11 acres located at 8822 Burgess Lane from PDD Planned Development District and R Rural to PDD Planned Development District. The Planning & Zoning Commission heard this item on November 16, 2017, and voted (6-0) to recommend approval. The City Council heard this item on December 14, 2017, and voted (5-2) to approve the request with a condition. *A Rezoning for approximately 2.2 acres located at 3747 Rock Prairie Road West from PDD Planned Development District to PDD Planned Development District. The Planning & Zoning Commission heard this item on November 16, 2017, and voted (6-0) to recommend approval. The City Council heard this item on December 14, 2017, and voted (7-0) to approve the request. *An Ordinance Amending the review authority and processing of preliminary plans. The Planning & Zoning Commission heard this item on November 16, 2017, and voted (6-0) to recommend approval. The City Council heard this item on December 14, 2017, and voted (7-0) to approve the request. 17-07539. 10. Discussion, review and possible action regarding the following meetings: Design Review Board, BioCorridor Board. 11. Discussion and possible action on future agenda items - A Planning & Zoning Member may inquire about a subject for which notice has not been given. A statement of specific factual information or the recitation of existing policy may be given. Any deliberation shall be limited to a proposal to place the subject on an agenda for a subsequent meeting. 12. Adjourn. The Commission may adjourn into Executive Session to consider any item listed on this agenda if a matter is raised that is appropriate for Executive Session discussion. An announcement will be made of the basis for the Executive Session discussion. I certify that the above Notice of Meeting was posted at College Station City Hall, 1101 Texas Avenue, College Station, Texas, on December 15, 2017 at 5:00 p.m. Page 2 College Station, TX Printed on 12/15/2017 December 21, 2017Planning and Zoning Commission Workshop Meeting Agenda - Final _____________________ City Secretary This building is wheelchair accessible. Persons with disabilities who plan to attend this meeting and who may need accommodations, auxiliary aids, or services such as interpreters, readers, or large print are asked to contact the City Secretary ’s Office at (979) 764-3541, TDD at 1-800-735-2989, or email adaassistance@cstx .gov at least two business days prior to the meeting so that appropriate arrangements can be made. If the City does not receive notification at least two business days prior to the meeting, the City will make a reasonable attempt to provide the necessary accommodations. Penal Code § 30.07. Trespass by License Holder with an Openly Carried Handgun. "Pursuant to Section 30.07, Penal Code (Trespass by License Holder with an Openly Carried Handgun) A Person Licensed under Subchapter H, Chapter 411, Government Code (Handgun Licensing Law), may not enter this Property with a Handgun that is Carried Openly." Codigo Penal § 30.07. Traspasar Portando Armas de Mano al Aire Libre con Licencia. “Conforme a la Seccion 30.07 del codigo penal (traspasar portando armas de mano al aire libre con licencia), personas con licencia bajo del Sub-Capitulo H, Capitulo 411, Codigo de Gobierno (Ley de licencias de arma de mano), no deben entrar a esta propiedad portando arma de mano al aire libre.” Page 3 College Station, TX Printed on 12/15/2017 Page 1 of 6 2017 Planning & Zoning Commission Plan of Work Comprehensive Plan Items Implementation of Adopted Plans Summary: Implementation of adopted master plans and neighborhood, district, and corridor plans, namely: Central College Station, Eastgate, Southside Area, Wellborn Community, and South Knoll Area neighborhood plans, and Bicycle, Pedestrian & Greenways, Parks and Recreation, Water, Waste Water, Medical District, and Economic Development master plans. Project Dates: 12/21/2017: Presentation of UDO & Comp Plan Annual Review (JP & LH) Staff Assigned: P&DS Staff Anticipated Completion: On-Going Thoroughfare Plan Update Summary: Project Dates: The Metropolitan Planning Organization (MPO) is in the process of updating its Concept Map for the BCS region. Once adopted by the MPO, the city is anticipating taking action to amend the Thoroughfare Plan to align with the changes in the MPO’s regional Concept Map. 06/15/17: Provide an update on the BCS Thoroughfare Concept Map as adopted by the MPO and provide information on the City’s next steps to amend the current Thoroughfare Master Plan. Presentation at P&Z Workshop. (JS) 11/16/17: Presentation of ordinance amendment aligning the City’s Thoroughfare Plan with the adopted MPO Plan. 11/16/17: Workshop presentation on thoroughfare classifications. 11/20/17: City Council adopts ordinance amendment aligning the City’s Thoroughfare Plan with the adopted MPO Plan. Staff Assigned: Jason Schubert Completed: November 20, 2017 Bicycle, Pedestrian and Greenways Master Plan Update Summary: Bring additional updates to the Planning and Zoning Commission as the Master Plan update moves forward. Project Dates: Staff Assigned: Venessa Garza Anticipated Completion: Winter 2018 Page 2 of 6 Neighborhood Integrity Items *Traffic Calming Toolkit Summary: Receive information regarding the current traffic calming policy and devices (speed pillows, etc.), and including updates as recommended by the Council Transportation and Mobility Committee. Additionally receive update on the implementation of the neighborhood parking toolbox created by the Neighborhood Transportation Task Force. Project Dates: 2/15/17: Anticipated presentation on consultant’s research on best practices in traffic calming and proposed modifications to College Station’s traffic calming toolkit. Staff Assigned: Troy Rother & Jason Schubert Anticipated Completion: February 15, 2018 Student Housing in Established Single-Family Neighborhoods Summary: Research best practices from peer university communities regarding the management of student housing in single-family neighborhoods. Explore the possibility of expanding options for Neighborhood Conservation Overlay (NCO), mitigate the impacts to on-street parking and drainage and provide educational opportunities for Homeowner’s Associations and Neighborhood Associations Project Dates: 4/20/17: Follow up discussion regarding the presentation on student housing in established single-family neighborhoods. 8/17/17: Presentation on Neighborhood Services (Barbara Moore) 10/19/17: P&Z presentation on student housing in established single-family neighborhoods. 11/9/17: City Council presentation on student housing in established single-family neighborhoods. Staff Assigned: Jenifer Paz, Rachel Lazo & Jade Broadnax Completed: November 9, 2017 UDO Regulatory Items Update on Off-Street Parking Requirements Summary: Provide options to allow flexibility to off-street parking requirements. Receive direction on future UDO text amendments. Project Dates: 5/4/17: Additional presentation and discussion on potential amendments or additions to the City’s current off-street parking requirements. 8/3/2017: Presentation of Draft UDO Amendments to 12-7.3 Off-Street Parking Requirements. 8/24/2017: UDO Amendments to 12-7.3 Off- Street Parking Requirements adopted by City Council. Staff Assigned: Justin Golbabai Completed: August 24, 2017 Page 3 of 6 Evaluation of UDO Regulations Summary: Project Dates: Review UDO requirements that add minimal value as identified by staff and consider opportunities to reduce regulations and streamline processes. 06/01/17 Presentation of staff's initial list of identified opportunities to reduce regulations and streamline processes. 06/15/2017: Comprehensive Plans and Rezoning staff reports revised to new coversheet format. 7/6/2017: Presentation of Draft UDO Amendments to eliminate certain screening requirements and eliminate the visual treatment for exposed concrete. 7/27/17: City Council adopts ordinance amendment to eliminate certain screening requirements and eliminate the visual treatment for exposed concrete. 8/3/2017: Presentation of Draft UDO Amendment on Off-Street Parking Requirements which includes the elimination of large parking lot concepts and allowing laydown curbs adjacent to buildings. Also, Preliminary Plan and Final Plat staff reports revised to new abbreviated format. 8/24/2017: The elimination of large parking lot concepts, allowing laydown curbs adjacent to buildings, and adopted by City Council as part of revisions to the parking ordinances. 8/30/17: Public meeting held for feedback on staff proposals regarding Preliminary Plans and Non- Conformities. 9/11/17: City Council adopted ordinance amendment increasing discretion granted to staff regarding requirements for easements. Provides flexibility to the requirement for 20-foot PUEs at the rear of all lots. 9/21/17: Presentation on staff’s initial ideas and public feedback for UDO amendments for changes to the preliminary plan process and requirements for non-conforming properties. 11/16/17: P&Z Presentation of ordinance amendments for preliminary plans and non- conformities. 12/21/17: P&Z presentation with revisions to staff’s non-conformities UDO recommendation. 1/18/17: Anticipated ordinance amendment presentations on streamlining NRA requirements, streamlining rezoning and comprehensive plan review criteria, eliminating the Krenek Tap Overlay, and no longer requiring site plans in Wolf Pen Creek to be reviewed by the Design Review Board. Staff Assigned: Justin Golbabai Anticipated Initiation: June 1, 2017 Page 4 of 6 Sign Ordinance Revisions Summary: Review and update the City’s sign ordinance in light of the recent Supreme Court decision regarding sign regulations based upon content. Project Dates: Staff Assigned: Molly Hitchcock, Rachel Lazo & Legal Anticipated Completion: Winter 2018 Suburban Commercial Land Use and Zoning Summary: Under City Council direction, review current Comprehensive Plan land use description and zoning ordinance requirements of the Suburban Commercial zoning district and provide options for future text amendments. Project Dates: 8/30/17: Public meeting held for feedback on staff proposals regarding options for the Suburban Commercial zoning district. 10/5/17: P&Z presentation on staff’s initial ideas and public feedback for changes to the Suburban Commercial zoning district. 11/9/17: City Council presentation on staff’s initial ideas and public feedback for changes to the Suburban Commercial zoning district. Staff Assigned: Madison Thomas, Jenifer Paz, Alaina Helton Completed: November 9, 2017 Bicycle Rack Standards Summary: Under City Council direction, review current non- residential parking requirements for providing on- site bicycle parking facilities. Project Dates: 9/5/17: Presentation to the Bicycle, Pedestrian, and Greenways Advisory Board on current bicycle parking requirements and staff’s recommended revisions. 9/7/17: Presentation to Planning and Zoning Commission on current bicycle parking requirements and staff’s recommended revisions. 11/16/17: Follow-up presentation on bicycle parking requirements. 11/20/17: City Council presentation on bicycle parking requirements. 1/18/17: Anticipated ordinance amendment presentations revising bicycle rack requirements. Staff Assigned: Alaina Helton & Madison Thomas Anticipated Completion: February 2017 Page 5 of 6 Non-Residential Landscaping Requirements Summary: Review current city landscaping requirements (including streetscaping and buffer standards) and the water usage needed to maintain current landscaping requirements. Explore options for water-conserving landscaping. Project Dates: 8/30/17: Public meeting held for feedback on staff proposals regarding options for the Suburban Commercial zoning district. 9/21/17: Presentation on staff’s initial ideas and the public feedback on those ideas regarding non-residential landscaping requirements. 12/21/17: Presentation on proposed revisions to the non-residential landscaping requirements. Staff Assigned: Rachel Lazo, Madison Thomas, Jade Broadnax Anticipated Completion: December 2017 On-Going Items Economic Development Updates Summary: Receive regular updates from the Economic Development Department regarding the vision and implementation of the commercialization of TAMU research-related output, including examples of successful efforts elsewhere. Additionally, receive an update on the recent announcement regarding plans for the TAMU System Rellis Campus revitalization effort. Project Dates: 06/15/17: Presentation of a quarterly update on Economic Development efforts and land availability for commercial uses. Presentation at P&Z Workshop. (NR) 12/7/17: Planned presentation of a quarterly update on Economic Development efforts and land availability for commercial uses. Presentation at P&Z Workshop. (NR) Staff Assigned: Economic Development Anticipated Completion: On-Going Semi-Annual Review of Pre-Application Conference Surveys Summary: Provide an update on the survey results from the Pre-Application Conference process. Project Dates: 3/16/17: Provided an update on the status of the PAC meeting process and implementation of the PAC survey. Presentation at P&Z Workshop. (MB) 12/7/17: Provided an update on the status of the PAC meeting process and implementation of the PAC survey. (JG) Staff Assigned: Justin Golbabai Anticipated Completion: On-Going Educational/Informational Items Parkland Dedication Summary: Review of parkland dedication requirements and available resources. Project Dates: 7/6/17: Staff presented information regarding parkland dedication requirements and summary or parks and greenways master plan. Staff Assigned: Jenifer Paz Completed: July 6, 2017 Page 6 of 6 Sidewalk Fee-in-Lieu Summary: Review of sidewalk fund requirements and available resources. Project Dates: 9/21/17: Staff presenting information regarding sidewalk fund requirements and available resources. Staff Assigned: Lauren Hovde & Rachel Lazo Completed: September 21, 2017 Block Length and Block Perimeter Summary: Review of current requirements regarding block length and block perimeter. Project Dates: 8/3/2017: Presentation of a review of current requirements regarding block length and block perimeter. Follow-up presentation requested for staff proposed amendments to this section. Staff Assigned: Justin Golbabai & Jason Schubert Completed: August 3, 2017 Public Hearing Notifications Summary: Review current community notification requirements and practices for cases involving a public hearing. Project Dates: 12/21/17: Staff presentation regarding current community notification requirements and practices for cases involving a public hearing. Staff Assigned: Lance Simms Anticipated Completion: December 21, 2017 Mueller Report Update Summary: Update on the implementation of the 2013 Organizational Review of P&DS (AKA “Mueller Report”) Project Dates: 07/20/17: Presentation of an update on the implementation of the Mueller Report. Staff Assigned: Lance Simms Completed: July 20, 2017 Review of Development Fees Summary: Evaluation of the effect of development fees on the price of single family housing to the homeowner and an overview of the financial context of development fees for the City. Project Dates: Staff Assigned: Justin Golbabai & Alaina Helton Anticipated Completion: Spring 2018 MEMORANDUM December 15, 2017 TO: Members of the Planning & Zoning Commission FROM: Rachel Lazo, Staff Planner rlazo@cstx.gov SUBJECT: Proposed Revisions to Non-Residential Landscaping Standards Item: Presentation, discussion and possible action regarding non-residential landscaping standards. Background: As part of the 2017 Plan of Work, City Council and Planning and Zoning Commission directed staff to review current city landscaping requirements, including streetscaping and buffer standards, and the water usage needed to maintain current landscaping requirements. Staff was also directed to explore options for water-conserving landscaping. Staff received feedback from stakeholders in the development community, neighborhood associations, and the general public on this item through two public meetings held in a “come and go” format on August 30th. On September 21st, Planning and Zoning Commission heard the results of this meeting and endorsed staff’s general recommendations at the time. Staff has further developed the specifics of this proposal and will now be seeking the Planning and Zoning Commission’s direction on the following: Encouraging drought tolerant irrigation by increasing point credit from 10 percent to 20 percent for water-conserving irrigation systems. Providing an extra 50 percent increase in landscaping points for Texas native plants. Incentivizing the retention of older/larger trees by doubling the point values for each protected tree. Creating administrative flexibility to waive buffer requirements adjacent to common area, and exempting buffers adjacent to FEMA 100-year floodplain. Allowing Staff to adjust buffer width up to 5 feet if providing above and beyond minimum requirements for screening. Removing the double landscape point requirements for building plots over 15 acres. Removing the heightened 2.5-inch caliper tree requirement for building plots over 15 acres and allow these sites to meet the 2-inch caliper tree requirement of other sites. Providing water conserving landscaping options, such as xeriscaping in lieu of sod. Requiring buffer by developed/proposed use instead of by zoning district. This item is currently scheduled to be heard by City Council on Thursday, January 11th, 2018. 1101 Texas Avenue South, PO Box 9960 College Station, Texas 77842 Phone 979.764.3570 / Fax 979.764.3496 MEMORANDUM DATE: December 21, 2017 TO: Planning & Zoning Commission FROM: Lance Simms, Director of Planning & Development Services SUBJECT: Public Hearing Notifications Item Presentation, possible action, and discussion regarding an overview of current community notification requirements and practices for cases involving a public hearing as identified in the 2017 Planning & Zoning Commission’s Plan of Work. Background This item is included in the 2017 Planning & Zoning Commission’s Plan of Work. Under “educational/informational items”, the Commission’s Plan of Work states, “Review current community notification requirements and practices for cases involving a public hearing”. The purpose of this memorandum is to provide an overview of the types of public hearing notifications provided by the City, whether required or discretionary. Required Notifications When an item requiring a public hearing is to be considered by the Planning & Zoning Commission, the City is legally required to: Post the meeting agenda on the City’s official website Post the meeting agenda at City Hall at least 72 hours before the meeting Publishing a notice in The Eagle at least 15 days prior to the meeting; and, Mail a notice to property owners within 200 feet of the parcel under consideration at least 15 days prior to the meeting (applies to rezonings, conditional use permits, and certain replats). At a minimum, the Unified Development Ordinance (UDO) requires that published and mailed notices provide: The general location of the land that is the subject of the application; The substance of the application, including the magnitude of proposed development and the current zoning district; P&Z Memo – Pg. 2 The time, date, and location of the public hearing; and A phone number to contact the City Discretionary/Courtesy Notifications Based on past direction from the City Council, Staff also provides public hearing notifications that exceed the UDO requirements. For example, in addition to the notifications outlined above, registered homeowner/neighborhood associations are notified of rezoning requests when the parcel under consideration is located nearby. Also, as a standard practice, Staff places public hearing signs on the parcel under consideration. The sign provides the Planning & Development Services’ contact information and the type of case being considered (e.g., comprehensive plan amendment, rezoning, variance, or replat). Neighborhood Meetings Finally, Staff also encourages applicants to proactively reach out to adjacent neighborhoods and host an informational meeting before a comprehensive plan amendment or rezoning request is considered by the Commission and City Council. These meetings have proven beneficial to date and provide a forum for the applicant to present an overview of the proposed development or request while seeking feedback from neighborhood residents. The applicant often chooses to amend their proposal to address concerns raised by those attending the informational meeting. Recent examples include the Aggieland Outfitters rezoning and the University Town Center comprehensive plan amendment/rezoning. City Staff is also available to attend these informational meetings as needed or requested. Attachments: 1. UDO Section - Required Public Notices 2. UDO Section - Required Hearings and Reviewing Bodies Unified Development Ordinance Section 3.2.G G. Required Public Notice. 1. Summary of Notice Required. Notice shall be required for development review as shown in the following table. Application Type Published Mailed Agenda Posted Comprehensive Plan Amendment X X Zoning Map Amend. (Rezoning) X X X UDO Text Amendment X X Conditional Use Permit X X X Subdivision - Replats* X* X* X Design District - Site Plan/Bldg. X Certificate of Appropriateness X Certificate of Demolition (No economically viable use) X X X Variances - ZBA X X X Appeals - Site Plan & Driveway X Waiver - Subdivision Design X Waiver - Buffer Requirements X Administrative Appeals X X Development Exaction Appeal X * Only when required per the Texas Local Government Code. Unified Development Ordinance Section 3.2.G.4 4. Required Hearings and Reviewing Body. The following table illustrates the types of review requiring a public hearing and the review body responsible for conducting the hearing. Application Type Zoning Board of Adjustment Landmark Commission Planning and Zoning Commission City Council Comprehensive Plan Amendment X X Zoning Map Amendment (Rezoning) X X Zoning Map Amendment (Rezoning - Historic Preservation Overlay District) X X X Certificate of Demolition (No economically viable use) X UDO Text Amendment X X Conditional Use Permit X X Subdivision* X Variances - ZBA X Administrative Appeals X Development Exaction Appeal X X** * Only when required per the Texas Local Government Code. ** Request is considered by Council only if Planning and Zoning Commission's decision is appealed. File #:17-0753,Version:1 College Station, TX Printed on 12/15/2017Page 2 of 2 powered by Legistar™ Planning and Zoning Commission Regular College Station, TX Meeting Agenda - Final City Hall 1101 Texas Ave College Station, TX 77840 The City Council may or may not attend the Planning & Zoning Commission Regular Meeting. City Hall Council Chambers7:00 PMThursday, December 21, 2017 1. Call meeting to order. 2. Pledge of Allegiance. 3. Hear Citizens. At this time, the Chairman will open the floor to citizens wishing to address the Commission on issues not already scheduled on tonight's agenda. The citizen presentations will be limited to three minutes in order to accommodate everyone who wishes to address the Commission and to allow adequate time for completion of the agenda items. The Commission will receive the information, ask city staff to look into the matter, or will place the matter on a future agenda for discussion. (A recording is made of the meeting; please give your name and address for the record.) All matters listed under Item 4, Consent Agenda, are considered routine by the Commission and will be enacted by one motion. These items include preliminary plans and final plats, where staff has found compliance with all minimum subdivision regulations. All items approved by Consent are approved with any and all staff recommendations. There will not be separate discussion of these items. If any Commissioner desires to discuss an item on the Consent Agenda it will be moved to the Regular Agenda for further consideration. 4. Consent Agenda Consideration, possible action, and discussion to approve meeting minutes. *December 7, 2017 ~ Workshop *December 7, 2017 ~ Regular 17-07544.1 Sponsors:Hejny December 7 2017 Workshop December 7 2017 Regular Attachments: Presentation, possible action, and discussion regarding a Final Plat for Creek Meadows Section 7, Phase 4 consisting of 32 lots and 1 common area on approximately 8.95 acres generally located northeast of the intersection of Greens Prairie Trail and Creek Meadow Boulevard. Case #FP2017-000001 17-07604.2 Page 1 College Station, TX Printed on 12/15/2017 December 21, 2017Planning and Zoning Commission Regular Meeting Agenda - Final Sponsors:Gray Staff report Vicinity Map and Aerial Final Plat Application Final Plat Attachments: Presentation, possible action, and discussion regarding a Final Plat for Creek Meadows Section 1C, Phase 2 consisting of 30 single-family lots and 3 common areas on approximately 8.9-acres generally located north of the intersection of Greens Prairie Road and Creek Meadows Boulevard North. Case #FP2017-000006 17-07614.3 Sponsors:Gray Staff report Vicinity Map and Aerial Map Application Final Plat Attachments: Presentation, possible action, and discussion regarding a Final Plat for Creek Meadows Section 1C, Phase 4 consisting of 30 single-family lots on approximately 5.6-acres generally located northeast of the intersection of Greens Prairie Road and Creek Meadows Boulevard North. Case #FP2017-000008 17-07624.4 Sponsors:Gray Staff Report Vicinity Map and Aerial Application Final Plat Attachments: Presentation, possible action, and discussion regarding a Final Plat for Brewster Pointe Subdivision Phase 1 consisting of 67 single-family lots and 3 common areas on approximately 20 acres located at 3451 Barron Cut-Off Road. Case #FP2016-000038 17-07554.5 Sponsors:Lazo Brewster Pointe Application Final Plat Attachments: Presentation, possible action, and discussion regarding a Preliminary Plan for JHW Commercial Addition consisting of two commercial lots on approximately two acres located at 100 Graham Road. Case # PP2017-000019 17-07474.6 Page 2 College Station, TX Printed on 12/15/2017 December 21, 2017Planning and Zoning Commission Regular Meeting Agenda - Final Sponsors:Broadnax Staff Report Vicinity Map, Aerial & Small Area Map Application PP2017-000019 Preliminary Plan Attachments: Presentation, possible action, and discussion regarding a Preliminary Plan for Carter Creek Condos consisting of one lot on approximately 5.95 acres located at 1451 Associates Avenue. Case #PP2017-000021 17-07494.7 Sponsors:Broadnax Staff Report Application Vicinity, Aerial, and Small Area Map Copy of Preliminary Plan Attachments: Regular Agenda 5. Consideration, possible action, and discussion on items removed from the Consent Agenda by Commission action. Public hearing, presentation, possible action, and discussion regarding an ordinance amendment to Appendix A, “Unified Development Ordinance”, Section 9.2 “Nonconforming Uses”, Section 9.3 “Nonconforming Structures”, and Section 7.10.C.4 “Building Materials” of the Code of Ordinances of the City of College Station, Texas to permit increased flexibility for non-conforming uses and structures. Case# ORDA2017-000013 (Note: Final action on this item will be considered at the January 11, 2018 City Council meeting - subject to change.) 17-07566. Sponsors:Golbabai Memo UDO UDO Amendment Sec. 9.2, 9.3 UDO Amendment Sec. 7.10.C.4 Attachments: Public hearing, presentation, possible action, and discussion regarding the 2017 Annual Review of the Comprehensive Plan and the Annual Review of the Unified Development Ordinance. 17-07067. Sponsors:Hovde and Paz P&Z Memo Comp Plan and UDO Review 2017 Attachments: Page 3 College Station, TX Printed on 12/15/2017 December 21, 2017Planning and Zoning Commission Regular Meeting Agenda - Final 8. Discussion and possible action on future agenda items – A Planning & Zoning Member may inquire about a subject for which notice has not been given. A statement of specific factual information or the recitation of existing policy may be given. Any deliberation shall be limited to a proposal to place the subject on an agenda for a subsequent meeting. 9. Adjourn The Commission may adjourn into Executive Session to consider any item listed on this agenda if a matter is raised that is appropriate for Executive Session discussion. An announcement will be made of the basis for the Executive Session discussion. I certify that the above Notice of Meeting was posted at College Station City Hall, 1101 Texas Avenue, College Station, Texas, on December 15, 2017 at 5:00 p.m. _____________________ City Secretary This building is wheelchair accessible. Persons with disabilities who plan to attend this meeting and who may need accommodations, auxiliary aids, or services such as interpreters, readers, or large print are asked to contact the City Secretary’s Office at (979) 764-3541, TDD at 1-800-735-2989, or email adaassistance@cstx.gov at least two business days prior to the meeting so that appropriate arrangements can be made. If the City does not receive notification at least two business days prior to the meeting, the City will make a reasonable attempt to provide the necessary accommodations. Penal Code § 30.07. Trespass by License Holder with an Openly Carried Handgun. "Pursuant to Section 30.07, Penal Code (Trespass by License Holder with an Openly Carried Handgun) A Person Licensed under Subchapter H, Chapter 411, Government Code (Handgun Licensing Law), may not enter this Property with a Handgun that is Carried Openly." Codigo Penal § 30.07. Traspasar Portando Armas de Mano al Aire Libre con Licencia. “Conforme a la Seccion 30.07 del codigo penal (traspasar portando armas de mano al aire libre con licencia), personas con licencia bajo del Sub-Capitulo H, Capitulo 411, Codigo de Gobierno (Ley de licencias de arma de mano), no deben entrar a esta propiedad portando arma de mano al aire libre.” Page 4 College Station, TX Printed on 12/15/2017 December 7, 2017 P&Z Workshop Meeting Minutes Page 1 of 3 MINUTES PLANNING & ZONING COMMISSION Workshop Meeting December 7, 2017 6:00 p.m. CITY HALL COUNCIL CHAMBERS College Station, Texas COMMISSIONERS PRESENT: Jane Kee, Elianor Vessali, Keith Williamson, Johnny Burns, and Jeremy Osborne COMMISSIONERS ABSENT: Casey Oldham, Bill Mather CITY COUNCIL MEMBERS PRESENT: Bob Brick, John Nichols, Jerome Rektorik CITY STAFF PRESENT: Molly Hitchcock, Carol Cotter, Justin Golbabai, Jenifer Paz, Alaina Helton, Madison Thomas, Rachel Lazo, Jade Broadnax, Laura Gray, Jason Schubert, Erika Bridges, Tim Horn, Anthony Armstrong, Natalie Ruiz, Jennifer Prochazka, Mary Ann Powell, and Kristen Hejny 1. Call the meeting to order. Chairperson Kee called the meeting to order at 6:00 p.m. 2. Discussion of consent and regular agenda items. There was general discussion regarding Regular Agenda Item #6. 3. Discussion of new development applications submitted to the City. New Development Link: www.cstx.gov/newdev There was no discussion. 4. Discussion of Minor and Amending Plats approved by Staff. *Final Plat ~ Minor Plat ~ Emerald Park Plaza Block 1, Lots 4R-A & 4R-B ~ Case #FP2017-000012 *Final Plat ~ Minor Plat ~ Century Hill Block 1, Lots 1R – 11R & Common Area 1 ~ Case #FPCO2017-000014 *Final Plat ~ Minor Plat ~ Drozd Subdivision Lot 1 ~ Case #FPCO2017-000013 5. Presentation, possible action, and discussion regarding the consideration of the 2017 P&Z Plan of Work. Planning Administrator Golbabai presented updates on the 2017 Plan of Work to the Commission. 6. Presentation, possible action, and discussion regarding a semi-annual update on Pre-Application Conference Surveys. December 7, 2017 P&Z Workshop Meeting Minutes Page 2 of 3 Planning Administrator Golbabai presented updates on PAC Surveys to the Commission. Commissioner Vessali asked for the response ratio for the total number of surveys received in 2017. Planning Administrator Golbabai stated that staff have held 79 PAC meetings in 2017 and 16 surveys have been received since April 2017. Commissioner Vessali asked if the PAC meeting surveys are anonymous. Planning Administrator Golbabai stated that surveys are anonymous. Commissioner Vessali suggested surveying developers at the end stages of their development process. Ms. Vessali also asked for the number of PAC meetings held that lead to actual development. Assistant Director of Planning & Development Services Hitchcock estimated that at least 50% of the PAC meetings did not move forward with development. Chairperson Kee asked for a continued update on the PAC Surveys. 7. Presentation, possible action, and discussion regarding a quarterly update on economic development efforts. Economic Development Manager Prochazka presented an update on economic efforts to the Commission. Commissioner Vessali asked if there are underlying infrastructure issues with some of the southernmost possible development sites presented by Ms. Prochazka. Economic Development Manager Prochazka stated that while some properties do not have connections, most of the properties have the capacity for sewer and water connections. Commissioner Osborne asked for a timeline of the Corporate Campus / Spring Creek Development. Economic Development Manager Prochazka stated that the Lakeway development is expected to be completed within 15 months. The Spring Creek Master Plan will be finished within six months. 8. Presentation, possible action, and discussion regarding the P&Z Calendar of Upcoming Meetings: *Thursday, December 14, 2017 ~ City Council Meeting ~ Council Chambers ~ Workshop 4:00 p.m. and Regular 6:00 p.m. (Liaison – Burns) *Thursday, December 21, 2017 ~ P&Z Meeting ~ Council Chambers ~ Workshop 6:00 p.m. and Regular 7:00 p.m. 9. Presentation, possible action, and discussion regarding an update on the following items: *A Compressive Plan Amendment amending the Thoroughfare Plan and Bicycle, Pedestrian, and Greenways Master Plan. The Planning & Zoning Commission heard this item on November 16, 2017, and voted (6-0) to recommend approval. The City Council heard this item on November 20, 2017, and voted (7-0) to approve the request. December 7, 2017 P&Z Workshop Meeting Minutes Page 3 of 3 *An Ordinance Amendment amending Section 1.6, “Relationship to the Comprehensive Plan”. The Planning & Zoning Commission heard this item on November 16, 2017, and voted (6-0) to recommend approval. The City Council heard this item on November 20, 2017, and voted (7-0) to approve the request. 10. Discussion, review and possible action regarding the following meetings: Design Review Board, Bio Corridor Board. There was no discussion. 11. Discussion and possible action on future agenda items - A Planning & Zoning Member may inquire about a subject for which notice has not been given. A statement of specific factual information or the recitation of existing policy may be given. Any deliberation shall be limited to a proposal to place the subject on an agenda for a subsequent meeting. Chairperson Kee asked that PAC survey information be distributed to Commissioners absent from this meeting. 12. Adjourn. The meeting was adjourned at 6:49 p.m. Approved: Attest: ______________________________ ________________________________ Jane Kee, Chairman Kristen Hejny, Admin. Support Specialist Planning & Zoning Commission Planning & Development Services December 7, 2017 P&Z Regular Meeting Minutes Page 1 of 4 MINUTES PLANNING & ZONING COMMISSION Regular Meeting December 7, 2017, 7:00 p.m. CITY HALL COUNCIL CHAMBERS College Station, Texas COMMISSIONERS PRESENT: Jane Kee, Elianor Vessali, Keith Williamson, Johnny Burns, and Jeremy Osborne COMMISSIONERS ABSENT: Casey Oldham, Bill Mather CITY COUNCIL MEMBERS PRESENT: Bob Brick, John Nichols, Jerome Rektorik CITY STAFF PRESENT: Molly Hitchcock, Carol Cotter, Justin Golbabai, Jenifer Paz, Alaina Helton, Madison Thomas, Rachel Lazo, Jade Broadnax, Laura Gray, Jason Schubert, Erika Bridges, Tim Horn, Anthony Armstrong, Mary Ann Powell, and Kristen Hejny 1. Call Meeting to Order Chairperson Kee called the meeting to order at 7:00 p.m. 2. Pledge of Allegiance 3. Hear Citizens 4. Consent Agenda 4.1 Consideration, possible action, and discussion on Absence Requests from meetings. *Casey Oldham ~ December 7, 2017 *Bill Mather ~ December 7, 2017 4.2 Consideration, possible action, and discussion to approve meeting minutes. *November 16, 2017 Workshop *November 16, 2016 Regular 4.3 Presentation, possible action, and discussion regarding a Preliminary Plan for Southern Pointe Subdivision consisting on 1994 single-family lots, two commercial lots, one urban lot, a school, proposed fire station site, and parkland lots on approximately 553 acres located at 17529 State Highway 6 South, generally located north of Peach Creek Cut-Off Road and west of Pipeline Road in the City’s Extraterritorial Jurisdiction, more generally known as Texas World Speedway. Case #PP2017-000011 4.4 Presentation, possible action, and discussion regarding a Preliminary Plan for Aggieland Business Park consisting of 24 lots on approximately 50 acres generally located west of the intersection of Dynasty Drive and FM 60 Raymond Stotzer Parkway, in the City’s Extraterritorial Jurisdiction. Case #PP2017-000023 December 7, 2017 P&Z Regular Meeting Minutes Page 2 of 4 4.5 Presentation, possible action, and discussion regarding a Development Plat for the Dairy Barn Subdivision consisting of one residential lot on approximately 1 acre located at 17801 FM 2154 in the City’s Extraterritorial Jurisdiction. Case #DVLP2017-000006 4.6 Presentation, possible action, and discussion regarding a Preliminary Plan for JHW Commercial Addition consisting of two commercial lots on approximately two acres located at 100 Graham Road. Case #PP2017-000019 This item was removed from the Consent Agenda. 4.7 Presentation, possible action, and discussion regarding a Final Plat for Indian Lakes Phase 33 consisting of 11 estate lots on 20.54 acres located on the south side of Anasazi Bluff Drive in the College Station Extraterritorial Jurisdiction. Case #FP2017-000026 Commissioner Osborne motioned to approve Consent Agenda Items 4.1-4.5 & 4.7. Commissioner Williamson seconded the motion, motion passed (5-0). Regular Agenda 5. Consideration, possible action, and discussion on items removed from the Consent Agenda by Commission Action. There was no discussion. 6. Public hearing, presentation, possible action, and discussion regarding an ordinance amending Appendix A, “Unified Development Ordinance,” Article 4, “Zoning Districts,” Section 4.2 “Official Zoning Map,” of the Code of Ordinances of the City of College Station, Texas by changing the zoning district boundaries from R Rural to GC General Commercial and NAP Natural Areas Protected on approximately 2.259 acres of land located at 4075 State Highway 6 South. Case #REZ2017-000029 (Note: Final action of this item will be considered at the January 11, 2018 City Council meeting – subject to change) Staff Planner Lazo presented the rezoning to the Commission and recommended approval. Chairperson Kee opened the public hearing. No one spoke. Chairperson Kee closed the public hearing. Commissioner Vessali motioned to recommend approval of Rezoning. Commissioner Burns seconded the motion, motion passed (5-0). 7. Presentation, possible action, and discussion regarding an ordinance amending Appendix A, “Unified Development Ordinance,” Article 4, “Zoning Districts,” Section 4.2 “Official Zoning Map,” of the Code of Ordinances of the City of College Station, Texas by changing the zoning district boundaries from R-4 Multi-Family to GC General commercial for approximately 5 acres located at 3635 Kenyon Drive generally located between Paloma Ridge Drive and Kenyon Drive along Holleman Drive South. Case #REZ2017-000030. (Note: Final action of this item will be considered at the January 11, 2018 City Council meeting – subject to change) December 7, 2017 P&Z Regular Meeting Minutes Page 3 of 4 Staff Planner Thomas presented the rezoning to the Commission and recommended approval. Chairperson Kee asked if the connecting road will be constructed during development. Applicant, Joe Schultz, Schultz Engineering stated that the road was recently constructed. Mr. Schultz, was also available to answer questions from Commission. Chairperson Kee asked when the site was established as an urban development area. Staff Planner Thomas stated that an urban designation was established with the Comprehensive Plan Master Plan in 2006. Chairperson Kee opened the public hearing. No one spoke. Chairperson Kee closed the public hearing. Commissioner Williamson motioned to recommend approval of the Rezoning. Commissioner Burns seconded the motion, motion passed (5-0). 8. Presentation, possible action, and discussion regarding an ordinance amending Appendix A, “Unified Development Ordinance,” Article 4, “Zoning Districts,” Section 4.2 “Official Zoning Map,” of the Code of Ordinances of the City of College Station, Texas by changing the zoning district boundaries from O Office to PDD Planned Development District on approximately 1.47 acres being a portion of Lot 1R, Block 3, Spring Creek Gardens Subdivision Phase 3, and being generally located at 4320 Decatur Drive. Case #REZ2017-000025. (Note: Final action of this item will be considered at the January 11, 2018 City Council meeting – subject to change) Senior Planner Helton presented the rezoning to the Commission and recommended approval with the condition that the existing 6-foot masonry wall built with the existing Self-Storage Facility is required to be continued along the property line abutting the single-family property with development, and that the requested modification to provide 100% metal buildings not be granted. Commissioner Vessali asked if any planting would be required along the fence line. Senior Planner Helton stated that landscaping requirements include a 10-foot landscape buffer with 2-inch caliber trees within the buffer. There was general discussion regarding citizen contact and inquiries regarding the rezoning. Commissioner Vessali asked for a snapshot of Non-Residential Architectural standards and language stating the requirements for material. Senior Planner Helton explained the minimum and maximum material requirements as stated within the Unified Development Ordinance. Applicant Joe Schultz, Schultz Engineering, was available to present to the Commission. December 7, 2017 P&Z Regular Meeting Minutes Page 4 of 4 Wallace Philips, 4490 Castlegate Drive, College Station, was available to answer commission’s concerns regarding buffer requirements and architectural standards. Chairperson Kee opened the public hearing. No one spoke. Chairperson Kee closed the public hearing. Commissioner Osborne motioned to recommend approval of Rezoning without the conditions stated in the staff report. Commissioner Burns seconded the motion, motion passed (5-0). 9. Discussion and possible action on future agenda items – A Planning & Zoning Member may inquire about a subject for which notice has not been given. A statement of specific factual information or the recitation of existing policy may be given. Any deliberation shall be limited to a proposal to place the subject on an agenda for a subsequent meeting. There was no discussion. 10. Adjourn The meeting adjourned at 7:35 p.m. Approved: Attest: ______________________________ ________________________________ Jane Kee, Chairman Kristen Hejny, Admin Support Specialist Planning & Zoning Commission Planning & Development Services Planning & Zoning Commission December 21, 2017 Scale Approximately 8.9 acres with 32 lots and 1 common area. Location The subject property is located northeast of the intersection of Greens Prairie Trail and Creek Meadow Boulevard in the Creek Meadows subdivision, Brazos County, Texas. Applicant Rabon Metcalf, RME Consulting Engineers Project Manager Laura Gray, Staff Planner lgray@cstx.gov Project Overview The final plat would reconfigure one tract into 32 single- family lots, and a 0.6 acre common area. Preliminary Plan A Master Plan was approved for the subject property in 2006. There have been six subsequent revisions to the Preliminary Plan, with the most recent being approved in March 2015. Parkland Dedication This development was approved as a Master Plan in the Extra-Territorial Jurisdiction (ETJ) prior to parkland dedication requirements being applicable in the ETJ. Therefore, no parkland dedication is proposed or required. Impact Fees The final plat would be subject to citywide impact fees— water, sanitary sewer, and roadway. Impact fees will be dependent upon timing of the building permit application date. Traffic Impact Analysis Not Required. Compliant with Comprehensive Plan (including Master Plans) and Unified Development Ordinance Yes Compliant with Subdivision Regulations Yes Staff Recommendation Approval Supporting Materials 1. Vicinity Map & Aerial 2. Application 3. Copy of Final Plat Final Plat for Creek Meadows Section 7, Phase Four FP2017-000001 Name of Project:CREEK MEADOWS SEC7 PH4 Address:N/A Legal Description:A001301, SAMUEL DAVIDSON (ICL), TRACT 64.12, 8.839 ACRES Applicant:: Property Owner:CREEK MEADOWS PARTNERS LP RME Consulting Engineers Total Acreage:8.945 Requested waiver(s) to subdivision regulations and reason for same (if applicable): N/A Regarding the waiver request, explain how: There are special circumstances or conditions affecting the land involved such that strict application of the subdivision regulations will deprive the applicant of the reasonable use of his land. N/A Total No. of Lots:32 ROW Acreage:1.312 Existing Use:Vacant Floodplain Acreage:N/A Special Flood Hazard Area?No - there is no Special Flood Hazard Area on the property FINAL PLAT APPLICATION SUPPORTING INFORMATION Page 1 of 2 The waiver is necessary for the preservation and enjoyment of a substantional property right of the applicant. N/A The granting of the waiver will not be detrimental to the public health, safety, or welfare, orinjurious to other property in the area, or to the City in administering subdivision regulations. N/A Fee in lieu of sidewalk construction is being requested because of the following condition (if applicable): The proposed development contains frontage on a Freeway / Expressway as designated by Map 6.6, Thoroughfare Plan - Functional Classification, in the City's Comprehensive Plan. N/A Requested Oversize Participation: Detailed explanation of condition identified above: #Error Parkland Dedication due prior to filing the Final Plat, if applicable: No. of acres to be dedicated: No. of acres in detention: N/ANo. of acres in floodplain: N/A N/A No. of acres in greenways:N/A Parkland Development Fee:N/A Parks & Recreation Advisory Board approval date: N/A Page 2 of 2 Planning & Zoning Commission December 21, 2017 Scale 30 lots and 3 common areas on approximately 8.9-acres Location Immediately north of the intersection of Greens Prairie Road and Creek Meadows Boulevard North Applicant Rabon Metcalf, RME Consulting Engineers Project Manager Laura Gray, Staff Planner lgray@cstx.gov Project Overview This plat reconfigures one tract into 30 single-family lots and 1.8 acres of common areas. Preliminary Plan A Master Plan was approved for the subject property in 2006. There have been six subsequent revisions to the Preliminary Plan with the most recent being approved in March 2015. Parkland Dedication This development was approved as a Master Plan in the Extra-Territorial Jurisdiction (ETJ) prior to parkland dedication requirements being applicable in the ETJ. Therefore, no parkland dedication is proposed or required. Impact Fees Subject to citywide impact fees—water, sanitary sewer, and roadway. Impact fees will be dependent upon timing of the building permit application date. Traffic Impact Analysis Not required Compliant with Comprehensive Plan (including Master Plans) and Unified Development Ordinance Yes Compliant with Subdivision Regulations Yes Staff Recommendation Approval Supporting Materials 1. Vicinity Map & Aerial 2. Application 3. Copy of Final Plat Final Plat for Creek Meadows Section 1C, Phase Two FP2017-000006 Name of Project:CREEK MEADOWS SEC1C PH2 Address:N/A Legal Description:A016701, A MCMAHON A-167 (ICL), TRACT 25, 19.137 ACRES Applicant:: Property Owner:CREEK MEADOWS PARTNERS LP RME Consulting Engineers Total Acreage:8.872 Requested waiver(s) to subdivision regulations and reason for same (if applicable): N/A Regarding the waiver request, explain how: There are special circumstances or conditions affecting the land involved such that strict application of the subdivision regulations will deprive the applicant of the reasonable use of his land. N/A Total No. of Lots:30 ROW Acreage:2.579 Existing Use:Vacant Floodplain Acreage:N/A Special Flood Hazard Area?No - there is no Special Flood Hazard Area on the property FINAL PLAT APPLICATION SUPPORTING INFORMATION Page 1 of 2 The waiver is necessary for the preservation and enjoyment of a substantional property right of the applicant. N/A The granting of the waiver will not be detrimental to the public health, safety, or welfare, orinjurious to other property in the area, or to the City in administering subdivision regulations. N/A Fee in lieu of sidewalk construction is being requested because of the following condition (if applicable): N/A Requested Oversize Participation: Detailed explanation of condition identified above: #Error Parkland Dedication due prior to filing the Final Plat, if applicable: No. of acres to be dedicated: No. of acres in detention: N/ANo. of acres in floodplain: N/A N/A No. of acres in greenways:N/A Parkland Development Fee:N/A Parks & Recreation Advisory Board approval date: N/A Page 2 of 2 Planning & Zoning Commission December 21, 2017 Scale 30 lots on approximately 5.6 acres Location Immediately northeast of the intersection of Greens Prairie Road and Creek Meadows Boulevard North Applicant Rabon Metcalf, RME Consulting Engineers Project Manager Laura Gray, Staff Planner lgray@cstx.gov Project Overview This plat reconfigures one tract into 30 single-family lots. Preliminary Plan A Master Plan was approved for the subject property in 2006. There have been six subsequent revisions to the Preliminary Plan with the most recent being approved in March 2015. Parkland Dedication This development was approved as a Master Plan in the Extra-Territorial Jurisdiction (ETJ) prior to parkland dedication requirements being applicable in the ETJ. Therefore, no parkland dedication is proposed or required. Impact Fees Subject to citywide impact fees—water, sanitary sewer, and roadway. Impact fees will be dependent upon timing of the building permit application date. Traffic Impact Analysis Not required Compliant with Comprehensive Plan (including Master Plans) and Unified Development Ordinance Yes Compliant with Subdivision Regulations Yes Staff Recommendation Approval Supporting Materials 1. Vicinity Map & Aerial 2. Application 3. Copy of Final Plat Final Plat for Creek Meadows Section 1C, Phase Four FP2017-000008 Name of Project:CREEK MEADOWS SEC1C PH4 Address:N/A Legal Description:A016701, A MCMAHON A-167 (ICL), TRACT 25, 19.137 ACRES Applicant:: Property Owner:CREEK MEADOWS PARTNERS LP RME Consulting Engineers Total Acreage:5.549 Requested waiver(s) to subdivision regulations and reason for same (if applicable): N/A Regarding the waiver request, explain how: There are special circumstances or conditions affecting the land involved such that strict application of the subdivision regulations will deprive the applicant of the reasonable use of his land. N/A Total No. of Lots:30 ROW Acreage:1.057 Existing Use:Vacant Floodplain Acreage:N/A Special Flood Hazard Area?No - there is no Special Flood Hazard Area on the property FINAL PLAT APPLICATION SUPPORTING INFORMATION Page 1 of 2 The waiver is necessary for the preservation and enjoyment of a substantional property right of the applicant. N/A The granting of the waiver will not be detrimental to the public health, safety, or welfare, orinjurious to other property in the area, or to the City in administering subdivision regulations. N/A Fee in lieu of sidewalk construction is being requested because of the following condition (if applicable): N/A Requested Oversize Participation: Detailed explanation of condition identified above: #Error Parkland Dedication due prior to filing the Final Plat, if applicable: No. of acres to be dedicated: No. of acres in detention: N/ANo. of acres in floodplain: N/A N/A No. of acres in greenways:N/A Parkland Development Fee:N/A Parks & Recreation Advisory Board approval date: N/A Page 2 of 2 Planning & Zoning Commission December 21, 2017 Scale 67 single-family lots and 3 common areas on approximately 20 acres Location 3451 Barron Cut-Off Road, generally located south of Barron Cut-Off Applicant Trent Thomas, Roundtree Development, Ltd. Project Manager Rachel Lazo, Staff Planner rlazo@cstx.gov Project Overview This plat reconfigures one tract into 67 single-family lots, and 3 common areas in the first phase of the Brewster Pointe Subdivision. With the plat, 0.19 acres of Right-of- Way are being dedicated for Barron Cut-Off Road. Preliminary Plan Originally approved in 2016 and revised in 2017. Parkland Dedication Parkland dedication of $1,261 per dwelling unit will be required prior to filing Final Plat. This phase will pay $84,487 in Parkland Dedication. Impact Fees Subject to citywide impact fees—water, sanitary sewer, and roadway. Impact fees will be dependent upon timing of the building permit application date. Traffic Impact Analysis Not Required. Compliant with Comprehensive Plan (including Master Plans) and Unified Development Ordinance Yes Compliant with Subdivision Regulations Yes Staff Recommendation Approval Supporting Materials 1. Vicinity Map & Aerial 2. Application 3. Copy of Final Plat Final Plat for Brewster Pointe Subdivision Phase 1 FP2016-000038 -FOR OFFICE USE ONLY DATE SUBMITTED:_____________ CITY OF COLLEGE STATION TIME. Home of Texas AóM Universitf STAFF: FINAL PLAT APPLICATION (Check one)~Minor ~Amending ~Final ~Vacating ~Replat ($700)($700)($932)($932)($932) Is this plat in the ETJ?~Yes ~No Is this plat Commercial ~or Residential ~ MINIMUM SUBMITTAL REQUIREMENTS: ~$700-$932 Final Plat Application Fee (see above). ~$233 Waiver Request to Subdivision Regulations Fee (if applicable). ~$600 (minimum)Development Permit Application /Public Infrastructure Review and Inspection Fee.Fee is 1%of acceptable Engineer’s Estimate for public infrastructure, $600 minimum (if fee is>$600,the balance is due prior to the issuance of any plans or development permit). ~Application completed in full.This application form provided by the City of College Station must be used and may not be adjusted or altered. Please attach pages if additional information is provided. ~Copy of plat.(A signed mylar original must be submitted after approval.) ~Grading,drainage,and erosion control plan with supporting drainage report. ~Public infrastructure plan and supporting documents (if applicable). ~Copy of original deed restrictions/covenants for replats (if applicable). ~Title report for property current within ninety (90)days or accompanied by a Nothing Further Certificate current within ninety (90)days.The report must include applicable information such as ownership,liens, encumbrances,etc. ~The attached Final Plat checklist with all items checked off or a brief explanation as to why they are not. NOTE:A paid tax certificates from City of College Station, Brazos County and College Station I.S.D.will be due at the time of the mylar submittal prior to filing the plat. Date of Optional Preapplication or Stormwater Management Conference N/A NAME OF PROJECT Brewster Pointe Subdivision Phase 1 ADDRESS 3387 Barron Cut Off Road SPECIFIED LOCATION OF PROPOSED PLAT: Barron Cut Off Road between W.S.Phillips Parkway and FM 2154.Property extends to Castlegate II Subdivision APPLICANT/PROJECT MANAGER’S INFORMATION (Primary contact for the project): Name Trent Thomas E-mail thomastrent614~gmail.com Street Address 1110 12th Man Circle City College Station State Texas Zip Code 77845 Phone Number 979.690.7117 Fax Number _____________________________ Revised 5/15 Page 1 of 9 PROPERTY OWNERS INFORMATION (All owners must be identified.Please attach an additional sheet for multiple owners): Name Rountree Development,LTD E-mail thomastrent6l4©gmail.com Street Address 1110 12th Man Circle City College Station State Texas Zip Code 77845 Phone Number 979.690.7117 Fax Number _______________________________ ARCHITECT OR ENGINEERS INFORMATION: Name Schultz Engineering, LLC -Joe Schultz,P.E.E-mail eng©schultzeng.com Street Address 911 Southwest Parkway East City College Station State Texas Zip Code 77845 Phone Number 979.764.3900 Fax Number 979.764.3910 Do any deed restrictions or covenants exist for this property?~Yes ~No Is there a temporary blanket easement on this property?If so,please provide the Volume__________and Page No._______ Total Acreage 20.515 Total No.of Lots 67 R-O-W Acreage 5.842 Existing Use Vacant Proposed Use Single Family Residential Number of Lots By Zoning District 67 /GS I I Average Acreage Of Each Residential Lot By Zoning District: 0.165 ,,GS ______/______ ______ ____________ ______ Floodplain Acreage N/A Is there Special Flood Hazard Area (Zone A or Zone AE on FEMA FIRM panels)on the property?fl Yes ~No This information is necessary to help staff identify the appropriate standards to review the application and will be used to help determine if the application qualifies for vesting to a previous ordinance. Notwithstanding any assertion made, vesting is limited to that which is provided in Chapter 245 of the Texas Local Government Code or other applicable law. Is this application a continuation of a project that has received prior City platting approval(s)and you are requesting the application be reviewed under previous ordinance as applicable? ~Yes ~No If yes,provide information regarding the first approved application and any related subsequent applications (provide additional sheets if necessary): Project Name:Brewster Pointe Preliminary Plan City Project Number (if known):PP2016-000015 Date!Timeframe when submitted:2016 Revised 5/15 Page 2 of 9 A statement addressing any differences between the Final Plat and Preliminary Plan (if applicable): Requested waiver to subdivision regulations and reason for same (if applicable): V/A Regarding the waiver request,explain how: 1.There are special circumstances or conditions affecting the land involved such that strict application of the subdivision regulations will deprive the applicant of the reasonable use of his land. fl/A 2.The waiver is necessary for the preservation and enjoyment of a substantial property right of the applicant. F/A 3.The granting of the waiver will not be detrimental to the public health,safety,or welfare,or injurious to other property in the area,or to the City in administering subdivision regulations. ‘f/A Fee in lieu of sidewalk construction is being requested because of the following condition (if applicable): 1.fl An alternative pedestrian way or multi-use path has been or will be provided outside the right-of-way; 2.E~The presence of unique or unusual topographic,vegetative,or other natural conditions exist so that strict adherence to the sidewalk requirements of the UDO is not physically feasible or is not in keeping with the purposes and goals of the UDO or the City’s comprehensive Plan; 3.~A capital improvement project is imminent that will include construction of the required sidewalk. Imminent shall mean the project is funded or projected to commence within twelve (12)months; 4.fl Existing streets constructed to rural section that are not identified on the Thoroughfare Plan with an estate I rural context; 5.fl When a sidewalk is required along a street where a multi-use path is shown on the Bicycle,Pedestrian,and Greenways Master Plan; 4.The granting of the waiver will not have the effect of preventing the orderly subdivision of other land in the area in accordance with the Drovisions of the Unified Development Ordinance. Revised 5/15 Page 3 of 9 6.~The proposed development is within an older residential subdivision meeting the criteria in Platting and Replatting within Older Residential Subdivisions Section of the UDO;or 7.fl The proposed development contains frontage on a Freeway /Expressway as designated by Map 6.6, Thoroughfare Plan -Functional Classification,in the City’s Comprehensive Plan. Detailed explanation of condition identified above: N/A NOTE:A waiver to the sidewalk requirements and fee in lieu of sidewalk construction shall not be considered at the same time by the Planning &Zoning Commission. Requested Oversize Participation 12”Waterline along Barron Cut Off Road Total Linear Footage of Parkiand Dedication due prior to filing the Final Plat: Proposed Public: ACREAGE:4203_Streets No.of acres to be dedicated +$__________development fee °‘-“~‘Sidewalks _______No.of acres in floodplain3245_Sanitary Sewer Lines No.of acres in detention4720_Water Lines No.of acres in greenways _______Channels OR2140StormSewers FEE IN LIEU OF LAND:1964 Bike Lanes /Paths 67 No.of SF Dwelling Units X $_1261 =$84,487 (date)Approved by Parks &Recreation Advisory Board NOTE:DIGITAL COPY OF PLAT MUST BE SUBMITTED PRIOR TO FILING. The applicant has prepared this application and certifies that the facts stated herein and exhibits attached hereto are true,correct,and complete.IF THIS APPLICATION IS FILED BY ANYONE OTHER THAN THE OWNER OF THE PROPERTY,this application must be accompanied by a power of attorney statement from the owner.If there is more than one owner,all owners must sign the application or the power of attorney.If the owner is a company,the application must be accompanied by proof of authority for the company’s representative to sign the application on its behalf.LIEN HOLDERS identified in the title report are also considered owners and the appropriate signatures must be provided as described above. ____________/~‘-(f~ Signature and title Date Revised 5/15 Page 4 of 9 CERTIFICATIONS REQUIRED FOR ALL DEVELOPMENT Owner Certification: 1.No work of any kind may start until a permit is issued. 2.The permit may be revoked if any false statements are made herein. 3.If revoked,all work must cease until permit is re-issued. 4.Development shall not be used or occupied until a Certificate of Occupancy is issued. 5.The permit will expire if no significant work is progressing within 24 months of issuance. 6.Other permits may be required to fulfill local,state,and federal requirements. Owner will obtain or show compliance with all necessary State and Federal Permits prior to construction including NOl and SWPPP. 7.If required, Elevation Certificates will be provided with elevations certified during construction (forms at slab pre pour)and post construction. 8.Owner hereby gives consent to City representatives to make reasonable inspections required to verify compliance. 9.If,stormwater mitigation is required,including detention ponds proposed as part of this project,it shall be designed and constructed first in the construction sequence of the project. 10.In accordance with Chapter 13 of the Code of Ordinances of the City of College Station,measures shall be taken to insure that all debris from construction,erosion,and sedimentation shall not be deposited in city streets, or existing drainage facilities.All development shall be in accordance with the plans and specifications submitted to and approved by the City Engineer for the above named project.All of the applicable codes and ordinances of the City of College Station shall apply. 11.The information and conclusions contained in the attached plans and supporting documents will comply with the current requirements of the City of College Station,Texas City Code,Chapter 13 and associated BCS Unified Design Guidelines Technical Specifications,and Standard Details. All development has been designed in accordance with all applicable codes and ordinances of the City of College Station and State and Federal Regulations. 12.Release of plans to ____________________________________(name or firm)is authorized for bidding purposes only.I understand that final approval and release of plans and development for construction is contingent on contractor signature on approved Development Permit. 13.I,THE OWNER,AGREE TO AND CERTIFY THAT ALL STATEMENTS HEREIN,AND IN ATTACHMENTS FOR THE D~ELOPMENTPERMIT APPLICATION,ARE,TO THE BEST OF MY KNOWLEDGE,TRUE,AND ACCJ~ATE. /V-~~ Property Owner(s)Date Engineer Certification: 1.The project has been designed to ensure that stormwater mitigation,including detention ponds,proposed as part of the project will be constructed first in the construction sequence. 2.I will obtain or can show compliance with all necessary Local,State and Federal Permits prior to construction including NOI and SWPPP.Design will not preclude compliance with TPDES:i.e.,projects over 10 acres may require a sedimentation basin. 3.The information and conclusions contained in the attached plans and supporting documents comply with the current requirements of the City of College Station,Texas City Code,Chapter 13 and associated BCS Unified Design Guidelines.All developr ~esigned in accordance with all applicable codes and ordinances of the City of College Station Regulations. 4.I,THE ENGINEER,AGREI ~T ALL STATEMENTS HEREIN,AND IN ATTACHMENTS FOR THE DEVELOPMEF~ARE,TO THE BEST OF MY KNOWLEDGE,TRUE,AND iRATE. /Ifr’t-’/~‘° Date Revised 5/15 Page 5of9 The following CERTIFICATIONS apply to development in Special Flood Hazard Areas. Required for Site Plans,Final Plats,Construction Plans, Fill I Grading Permits,and Clearing Only Permits :* A.I,________________________________________certify,as demonstrated in the attached drainage study,that the alterations or development covered by this permit,shall not: (i)increase the Base Flood elevation; (ii)create additional areas of Special Flood Hazard Area; (iii)decrease the conveyance capacity to that part of the Special Flood Hazard Area that is not in the floodway and where the velocity of flow in the Base Flood event is greater than one foot per second.This area can also be approximated to be either areas within 100 feet of the boundary of the regulatory floodway or areas where the depth of from the BFE to natural ground is 18 inches or greater; (iv)reduce the Base Flood water storage volume to the part of the Special Flood Hazard Area that is beyond the floodway and conveyance area where the velocity of flow in the Base Flood is equal to and less than one foot per second without acceptable compensation as set forth in the City of College Station Code of Ordinances, Chapter 13 concerning encroachment into the Special Flood Hazard Area;nor (v)increase Base Flood velocities. beyond those areas exempted by ordinance in Section 5.11.3a of Chapter 13 Code of Ordinances. Engineer Date Initial *If a platting-status exemption to this requirement is asserted,provide written justification under separate _______letter in lieu of certification. Required for Site Plans, Final Plats,Construction Plans, and Fill I Grading Permits: B.I,______________________________________,certify to the following: (i)that any nonresidential or multi-family structure on or proposed to be on this site as part of this application is designed to prevent damage to the structure or its contents as a result of flooding from the 100-year storm. Engineer Date Additional certification for Floodway Encroachments: C.I,________________________________________,certify that the construction,improvement,or fill covered by this permit shall not increase the base flood elevation.I will apply for a variance to the Zoning Board of Adjustments. Engineer Date Revised 5/15 Page 6 of 9 Required for all projects proposing structures in Special Flood Hazard Area (Elevation Certificate required). Residential Structures: D.I,______________________________________,certify that all new construction or any substantial improvement of any residential structure shall have the lowest floor,including all utilities,ductwork and any basement,at an elevation at least one foot above the Base Flood Elevation.Required Elevation Certificates will be provided with elevations certified during construction (forms at slab pre-pour)and post construction. Engineer!Surveyor Date Commercial Structures: E.I,______________________________________,certify that all new construction or any substantial improvement of any commercial,industrial,or other non-residential structure are designed to have the lowest floor,including all utilities,ductwork and basements, elevated at least one foot above the Base Flood Elevation Engineer!Surveyor Date OR ___________________________________________certify that the structure with its attendant utility,ductwork, basement and sanitary facilities is designed to be flood-proofed so that the structure and utilities,ductwork, basement and sanitary facilities are designed to be watertight and impermeable to the intrusion of water in all areas below the Base Flood Elevation,and shall resist the structural loads and buoyancy effects from the hydrostatic and hydrodynamic conditions. Required Elevation Certificates will be provided with elevations certified during construction (forms at slab pre pour)and post construction. Engineer!Surveyor Date Conditions or comments as part of approval:________________________________________________________________ Revised 5/15 Page 7 of 9 Drawn on 24” x 36”sheet to scale of 100’per inch. ~Vicinity map which includes enough of surrounding area to show general location of subject property in relationship to College Station and its City Limits.No scale required but include north arrow. ~Title Block with the following information: ~Name and address of subdivider, recorded owner,planner,engineer and surveyor. ~Proposed name of subdivision.(Subdivision name &street names will be approved through Brazos County 911.) ~Date of preparation. ~Engineer’s scale in feet. ~Total area intended to be developed. ~North Arrow. ~Subdivision boundary indicated by heavy lines. ~If more than 1 sheet,an index sheet showing entire subdivision at a scale of 500 feet per inch or larger. ~All applicable certifications based on the type of final plat. ~Ownership and Dedication ~Surveyor and/or Engineer ~City Engineer (and City Planner,if a minor plat) ~Planning and Zoning Commission (delete if minor plat) ~Brazos County Clerk ~Brazos County Commissioners Court Approval (ETJ Plats only) ~If submitting a replat where there are existing improvements,submit a survey of the subject property showing the improvements to ensure that no encroachments will be created. ~If using private septic systems,add a general note on the plat that no private sewage facility may be installed on any lot in this subdivision without the issuance of a license by the Brazos County Health Unit under the provisions of the private facility regulations adopted by the Commissioner’s Court of Brazos County,pursuant to the provisions of Section 21.084 of the Texas Water Code. ~1 Location of the 100-Year Floodplain and floodway,if applicable, according to the most recent available data. ~1 Lot corner markers and survey monuments (by symbol)and clearly tied to basic survey data. ~Matches the approved preliminary plan or qualifies as minor amendments (UDO Section 3.3.E.2). ~The location and description with accurate dimensions,bearings or deflection angles and radii,area,center angle,degree of curvature,tangent distance and length of all curves for all of the following:(Show existing items that are intersecting or contiguous with the boundary of or forming a boundary with the subdivision,as well as,those within the subdivision). Existing Proposed Streets.Continuous or end in a cul-de-sac,stubbed out streets must end into a temp turn around unless they are shorter than 100 feet. ~Public and private R.O.W.locations and widths.(All existing and proposed R.O.W.’s sufficient to meet Thoroughfare Plan.) ~Street offsets and/or intersection angles meet ordinance. FINAL PLAT MINIMUM REQUIREMENTS (ALL CITY ORDINANCES MUST BE MET) INCLUDING BUT NOT LIMITED TO THE FOLLOWING: (Requirements based on field survey and marked by monuments and markers.) Revised 5/15 Page 8 of 9 Existing Proposed Alleys. Easements. A number or letter to identify each lot or site and each block (numbered sequentially). E~1 ~Parkland dedication/greenbelt area/park linkages.All proposed dedications must be reviewed by the Parks and Recreation Advisory Board and documentation of their recommendation provided prior to being scheduled for P&Z Commission consideration. ~Construction documents for all public infrastructure drawn on 24”x 36”sheets and properly sealed by a Licensed Texas Professional Engineer that include the following: ~Street,alley and sidewalk plans,profiles and sections.One sheet must show the overall street,alley and/or sidewalk layout of the subdivision.(may be combined with other utilities). Sewer Design Report. Sanitary sewer plan and profile showing depth and grades.One sheet must show the overall sewer layout of the subdivision.(Utilities of sufficient size/depth to meet the utility master plan and any future growth areas.) Water Design Report and/or Fire Flow Report. Water line plan showing fire hydrants, valves,etc.with plan and profile lines showing depth and grades. One sheet must show the overall water layout of the subdivision. (Utilities of sufficient size/depth to meet the utility master plan and any future growth areas.) Storm drainage system plan with contours,street profile,inlets,storm sewer and drainage channels,with profiles and sections.Drainage and runoff areas,and runoff based on 5,10,25, 50 and 100 year rain intensity.Detailed drainage structure design, channel lining design &detention if used.One sheet must show the overall drainage layout of the subdivision. E~1 Detailed cost estimates for all public infrastructure listed above sealed by Texas P.E. ~Letter of completion for public infrastructure or guarantee /surety in accordance with UDO Section 8.6. ~Drainage Report with a Technical Design Summary. Erosion Control Plan (must be included in construction plans). ~All off-site easements necessary for infrastructure construction must be shown on the final plat with a volume and page listed to indicate where the separate instrument easements were filed. Separate instrument easements must be provided in recordable form to the City prior to being scheduled for P&Z Commission consideration. E~1 Are there impact fees associated with this development?~1 Yes D No Impact fees must be paid prior to building permit. ~Will any construction occur in TxDOT rights-of-way?D Yes ~1 No If yes,TxDOT permit must be submitted along with the construction documents. NOTE:1.We will be requesting the corrected Final Plat to be submitted in digital form if available prior to filing the plat at the Courthouse. 2.If the construction area is greater than 5 acres, EPA Notice of Intent (NOl) must be submitted prior to issuance of a development permit. Pnnt Form Revised 5/15 Page 9 of 9 BLOCK 1 BLOCK 2 BLOCK 4 BREWSTER DRIVEYANWORTH LANE BLOCK 3 BLOCK 4 BLOCK 5 1 2 3 4 5 6 1 2 3 4 5 1 2 3 4 5 6 7 8 9 10 1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8 9 10 13 141516171819202122 9 10 11BARRON CUT-OFF ROAD12 8 11 7 12 11 2324 1312 26 25 69 ESKEW DRIVE SPRING BREEZE WAYTRADEWIND DRIVEBROWNWAY DRIVE ESKEW DRIVE 1.733 ACRE COMMON AREA 1 AND PRIVATE DRAINGE EASEMENT FOR STORMWATER DETENTION 0.905 ACRE COMMON AREA 2 AND PRIVATE DRAINGE EASEMENT FOR STORMWATER DETENTION 12 15 13 14 16 1 BLOCK 39 BLOCK 39 BLOCK 46 11 10 9 8 7 6 5 4 3 2 BLOCK 39 10 TBPE NO. 12327 911 SOUTHWEST PKWY E. College Station, Texas 77840 (979) 764-3900 ENGINEER: FINAL PLAT BREWSTER POINTE SUBDIVISION PHASE 1 19.950 ACRES - 67 LOTS ROBERT STEVENSON LEAGUE, A-54 COLLEGE STATION, BRAZOS COUNTY, TEXAS (0.186 ACRE ROW DEDICATION FOR BARRON CUT-OFF ROAD) (1.733 ACRE COMMON AREA 1) (0.905 ACRE COMMON AREA 2) (0.115 ACRE COMMON AREA 3) SURVEYOR: Brad Kerr, RPLS No. 4502 Kerr Surveying, LLC 409 N. Texas Ave. Bryan, TX 77803 (979) 268-3195 SCALE 1'' = 60' NOVEMBER, 2017 OWNER/DEVELOPER: Rountree Development, Ltd. 1110 12th Man Circle College Station, TX 77845 (979) 690-7117 LEGEND LEGEND VICINITY MAP WI L L I AM D . F I T C H P KW Y BRE W S T E R BARRON CUT OFF RD NOT TO SCALEFM 2154METES AND BOUNDS DESCRIPTION OF ALL THAT CERTAIN TRACT OR PARCEL OF LAND LYING AND BEING SITUATED IN THE ROBERT STEVENSON LEAGUE, ABSTRACT NO. 54, COLLEGE STATION, BRAZOS COUNTY, TEXAS. SAID TRACT BEING A PORTION OF A CALLED 21.921 ACRE TRACT AS DESCRIBED BY A DEED TO ROUNTREE DEVELOPMENT, LTD. RECORDED IN VOLUME 13325, PAGE 257 OF THE OFFICIAL PUBLIC RECORDS OF BRAZOS COUNTY, TEXAS. SAID TRACT BEING MORE PARTICULARLY DESCRIBED BY METES AND BOUNDS AS FOLLOWS: BEGINNING AT A 1/2 INCH IRON ROD FOUND ON THE SOUTHEAST LINE OF BARRON CUT-OFF ROAD MARKING THE NORTH CORNER OF SAID 21.921 ACRE TRACT AND THE WEST CORNER OF A CALLED 9.500 ACRE TRACT AS DESCRIBED BY A DEED TO BARBARA ANN BOONE AND FREDERICK DESHON ROBINSON RECORDED IN VOLUME 12313, PAGE 103 OF THE OFFICIAL PUBLIC RECORDS OF BRAZOS COUNTY, TEXAS {BEARING SYSTEM SHOWN HEREIN IS BASED ON TEXAS STATE PLANE CENTRAL ZONE GRID NORTH AS ESTABLISHED BY GPS OBSERVATION. DISTANCES SHOWN HEREIN ARE GRID DISTANCES. TO OBTAIN SURFACE DISTANCES MULTIPLY BY A COMBINED SCALE FACTOR OF 1.00009342553280 (CALCULATED USING GEOID 2012A)}; THENCE: S 48° 04' 52" E ALONG THE COMMON LINE OF SAID 21.921 ACRE TRACT AND SAID 9.500 ACRE TRACT AND A CALLED 29.405 ACRE TRACT AS DESCRIBED BY A DEED TO AGNES S. BAKER REVOCABLE LIVING TRUST RECORDED IN VOLUME 2488, PAGE 64 OF THE OFFICIAL PUBLIC RECORDS OF BRAZOS COUNTY, TEXAS, FOR A DISTANCE OF 1721.81 FEET TO A 1/2 INCH IRON ROD FOUND ON THE NORTHWEST LINE OF CASTLEGATE II SUBDIVISION, SECTION 107, ACCORDING TO THE PLAT RECORDED IN VOLUME 13037, PAGE 274 OF THE OFFICIAL PUBLIC RECORDS OF BRAZOS COUNTY, TEXAS, MARKING THE EAST CORNER OF SAID 21.921 ACRE TRACT AND THE SOUTH CORNER OF SAID 29.405 ACRE TRACT; THENCE:S 41° 56' 44" W ALONG THE COMMON LINE OF SAID 21.921 ACRE TRACT AND SAID SECTION 107 FOR A DISTANCE OF 517.00 FEET TO A 1/2 INCH IRON ROD FOUND MARKING THE WEST CORNER OF SAID SECTION 107 AND THE NORTH CORNER OF CASTLEGATE II SUBDIVISION, SECTION 208, ACCORDING TO THE PLAT RECORDED IN VOLUME 13439, PAGE 51 OF THE OFFICIAL PUBLIC RECORDS OF BRAZOS COUNTY, TEXAS; THENCE:S 41° 52' 05" W ALONG THE COMMON LINE OF SAID 21.921 ACRE TRACT AND SAID SECTION 208 FOR A DISTANCE OF 466.10 FEET TO A 5/8 INCH IRON ROD FOUND MARKING THE SOUTH CORNER OF SAID 21.921 ACRE TRACT AND THE EAST CORNER OF A CALLED 12 ACRE TRACT AS DESCRIBED BY A DEED TO WILLIAM GRAY RECORDED IN VOLUME 99, PAGE 30 OF THE DEED RECORDS OF BRAZOS COUNTY, TEXAS; THENCE:N 47° 41' 21" W ALONG THE COMMON LINE OF SAID 21.921 ACRE TRACT AND SAID 12 ACRE TRACT FOR A DISTANCE OF 82.28 FEET TO THE MOST SOUTHERLY WEST CORNER OF THIS HEREIN DESCRIBED TRACT AND THE BEGINNING OF A COUNTERCLOCKWISE CURVE HAVING A RADIUS OF 535.00 FEET; THENCE: THROUGH SAID 21.921 ACRE TRACT FOR THE FOLLOWING CALLS: ALONG SAID CURVE THROUGH A CENTRAL ANGLE OF 05° 17' 39" FOR AN ARC DISTANCE OF 49.43 FEET (CHORD BEARS: N 44° 30' 54" E - 49.42FEET) TO THE END OF SAID CURVE; N 41° 52' 05" E FOR A DISTANCE OF 320.87 FEET; N 47° 38' 20" W, AT 165.60 FEET PASS A 5/8 INCH IRON ROD FOUND MARKING THE EAST CORNER OF A CALLED 3.123 ACRE TRACT AS DESCRIBED BY A DEED TO ROUNTREE DEVELOPMENT, LTD. RECORDED IN VOLUME 14130, PAGE 108 OF THE OFFICIAL PUBLIC RECORDS OF BRAZOS COUNTY, TEXAS, CONTINUE ON ALONG THE COMMON LINE OF SAID 21.921 ACRE TRACT AND SAID 3.123 ACRE TRACT FOR A TOTAL DISTANCE OF 858.45 FEET, FOR REFERENCE A 5/8 INCH IRON ROD FOUND ON THE SOUTHWEST LINE OF SAID 21.921 ACRE TRACT MARKING THE NORTH CORNER OF SAID 3.123 ACRE TRACT BEARS: N 47° 38' 20" W FOR A DISTANCE OF 41.25 FEET; N 42° 21' 40" E (LEAVING SAID COMMON LINE) FOR A DISTANCE OF 246.17 FEET; N 47° 39' 59" W, AT 53.46 FEET PASS THE EAST CORNER OF A CALLED 3.126 ACRE TRACT AS DESCRIBED BY A DEED TO ROUNTREE DEVELOPMENT, LTD. RECORDED IN VOLUME 14130, PAGE 149 OF THE OFFICIAL PUBLIC RECORDS OF BRAZOS COUNTY, TEXAS, CONTINUE ON ALONG THE COMMON LINE OF SAID 21.921 ACRE TRACT AND SAID 3.126 ACRE TRACT FOR A TOTAL DISTANCE OF 127.60 FEET; N 42° 20' 01" E (LEAVING SAID COMMON LINE) FOR A DISTANCE OF 17.50 FEET; N 47° 39' 59" W FOR A DISTANCE OF 657.58 FEET THE SOUTHEAST LINE OF BARRON CUT-OFF ROAD MARKING THE WEST CORNER OF THIS HEREIN DESCRIBED TRACT; THENCE: N 41° 54' 10" E ALONG THE SOUTHEAST LINE OF BARRON CUT-OFF ROAD FOR A DISTANCE OF 336.32 FEET TO THE POINT OF BEGINNING CONTAINING 19.950 ACRES OF LAND, AS SURVEYED ON THE GROUND. Planning & Zoning Commission December 21, 2017 Scale 2 commercial lots on approximately 1.7 acres Location 100 Graham Road; north intersection of FM2154 and Graham Road. Applicant Glenn Jones, J4 Engineering Project Manager Jade Broadnax, Staff Planner jbroadnax@cstx.gov Project Overview The preliminary plan is for the future subdivision of approximately 1.7 acres along Graham Road into 2 commercial lots, each being approximately 0.8 acres in size. 0.04 acres of Right of Way will be dedicated on the south side of Graham Road with the filing of the Final Plat. There is an existing one story commercial building on Lot 5, while Lot 4 is presently undeveloped. Parkland Dedication Parkland dedication is not required. Traffic Impact Analysis TIA is not required Compliant with Comprehensive Plan (including Master Plans) and Unified Development Ordinance Yes Compliant with Subdivision Regulations Yes Staff Recommendation Approval Supporting Materials 1. Vicinity Map, Aerial, and Small Area Map 2. Application 3. Copy of Preliminary Plan Preliminary Plan for JHW Commercial Addition PP2017-000019 108.65'49.92'108.65'49.92'1 STORY BRICK COMMERCIAL BUILDING 100 GRAHAM ROAD PRELIMINARY PLAN NOT FOR RECORD Engineer: PO Box 5192 Bryan, TX 77805 979-739-0567 TBPE F-9951 JHW Commercial Addition Block 1,Lots 4 & 5~1.707 Acres Robert Stevenson Survey, A-54, 1.707 Acre Tract College Station, Brazos County, Texas November 2017 Owner: JHW, Inc. PO Box 10220 College Station, TX 77845 Surveyor: Kerr Surveying, LLC 409 N. Texas Ave. Bryan, TX 77803 979-268-3195 N.T.S. ” ” ” ” ” ” ” Planning & Zoning Commission December 21, 2017 Scale One lot on approximately 5.96 Acres Location 1451 Associates Avenue, generally located North of Harvey Road and East of Associates Avenue Applicant Mike Hester, P.E. Project Manager Jade Broadnax Staff Planner, jbroadnax@cstx.gov Project Overview The applicant is requesting to preliminary plan this 5.96 acre tract as one lot. The request includes the building of a sidewalk along the southern portion of the property that is parallel to Associates Ave. A 30’ public utility easements and a 20’ sanitary sewer easements would be dedicated with the Final Plat to accommodate future CIP trunk lines at those locations. Parkland Dedication Parkland dedication will be determined at the site planning phase. Traffic Impact Analysis N/A Compliant with Comprehensive Plan (including Master Plans) and Unified Development Ordinance Yes Compliant with Subdivision Regulations Yes Staff Recommendation Staff recommends approval. Supporting Materials 1. Application 2. Vicinity Map & Aerial 3. Copy of Preliminary Plan Preliminary Plan for Carter Creek Condos Subdivision PP2017-000021 Name of Project:CARTER'S CREEK CONDOS Address:1451 ASSOCIATES AVE Legal Description:A000801, R CARTER (ICL), TRACT 10.2, 5.9551 ACRES Applicant:: Property Owner:TDG MANAGEMENT LP Michael G. Hester, P.E. Total Acreage:5.9 Requested waiver(s) to subdivision regulations and reason for same (if applicable): N/A Regarding the waiver request, explain how: There are special circumstances or conditions affecting the land involved such that strict application of the subdivision regulations will deprive the applicant of the reasonable use of his land. N/A Total No. of Lots:1 ROW Acreage:N/A Floodplain Acreage:0.37 PRELIMINARY PLAN APPLICATION SUPPORTING INFORMATION Page 1 of 2 The waiver is necessary for the preservation and enjoyment of a substantional property right of the applicant. N/A The granting of the waiver will not be detrimental to the public health, safety, or welfare, orinjurious to other property in the area, or to the City in administering subdivision regulations. N/A Fee in lieu of sidewalk construction is being requested because of the following condition (if applicable): N/A Requested Oversize Participation: Detailed explanation of condition identified above: N/A Parkland Dedication due prior to filing the Final Plat, if applicable: No. of acres to be dedicated: No. of acres in detention: N/ANo. of acres in floodplain: N/A N/A No. of acres in greenways:N/A Parkland Development Fee:N/A Parks & Recreation Advisory Board approval date: N/A Page 2 of 2 Planning & Development Services 1101 Texas Avenue, PO Box 9960 College Station, TX 77840 Office 979.764.3570 / Fax 979.764.3496 MEMORANDUM December 12, 2017 TO: Members of the Planning & Zoning Commission FROM: Justin Golbabai AICP, CNU-A, Planning Administrator SUBJECT: UDO Amendment – Flexibility for Non-Conforming Uses and Structures Item: Public hearing, presentation, possible action, and discussion regarding an ordinance amendment to Appendix A, “Unified Development Ordinance”, Section 9.2 “Nonconforming Uses”, Section 9.3 “Nonconforming Structures”, and Section 7.10.C.4 “Building Materials” of the Code of Ordinances of the City of College Station, Texas to permit increased flexibility for non-conforming uses and structures. Case# ORDA2017-000013. Background: On November 16th, Planning and Zoning Commission endorsed staff’s recommendations on providing additional flexibility and leniency on how and to what extent non-conforming uses and structures come into compliance with current requirements. One of those items was to increase the amount an existing building or structure devoted to a non-conforming land use can be enlarged by right to 50% without needing to go to the Zoning Board of Adjustments. Staff is now modifying this proposal to exclude extending this right to areas designated as Neighborhood Conservation in the Future Land Use and Character Map. Areas with a Neighborhood Conservation future land use designation often were platted before current development regulations were in place, often resulting in non-conforming situations and the Comprehensive Plan states that these areas are appropriate for additional character protection and addressing non-conforming issues. Given this language, staff believes that the current non-conforming uses provision that allows up to a 25% expansion of non- conforming uses with the authorization of the Zoning Board of Adjustments, rather than allowing an expansion of non-conforming uses by right, better fits the direction of the Comprehensive Plan for these areas. Planning & Development Services 1101 Texas Avenue, PO Box 9960 College Station, TX 77840 Office 979.764.3570 / Fax 979.764.3496 In addition to addressing non-conforming uses, as previously discussed, the proposed ordinance amendment would: Provide an administrative approval process that allows flexibility for existing non- conforming, non-residential structures where there are physical limitations that do not allow compliance with all UDO standards. In these situations, the Administrator would be allowed to make exceptions to parking and landscaping standards as well as reduce buffer width and planting requirements. The Administrator would not be able to reduce the number of parking spaces or landscaping points more than 50%. Increase the total area of materials that can be changed or replaced on a non-residential buildings or multi-family building façade without requiring full compliance from 10% to 50%. Supporting Materials: 1. Section 9 “Non-Conformities” Ordinance Redline 2. Section 7.10.C.4 “Building Materials” Ordinance Redline Page 1 Article 9. - Nonconformities Sec. 12-9.1. - General. Except as specified in this Article, any use, building, structure, or sign existing at the time of enactment of this UDO or classification amendment applicable to its use, may be continued even though such use, building, structure, or sign may not conform with the provisions of this UDO for the district in which it is located; provided, however, that this Article shall not apply to any use, building, structure, or sign established in violation of this UDO or ordinance previously in effect in College Station. Sec. 12-9.2. - Nonconforming Uses. A. Continuance. An existing use that is not in compliance with this UDO or subsequent amendments applicable to the use shall not be enlarged, extended, reconstructed, substituted or structurally altered unless the use is brought into compliance with this UDO, except as follows: 1. Expansion. a. For properties designated as Neighborhood Conservation in the Comprehensive Plan Future Land Use and Character Map: When authorized by the Zoning Board of Adjustment in accordance with the provisions of this Article, enlargement or completion of a building devoted to a nonconforming use may be made upon the lot occupied by such building, where such extension is necessary and incidental to the existing use of such building and does not exceed twenty-five (25) percent of the original area of nonconformity. b. For properties in all other areas: Buildings and structures devoted to nonconforming uses located within the area annexed by Ordinance No. 3331, adopted by the City Council on April 14, 2011, may be enlarged, extended, or structurally altered provided such enlargement, extension, or structural alteration is incidental to the existing use of such existing buildings and the enlargement does not exceed twenty-five fifty (2550) percent of the original area of nonconformity. Enlargements greater than twenty-five fifty (2550) percent of the original area of nonconformity shall require approval of the Zoning Board of Adjustment. 2. Conditional Use. A use existing on the effective date of this UDO, or subsequent amendment applicable to its use, which would only be permitted as a conditional use, shall be a lawful nonconforming use until altered pursuant to the Conditional Use Permit section of this UDO. In the event of issuance of a conditional use permit, such use becomes a permitted and lawful use. B. Termination. The City Council shall have the authority to initiate, on its motion, action to bring about the discontinuance of a nonconforming use under any plan whereby full value of the structure can be amortized within a definite period of time, taking into consideration the general character of the area and the necessity for all property to conform to the regulations of this UDO. C. Abandonment. Page 2 Whenever a nonconforming use has been discontinued and changed to a conforming use, or whenever a nonconforming use has been discontinued or abandoned for more than three (3) months, a presumption of intent to abandon said use shall have been established and the right to continue the former nonconforming use shall no longer exist. Subsequent operation as a nonconforming use shall be unlawful. (Ord. No. 2011-3355 , § 1(Exh. A), 6-23-2011; Ord. No. 2012-3449 , Pt. 1(Exh. M), 9-27-2012) Sec. 12-9.3. - Nonconforming Structures. A. Enlargement, Alteration. 1. A structure (including parking lots, parking structures, and parking areas), which is nonconforming by physical design may be enlarged or structurally altered as long as such enlargement or alteration otherwise complies with the terms of this UDO with the following exceptions: a. Parking Requirements: The Administrator may make exceptions to the requirement of following the UDO for parking requirements for non-residential properties where there are physical limitations and a demonstrated inability to meet all standards of this UDO but may not waive more than 50% of the required number of parking spaces. b. Landscaping Requirements: The Administrator may make exceptions to the requirement of following the UDO for landscaping requirements for non-residential properties where there are physical limitations and a demonstrated inability to meet all standards of this UDO but may not waive more than 50% of required landscaping points. c. Buffer Requirements: The Administrator may reduce required buffer yard widths and plantings where there are existing structures being retained in the required buffer area or where there are other physical limitations and a demonstrated inability to meet all standards of this UDO so long as such reductions do not increase the existing degree of nonconformity. 2. In NG-1, NG-2, and NG-3, the whole building plot must come into compliance with the requirements of this UDO when more than fifty (50) percent of a building(s) on the site is enlarged or altered. B. Termination. The City Council shall have the authority to initiate on its motion, or cause to be presented by interested property owner, action to bring about the discontinuance of a nonconforming structure under any plan whereby full value of the structure can be amortized within a definite period of time, taking into consideration the general character of the neighborhood and the necessity for all property to conform to the regulations of this UDO. C. Abandonment. Whenever a nonconforming structure has been discontinued or abandoned for more than three (3) months, a presumption of intent to abandon said structure shall have been established and the right to continue the former nonconforming structure shall no longer exist. Subsequent operation as a nonconforming structure shall be unlawful. Sec. 12-9.4. - Nonconforming Lots of Record. A. Authority to Utilize for Single-Family Residence. In any district in which single-family dwellings are a permitted use, notwithstanding the regulations imposed by any other provisions of this Section, a single-family detached dwelling that complies with the restrictions below may be erected on a nonconforming lot that is not less than thirty (30) feet in Page 3 width, consisting entirely of one (1) tract of land of not less than three thousand (3,000) square feet, and that: 1. Has less than the prescribed minimum lot area, width, and/or depth; 2. Is shown by a recorded plat or deed to have been a lot of record owned separately and individually from adjoining tracts of land at a time when the creation of a lot of such size, depth, and width at such location would not have been prohibited by any zoning or other ordinance; and 3. Has remained in separate and individual ownership from adjoining tracts of land continuously during the entire time that the creation of such lot has been prohibited by the applicable zoning ordinance or other ordinances. B. Regulations for Single-Family Use of Nonconforming Lots. A nonconforming lot authorized to be used pursuant to this Section may be used for a single-family dwelling and no other structure except for a garage or carport. Construction of such single-family dwelling shall comply with all the regulations (except lot area, width, and depth) applicable to single- family dwellings in the zoning district in which the lot in question is located, except that the following side yard requirements shall apply in place of the side yard requirements otherwise applicable: 1. The dwelling shall be placed on the lot so as to provide a yard on each side of the dwelling. 2. The sum of the widths of the two (2) side yards on such lot shall be not less than the smaller of: a. Twenty-five (25) percent of the width of the lot; or b. The minimum total for both side yards prescribed by the bulk regulations for said zoning district; and 3. No side yard shall be less than three (3) feet wide. C. Regulations for Certain Nonconforming Lots Zoned R Rural. 1. A single-family dwelling and accessory structure(s) in areas zoned R Rural, may be erected or structurally altered on a nonconforming lot of record, that is not less than five thousand (5,000) square feet in area and not more than one (1) acre in area, so long as the structure or the addition to the structure complies with the setbacks established by the GS General Suburban zoning district. 2. A single-family dwelling or accessory structure located on property within the area annexed by Ordinance No. 3331, adopted by the City Council on April 14, 2011, may be erected or structurally altered on a nonconforming lot of record provided the proposed construction complies with the setback requirements established by the GS General Suburban zoning district. D. Other Uses of Nonconforming Lots: Site Plan Required. In any district in which single-family dwellings are not permitted, a nonconforming lot of record which meets the requirements above may be used for any use permitted in the district in which it is located if, but only if, a site plan for such use has been approved in accordance with the provisions of the Site Plan Review section of this UDO. E. Lots Made Nonconforming by Right-of-Way Acquisition. Any lot made nonconforming solely by means of area dedicated, condemned, sold or otherwise conveyed for public right-of-way shall be allowed to pursue any allowed use as if such area were a part of the remaining lot, except that all applicable setbacks shall be adhered to. (Ord. No. 2011-3355 , § 1(Exh. B), 6-23-2011; Ord. No. 2012-3449 , Pt. 1(Exh. M), 9-27-2012; Ord. No. 2013-3521 , Pt. 1(Exh. N), 9-12-2013) Sec. 12-9.5. - Nonconforming Tracts. Page 4 Unplatted properties made nonconforming by the zoning applied at the time of annexation shall be allowed to plat, provided that the resulting lot contains the entire tract. Sec. 12-9.6. - Nonconforming Signs. A. Continuation Allowed. A lawfully nonconforming sign may continue in use except as otherwise provided in or authorized by this Section. A change in the information on the face of an existing nonconforming sign is allowed if the change does not increase the area of the sign face and involves no structural alteration. B. Alteration, Expansion, Moving. No nonconforming sign, by voluntary act of the owner, shall be: 1. Changed or altered in any manner which would increase the degree of its nonconformity; 2. Expanded (sign face); or 3. Moved in whole or in part to any other location where it would remain nonconforming. C. Signs Required to be Moved by the City. Any nonconforming sign required to be moved or removed by the City shall be removed or relocated in accordance with the provisions of the Texas Local Government Code. D. Regulations for Certain Nonconforming Properties Zoned R Rural . Attached signs may either be erected or structurally altered on a nonconforming nonresidential structure located on property within the area annexed by Ordinance No. 3331, dated April 14, 2011, provided the proposed sign or alteration complies with Section 12-7.5.I. "Attached Signs" of this UDO. (Ord. No. 2015-3643 , Pt. 1(Exh. A), 3-12-2015) Page 1 Sec. 12-7.10. - Non-Residential Architectural Standards. C. Standards for Non-Residential Structures. 4. Building Materials . a. The following minimum amount of fired brick, natural stone, marble, granite, or any concrete product so long as it has an integrated color and is textured or patterned (not aggregate material) to simulate brick, stone, marble, or granite shall be provided: 1. A minimum of ten (10) percent on any façade visible from a public right-of-way or public way; 2. A minimum of twenty (20) percent on primary entrance façades (single or multiple tenant building) that exceed two-hundred (200) feet in horizontal length; 3. A minimum of twenty (20) percent on any façade facing a public right-of-way of a street classified as a major collector on the Thoroughfare Plan; and 4. A minimum of thirty (30) percent on any façade facing a public right-of-way of a street classified as a minor arterial or greater on the Thoroughfare Plan. b. Building materials used to meet the minimum material requirements as provided above may not be painted. c. The following building materials are allowed on all façades subject to the following limitations: 1. Stucco, EIFS, high build textured paint on concrete to simulate the appearance of stucco, split-face concrete masonry that does not simulate brick or stone, fiber cement siding, reflective glass, or any material equivalent in appearance and quality as determined by the Design Review Board, shall not cover more than seventy-five (75) percent of any façade. 2. Wood or cedar siding, stainless steel, chrome, standing seam metal, premium grade architectural metal, or architecturally finished metal panels (not corrugated metal) shall not cover more than thirty (30) percent of any façade. 3. Tile or smooth face, tinted concrete blocks shall only be used as an accent and shall not cover more than ten (10) percent of any façade. 4. Painted metal panel siding is allowed without limitation on a rear façade of a building when the façade is not visible from a right-of-way, parkland, greenway, or any residential area. 5. Galvanized steel and painted steel are allowed on doors, including roll-up doors. 6. Metal, standing seam metal, architectural metal or steel may be used as a roof and or canopy/awnings with no limitation on percentage. 7. In WC Wellborn Commercial wood or cedar siding shall be allowed but not cover more than seventy-five (75) percent of any façade and reflective glass shall not cover more than thirty (30) percent of any façade. d. When determining the area of a façade, doors, windows, and other openings are included and roof area is not included. e. Existing buildings may continue to utilize materials other than those listed provided that any material replacement is for maintenance purposes only and the existing material is continued. Any material change or replacement of more than ten fifty (1050) percent of the total area of a façade, including on a cumulative basis, shall require that all building materials and color be brought into compliance on that façade. f. All architectural submittals shall provide elevation drawings for each façade and a material legend (see sample below) for each façade. Page 2 SAMPLE LEGEND USE OF MATERIALS ON FAÇADE 'A' Total Square Footage of Façade 'A': 10,000 s.f. Material Area in Square Feet Percent of Overall Façade Stucco 2,000 s.f. 20% Brick 5,000 s.f. 50% Doors and Windows 3,000 s.f. 30% MEMORANDUM December 21, 2017 TO: Members of the Planning & Zoning Commission FROM: Jenifer Paz, Principal Planner Lauren Hovde, Senior Planner SUBJECT: Annual Review of the Comprehensive Plan & Unified Development Ordinance Item: Public hearing, presentation, possible action, and discussion regarding the Annual Review of the Comprehensive Plan and the Annual Review of the Unified Development Ordinance. Comprehensive Plan The Comprehensive Plan was adopted in 2009 and acts as a guide to ensure the goals and objectives of the City are implemented by acting as a long-range planning and policy structure for future growth. It focuses on the creation and enhancement of places of distinction in College Station. The Plan recognizes the importance of character and capitalizes on that to offer the greatest flexibilities for development, while protecting special places. Yearly reviews are performed to ensure that the Comprehensive Plan remains relevant and to identify any changes necessary to accommodate College Station’s future growth. Our Neighborhood, District & Corridor Planning program produces plans that are intended to serve as action plans for specific areas, focusing on the particular needs identified by those that live and own property in those areas. The City has adopted five neighborhood plans and one district plan and under this program, all of which are currently in implementation. The City has also adopted a number of specific master plans as amendments to the City’s Comprehensive Plan that are currently in the implementation phase. Unified Development Ordinance The Annual Review of the Unified Development Ordinance (UDO) is required by the UDO as an on-going effort to keep the development codes of the City of College Station current and relevant. Included, as part of the review, is a list of amendments to the UDO during the past 12 months. Summary of Item The Annual Review of the Comprehensive Plan and UDO highlight some of the City’s major initiatives this past year. The Review is organized by project type and assesses significant actions and accomplishments during the past year that further implementation of the Plan. The report is an interactive format that links to more detailed information on the City’s web pages, including the original plans, maps, and more detailed implementation status. The last Annual Review was considered by City Council in November 2016. Attachments: 2017 Annual Review of the Comprehensive Plan and Unified Development Ordinance Comprehensive Plan & Unified Development Ordinance A Review of 2017. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . CONTENTS Evaluation & Appraisal Report ..........................2 Neighborhood, District & Corridor Plans ..................3 Master Plans .......................................6 Projects in Progress.................................13 Unified Development Ordinance........................14 Vision Statement ...................................16 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . This annual review includes an overview of major Comprehensive Plan initiatives. Yearly reviews are performed to ensure the Comprehensive Plan remains relevant and to identify changes necessary to accommodate College Station’s future growth. 2 Comprehensive Plan Evaluation & Appraisal Report Progress in FY17: • Future Land Use and Character Map amendments to five areas through city-initiatives. • Identified potential impediments to development and addressed through ordinance amendments. • Amended the Unified Development Ordinance to incentivize redevelopment and infill development. • Began annexation discussions with properties under expiring Non-Annexation Development Agreements. • Roadway Impact Fees were approved in November 2016. WEB WEB Five-Year Comprehensive Plan Evaluation & Appraisal Report September 2014 As called for in the 2009 Comprehensive Plan, a five-year evaluation and appraisal report was prepared in 2014 that evaluates the existing plan and assesses its success in achieving the community’s goals. The review served as a check-up on the Comprehensive Plan by identifying successes and shortcomings, considering changing conditions, and recommending appropriate modifications. PDF 3 MAP MAP MAP Comprehensive Plan Neighborhood, District & Corridor Plans Central College Station Adopted June 2010* Progress in FY17: • Completed stand-alone sidewalk on San Saba Drive from Pedernales Drive to Rio Grande Boulevard. . . . . . . . * Received the Long Range Planning Award from CTxAPA in 2010. Eastgate Neighborhood Adopted June 2011 Progress in FY17: • Construction completed on Nimitz Street from Lincoln Avenue to Ash Street, including a sidewalk on one side. • Completed stand-alone sidewalks along Eisenhower Street from University Drive to Ash Street, and on Live Oak Street from Texas Avenue South to Eisenhower Street. Southside Area Neighborhood Adopted September 2012 Progress in FY17: • Design underway for stand-alone sidewalks along Southwest Parkway on both sides from Wellborn Road to Welsh Avenue to address ADA concerns. • Design underway for a capital project pertaining to neighborhood safety improvements, including sidewalks on Park Place, Holik Street, Glade Street, and Anna Street. WEB Goals of the Comprehensive PlanFuture Land Use and Character | Neighborhood Integrity | Economic Development | ParksMobility | Municipal Facilities & Community Services | Growth Management Neighborhood, District, and Corridor plans are small-area plans focused on areas designated for further review in the Comprehensive Plan. The plans are intended to serve as action plans that focus on the particular needs and opportunities of a specific area. WEB WEB WEB WEB 4 Wellborn Community Plan Adopted April 2013 Progress in FY17: • Construction completed for a capital project along Greens Prairie Trail from Wellborn Road to Royder Road, including bike lanes and sidewalks. South Knoll Area Neighborhood Plan Adopted September 2013 Progress in FY17: • Design of landscaping, irrigation, and hardscaping initiated for the multi-use path along Harvey Mitchell Parkway from Texas Avenue to Welsh. • Construction completed on a stand-alone sidewalk along Langford Street from Haines Drive to Guadalupe Drive to comply with the ADA. • Design underway for stand-alone sidewalks along Southwest Parkway on both sides from Wellborn Road to Welsh Avenue to address ADA concerns. MAP MAPWEB WEB Comprehensive Plan Neighborhood, District & Corridor Plans WEB WEB 5 WEB Comprehensive Plan Neighborhood, District & Corridor Plans Medical District Master Plan Adopted October 2012 Progress in FY17: • Completion for Lick Creek Park Nature Trail set for FY2018. • Completed Rock Prairie Road widening from State Highway 6 to Normand Drive. • Design completed for a capital project extending Lakeway Drive from Medical Avenue toward William D. Fitch Parkway, including bike lanes and sidewalks. WEB WEB 6 Comprehensive Plan Bicycle, Pedestrian and Greenways Master Plan WEB Bicycle, Pedestrian and Greenways Master Plan Adopted January 2010 (2011 TxAPA Project Plan of the Year) Progress in FY17: • Master plan update underway. • Free bike classes offered. • Adopt-A-Greenway Program – 15 areas adopted; 332 volunteers; 523 volunteer hours and 123 bags of trash (about 3,650 gallons). Design underway for this stand-alone sidewalk project: • Both sides of Southwest Parkway from Wellborn Road (FM 2154) to Welsh Avenue to address ADA concerns. Design underway or completed for these projects with bike/pedestrian facilities: • Neighborhood Safety Improvements Project in the Southside neighborhood. This includes the addition of sidewalks on Park Place, Holik Street, Glade Street and Anna Street to make it safer for students walking to school. • Harvey Mitchell Parkway (FM 2818) Capacity Improvements from George Bush Drive to Wellborn Road and includes a multi-use path for biking and walking. • Holleman Drive South Widening Project from North Dowling to Rock Prairie Road West and includes a sidewalk on one side and a multi-use path on the other. • University Drive Pedestrian Improvements Project from Boyett Street to South College Avenue includes wider sidewalks on both sides and intersection improvements. • Lakeway Drive extension from Medical Avenue towards William D. Fitch Parkway and includes bike lanes and sidewalks. 645 acres of city-owned greenways 220 miles of sidewalks 48 miles of bike lanes 18 miles of trails WEB 7 Comprehensive Plan Bicycle, Pedestrian and Greenways Master Plan WEB Construction completed for these stand-alone sidewalk projects: • Langford Street from Haines Drive to Guadalupe Drive (upgraded existing sidewalk – ADA request). • Eisenhower Street from University Drive East to Ash Street. • Live Oak Street from Texas Avenue South to Eisenhower Street. • San Saba Drive from Pedernales Drive to Rio Grande Boulevard. • Emerald Dove from Creek View Elementary School to Dove Hollow Lane. Construction completed for these projects with bike/pedestrian facilities: • Intersection of William D. Fitch Parkway (SH 40) and Victoria Avenue and included sidewalks and bike lanes. • Luther Street West Rehabilitation from Marion Pugh Drive to Harvey Mitchell Parkway (FM 2818) and included a bike lane on one side. • Nimitz Street Rehabilitation from Lincoln Avenue to Ash Street and included a sidewalk on one side. WEB 8 Water System Master Plan Adopted April 6, 2017* Progress in FY17 (private and public): • Phased expansion of water supply resources and production capacity. • Groundwater Production Well No. 9 and collection line are under construction. The project will increase system capacities to meet future demands as well as TCEQ requirements. • City-wide water impact fees passed in 2016 help fund water capital projects. • State Highway 6 Water Line Phases 1-3 are under design. The water line extension will improve distribution connectivity along the Highway 6 corridor and will begin to allow the creation of a second pressure plane. • Rock Prairie Road Elevated Storage Tank is under design. The project will add a new three million gallon elevated storage tank near the intersection of Rock Prairie Road and SH 6 that will serve a newly created lower pressure plane. Comprehensive Plan Water/Wastewater Master Plans WEB PDF Wastewater System Master Plan Adopted April 6, 2017 Progress in FY17 (private and public): • Bee Creek Trunkline Phase 2 is under construction and will serve the ultimate build-out area near FM 2818 and Wellborn Road. • Eastside Sewer Service Extension is under design. This project was included as part of the sanitary sewer CCN swap with the City of Bryan and associated with the BioCorridor Infrastructure Project and interlocal agreement. • Lick Creek Generator Replacement is under construction and will replace and upgrade the existing Lick Creek Wastewater Treatment Plant emergency power generator, which is nearing the end of its service life. • Lick Creek Wastewater Treatment Plant capacity expansion is under design and will increase the plant’s capacity from 2 million gallons a day to 5 million a day. WEB 9 Comprehensive Plan Water/Wastewater Master Plans WEB WEB Joint Rehabilitation Projects Older neighborhoods, redevelopment areas Progress in FY17 (private and public): • The Eastgate Utility Rehabilitation project is under construction and will replace deteriorating/problematic water and wastewater lines. The overall project is in the vicinity of Texas Avenue, Lincoln Street, Walton Avenue, and Francis Drive. • Francis Phase 1 Utility/Street Rehabilitation project is under design and will replace deteriorating/problematic water and wastewater lines in conjunction with the street rehabilitation. The overall project is along Francis Street, from Glenhaven to Munson Street. • Woodson Village Utility Rehabilitation project is under design and will replace deteriorating/problematic water and wastewater lines in conjunction with the street rehabilitation. The overall project is along Haines Drive, Glade Street, Dexter Drive, and Timm Drive. PDF 10 Comprehensive Plan Parks and Recreation Master Plan WEB Parks and Recreation Master Plan Adopted July 2011 Progress in FY17: • National Recreation and Parks Association re-accreditation. • Promotional and Marketing Excellence Award from state organization. • Sports Event Magazine named Veterans Park one of the country’s top 10 multi-purpose facilities. • Hosted 54 athletic events, including two national, three regional, and five state championships. • Hosted 75 special events, including Christmas in the Park, the Starlight Series (six concerts), Movies in the Park (six), and Trick or Treat at Werewolf Creek. • Continued process for community parkland purchases (111 acres). • Continued Save the Monarch Butterflies campaign through the Mayor’s Monarch Pledge and created a butterfly garden at Bee Creek Arboretum. • Received the Tree City USA designation for the 26th time. • Sold 220 (21 more than in FY16) cemetery spaces and had 129 interments through Aug. 31. • Completed design of phase 1 of the Veteran’s Park Build-Out (two synthetic turf athletic fields). • Completed PER reports for Southeast Community Park and Veterans Park projects. • Completed renovations of playgrounds and surfacing at 15 parks. • Completed total renovation of the water slide features at Adamson Lagoon. • Repaired and renovated the splash pad at the Lincoln Recreation Center. • Completed construction of the Lick Creek Park Nature Center. • Completed construction of the Lincoln Recreation Center expansion. • Completed the design of the Ringer Library expansion. • Completed 95 percent of the design of the Fun for All Playground at Beachy Central Park. 250+ programs offered 58 parks 1,374 acres of parkland WEB 11 Comprehensive Plan Economic Development Master Plan WEB Economic Development Master Plan Adopted September 2013 Progress in FY17: INDUSTRY GROWTH & DEVELOPMENT • Hosted the 7th annual America’s Competitiveness Exchange on Innovation and Entrepreneurship (ACE) – week-long international reverse trade mission focusing on economic development in Central Texas. Industry Recruitment • Partnership with Texas A&M – Developed an industry recruitment strategy with the University identifying strengths, weaknesses, opportunities and threats as well as targeted industries for direct outreach. • Recruitment trip to Detroit with Texas A&M University System. • ED Marketing Framework for CS – Research and targeting efforts to evaluate current conditions, target industry selection and optimization, and competitiveness. Spring Creek Technology Park • City-initiated rezoning and utility master planning to prepare the initial properties for development. • Construction contract awarded for Lakeway Drive and Pebble Creek Parkway extension projects. • Created the Spring Creek LGC, a not-for-profit economic development entity. Medical District Master Plan • Construction contract awarded for Lakeway Drive through the Medical District. • Regional sewer line design in conjunction with private development. • Worked with majority property owner on creation and approval of a Planned Development District zoning. PDF WEB 12 Comprehensive Plan Economic Development Master Plan WEB WEB RETAIL GROWTH & DEVELOPMENT Retail Recruitment • Attended a state and national trade show for direct retail recruitment. • Direct outreach and marketing efforts with developers and retailers. Development Projects & “Broken” Sites • City-initiated commercial preservation rezonings & land use amendments – successfully completed five out of eight commercial rezonings and all proposed city-initiated land use amendments. Floodplain analysis and traffic impact analysis on the remaining three city-initiated rezonings. • Fast-tracked projects – managed economic development-related projects, including Medical District, Academy & Providence Park, Embassy Suites, and BV Auto. • Infrastructure agreements – Dartmouth extension from Harvey Mitchell Parkway to Texas Avenue through an infrastructure participation agreement. Eisenhower and Jane pavement overlay agreements to meet Embassy Suites grand opening. • Continued redevelopment efforts along University Drive to maximize property values. 117,238 2017 population estimate 24.9% Population growth since 2010 2.5% 2017 unemployment rate 49.75¢ tax rate per $100 valuation 13 Comprehensive Plan Projects in Progress WEBStormwater Master Plan Initiated 2011 Progress in FY17: • Engineering firm retained to focus on drainage capacity and flood control projects on public storm sewer systems and open channels. • For fourth year, continued the contract with the U.S. Geological Survey for two stream gauges to collect field-measured stream data. Thoroughfare Plan Initiated July 2017 Project Scope: • Update thoroughfares to reflect the MPO 2050 Thoroughfare Concept adopted in June 2017. • Revise the color scheme to follow the MPO Concept. • Include remaining South College Station Mobility Analysis revisions. • Incorporate other city-initiated studies and housekeeping items. Additional Progress in FY17: • City-initiated South College Station Thoroughfare Plan amendment to realign Royder Road within the Wellborn Community Plan area. TMDL Implementation Plan Total Maximum Daily Load, Approved August 2012 (TCEQ), I-Plan, Approved September 2012 (EPA) Progress in FY17: • Final year completed of five-year Implementation Plan. Discussions initiated on next phase of I-Plan. • MS4 permit renewed. • Sanitary Sewer Overflow initiative is active and being maintained. • Outreach efforts included utility bill inserts, classroom lectures, PSAs, blog posts, newsletters, and information on brazoscleanwater.org, the official website. • Monitoring is occurring and conditions look good. • Navasota Watershed Protection Plan accepted by EPA November 2017. WEB 14 Unified Development Ordinance Amendments in Fiscal Year 2017 WEB WEB Code of Ordinances Fee Updates Ordinance #2016-3845, adopted Dec. 8, 2016 Adjust Planning & Development Services fees for applications and permits.The amendment also consolidated fees embedded in other parts of the Code of Ordinances. Design Review Board Membership Ordinance #2016-3835, adopted Nov. 10, 2016 Amendments to the membership requirements. Roadway Impact Fees Ordinance #2016-3840, adopted Nov. 10, 2016 Provides for roadway impact fees. Itinerant Vendors & Tent Sales Ordinance #2017-3857, adopted Jan. 26, 2017 Revisions exempt mobile medical clinics from requirements of itinerant vendor ordinance and expands the number of days allowed for outdoor tent sales. Platting & Replatting in Older Subdivisions Ordinance #2017-3886, adopted May 11, 2017 Amendment clarifies the intent of the ordinance and provides the administrator with discretion of which lots to include in the calculation of average lot width. Single-Family Landscape Requirements & Landscape Screening Ordinance #2017-3909, adopted July 27, 2017 Allows alternative placement for required landscaping for townhome developments. The amendment also included a revision to the treatment of exposed concrete, retaining walls, off-street loading areas, and utility connections. 15 Unified Development Ordinance Amendments in Fiscal Year 2017 WEB WEB Off-Street Parking Standards Ordinance #2017-3923, adopted Aug. 24, 2017 Provide flexibility and parking alternatives for developing and redeveloping properties. It increases the discretion given to the administrator to consider alternate parking options. Health Clubs in Commercial Industrial Zoning Districts Ordinance #2017-3931, adopted Sept. 11, 2017 Allowed indoor and outdoor health clubs in Commercial Industrial zoning districts. Subdivision Regulations Utility Easement Requirements Ordinance #2017-3930, adopted Sept. 11, 2017 Grants the city engineer discretion to approve alternative easement locations for any subdivision and to require additional utility easements or additional easement width for any subdivision. Start Time for Construction Activity Ordinance #2017-3926, adopted Sept. 11, 2017 Changes to the noise ordinance that adjusted the start time for necessary construction from 7 a.m. to 6 a.m. with approval by the city’s building official. College Station, the proud home of Texas A&M University and the heart of the Research Valley, will remain a vibrant, forward-thinking, knowledge-based community which promotes the highest quality of life for its citizens by: • Ensuring safe, tranquil, clean, and healthy neighborhoods with enduring character. • Increasing and maintaining the mobility of citizens through a well-planned and constructed inter-modal transportation system. • Expecting sensitive development and management of the built and natural environment. • Supporting well-planned, high quality, and sustainable growth. • Valuing and protecting cultural and historical community resources. • Developing and maintaining high quality, cost-effective community facilities, infrastructure and services that ensure our city is cohesive and well connected • Proactively creating and maintaining economic and educational opportunities for citizens. College Station will continue to be among the friendliest and most responsive of communities and a demonstrated partner in maintaining and enhancing all that is good and celebrated in the Brazos Valley. It will continue to be a place where Texas and the world come to learn, live, and conduct business!