HomeMy WebLinkAbout11/06/2017 - Regular Agenda Packet - Bicycle, Pedestrian, and Greenways Advisory Board
BICYCLE, PEDESTRIAN, AND
GREENWAYS ADVISORY BOARD
November 6, 2017
3:00 P.M.
City Hall
2nd Floor Conference Room 1
1101 Texas Avenue
College Station, Texas
AGENDA
BICYCLE, PEDESTRIAN, AND GREENWAYS
ADVISORY BOARD
Monday, November 6, 2017, 3:00 PM City Hall 2nd Floor Conference Room 1
1101 Texas Avenue College Station, Texas, 77840
1. Call to Order
2. Hear Visitors - At this time, the Chairman will open the floor to citizens wishing to address the Board on issues not already scheduled on today's agenda. The citizen presentations
will be limited to three minutes in order to accommodate everyone who wishes to address
the Board and to allow adequate time for completion of the agenda items. The Board will
receive the information, ask city staff to look into the matter, or will place the matter on
a future agenda for discussion. (A recording is made of the meeting; please give your name and address for the record.)
3. Consideration, possible action, and discussion to approve meeting Minutes.
• October 2, 2017
4. Presentation and discussion regarding an update on the following item:
• Bicycle Parking Standards
5. Public hearing, presentation, possible action, and discussion regarding a recommendation to the Planning and Zoning Commission on proposed changes to the Bicycle, Pedestrian and Greenways Master Plan related to Thoroughfare Plan amendments that incorporate the Bryan/College Station Metropolitan Planning Organization 2050 Thoroughfare Concept and other City-initiated and clean up items.
6. Presentation, possible action, and discussion regarding the Bicycle, Pedestrian, and
Greenways Master Plan Update including Project Priorities.
7. Presentation and discussion regarding the Bicycle, Pedestrian, and Greenways Advisory Board calendar of upcoming meetings.
• November 14, 2017 ~ TxDOT Public Meeting ~ FM 2818 Corridor ~ Larry J. Ringer Library, 1818 Harvey Mitchell Parkway South ~ 4:30 p.m. – 6:30 p.m.
• November 16, 2017 ~ Planning and Zoning Commission Meeting ~ City Hall,
Council Chambers, 1101 Texas Avenue ~ 6:00 p.m.
• December 4, 2017 ~ Bicycle, Pedestrian, and Greenways Advisory Board ~ City
Hall, City Hall 2nd Floor Conference Room 1, 1101 Texas Avenue ~ 3:00 p.m.
8. Possible action and discussion on future agenda items – A Bicycle, Pedestrian, and Greenways Advisory Board Member may inquire about a subject for which notice has not been given. A statement of specific factual information or the recitation of existing policy
may be given. Any deliberation shall be limited to a proposal to place the subject on an
agenda for a subsequent meeting.
9. Adjourn.
Notice is hereby given that a Regular Meeting of the Bicycle, Pedestrian, and Greenways Advisory Board of the City of College Station, Texas will be held on Monday, November 6, 2017 at 3:00 p.m. in the City Hall 2nd Floor Conference Room 1, 1101 Texas Avenue, College Station, Texas. The following subjects will be discussed, to wit: See Agenda. Agendas may be viewed on www.cstx.gov.
APPROVED:
By________________________________ City Manager I certify that the above Notice of Meeting was posted at College Station City Hall, 1101 Texas Avenue, College Station, Texas, on October 30, 2017 at 5:00 p.m.
CITY OF COLLEGE STATION, TEXAS
By_________________________________ City Secretary
This building is wheelchair accessible. Persons with disabilities who plan to attend this meeting
and who may need accommodations, auxiliary aids, or services such as interpreters, readers, or
large print are asked to contact the City Secretary’s Office at (979) 764-3541, TDD at 1-800-
735-2989, or email adaassistance@cstx.gov at least two business days prior to the meeting so that appropriate arrangements can be made. If the City does not receive notification at least two business days prior to the meeting, the City will make a reasonable attempt to provide the necessary accommodations.
Penal Code § 30.07. Trespass by License Holder With an Openly Carried Handgun.
“Pursuant to Section 30.07, Penal Code (trespass by license holder with an openly carried handgun), a person licensed under Subchapter H, Chapter 411, Government Code (handgun licensing law), may not enter this property with a handgun that is carried openly”
Codigo Penal §30.07. Trespasar Portando Armas de Mano al Aire Libre con Licencia.
“Conforme a la Seccion 30.07 del codigo penal (traspasar portando armas de mano al aire libre con licencia), personas con licencia bajo del Sub-Capitulo H, Capitulo 411, Codigo de Gobierno (Ley de licencias de arma de mano), no deben entrar a esta propiedad portando arma de mano
al aire libre”
MINUTES
BICYCLE, PEDESTRIAN, AND GREENWAYS
ADVISORY BOARD
Monday, October 2, 2017 3:00 PM
College Station City Hall
2nd Floor Conference Room 1
1101 Texas Avenue
College Station, Texas, 77840
MEMBERS PRESENT: Chairman Blanche Brick, Jon Denton, Tina Evans, Andrew Middleton,
Neal Johnson, Jonathan Coopersmith
MEMBERS ABSENT: Molly Fierro
STAFF PRESENT: Bicycle, Pedestrian, and Greenways Senior Program Manager
Venessa Garza, Transportation Planning Coordinator Jason
Schubert, Board Secretary Amber Johnson
AGENDA ITEM NO. 1: Call to Order.
Chairman Brick called the meeting to order at 3:02 p.m.
AGENDA ITEM NO. 2: Hear Visitors.
There were no visitors present who wished to address the board.
AGENDA ITEM NO. 3: Consideration, possible action, and discussion to approve
meeting minutes.
Board Member Evans motioned to approve the meeting minutes from September 5, 2017. The
motion was seconded by Board Member Denton and was approved (5-0).
AGENDA ITEM NO. 4: Presentation and discussion regarding an updated on the
following item: Bicycle Parking Standards.
This agenda item was discussed after Agenda Item No. 5.
Senior Program Manager Garza presented an update to the board on this item. Ms. Garza
stated that the item previously discussed by the board was brought before the Planning and
Zoning Commission (P&Z). Some of the changes proposed by staff were not supported by P&Z
so this item will be going back to P&Z so staff can narrow the scope for discussion and next
steps.
Board Member Coopersmith attended the Planning and Zoning Commission meeting and
provided the board with details regarding their concerns.
The board held a general discussion regarding bicycle parking standards.
AGENDA ITEM NO. 5: Presentation, possible action, and discussion regarding
upcoming changes to the City’s Comprehensive Plan – Thoroughfare Plan and the
Bicycle, Pedestrian, and Greenway’s Master Plan based on the Bryan/College Station
MPO 2050 Thoroughfare Concept.
Transportation Planning Coordinator Jason Schubert presented this item to the board.
Mr. Schubert explained that following several months of public meetings and revisions resulting
from public comments, the Bryan/College Station Metropolitan Planning Organization (MPO)
adopted a 2050 Thoroughfare Concept plan in June 2017. The Thoroughfare Concept includes
major roadways classified as arterials and highways intended as a guide to help develop a
County-wide roadway network to support the long-term growth anticipated in Brazos County
over the coming decades. Staff is in the process of identifying the amendments needed to align
the City’s Thoroughfare Plan with the MPO’s 2050 Thoroughfare Concept and corresponding
revisions to bicycle and pedestrian facilities along these roadways which will also amend the
Bicycle, Pedestrian, and Greenways Master Plan. Amendments to Master Plan will be proposed
today and at the November meeting for the Board’s consideration and recommendation to the
Planning and Zoning Commission.
Board Member Coopersmith arrived at the meeting at 3:06 p.m.
The board held a general discussion regarding proposed changes to the thoroughfare plan.
Chairman Brick left the meeting at 3:51 p.m.
The board returned to Agenda Item No. 4 after this item.
AGENDA ITEM NO. 6: Presentation, possible action, and discussion regarding
appointing a member of the BPG Board to the Metropolitan Planning Organization’s
Alternative Transportation Advisory Panel.
Senior Program Manager Garza presented this item to the board. Ms. Garza explained that the
advisory panel meets monthly to discuss items related to bicycling and walking at a regional
level. The board is made up of representatives from local government entities and citizens and
is seeking to fill a citizen spot as well as a citizen alternate spot.
Board Member Evans motioned to appoint Board Member Coopersmith as the Alternative
Transportation Advisory Panel representative from the BPG board with the alternate being
Board Member Johnson. Board Member Denton seconded the motion and was approved (5-0).
AGENDA ITEM NO. 7: Presentation, possible action, and discussion regarding the
Bicycle, Pedestrian, and Greenways Master Plan Update and Project Priorities
Methodology.
Senior Program Manager Garza presented this item to the board.
The first area evaluated by the board is located along the Gulf States Trail.
Ms. Garza stated that staff is proposing to extend the proposed Gulf States Trail down to Peach
Creek Road.
There was no opposition from the board regarding this item.
The second area evaluated by the board is located on Southwest Parkway.
Ms. Garza stated that staff is proposing to add a multi-use path on one side of Southwest
Parkway from Welsh Avenue to Anderson Street. She added that staff is also proposing
removing the bike route on Southwest Parkway from State Highway 6 South to Wellborn Road.
The board held a general discussion regarding the ability to construct in the area. Discussion
included if there was adequate room to construct a larger facility and the hazardous nature of
the existing sidewalk conditions.
There was no opposition from the board regarding the proposed changes but expressed the
challenges that exist in terms of construction feasibility.
The third area evaluated by the board is located on Rock Prairie Road.
Ms. Garza stated that staff is proposing to add a multi-use path on Rock Prairie Road from
Wellborn Road to College Station Middle School.
Board Member Johnson asked if there was a way to connect into the bike lanes that exist on
Welsh Avenue and Victoria Avenue.
Ms. Garza stated that she will need to look at it closer to determine exactly how those
connections are going to be made.
There was no opposition from the board regarding this item.
The fourth area evaluated by the board is located along State Highway 6 Frontage
Road.
Ms. Garza stated that staff is proposing adding a trail along State Highway 6 Frontage Road
from Harvey Road to Holleman Drive East.
There was no opposition from the board regarding this item.
The fifth area evaluated by the board is located in the area of Tarrow Park.
Ms. Garza stated that based on discussions staff is proposing adding a bike route on Eleanor
Street from Holleman Drive to Montclair Avenue and on Montclair Avenue from Eleanor Street
to Luther Street as previously discussed and not widening the trail that exists within the park.
The board held a general discussion regarding the area.
There was no opposition from the board regarding this item.
The sixth area evaluated by the board is located in the area of Alexandria Avenue.
Ms. Garza stated that staff is proposing adding a trail along the perimeter of the park on
Alexandria Avenue from Southern Plantation Drive to the southeastern corner of Southern Oaks
Park.
There was no opposition from the board regarding this item.
The seventh area evaluated by the board is located on Texas Avenue.
Ms. Garza stated that staff is proposing adding a trail on both sides along Texas Avenue from
FM 2818 to State Highway 6 South.
There was no opposition from the board regarding this item.
The eighth area evaluated by the board is located on Wellborn Road.
Ms. Garza stated that staff is proposing adding a trail on Wellborn Road from State Highway 40
to Barron Cut-Off Road.
There was no opposition from the board regarding this item.
The ninth and tenth area evaluated by the board is located in the Southern part of
town.
Ms. Garza stated that staff is proposing adding trails to both Hopes Creek and Peach Creek that
following along the creek corridors in anticipation of potential residential growth in the areas
with the goal to connect to future schools in these areas.
There was no opposition from the board regarding this item.
The eleventh area evaluated by the board is located along Harvey Road.
Ms. Garza stated that staff is proposing to remove the existing proposed bike route along
Harvey Road from Scarlett Ohara to Veteran’s Park as a multi-use path is now being proposed
along the corridor.
The twelfth area evaluated by the board is located along Tonkaway Lake Road.
Ms. Garza stated that staff is proposing to add a bike route along Tonkaway Lake Road from
William D Fitch Parkway to Bird Pond Road based on existing use by bicyclists.
There was no opposition from the board regarding this item.
The thirteenth area evaluated by the board is located at William D Fitch Parkway and
State Highway 6 S.
Ms. Garza stated that staff is proposing to add a bike facility along William D. Fitch Parkway at
State Highway 6 South.
There was no opposition from the board regarding this item.
The board then began discussion regarding Project Priorities Methodology.
Ms. Garza explained that Geographic Information Systems (GIS) is used to construct a model
per facility type to objectively develop a list of priorities based on various criteria. Each model
includes a criteria that help identify the need is and then a weight based on the level of
importance.
Ms. Garza stated that the board had previous discussions about wanting to use projected
population. She stated that they need how population is going to be weighted between
projected versus existing population.
The board held a general discussion and agreed on doing running the model with two scenarios:
one for equal weights for projecting and existing population of 9 and 9 and another run with a
weight of 12 for existing and 6 for proposed. Ms. Garza added that she can start the model with
just sidewalks and see what the outcome is.
Ms. Garza stated that the other discussion item is in regards to crash data and if they should be
broken into major and minor and how they should be appropriately weighted.
The group agreed that major crashes should most likely have a higher weight of 12 and minor
crashes a weight of 6.
AGENDA ITEM NO. 8: Presentation and discussion regarding the Bicycle, Pedestrian,
and Greenways Advisory Board calendar of upcoming meetings.
• October 5, 2017 ~ Planning and Zoning Commission Meeting ~ City Hall, Council
Chambers ~ 6:00 p.m.
• October 19, 2017 ~ Planning and Zoning Commission Meeting ~ City Hall,
Council Chambers ~ 6:00 p.m.
• November 6, 2017 ~ Bicycle, Pedestrian, and Greenways Advisory Board ~ City
Hall, 2nd Floor Conference Room 1 ~ 3:00 p.m.
AGENDA ITEM NO. 9: Possible action and discussion on future agenda items – A Bicycle,
Pedestrian, and Greenways Advisory Board Member may inquire about a subject for
which notice has not been given. A statement of specific factual information or the
recitation of existing policy may be given. Any deliberation shall be limited to a proposal
to place the subject on an agenda for a subsequent meeting.
There were no future agenda items requested.
AGENDA ITEM NO. 9: Adjourn.
The meeting adjourned at 5:20 p.m.
APPROVED: ATTEST:
____________________________ ____________________________
Blanche Brick, Chairman Amber Johnson, Board Secretary
1101 Texas Avenue, P.O. Box 9960
College Station, Texas 77842
Phone 979.764.3570 / Fax 979.764.3496
MEMORANDUM
DATE: November 6, 2017
TO: Members of the Bicycle, Pedestrian, and Greenways Advisory Board
FROM: Jason Schubert, AICP, Transportation Planning Coordinator
jschubert@cstx.gov
SUBJECT: Bicycle, Pedestrian and Greenways Master Plan Amendments Related to the 2017 Thoroughfare Plan
Update
Item: Public hearing, presentation, possible action, and discussion regarding a recommendation to the Planning and
Zoning Commission on proposed changes to the Bicycle, Pedestrian and Greenways Master Plan related to Thoroughfare
Plan amendments that incorporate the Bryan/College Station Metropolitan Planning Organization 2050 Thoroughfare
Concept and other City-initiated and clean up items.
Summary: Following several months of public meetings and revisions resulting from public comments, the Bryan/College
Station Metropolitan Planning Organization (MPO) adopted a 2050 Thoroughfare Concept plan in June 2017. The
Thoroughfare Concept includes major roadways classified as arterials and highways intended as a guide to help develop a
County-wide roadway network to support the long-term growth anticipated in Brazos County. Staff has identified the
amendments needed to incorporate the MPO’s 2050 Thoroughfare Concept into the College Station Thoroughfare Plan
and the recommended revisions to bicycle and pedestrian facilities along these roadways that would amend the Bicycle,
Pedestrian and Greenways Master Plan. As part of this effort, staff is proposing to include some other City-initiated
amendments and clean up items. Potential changes related to the on-going update of the Bicycle, Pedestrian, Greenways
Master Plan are being processed separately as a part of that effort.
An overview and initial discussion of the Thoroughfare Plan update and some of the related bicycle and pedestrian changes
were presented at the October 2, 2017 Board meeting. This item will present all proposed changes for formal
consideration and a recommendation to the Planning and Zoning Commission. The proposed changes are summarized in
table form and two map books – one for the Bicycle Master Plan and one for the pedestrian Master Plan.
The proposed amendments are tentatively scheduled for public hearing and consideration by the Planning and Zoning
Commission at their November 16, 2017 meeting, followed by a public hearing and final consideration by City Council at
their November 20, 2017 meeting.
Attachments:
1. Table - Changes Based on the Adopted MPO 2050 Thoroughfare Concept
2. Table - Changes Initiated by the City including Cleanup Items
3. Bicycle Master Plan Map Book with related amendments
4. Pedestrian Master Plan Map Book with related amendments
Additional Information and Tips
PLEASE READ. It will be helpful in navigating all of the information you’ve been provided with.
• There are two tables:
1. Changes Based on the Adopted MPO 2050 Thoroughfare Concept
2. Changes Initiated by the City including Cleanup Items
• There are two map books:
1. Bicycle Master Plan Map Book
2. Pedestrian Master Plan Map Book
Quick Review:
1. Review each Map Book only.
2. Each page has a map with the Adopted/Current Plan and a map with the Proposed Plan.
3. Find each labeled colored dot on each map to find the change proposed.
4. The changes are represented with labeled numbers (circles) that correspond with the tables.
For a more detailed review, read below:
Table related information
a. All the changes related to the Thoroughfare Plan update are described in each table respectively.
b. Bicycle and Pedestrian changes are highlighted in gray and are the only changes reflected and numbered in the
corresponding map books.
c. Look at the map book page # in the table to determine which page to flip to and find the change (please note: pages are
printed front and back). Although the changes are in order by number in the table the corresponding map book pages that
reflect the changes will not necessary be in order and will require flipping back and forth to find the proposed change. For
example, change #2 may be on page 2 in the map book but change #3 may be on page 5.
d. The last column of the table references if the Board discussed the proposed change at the board meeting in October.
Map book related information
a. Each map book has a grid system of the City and reflects the bicycle and pedestrian plan respectively.
b. Each page has the Adopted/Current Plan and the Proposed Plan (with recommended changes).
c. Changes Based on the Adopted MPO 2050 Thoroughfare Concept are labeled with red circles .
d. Changes Initiated by the City including Clean-up items are labeled with purple circles .
e. You will skip some pages in each map book as there aren’t any related bicycle or pedestrian changes proposed on those
pages.
f. Not all roads are labeled due to the scale of the document.
Let’s get started:
1. First, review proposed bicycle changes using the Bicycle Master Plan Map Book and the table called Changes Initiated
by the City including Cleanup Items.
a. Look at the change number column and turn to the appropriate page number in the map book referenced to find
the circle labeled in the map that reflects the change described in the table under the column called Proposed Bike
Changes. Remember to only look at the rows highlighted in gray for proposed bicycle and pedestrian changes.
b. Compare the numbers/dots and associated description with corresponding proposed changes in the map book for
all the City Initiated/ Cleanup Items.
2. Then, using the Bicycle Master Plan Map Book and the table called Changes Based on the Adopted MPO 2050
Thoroughfare Concept, do the same as described above to review MPO related changes.
3. Once you’ve reviewed all of the proposed bicycle changes follow the same steps to review the pedestrian changes
using the two tables and Pedestrian Master Plan Map Book.
#
#
DRAFT Thoroughfare Plan Update with Bicycle and Pedestrian Related Changes
Changes Initiated by the City including Cleanup Items
From To
1a 1,7 Hensel Street College Avenue Texas Avenue
Add bike lanes as per 2017
TAMU Campus Master
Plan
Add sidewalks as per
2017 TAMU Campus
Master Plan
Realign Minor Collector on west to College Avenue at Cross Street and extend to east
to intersect Texas Avenue at Rosemary Drive as per 2017 Texas A&M University
Campus Master Plan. Roadway on Texas A&M property, alignment shown for planning
purposes.
1b 1,7 Front Street University Drive Hensel Street None Remove sidewalks as
roadway is removed Remove Minor Collector as not provided as part of Century Square development.
2 2 Future Minor Collector University Drive East Harvey Road None Remove sidewalks Remove as either located on Veterans Park or Texas A&M University System tract,
would not have connections to Veterans Park or Crescent Pointe subdivision.
3 2 Summit Crossing thoroughfares
and extensions Harvey Road University Drive Adjust bike lanes to
proposed alignments
Adjust sidewalks to
proposed alignments
Adjust Summit Crossing Lane and future minor collector as per Summit Crossing
Master Plan and realign to existing median breaks on University Drive East at East
Crest Drive and on Bonneville Road at Hicks Lane.
4 5,17 Thoroughfares in Grimes County
Remove bike route on
Peach Creek Road
extension and SH 30
None Remove future thoroughfares from plan as Inter-Local Agreement regarding
subdivisions not in place with Grimes County.
5 6,7 Finfeather Road/Agronomy
Road Raymond Stotzer Pkwy Bryan City limits Add as Major Collector as on City of Bryan Thoroughfare Plan and cross section in
2017 Texas A&M University Campus Master Plan.
6a 7 College Main University Drive Bryan City limits Reclassify from Major Collector to Minor Collector as constructed; remove section
from University Drive to Church Avenue which is a pedestrian mall.
6b 7 Boyett Street University Drive Louise Avenue Add as Minor Collector intersecting University Drive to replace College Main.
7a 7 Fairview Avenue George Bush Drive Holleman Drive Reclassify from Major Collector to Minor Collector as per Southside Area
Neighborhood Plan.
7b 7 Montclair Avenue George Bush Drive Luther Street Reclassify from Major Collector to Minor Collector as per Southside Area
Neighborhood Plan.
8 8 Corsair Drive Emerald Parkway Pavilion Avenue Add bike lanes None Add remaining portion of Corsair Drive and reclassify from Major Collector to Minor
Collector as constructed.Oct-17
9a 8 Pavilion Avenue SH 6 Sebesta Road Adjust bike lanes None Reclassify from Major Collector to Minor Collector as constructed.
9b 8 Pavilion Avenue extension Sebesta Road SH 6 Realign bike lanes Realign sidewalks Adjust alignment to consider approved Brazos Valley Auto Complex preliminary plan.
10a 12 River Road/Lost Trail extensions Lightsey Lane Brazos River Remove future Minor Collector extension as no longer crossing Brazos River.
10b 12 Paint Trail extension Paint Trail Brazos River Remove future Minor Collector extension as no longer crossing Brazos River.
10c 12 Lightsey Lane Raymond Stotzer Pkwy River Road Add as Minor Collector to connect existing River Road with future Lightsey Lane
extension north of Raymond Stotzer Parkway.
11 13 North Dowling Road realignment Holleman Drive S Luther Street West
extension
Realign and change bike
lanes to multi-use path as
constructed
Realign sidewalks as
constructed
Adjust as constructed with realignment and through movement planned to Holleman
Drive South via Junction Boys Road.
Proposed Thoroughfare Change Description
BPG
Board
Meeting
Change
#
Map
Book
Page #
Thoroughfare
Extent Proposed Bicycle
Changes
Proposed Pedestrian
Changes
None
None
None
None
None
None
None
None
Bicycle, Pedestrian and Greenway Master Plan
Proposed Changes
#
From To Proposed Thoroughfare Change Description
BPG
Board
Meeting
Change
#
Map
Book
Page #
Thoroughfare
Extent Proposed Bicycle
Changes
Proposed Pedestrian
Changes
12 13 Mission Ranch subdivision minor
collectors
Change bike lanes to bike
route on Cameron Oaks
Lane and Feather Run
north of Deacon; Adjust
all facilities
Remove sidewalks on
Cameron Oaks Lane and
Feather Run from Kerr
Valley Lane to Quail Run
subdivision; Adjust all
facilities
Adjust alignment of Deacon Drive West, Feather Run, and Cameron Oaks Lane as per
approved Mission Ranch preliminary plan.
13 13 General Parkway Holleman Drive S Aspen Heights subdivision Adjust bike lanes to
existing alignment
Adjust sidewalks to
existing alignment Adjust alignment of General Parkway as constructed with Aspen Heights project.
14 13 Cain Road Realign Cain Road to intersect Holleman Drive South at Paloma Ridge Drive.
15 14 Deacon Drive Welsh Avenue Wellborn Road Reclassify from Minor Collector to Major Collector as constructed.
16a 14 General Parkway extension Rock Prairie Road West William D. Fitch Parkway
extension Add bike lanes Add sidewalks Add future Minor Collector extension south of Rock Prairie Road West and North
Graham Road to tie into new 4-lane Major Arterial.
16b 14 Old Wellborn Road Rock Prairie Road West North Graham Road Remove as Minor Collector as General Parkway extension will provide thoroughfare
access south to North Graham Road.
16c 14 North Graham Road Old Wellborn Road General Pkwy extension Remove bike lanes Remove sidewalks Remove as Major Collector as not needed to tie North Graham Road into Old
Wellborn Road due to General Parkway extension to south.
17a 14 Scott & White Boulevard SH 6 Rock Prairie Road Reclassify from Major Collector to Minor Collector as constructed, roadway flares out
with turn lane at Rock Prairie Road.
17b 14 Healing Way Scott & White Blvd Lakeway Drive Reclassify from Major Collector to Minor Collector as constructed.
17c 14 Medical Avenue Lakeway Drive Rock Prairie Road Reclassify from Major Collector to Minor Collector as constructed, roadway flares out
with turn lane at Rock Prairie Road.
17d 14,15 Lakeway Drive Medical Avenue Spring Creek Reclassify from Major Collector to 4-lane Minor Arterial to reflect 4-lane boulevard
section within College Station Medical District PDD.
18a 14,15 Future Major Collector SH 6 Lakeway Drive Remove bike lanes as
roadway is removed
Remove sidewalks as
roadway is removed Remove Major Collector as per Kimley-Horn thoroughfare assessment.
18b 14,15 Barron Road extension SH 6 Rock Prairie Road Remove bike lanes as
roadway is removed
Remove sidewalks as
roadway is removed
Remove 4-lane Minor Arterial as per Kimley-Horn thoroughfare assessment and prior
alignment study over closed landfill near SH 6.
18c 15 Future Minor Collector Bird Pond Road extension Pebble Creek Parkway
extension Realign bike lanes Realign sidewalks
Remove future Minor Collector portion crossing Spring Creek as per Kimley-Horn
thoroughfare assessment and realign remaining section to Rock Prairie Road at Harris
Drive.
19 14,20 Barron Cut-off Road WS Phillips Parkway William D. Fitch Parkway Add Minor Collector to reflect roadway extension as constructed.
20 15 Tower Point Future Major
Collector Arrington Road SH 6 Remove Major Collector as already platted and developed with private drive aisle.
21 15,21 Birkdale Drive St. Andrews Drive SH 6 Realign and extend bike
lanes
Realign and extend
sidewalks Realign to existing roadway as constructed and around dormant oil/gas well site.
22 18,23,
28
Thoroughfares in Burleson
County None Remove thoroughfares due to Inter-Local Agreement with Burleson County not
requiring City subdivision review, also mostly in Brazos River floodplain.
23 20 Etonbury Avenue Greens Prairie Road Barron Cut-Off Road Realign bike lanes Realign sidewalks Reclassify from Major Collector to Minor Collector, existing section in Castlegate II
subdivision constructed as Minor Collector with Major Collector right-of-way.
24a 20 Long Creek Lane Greens Prairie Trail Cottonwood Creek Lane Remove as Minor Collector as street is constructed as local street in Creek Meadows
subdivision.
24b 20 Cottonwood Creek Lane Long Creek Lane Timber Creek Lane Remove as Minor Collector as street is constructed as local street in Creek Meadows
subdivision.
24c 20 Timber Creek Lane/Timber Drive Greens Prairie Trail Cottonwood Creek Lane Remove as Minor Collector as street is constructed as local street in Creek Meadows
subdivision.
24d 20 Creek Meadow Blvd North Greens Prairie Trail Cottonwood Creek Lane Remove as Minor Collector as street does not connect through to another
thoroughfare.
Holleman Drive S None
None
None
None
None
None
None
None
None
None
None
None
None
From To Proposed Thoroughfare Change Description
BPG
Board
Meeting
Change
#
Map
Book
Page #
Thoroughfare
Extent Proposed Bicycle
Changes
Proposed Pedestrian
Changes
24e 20 Wild Creek Court extension Cottonwood Creek Lane Future Minor Collector
Remove bike route on
extension section as
roadway is removed
None Remove as Minor Collector as street is constructed as local street in Creek Meadows
subdivision, extends south to another future minor collector.
25 21,22 Margraves/Windham Tracts
Future Minor Collectors
Change all bike routes to
bike lanes for all future
minor collectors
Add sidewalks to all
future minor collectors
Adjust location of second Future Minor Collector to be more evenly spaced on
Arrington Road between Harpers Ferry Road and Indian Lakes Drive.
26 22 Lakeway Drive extension SH 6 Birkdale Drive Realign bike lanes Realign sidewalks Reclassify future Minor Collector from SH 6 to Future 4-lane Minor Arterial as Major
Collector and realign to Lakeway Drive extension to remove offset.
27 21 Southern Pointe sudivision
collectors
Adjust bike lanes to
proposed alignment
Adjust sidewalks to
proposed alignment
Adjust alignment of planned Mather Parkway and Darlington Avenue as per approved
Southern Pointe preliminary plan.
28a 24 Straub Road Wellborn Road I&GN Road Remove bike route None Remove as Minor Collector as railroad crossing closed by Union Pacific.
28b 24 Wade Road Wellborn Road Stousland Road None None Remove as Minor Collector as railroad crossing closed by Union Pacific.
28c 24 Future Minor Collector Wellborn Road Future Minor Arterial Remove bike route as
roadway removed None Remove as Minor Collector as additional railroad crossing not likely between Greens
Prairie Trail and Drake Drive.
28d 24 Saddle Creek Drive Stousland Road Vintage Oaks Drive Add bike route None Add as Minor Collector as constructed to connect existing to other thoroughfares.
28e 24,25,
28 Future Minor Collector Wellborn Road Future Western Arterial
Loop
Remove as Minor Collector as additional railroad crossing not likely between Drake
Drive and the Future Minor Arterial to the south.
29 26,27 Future Major Collector Future Western Freeway
Loop SH 6 Add future Major Collector extension to existing SH 6 grade separation between FM
159 and Westward Ho.
30 28 Stousland Road extension Future Western Arterial
Loop
Future Western Freeway
Loop
Remove future Minor Collector west of Future Western Arterial loop, constrained by
floodplain and intersects Future Western Freeway loop.
None
None
None
DRAFT Thoroughfare Plan Update with Bicycle and Pedestrian Related Changes
Changes Based on the Adopted MPO 2050 Thoroughfare Concept
From To
1 1,7 Texas Avenue University Drive Bryan City limits Reclassify from 4-lane Minor Arterial to 4-lane Major Arterial.
2 2 Future Minor Arterial Harvey Road Linda Lane extension Add bike route None Reclassify from 4-lane Minor Arterial to Major Collector and terminate into
extension of Linda Lane as Future Minor Arterial not shown on MPO Concept.
3a 3,9,15 Bird Pond Road and future
realignment Rock Prairie Road SH 30
Realign bike route from
west of Linda Lane
extension to SH 30
None Reclassify from 4-lane Minor Arterial to 4-lane Major Arterial, realign more with
existing roadway, and extend across SH 30.Oct-17
3b 9 Future Minor Collector (portion
of existing Bird Pond Road)Bird Pond Road (existing)Bird Pond Road
(realignment)
Remove as Future Minor Collector as portion of Bird Pond Road proposed to revert
to existing roadway.
4a 4,10 William D. Fitch Parkway
(future realignment)
East of Tonkaway Lake
Road SH 30 Realign east of Tonkaway Lake Road to the north toward SH 30 to provide adequate
spacing from Future Eastern Freeway loop and extend across SH 30.
4b 10 William D. Fitch Parkway
(remaining)
East of Tonkaway Lake
Road SH 30 Remove bike lanes None Reclassify roadway remaining after realignment to Major Collector and tie into
realigned portion.
5a 17,22,26 Future Eastern Freeway Loop SH 6 SH 30
Change and realign bike
lanes to multi-use path
from SH 6 to Rock Prairie
Road
Change and realign
sidewalks to multi-use
path from SH 6 to Rock
Prairie Road
Reclassify Peach Creek Road from 4-lane Minor Arterial to Freeway/Expressway and
realign and extend across SH 30.
5b 10 Future Grade Separation Add future grade separation at SH 30 and Future Eastern Freeway loop.
5c 17 Future Grade Separation Add future grade separation at Rock Prairie Road and Future Eastern Freeway loop.
6 6,7 Wellborn Road University Drive Bryan City limits Reclassify from 4-lane Minor Arterial to 4-lane Major Arterial.
7a 6 F&B Road Wellborn Road Turkey Creek Road
Change bike route/lanes
to multi-use path as per
2017 TAMU Campus
Master Plan.
Add multi-use path as
per 2017 TAMU Campus
Master Plan
Reclassify from Major Collector to 4-lane Minor Arterial.
7b 6 HSC Parkway Turkey Creek Road SH 47 Add as 4-lane Minor Arterial as constructed.
7c 6 Existing Grade Separation Add existing grade separation at SH 47 and HSC Parkway.Oct-17
8
6,12,
13,18,
19,23,24
Future Western Arterial Loop HSC Parkway Future Western
Freeway Loop
Reclassify from 6-lane Major Arterial to 4-lane Minor Arterial, realign from
continuation of SH 47 to HSC Parkway with future grade separation at Raymond
Stotzer Pkwy (FM 60) and intersect Future Western Freeway loop to the south.
Oct-17
9a 13 Luther Street West and
extension Jones Butler Road North Dowling Road Realign bike lanes on
extension
Realign sidewalks on
extension
Reclassify from Major Collector to 4-lane Minor Arterial and realign at North
Dowling Road to become through movement.
None
Change
#
Map
Book
Page #
Thoroughfare
Extent
Bicycle Master Plan Pedestrian Master
Plan Proposed Thoroughfare Change Description
BPG
Board
Meeting
None
None
Add multi-use path to realigned section
Add future grade separation
None
None
Add existing grade separation
Add future grade separation at Raymond Stotzer
Parkway and multi-use path from SH 47 to North
Dowling extension and then bike route beyond to
existing Hopes Creek Road.
Bicycle, Pedestrian and Greenway Master Plan
Proposed Changes
#
From To
Change
#
Map
Book
Page #
Thoroughfare
Extent
Bicycle Master Plan Pedestrian Master
Plan Proposed Thoroughfare Change Description
BPG
Board
Meeting
9b 7,13 Future Grade Separation Add future grade separation at Harvey Mitchell Parkway and Luther Street West.
9c 13 North Dowling Road extension Luther Street West
extension
Future Western
Arterial Loop
Add bike facilities on
extension to Future
Western Arterial loop
Add sidewalks on
extension to Future
Western Arterial loop
Reclassify from Major Collector to 4-lane Minor Arterial, realign at Luther Street
West for it to become through movement instead, and add extension at existing 90
degree curve to Future Western Arterial Loop.
Oct-17
10a 4,10 SH 30 William D. Fitch Parkway
(future realignment)
Future Eastern
Freeway loop Remove bike route None Reclassify from 4-lane Major Arterial to 6-lane Major Arterial.
10b 10 SH 30 Future Eastern Freeway
loop Navasota River Remove bike route None Reclassify from 4-lane Major Arterial to Freeway/Expressway.
11 11,12 Lightsey Lane extension Raymond Stotzer Parkway Bryan City limits Reclassify from 4-lane Minor Arterial to Minor Collector as future Minor Arterial not
shown on MPO Concept.
12a 13 Jones Butler Road extension Harvey Mitchell Parkway Holleman Drive South Add bike lanes Add sidewalks Add as future 4-lane Minor Arterial.Oct-17
12b 13 Future Grade Separation Add future grade separation at Harvey Mitchell Parkway and Jones Butler Road.Oct-17
13 13 Future Grade Separation Add future grade separation at Harvey Mitchell Parkway and Holleman Drive South.
14a 19 Blue Ridge Drive North Dowling Road Brazos River
Add bike route on
realigned section to
Hopes Creek Road/Future
Western Freeway Loop
None Reclassify from Minor Collector to 4-lane Major Arterial, realign portion at curve to
extend to Hope Creek Road and Brazos River.Oct-17
14b 13,14 Rock Prairie Road West North Dowling Road Wellborn Road Reclassify from Major Collector to 4-lane Major Arterial.
14c 13,14 Rock Prairie Road Wellborn Road Longmire Drive Reclassify from 4-lane Minor Arterial to 4-lane Major Arterial.
14d 14 Future Grade Separation Add future grade separation at Wellborn Road and Rock Prairie Road.
15a 14 William D. Fitch Parkway
extension Wellborn Road Rock Prairie Road
West Add bike lanes Add sidewalks Add 4-lane Major Arterial to connect Rock Prairie Road West to future grade
separation at Wellborn Road and William D. Fitch Pkwy.Oct-17
15b 14 Towers Parkway extension Rock Prairie Road West I&GN Road Remove bike lanes as
roadway is removed
Remove sidewalks as
roadway is removed
Remove future Minor Collector in conflict with proposed 4-lane Major Arterial
extension including portion on existing manufactured home park.Oct-17
16 15,16,17 Rock Prairie Road Bradley Drive Peach Creek Road Reclassify from 4-lane Minor Arterial to 4-lane Major Arterial.
17a 22 Pebble Creek Parkway and
extension William D. Fitch Parkway SH 6 at Peach Creek
Realign bike route and
change to bike lanes from
Pebble Creek subdivision
to Future Minor Arterial
to south.
Realign sidewalks Reclassify from Major Collector to 4-lane Minor Arterial and realign past future 4-
lane Minor Arterial to extend through to SH 6 overpass north of Peach Creek.
17b 22 Existing Grade Separation Add existing grade separation at SH 6 and Pebble Creek Pkwy extension south of
Texas World Speedway.
18 15,21,
24, 25 Arrington Road and extension William D. Fitch Parkway Wellborn Road Reclassify from Major Collector to 4-lane Minor Arterial.
19a 16,22 Southern Pointe Parkway
extension SH 6 Rock Prairie Road Realign bike lanes Realign sidewalks Extend 4-lane Minor Arterial east of Pipeline Road to Rock Prairie Road and replace
future Major Collector east of Lick Creek Park.
19b 22 Pipeline Road extension Southern Pointe Parkway Future Minor Arterial
extension
Remove bike lanes as
roadway is removed
Remove sidewalks as
roadway is removed
Remove future Minor Collector north of Southern Pointe Parkway due to
reconfiguration of Pebble Creek Parkway extension.
Add future grade separation
None
Add future grade separation
None
Add future grade separation
None
None
Add future grade separation
None
Add future grade separation
From To
Change
#
Map
Book
Page #
Thoroughfare
Extent
Bicycle Master Plan Pedestrian Master
Plan Proposed Thoroughfare Change Description
BPG
Board
Meeting
20a 16,22 Future Minor Arterial SH 6 Pebble Creek Pkwy
extension Realign bike lanes Realign sidewalks Realign to intersect Pebble Creek Parkway extension instead of extending further
east to Peach Creek Road.
20b 16,22 Future Major Collector Pebble Creek Parkway
extension
Southern Pointe Pkwy
extension Realign bike lanes Realign sidewalks
Realign future Major Collector to continue Future Minor Arterial east of Pebble
Creek Parkway extension and extend to Southern Pointe Parkway extension at future
Minor Collector to east.
20c 16,22 Future Major Collector Future Minor Arterial Future Major
Collector
Remove bike lanes as
roadway is removed
Remove sidewalks as
roadway is removed
Remove future Major Collector due to reconfiguration of Pebble Creek Parkway and
Southern Pointe Parkway extensions.
21a 20, 23 Royder Road extension Existing Royder Road Brazos River
Change bike route to bike
lanes from Wellborn Road
to Future Minor Collector,
Realign bike lanes east of
Wellborn Road
Add sidewalks from
Wellborn Road to Future
Minor Collector, Realign
sidewalks east of
Wellborn Road
Reclassify Major Collector to 4-lane Minor Arterial, realign from planned railroad
crossing at Greens Prairie Road to realignment of Royder Road at Wellborn Road and
extend roadway to Brazos River. Area part of South College Station study with
Wellborn community participants.
21b 20 South Dowling Road and
realignment I&GN Road Royder Road
extension
Change bike route to bike
lanes and realign
Add sidewalks to
realigned section
Reclassify from Major Collector to Minor Collector and extend to Royder Road
extension. Area part of South College Station study with Wellborn community
participants.
21c 20 Koppe Bridge Road I&GN Road Wellborn Road Remove bike route None Remove as Minor Collector due to realignment of Royder Road extension.
22 20 Capstone Drive Wellborn Road I&GN Road Realign bike lanes Realign sidewalks Reclassify from Major Collector to 4-lane Minor Arterial and adjust alignment to
Barron Road at Wellborn Road.
23 24
I&GN Road/Straub
Road/Stousland Road and
extension
Koppe Bridge Road Future Minor Arterial
Realign bike route at
I&GN Road and Straub
Road
None
Reclassify from Minor Collector to 4-lane Minor Arterial, realign at Straub Road to
become through movement, and extend west of Saddle Creek subdivision to future
Minor Arterial to the south.
24 20,24 Greens Prairie Trail extension I&GN Road Future Western
Arterial Loop Add future 4-lane Minor Arterial to extend Greens Prairie Trail to the west.
25a 21 WS Phillips Parkway extension Greens Prairie Road Indian Lakes Drive Realign bike lanes Realign sidewalks Realign to Mesa Verde Drive via Indian Lakes Drive and reconfigure Indian Lakes
Drive/Mesa Verde Drive intersection.Oct-17
25b 21 Future Minor Collector Arrington Road Castlegate Drive
extension
Remove bike route as
roadway is removed None Remove future Minor Collector from Windham tract due to reduced spacing
between WS Phillips Parkway extension and other realigned future Minor Collectors.Oct-17
25c 21,25 Future Minor Collector Mesa Verde Drive Millican Reserve
Minor Arterial
Remove bike route as
roadway is removed None Remove Minor Collector due to reconfiguration of WS Phillips Parkway/Mesa Verde
Drive realignment and existing topography.
26a 21 Chaco Canyon Drive Mesa Verde Drive Indian Lakes Drive Reclassify from 4-lane Minor Arterial to Minor Collector as constructed as not shown
on MPO Concept and realign to existing roadway.
26b 21,26 Future Minor Collector Chaco Canyon Drive Indian Lakes Drive Remove future Minor Collector as not shown on MPO Concept and not able to
extend through Indian Lakes subdivision.
27a 22,26,
28 Future Minor Arterial SH 6 Indian Lakes Drive
extension
Add future 4-lane Minor Arterial from existing SH 6 grade separation north of Peach
Creek to Indian Lakes Drive and extend to Future Western Freeway Loop at grade
separation near Brazos River.
28 25,26,
29 High Prairie Road extension Wellborn Road FM 159 Realign bike route None Realign future 4-lane Minor Arterial to FM 159 similar to thoroughfare in Peach
Creek Master Plan (Millican Reserve).
29a
26,27,
28,29,
30
Future Western Freeway Loop SH 6 Brazos River
Reclassify future western loop from 6-lane Major Arterial to Freeway/ Expressway,
remove proposed Minor Collector on FM 159 to accommodate alignment, realign
north of Millican community, and extend to Brazos River.
29b 26,27 Existing Grade Separation Add existing grade separation at SH 6 and FM 159.
29c 26 Future Grade Separation Add future grade separation at Future Western Freeway loop and Royder Road
extension.
None
None
None
None
Add multi-use path from SH 6 to Royder Road
extension
Add existing grade separation
Add future grade separation
From To
Change
#
Map
Book
Page #
Thoroughfare
Extent
Bicycle Master Plan Pedestrian Master
Plan Proposed Thoroughfare Change Description
BPG
Board
Meeting
29d 26,30 Future Minor Arterial Royder Road extension Future Western
Arterial Loop
Reclassify future 4-lane Minor Arterial to Minor Collector due to alignment of Future
Western Freeway loop.
29e 27 Future Minor Collector Future Western Freeway
Loop
Royder Road
extension
Remove future Minor Collector to intersect future Major Collector extension due to
Future Western Arterial loop realignment.
29f 27 Future Minor Collector Future Western Freeway
Loop
Royder Road
extension
Realign future Minor Collector to intersect future Major Collector extension due to
Future Western Arterial loop realignment.
29g 28 Future Grade Separation Add future grade separation at Future Western Freeway loop and Future Minor
Arterial near Brazos River.
29h 29 Future Grade Separation Add future grade separation at Future Western Freeway loop and Future Western
Arterial loop.
29i 29 Future Minor Collector High Prairie Road extension Future Western
Freeway Loop
Realign future Minor Collector to continue roadway and intersect Future Western
Freeway loop.
29j 30 Future Grade Separation Add future grade separation at Future Western Freeway loop and Wellborn Road.
30 27 Existing Grade Separation Add existing grade separation on SH 6 between FM 159 and Westward Ho
overpasses.
31a 27 Existing Grade Separation Add existing grade separation at SH 6 and Westward Ho.
31b 27 Royder Road south extension Future Western Freeway
Loop SH 6
Add bike route from
Future Eastern Freeway
Loop to existing bike
route
None Realign Future 4-lane Minor Arterial to existing SH 6 grade separation at Westward
Ho.
None
None
None
None
None
None
None
None
None
B I C Y C L E M A S T E R P L A NB I C Y C L E M A S T E R P L A NM A P B O O KM A P B O O K
N O V E M B E R 2 0 1 7N O V E M B E R 2 0 1 7
[DRAFT]
51234
6 7 8 9 10
11 12 13 14 15 16 17
18
19 20 21 22
23 24 25 26 27
28 29 30
¹
0 5 102.5 Miles
Bicycle Master Plan Locator Map
!!!!!!!!!
!!
!
!!!!
!
!
!
!
!
!!!!!!!!!!!!!!!!!!!SPEARMA N DRHSC PWGE
N
E
R
A
L
P
W
I &
GN
RDPEACHCREEKRDM ESA VERDEVICTORIAAVWALNUTRD
SADDL
E
CREEK
D
R
H A R PER'SFERRYRD
IN
DIANLAKESDR
H
OPES
CR
EEKRDSTOUSLANDRDSTRAUB RDTIMBERLINEDRKOPPEBRIDGERD BIRDPONDRDCHEROKEEDRLONESTARLN
TEX
A
S
A
V
SGEORGEBUSHDRTEX
A
S
A
V
W
E
L
L
B
O
R
N
R
D
E 29TH ST
WELSHAV
WILLIAM D FITCH PWHOLLEMANDRBARRON RDUNIVERSITYDRESOUTHW ESTPWNH
AR
V
E
Y
MITCHELLPW HARVEY RDWVILLAMARIARDS MA
IN
STTARRO
WST
ROCKPRAIRIERD
FM 2
1
5
4HOLLEMANDREANDERSONSTLEONARD RDSOUTHWESTPWEGROESBECKSTE
A
RL
R
U
D
D
E
R
F
WSWSH21BRIARCREST DRSH 6
S
S
C
O
LLE
G
E
A
V
RAYMOND STOTZER PWN
EA
RLRU
D
D
ERF
W
GREENSPRAIRIERDWBOONVILLERD
HARVEY
MITC
HELLPWS
RIVERSIDEPW
SH 30
FM158
S TE
XASAV
LINCOLNAVFINFEATHER RDCOUNTYROAD174ROESE
C OU N T YROAD 192DEBBIECOUNTYROAD173
C O UN TY R O A D 40 1JOHNRICELANCASTERFM 3090COUNTYROAD175
COUN
TYROAD 172
ST
J
OHNS FM 244COUNTY ROAD 190FM 60COUNTYROAD272FM
2
1
5
5
COUNTY ROAD268COUNTYROAD269LUKEBUSHCOUNTYROAD295
COUNTY ROAD 277FM 5
0
REVEILLE
¹
0 5 102.5 Miles
Existing Bicycle Master Plan
Multi-use Path ProposedMulti-use Path Funded! ! !
Multi-use Path Existing
Grade Separation Proposed
Grade Separation Funded
Grade Separation Existing
!!!!Bike Lane Existing
! ! !Bike Lane Funded
Bike Lane Proposed
Bike Route Existing
Bike Route Proposed
!!!!!!!!!
!!
!
!!!!
!
!
!
!
!
!
!!!!!!!!!!!!!!!!!!!SPEARMA N DRHSC PWI &
G
N
RD
PEACHCREEKRDM ESA VERDEVICTORIAAVWALNUTRD
SADDL
E
CREEK
D
R
H A R PER'SFERRYRD
INDIA
N
LAKESDR
H
OP
ES
CR
E
EKRDSTOUSLANDRDSTRAUB RDTIMBERLINEDRKOPPEBRIDGERD BIRDPONDRDCHEROKEEDRLONESTARLN
TEX
A
S
A
V
SGEORGEBUSHDRTEX
A
S
A
V
W
E
L
L
B
O
R
N
R
D
E 29TH ST
WELSHAV
WILLIAM D FITCH PWHOLLEMANDRBARRON RDUNIVERSITYDRESOUTHW ESTPWNH
AR
V
E
Y
MITCHELLPW HARVEY RDWVILLAMARIARDS MA
IN
STTARRO
WST
ROCKPRAIRIERD
FM 2
1
5
4HOLLEMANDREANDERSONSTLEONARD RDSOUTHWESTPWEGROESBECKSTE
A
RL
R
U
D
D
E
R
F
WSWSH21BRIARCREST DRSH 6
S
S
C
O
LLE
G
E
A
V
RAYMOND STOTZER PWN
EA
RLRU
D
D
ERF
W
GREENSPRAIRIERDWBOONVILLERD
HARVEY
MITC
HELLPWS
RIVERSIDEPW
SH 30
FM158
S TE
XASAV
LINCOLNAVFINFEATHER RDCOUNTYROAD174ROESE
C OU N T YROAD 192DEBBIECOUNTYROAD173
C O UN TY R O A D 40 1JOHNRICELANCASTERFM 3090COUNTYROAD175
COUN
TYROAD 172
ST
J
OHNS FM 244COUNTY ROAD 190FM 60COUNTYROAD272FM
2
1
5
5
COUNTY ROAD268COUNTYROAD269LUKEBUSHCOUNTYROAD295
COUNTY ROAD 277FM 5
0
REVEILLE
¹
0 5 102.5 Miles
Proposed Bicycle Master Plan
Multi-use Path ProposedMulti-use Path Funded! ! !
Multi-use Path Existing
Grade Separation Proposed
Grade Separation Funded
Grade Separation Existing
!!!!Bike Lane Existing
! ! !Bike Lane Funded
Bike Lane Proposed
Bike Route Existing
Bike Route Proposed
!(
E 25
T
H
S
T
SPRING LOOAK HILL DRMU
N
S
O
N
A
V
BAR
A
K
L
N
FRANCIS DRWALTON
DRN ROSEMARY DRHENSELDR
UNIVERSITY DRE
2
9
TH
S
T
TEX
A
S
A
V
S TE
X
A
S
A
VE VILLA MARIA RDC
A
V
I
T
T
A
V
UNIVERSITY
D
R
EBRIARCRESTDR
S
C
OLLEGEAV
N
E
A
R
L
R
U
D
D
E
R
F
W
LINCOLN AVTARROWST1a
¹51234678910
11 12 13 14 15 16 17
18 19 20 21 2223242526 27282930
Page 1 of 30
See Page See Page See Page 2!(
E 25
T
H
S
T
SPRING LOOAK HILL DRMU
N
S
O
N
A
V
BAR
A
K
L
N
FRANCIS DRWALTON DRN ROSEMARY DRHENSELDR
UNIVERSITY DRE
2
9
TH
S
T
TEX
A
S
A
V
S TE
X
A
S
A
VE VILLA MARIA RDC
A
V
I
T
T
A
V
UNIVERSITY
D
R EBRIARCRESTDRS
C
OLLEGEAV
N
E
A
R
L
R
U
D
D
E
R
F
W
LINCOLN AVTARROWST1a
ADOPTED/CURRENT PLAN PROPOSED PLAN
0 2010Miles
See Page 7Bike Lane Existing
! ! ! !Bike Lane Funded
Bike Lane Proposed
Bike Route Existing
Bike Route Proposed
B i c y c l e M a s t e r P l a n B i c y c l e M a s t e r P l a n 2 0 1 7 U p d a t e2 0 1 7 U p d a t e[DRAFT]!!!!Multi-use Path Existing
! ! ! !Multi-use Path FundedMulti-use Path ProposedGrade Separation ExistingGrade Separation FundedGrade Separation ProposedCity Initiated/Cleanup Thoroughfare Changes!(
MPO Related Thoroughfare Changes!(
!(
!(DOMINIK DRCOPPERFIELD DRLIN
D
A
L
NUNIVERSITYDRE SH 30
EARLRUD
DER
F
W
S HARVEY RDBOONVILLERD
FM158
FUTURELINDA
LN
2
3
¹51234678910
11 12 13 14 15 16 17
18 19 20 21 2223242526 27282930
Page 2 of 30
See Page See Page 1See Page 3!(
!(DOMINIK DRCOPPERFIELD DRLIN
D
A
L
NUNIVERSITYDRE SH 30
EARLRUD
DER
F
W
S HARVEY RDBOONVILLERD
FM158
FUTURELINDA
LN
2
3
ADOPTED/CURRENT PLAN PROPOSED PLAN
0 2010Miles
See Page 8Bike Lane Existing
! ! ! !Bike Lane Funded
Bike Lane Proposed
Bike Route Existing
Bike Route Proposed
B i c y c l e M a s t e r P l a n B i c y c l e M a s t e r P l a n 2 0 1 7 U p d a t e2 0 1 7 U p d a t e[DRAFT]!!!!Multi-use Path Existing
! ! ! !Multi-use Path FundedMulti-use Path ProposedGrade Separation ExistingGrade Separation FundedGrade Separation ProposedCity Initiated/Cleanup Thoroughfare Changes!(
MPO Related Thoroughfare Changes!(
!(BIRDPONDRDSH 30
FU
T
U
R
E
L
I
N
D
A
L
N
3a
¹51234678910
11 12 13 14 15 16 17
18 19 20 21 2223242526 27282930
Page 3 of 30
See Page See Page 2See Page 4!(BIRDPONDRDSH 30
FU
T
U
R
E
L
I
N
D
A
L
N
3a
ADOPTED/CURRENT PLAN PROPOSED PLAN
0 2010Miles
See Page 9Bike Lane Existing
! ! ! !Bike Lane Funded
Bike Lane Proposed
Bike Route Existing
Bike Route Proposed
B i c y c l e M a s t e r P l a n B i c y c l e M a s t e r P l a n 2 0 1 7 U p d a t e2 0 1 7 U p d a t e[DRAFT]!!!!Multi-use Path Existing
! ! ! !Multi-use Path FundedMulti-use Path ProposedGrade Separation ExistingGrade Separation FundedGrade Separation ProposedCity Initiated/Cleanup Thoroughfare Changes!(
MPO Related Thoroughfare Changes!(
!(
!(
!(
SH30
4a
10a
¹51234678910
11 12 13 14 15 16 17
18 19 20 21 2223242526 27282930
Page 4 of 30
See Page See Page 3See Page 5!(
!(
!(
SH30
FUTUREEASTERNFREEWAYLOOP4a
10a
ADOPTED/CURRENT PLAN PROPOSED PLAN
0 2010Miles
See Page 10Bike Lane Existing
! ! ! !Bike Lane Funded
Bike Lane Proposed
Bike Route Existing
Bike Route Proposed
B i c y c l e M a s t e r P l a n B i c y c l e M a s t e r P l a n 2 0 1 7 U p d a t e2 0 1 7 U p d a t e[DRAFT]!!!!Multi-use Path Existing
! ! ! !Multi-use Path FundedMulti-use Path ProposedGrade Separation ExistingGrade Separation FundedGrade Separation ProposedCity Initiated/Cleanup Thoroughfare Changes!(
MPO Related Thoroughfare Changes!(
!(
!(GRIMES
COUNTY
G
R
I
M
E
S
C
O
U
N
T
Y
PEACHCREEKRDSH 3
0
COUNTYROAD174LANCASTERYERBY
C O U NTYROAD185
ROESE
GILPIN
JUBILEECOUNT YROAD 15 7COUNTYROAD121
COUNTY ROAD166
F
M
39
LONG
OAKDEBBIEC O UNTYROAD165FM 2
4
4JOHNRICECOUNTY ROAD 164COUNTYR O A D 175FM 3090COUNTYROAD172COUNTYROAD19
0
F U TURE
ROCK PRAIRIERD4
4
¹51234678910
11 12 13 14 15 16 17
18 19 20 21 2223242526 27282930
!(
!(GRIMES
COUNTY
G
R
I
M
E
S
C
O
U
N
T
Y
PEACHCREEKRDSH30
COUNTYROAD174LANCASTERYERBY
C O UNTYROAD185
ROESE
GILPIN J UBILEE COUNT YROAD 15 7
C OU NT Y ROA D 1 21COUNTY ROAD16 6
F
M
39
LONG
OAKC O UNTYROAD165FM
2
4
4JOHNRICECOUNTY ROAD 164COUNTYRO A D 175FM 3090COUNTYROAD172COUNTYROAD190FUTURE
ROCK PRAIRIERD4
4
ADOPTED/CURRENT PLAN PROPOSED PLAN
0 2010Miles
Bike Lane Existing
! ! ! !Bike Lane Funded
Bike Lane Proposed
Bike Route Existing
Bike Route Proposed
See Page See Page 4See PageSee Page B i c y c l e M a s t e r P l a n B i c y c l e M a s t e r P l a n 2 0 1 7 U p d a t e2 0 1 7 U p d a t e[DRAFT]!!!!Multi-use Path Existing
! ! ! !Multi-use Path FundedMulti-use Path ProposedGrade Separation ExistingGrade Separation FundedGrade Separation ProposedCity Initiated/Cleanup Thoroughfare Changes!(
MPO Related Thoroughfare Changes!(
Page 5 of 30
!!!!!!!!!!!!!!(
!(
!(F & B RDHSCPWTURKEY CREEK RDWVILLAMARIARDHARVEY
MITCHELLP
W
S RAYMOND STOTZER PWWE
L
L
B
O
R
N
R
D
RIVERSIDEPW NHARVEYMITCHELLPW7a
7c
8
¹51234678910
11 12 13 14 15 16 17
18 19 20 21 2223242526 27282930
Page 6 of 30
See Page See Page See Page 7!
!!!!!!!!!!!!!(
!(
!(F & B RDHSCPWTURKEY CREEK RDWVILLAMARIARDHARVEY
MITCHELLP
W
S RAYMOND STOTZER PWWE
L
L
B
O
R
N
R
D
RIVERSIDEPW NHARVEYMITCHELLPW7a
7c
8
ADOPTED/CURRENT PLAN PROPOSED PLAN
0 2010Miles
See Page 12Bike Lane Existing
! ! ! !Bike Lane Funded
Bike Lane Proposed
Bike Route Existing
Bike Route Proposed
B i c y c l e M a s t e r P l a n B i c y c l e M a s t e r P l a n 2 0 1 7 U p d a t e2 0 1 7 U p d a t e[DRAFT]!!!!Multi-use Path Existing
! ! ! !Multi-use Path FundedMulti-use Path ProposedGrade Separation ExistingGrade Separation FundedGrade Separation ProposedCity Initiated/Cleanup Thoroughfare Changes!(
MPO Related Thoroughfare Changes!(
!!!!!!!!!!!!!!!!!(
!(!(
!(F & B RDDEXT
E
R
D
R
NU
E
C
E
S
D
R
TIM
B
E
R
S
T
DE
X
T
E
R
D
R
S FRANCIS DRDOMINIK DRMU
N
S
O
N
A
V
GLADEST
WALTON DR
LUTHER ST WHENSELDR
W
ELSHAVRAYMONDSTOTZERPWGEORGE BUSH DRTEX
A
S
A
V
WEL
L
B
O
R
N
R
DUNIVERSITY DRLINCOLN AVHOLLEMAN DRCO
L
L
E
G
E
A
V
SOUTHWEST PWTEX
A
S
A
V
S
WELLB
ORN
R
D
N HARVEY RDHAR
V
E
Y
M
I
T
C
H
E
L
L
P
W
S
ANDERSONST
SCOLLEGEAV
GEORGE BUSH DR WHOLLEMANDRW1a
9b 12b
¹51234678910
11 12 13 14 15 16 17
18 19 20 21 2223242526 27282930
Page 7 of 30
See Page 1
See Page 6See Page 8!!!!!!!!!!!!!!!!!(
!(!(F & B RDDEXT
E
R
D
R
NU
E
C
E
S
D
R
TIM
B
E
R
S
T
DE
X
T
E
R
D
R
S FRANCIS DRDOMINIK DRMU
N
S
O
N
A
V
GLADEST
WALTON DR
LUTHER ST WHENSELDR
W
ELSHAVRAYMONDSTOTZERPWGEORGE BUSH DRTEX
A
S
A
V
WEL
L
B
O
R
N
R
DUNIVERSITY DRLINCOLN AVHOLLEMAN DRCO
L
L
E
G
E
A
V
SOUTHWEST PW
TEX
A
S
A
V
S
WELLBORN
R
D
N HARVEY RDHAR
V
E
Y
M
I
T
C
H
E
L
L
P
W
S
ANDERSONST
SCOLLEGEAV
GEORGE BUSH DR WHOLLEMANDRW
1a
9b 12b
ADOPTED/CURRENT PLAN PROPOSED PLAN
0 2010Miles
See Page 13Bike Lane Existing
! ! ! !Bike Lane Funded
Bike Lane Proposed
Bike Route Existing
Bike Route Proposed
B i c y c l e M a s t e r P l a n B i c y c l e M a s t e r P l a n 2 0 1 7 U p d a t e2 0 1 7 U p d a t e[DRAFT]!!!!Multi-use Path Existing
! ! ! !Multi-use Path FundedMulti-use Path ProposedGrade Separation ExistingGrade Separation FundedGrade Separation ProposedCity Initiated/Cleanup Thoroughfare Changes!(
MPO Related Thoroughfare Changes!(
!(
!(
!(
GLADE S
T
NU
E
C
E
S
D
RDOMINIK DRCOLGATE DRMU
N
S
O
N
A
V
LONG
M
I
R
E
D
RKRENEK TAP RDBROTHERS BLAPPOMATTOX DRDEACONDRE M ER A LDPWCORSAIRDRW
E
L
S
H
A
V
TEX
A
S
A
V
S
SOUTHWESTPWHARVEY RDSH6
SHOLLEMANDREANDERSONSTDARTMOU
T
H
S
T
SOUTHWEST PW EE
A
R
L
R
U
D
D
E
R
F
W
S
R OCK PRAIRIE RDHARVEYMITCHELLPWS9a
8
9b
¹51234678910
11 12 13 14 15 16 17
18 19 20 21 2223242526 27282930
Page 8 of 30
See Page 2
See Page 7See Page 9!(
!(
!(
GLADE ST
NU
E
C
E
S
D
RDOMINIK DRCOLGATE DRMU
N
S
O
N
A
V
LONG
M
I
R
E
D
RKRENEK TAP RDBROTHERS BLAPPOMATTOX DRDEACONDRE M ERA LDPWCORSAIRDRW
E
L
S
H
A
V
TEX
A
S
A
V
S
SOUTHWESTPWHARVEY RDS
H
6
SHOLLEMANDREANDERSONSTDARTMOU
T
H
S
T
SOUTHWEST PW EE
A
R
L
R
U
D
D
E
R
F
W
S
R OCK PRAIRIE RDHARVEYMITCHELLPWS9a
8
9b
ADOPTED/CURRENT PLAN PROPOSED PLAN
0 2010Miles
See Page 14Bike Lane Existing
! ! ! !Bike Lane Funded
Bike Lane Proposed
Bike Route Existing
Bike Route Proposed
B i c y c l e M a s t e r P l a n B i c y c l e M a s t e r P l a n 2 0 1 7 U p d a t e2 0 1 7 U p d a t e[DRAFT]!!!!Multi-use Path Existing
! ! ! !Multi-use Path FundedMulti-use Path ProposedGrade Separation ExistingGrade Separation FundedGrade Separation ProposedCity Initiated/Cleanup Thoroughfare Changes!(
MPO Related Thoroughfare Changes!(
!(
!(BIRD POND RDFUTURELINDA LN
3a
¹51234678910
11 12 13 14 15 16 17
18 19 20 21 2223242526 27282930
Page 9 of 30
See Page 3
See Page 8See Page 10!(
!(BIRD POND RDFUTURELINDA LN
3a
ADOPTED/CURRENT PLAN PROPOSED PLAN
0 2010Miles
See Page 15Bike Lane Existing
! ! ! !Bike Lane Funded
Bike Lane Proposed
Bike Route Existing
Bike Route Proposed
B i c y c l e M a s t e r P l a n B i c y c l e M a s t e r P l a n 2 0 1 7 U p d a t e2 0 1 7 U p d a t e[DRAFT]!!!!Multi-use Path Existing
! ! ! !Multi-use Path FundedMulti-use Path ProposedGrade Separation ExistingGrade Separation FundedGrade Separation ProposedCity Initiated/Cleanup Thoroughfare Changes!(
MPO Related Thoroughfare Changes!(
!(
!(
!(
!(
!(
SH 3
0
WILLIAM D FITCH PWFUT
U
R
E
L
I
N
D
A
L
N
4a
4b
10a
10b
¹51234678910
11 12 13 14 15 16 17
18 19 20 21 2223242526 27282930
Page 10 of 30
See Page 4
See Page 9See Page 5!(
!(
!(
!(
!(
SH 3
0
WILLIAMDFITCHPWFUT
U
R
E
L
I
N
D
A
L
N FUTUREEASTERNFREEWAYLOOP4a
4b
10a
10b
ADOPTED/CURRENT PLAN PROPOSED PLAN
0 2010Miles
See Page 16Bike Lane Existing
! ! ! !Bike Lane Funded
Bike Lane Proposed
Bike Route Existing
Bike Route Proposed
B i c y c l e M a s t e r P l a n B i c y c l e M a s t e r P l a n 2 0 1 7 U p d a t e2 0 1 7 U p d a t e[DRAFT]!!!!Multi-use Path Existing
! ! ! !Multi-use Path FundedMulti-use Path ProposedGrade Separation ExistingGrade Separation FundedGrade Separation ProposedCity Initiated/Cleanup Thoroughfare Changes!(
MPO Related Thoroughfare Changes!(
BURLESONCOUNTYBURLESON COUNTYRAYMONDSTOTZERPWFM60PRIVATE ROAD4048¹51234678910
11 12 13 14 15 16 17
18 19 20 21 2223242526 27282930
Page 11 of 30
See Page See Page See Page 12BURLESONCOUNTYBURLESON COUNTYRAYMONDSTOTZERPWFM60PRIVATE ROAD4048ADOPTED/CURRENT PLAN PROPOSED PLAN
0 2010Miles
See Page 18Bike Lane Existing
! ! ! !Bike Lane Funded
Bike Lane Proposed
Bike Route Existing
Bike Route Proposed
B i c y c l e M a s t e r P l a n B i c y c l e M a s t e r P l a n 2 0 1 7 U p d a t e2 0 1 7 U p d a t e[DRAFT]!!!!Multi-use Path Existing
! ! ! !Multi-use Path FundedMulti-use Path ProposedGrade Separation ExistingGrade Separation FundedGrade Separation ProposedCity Initiated/Cleanup Thoroughfare Changes!(
MPO Related Thoroughfare Changes!(
!(
!(
!(
!(
HSC P W
RAYMONDSTOTZERPWRIVERSIDEPW
FUTURE
W
EST
ERN FREEWAYLOOP
7c
8
8
9c
¹51234678910
11 12 13 14 15 16 17
18 19 20 21 2223242526 27282930
Page 12 of 30
See Page 6
See Page 11See Page 13!(
!(
!(
!(
HSC P W
RAYMONDSTOTZERPWRIVERSIDEPW
FUTURE
WESTERNFREEWAY
L
O
O
P
7c
8
8
9c
ADOPTED/CURRENT PLAN PROPOSED PLAN
0 2010Miles
See Page 18Bike Lane Existing
! ! ! !Bike Lane Funded
Bike Lane Proposed
Bike Route Existing
Bike Route Proposed
B i c y c l e M a s t e r P l a n B i c y c l e M a s t e r P l a n 2 0 1 7 U p d a t e2 0 1 7 U p d a t e[DRAFT]!!!!Multi-use Path Existing
! ! ! !Multi-use Path FundedMulti-use Path ProposedGrade Separation ExistingGrade Separation FundedGrade Separation ProposedCity Initiated/Cleanup Thoroughfare Changes!(
MPO Related Thoroughfare Changes!(
!!!!!!!!!!!!!!!
!(
!(!(
!(
!(
!(
!(
!(
!(
!(
NU
E
C
E
S
D
R
DOWLING RDLUTHER ST WHOL
L
EMAN
D
R
S
N D
O
W
L
I
N
G
R
D
ROCK PRAIRIE R D W
TOWERSPW
NGRAHAMRDGE
N
E
R
A
L
P
WDEACON DR WBLUERIDGEDRI &
GN
RDGREATOAKSDRHOPESCREEKRDWA
L
N
U
T
R
D
HOLLEMA N D R SHOLLEMANDRW WELSHAV
W
E
L
L
B
O
R
N
R
DSOUTHWEST PWFM
2
1
5
4
HARVEY
MITCHELL PWS
9b
11 13
12
9a
9c
13
12b
12a
¹51234678910
11 12 13 14 15 16 17
18 19 20 21 2223242526 27282930
Page 13 of 30
See Page 7
See Page 12See Page 14!!!!!!!!!!!!!!!
!(
!(!(
!(
!(
!(
!(
!(
!(
!(
NUE
C
E
S
D
R
DOWLING RDLUTHER ST WHOL
L
EMAN
D
R
S
N D
O
W
L
I
N
G
R
D
ROCK PRAIRIE R D W
T
OWERSPW
NGRAHAMRDGE
N
E
R
A
L
P
WDEACONDRW
BLUERIDGEDRI
&
GN
RDGREATOAKSDRHOPESCREEKRDWA
L
N
U
T
R
D HOLLEMANDRWHOLLEMA N D R S
WELSHAV
W
E
L
L
B
O
R
N
R
DSOUTHWEST PWFM
2
1
5
4
HARVEY
MITCHELLPWS 9b
11 13
12
9a
9c
13
12b
12a
ADOPTED/CURRENT PLAN PROPOSED PLAN
0 2010Miles
See Page 19Bike Lane Existing
! ! ! !Bike Lane Funded
Bike Lane Proposed
Bike Route Existing
Bike Route Proposed
B i c y c l e M a s t e r P l a n B i c y c l e M a s t e r P l a n 2 0 1 7 U p d a t e2 0 1 7 U p d a t e[DRAFT]!!!!Multi-use Path Existing
! ! ! !Multi-use Path FundedMulti-use Path ProposedGrade Separation ExistingGrade Separation FundedGrade Separation ProposedCity Initiated/Cleanup Thoroughfare Changes!(
MPO Related Thoroughfare Changes!(
!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!
!!!!!!
!
!
!
!
!
!
!
!!!!!!!!!!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!!!!!!!!!!!!!!!
!(
!(
!(
!(
!(
!(
!(GRAHAM RDBROTHERS BLLO
N
G
M
IR
E
D
RLAKEW A Y DR
GE
N
E
R
A
L
P
W
NGRAHAMRDI &
GN
R
D
NE
W
P
O
R
T
L
N
VICTORIAAVDEACON DRW
ELS
H
AV
BARRON RDWILLIAM D FIT CH PW
FM
2
1
5
4 RO CKPRAIRIER DHARVEYMITCHELLPWS
S
H
6
S
15b
14d
16c
16a
15a
¹51234678910
11 12 13 14 15 16 17
18 19 20 21 2223242526 27282930
Page 14 of 30
See Page 8
See Page 13See Page 15!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!
!!!!!!
!
!
!
!
!
!
!
!!!!!!!!!!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!!!!!!!!!!!!!!!
!(
!(
!(
!(
!(
!(
!(GRAHAM RDBROTHERS BLLO
N
G
M
IR
E
D
RLAKEW A Y DR
GE
N
E
R
A
L
P
W
N GRAHAM RDI
&
GN
RD
NE
W
P
O
R
T
L
N
VICTORIAAVDEACON DRW
ELS
H
AV
BARRON RDWILLIAM D FITCH PW
FM
2
1
5
4 RO CKPRAIRIER DHARVEYMITCHELLPWS
S
H
6
S
15b
14d
16c
16a
15a
ADOPTED/CURRENT PLAN PROPOSED PLAN
0 2010Miles
See Page 20Bike Lane Existing
! ! ! !Bike Lane Funded
Bike Lane Proposed
Bike Route Existing
Bike Route Proposed
B i c y c l e M a s t e r P l a n B i c y c l e M a s t e r P l a n 2 0 1 7 U p d a t e2 0 1 7 U p d a t e[DRAFT]!!!!Multi-use Path Existing
! ! ! !Multi-use Path FundedMulti-use Path ProposedGrade Separation ExistingGrade Separation FundedGrade Separation ProposedCity Initiated/Cleanup Thoroughfare Changes!(
MPO Related Thoroughfare Changes!(
!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!
!!!!!!
!
!
!
!
!
!
!
!!!!!!!!!!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!!!!!!!!!(
!(
!(
ROC
K
P
R
A
I
R
I
E
R
D
SPEARMAN D RBIRDPONDRDSTANDREW
S
D
R
ALEXAND R IAAVPARKVIEW DRARRINGTO
N
RDHU
N
T
E
R
C
R
E
E
K
D
R
PE
B
B
L
E
C
R
E
E
K
P
W
LAKEW
AY
DR WILLIAM D FITCH PWROCKPRAIRIERD
SH 6
S
18b
18c
21
¹51234678910
11 12 13 14 15 16 17
18 19 20 21 2223242526 27282930
Page 15 of 30
See Page 9
See Page 14See Page 16!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!
!!!!!!
!
!
!
!
!
!
!
!!!!!!!!!!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!!!!!!!!!(
!(
!(
ROC
K
P
R
A
I
R
I
E
R
D
SPEARMAN D RBIRDPONDRDSTANDREW
S
D
R
ALEXANDR IA AVPARKVIEW DRARRINGTO
N
RDHU
N
T
E
R
C
R
E
E
K
D
R
PE
B
B
L
E
C
R
E
E
K
P
W
LAKEW
AY
DR WILLIAM D FITCH PWROCKPRAIRIERD
SH 6
S
18b
18c
21
ADOPTED/CURRENT PLAN PROPOSED PLAN
0 2010Miles
See Page 21Bike Lane Existing
! ! ! !Bike Lane Funded
Bike Lane Proposed
Bike Route Existing
Bike Route Proposed
B i c y c l e M a s t e r P l a n B i c y c l e M a s t e r P l a n 2 0 1 7 U p d a t e2 0 1 7 U p d a t e[DRAFT]!!!!Multi-use Path Existing
! ! ! !Multi-use Path FundedMulti-use Path ProposedGrade Separation ExistingGrade Separation FundedGrade Separation ProposedCity Initiated/Cleanup Thoroughfare Changes!(
MPO Related Thoroughfare Changes!(
!(
!(
!(!(
!(!(
!(
ROCKPRAIRIERD
PE
B
B
L
E
C
R
E
E
K
P
W
S T A N DREWSDRLONESTARLNWILLIAM D FITCH PWFUTURE
ROCKPRAIRIE
RD
19a
20b
20c20a
17a
¹51234678910
11 12 13 14 15 16 17
18 19 20 21 2223242526 27282930
Page 16 of 30
See Page 10
See Page 15See Page 17!(
!(
!(!(
!(!(
!(
ROCK PRAIRIERD
PE
B
B
L
E
C
R
E
E
K
P
W
S T A N DREWSDRLONESTARLNWILLIAM D FITCH PWFUTURE
ROCKPRAIRIE
RD
F
UT
UREEASTERN
F
RE
E
WA
Y
L
OOP
19a
20b
20c20a
17a
ADOPTED/CURRENT PLAN PROPOSED PLAN
0 2010Miles
See Page 22Bike Lane Existing
! ! ! !Bike Lane Funded
Bike Lane Proposed
Bike Route Existing
Bike Route Proposed
B i c y c l e M a s t e r P l a n B i c y c l e M a s t e r P l a n 2 0 1 7 U p d a t e2 0 1 7 U p d a t e[DRAFT]!!!!Multi-use Path Existing
! ! ! !Multi-use Path FundedMulti-use Path ProposedGrade Separation ExistingGrade Separation FundedGrade Separation ProposedCity Initiated/Cleanup Thoroughfare Changes!(
MPO Related Thoroughfare Changes!(
!(
!(
!(GRIMES COUNTYGRIME
S
C
O
U
N
T
Y
GRIMES
COUNTYFUTUREROCKPRAIRIERDFUTUREEASTERNFREEWAYLOOPLONE STAR LN
4
5c
5a
¹51234678910
11 12 13 14 15 16 17
18 19 20 21 2223242526 27282930
Page 17 of 30
See Page 5
See Page 16See Page 5!(
!(
!(GRIMES COUNTYGRIME
S
C
O
U
N
T
Y
GRIMES
COUNTYFUTUREROCKPRAIRIERDFUTUREEASTERNFREEWAYLOOPLONE STAR LN
4
5c
5a
ADOPTED/CURRENT PLAN PROPOSED PLAN
0 2010Miles
See Page Bike Lane Existing
! ! ! !Bike Lane Funded
Bike Lane Proposed
Bike Route Existing
Bike Route Proposed
B i c y c l e M a s t e r P l a n B i c y c l e M a s t e r P l a n 2 0 1 7 U p d a t e2 0 1 7 U p d a t e[DRAFT]!!!!Multi-use Path Existing
! ! ! !Multi-use Path FundedMulti-use Path ProposedGrade Separation ExistingGrade Separation FundedGrade Separation ProposedCity Initiated/Cleanup Thoroughfare Changes!(
MPO Related Thoroughfare Changes!(
!!!!BURLESONCOUNTYBURLESO N COUNTYBURLESONCOUNTYKO P P E BRIDGERD
WALN
UTRDBLUERIDGEDRRAYMOND STOTZER PWCOUNTYROAD268
COUNTY ROAD 443FM60FM2155
FM 1361
FM
5
0
FM
1
6
6
COUNTY ROAD 201COUNTYROAD 270COUNTY ROAD 264PARKBLUEJAY COUNTYROAD269F
M
2039
COUNTYROAD276COUNTY ROAD 277COUNTY ROAD 440COUNTY ROAD 272REVEILLE
COUNTY ROAD295FUTUR
E
WESTERNFREEWAYLOO
P
¹51234678910
11 12 13 14 15 16 17
18 19 20 21 2223242526 27282930
Page 18 of 30
See Page 11
See Page See Page 23!!!!BURLESONCOUNTYBURLES O N COUNTYBURLESONCOUNTYWALNUTRDBLUERIDGEDRRAYMOND STOTZER PWCOUNTYROAD268
COUNTY ROAD 443FM60F
M
2
1
5
5
FM 1361
FM
5
0
FM
1
6
6
COUNTY ROAD 201C
OUNTYROAD270COUNTY ROAD 264PARKBLUEJAY COUNTYROAD269F
M
2039
COUNTYROAD276COUNTY ROAD 277COUNTY ROAD 440COUNTY ROAD 272REVEILLE
COUNTY ROAD295FUTURE ROYDER RDFUTUREWEST
ERNFREE
WA
Y
L
O
OP
ADOPTED/CURRENT PLAN PROPOSED PLAN
0 2010Miles
See Page Bike Lane Existing
! ! ! !Bike Lane Funded
Bike Lane Proposed
Bike Route Existing
Bike Route Proposed
B i c y c l e M a s t e r P l a n B i c y c l e M a s t e r P l a n 2 0 1 7 U p d a t e2 0 1 7 U p d a t e[DRAFT]!!!!Multi-use Path Existing
! ! ! !Multi-use Path FundedMulti-use Path ProposedGrade Separation ExistingGrade Separation FundedGrade Separation ProposedCity Initiated/Cleanup Thoroughfare Changes!(
MPO Related Thoroughfare Changes!(
!(BURLESON COUNTYBU RLESONCOUNTYN D
O
W
L
I
N
G
R
D S DOW
L
ING
RDN GRAHAM RDI
&
GN
RD
HOP
E
S
C
REEKRDBLUERIDGEDRH
U
N
TE
R
'
S
CR
EE
K
R
D TIMBERLINEDRFUTUREWE
S
T
E
R
NFREEWAYLOOP14a
¹51234678910
11 12 13 14 15 16 17
18 19 20 21 2223242526 27282930
Page 19 of 30
See Page 13
See Page 18See Page 20!(BURLESON COUNTYB U RLESONCOUNTYN D
O
W
L
I
N
G
R
D S DOWL
ING
RDN GRAHAM RDI
&
GN
RD
HOP
E
S
CREEKRDBLUERIDGEDRH
U
N
TE
R
'
S
CR
EE
K
R
D TIMBERLINEDRFUTUREROYDERRDFUTUREWE
S
T
E
RNFREEWAYLOOP14a
ADOPTED/CURRENT PLAN PROPOSED PLAN
0 2010Miles
See Page 23Bike Lane Existing
! ! ! !Bike Lane Funded
Bike Lane Proposed
Bike Route Existing
Bike Route Proposed
B i c y c l e M a s t e r P l a n B i c y c l e M a s t e r P l a n 2 0 1 7 U p d a t e2 0 1 7 U p d a t e[DRAFT]!!!!Multi-use Path Existing
! ! ! !Multi-use Path FundedMulti-use Path ProposedGrade Separation ExistingGrade Separation FundedGrade Separation ProposedCity Initiated/Cleanup Thoroughfare Changes!(
MPO Related Thoroughfare Changes!(
!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!
!
!
!
!
!!!!!!!!!!!!!!!(
!(
!(!(
!(
!(GREENS PRAIRIE TRETONBURYAVVICTORIAAV
ROYDERRD
I
&
GNRD
WOODLAKEDR
FRIERSONRDKOPPE BRIDGE RDCALUMETTR
GREENSPRAIRIE RDWWILLIAMD FITCH PW
FM 2154BARRON RDCAPSTONE DR
22
21b
21a 21c
24e
23
¹51234678910
11 12 13 14 15 16 17
18 19 20 21 2223242526 27282930
Page 20 of 30
See Page 14
See Page 19See Page 21!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!
!
!
!
!
!!!!!!!!!!!!!!!!!(
!(
!(!(
!(
!(GREENS PRAIRIE TRETONBURYAVVICTORIAAV
ROYDERRD
I&
G
NRD
WOODLAKEDR
FRIERSONRDKOPPE BRIDGE RDCALUMETTR
GREENSPRAIRIE RDWWILLIAMD FITCH PW
FM 2154BARRON RDCAPSTONE DR
FUTUREROYDERRD22
21b
21a 21c
24e
23
ADOPTED/CURRENT PLAN PROPOSED PLAN
0 2010Miles
See Page 24Bike Lane Existing
! ! ! !Bike Lane Funded
Bike Lane Proposed
Bike Route Existing
Bike Route Proposed
B i c y c l e M a s t e r P l a n B i c y c l e M a s t e r P l a n 2 0 1 7 U p d a t e2 0 1 7 U p d a t e[DRAFT]!!!!Multi-use Path Existing
! ! ! !Multi-use Path FundedMulti-use Path ProposedGrade Separation ExistingGrade Separation FundedGrade Separation ProposedCity Initiated/Cleanup Thoroughfare Changes!(
MPO Related Thoroughfare Changes!(
!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!(
!(
!(
!(
!(
!(
STANDREWS D R
INDIANLAKESDR
M ESA V ER D EH A R P E R'SF ER RY RDARRINGTONRD L
AKE
WAYDR
WOODLAKEDR
CAL
U
M
E
T
T
R
WILL IAM D FITC H P W
GREENSPRAIRIERDWSH
6
S
FU
T
U
R
E
W
S
P
H
I
L
L
I
P
S
P
W
21
26
25c
25a
25b
25
¹51234678910
11 12 13 14 15 16 17
18 19 20 21 2223242526 27282930
Page 21 of 30
See Page 15
See Page 20See Page 22!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!(
!(
!(
!(
!(
!(
STANDREWS D R
INDIANLAKESDR
M ESA V ER D EH A R P E R'SFE RRY RD
ARRINGTON RDL
AKE
WAYDR
WOODLAKEDR
CA
L
U
M
E
T
T
R
W ILLIAM D FITC H P W
GREENSPRAIRIERDWSH
6
S
FU
T
U
R
E
W
S
P
H
I
L
L
I
P
S
P
W
21
26
25c
25a
25b
25
ADOPTED/CURRENT PLAN PROPOSED PLAN
0 2010Miles
See Page 25Bike Lane Existing
! ! ! !Bike Lane Funded
Bike Lane Proposed
Bike Route Existing
Bike Route Proposed
B i c y c l e M a s t e r P l a n B i c y c l e M a s t e r P l a n 2 0 1 7 U p d a t e2 0 1 7 U p d a t e[DRAFT]!!!!Multi-use Path Existing
! ! ! !Multi-use Path FundedMulti-use Path ProposedGrade Separation ExistingGrade Separation FundedGrade Separation ProposedCity Initiated/Cleanup Thoroughfare Changes!(
MPO Related Thoroughfare Changes!(
!(!(!(
!(
!(
!(
!(
!(
!(
!(
!(PEACHCREEKRDS T A NDREWSDRINDIANLAKESDR
PEACH CREEK CUT-OFF RD
CHEROKEE DRLONESTARLNSH
6
S FUTUREEASTERNFREEWAYLOOP20b 20c20a
26
19b
27
5a
27a
17b
19a
17a
¹51234678910
11 12 13 14 15 16 17
18 19 20 21 2223242526 27282930
Page 22 of 30
See Page 16
See Page 21See Page 17!(!(!(
!(
!(
!(
!(
!(
!(
!(
!(PEACHCREEKRDS T A NDREWSDRINDIANLAKESDR
PEACH CREEK CUT-OFF RD
CHEROKEE DRLONE STAR LNSH
6
S
FUTUREEASTERNFREEWAYLOOP20b 20c20a
26
19b
27
5a
27a
17b
19a
17a
ADOPTED/CURRENT PLAN PROPOSED PLAN
0 2010Miles
See Page 26Bike Lane Existing
! ! ! !Bike Lane Funded
Bike Lane Proposed
Bike Route Existing
Bike Route Proposed
B i c y c l e M a s t e r P l a n B i c y c l e M a s t e r P l a n 2 0 1 7 U p d a t e2 0 1 7 U p d a t e[DRAFT]!!!!Multi-use Path Existing
! ! ! !Multi-use Path FundedMulti-use Path ProposedGrade Separation ExistingGrade Separation FundedGrade Separation ProposedCity Initiated/Cleanup Thoroughfare Changes!(
MPO Related Thoroughfare Changes!(
BU RLESONCOUNTYBURLESONCOUNTYKOPPE BRIDGE RDHO
PES
C
R
E
E
K
R
D
COUNTY ROAD 277F
U
T
U
R
E
WESTERNFREEWAYLOOP
¹51234678910
11 12 13 14 15 16 17
18 19 20 21 2223242526 27282930
Page 23 of 30
See Page 19
See Page 18See Page 24B U RLESONCOUNTYBURLESONCOUNTYKOPPE BRIDGE RDHO
PES
C
R
E
E
K
R
D
COUNTY ROAD 277FUTURE ROYDER RDF
U
T
U
R
EWESTERNFREEWAYLOOP
ADOPTED/CURRENT PLAN PROPOSED PLAN
0 2010Miles
See Page 18Bike Lane Existing
! ! ! !Bike Lane Funded
Bike Lane Proposed
Bike Route Existing
Bike Route Proposed
B i c y c l e M a s t e r P l a n B i c y c l e M a s t e r P l a n 2 0 1 7 U p d a t e2 0 1 7 U p d a t e[DRAFT]!!!!Multi-use Path Existing
! ! ! !Multi-use Path FundedMulti-use Path ProposedGrade Separation ExistingGrade Separation FundedGrade Separation ProposedCity Initiated/Cleanup Thoroughfare Changes!(
MPO Related Thoroughfare Changes!(
!(
!(
!(!(
I &
GN
RD
SADDLECREEK
D
R
RO
Y
D
E
R
R
D
DY
M
P
L
E
L
NKOPPEBRIDGERD
THOUSAND OAKS RDSTOUSLANDRDSTRAUB R D FRIERSONRDFM 2
1
5
4
FUTUREWESTERNFREEWAYLOOP
28a
23
28d 28c
¹51234678910
11 12 13 14 15 16 17
18 19 20 21 2223242526 27282930
Page 24 of 30
See Page 20
See Page 23See Page 25!(
!(
!(!(
I &
GN
RD
SADDLECREEK
D
R
RO
Y
D
E
R
R
D
DY
M
P
L
E
L
NKOPPEBRIDGERD
THOUSAND OAKS RDSTOUSLANDRDSTRAUB R D FRIERSONRDFM 2
1
5
4
FUTUREWESTERNFREEWAYLOOP
28a
23
28d 28c
ADOPTED/CURRENT PLAN PROPOSED PLAN
0 2010Miles
See Page 28Bike Lane Existing
! ! ! !Bike Lane Funded
Bike Lane Proposed
Bike Route Existing
Bike Route Proposed
B i c y c l e M a s t e r P l a n B i c y c l e M a s t e r P l a n 2 0 1 7 U p d a t e2 0 1 7 U p d a t e[DRAFT]!!!!Multi-use Path Existing
! ! ! !Multi-use Path FundedMulti-use Path ProposedGrade Separation ExistingGrade Separation FundedGrade Separation ProposedCity Initiated/Cleanup Thoroughfare Changes!(
MPO Related Thoroughfare Changes!(
!(
!(HIGH PRAIRIE RDINDIA
NLAKESDR
FM 2
1
5
4
FUTUREROYDERRD
25c
28
¹51234678910
11 12 13 14 15 16 17
18 19 20 21 2223242526 27282930
Page 25 of 30
See Page 21
See Page 24See Page 26!(
!(HIGH PRAIRIE RDINDIA
NLAKESDR
FM 2
1
5
4
FU
T
U
R
E
R
O
Y
D
E
R
R
D
25c
28
ADOPTED/CURRENT PLAN PROPOSED PLAN
0 2010Miles
See Page 29Bike Lane Existing
! ! ! !Bike Lane Funded
Bike Lane Proposed
Bike Route Existing
Bike Route Proposed
B i c y c l e M a s t e r P l a n B i c y c l e M a s t e r P l a n 2 0 1 7 U p d a t e2 0 1 7 U p d a t e[DRAFT]!!!!Multi-use Path Existing
! ! ! !Multi-use Path FundedMulti-use Path ProposedGrade Separation ExistingGrade Separation FundedGrade Separation ProposedCity Initiated/Cleanup Thoroughfare Changes!(
MPO Related Thoroughfare Changes!(
!(
!(
!(
!(
!(
!(
INDIANLAKESDR
PEACHCREEKRDCHEROKEE DRFM 2154
SH
6
S FUTUREEASTERNFREEWAYLOOPFUTUREROYDERRD
27a
28
29b
29c
29a
31b
¹51234678910
11 12 13 14 15 16 17
18 19 20 21 2223242526 27282930
Page 26 of 30
See Page 22
See Page 25See Page 27!(
!(
!(
!(
!(
!(
INDIANLAKESDR
PEACHCREEKRDCHEROKEE DRFM 2154
SH
6
S
FUTURE ROYD
E
R
R
DFUTUREEASTERNFREEWAYLOOP27a
28
29b
29c
29a
31b
ADOPTED/CURRENT PLAN PROPOSED PLAN
0 2010Miles
See Page 30Bike Lane Existing
! ! ! !Bike Lane Funded
Bike Lane Proposed
Bike Route Existing
Bike Route Proposed
B i c y c l e M a s t e r P l a n B i c y c l e M a s t e r P l a n 2 0 1 7 U p d a t e2 0 1 7 U p d a t e[DRAFT]!!!!Multi-use Path Existing
! ! ! !Multi-use Path FundedMulti-use Path ProposedGrade Separation ExistingGrade Separation FundedGrade Separation ProposedCity Initiated/Cleanup Thoroughfare Changes!(
MPO Related Thoroughfare Changes!(
!(
!(
GRI
M
E
S
C
O
U
N
T
Y
PEACHCREEKRDSH6S
FM 2
1
5
4
FUTURE ROYDER RD29b
29a
¹51234678910
11 12 13 14 15 16 17
18 19 20 21 2223242526 27282930
Page 27 of 30
See Page See Page 26See Page !(
!(
GRI
M
E
S
C
O
U
N
T
Y
PEACHCREEKRDSH6S
FM 2
1
5
4
FUTUREROYDERRD
29b
29a
ADOPTED/CURRENT PLAN PROPOSED PLAN
0 2010Miles
See Page Bike Lane Existing
! ! ! !Bike Lane Funded
Bike Lane Proposed
Bike Route Existing
Bike Route Proposed
B i c y c l e M a s t e r P l a n B i c y c l e M a s t e r P l a n 2 0 1 7 U p d a t e2 0 1 7 U p d a t e[DRAFT]!!!!Multi-use Path Existing
! ! ! !Multi-use Path FundedMulti-use Path ProposedGrade Separation ExistingGrade Separation FundedGrade Separation ProposedCity Initiated/Cleanup Thoroughfare Changes!(
MPO Related Thoroughfare Changes!(
BURLESON COUNTYBURLESON COUNTYSTOUSLAND RDCOUNTYR
O
A
D
443
FUTUREWESTERNFREEWAYLOOP
¹51234678910
11 12 13 14 15 16 17
18 19 20 21 2223242526 27282930
Page 28 of 30
See Page 24
See Page 18See Page 29BURLESON COUNTYBURLESON COUNTYSTOUSLAND RDCOUNTYR
O
A
D
443
FUTURE
WESTERNFREEWAYLOOP
FUTURE EASTERN FREEWAY LOOP
ADOPTED/CURRENT PLAN PROPOSED PLAN
0 2010Miles
See Page Bike Lane Existing
! ! ! !Bike Lane Funded
Bike Lane Proposed
Bike Route Existing
Bike Route Proposed
B i c y c l e M a s t e r P l a n B i c y c l e M a s t e r P l a n 2 0 1 7 U p d a t e2 0 1 7 U p d a t e[DRAFT]!!!!Multi-use Path Existing
! ! ! !Multi-use Path FundedMulti-use Path ProposedGrade Separation ExistingGrade Separation FundedGrade Separation ProposedCity Initiated/Cleanup Thoroughfare Changes!(
MPO Related Thoroughfare Changes!(
HIGH PRAIRIE RDFM 2154
FUTUREWESTERNFREEWAYLOOP
¹51234678910
11 12 13 14 15 16 17
18 19 20 21 2223242526 27282930
Page 29 of 30
See Page 25
See Page 28See Page 30HIGH PRAIRIE RDFM 2154
F U T U R E E A S T E R N F R E E W AY L O O P
FUTUREWESTERNFREEWAYLOOP
ADOPTED/CURRENT PLAN PROPOSED PLAN
0 2010Miles
See Page Bike Lane Existing
! ! ! !Bike Lane Funded
Bike Lane Proposed
Bike Route Existing
Bike Route Proposed
B i c y c l e M a s t e r P l a n B i c y c l e M a s t e r P l a n 2 0 1 7 U p d a t e2 0 1 7 U p d a t e[DRAFT]!!!!Multi-use Path Existing
! ! ! !Multi-use Path FundedMulti-use Path ProposedGrade Separation ExistingGrade Separation FundedGrade Separation ProposedCity Initiated/Cleanup Thoroughfare Changes!(
MPO Related Thoroughfare Changes!(
FM 159FM 2154
FUTURE ROYDER RD
F U T U RE W E S T E R N F R E EW AYLOOP¹51234678910
11 12 13 14 15 16 17
18 19 20 21 2223242526 27282930
Page 30 of 30
See Page 26
See Page 29See Page 27FM 159FM 2154
FUTURE ROY
D
E
R
R
D
F U T U R E E A S T E R N FREEW AYLOOPADOPTED/CURRENT PLAN PROPOSED PLAN
0 2010Miles
See Page Bike Lane Existing
! ! ! !Bike Lane Funded
Bike Lane Proposed
Bike Route Existing
Bike Route Proposed
B i c y c l e M a s t e r P l a n B i c y c l e M a s t e r P l a n 2 0 1 7 U p d a t e2 0 1 7 U p d a t e[DRAFT]!!!!Multi-use Path Existing
! ! ! !Multi-use Path FundedMulti-use Path ProposedGrade Separation ExistingGrade Separation FundedGrade Separation ProposedCity Initiated/Cleanup Thoroughfare Changes!(
MPO Related Thoroughfare Changes!(
P E D E S T R I A N M A S T E R P L A NP E D E S T R I A N M A S T E R P L A NM A P B O O KM A P B O O K
N O V E M B E R 2 0 1 7N O V E M B E R 2 0 1 7
[DRAFT]
51234
6 7 8 9 10
11 12 13 14 15 16 17
18
19 20 21 22
23 24 25 26 27
28 29 30
¹
0 5 102.5 Miles
Pedestrian Master Plan Locator Map
PE
B
B
L
E
C
R
E
E
K
P
W
SPEARM A NDRHS C P WGE
N
E
R
A
L
P
W
I
&GNRD
PEACHCREEKRDM E SA VERDEVICTORIAAVHARPER'SFERRYRD
INDIA
N
LAKESDR
P EACH CREEK CUT-OFF RD
DY
M
P
L
E
L
N
WA
L
N
U
T
R
D
H
OPES
CRE
E
KRDSTRAUBRD
TI M B ERLIN EDRKOPPEBRIDGERDBIRDPONDRDCHEROKEEDRLONESTARLN
TEX
A
S
A
V
S
GEORGEBUSHDRTEXASAV
WEL
L
B
O
R
N
R
DUNIVERSITY DRE 29TH ST
WILLIAM D FITCH PWHOLLEMANDRBARRON RDUNIVERSITYDRESOUTHWESTPWNHAR
V
E
Y
MITCHELLPW
HARVEYRDW VILLA MARIA RDTARROWST
ROCK PRAIRIERDHOLLEMANDREC
A
VITTAV
ANDERSONSTLEONARD RDDARTMOUTHSTGROESBECKST E
A
RL
R
U
DDE
RFWSW SH 21BRIARCREST DREVILLAMARIARDFM 2154
S
C
O
L
L
E
G
E
A
VS MA
IN
STRAYMOND STOTZER PWN
E
A
R
L
R
U
D
D
E
R
F
W
GEORGEBUSHDRWGREENSPRAIRIERDWBOONVILLERD
H
AR
V
E
Y
MITCHELLPW
S
RIVERSIDEPW
SH 30
FM158
SH 6
SLINCOLNAVS TE
XASAVFINFEATHER RDROESE
DEBBIECOUNTYROAD175JOHNRICELANC A S T ERKING
OAKSST
J
OHNS
FM60FM
5
0
COUNTY ROAD 269REVEILLEPRIVATER OAD4048PRIVATEROAD4007¹
0 5 102.5 Miles
Existing Pedestrian Master Plan
Multi-use Path ExistingMulti-use Path Funded Multi-use Path Proposed
Grade Separation Proposed
Grade Separation Funded
Grade Separation Existing Sidewalk ProposedSidewalk FundedSidewalk Existing on One SideSidewalk Existing on Both Sides
!!!!
PEBBLECREEKP
W
SPEARMA N DRH SC PWI &
GN
RDPEACHCREEKRDM E SA VERDEVICTORIAAV
SADDLE
CREEKDR
H A RPER'SFERRYRD
IN
DIANLAKESDR
STOUSLANDRDPEACH CREEK CUT-OFF RD
DY
M
P
L
E
L
N
WA
L
N
U
T
R
D
H
O
PES
CRE
E
KRDSTRAUBRD
TIM B ERLI N EDRKOPPEBRIDGERDBIRDPONDRDCHEROKEEDRLONESTARLN
TEX
A
S
A
V
SGEORGEBUSHDRTEXASAV
W
E
L
L
B
O
R
N
R
DUNIVERSITY DRE
2
9T
HS
T
WELSH
AV
WILLIAM D FITCH PWB R IARCRESTDRHOLLEMANDRBARRON RDUNIVERSITYDRESOUTHWESTPW
NHARVEYMITCHELLPW
HARVEYRDWVILLAMARIARDTARROWST
ROCKPRAIRIERDHOLLEMANDREC
AVITT
AV
ANDERSONSTLEONARD RDDARTMOUTH
ST
E
A
RL
R
U
DDERFWSEVILLAMARIARDGROESBECKSTFM 2
1
5
4
S
C
O
L
L
E
G
E
A
V
RAYMOND STOTZER PWWSH21N
E
A
R
L
R
U
D
D
E
R
F
W
GEORGEBUSHDRWFINFEATHER RDGREENSPRAIRIERDWHA
R
VE
Y
MITCHELLP
W
S
RIVERSIDEPW
SH 30
FM158
SH6SLINCOLNAVS TE
XASAV
ROESE
OWL TREE
COUNTYROAD 175DEBBIE
COUNTYROAD 173JOHNRICELANCASTERKINGOAKSST
J
OHNS
CAJUN
R
IDGE
COUNTY ROAD 190FM60FM 5
0
COUNTYROAD269REVEILLE
PRIVATEROAD4007¹
0 5 102.5 Miles
Proposed Pedestrian Master Plan
Multi-use Path ExistingMulti-use Path Funded Multi-use Path Proposed
Grade Separation Proposed
Grade Separation Funded
Grade Separation Existing Sidewalk ProposedSidewalk FundedSidewalk Existing on One SideSidewalk Existing on Both Sides
!!!!
!(!(
E 25
T
H
S
T
SPRING LOOAK HILL DRMU
N
S
O
N
A
V
BAR
A
K
L
N
FRANCIS DRWALTON DRN ROSEMARY DRHENSE LDR
UNIVERSITY DRE
2
9
TH
S
T
TEX
A
S
A
V
S TE
X
A
S
A
VE VILLA MARIA RDC
A
V
I
T
T
A
V
UNIVERSITY
D
R
EBRIARCRESTDR
S
C
OLLEGEAV
N
E
A
R
L
R
U
D
D
E
R
F
W
LINCOLN AVTARROW ST1a 1b
¹51234678910
11 12 13 14 15 16 17
18 19 20 21 2223242526 27282930
Page 1 of 30
See Page See Page See Page 2!(!(
E 25
T
H
S
T
SPRING LOOAK HILL DRMU
N
S
O
N
A
V
BAR
A
K
L
N
FRANCIS DRWALTON DRN ROSEMARY DRHENSE L DR
UNIVERSITY DRE
2
9
TH
S
T
TEX
A
S
A
V
S TE
X
A
S
A
VE VILLA MARIA RDC
A
V
I
T
T
A
V
UNIVERSITY
D
R EBRIARCRESTDRS
C
OLLEGEAV
N
E
A
R
L
R
U
D
D
E
R
F
W
LINCOLN AVTARROW ST1a 1b
ADOPTED/CURRENT PLAN PROPOSED PLAN
0 2010Miles
See Page 7P e d e s t r i a n M a s t e r P l a nP e d e s t r i a n M a s t e r P l a n2 0 1 7 U p d a t e2 0 1 7 U p d a t e
[DRAFT]!!!!Grade Separation Proposed
Multi-use Path Existing
Multi-use Path Funded
Multi-use Path Proposed
Grade Separation Funded Grade Separation Existing Sidewalk ProposedSidewalk FundedSidewalk Existing on One SideSidewalk Existing on Both Sides
City Initiated/Cleanup Thoroughfare Changes!(
MPO Related Thoroughfare Changes!(
!(
!(DOMINIK DRCOPPERFIELD DRLIN
D
A
L
NUNIVERSITYDRE SH 30
EARLRUD
DER
F
W
S HARVEY RDBOONVILLERD
FM158
FUTURELINDA
LN
2
3
¹51234678910
11 12 13 14 15 16 17
18 19 20 21 2223242526 27282930
Page 2 of 30
See Page See Page 1See Page 3!(
!(DOMINIK DRCOPPERFIELD DRLIN
D
A
L
NUNIVERSITYDRE SH 30
EARLRUD
DER
F
W
S HARVEY RDBOONVILLERD
FM158
FUTURELINDA
LN
2
3
ADOPTED/CURRENT PLAN PROPOSED PLAN
0 2010Miles
See Page 8P e d e s t r i a n M a s t e r P l a nP e d e s t r i a n M a s t e r P l a n2 0 1 7 U p d a t e2 0 1 7 U p d a t e
[DRAFT]!!!!Grade Separation Proposed
Multi-use Path Existing
Multi-use Path Funded
Multi-use Path Proposed
Grade Separation Funded Grade Separation Existing Sidewalk ProposedSidewalk FundedSidewalk Existing on One SideSidewalk Existing on Both Sides
City Initiated/Cleanup Thoroughfare Changes!(
MPO Related Thoroughfare Changes!(
BIRDPONDRDSH 30
FU
T
U
R
E
L
I
N
D
A
L
N
¹51234678910
11 12 13 14 15 16 17
18 19 20 21 2223242526 27282930
Page 3 of 30
See Page See Page 2See Page 4BIRDPONDRDSH 30
FU
T
U
R
E
L
I
N
D
A
L
N
ADOPTED/CURRENT PLAN PROPOSED PLAN
0 2010Miles
See Page 9P e d e s t r i a n M a s t e r P l a nP e d e s t r i a n M a s t e r P l a n2 0 1 7 U p d a t e2 0 1 7 U p d a t e
[DRAFT]!!!!Grade Separation Proposed
Multi-use Path Existing
Multi-use Path Funded
Multi-use Path Proposed
Grade Separation Funded Grade Separation Existing Sidewalk ProposedSidewalk FundedSidewalk Existing on One SideSidewalk Existing on Both Sides
City Initiated/Cleanup Thoroughfare Changes!(
MPO Related Thoroughfare Changes!(
!(
SH30
4a
¹51234678910
11 12 13 14 15 16 17
18 19 20 21 2223242526 27282930
Page 4 of 30
See Page See Page 3See Page 5!(
SH30
FUTUREEASTERNFREEWAYLOOP4a
ADOPTED/CURRENT PLAN PROPOSED PLAN
0 2010Miles
See Page 10P e d e s t r i a n M a s t e r P l a nP e d e s t r i a n M a s t e r P l a n2 0 1 7 U p d a t e2 0 1 7 U p d a t e
[DRAFT]!!!!Grade Separation Proposed
Multi-use Path Existing
Multi-use Path Funded
Multi-use Path Proposed
Grade Separation Funded Grade Separation Existing Sidewalk ProposedSidewalk FundedSidewalk Existing on One SideSidewalk Existing on Both Sides
City Initiated/Cleanup Thoroughfare Changes!(
MPO Related Thoroughfare Changes!(
!(
!(GRIMES
COUNTY
G
R
I
M
E
S
C
O
U
N
T
Y
PEACHCREEKRDLONESTAR LN
SH6S
SH 3
0
COUNTYROAD174LANCASTERROESE
YER BYJUBILEECOUNTYROA D 166LONGOAK
COUNTYROAD185
C OUNTYROAD165F
M
2
44JOHNRICECOUNTYROAD175
FM 3090COUNT
YROAD 172
COUNTYROAD190
5c
5a
¹51234678910
11 12 13 14 15 16 17
18 19 20 21 2223242526 27282930
!(
!(GRIMES
COUNTY
G
R
I
M
E
S
C
O
U
N
T
Y
PEACHCREEKRDLONESTAR LN
SH6S
SH 3
0
COUNTYROAD174LANCASTERROESE
YERB YJU
BILEEC O U N T Y R O A D 1 2 1
COUNTYROA D 16 6LONGOAK
DEBBIECOUNTYROAD185
C OUNTYROAD165F
M
2
44JOHNRICECOUNTYROAD175
FM 3090COUNT
YROAD 172
COUNTYROAD190F UTURE
ROCK PRAIRIERD5c
5a
ADOPTED/CURRENT PLAN PROPOSED PLAN
0 2010Miles
See Page See Page 4See PageSee Page P e d e s t r i a n M a s t e r P l a nP e d e s t r i a n M a s t e r P l a n2 0 1 7 U p d a t e2 0 1 7 U p d a t e
[DRAFT]!!!!Grade Separation Proposed
Multi-use Path Existing
Multi-use Path Funded
Multi-use Path Proposed
Grade Separation Funded Grade Separation Existing Sidewalk ProposedSidewalk FundedSidewalk Existing on One SideSidewalk Existing on Both Sides
City Initiated/Cleanup Thoroughfare Changes!(
MPO Related Thoroughfare Changes!(
Page 5 of 30
!(
!(
!(F & B RDHSC PWTURKEY CREEK RDWVILLAMARIARDHARVEY
MITCHELLPW
S
WE
L
L
B
O
R
N
R
D
RIVERSIDEPW RAYMOND STOTZER PWNHARVEYMITCHELLPW7a
7c
8
¹51234678910
11 12 13 14 15 16 17
18 19 20 21 2223242526 27282930
Page 6 of 30
See Page See Page See Page 7!(
!(
!(F & B RDHSC PWTURKEY CREEK RDWVILLAMARIARDHARVEY
MITCHELLPW
S
WE
L
L
B
O
R
N
R
D
RIVERSIDEPW RAYMOND STOTZER PWNHARVEYMITCHELLPW7a
7c
8
ADOPTED/CURRENT PLAN PROPOSED PLAN
0 2010Miles
See Page 12P e d e s t r i a n M a s t e r P l a nP e d e s t r i a n M a s t e r P l a n2 0 1 7 U p d a t e2 0 1 7 U p d a t e
[DRAFT]!!!!Grade Separation Proposed
Multi-use Path Existing
Multi-use Path Funded
Multi-use Path Proposed
Grade Separation Funded Grade Separation Existing Sidewalk ProposedSidewalk FundedSidewalk Existing on One SideSidewalk Existing on Both Sides
City Initiated/Cleanup Thoroughfare Changes!(
MPO Related Thoroughfare Changes!(
!(!(
!(!(
!(F & B RDDEXTE
R
D
R
NU
E
C
E
S
D
R
TIM
B
E
R
S
T
DE
X
T
E
R
D
R
S FRANCIS DRDOMINIK DRMU
N
S
O
N
A
V
GLADEST
WALTONDR
LUTHER ST WHENSE L DR
W
ELSHAVRAYMONDSTOTZERPWGEORGE BUSH DRTEX
A
S
A
V
W
E
L
L
B
O
R
N
R
DUNIVERSITYDR LINCOLN AVHOLLEMANDRCO
L
L
E
G
E
A
V
SOUTHWEST PWTEX
A
S
A
V
S
WELLB
ORN
R
D
N HARVEY RDHAR
V
E
Y
M
I
T
C
H
E
L
L
P
W
S
ANDERSONST
SCOLLEGEAV
GEORGE BUSH DR WHOLLEMANDRW
1a 1b
9b 12b
¹51234678910
11 12 13 14 15 16 17
18 19 20 21 2223242526 27282930
Page 7 of 30
See Page 1
See Page 6See Page 8!(!(
!(!(F & B RDDEXTE
R
D
R
NU
E
C
E
S
D
R
TIM
B
E
R
S
T
DE
X
T
E
R
D
R
S FRANCIS DRDOMINIK DRMU
N
S
O
N
A
V
GLADEST
WALTONDR
LUTHER ST WHENSE LDR
W
ELSHAVRAYMONDSTOTZERPWGEORGE BUSH DRTEX
A
S
A
V
W
E
L
L
B
O
R
N
R
DUNIVERSITY DRLINCOLN AVHOLLEMANDRCO
L
L
E
G
E
A
V
SOUTHWEST PWTEX
A
S
A
V
S
WELLBORN
R
D
N HARVEY RDHAR
V
E
Y
M
I
T
C
H
E
L
L
P
W
S
ANDERSONST
SCOLLEGEAV
GEORGE BUSH DR WHOLLEMANDRW1a 1b
9b 12b
ADOPTED/CURRENT PLAN PROPOSED PLAN
0 2010Miles
See Page 13P e d e s t r i a n M a s t e r P l a nP e d e s t r i a n M a s t e r P l a n2 0 1 7 U p d a t e2 0 1 7 U p d a t e
[DRAFT]!!!!Grade Separation Proposed
Multi-use Path Existing
Multi-use Path Funded
Multi-use Path Proposed
Grade Separation Funded Grade Separation Existing Sidewalk ProposedSidewalk FundedSidewalk Existing on One SideSidewalk Existing on Both Sides
City Initiated/Cleanup Thoroughfare Changes!(
MPO Related Thoroughfare Changes!(
!(
!(
GLADE S
T
NU
E
C
E
S
D
RDOMINIK DRCOLGATE DRMU
N
S
O
N
A
V
LONG
M
I
R
E
D
RKRENEK TAP RDBROTHERS BLAPPOMATTOX DRDEACONDREMERA LD PW
CORSAIRDRW
E
L
S
H
A
V
TEX
A
S
A
V
SHARVEY RDSH6
SHOLLEMANDREAN
D
E
R
S
O
N
S
T
DARTMOUTH
STSOUTHWEST PW EE
A
R
L
R
U
D
D
E
R
F
W
S
R OCK PRAIRIE RDHARVEYMITCHELLPWS9a
9b
¹51234678910
11 12 13 14 15 16 17
18 19 20 21 2223242526 27282930
Page 8 of 30
See Page 2
See Page 7See Page 9!(
!(
GLADE S
T
NU
E
C
E
S
D
RDOMINIK DRCOLGATE DRMU
N
S
O
N
A
V
LONG
M
I
R
E
D
RKRENEK TAP RDBROTHERS BLAPPOMATTOX DRDEACONDREMERA L D PW
CORSAIRDRW
E
L
S
H
A
V
TEX
A
S
A
V
SHARVEY RDS
H
6
SHOLLEMANDREAN
D
E
R
S
O
N
S
T
DARTMOUTH
STSOUTHWEST PW EE
A
R
L
R
U
D
D
E
R
F
W
S
R O CK PRAIRIE RDHARVEYMITCHELLPWS9a
9b
ADOPTED/CURRENT PLAN PROPOSED PLAN
0 2010Miles
See Page 14P e d e s t r i a n M a s t e r P l a nP e d e s t r i a n M a s t e r P l a n2 0 1 7 U p d a t e2 0 1 7 U p d a t e
[DRAFT]!!!!Grade Separation Proposed
Multi-use Path Existing
Multi-use Path Funded
Multi-use Path Proposed
Grade Separation Funded Grade Separation Existing Sidewalk ProposedSidewalk FundedSidewalk Existing on One SideSidewalk Existing on Both Sides
City Initiated/Cleanup Thoroughfare Changes!(
MPO Related Thoroughfare Changes!(
BIRD POND RDFUTURELINDA LN
¹51234678910
11 12 13 14 15 16 17
18 19 20 21 2223242526 27282930
Page 9 of 30
See Page 3
See Page 8See Page 10BIRD POND RDFUTURELINDA LN
ADOPTED/CURRENT PLAN PROPOSED PLAN
0 2010Miles
See Page 15P e d e s t r i a n M a s t e r P l a nP e d e s t r i a n M a s t e r P l a n2 0 1 7 U p d a t e2 0 1 7 U p d a t e
[DRAFT]!!!!Grade Separation Proposed
Multi-use Path Existing
Multi-use Path Funded
Multi-use Path Proposed
Grade Separation Funded Grade Separation Existing Sidewalk ProposedSidewalk FundedSidewalk Existing on One SideSidewalk Existing on Both Sides
City Initiated/Cleanup Thoroughfare Changes!(
MPO Related Thoroughfare Changes!(
!(
SH 3
0
WILLIAM D FITCH PWFUT
U
R
E
L
I
N
D
A
L
N
4a
¹51234678910
11 12 13 14 15 16 17
18 19 20 21 2223242526 27282930
Page 10 of 30
See Page 4
See Page 9See Page 5!(
SH 3
0
WILLIAMDFITCHPWFUT
U
R
E
L
I
N
D
A
L
N FUTUREEASTERNFREEWAYLOOP4a
ADOPTED/CURRENT PLAN PROPOSED PLAN
0 2010Miles
See Page 16P e d e s t r i a n M a s t e r P l a nP e d e s t r i a n M a s t e r P l a n2 0 1 7 U p d a t e2 0 1 7 U p d a t e
[DRAFT]!!!!Grade Separation Proposed
Multi-use Path Existing
Multi-use Path Funded
Multi-use Path Proposed
Grade Separation Funded Grade Separation Existing Sidewalk ProposedSidewalk FundedSidewalk Existing on One SideSidewalk Existing on Both Sides
City Initiated/Cleanup Thoroughfare Changes!(
MPO Related Thoroughfare Changes!(
BURLESONCOUNTYBURLESON COUNTYRAYMONDSTOTZERPWFM60PRIVATE ROAD4048¹51234678910
11 12 13 14 15 16 17
18 19 20 21 2223242526 27282930
Page 11 of 30
See Page See Page See Page 12BURLESONCOUNTYBURLESON COUNTYRAYMONDSTOTZERPWFM60PRIVATE ROAD4048ADOPTED/CURRENT PLAN PROPOSED PLAN
0 2010Miles
See Page 18P e d e s t r i a n M a s t e r P l a nP e d e s t r i a n M a s t e r P l a n2 0 1 7 U p d a t e2 0 1 7 U p d a t e
[DRAFT]!!!!Grade Separation Proposed
Multi-use Path Existing
Multi-use Path Funded
Multi-use Path Proposed
Grade Separation Funded Grade Separation Existing Sidewalk ProposedSidewalk FundedSidewalk Existing on One SideSidewalk Existing on Both Sides
City Initiated/Cleanup Thoroughfare Changes!(
MPO Related Thoroughfare Changes!(
!(
!(
!(
!(
HSC P W
RAYMONDSTOTZERPWRIVERSIDEPW
FUTURE
W
EST
ERN FREEWAYLOOP
7c
8
8
9c
¹51234678910
11 12 13 14 15 16 17
18 19 20 21 2223242526 27282930
Page 12 of 30
See Page 6
See Page 11See Page 13!(
!(
!(
!(
HSC P W
RAYMONDSTOTZERPWRIVERSIDEPW
FUTURE
WESTERNFREEWAY
L
O
O
P
7c
8
8
9c
ADOPTED/CURRENT PLAN PROPOSED PLAN
0 2010Miles
See Page 18P e d e s t r i a n M a s t e r P l a nP e d e s t r i a n M a s t e r P l a n2 0 1 7 U p d a t e2 0 1 7 U p d a t e
[DRAFT]!!!!Grade Separation Proposed
Multi-use Path Existing
Multi-use Path Funded
Multi-use Path Proposed
Grade Separation Funded Grade Separation Existing Sidewalk ProposedSidewalk FundedSidewalk Existing on One SideSidewalk Existing on Both Sides
City Initiated/Cleanup Thoroughfare Changes!(
MPO Related Thoroughfare Changes!(
!(
!(!(
!(
!(
!(
!(
!(
!(
!(
!(
NU
E
C
E
S
D
R
DOWLING RDLUTHER ST WHOL
L
EMAN
D
R
S
N D
O
W
L
I
N
G
R
D
ROCK PRAI R I E R D W
TOWERSPW
NGRAHAMRDGENERALPW
DEACON DR WBLUERIDGEDRI &
GN
RDGREATOAKSDRHOPESCREEKRDWA
L
N
U
T
R
D
HOLLEMA N D RSHOLLEMANDRW WELSHAV
W
E
L
L
B
O
R
N
R
DSOUTHWEST PWFM
2
1
5
4
HARVEYMITCHELLPWS
9b
11 13
14
12
9a
9c
13
12b
12a
¹51234678910
11 12 13 14 15 16 17
18 19 20 21 2223242526 27282930
Page 13 of 30
See Page 7
See Page 12See Page 14!(
!(!(
!(
!(
!(
!(
!(
!(
!(
!(
NU
E
C
E
S
D
R
DOWLING RDLUTHER ST WHOL
L
EMAN
D
R
S
N D
O
W
L
I
N
G
R
D
ROCKPRAI RI E R D W
TOWERSPW
NGRAHAMRDGENERALPW
DEACON DR WBLUERIDGEDRI
&
GN
RD
GREA
T
OAK
S
DRHOPESCREEKRDWA
L
N
U
T
R
D HOLLEMANDRWHOLLEMA N D RS
WELSHAV
W
E
L
L
B
O
R
N
R
DSOUTHWEST PWFM
2
1
5
4
HARVEY
MITCHELLPWS
9b
11 13
14
12
9a
9c
13
12b
12a
ADOPTED/CURRENT PLAN PROPOSED PLAN
0 2010Miles
See Page 19P e d e s t r i a n M a s t e r P l a nP e d e s t r i a n M a s t e r P l a n2 0 1 7 U p d a t e2 0 1 7 U p d a t e
[DRAFT]!!!!Grade Separation Proposed
Multi-use Path Existing
Multi-use Path Funded
Multi-use Path Proposed
Grade Separation Funded Grade Separation Existing Sidewalk ProposedSidewalk FundedSidewalk Existing on One SideSidewalk Existing on Both Sides
City Initiated/Cleanup Thoroughfare Changes!(
MPO Related Thoroughfare Changes!(
!(
!(
!(
!(
!(
!(
!(!(GRAHAM RDBROTHERS BLLO
N
G
M
IR
E
D
RLAKEW A Y DR
GE
N
E
R
A
L
P
W
NGRAHAMRDI &
GN
R
D
NE
W
P
O
R
T
L
NDEACON DRWELSH
AV
BARRON RDWILLIAM D FIT CH PWFM 2154ROCK PRAIRIE RDHARVEYM ITCHELLPWSS
H
6
S
15b
14d
16a
15a
16b16c
¹51234678910
11 12 13 14 15 16 17
18 19 20 21 2223242526 27282930
Page 14 of 30
See Page 8
See Page 13See Page 15!(
!(
!(
!(
!(
!(
!(!(GRAHAM RDBROTHERS BLLO
N
G
M
IR
E
D
RLAKEW A Y DR
GE
N
E
R
A
L
P
W
N GRAHAM RDI
&
GN
RD
NE
W
P
O
R
T
L
NDEACON DRWELSH
AV
BARRON RDWILLIAM D FITCH PW
FM 2154ROCK PRAIRIE RDHARVEYMITCHELLPWSS
H
6
S
15b
14d
16a
15a
16b16c
ADOPTED/CURRENT PLAN PROPOSED PLAN
0 2010Miles
See Page 20P e d e s t r i a n M a s t e r P l a nP e d e s t r i a n M a s t e r P l a n2 0 1 7 U p d a t e2 0 1 7 U p d a t e
[DRAFT]!!!!Grade Separation Proposed
Multi-use Path Existing
Multi-use Path Funded
Multi-use Path Proposed
Grade Separation Funded Grade Separation Existing Sidewalk ProposedSidewalk FundedSidewalk Existing on One SideSidewalk Existing on Both Sides
City Initiated/Cleanup Thoroughfare Changes!(
MPO Related Thoroughfare Changes!(
!(
!(
!(
ROC
K
P
R
A
I
R
I
E
R
D
S P E A RMANDRBIRDPONDRDSTANDREW
S
D
R
ALEXAN D RIAAVPARKVIEW DRARRINGTO
N
RDHU
N
T
E
R
C
R
E
E
K
D
R
PE
B
B
L
E
C
R
E
E
K
P
W
LAKEWAYDR
W ILLIAM D FIT CH P W
ROCKPRAIRIERD
SH 6
S
18b
18c
21
¹51234678910
11 12 13 14 15 16 17
18 19 20 21 2223242526 27282930
Page 15 of 30
See Page 9
See Page 14See Page 16!(
!(
!(
ROC
K
P
R
A
I
R
I
E
R
D
S P E A RMANDRBIRDPONDRDSTANDREW
S
D
R
ALEXAN D RIAAVPARKVIEW DRARRINGTO
N
RDHU
N
T
E
R
C
R
E
E
K
D
R
PE
B
B
L
E
C
R
E
E
K
P
W
LAKEWAYDR
WILLIAM D FITCH P W
ROCKPRAIRIERD
SH 6
S
18b
18c
21
ADOPTED/CURRENT PLAN PROPOSED PLAN
0 2010Miles
See Page 21P e d e s t r i a n M a s t e r P l a nP e d e s t r i a n M a s t e r P l a n2 0 1 7 U p d a t e2 0 1 7 U p d a t e
[DRAFT]!!!!Grade Separation Proposed
Multi-use Path Existing
Multi-use Path Funded
Multi-use Path Proposed
Grade Separation Funded Grade Separation Existing Sidewalk ProposedSidewalk FundedSidewalk Existing on One SideSidewalk Existing on Both Sides
City Initiated/Cleanup Thoroughfare Changes!(
MPO Related Thoroughfare Changes!(
!(
!(
!(!(
!(!(
ROCK PRAIRIE
R
D
PE
B
B
L
E
C
R
E
E
K
P
W
S T A N DREWSDRLONESTARLNWILLIAM D FITCH PWFUTURE
ROCKPRAIRIE
RD
19a
20b
20c20a
¹51234678910
11 12 13 14 15 16 17
18 19 20 21 2223242526 27282930
Page 16 of 30
See Page 10
See Page 15See Page 17!(
!(
!(!(
!(!(
ROCK PRAIRIE
R
D
PE
B
B
L
E
C
R
E
E
K
P
W
S T A N DREWSDRLONESTARLNWILLIAM D FITCH PWFUTURE
ROCKPRAIRIE
RD
F
UT
UREEASTERN
F
RE
E
WA
Y
L
OOP
19a
20b
20c20a
ADOPTED/CURRENT PLAN PROPOSED PLAN
0 2010Miles
See Page 22P e d e s t r i a n M a s t e r P l a nP e d e s t r i a n M a s t e r P l a n2 0 1 7 U p d a t e2 0 1 7 U p d a t e
[DRAFT]!!!!Grade Separation Proposed
Multi-use Path Existing
Multi-use Path Funded
Multi-use Path Proposed
Grade Separation Funded Grade Separation Existing Sidewalk ProposedSidewalk FundedSidewalk Existing on One SideSidewalk Existing on Both Sides
City Initiated/Cleanup Thoroughfare Changes!(
MPO Related Thoroughfare Changes!(
!(
!(GRIMES COUNTYGRIME
S
C
O
U
N
T
Y
GRIMES
COUNTYPEACHCREEKRDLONE STAR LN
FUTURE
ROCK
PRAIRIERD
FUTUREEASTERNFREEWAYLOOP5c
5a
¹51234678910
11 12 13 14 15 16 17
18 19 20 21 2223242526 27282930
Page 17 of 30
See Page 5
See Page 16See Page 5!(
!(GRIMES COUNTYGRIME
S
C
O
U
N
T
Y
GRIMES
COUNTYPEACHCREEKRDLONE STAR LN
FUTURE ROCKPRAIRIERDFUTUREEASTERNFREEWAYLOOP5a
ADOPTED/CURRENT PLAN PROPOSED PLAN
0 2010Miles
See Page P e d e s t r i a n M a s t e r P l a nP e d e s t r i a n M a s t e r P l a n2 0 1 7 U p d a t e2 0 1 7 U p d a t e
[DRAFT]!!!!Grade Separation Proposed
Multi-use Path Existing
Multi-use Path Funded
Multi-use Path Proposed
Grade Separation Funded Grade Separation Existing Sidewalk ProposedSidewalk FundedSidewalk Existing on One SideSidewalk Existing on Both Sides
City Initiated/Cleanup Thoroughfare Changes!(
MPO Related Thoroughfare Changes!(
BURLESONCOUNTYBURLESO N COUNTYBURLESONCOUNTYKO P P E BRIDGERD
WALN
UTRDBLUERIDGEDRRAYMOND STOTZER PWCOUNTYROAD268
COUNTY ROAD 443FM60FM2155
FM 1361
FM
5
0
FM
1
6
6
COUNTY ROAD 201COUNTYROAD 270COUNTY ROAD 264PARKBLUEJAY COUNTYROAD269F
M
2039
COUNTYROAD276COUNTY ROAD 277COUNTY ROAD 440COUNTY ROAD 272REVEILLE
COUNTY ROAD295FUTUR
E
WESTERNFREEWAYLOO
P
¹51234678910
11 12 13 14 15 16 17
18 19 20 21 2223242526 27282930
Page 18 of 30
See Page 11
See Page See Page 23BURLESONCOUNTYBURLES O N COUNTYBURLESONCOUNTYWALNUTRDBLUERIDGEDRRAYMOND STOTZER PWCOUNTYROAD268
COUNTY ROAD 443FM60F
M
2
1
5
5
FM 1361
FM
5
0
FM
1
6
6
COUNTY ROAD 201C
OUNTYROAD270COUNTY ROAD 264PARKBLUEJAY COUNTYROAD269F
M
2039
COUNTYROAD276COUNTY ROAD 277COUNTY ROAD 440COUNTY ROAD 272REVEILLE
COUNTY ROAD295FUTURE ROYDER RDFUTUREWEST
E
RNFREE
WA
Y
L
O
OP
ADOPTED/CURRENT PLAN PROPOSED PLAN
0 2010Miles
See Page P e d e s t r i a n M a s t e r P l a nP e d e s t r i a n M a s t e r P l a n2 0 1 7 U p d a t e2 0 1 7 U p d a t e
[DRAFT]!!!!Grade Separation Proposed
Multi-use Path Existing
Multi-use Path Funded
Multi-use Path Proposed
Grade Separation Funded Grade Separation Existing Sidewalk ProposedSidewalk FundedSidewalk Existing on One SideSidewalk Existing on Both Sides
City Initiated/Cleanup Thoroughfare Changes!(
MPO Related Thoroughfare Changes!(
BURLESON COUNTYBU RLESONCOUNTYN D
O
W
L
I
N
G
R
D S DOW
L
ING
RDN GRAHAM RDI
&
GN
RD
HOP
E
S
C
REEKRDBLUERIDGEDRH
U
N
TE
R
'
S
CR
EE
K
R
D TIMBERLINEDRFUTUREWE
S
T
E
R
NFREEWAYLOOP¹51234678910
11 12 13 14 15 16 17
18 19 20 21 2223242526 27282930
Page 19 of 30
See Page 13
See Page 18See Page 20BURLESON COUNTYB U RLESONCOUNTYN D
O
W
L
I
N
G
R
D S DOWL
ING
RDN GRAHAM RDI
&
GN
RD
HOP
E
S
CREEKRDBLUERIDGEDRH
U
N
TE
R
'
S
CR
EE
K
R
D TIMBERLINEDRFUTUREROYDERRDFUTUREWE
S
T
E
RNFREEWAYLOOPADOPTED/CURRENT PLAN PROPOSED PLAN
0 2010Miles
See Page 23P e d e s t r i a n M a s t e r P l a nP e d e s t r i a n M a s t e r P l a n2 0 1 7 U p d a t e2 0 1 7 U p d a t e
[DRAFT]!!!!Grade Separation Proposed
Multi-use Path Existing
Multi-use Path Funded
Multi-use Path Proposed
Grade Separation Funded Grade Separation Existing Sidewalk ProposedSidewalk FundedSidewalk Existing on One SideSidewalk Existing on Both Sides
City Initiated/Cleanup Thoroughfare Changes!(
MPO Related Thoroughfare Changes!(
!(
!(
!(
!(GREENS PRAIRIE TRETONBURYAVVICTORIAAV
ROYDERRD
I
&
G
N
RD
WOODLAKEDR
FRIERSONRDKOPPEBRIDGERDCALUMETTR
GREENSPRAIRIE RDWWILLIAM D FIT CH P W
FM 2154BARRON RDCAPSTONE DR
22
21b
21a
23
¹51234678910
11 12 13 14 15 16 17
18 19 20 21 2223242526 27282930
Page 20 of 30
See Page 14
See Page 19See Page 21!(
!(
!(
!(GREENS PRAIRIE TRETONBURYAVVICTORIAAV
ROYDERRD
I&
G
NRD
WOODLAKEDR
FRIERSONRDKOPPEBRIDGERDCALUMETTR
GREENSPRAIRIE RDWWILLIAM D FITCH PW
FM 2154BARRON RDCAPSTONE DR
FUTUREROYDERR D
22
21b
21a
23
ADOPTED/CURRENT PLAN PROPOSED PLAN
0 2010Miles
See Page 24P e d e s t r i a n M a s t e r P l a nP e d e s t r i a n M a s t e r P l a n2 0 1 7 U p d a t e2 0 1 7 U p d a t e
[DRAFT]!!!!Grade Separation Proposed
Multi-use Path Existing
Multi-use Path Funded
Multi-use Path Proposed
Grade Separation Funded Grade Separation Existing Sidewalk ProposedSidewalk FundedSidewalk Existing on One SideSidewalk Existing on Both Sides
City Initiated/Cleanup Thoroughfare Changes!(
MPO Related Thoroughfare Changes!(
!(
!(
!(
!(
STANDREWS D R
INDIANLAKESDR
M ESA V ER D EHARPER'SFERRYRDARRINGTONRDLAKE
WAYDR
WOODLAKEDR
CAL
U
M
E
T
T
R
W ILL IA M D FITCHPWGREENSPRAIRIERDWSH
6
S
FUTURE
WSPHILLIPSPW
21
26
25a
25
¹51234678910
11 12 13 14 15 16 17
18 19 20 21 2223242526 27282930
Page 21 of 30
See Page 15
See Page 20See Page 22!(
!(
!(
!(
STANDREWS D R
INDIANLAKESDR
M ESA V ER D EHARPER'SFERRYRD
ARRINGTON RDL
AKE
WAYDR
WOODLAKEDR
CA
L
U
M
E
T
T
R
WIL L I A M D FITCHPWGREENSPRAIRIERDWSH
6
S
FU
T
U
R
E
W
S
P
H
I
L
L
I
P
S
P
W
21
26
25a
25
ADOPTED/CURRENT PLAN PROPOSED PLAN
0 2010Miles
See Page 25P e d e s t r i a n M a s t e r P l a nP e d e s t r i a n M a s t e r P l a n2 0 1 7 U p d a t e2 0 1 7 U p d a t e
[DRAFT]!!!!Grade Separation Proposed
Multi-use Path Existing
Multi-use Path Funded
Multi-use Path Proposed
Grade Separation Funded Grade Separation Existing Sidewalk ProposedSidewalk FundedSidewalk Existing on One SideSidewalk Existing on Both Sides
City Initiated/Cleanup Thoroughfare Changes!(
MPO Related Thoroughfare Changes!(
!(!(!(
!(
!(
!(
!(
!(
!(
!(PEACHCREEKRDS T A N DREWSDRINDIANLAKESDR
PEACH CREEK CUT-OFF RD
CHEROKEE DRLONESTARLNSH
6
S FUTUREEASTERNFREEWAYLOOP20b 20c20a
26
19b
27
5a
17b
19a
17a
¹51234678910
11 12 13 14 15 16 17
18 19 20 21 2223242526 27282930
Page 22 of 30
See Page 16
See Page 21See Page 17!(!(!(
!(
!(
!(
!(
!(
!(
!(PEACHCREEKRDS T A N DREWSDRINDIANLAKESDR
PEACH CREEK CUT-OFF RD
CHEROKEE DRLONE STAR LNSH
6
S
FUTUREEASTERNFREEWAYLOOP20b 20c20a
26
19b
27
5a
17b
19a
17a
ADOPTED/CURRENT PLAN PROPOSED PLAN
0 2010Miles
See Page 26P e d e s t r i a n M a s t e r P l a nP e d e s t r i a n M a s t e r P l a n2 0 1 7 U p d a t e2 0 1 7 U p d a t e
[DRAFT]!!!!Grade Separation Proposed
Multi-use Path Existing
Multi-use Path Funded
Multi-use Path Proposed
Grade Separation Funded Grade Separation Existing Sidewalk ProposedSidewalk FundedSidewalk Existing on One SideSidewalk Existing on Both Sides
City Initiated/Cleanup Thoroughfare Changes!(
MPO Related Thoroughfare Changes!(
BU RLESONCOUNTYBURLESONCOUNTYKOPPE BRIDGE RDHO
PES
C
R
E
E
K
R
D
COUNTY ROAD 277F
U
T
U
R
E
WESTERNFREEWAYLOOP
¹51234678910
11 12 13 14 15 16 17
18 19 20 21 2223242526 27282930
Page 23 of 30
See Page 19
See Page 18See Page 24B U RLESONCOUNTYBURLESONCOUNTYKOPPE BRIDGE RDHO
PES
C
R
E
E
K
R
D
COUNTY ROAD 277FUTURE ROYDER RDFUTURE
WESTERN
FREEWAYLO
OP
ADOPTED/CURRENT PLAN PROPOSED PLAN
0 2010Miles
See Page 18P e d e s t r i a n M a s t e r P l a nP e d e s t r i a n M a s t e r P l a n2 0 1 7 U p d a t e2 0 1 7 U p d a t e
[DRAFT]!!!!Grade Separation Proposed
Multi-use Path Existing
Multi-use Path Funded
Multi-use Path Proposed
Grade Separation Funded Grade Separation Existing Sidewalk ProposedSidewalk FundedSidewalk Existing on One SideSidewalk Existing on Both Sides
City Initiated/Cleanup Thoroughfare Changes!(
MPO Related Thoroughfare Changes!(
I &
GN
RD
SADDLECREEK
D
R
RO
Y
D
E
R
R
D
DY
M
P
L
E
L
NKOPPEBRIDGERD
THOUSAND OAKS RDSTOUSLANDRDSTRAUB R D FRIERSONRDFM 2
1
5
4
FUTUREWESTERNFREEWAYLOOP
¹51234678910
11 12 13 14 15 16 17
18 19 20 21 2223242526 27282930
Page 24 of 30
See Page 20
See Page 23See Page 25I &
GN
RD
SADDLECREEK
D
R
RO
Y
D
E
R
R
D
DY
M
P
L
E
L
NKOPPEBRIDGERD
THOUSAND OAKS RDSTOUSLANDRDSTRAUB R D FRIERSONRDFM 2
1
5
4
FUTUREWESTERNFREEWAYLOOP
ADOPTED/CURRENT PLAN PROPOSED PLAN
0 2010Miles
See Page 28P e d e s t r i a n M a s t e r P l a nP e d e s t r i a n M a s t e r P l a n2 0 1 7 U p d a t e2 0 1 7 U p d a t e
[DRAFT]!!!!Grade Separation Proposed
Multi-use Path Existing
Multi-use Path Funded
Multi-use Path Proposed
Grade Separation Funded Grade Separation Existing Sidewalk ProposedSidewalk FundedSidewalk Existing on One SideSidewalk Existing on Both Sides
City Initiated/Cleanup Thoroughfare Changes!(
MPO Related Thoroughfare Changes!(
HIGHPRAIRIERDINDIA
NLAKESDR
S
A
D
DLECREEKDR
CA
L
U
M
E
T
T
R
FM 2
1
5
4
FU
T
U
R
E
R
O
Y
D
E
R
R
D
¹51234678910
11 12 13 14 15 16 17
18 19 20 21 2223242526 27282930
Page 25 of 30
See Page 21
See Page 24See Page 26HIGHPRAIRIERDINDIA
NLAKESDR
S
A
D
DLECREEKDR
CA
L
U
M
E
T
T
R
FM 2
1
5
4
FU
T
U
R
E
R
O
Y
D
E
R
R
D
ADOPTED/CURRENT PLAN PROPOSED PLAN
0 2010Miles
See Page 29P e d e s t r i a n M a s t e r P l a nP e d e s t r i a n M a s t e r P l a n2 0 1 7 U p d a t e2 0 1 7 U p d a t e
[DRAFT]!!!!Grade Separation Proposed
Multi-use Path Existing
Multi-use Path Funded
Multi-use Path Proposed
Grade Separation Funded Grade Separation Existing Sidewalk ProposedSidewalk FundedSidewalk Existing on One SideSidewalk Existing on Both Sides
City Initiated/Cleanup Thoroughfare Changes!(
MPO Related Thoroughfare Changes!(
!(
!(
!(
INDIANLAKESDR
PEACHCREEKRDCHEROKEE DRFM 2154
SH
6
S FUTUREEASTERNFREEWAYLOOPFUTUREROYDERRD
29b
29c
29a
¹51234678910
11 12 13 14 15 16 17
18 19 20 21 2223242526 27282930
Page 26 of 30
See Page 22
See Page 25See Page 27!(
!(
!(
INDIANLAKESDR
PEACHCREEKRDCHEROKEE DRFM 2154
SH
6
S
FUTURE ROYD
E
R
R
DFUTUREEASTERNFREEWAYLOOP29b
29c
29a
ADOPTED/CURRENT PLAN PROPOSED PLAN
0 2010Miles
See Page 30P e d e s t r i a n M a s t e r P l a nP e d e s t r i a n M a s t e r P l a n2 0 1 7 U p d a t e2 0 1 7 U p d a t e
[DRAFT]!!!!Grade Separation Proposed
Multi-use Path Existing
Multi-use Path Funded
Multi-use Path Proposed
Grade Separation Funded Grade Separation Existing Sidewalk ProposedSidewalk FundedSidewalk Existing on One SideSidewalk Existing on Both Sides
City Initiated/Cleanup Thoroughfare Changes!(
MPO Related Thoroughfare Changes!(
!(
!(
GRI
M
E
S
C
O
U
N
T
Y
PEACHCREEKRDSH6S
FM 2
1
5
4
FUTURE ROYDER RD29b
29a
¹51234678910
11 12 13 14 15 16 17
18 19 20 21 2223242526 27282930
Page 27 of 30
See Page See Page 26See Page !(
!(
GRI
M
E
S
C
O
U
N
T
Y
PEACHCREEKRDSH6S
FM 2
1
5
4
FUTUREROYDERRDFUTUREEASTERNFREEWAYLOOP29b
29a
ADOPTED/CURRENT PLAN PROPOSED PLAN
0 2010Miles
See Page P e d e s t r i a n M a s t e r P l a nP e d e s t r i a n M a s t e r P l a n2 0 1 7 U p d a t e2 0 1 7 U p d a t e
[DRAFT]!!!!Grade Separation Proposed
Multi-use Path Existing
Multi-use Path Funded
Multi-use Path Proposed
Grade Separation Funded Grade Separation Existing Sidewalk ProposedSidewalk FundedSidewalk Existing on One SideSidewalk Existing on Both Sides
City Initiated/Cleanup Thoroughfare Changes!(
MPO Related Thoroughfare Changes!(
BURLESON COUNTYBURLESON COUNTYSA
D
D
L
E
CREEKDR
STOUSLAND RDCOUNTYR
O
A
D
443
FUTUREWESTERNFREEWAYLOOP
¹51234678910
11 12 13 14 15 16 17
18 19 20 21 2223242526 27282930
Page 28 of 30
See Page 24
See Page 18See Page 29BURLESON COUNTYBURLESON COUNTYSA
D
D
L
E
CREEKDR
STOUSLAND RDCOUNTYR
O
A
D
443
FUTURE
WESTERNFREEWAYLOOP
FUTURE EASTERN FREEWAY LOOP
ADOPTED/CURRENT PLAN PROPOSED PLAN
0 2010Miles
See Page P e d e s t r i a n M a s t e r P l a nP e d e s t r i a n M a s t e r P l a n2 0 1 7 U p d a t e2 0 1 7 U p d a t e
[DRAFT]!!!!Grade Separation Proposed
Multi-use Path Existing
Multi-use Path Funded
Multi-use Path Proposed
Grade Separation Funded Grade Separation Existing Sidewalk ProposedSidewalk FundedSidewalk Existing on One SideSidewalk Existing on Both Sides
City Initiated/Cleanup Thoroughfare Changes!(
MPO Related Thoroughfare Changes!(
HIGH PRAIRIE RDFM 2154
FUTUREWESTERNFREEWAYLOOP
¹51234678910
11 12 13 14 15 16 17
18 19 20 21 2223242526 27282930
Page 29 of 30
See Page 25
See Page 28See Page 30HIGH PRAIRIE RDFM 2154
F U T U R E E A S T E R N F R E E W AY L O O P
FUTUREWESTERNFREEWAYLOOP
ADOPTED/CURRENT PLAN PROPOSED PLAN
0 2010Miles
See Page P e d e s t r i a n M a s t e r P l a nP e d e s t r i a n M a s t e r P l a n2 0 1 7 U p d a t e2 0 1 7 U p d a t e
[DRAFT]!!!!Grade Separation Proposed
Multi-use Path Existing
Multi-use Path Funded
Multi-use Path Proposed
Grade Separation Funded Grade Separation Existing Sidewalk ProposedSidewalk FundedSidewalk Existing on One SideSidewalk Existing on Both Sides
City Initiated/Cleanup Thoroughfare Changes!(
MPO Related Thoroughfare Changes!(
FM 159FM 2154
FUTURE ROYDER RD
F U T U RE W E S T E R N F R E EW AYLOOP¹51234678910
11 12 13 14 15 16 17
18 19 20 21 2223242526 27282930
Page 30 of 30
See Page 26
See Page 29See Page 27FM 159FM 2154
FUTURE ROY
D
E
R
R
D
F U T U R E E A S T E R N FREEW AYLOOPADOPTED/CURRENT PLAN PROPOSED PLAN
0 2010Miles
See Page P e d e s t r i a n M a s t e r P l a nP e d e s t r i a n M a s t e r P l a n2 0 1 7 U p d a t e2 0 1 7 U p d a t e
[DRAFT]!!!!Grade Separation Proposed
Multi-use Path Existing
Multi-use Path Funded
Multi-use Path Proposed
Grade Separation Funded Grade Separation Existing Sidewalk ProposedSidewalk FundedSidewalk Existing on One SideSidewalk Existing on Both Sides
City Initiated/Cleanup Thoroughfare Changes!(
MPO Related Thoroughfare Changes!(