Cost: $525,000 funded through Community Development Block Grant
Utilities: Sewer is already done, water and hydrants will be included. May possibly
include new streetlights.
Timeframe: Will not be out to bid until the end of 1999. Construction will begin in the
spring.
Acquisition: City was authorized to acquire land at the October 14th City Council
meeting including 19 right of ways and two easements
Development: Between 2"d and Boyett-acquiring property from both sides
Between 2nd and College Main -acquiring property from the North Side
Between College Main and Tauber -acquiring property from the North
Side
Development will include curb and gutter, no sidewalks are budgeted but
are built into the design for construction at a later date -budget permitting,
street width will be 29 feet (standard)
Engineering will be requesting bids for both asphalt and concrete