Loading...
HomeMy WebLinkAbout04/06/2017 - Agenda Packet - Planning & Zoning CommissionPlanning and Zoning Commission Workshop College Station, TX Meeting Agenda - Final City Hall 1101 Texas Ave College Station, TX 77840 The City Council may or may not attend the Planning & Zoning Commission Workshop Meeting. City Hall Council Chambers6:00 PMThursday, April 6, 2017 1. Call the meeting to order. 2. Discussion of consent and regular agenda items. 3. Discussion of new development applications submitted to the City. New Development Link: www.cstx.gov/newdev Presentation, possible action, and discusssion regarding the consideration of the 2016 P&Z Plan of Work (see attached) 17-01474. Sponsors:Bombek 2016 Plan of WorkAttachments: Presentation, possible action, and discusssion regarding student housing in established single -family neighborhoods and research on multi-family zoning districts as specifically described in the 2016 P&Z Plan of Work. 17-01495. Sponsors:Bombek and Bullock MemoAttachments: Presentation, possible action, and discusssion regarding the consideration of the Draft 2017 P&Z Plan of Work (see attached) 17-01486. Sponsors:Bombek DRAFT-2017 Plan of WorkAttachments: Presentation, possible action, and discussion regarding the P&Z Calendar of Upcoming Meetings: *Thursday, April 13, 2017 ~ City Council Meeting ~ Council Chambers ~ Workshop 6:00 p.m. and Regular 7:00 p.m. (Liaison - Osborne) *Thursday, April 20, 2017 ~ P&Z Meeting ~ Council Chambers ~ Workshop 6:00 p.m. and Regular 7:00 p.m. *Thursday, May 11, 2017 ~ City Council and P&Z Joint Meeting ~ Council Chambers ~ Workshop 6:00 p.m. 17-01367. Presentation, possible action, and discussion regarding an update on the following item: 17-01308. Page 1 College Station, TX Printed on 3/31/2017 April 6, 2017Planning and Zoning Commission Workshop Meeting Agenda - Final *A Rezoning for approximately 17 acres located west of the intersection of State Highway 30 and Linda Lane from R Rural to MF Multi-Family and NAP Natural Areas Protected. The Planning & Zoning Commission heard this item on March 16, 2017, and voted (5-0-1) to recommend approval. The City Council heard this item on March 23, 2017, and voted (7-0) to approve the request. 9. Discussion, review and possible action regarding the following meetings: Design Review Board, BioCorridor Board. 10. Discussion and possible action on future agenda items - A Planning & Zoning Member may inquire about a subject for which notice has not been given. A statement of specific factual information or the recitation of existing policy may be given. Any deliberation shall be limited to a proposal to place the subject on an agenda for a subsequent meeting. 11. Adjourn. The Commission may adjourn into Executive Session to consider any item listed on this agenda if a matter is raised that is appropriate for Executive Session discussion . An announcement will be made of the basis for the Executive Session discussion. APPROVED _____________________ City Manager I certify that the above Notice of Meeting was posted at College Station City Hall, 1101 Texas Avenue, College Station, Texas, on March 31, 2017 at 5:00 p.m. _____________________ City Secretary This building is wheelchair accessible. Persons with disabilities who plan to attend this meeting and who may need accommodations, auxiliary aids, or services such as interpreters, readers, or large print are asked to contact the City Secretary ’s Office at (979) 764-3541, TDD at 1-800-735-2989 , or email adaassistance@cstx .gov at least two business days prior to the meeting so that appropriate arrangements can be made . If the City does not receive notification at least two business days prior to the meeting, the City will make a reasonable attempt to provide the necessary accommodations. Penal Code § 30.07. Trespass by License Holder with an Openly Carried Handgun. "Pursuant to Section 30.07, Penal Code (Trespass by License Holder with an Openly Carried Handgun) A Person Licensed under Subchapter H, Chapter 411, Government Code (Handgun Licensing Law), may not enter this Property with a Page 2 College Station, TX Printed on 3/31/2017 April 6, 2017Planning and Zoning Commission Workshop Meeting Agenda - Final Handgun that is Carried Openly." Codigo Penal § 30.07. Traspasar Portando Armas de Mano al Aire Libre con Licencia. “Conforme a la Seccion 30.07 del codigo penal (traspasar portando armas de mano al aire libre con licencia), personas con licencia bajo del Sub-Capitulo H, Capitulo 411, Codigo de Gobierno (Ley de licencias de arma de mano), no deben entrar a esta propiedad portando arma de mano al aire libre.” Page 3 College Station, TX Printed on 3/31/2017 City Hall 1101 Texas Ave College Station, TX 77840 College Station, TX Legislation Details (With Text) File #: Version:517-0147 Name:2016 P&Z Plan of Work Status:Type:Updates Agenda Ready File created:In control:3/27/2017 Planning and Zoning Commission Workshop On agenda:Final action:4/6/2017 Title:Presentation, possible action, and discusssion regarding the consideration of the 2016 P&Z Plan of Work (see attached) Sponsors:Mark Bombek Indexes: Code sections: Attachments:2016 Plan of Work Action ByDate Action ResultVer. Presentation, possible action, and discusssion regarding the consideration of the 2016 P&Z Plan of Work (see attached) College Station, TX Printed on 3/31/2017Page 1 of 1 powered by Legistar™ 2016 Planning & Zoning Commission Plan of Work Comprehensive Plan Items Implementation of Adopted Plans Summary: Implementation of adopted master plans and neighborhood, district, and corridor plans, namely: Central College Station, Eastgate, Southside Area, Wellborn Community, and South Knoll Area neighborhood plans, and Bicycle, Pedestrian & Greenways, Parks and Recreation, Water, Waste Water, Medical District, and Economic Development master plans. Project Dates: 5/12/16: Sidewalk extension completed along Guadalupe. (South Knoll Area Plan) 7/28/16: City Council approved Wellborn Zoning Districts (WC, WRS, & WE). 9/30/16: Sidewalk extension completed along Langford (South Knoll Area Plan) 11/17/16: Presentation to P&Z regarding the Comprehensive Plan Annual Review (JB) and UDO Annual Review (JPAZ) 11/17/16: Presentation to City Council regarding the Comprehensive Plan Annual Review (JB) and UDO Annual Review (JPAZ) 12/08/16: Construction Contract to be considered by council for sidewalk improvements along Eisenhower Street, and Live Oak Street (Eastgate Area Plan) 12/08/16: Construction Contract to be considered by council for sidewalk improvements along San Saba (Central College Station Area Plan) 01/12/17: Construction Contract to be considered by council for sidewalk improvements along Park Place, Holik, Glade and Anna Streets. (Southside Area Plan) 2/07/17: Bicycle, Pedestrian, & Greenway Master Plan Community Meeting 02/16/17: Presentation to P&Z regarding an update on the Bicycle, Pedestrian & Greenways Master Plan. 03/02/17: Presentation to P&Z regarding an update on the implementation of the Southside Area Neighborhood Plan. (MH) Staff Assigned: P&DS Staff Anticipated Completion: on-going Review of Adopted Plans Summary: Project Dates: After action review of adopted planning areas, specifically Northgate, BioCorridor, and Medical Districts. This may also include a tour of one of the planning areas mentioned above. 10/20/16: Provided an update to P&Z on Development activity in the BioCorridor (MH) Staff Assigned: Economic Development & Molly Hitchcock Initiated: 10/20/16 Update on Wastewater Master Plan Summary: Project Dates: This plan is intended to provide a holistic look at the City’s wastewater system and provide information on potential solutions and costs so that Wastewater System Capital Improvement Projects can be planned in the future by City Staff. 9/15/16: Provided an update to P&Z on the Wastewater Master Plan- DC 4/6/17: Comprehensive Plan Amendment for Water/Wastewater Master Plan Update presented to P&Z for recommendation. Staff Assigned: Water/Wastewater Completed: 9/15/16 Impact Fees for Water, Wastewater, and Roadways Summary: Engineering consultants have been engaged and impact fee studies are underway. Council recently appointed the P&Z Commission as the Impact Fee Advisory Committee (IFAC) with additional members for representation from the ETJ (water/wastewater), and Home Builders Association, as well as citizens/neighborhoods. Several presentations and findings are forthcoming to the IFAC and Council over the next few months for review and consideration. The IFAC will eventually be asked to advise the Council on Impact Fees. Project Dates: 7/21/16: IFAC began to review calculation of maximum impact fees 8/4/16: IFAC reviewed calculation of maximum impact fees for Water/ Wastewater and provided comment. 9/1/16: IFAC reviewed calculation of maximum impact fees for roadways and provided comment. 9/22/16: Council adopted wastewater and water impact fees. 10/13/16: Council received an update on the IFAC’s written comments regarding Roadway Impact Fees. 11/10/16: Council adopted roadway impact fees. Staff Assigned: Alan Gibbs & Dave Coleman Completed: 9/1/16 *Annexation Task Force Implementation Summary: Project Dates: 02/23/17: An Inter-local Agreement with the City of Bryan regarding the common ETJ Boundary is scheduled to be heard by City Council at their February 23rd regular meeting. 2/23/17: The Inter-local Agreement with the City of Bryan regarding the common ETJ Boundary was approved by City Council. Implement the City's future annexation policy as identified in the revised Growth Management and Capacity chapter of the Comprehensive Plan. Staff Assigned: Lance Simms Anticipated Initiation: Fall 2016 Neighborhood Integrity Items *Traffic Calming Toolkit Summary: Receive information regarding the current traffic calming policy, including updates as recommended by the Council Transportation and Mobility Committee. Additionally receive update on the implementation of the neighborhood parking toolbox created by the Neighborhood Transportation Task Force. Project Dates: Staff Assigned: Troy Rother & Jason Schubert Anticipated Completion: 2017-2018 Traffic Impact Analysis for Single-Family Development Summary: Review the Traffic Impact Analysis ordinance and consider a recommendation to require TIAs for Single- Family Residential development. Project Dates: 8/4/16: P&Z recommended approval of Single-Family TIA Ordinance Amendment 8/11/16: City Council approved Single- Family TIA Ordinance Amendment Staff Assigned: Danielle Singh Completed: 8/11/16 Student Housing in Established Single-Family Neighborhoods Summary: Research best practices from other communities regarding the management of student housing in single-family neighborhoods. Project Dates: 4/6/17: Presentation to P&Z to discuss student housing in established single- family Neighborhoods. Staff Assigned: Jessica Bullock and Mark Bombek Anticipated Completion: April 6, 2017 Update on Landscaping Requirements for Single-Family Developments Summary: Provide an update on the City’s landscaping requirements for single-family development and recommend adjustments as deemed necessary. Project Dates: 1/5/17: Presentation to P&Z regarding the landscaping requirements for single-family development. P&Z agreed that staff should pursue amending the current ordinance to allow flexibility of planting area for townhome developments, allowing credit for existing trees, and to clarify applicability to apply to all new single-family homes. (MB & MT) Staff Assigned: Mark Bombek & Madison Thomas Completed: 1/5/17 UDO Regulatory Items Wellborn Zoning Districts Summary: Implement the Wellborn Community Plan by creating new or modified zoning districts as described in the Plan. Project Dates: 6/16/16: P&Z recommended approval of UDO amendment for zoning districts 7/28/16: City Council adopted UDO amendment for zoning districts Staff Assigned: Jessica Bullock Completed: 07/28/16 Sign Ordinance Revisions Summary: Review and update the City’s sign ordinance in light of the recent Supreme Court decision regarding sign regulations based upon content. Project Dates: Staff Assigned: Molly Hitchcock, Rachel Lazo & Legal Anticipated Completion: March 2017 Update on Off-Street Parking Requirements Summary: Provide an update on the City’s off-street parking requirements. Receive Information regarding current off-street parking requirements including options that provide flexibility. Project Dates: 2/2/17: Presentation given to P&Z regarding the City’s current parking requirements and discussions of current parking trends across the country. 4/20/17: Additional presentation and discussion on potential amendments or additions to the City’s current off-street parking requirements. Staff Assigned: Justin Golbabai Completed: February 2, 2017 *Research Multi-Family Zoning Options Summary: Research the ability to provide multi-family zoning for market rate units (conventional multi-family) vs. rental by bedroom (student multi-family). Project Dates: 4/6/17: Presentation to P&Z regarding multi-family zoning options for market rate (by the unit) multi-family and student oriented (by-the-bed) multi- family Staff Assigned: Jessica Bullock & Mark Bombek Anticipated Completion: April 6, 2017 On-Going Items Pre-Application Conference Overview Summary: Provide an update on the Pre-Application Conference process. Project Dates: 07/07/16 Provide an overview of the PAC Process and provide an update on the PAC survey. Staff Assigned: Mark Bombek Completed: 7/7/16 Quarterly Review of Pre-Application Conference Surveys Summary: Provide an update on the survey results from the Pre-Application Conference process. Project Dates: 11/17/16: Provided an update on the status of the PAC meeting process and implementation of the PAC Survey. Presentation at P&Z Workshop. (MB) 3/16/17: Provide an update on the status of the PAC meeting process and implementation of the PAC survey. Presentation at P&Z Workshop. (MB) Staff Assigned: Mark Bombek Anticipated Completion: on-going Economic Development Updates Summary: Receive regular updates from the Economic Development Department regarding the vision and implementation of the commercialization of TAMU research- related output, including examples of successful efforts elsewhere. Additionally, receive an update on the recent announcement regarding plans for the TAMU System Riverside Campus revitalization effort. Project Dates: 6/16/2016 Economic development efforts and land availability for commercial uses, Presentation at P&Z Workshop. 11/17/16: Provided a quarterly update on Economic Development efforts and land availability for commercial uses. Presentation at P&Z Workshop. (NR) Staff Assigned: Economic Development Anticipated Initiation: June 2016 City Hall 1101 Texas Ave College Station, TX 77840 College Station, TX Legislation Details (With Text) File #: Version:317-0149 Name:Student housing and Multi-Family zoning districts- 2016 P&Z Plan of Work Status:Type:Updates Agenda Ready File created:In control:3/27/2017 Planning and Zoning Commission Workshop On agenda:Final action:4/6/2017 Title:Presentation, possible action, and discusssion regarding student housing in established single-family neighborhoods and research on multi-family zoning districts as specifically described in the 2016 P&Z Plan of Work. Sponsors:Mark Bombek, Jessica Bullock Indexes: Code sections: Attachments:Memo Action ByDate Action ResultVer. Presentation, possible action, and discusssion regarding student housing in established single-family neighborhoods and research on multi-family zoning districts as specifically described in the 2016 P&Z Plan of Work. College Station, TX Printed on 3/31/2017Page 1 of 1 powered by Legistar™ Planning & Development Services  1101 Texas Avenue, PO Box 9960  College Station, TX 77840 Office 979.764.3570 / Fax 979.764.3496 MEMORANDUM April 6, 2017 TO: Members of the Planning & Zoning Commission FROM: Mark Bombek, Senior Planner & Jessica Bullock, Senior Planner SUBJECT: Plan of Work Update – Multi-Family Zoning Districts & Student Housing in Single- Family Neighborhoods Item: Presentation, possible action, and discussion regarding student housing in established single-family neighborhoods and research in multi-family zoning districts as specifically described in the 2016 P&Z Plan of Work. Background: The 2016 Plan of Work for P&Z identified two items related to housing in College Station. For the first item, there have recently been several applications for multi-family projects that comply with the Future Land Use Plan, but have been located near single-family neighborhoods. Due to concerns regarding the types of multi-family development, staff was tasked to research the ability to create specific zoning districts distinguishing market-rate (by-the-unit) from student oriented (by- the-bed) multi-family housing. For the second item, staff was asked to research best practices from other communities regarding the management of student housing in single-family neighborhoods. Given the private market demand to replat and rebuild homes on single family lots in established neighborhoods for rental property, this item seeks to find potential solutions that may address concerns from residents about student encroachment. This presentation is intended to act as an initial step where staff is providing an overview of the issues, current regulations, and tools available. Additionally, staff is requesting to obtain direction from P&Z for future action. City Hall 1101 Texas Ave College Station, TX 77840 College Station, TX Legislation Details (With Text) File #: Version:217-0148 Name:Draft- 2017 P&Z Plan of Work Status:Type:Updates Agenda Ready File created:In control:3/27/2017 Planning and Zoning Commission Workshop On agenda:Final action:4/6/2017 Title:Presentation, possible action, and discusssion regarding the consideration of the Draft 2017 P&Z Plan of Work (see attached) Sponsors:Mark Bombek Indexes: Code sections: Attachments:DRAFT-2017 Plan of Work Action ByDate Action ResultVer. Presentation, possible action, and discusssion regarding the consideration of the Draft 2017 P&Z Plan of Work (see attached) College Station, TX Printed on 3/31/2017Page 1 of 1 powered by Legistar™ Page 1 of 4 2017 Planning & Zoning Commission Plan of Work Comprehensive Plan Items Implementation of Adopted Plans Summary: Implementation of adopted master plans and neighborhood, district, and corridor plans, namely: Central College Station, Eastgate, Southside Area, Wellborn Community, and South Knoll Area neighborhood plans, and Bicycle, Pedestrian & Greenways, Parks and Recreation, Water, Waste Water, Medical District, and Economic Development master plans. Project Dates: Staff Assigned: P&DS Staff Anticipated Completion: Thoroughfare Plan Update Summary: Project Dates: The Metropolitan Planning Organization (MPO) is in the process of updating its Concept Map for the BCS region. Once adopted by the MPO, the city is anticipating taking action to amend the Thoroughfare Plan to align with the changes in the MPO’s regional Concept Map. Staff Assigned: Initiated: Bicycle, Pedestrian and Greenways Master Plan Update Summary: Bring additional updates to the Planning and Zoning Commission as the Master Plan update moves forward. Project Dates: Staff Assigned: Venessa Garza, P&DS Staff Anticipated Completion: Neighborhood Integrity Items *Traffic Calming Toolkit Summary: Receive information regarding the current traffic calming policy, including updates as recommended by the Council Transportation and Mobility Committee. Additionally receive update on the implementation of the neighborhood parking toolbox created by the Neighborhood Transportation Task Force. Project Dates: Staff Assigned: Troy Rother & Jason Schubert Anticipated Completion: Page 2 of 4 Student Housing in Established Single-Family Neighborhoods Summary: Research best practices from other communities regarding the management of student housing in single-family neighborhoods. Project Dates: Staff Assigned: Jessica Bullock and Mark Bombek Anticipated Completion: UDO Regulatory Items Evaluation of UDO Regulations Summary: Project Dates: Review UDO requirements that add minimal value as identified by staff and consider opportunities to reduce regulations and streamline processes. Staff Assigned: Initiated: Sign Ordinance Revisions Summary: Review and update the City’s sign ordinance in light of the recent Supreme Court decision regarding sign regulations based upon content. Project Dates: Staff Assigned: Molly Hitchcock, Rachel Lazo & Legal Anticipated Completion: Update on Off-Street Parking Requirements Summary: Provide options to allow flexibility to off - street parking requirements. Receive direction on future UDO text amendments. Project Dates: Staff Assigned: Justin Golbabai Anticipated Completion: *Research Multi-Family Zoning Options Summary: Research the ability to provide multi-family zoning for market rate units (conventional multi-family) vs. rental by bedroom (student multi-family). Project Dates: Staff Assigned: Jessica Bullock & Mark Bombek Completed: Suburban Commercial Land Use and Zoning Summary: Under City Council direction, review current Comprehensive Plan land use description and zoning ordinance requirements of the Suburban Project Dates: Page 3 of 4 Commercial zoning district and provide options for future text amendments. Staff Assigned: Anticipated Completion: Bicycle Rack Standards Summary: Under City Council direction, review current non- residential parking requirements for providing on- site bicycle parking facilities. Project Dates: Staff Assigned: Anticipated Completion: Non-Residential Landscaping Requirements Summary: Review current city landscaping requirements including streetscaping and buffer standards. Project Dates: Staff Assigned: Anticipated Completion: On-Going Items Economic Development Updates Summary: Receive regular updates from the Economic Development Department regarding the vision and implementation of the commercialization of TAMU research- related output, including examples of successful efforts elsewhere. Additionally, receive an update on the recent announcement regarding plans for the TAMU System Rellis Campus revitalization effort. Project Dates: Staff Assigned: Economic Development Anticipated Initiation: Semi-Annual Review of Pre-Application Conference Surveys Summary: Provide an update on the survey results from the Pre-Application Conference process. Project Dates: Staff Assigned: Mark Bombek Completed: Page 4 of 4 Educational/informational Items Parkland Dedication Summary: Review of parkland dedication requirements and available resources. Project Dates: Staff Assigned: Anticipated Completion: Sidewalk Fee-in-Lieu Summary: Review of sidewalk fund requirements and available resources. Project Dates: Staff Assigned: Anticipated Completion: Block Length and Block Perimeter Summary: Review of current requirements regarding block length and block perimeter. Project Dates: Staff Assigned: Anticipated Completion: City Hall 1101 Texas Ave College Station, TX 77840 College Station, TX Legislation Details (With Text) File #: Version:117-0136 Name:Calendar of Upcoming Meetings Status:Type:Updates Agenda Ready File created:In control:3/24/2017 Planning and Zoning Commission Workshop On agenda:Final action:4/6/2017 Title:Presentation, possible action, and discussion regarding the P&Z Calendar of Upcoming Meetings: *Thursday, April 13, 2017 ~ City Council Meeting ~ Council Chambers ~ Workshop 6:00 p.m. and Regular 7:00 p.m. (Liaison - Osborne) *Thursday, April 20, 2017 ~ P&Z Meeting ~ Council Chambers ~ Workshop 6:00 p.m. and Regular 7:00 p.m. *Thursday, May 11, 2017 ~ City Council and P&Z Joint Meeting ~ Council Chambers ~ Workshop 6:00 p.m. Sponsors: Indexes: Code sections: Attachments: Action ByDate Action ResultVer. Presentation, possible action, and discussion regarding the P&Z Calendar of Upcoming Meetings: *Thursday, April 13, 2017 ~ City Council Meeting ~ Council Chambers ~ Workshop 6:00 p.m. and Regular 7:00 p.m. (Liaison - Osborne) *Thursday, April 20, 2017 ~ P&Z Meeting ~ Council Chambers ~ Workshop 6:00 p.m. and Regular 7:00 p.m. *Thursday, May 11, 2017 ~ City Council and P&Z Joint Meeting ~ Council Chambers ~ Workshop 6:00 p.m. College Station, TX Printed on 3/31/2017Page 1 of 1 powered by Legistar™ City Hall 1101 Texas Ave College Station, TX 77840 College Station, TX Legislation Details (With Text) File #: Version:117-0130 Name:Update on Item Heard Status:Type:Updates Agenda Ready File created:In control:3/22/2017 Planning and Zoning Commission Workshop On agenda:Final action:4/6/2017 Title:Presentation, possible action, and discussion regarding an update on the following item: *A Rezoning for approximately 17 acres located west of the intersection of State Highway 30 and Linda Lane from R Rural to MF Multi-Family and NAP Natural Areas Protected. The Planning & Zoning Commission heard this item on March 16, 2017, and voted (5-0-1) to recommend approval. The City Council heard this item on March 23, 2017, and voted (7-0) to approve the request. Sponsors: Indexes: Code sections: Attachments: Action ByDate Action ResultVer. Presentation, possible action, and discussion regarding an update on the following item: *A Rezoning for approximately 17 acres located west of the intersection of State Highway 30 and Linda Lane from R Rural to MF Multi-Family and NAP Natural Areas Protected. The Planning & Zoning Commission heard this item on March 16, 2017, and voted (5-0-1) to recommend approval. The City Council heard this item on March 23, 2017, and voted (7-0) to approve the request. College Station, TX Printed on 3/31/2017Page 1 of 1 powered by Legistar™ Planning and Zoning Commission Regular College Station, TX Meeting Agenda - Final City Hall 1101 Texas Ave College Station, TX 77840 The City Council may or may not attend the Planning & Zoning Commission Regular Meeting. City Hall Council Chambers7:00 PMThursday, April 6, 2017 1. Call meeting to order. 2. Pledge of Allegiance. 3. Hear Citizens. At this time, the Chairman will open the floor to citizens wishing to address the Commission on issues not already scheduled on tonight's agenda. The citizen presentations will be limited to three minutes in order to accommodate everyone who wishes to address the Commission and to allow adequate time for completion of the agenda items. The Commission will receive the information, ask city staff to look into the matter, or will place the matter on a future agenda for discussion. (A recording is made of the meeting; please give your name and address for the record.) All matters listed under Item 4, Consent Agenda, are considered routine by the Commission and will be enacted by one motion. These items include preliminary plans and final plats, where staff has found compliance with all minimum subdivision regulations. All items approved by Consent are approved with any and all staff recommendations. There will not be separate discussion of these items. If any Commissioner desires to discuss an item on the Consent Agenda it will be moved to the Regular Agenda for further consideration. 4. Consent Agenda Consideration, possible action, and discussion on Absence Requests from meetings. *Casey Oldham ~ March 16, 2017 *Elianor Vessali ~ April 6, 2017 17-01254.1 Casey Oldham Elianor Vessali Attachments: Consideration, possible action, and discussion to approve meeting minutes. *March 16, 2017 ~ Workshop *March 16, 2017 ~ Regular 17-01294.2 Page 1 College Station, TX Printed on 3/31/2017 April 6, 2017Planning and Zoning Commission Regular Meeting Agenda - Final March 16 2017 Workshop March 16 2017 Regular Conflict of Interest Attachments: Presentation, possible action, and discussion regarding a Final Plat for The Hollow Phase 1 & 2 consisting of 22 lots on approximately 28 acres located at 4112 Panther Crossing Road, generally located northeast of Wellborn Road and Schehin Road in the College Station Extraterritorial Jurisdiction (ETJ). Case #FP2016-00005 17-01404.3 Sponsors:Bullock Staff Report Application Final Plat Attachments: Regular Agenda 5. Consideration, possible action, and discussion on items removed from the Consent Agenda by Commission action. Public Hearing, presentation, possible action, and discussion regarding an ordinance amending the Comprehensive Plan - Future Land Use & Character Map from Natural Areas Reserved and Commercial to Natural Areas Reserved and Urban for approximately 5.96 acres located at 1451 Associates Avenue, generally located in the northeast corner of State Highway 6 and Harvey Road intersection. Case #CPA2016-000018 (Note: Final action on this item is scheduled for the April 27, 2017 City Council meeting - subject to change) 17-01466. Sponsors:Thomas Staff Report Application Comprehensive Plan Map Attachments: Public hearing, presentation, possible action, and discussion regarding an ordinance amending the College Station Comprehensive Plan, specifically amending the Future Land Use & Character Map from Urban, Village Center, Suburban Commercial and General Commercial to Urban Mixed-Use and General Suburban; and the Bicycle, Pedestrian, and Greenways Master Plan to amend the location of a future trail; for approximately 232 acres located at 4000 and 4200 Rock Prairie Road, and more generally located along the south side of Rock Prairie Road, east of State Highway 6 South. Case # CPA2016-000014 (Note: Final action on this item is scheduled for the April 27, 2017 City Council 17-01587. Page 2 College Station, TX Printed on 3/31/2017 April 6, 2017Planning and Zoning Commission Regular Meeting Agenda - Final meeting - subject to change) Sponsors:Prochazka Staff Report Map Attachments: Public hearing, presentation, possible action, and discussion regarding an ordinance amending Chapter 12, “Unified Development Ordinance,” Section 12-4.2, “Official Zoning Map,” of the Code of Ordinances of the City of College Station, Texas by changing the zoning district boundaries from R Rural to PDD Planned Development District for a mixed-use development including commercial, office, multi-family, single-family, parks and trails on approximately 232 acres of land being situated in the Thomas Caruthers League, Abstract No. 9, College Station, Brazos County, Texas, said tract being the remainder of a called 341.06 acre tract of land as described by a deed to Willis S. Ritchey recorded in Volume 1160, Page 777 of the Official Public Records of Brazos County, Texas and the remainder of a called 11 acre tract of land as described by a deed to Willis S. Ritchey recorded in Volume 260, Page 466 of the Deed Records of Brazos County, Texas, located at 4000 and 4200 Rock Prairie Road, and more generally located along the south side of Rock Prairie Road, east of State Highway 6. South Case # REZ2016-000043 (Note: Final action on this item is scheduled for the April 27, 2017 City Council meeting - subject to change) 17-01598. Sponsors:Prochazka Staff Report Maps & Imagery Attachments: Public hearing, presentation, possible action, and discussion regarding an ordinance amending the Comprehensive Plan-Future Land Use & Character Map from Suburban Commercial to General Commercial for approximately 11.3 acres located at 3005 Earl Rudder Freeway South, generally located at the southeast intersection of Earl Rudder Freeway South and Emerald Parkway. Case #CPA2017-000001 (Note: Final action on this item is scheduled for the April 27, 2017 City Council meeting - subject to change) 17-01509. Sponsors:Paz Staff Report Application Comp Plan Exhibit Attachments: Page 3 College Station, TX Printed on 3/31/2017 April 6, 2017Planning and Zoning Commission Regular Meeting Agenda - Final Public hearing, presentation, possible action, and discussion regarding an ordinance amending Chapter 12, "Unified Development Ordinance," Section 12-4.2, "Official Zoning Map," of the Code of Ordinances of the City of College Station, Texas by changing the zoning district boundaries from M-1 Light Commercial to GC General Commercial and SC Suburban Commercial for approximately 16.8 acres being Lots 1-6 situated in the Emerald Point Subdivision, College Station, Brazos County, Texas, recorded in Volume 13606, Page 14 of the Official Public Records of Brazos County, Texas, generally located at 3005 Earl Rudder Freeway South and 3105 Corsair Circle. Case #REZ2017-000001 (Note: Final action on this item is scheduled for the April 27, 2017 City Council meeting - subject to change) 17-015710. Sponsors:Paz Application Staff Report Rezoning Exhibit Letter of Concern Attachments: Public hearing, presentation, possible action, and discussion regarding an ordinance to amend the Comprehensive Plan by adopting the updated Water System Master Plan . Case #CPA2017-000003 (Note: Final action on this item is scheduled for the April 27, 2017 City Council meeting - subject to change) 17-013711. Sponsors:Coleman Memo - Water MP Implementation Plan - Water Attachments: Public hearing, presentation, possible action, and discussion regarding an ordinance to amend the Comprehensive Plan by adopting the updated Wastewater Master Plan . Case #CPA2017-000003 (Note: Final action on this item is scheduled for the April 27, 2017 City Council meeting - subject to change) 17-014212. Sponsors:Coleman Memo - Wastewater MP Implementation Plan - WW Attachments: 13. Discussion and possible action on future agenda items – A Planning & Zoning Member may inquire about a subject for which notice has not been given. A statement of specific factual information or the recitation of existing policy may be given. Any deliberation shall be limited to a proposal to place the subject on an agenda for a subsequent meeting. Page 4 College Station, TX Printed on 3/31/2017 April 6, 2017Planning and Zoning Commission Regular Meeting Agenda - Final 14. Adjourn The Commission may adjourn into Executive Session to consider any item listed on this agenda if a matter is raised that is appropriate for Executive Session discussion. An announcement will be made of the basis for the Executive Session discussion. APPROVED _____________________ City Manager I certify that the above Notice of Meeting was posted at College Station City Hall, 1101 Texas Avenue, College Station, Texas, on March 31, 2017 at 5:00 p.m. _____________________ City Secretary This building is wheelchair accessible. Persons with disabilities who plan to attend this meeting and who may need accommodations, auxiliary aids, or services such as interpreters, readers, or large print are asked to contact the City Secretary’s Office at (979) 764-3541, TDD at 1-800-735-2989, or email adaassistance@cstx.gov at least two business days prior to the meeting so that appropriate arrangements can be made. If the City does not receive notification at least two business days prior to the meeting, the City will make a reasonable attempt to provide the necessary accommodations. Penal Code § 30.07. Trespass by License Holder with an Openly Carried Handgun. "Pursuant to Section 30.07, Penal Code (Trespass by License Holder with an Openly Carried Handgun) A Person Licensed under Subchapter H, Chapter 411, Government Code (Handgun Licensing Law), may not enter this Property with a Handgun that is Carried Openly." Codigo Penal § 30.07. Traspasar Portando Armas de Mano al Aire Libre con Licencia. “Conforme a la Seccion 30.07 del codigo penal (traspasar portando armas de mano al aire libre con licencia), personas con licencia bajo del Sub-Capitulo H, Capitulo 411, Codigo de Gobierno (Ley de licencias de arma de mano), no deben entrar a esta propiedad portando arma de mano al aire libre.” Page 5 College Station, TX Printed on 3/31/2017 City Hall 1101 Texas Ave College Station, TX 77840 College Station, TX Legislation Details (With Text) File #: Version:117-0125 Name:Absence Requests Status:Type:Absence Request Agenda Ready File created:In control:3/14/2017 Planning and Zoning Commission Regular On agenda:Final action:4/6/2017 Title:Consideration, possible action, and discussion on Absence Requests from meetings. *Casey Oldham ~ March 16, 2017 *Elianor Vessali ~ April 6, 2017 Sponsors: Indexes: Code sections: Attachments:Casey Oldham Elianor Vessali Action ByDate Action ResultVer. Consideration, possible action, and discussion on Absence Requests from meetings. *Casey Oldham ~ March 16, 2017 *Elianor Vessali ~ April 6, 2017 College Station, TX Printed on 3/31/2017Page 1 of 1 powered by Legistar™ Absence Request Form For Elected and Appointed Officers Name Casey Oldham Request Submitted on March 14, 2017 I will not be in attendance at the meeting on March 16, 2017 for the reason specified: (Date) Signature Casey Oldham Kristen, Thank you for your assistance in this matter. Mr. Casey Oldham will be unable to attend the subject meeting. Regards, Pamela Francis Absence Request Form For Elected and Appointed Officers Name: Elianor Vessali Request Submitted on March 28, 2017 I will not be in attendance at the meeting on April 6, 2017 (Date) Signature Elianor Vessali for the reason specified: Will be unavailable for meeting. City Hall 1101 Texas Ave College Station, TX 77840 College Station, TX Legislation Details (With Text) File #: Version:117-0129 Name:Minutes Status:Type:Minutes Agenda Ready File created:In control:3/21/2017 Planning and Zoning Commission Regular On agenda:Final action:4/6/2017 Title:Consideration, possible action, and discussion to approve meeting minutes. *March 16, 2017 ~ Workshop *March 16, 2017 ~ Regular Sponsors: Indexes: Code sections: Attachments:March 16 2017 Workshop March 16 2017 Regular Conflict of Interest Action ByDate Action ResultVer. Consideration, possible action, and discussion to approve meeting minutes. *March 16, 2017 ~ Workshop *March 16, 2017 ~ Regular College Station, TX Printed on 3/31/2017Page 1 of 1 powered by Legistar™ March 16, 2017 P&Z Workshop Meeting Minutes Page 1 of 2 MINUTES PLANNING & ZONING COMMISSION Workshop Meeting March 16, 2017 6:30 p.m. CITY HALL COUNCIL CHAMBERS College Station, Texas COMMISSIONERS PRESENT: Jane Kee, Johnny Burns, Elianor Vessali, Bill Mather, Keith Williamson and Jeremy Osborne COMMISSIONERS ABSENT: Casey Oldham CITY COUNCIL MEMBERS PRESENT: Linda Harvell CITY STAFF PRESENT: Lance Simms, Alan Gibbs, Justin Golbabai, Jason Schubert, Mark Bombek, Erika Bridges, Anthony Armstrong, Mary Ann Powell, Lauren Basey and Kristen Hejny 1. Call the meeting to order. Chairperson Kee Called the meeting to order at 6:33 p.m. 2. Discussion of consent and regular agenda items. There was discussion on Regular Agenda Item #6. 3. Discussion of new development applications submitted to the City. New Development Link: www.cstx.gov/newdev There was no discussion. 4. Presentation, possible action, and discussion regarding the consideration of the 2016 P&Z Plan of work. Senior Planner Bombek presented updates on this item to the Commission. There was no discussion. 5. Presentation, possible action, and discussion regarding the quarterly update for the Pre-Application Conference (PAC) meeting process, and the implementation of the PAC Survey as a part of the 2016 P&Z Plan of Work. Senior Planner Bombek presented updates on this item to the Commission. Commissioner Mather asked for the ratio of PACs to received responses. Senior Planner Bombek stated that the City has received eight responses out of 78 PAC meetings that were held. Chairperson Kee asked if all departments within the City are available at PAC meetings. March 16, 2017 P&Z Workshop Meeting Minutes Page 2 of 2 Senior Planner Bombek stated that there is a standard set of department representatives that attend PACs dependent upon what questions the applicant has. 6. Presentation, possible action, and discussion regarding the P&Z Calendar of Upcoming Meetings: *Monday, March 20, 2017 ~ P&Z Retreat ~ 1603 Graham Road ~ 4:00 p.m. *Thursday, March 23, 2017 ~ City Council Meeting ~ Council Chambers ~ Workshop 6:00 p.m. and Regular 7:00 p.m. (Liaison – Mather) *Thursday, April 6, 2017 ~ P&Z Meeting ~ Council Chambers ~ Workshop 6:00 p.m. and Regular 7:00 p.m. 7. Discussion, review and possible action regarding the following meetings: Design Review Board, Bio Corridor Board. There was no discussion. 8. Discussion and possible action on future agenda items - A Planning & Zoning Member may inquire about a subject for which notice has not been given. A statement of specific factual information or the recitation of existing policy may be given. Any deliberation shall be limited to a proposal to place the subject on an agenda for a subsequent meeting. There were no items. 9. Adjourn. The meeting was adjourned at 7:01 p.m. Approved: Attest: ______________________________ ________________________________ Jane Kee, Chairman Kristen Hejny, Admin. Support Specialist Planning & Zoning Commission Planning & Development Services March 16, 2017 P&Z Regular Meeting Minutes Page 1 of 3 MINUTES PLANNING & ZONING COMMISSION Regular Meeting March 16, 2017, 7:00 p.m. CITY HALL COUNCIL CHAMBERS College Station, Texas COMMISSIONERS PRESENT: Jane Kee, Johnny Burns, Elianor Vessali, Bill Mather, Keith Williamson and Jeremy Osborne COMMISSIONERS ABSENT: Casey Oldham CITY COUNCIL MEMBERS PRESENT: Linda Harvell CITY STAFF PRESENT: Lance Simms, Alan Gibbs, Justin Golbabai, Jason Schubert, Mark Bombek, Erika Bridges, Anthony Armstrong, Mary Ann Powell, Lauren Basey and Kristen Hejny 1. Call Meeting to Order Chairperson Kee called the meeting to order at 7:02 p.m. 2. Pledge of Allegiance 3. Hear Citizens 4. Consent Agenda 4.1 Consideration, possible action, and discussion on Absence Requests from meetings. *Keith Williamson ~ March 2, 2017 4.2 Consideration, possible action, and discussion to approve meeting minutes. *March 2, 2017 Workshop *March 2, 2017 Regular Commissioner Burns motioned to approve Consent Agenda Items 4.1 - 4.2. Commissioner Mather seconded the motion, motion passed (6-0). Regular Agenda 5. Consideration, possible action, and discussion on items removed from the Consent Agenda by Commission Action. No items were removed. 6. Presentation, possible action, and discussion regarding waiver requests to UDO Section 12-8.3.G. ‘Blocks’ (Block length and perimeter), and 12-8.3.I.2.1. Minimum Utility Easements, and a presentation possible action, and discussion regarding a Preliminary Plan for the Jones Crossing Subdivision consisting of 10 lots, common area and future parkland on approximately 71.86 acres March 16, 2017 P&Z Regular Meeting Minutes Page 2 of 3 located at 1720 Harvey Mitchell Parkway South, generally located at the hard corner of Wellborn Road and Harvey Mitchell Parkway South. Case #PP2016-000028 Senior Planner Bombek presented the waiver requests and Preliminary Plan to the Commission, recommending approval of both. Applicant, Veronica Morgan, 3204 Earl Rudder Freeway South, College Station was available for questions from the Commission. There was general discussion. Commissioner Mather motioned to approve all waiver requests without conditions, citing special conditions, and approval of the Preliminary Plan as presented. Commissioner Burns seconded the motion, motion passed (6-0). 7. Public hearing, presentation, possible action, and discussion regarding an ordinance amending Chapter 12, “Unified Development Ordinance,” Section 12-4.2, “Official Zoning Map,” of the Code of Ordinances of the City of College Station, Texas by changing the zoning district boundaries from R Rural to MF Multi-Family and NAP Natural Areas Protected for approximately 16.485 acres, generally located west of the intersection of State Highway 30 and Linda Lane. Case #REZ2016- 000047 (Note: Final action on this item is scheduled for the March 23, 2017 City Council meeting – subject to change) Commissioner Vessali stated that she would be recusing herself from discussion and vote for Agenda Item #7. Senior Planner Bombek presented the Rezoning to the Commission, and recommended approval. Commissioner Mather asked if the NAP designation was the same designation as Parkland areas. Senior Planner Bombek explained that NAP are a completely separate zoning district garnered toward reserving natural features as floodplain. Mr. Bombek also explained that Parkland Dedication can designate floodplain for parkland, but would typically be under a different designation than NAP. Applicant, Crissy Hartl, 3204 Earl Rudder Freeway South, College Station presented to the Commission and was available for questions from the Commission. Commissioner Osborne clarified that due to nature of the creek and floodplain, nothing can be developed in this area. Ms. Hartl stated that this is correct and it will remain in its natural state. Chairperson Kee asked if there is actual floodplain on this property. City Engineer Gibbs responded that generally the NAP buffer would keep the area protected from development within the City of College Station jurisdiction. Chairperson Kee opened the public hearing. March 16, 2017 P&Z Regular Meeting Minutes Page 3 of 3 No one spoke. Chairperson Kee closed the public hearing. Commissioner Osborne motioned to recommend approval of the Rezoning as presented. Commissioner Burns seconded the motion, motion passed (5-0-1). 8. Discussion and possible action on future agenda items – A Planning & Zoning Member may inquire about a subject for which notice has not been given. A statement of specific factual information or the recitation of existing policy may be given. Any deliberation shall be limited to a proposal to place the subject on an agenda for a subsequent meeting. There was no discussion. 9. Adjourn The meeting adjourned at 7:25 p.m. Approved: Attest: ______________________________ ________________________________ Jane Kee, Chairman Kristen Hejny, Admin Support Specialist Planning & Zoning Commission Planning & Development Services City Hall 1101 Texas Ave College Station, TX 77840 College Station, TX Legislation Details (With Text) File #: Version:117-0140 Name:The Hollow Phase 1 & 2 Status:Type:Final Plat Agenda Ready File created:In control:3/24/2017 Planning and Zoning Commission Regular On agenda:Final action:4/6/2017 Title:Presentation, possible action, and discussion regarding a Final Plat for The Hollow Phase 1 & 2 consisting of 22 lots on approximately 28 acres located at 4112 Panther Crossing Road, generally located northeast of Wellborn Road and Schehin Road in the College Station Extraterritorial Jurisdiction (ETJ). Case #FP2016-00005 Sponsors:Jessica Bullock Indexes: Code sections: Attachments:Staff Report Application Final Plat Action ByDate Action ResultVer. Presentation, possible action, and discussion regarding a Final Plat for The Hollow Phase 1 & 2 consisting of 22 lots on approximately 28 acres located at 4112 Panther Crossing Road, generally located northeast of Wellborn Road and Schehin Road in the College Station Extraterritorial Jurisdiction (ETJ). Case #FP2016-00005 College Station, TX Printed on 3/31/2017Page 1 of 1 powered by Legistar™ Planning & Zoning Commission Page 1 of 4 April 6, 2017 FINAL PLAT for The Hollow Phase 1 & 2 FP2016-000005 SCALE: 22 lots on approximately 28 acres LOCATION: 4112 Panther Crossing Road, generally located northeast of Wellborn Road and Schehin Road in the College Station Extraterritorial Jurisdiction (ETJ) ZONING: N/A (ETJ) APPLICANT: Rock Barn Conservation Partners PROJECT MANAGER: Jessica Bullock, Senior Planner Jbullock@cstx.gov RECOMMENDATION: Staff recommends approval of the Final Plat. Planning & Zoning Commission Page 2 of 4 April 6, 2017 Planning & Zoning Commission Page 3 of 4 April 6, 2017 Planning & Zoning Commission Page 4 of 4 April 6, 2017 DEVELOPMENT HISTORY Annexation: N/A (ETJ) Zoning: N/A (ETJ) Preliminary Plan Master Plan - approved in December 2007 and again in January 2010. Preliminary Plan - approved in October 2014 and revised in November 2015. Site development: Undeveloped COMMENTS Parkland Dedication Fees: This development was approved as a Master Plan in the ETJ prior to parkland dedication requirements being applicable in the ETJ; therefore, no parkland dedication is required. Greenways: N/A Pedestrian Connectivity: The subject property is located in the ETJ. Pedestrian facilities are not proposed or required. Bicycle Connectivity: The subject property is located in the ETJ. Bicycle facilities are not proposed or required. Impact Fees: NA REVIEW CRITERIA Compliance with Subdivision Regulations: The proposed Final Plat is part of the Peach Creek Master Plan which originally received approval in December 2007. It is vested to Subdivision Regulations in effect in 2007 and chooses to comply with current regulations for Unified Development Ordinance Sec. 12-8.4.F ‘Lots’. The proposed Final Plat is in compliance with the approved Preliminary Plan and the applicable Subdivision Regulations. STAFF RECOMMENDATION Staff recommends approval of the Final Plat. SUPPORTING MATERIALS 1. Application 2. Copy of Final Plat “”“”“”“”“”“”“” City Hall 1101 Texas Ave College Station, TX 77840 College Station, TX Legislation Details (With Text) File #: Version:217-0146 Name:Carters Creek Condos - Comp. Plan Amendment Status:Type:Comprehensive Plan Agenda Ready File created:In control:3/24/2017 Planning and Zoning Commission Regular On agenda:Final action:4/6/2017 Title:Public Hearing, presentation, possible action, and discussion regarding an ordinance amending the Comprehensive Plan - Future Land Use & Character Map from Natural Areas Reserved and Commercial to Natural Areas Reserved and Urban for approximately 5.96 acres located at 1451 Associates Avenue, generally located in the northeast corner of State Highway 6 and Harvey Road intersection. Case #CPA2016-000018 (Note: Final action on this item is scheduled for the April 27, 2017 City Council meeting - subject to change) Sponsors:Madison Thomas Indexes: Code sections: Attachments:Staff Report Application Comprehensive Plan Map Action ByDate Action ResultVer. Public Hearing, presentation, possible action, and discussion regarding an ordinance amending the Comprehensive Plan - Future Land Use & Character Map from Natural Areas Reserved and Commercial to Natural Areas Reserved and Urban for approximately 5.96 acres located at 1451 Associates Avenue, generally located in the northeast corner of State Highway 6 and Harvey Road intersection. Case #CPA2016-000018 (Note: Final action on this item is scheduled for the April 27, 2017 City Council meeting - subject to change) College Station, TX Printed on 3/31/2017Page 1 of 1 powered by Legistar™ Planning & Zoning Commission April 6, 2017 Page 1 of 7 COMPREHENSIVE PLAN AMENDMENT FOR 1451 Associates Ave. CPA2016-000018 REQUEST: Natural Areas Reserved and General Commercial to Urban and Natural Areas Reserved SCALE: Approximately 6 acres LOCATION: 1451 Associates Ave. APPLICANT: Michael G. Hester, P.E., Hester Engineering PROJECT MANAGER: Madison Thomas, AICP Staff Planner mthomas@cstx.gov RECOMMENDATION: Staff recommends approval of the Future Land Use and Character Map amendment. Planning & Zoning Commission April 6, 2017 Page 4 of 7 NOTIFICATIONS Advertised Commission Hearing Date: April 6, 2017 Advertised Council Hearing Dates: April 27, 2016 The following neighborhood organizations that are registered with the City of College Station’s Neighborhood Services have received a courtesy letter of notification of this public hearing: N/A Contacts in support: None at the time of the staff report Contacts in opposition: None at the time of the staff report Inquiry contacts: None at the time of the staff report ADJACENT LAND USES Direction Comprehensive Plan Zoning Land Use North Natural Areas Reserved GC General Commercial GS General Suburban Undeveloped South (Across Associates Avenue) General Commercial GC General Commercial Commercial East Natural Areas Reserved GC General Commercial Undeveloped West Natural Areas Reserved CI Commercial Industrial GS General Suburban Undeveloped DEVELOPMENT HISTORY Annexation: 1958 Zoning: A-O to C-1 General Commercial, A-O Agricultural Open upon Annexation (1984) C-1 General Commercial to C-2 Commercial Industrial (2003) C-2 Commercial Industrial renamed CI Commercial Industrial Final Plat: Unplatted Site development: Vacant PROPOSAL The applicant has requested the proposed Comprehensive Plan amendment to Urban and Natural Areas Reserved as a step toward permitting a multi-family residential housing development at 1451 Associates Ave. This development is intended to provide housing within walking distance of the nearby commercial developments and Veteran’s Park. The subject property is designated as General Commercial and Natural Areas Reserved, with the properties to the north, east, west designated as Natural Areas Reserved, and to the south, General Commercial on the Comprehensive Plan Future Land Use and Character Map. Planning & Zoning Commission April 6, 2017 Page 5 of 7 REVIEW CRITERIA 1. Changed or changing conditions in the subject area or the City: The City of College Station’s Comprehensive Plan was adopted in 2009. This site was designated as General Commercial and Natural Areas Reserved on the Comprehensive Future Land Use and Character Map. The area of the site closest to Associates Ave. was designated as General Commercial, while the rest of the property was identified as Natural Areas Reserved. The Comprehensive Plan Natural Areas Reserved is designation is for areas that represent a constraint to development and that should be preserved for their natural function or open space qualities. These areas include floodplains and riparian buffers, as well as recreation facilities. The existing Natural Area Reserved was originally determined by Carter’s Creek floodplain, encompassing this area plus additional area. The Letter of Map Revision (LOMR) was approved in 2011, updating the floodplain limits of this area with a more comprehensive study. The subject property is located south of Area 8-Carters Creek Corridor on the Comprehensive Future Land Use and Character Map Concept Plan. The Carters Creek Corridor is an area that has identified Carters Creek and the floodplain along it as a significant natural feature that should be protected and developed for recreational opportunities that tie the region together. The Natural Areas Reserved designation on the edge of this property allows for the continued protection of the floodplain along the creek, some of which concentrations of commercial activity to serve the nearby residents. Suburban Commercial areas tend to be small in size and located adjacent to major roads (arterials and collectors). Properties to the south are all developed as commercial uses and zoned for commercial uses, property to the north and west are zoned General Commercial, General Suburban and Rural. Currently, they are all undeveloped. General Suburban zoning allows for smaller lot, single-family development. General Commercial allows for large commercial and retail development. Staff feels that an Urban designation on this property to allow for high density multi-family would create a transitional land use designation between property that allows for single-family and property that has developed as commercial. 2. Scope of the request. The request is to convert approximately 6 acres from General Commercial to Urban by amending the Comprehensive Plan Future Land Use and Character Map. The Urban designation calls for areas to have a very intense level of development activity that tend to consist of townhomes, duplexes and high-density apartments. The applicant anticipates proposing a future rezoning for an apartment complex. Under the existing land use designation, large scale commercial uses could be developed. 3. Availability of adequate information: An Urban designation allows for future development of high-density residential. College Station Utilities will provide water and sewer service to the property and is available to the site. College Station Utilities (CSU) serves properties in this area and is able to provide domestic water & sanitary sewer service to the proposed development. A Transportation Impact Analysis is not required for a Comprehensive Plan Amendment, and due to the size of the property, will likely not require one in the future. 4. Consistency with the goals and strategies set forth in the Plan: The goal for College Station’s Future Land Use and Character is to create a community with strong, unique Planning & Zoning Commission April 6, 2017 Page 6 of 7 neighborhoods, protected rural areas, special districts, distinct corridors, and a protected and enhanced natural environment. The Comprehensive Plan identifies relevant strategies to achieve this goal, specifically the strategy to develop and maintain, through regular review, a land use plan that identifies, establishes and enhances community character. The subject tract is adjacent to developed commercial, and adjacent to property that is zoned for commercial and single-family use. The proposed designation is in an area that is sensitive and complementary to the surrounding land uses. 5. Consideration of the Future Land Use & Character and/or Thoroughfare Plans: The existing Future Land Use and Character designation on the property is Commercial: this land use designation is generally for concentrations of commercial activities that cater to both nearby residents and to the larger community or region. Generally, these areas tend to be large in size and located near the intersection of tow regionally significant roads. It is preferred that in such areas development be concentrated in nodes rather than spread out in strips. The proposed land use, Urban, is described as: generally for areas that should have a very intense level of development activities. These areas will tend to consist of townhomes, duplexes, and high-density apartments. General commercial and office uses, business parks, and vertical mixed-use may also be permitted within growth and redevelopment areas. The Urban land use designation, when not in a Growth Area, is typically characterized by more dense residential developments in the form of duplexes, townhomes or apartments. This mix of residential uses would be benefitted by the adjacent Natural Areas Reserved and Commercial uses which are within walking distance. The property is located off of Associates Avenue, a dead-end street. The properties to the south, are already developed with commercial buildings, the rear of these buildings facing Associates Ave. The adjacent properties are limited in development opportunities due to the shape of the property and existing water features. Due to the limited access, existing surrounding development, a reduced potential for development of large commercial structures, this property would better serve a multi-family development. 6. Compatibility with the surrounding area: The proposed amendment to Urban would allow zoning for high-density residential uses, such as townhomes and apartments. Properties to the south are already developed as commercial. Properties to the north can develop as commercial and as single-family. The current property and adjacent have not yet developed as commercial, possibly due to their locations behind existing commercial development, lack of visibility from the road, and restrictions related to the property shape and size. A change to a multi-family use would create a transition in density between permitted single-family development and existing commercial developments. 7. Impacts on infrastructure including water, wastewater, drainage, and the transportation network: Water service will be served by City of College Station. There is an existing 6-inch waterline at the driveway of Sam’s Club’s driveway on Associates Planning & Zoning Commission April 6, 2017 Page 7 of 7 Avenue. Sanitary Sewer service is available via existing 21-inch sanitary sewer line running diagonally across subject tract. A Future parallel 30-inch sanitary sewer line is planned to parallel the existing 21-inch sewer line up to the boundary of the tract which then runs along the rear of the tract. Subject tract is in the Carter Creek Drainage Basin. Tract is generally draining towards Carter Creek. Detention will not be required with development as assessed by the current city adopted Watearth’s watershed timing analysis. Drainage and other public infrastructure required with site development shall be designed and constructed in accordance with the B/CS Unified Design Guidelines. Infrastructure appear to have capacity to adequate serve the proposed change of use at this time. 8. Impact on the City’s ability to provide, fund, and maintain services: The proposed amendment for the subject property does not negatively impact the City’s ability to provide, fund and maintain services. Infill development will add to the tax base while utilizing existing city infrastructure. 9. Impact on environmentally sensitive and natural areas: The applicant has proposed to reserve natural areas within this site. As defined in previous criteria, this designation is for areas that represent a constraint to development, and should be preserved for their natural function. The Natural Areas Reserved boundary on this site is proposed to change from its current location on the Comprehensive Plan Future Land Use and Character Map, to the newly proposed location. The current location of the Natural Areas Reserved is conceptual and was determined by previous knowledge. In 2011, the LOMR presented a more recent floodplain study on the property. The proposed location for the Natural Areas Reserved has been determined by the location of the floodplain line with an additional 50’ boundary added for safety due to the topography of the land adjacent to the creek. This proposed location is supported by staff. It will be heard at the Bike, Pedestrian and Greenways Board on April 3, 2017 and the board will make a recommendation on the proposed location, which staff will present to the Commission. 10. Contribution to the overall direction and character of the community as captured in the Plan’s vision and goals: The goal for College Station’s Future Land Use and Character is to create a community with strong, unique neighborhoods, protected rural areas, special districts, distinct corridors, and a protected and enhanced natural environment. The amendment will allow for dense residential development adjacent to existing commercial developments and within walking distance to Veterans Park. The identification and designation of Natural Areas Reserved on the property, reflects the vision statement provide sensitive development and management of the natural environment. The vision statements that reference planned, quality and sustainable growth as well as neighborhoods with character can be seen though the proposed designation of this property to Natural Areas Reserved and Urban land uses. STAFF RECOMMENDATION Staff recommends approval of the Future Land Use and Character Map amendment request. Planning & Zoning Commission April 6, 2017 Page 8 of 7 SUPPORTING MATERIALS 1. Application 2. Comprehensive Plan Map 5/15 Page 1 of 3 COMPREHENSIVE PLAN AMENDMENT APPLICATION (Check all applicable) Related to Community Character Related to Transportation Related to Other MINIMUM SUBMITTAL REQUIREMENTS: Application completed in full. This application form provided by the City of College Station must be used and may not be adjusted or altered. Please attach pages if additional information is provided. Fully dimensioned map on 24" X 36" paper showing (if applicable): $1,165 Comprehensive Plan Amendment Application Fee. a. Land affected; b. Present zoning of property and zoning classification of all abutting property; c. Current Concept Map and Future Land Use and Character Map classifications and proposed classifications; d. Current Concept Map and Future Land Use and Character Map classifications of all abutting property; e. Current and proposed thoroughfare alignments; g. General location and address of property; and h. Total acres of property. f. Currently planned utility infrastructure and proposed utility infrastructure; Date of Optional Preapplication Conference FOR OFFICE USE ONLY CASE NO.: DATE SUBMITTED: TIME: STAFF: GENERAL LOCATION OF PROPERTY, IF NOT PLATTED: LEGAL DESCRIPTION (Lot, Block, Subdivision) ADDRESS NAME OF PROJECT TOTAL ACREAGE APPLICANT / PROJECT MANAGER'S INFORMATION (Primary contact for the project): Name E-mail Street Address City State Zip Code Phone Number Fax Number 9-28-2016 X X X X 77845 5.955 ACRES 5.955 ACRES RICHARD CARTER LEAGUE A-8 BEHIND SAMS CLUB 1451 ASSOCIATES AVENUE CARTER'S CREEK CONDOS MICHAEL G. HESTER, P.E. 2900 BROTHERS BLVD COLLEGE STATION TX mhester@hester-engr.com 979-693-1100 5/15 Page 2 of 3 1. What specific element of the Comprehensive Plan (for example, Land Use and Character designation, Thoroughfare Plan Context Class, or thoroughfare alignment) and at what specific location (if applicable) is requested to be amended? 2. What is the amendment request? 3. Explain the reason for this amendment. 4. Identify the conditions that have changed to warrant this change to the existing Comprehensive Plan. PROPERTY OWNER'S INFORMATION: Fax Number Phone Number Zip CodeStateCity Street Address E-mailName 5. Explain why the existing element of the Comprehensive Plan in question is no longer appropriate. ANSWER ALL OF THE FOLLOWING: 6. How does the requested amendment further the goals and objectives of the Comprehensive Plan? ALTON OFCZARZAK, MM, TDG MANAGEMENT 4060 SH6 S COLLEGE STATION TX 77845 979-690-1504 LAND USE AND CHARACTER DESIGNATION Going from General Commercial and Natural Areas Reserved to Urban and Natural Areas Reserved. DEVELOPMENT OF A CONDOMINUM DEVELOPMENT THE SITE HAS GONE THROUGH NUMEROUS APPLICATIONS FOR COMMERCIAL INDUSTRIAL AND ALL EFFORTS HAVE FAILED Numerous applications to develop this tract have been withdrawn due to the cities extensive site development requirements and with the natural area reserve (NAR) and a 50-foot wide sanitary sewer easement required by the cities staff rendering the back portion of the tract un-developable there is no demand for general commercial at this location A GOAL OF THE COMPRENHENSIVE PLAN IS TO CONTROL BUT ALLOW LAND TO BE DEVELOPED alton@oakchb.com City Hall 1101 Texas Ave College Station, TX 77840 College Station, TX Legislation Details (With Text) File #: Version:117-0158 Name:College Station Medical District Town Center CPA Status:Type:Comprehensive Plan Agenda Ready File created:In control:3/30/2017 Planning and Zoning Commission Regular On agenda:Final action:4/6/2017 Title:Public hearing, presentation, possible action, and discussion regarding an ordinance amending the College Station Comprehensive Plan, specifically amending the Future Land Use & Character Map from Urban, Village Center, Suburban Commercial and General Commercial to Urban Mixed-Use and General Suburban; and the Bicycle, Pedestrian, and Greenways Master Plan to amend the location of a future trail; for approximately 232 acres located at 4000 and 4200 Rock Prairie Road, and more generally located along the south side of Rock Prairie Road, east of State Highway 6 South. Case # CPA2016-000014 (Note: Final action on this item is scheduled for the April 27, 2017 City Council meeting - subject to change) Sponsors:Jennifer Prochazka Indexes: Code sections: Attachments:Staff Report Map Action ByDate Action ResultVer. Public hearing, presentation, possible action, and discussion regarding an ordinance amending the College Station Comprehensive Plan, specifically amending the Future Land Use & Character Map from Urban, Village Center, Suburban Commercial and General Commercial to Urban Mixed-Use and General Suburban; and the Bicycle, Pedestrian, and Greenways Master Plan to amend the location of a future trail; for approximately 232 acres located at 4000 and 4200 Rock Prairie Road, and more generally located along the south side of Rock Prairie Road, east of State Highway 6 South. Case # CPA2016-000014 (Note: Final action on this item is scheduled for the April 27, 2017 City Council meeting - subject to change) College Station, TX Printed on 3/31/2017Page 1 of 1 powered by Legistar™ Planning & Zoning Commission April 6, 2017 Page 1 of 9 COMPREHENSIVE PLAN AMENDMENT for College Station Town Center in the Medical District CPA2016-000014 REQUEST: 1. Future Land Use and Character Map amendment from General Suburban, Urban, Natural Areas, General Commercial, Medical, and Village Center to Urban Mixed Use, General Suburban, and Natural Areas. 2. Bicycle, Pedestrian, and Greenways Master Plan amendment related to future trail locations. SCALE: Approximately 232 acres LOCATION: 4000 and 4200 Rock Prairie Road, and more generally located along the south side of Rock Prairie Road, east of State Highway 6 South APPLICANT: James Murr PROJECT MANAGER: Jennifer Prochazka, AICP, Economic Development Manager jprochazka@cstx.gov Planning & Zoning Commission April 6, 2017 Page 2 of 9 Planning & Zoning Commission April 6, 2017 Page 3 of 9 Planning & Zoning Commission April 6, 2017 Page 4 of 9 Planning & Zoning Commission April 6, 2017 Page 5 of 9 NOTIFICATIONS Advertised Commission Hearing Date: April 6, 2017 Advertised Council Hearing Date: April 27, 2017 Contacts in support: None at the time of staff report. Contacts in opposition: None at the time of staff report. Inquiry contacts: Two at the time of staff report. ADJACENT LAND USES Direction Comprehensive Plan Zoning Land Use North (across Rock Prairie Road) Estate, Suburban Commercial, and Restricted Suburban R Rural, SC Suburban Commercial, and RS Restricted Suburban Duplex subdivision and vacant land South Natural Areas R Rural City-owned Greenway East Natural Areas and General Suburban R Rural Vacant land West Medical PDD Planned Development District and O Office Hospital and assisted living facilities (under construction) DEVELOPMENT HISTORY Annexation: Frontage along Rock Prairie road was annexed in 1983. The remainder was annexed in 1995 Zoning: 1983 & 1995 – A-O Agricultural Open 2013 – A-O Agricultural Open renamed R Rural Final Plat: N/A Site development: Vacant PROPOSAL The applicant has proposed an amendment to the Future Land Use and Character Map for approximately 232 acres located in the College Station Medical District. The Comprehensive Plan designates the subject property as General Suburban, Urban, Natural Areas, General Commercial, Medical, and Village Center with a proposed amendment to Urban Mixed Use, General Suburban, and Natural Areas. The future development is proposed to provide a variety of residential, office, and retail opportunities in an urban environment with park, lake, and trail amenities, as was intended by the Medical District Master Plan and the current land use designations on the property. The proposed amendment provides more flexibility on the location of the types of uses and on the overall mix of uses to better respond to market changes throughout the life of the project. In addition, the applicant has proposed an alternative route for the trail system. The proposed trail does not extend to Rock Prairie Road along the creek/tree line, but within a linear park along Bird Pond Road, requiring an amendment to the Bicycle, Pedestrian, and Greenways Master Plan. Planning & Zoning Commission April 6, 2017 Page 6 of 9 The proposed amendments are consistent with the Medical District Master Plan adopted by the City in 2012 and compliments the existing medical uses to the west and existing and future trail system to the south. REVIEW CRITERIA 1. Changed or changing conditions in the subject area or the City: The City of College Station’s Comprehensive Plan was adopted in 2009. This site was designated general suburban on the Future Land Use and Character Map. The Medical District Master Plan was adopted in 2012 amending the Future Land Use & Character Map and the Bicycle, Pedestrian, and Greenways Master Plan to create an urban district intended as a health and wellness district with a mix of uses anchored by Medical facilities. The Medical District Master Plan describes the subject property as being appropriate for a mixture of medical uses, retail, hotel, service uses, supporting offices, and a variety of residential uses (including detached single-family homes, townhomes, apartments, urban residential, independent living, and assisted living), in a pedestrian and bicycle-friendly environment. 2. Scope of the request: The applicant has requested to amend the Future Land Use and Character Map and the Bicycle, Pedestrian, and Greenways Master Plan for 232 acres in the College Station Medical District. The Comprehensive Plan Future Land Use and Character Map designates the subject property as General Suburban, Urban, Natural Areas, General Commercial, Medical, and Village Center with a proposed amendment to Urban Mixed Use, General Suburban, and Natural Areas. In addition, the applicant has proposed an alternative route for the trail system. The proposed trail does not extend to Rock Prairie Road along the creek/tree line, but within a linear park along Bird Pond Road, requiring an amendment to the Bicycle, Pedestrian, and Greenways Master Plan. 3. Availability of adequate information: Because a request for a PDD Planned Development District zoning has been requested concurrent with this request, the applicant has provided extensive information related to future development scenarios, including floodplain location, future thoroughfares, existing and proposed traffic counts, anticipated densities of development, conceptual locations of parkland, and buffering for an existing oil well. 4. Consistency with the goals and strategies set forth in the Plan: The proposal is consistent with the goals and strategies of the Comprehensive Plan, and specifically the Medical District Master Plan, a 2012 amendment to the Comprehensive Plan. The goal for College Station’s Future Land Use and Character is to create a community with strong, unique neighborhoods, protected rural areas, special districts, distinct corridors, and a protected and enhanced natural environment. The Medical District Master Plan describes this area as a future special district. The Comprehensive Plan states that infill development is desirable in appropriate locations and should be sensitive to surrounding neighborhoods. City staff identifies the Planning & Zoning Commission April 6, 2017 Page 7 of 9 general area surrounded by State Highway 6, William D. Fitch Parkway, and Rock Prairie Road as a prime infill opportunity. Generally, this area has lacked the regional infrastructure to open it up for development. An Infrastructure and Economic Development Agreement executed in this area in 2015 provides a mechanism to complete the infrastructure. There are no neighborhoods in direct proximity to this project. The Medical District Master Plan describes this area as being appropriate for a mixture of medical uses, retail, hotel, service uses, supporting offices, and a variety of residential uses (including detached single-family homes, townhomes, apartments, urban residential, independent living, and assisted living), in a pedestrian and bicycle-friendly environment. 5. Consideration of the Future Land Use & Character and/or Thoroughfare Plans: The Comprehensive Plan Future Land Use and Character Map designates the subject property as General Suburban, Urban, Natural Areas, General Commercial, Medical, and Village Center with the proposed amendment to Urban Mixed Use, General Suburban, and Natural Areas. The Comprehensive Plan generally describes the land uses as follows: General Suburban - areas that should have an intense level of development activities. These areas will tend to consist of high-density single-family residential lots. Townhomes, duplexes, and neighborhood commercial and office uses may also be permitted in growth areas. Natural Areas - areas that represent a constraint to development and that should be preserved for their natural function or open space qualities. These areas include floodplains and riparian buffers, as well as recreation facilities. Urban Mixed Use - areas that should have the most intense development activities. These areas will tend to consist exclusively of residential, commercial, and office uses in vertical mixed-use structures. The subject property also lies within Growth Area III. The Growth Area III description within the Comprehensive Plan was written prior to the adoption of the Medical District Master Plan, but describes the General Suburban portion as follows: Appropriate for high-density single-family lots, townhomes, and duplexes are appropriate and should incorporate specific design criteria. Suburban or neighborhood commercial and office activities area appropriate in this area as an element of a planned development of at least 30 acres. The subject tract has or will have frontage to several roadways on the Thoroughfare Plan as development of the tract occurs. In a north-south orientation, these include: Rock Prairie Road, a four-lane Major Arterial; the extension of Lakeway Drive, a two-lane Major Collector; and the extension of Double Mountain Road, a two-lane Minor Collector. In an east-west orientation, these include: the extension of Bird Pond Road, a four-lane Minor Arterial; a future two-lane Major Collector; and a portion of the extension of Barron Road, a four-lane Minor Arterial. 6. Compatibility with the surrounding area: The subject property is adjacent to O Office Planning & Zoning Commission April 6, 2017 Page 8 of 9 and PDD Planned Development District zoning (assisted living facility) to the west, but otherwise is surrounded by undeveloped R Rural zoned property. Much of the surrounding property is owned by the City of College Station as parkland and greenway. The proposed PDD zoning is compatible with the neighboring PDDs for medical use and with the surrounding City-owned land, as the proposed internal trail system will connect to the existing Lick Creek hike and bike trail to the south and Southeast Park to the east. The proposed amendment is consistent with the surrounding area. 7. Impacts on infrastructure including water, wastewater, drainage, and the transportation network: College Station Utilities (CSU) will provide water service via an existing 18-inch main along Rock Prairie Road. With site development, water mains for domestic and fire protection will be extended and looped throughout the development. There are currently no sanitary sewer mains available to serve this property. The developer is proposing the extension of gravity sewer mains to serve this area. Currently, all existing infrastructure, with the exception of the sanitary sewer, appears to be adequate to serve the proposed zoning amendment. The property is within the Lick Creek drainage basin in an area where the requirement for detention must be evaluated with site development. There is currently a portion of the tract that lies within the FEMA regulated floodplain. Drainage and all other public infrastructure will be required to be designed and constructed in accordance with the B/CS Design Guidelines. The subject tract has or will have frontage to several roadways on the Thoroughfare Plan as development of the tract occurs. In a north-south orientation, these include: Rock Prairie Road, a four-lane Major Arterial; the extension of Lakeway Drive, a two-lane Major Collector; and the extension of Double Mountain Road, a two-lane Minor Collector. In an east-west orientation, these include: the extension of Bird Pond Road, a four-lane Minor Arterial; a future two-lane Major Collector; and a portion of the extension of Barron Road, a four-lane Minor Arterial. In accordance with the Infrastructure and Economic Development Agreement approved by Council in July 2015, the City is currently in design and will construct the extension of Lakeway Drive to connect the existing portions of Lakeway Drive at Scott & White on the north and behind CHI St. Joseph to the south, including the section across this tract (initially constructed as one-half of a four-lane boulevard with on-street parking). Additional roadways to serve the property are anticipated as the tract subdivides and develops. A traffic study was submitted that performed a high-level two-lane roadway capacity analysis of existing and future thoroughfares. It analyzed roadway capacities under scenarios of 70% build-out in 2034 and full build-out in 2034. It found that Rock Prairie Road and the Bird Pond Road extension would need to be constructed to their four-lane section as well as the SH 6 Northbound Frontage Road as a three-lane section to accommodate the full build-out scenario in 2034. A traffic impact analysis will be required with the Preliminary Plan application and will provide a more detailed analysis of roadways and intersections when the configuration of the tract’s roadways is proposed. 8. Impact on the City’s ability to provide, fund, and maintain services: City Services are not anticipated to be negatively impacted by the change in land use. Planning & Zoning Commission April 6, 2017 Page 9 of 9 9. Impact on environmentally sensitive and natural areas: The Comprehensive Plan amendment has no negative impact on environmentally sensitive or natural areas. 10. Contribution to the overall direction and character of the community as captured in the Plan’s vision and goals: The goal for College Station’s Future Land Use and Character is to create a community with strong, unique neighborhoods, protected rural areas, special districts, distinct corridors, and a protected and enhanced natural environment. The proposed amendment does not limit the general goals of the Comprehensive Plan. The amendment proposes uses consistent with the Medical District Master Plan and the anticipated growth in this area. RECOMMENDATION The Bicycle, Pedestrian, and Greenways Advisory Board recommended approval of the amendment to the Bicycle, Pedestrian, and Greenways Master Plan (trail locations) and the amendment to the Future Land Use and Character Map related to the Natural Areas land use designation. Staff recommends approval of the Future Land Use and Character Map amendment request and the Bicycle, Pedestrian Greenways Master Plan amendment. City Hall 1101 Texas Ave College Station, TX 77840 College Station, TX Legislation Details (With Text) File #: Version:117-0159 Name:College Station Medical District Town Center Rez Status:Type:Rezoning Agenda Ready File created:In control:3/30/2017 Planning and Zoning Commission Regular On agenda:Final action:4/6/2017 Title:Public hearing, presentation, possible action, and discussion regarding an ordinance amending Chapter 12, “Unified Development Ordinance,” Section 12-4.2, “Official Zoning Map,” of the Code of Ordinances of the City of College Station, Texas by changing the zoning district boundaries from R Rural to PDD Planned Development District for a mixed-use development including commercial, office, multi-family, single-family, parks and trails on approximately 232 acres of land being situated in the Thomas Caruthers League, Abstract No. 9, College Station, Brazos County, Texas, said tract being the remainder of a called 341.06 acre tract of land as described by a deed to Willis S. Ritchey recorded in Volume 1160, Page 777 of the Official Public Records of Brazos County, Texas and the remainder of a called 11 acre tract of land as described by a deed to Willis S. Ritchey recorded in Volume 260, Page 466 of the Deed Records of Brazos County, Texas, located at 4000 and 4200 Rock Prairie Road, and more generally located along the south side of Rock Prairie Road, east of State Highway 6. South Case # REZ2016-000043 (Note: Final action on this item is scheduled for the April 27, 2017 City Council meeting - subject to change) Sponsors:Jennifer Prochazka Indexes: Code sections: Attachments:Staff Report Maps & Imagery Action ByDate Action ResultVer. Public hearing, presentation, possible action, and discussion regarding an ordinance amending Chapter 12, “Unified Development Ordinance,” Section 12-4.2, “Official Zoning Map,” of the Code of Ordinances of the City of College Station, Texas by changing the zoning district boundaries from R Rural to PDD Planned Development District for a mixed-use development including commercial, office, multi-family, single-family, parks and trails on approximately 232 acres of land being situated in the Thomas Caruthers League, Abstract No. 9, College Station, Brazos County, Texas, said tract being the remainder of a called 341.06 acre tract of land as described by a deed to Willis S. Ritchey recorded in Volume 1160, Page 777 of the Official Public Records of Brazos County, Texas and the remainder of a called 11 acre tract of land as described by a deed to Willis S. Ritchey recorded in Volume 260, Page 466 of the Deed Records of Brazos County, Texas, located at 4000 and 4200 Rock Prairie Road, and more generally located along the south side of Rock Prairie Road, east of State Highway 6. South Case # REZ2016-000043 (Note: Final action on this item is scheduled for the April 27, 2017 City Council meeting - subject to change) College Station, TX Printed on 3/31/2017Page 1 of 1 powered by Legistar™ Planning & Zoning Commission Page 1 of 17 April 6, 2017 REZONING REQUEST for College Station Town Center in the Medical District REZ2016-000043 REQUEST: R Rural to PDD Planned Development District for a multi-use development SCALE: Approximately 232 acres LOCATION: 4000 and 4200 Rock Prairie Road, and more generally located along the south side of Rock Prairie Road, east of State Highway 6 South APPLICANT: James Murr PROJECT MANAGER: Jennifer Prochazka, AICP, Economic Development Manager jprochazka@cstx.gov PROJECT OVERVIEW: The applicant has proposed a PDD Planned Development District zoning for approximately 232 acres located in the College Station Medical District. The PDD is intended to provide a variety of residential, office, and retail opportunities in an urban environment with park, lake, and trail amenities. The property abuts hundreds of acres of City- owned properties, including parkland, greenway and the future Spring Creek Business Center. The proposed internal trail system will connect to the existing Lick Creek hike and bike trail to the south and Southeast Park to the east. The proposal is consistent with the Medical District Master Plan adopted by the City in 2012 and compliments the existing medical uses to the west. Extensions of Lakeway Drive, Bird Pond Road, Double Mountain Road, as well as other future thoroughfares, will provide connectivity through the area. RECOMMENDATION: Staff recommends approval of the rezoning request. Planning & Zoning Commission Page 2 of 17 April 6, 2017 Planning & Zoning Commission Page 3 of 17 April 6, 2017 Planning & Zoning Commission Page 4 of 17 April 6, 2017 Planning & Zoning Commission Page 5 of 17 April 6, 2017 NOTIFICATIONS Advertised Commission Hearing Date: April 6, 2017 Advertised Council Hearing Date: April 27, 2017 The following neighborhood organizations that are registered with the City of College Station’s Neighborhood Services have received a courtesy letter of notification of this public hearing: N/A Property owner notices mailed: 12 Contacts in support: None at the time of staff report. Contacts in opposition: None at the time of staff report. Inquiry contacts: Two at the time of staff report. ADJACENT LAND USES Direction Comprehensive Plan Zoning Land Use North (across Rock Prairie Road) Estate, Suburban Commercial, and Restricted Suburban R Rural, SC Suburban Commercial, and RS Restricted Suburban Duplex subdivision and vacant land South Natural Areas R Rural City-owned Greenway East Natural Areas and General Suburban R Rural Vacant land West Medical PDD Planned Development District and O Office Hospital and assisted living facilities (under construction) DEVELOPMENT HISTORY Annexation: Frontage along Rock Prairie road was annexed in 1983. The remainder was annexed in 1995 Zoning: 1983 & 1995 – A-O Agricultural Open 2013 – A-O Agricultural Open renamed R Rural Final Plat: N/A Site development: Vacant PROPOSAL The applicant has proposed a PDD Planned Development District zoning for approximately 232 acres located in the College Station Medical District. The PDD is intended to provide a variety of residential, office, and retail opportunities in an urban environment with park, lake, and trail amenities. The property abuts hundreds of acres of City-owned properties, including parkland, greenway and the future Spring Creek Business Center. The proposed internal trail system will connect to the existing Lick Creek hike and bike trail to the south and Southeast Park to the east. The proposal is consistent with the Medical District Master Plan adopted by the City in 2012 and compliments the existing medical uses to the west. Extensions of Lakeway Drive, Planning & Zoning Commission Page 6 of 17 April 6, 2017 Bird Pond Road, Double Mountain Road, as well as other future thoroughfares, will provide connectivity through the area. REZONING REVIEW CRITERIA 1. Consistency with the Comprehensive Plan: The Comprehensive Plan Future Land Use and Character Map designates the subject property as General Suburban, Urban, Natural Areas, General Commercial, Medical, and Village Center with an amendment to Urban Mixed Use, General Suburban, and Natural Areas pending. The Comprehensive Plan generally describes the land uses as follows: General Suburban - areas that should have an intense level of development activities. These areas will tend to consist of high-density single-family residential lots. Townhomes, duplexes, and neighborhood commercial and office uses may also be permitted in growth areas. Natural Areas - areas that represent a constraint to development and that should be preserved for their natural function or open space qualities. These areas include floodplains and riparian buffers, as well as recreation facilities. Urban Mixed Use - areas that should have the most intense development activities. These areas will tend to consist exclusively of residential, commercial, and office uses in vertical mixed-use structures. The property is in the area studied by the Medical District Master Plan (2012). The subject property is described as being appropriate for a mixture of medical uses, retail, hotel, service uses, supporting offices, and a variety of residential uses (including detached single-family homes, townhomes, apartments, urban residential, independent living, and assisted living), in a pedestrian and bicycle-friendly environment. The subject property also lies within Growth Area III, which describes the General Suburban portion as follows: appropriate for high-density single-family lots, townhomes, and duplexes are appropriate and should incorporate specific design criteria. Suburban or neighborhood commercial and office activities area appropriate in this area as an element of a planned development of at least 30 acres. It should be noted that the Growth Area III description was written prior to the adoption of the Medical District Master Plan. 2. Compatibility with the present zoning and conforming uses of nearby property and with the character of the neighborhood: The subject property is adjacent to O Office and PDD Planned Development District zoning (assisted living facility) to the west, but otherwise is surrounded by undeveloped R Rural zoned property. Much of the surrounding property is owned by the City of College Station as parkland and greenway. The proposed PDD zoning is compatible with the neighboring PDDs for medical use and with the surrounding City-owned land, as the proposed internal trail system will connect to the existing Lick Creek hike and bike trail to the south and Southeast Park to the east. 3. Suitability of the property affected by the amendment for uses permitted by the district that would be made applicable by the proposed amendment: The PDD is intended to provide a variety of residential, office, and retail opportunities in an urban environment with park, lake, and trail amenities. The property is suitable for development of the proposed uses because it is large and under one master plan, has Planning & Zoning Commission Page 7 of 17 April 6, 2017 access from Rock Prairie Road, Lakeway Drive, the extension of Bird Pond Road, and several other future unnamed thoroughfares, and connects to the City’s existing trail system. 4. Suitability of the property affected by the amendment for uses permitted by the district applicable to the property at the time of the proposed amendment: The property is currently zoned R Rural. The property is currently suitable for rural and agricultural use. 5. Marketability of the property affected by the amendment for uses permitted by the district applicable to the property at the time of the proposed amendment: The subject property may be marketable with its current zoning of R Rural, as it is currently being used for agricultural purposes. The requested rezoning provides an opportunity for a mixed-use development on the property in compliance with the adopted Medical District Master Plan (2012). 6. Availability of water, wastewater, Stormwater, and transportation facilities generally suitable and adequate for the proposed use: College Station Utilities (CSU) will provide water service via an existing 18-inch main along Rock Prairie Road. With site development, water mains for domestic and fire protection will be extended and looped throughout the development. There are currently no sanitary sewer mains available to serve this property. The developer is proposing the extension of gravity sewer mains to serve this area. Currently, all existing infrastructure, with the exception of the sanitary sewer, appears to be adequate to serve the proposed zoning amendment. The property is within the Lick Creek drainage basin in an area where the requirement for detention must be evaluated with site development. There is currently a portion of the tract that lies within the FEMA regulated floodplain. Drainage and all other public infrastructure will be required to be designed and constructed in accordance with the B/CS Design Guidelines. The subject tract has or will have frontage to several roadways on the Thoroughfare Plan as development of the tract occurs. In a north-south orientation, these include: Rock Prairie Road, a four-lane Major Arterial; the extension of Lakeway Drive, a two- lane Major Collector; and the extension of Double Mountain Road, a two-lane Minor Collector. In an east-west orientation, these include: the extension of Bird Pond Road, a four-lane Minor Arterial; a future two-lane Major Collector; and a portion of the extension of Barron Road, a four-lane Minor Arterial. In accordance with the Infrastructure and Economic Development Agreement approved by Council in July 2015, the City is currently in design and will construct the extension of Lakeway Drive to connect the existing portions of Lakeway Drive at Scott & White on the north and behind CHI St. Joseph to the south, including the section across this tract (initially constructed as one- half of a four-lane boulevard with on-street parking). Additional roadways to serve the property are anticipated as the tract subdivides and develops. A traffic study was submitted that performed a high-level two-lane roadway capacity analysis of existing and future thoroughfares. It analyzed roadway capacities under scenarios of 70% build-out in 2034 and full build-out in 2034. It found that Rock Prairie Road and the Bird Pond Road extension would need to be constructed to their four-lane Planning & Zoning Commission Page 8 of 17 April 6, 2017 section as well as the SH 6 Northbound Frontage Road as a three-lane section to accommodate the full build-out scenario in 2034. A traffic impact analysis will be required with the Preliminary Plan application and will provide a more detailed analysis of roadways and intersections when the configuration of the tract’s roadways is proposed. REVIEW OF CONCEPT PLAN Purpose and Intent: The City’s Medical District Master Plan recognizes the importance of developing this area as an urban environment with both the density and the mix of uses to serve the area with offices, services, and retail, as well as living opportunities for employees and patrons of the area. The intent is for this area to serve as a Health and Wellness District that would provide a Live-Work-Play environment with enhanced pedestrian facilities and destinations. In order to construct a more urban environment, some of the City’s existing development standards must be modified. In general, structures are proposed to have minimal setbacks, few height limitations, and no buffers between uses. Additionally, availability of public parking is considered very important to the success of the development. To encourage a healthy lifestyle, site enhancements will be made throughout to provide pedestrian traffic within and through the site for both recreation and commuting. This will be accomplished in part by providing trail connections to the Lick Creek hike and bike trail and enhanced recreational amenities around the existing pond within the development. To provide walkable vibrant urban environment, the public realm should be supported by landscape, site furniture, outdoor plazas and art. The urban design and mixed-use nature of the Planning & Zoning Commission Page 9 of 17 April 6, 2017 development will create the need for enhanced urban amenities such as benches and other site furniture, street trees, enhanced paving materials, and wide sidewalks. All street furniture and amenities as well as placement will be standardized according to the district’s architectural guidelines. Street light standards are proposed to be distinct to the District and will be coordinated between the City and the District. Base Zoning Districts: At the time of platting and site plan, the project as a whole and in phases will need to meet all applicable requirements of the Unified Development Ordinance, unless otherwise modified through the PDD ordinance. The applicant is requesting a number of meritorious modifications, listed below, to realize the more urban proposal. In addition, amendments to Preliminary Plans and their associated Final Plats are proposed to be taken through the review process and to the Planning and Zoning Commission concurrently, at the request of the developer. The proposed PDD zoning includes the following base zoning districts: • MU Mixed-Use with modifications (for the area described as “Town Center Commercial” on the Concept Plan), • GS General Suburban with modifications (for the area described as “Town Center Residential” on the Concept Plan), • NAP Natural Areas Protected (for the area described as “Natural Areas” and “Park Space” on the Concept Plan). Permitted Uses: Town Center Residential: GS General Suburban uses with the following additional uses, as defined in the Unified Development Ordinance: • Boarding and Rooming House • Duplex • Multi-family (maximum of four (4) units) • Townhouse • Single-unit dwelling • Two-unit dwelling • Cottage Green Single-Family (**as defined below) o ** Cottage Green is defined as a grouping of detached single-family dwelling units clustered around a common open space developed with a common plan for the site. Residential lots may front on an alley (no street frontage) so long as fire protection is maintained. Green clusters will have parking associated with the common development, but not necessarily with each lot. Town Center Commercial: MU Mixed Use uses with the following additional uses, as defined in the Unified Development Ordinance: • Extended Care Facility / Convalescent / Nursing Home • Educational facility o Indoor Instruction o College, Junior College, and University o Outdoor Instruction o Primary & Secondary o Tutoring o Vocational / Trade • Health Care – Hospitals • Golf Course / Driving Range Planning & Zoning Commission Page 10 of 17 April 6, 2017 • Storage, Self Service (indoor access only) • Vehicle Sales and Rental (indoor or within parking structure only) Modifications: The requested modifications are as follows: • Section 12-5.1.J.1 Supplemental Standards for MU Mixed Use o This development will not be subject to the minimum 30 percent residential use requirement. o Floor-to-Area Ratio is .5:1 for this development. • Section 12-5.2 Residential Dimensional Standards o Variances to the General Suburban standards for the Town Center Residential area. Average Lot Area per Dwelling Unit (DU) No Minimum Absolute Min. Lot Area per Dwelling Unit (DU) 1500 SF Min. Lot Width No Minimum Min. Lot Depth No Minimum Min. Front Setback(H) 10' Min. Side Setback 5'(A) Min. Side Street Setback 10’ Min. Side Setback between Structures 10' Min. Rear Setback No Minimum Max. Height No Max Max. Dwelling Units/Acre (Subdivision Gross) 16 (A) Zero lot line construction is allowed so long as a minimum distance of 10’ between structures is maintained. o Variances to the Mixed Use standards for the Town Center Commercial area. Max. Front Setback 20'(O) Max. Side Street Setback 20'(O) Min. Rear Setback(L) 12' Max. Height *No Maximum(L) Minimum Number of Stories **2 Stories Max. Dwelling Units/Acre (Subdivision Gross) No Maximum (L)Reference Easterwood Field Airport Zoning Ordinance only regarding height limitations. (O)For MU zoned properties, maximum side street and front setbacks may be measured from the edge of a public easement when it is in excess of the maximum setback. Maximum setbacks may be increased to up to one hundred ten feet (110’) to accommodate a parking lot between the structure and the street. Maximum setback requirements may be fulfilled through the use of plazas, outdoor dining, and bicycle parking. * Section 12-7.2.H.3.b Low-Density Residential Protection limiting height and/or setback does not apply **2 story elevations are required fronting major thoroughfares and primary street frontages. These dimensional standards are with the understanding that sufficient easements for utilities will be provided. • Section 12-7.2.H.3.b Low-Density Residential Protection Planning & Zoning Commission Page 11 of 17 April 6, 2017 o This section does not apply to the proposed development. • Section 12-7.3 Off-Street Parking Standards – In an effort to make a more walkable environment, traditional surface parking will be supplemented with on-street parking and shared-use parking. Shared Parking will take into account peak demands of both uses and may be achieved with surface lots or multi-level garages. Parking study will be based on current Urban Land Institute (ULI) definitions. o Residential uses: One (1) parking space for the first bedroom and 0.5 spaces for each additional bedroom o Non-Residential Uses: One (1) parking spaces per 250 square feet of gross building area, with no additional parking for more intense commercial uses. o A parking area with 12 parking spaces or fewer is not required to construct interior parking islands. End islands are required with a minimum of 90 square feet located at the end of each parking row. • Section 12-7.5.C Summary of Permitted Signs –Signage for the district should be customized based on the district’s vehicular and pedestrian oriented environment. All signs should convey the intent of the district in both look and feel and be cohesive in nature. In addition to those permitted by the base zoning districts, the following signs are permitted: o Freestanding signage will be allowed in the Town Center Commercial portion of the development, in accordance with height, area, and setback requirements of Section 12-7.5.N.a o Projections signs are permitted in the Town Center Commercial portion of the development and may be used as identification for the general area or for a specific business and/or tenants. Square footage of projection signs will not count against the allowed square footage of attached signage. One projection sign shall be allowed per tenant, per public right-of-way or public way frontage. o Temporary, removable Sidewalk Signs are permitted in the Town Center Commercial portion of the development adjacent to the building, directly in front of the business that it advertises, leaving a minimum clear space as defined by the American with Disabilities Act (ADA). The maximum height is four (4) feet and the maximum area is 12 square feet. o Special District Identification Signs are permitted. The sign must primarily identify the District (Municipal Management District) and must be owned and maintained by the District. Such signs may be on- or off-District property and are limited to 50 square feet, exclusive of supports/base. Signs may not be located within the public right-of-way. Subject to an agreement with the private property owner of the sign location and the District, signs may be located near the following intersections:  Bird Pond Road and Rock Prairie Road,  Bird Pond Road and State Hwy 6,  Barron Road and State Hwy 6,  Lakeway Drive. and State Hwy 6,  Lakeway Drive. and William D. Fitch Parkway, and  Rock Prairie Road and State Hwy 6 o Wayfinding signage will be permitted as a district-oriented place making element that is cohesive with the overall District signage package. Wayfinding is permitted on private property located along public rights-of-way. Wayfinding signs may be a maximum of eight (8) feet in height and a maximum of 32 square feet. Planning & Zoning Commission Page 12 of 17 April 6, 2017 o District Street Pole Banners that serve as seasonal or special event notification are permitted only after coordination and approval by College Station Electric and the City Manager’s Office. Such banners shall be attached at two points and may be constructed of flexible canvas-type material. District Street Pole Banners will be mounted at a height prescribed by the City of College Station at the time of installation and will not exceed six (6) square feet. • Section 12-7.6 Landscape and Tree Protection - The following modifications are proposed: o Section 12-7.6.B.2.a - As denser urban conditions are requested in the residential areas, a minimum of one tree (canopy or non-canopy) is required in the front yard of townhouse or single-family residential. This is a variance from the General Suburban requirement of 2 trees canopy trees (or one minimum 4” canopy tree) for each lot. o Section 12-7.6.B.3 – the following modifications are requested from the MU Mixed Use Landscape Standards:  Flexibility with the spacing, placement, and planting materials for street trees that have close proximity to building foundations will be provided. This allows for a streetscape that is more compatible in an urban environment.  Required Street Trees may be selected from the canopy or non-canopy list as space allows.  A minimum 6’ length x 3’ wide tree planting area. No tree grate is required. • Section 12-7.7 Buffer Requirements o Buffers do not apply between uses within the Town Center development. • Section 12-8.3 General Requirements & Minimum Standards of Design for Subdivisions within the City Limits. Enjoyable, well-designed streets define the character of the district. They should support high levels of walking and bicycling, as well as vehicular traffic and parking. Modifications are requested to the following sections of the Subdivision Regulations. o 12-8.3.E.8.a Geometric Standards, Street Design Criteria o 12-8.3.G.2.a Block length  Allow for 1200’ block length of a linear park block adjacent and parallel to a Right-of-Way on Rock Prairie Road, Bird Pond Road, and Lakeway Drive. o 12-8.3.H.1.h Lot frontage on a public street  Residential lots that front on a common courtyard or access lot will have access to public streets through alleys. The following are Guiding Principles of Street Design for the proposed development: Town Center Residential: Right-of-Way & Easements • Standard street Right-of-Way (ROW) widths • As bicycle facilities are standard on thoroughfares, if parking is desired, then additional ROW width is needed to accommodate separated bike lanes and parking. • Ten (10) foot Public Utility Easements (PUE) provided adjacent to each side of the ROW and within proposed ten (10) foot building setback. • Utilities will be located within the ROW or PUE with no additional width of ROW or PUE dedication required Planning & Zoning Commission Page 13 of 17 April 6, 2017 • Utilities may not be located under vehicular pavement, with the exception of crossings. Utilities can be located in other areas within the ROW or PUE such that they will not affect the building setback. o Utilities are permitted under sidewalks. o Storm sewer is permitted under the street. • Additional PUE will not be required if depth of utility exceeds the standard depth. Maximum 10-foot PUE. • Water and wastewater lines will be located at least 15 feet from the permitted setback of structures (or at least five (5) feet inside of the ROW) • Exceptions may be made to the standard 15’ building separation from a pressurized water line and/or wastewater line for minor conflicts to ensure the 10’ building setback is not affected. Building Setbacks from Right-of-Way • A minimum of ten (10) foot building setbacks from the property line/ROW line • Utility placement will be such that structures may be erected at the Ten (10) foot setback line Pavement Width and Parking • On-street parking is permitted at the time of development. As public streets, if the City desires to remove parking in the future for public safety or other reasons, it may do so at its discretion with approval of a parking removal ordinance. • Minimum pavement width is 27 feet (back of curb) and meeting all other standards. • Phases of development with all pavement widths of at least 30 feet (back of curb) do NOT have to comply with “Single-Family Residential parking Requirements for Platting” (Unified Development Ordinance Section 12-8.3.W). • Residential sidewalks will be a minimum of six (6) feet in width. Tree Placement • Canopy and non-canopy trees may be planted in residential front yards within the 10-ft setback/PUE so long as canopy trees are not located over water or wastewater lines • Trees will be located between the sidewalk and the raised bike lane, if bike lane exists, and will be maintained by the Municipal Management District (MMD) such that they do not create a conflict with pedestrians or cyclists. Town Center Commercial: Right-of-Way & Easements • Standard street Right-of-Way (ROW) widths • As bicycle facilities are standard on thoroughfares, if parking is desired, then additional ROW width is needed to accommodate separated bike lanes and parking. • Additional Public Utility Easements (PUE) will not be provided adjacent to the ROW • Utilities will be located within the ROW with no additional width of ROW or PUE dedication required • Utilities may be located under vehicular pavement, sidewalks, medians, or other areas within the ROW such that they will not affect the building setback. • Additional ROW or PUE will not be required if depth of utility exceeds the standard depth. • Water and wastewater lines will be located at least 15 feet from the permitted setback of structures (or at least 15 feet inside of the ROW) Planning & Zoning Commission Page 14 of 17 April 6, 2017 • Exceptions may be made to the standard 15’ building separation from a pressurized water line and/or wastewater line for minor conflicts to ensure the 0’ building setback is not affected. Building Setbacks from Right-of-Way • Zero (0) foot building setbacks from the property line/ROW line • Utility placement will be such that structures may be erected at the property line Pavement Width and Parking • Standard curb and street radii • Aerial Apparatus Easements (AAE) are required where structures are anticipated to be over 30 feet in height. AAEs are a minimum of 26 feet in width. Paved, to include pavers or other surfacing which provides adequate support, portions of medians may be utilized to meet the 26-foot requirement. • On-street parking is permitted at the time of development. As public streets, if the City desires to remove parking in the future for public safety or other reasons, it may do so at its discretion with approval of a parking removal ordinance. • Commercial and multi-family sidewalks will be a minimum of 11 feet in width on Thoroughfares and 8 feet on all other commercial streets. Tree Placement • Non-canopy trees and canopy trees are allowed within the ROW (both in the median and along the street edge / sidewalk) to meet street tree requirements, so long as canopy trees are not located over water or wastewater lines • Trees will be located in planting strips without grates (3’x6’ typical) and will include irrigation and drains under the tree. • Trees will be located between sidewalk and raised bike lane, if bike lane exists, and will be maintained by the Municipal Management District (MMD) such that they do not create a conflict with pedestrians or cyclists. • Canopy trees will be spaced a minimum of 45 feet where AAEs are required for fire protection. Non-canopy trees can be spaced appropriately without limitation by location of AAEs. Detention: A drainage analysis is required to determine the extent of detention needed on site, as required by the Unified Development Ordinance. The developer or the Municipal Management District is responsible for providing all storm water detention facilities. After construction, all storm water detention facilities will be maintained by the MMD. Salt Water Disposal Well: An existing salt water disposal well exists on the property, located in the proposed commercial area north of the pond and east of the future extension of Bird Pond Road. Due to existing equipment on the Richie Willis SWD#1 Well, the HUD Acceptable Separation Distance calculated a recommended thermal radial buffer of 211 feet measured from the earthen berm surrounding the tanks. • No portion of any townhome or commercial lot shall be platted (preliminary plan or final plat) within the 211 feet of the tanks’ berm. • Only limited, passive uses of the parkland and ROW is permitted within 211 feet of the tanks’ berm. Specifically permitted uses are: thoroughfare, sidewalks, landscaping, parking lots, etc. The following are examples of items not permitted: benches, bus stops, recreational equipment, structures, etc. • The Developer’s professional engineer may incorporate a Mitigation Plan to reduce the stated 211 feet thermal radiation buffer if the sealed plan is approved by the City Engineer. Planning & Zoning Commission Page 15 of 17 April 6, 2017 Parkland Dedication Proposal: The Parks and Recreation Advisory Board considered this item in February and recommended approval of the proposal. Public parkland dedication for this planned development will be approximately 50 acres, as required by the City. This total acreage reflects the requirement for both neighborhood and community parks. The exact acreage required for dedication will be based on the number of dwelling units developed. The dedicated community parkland will become an extension of the Southeast Community Park with a continuation of the Lick Creek Hike and Bike Trail. Extensive trails will be built within the floodplain to connect to the City’s trail system. This creates a higher level of connectivity though the park system. The land within the floodplain is proposed to be counted at the same ratio as other park land within the development. Urban parks such as highly amenitized linear street side parks and other urban green spaces are also proposed for parkland dedication. The natural pond on the property will be maintained and may be increased to serve as detention/retention. The full acreage of the pond and park area will be counted toward parkland dedication. All park and public spaces will be maintained by the Municipal Management District. The Unified Development Ordinance provides the following review criteria for PDD Concept Plans: 1. The proposal will constitute an environment of sustained stability and will be in harmony with the character of the surrounding area: The applicant has proposed a development with a mix of uses over 232 acres. The subject property and surrounding area are part of the City’s adopted Medical District Master Plan (2012). The proposed Concept Plan includes preservation of natural features as an extension of the City- Planning & Zoning Commission Page 16 of 17 April 6, 2017 owned greenway to the south. Additionally, public trails are proposed to connect to the new Lick Creek hike and bike facility and to the future Southeast Park. Proposed housing, commercial and office uses are intended to support the existing medical facilities in the area, as described in the Medical District Master Plan. 2. The proposal is in conformity with the policies, goals, and objectives of the Comprehensive Plan, and any subsequently adopted Plans, and will be consistent with the intent and purpose of this Section: The proposed Concept Plan is in general conformity with the policies, goals and objectives of the Comprehensive Plan and of the Medical District Master Plan. 3. The proposal is compatible with existing or permitted uses on abutting sites and will not adversely affect adjacent development: Adjacent properties are largely undeveloped. Properties to the east are shown for future single-family development. Properties to the west are shown for medical uses. The proposed development ties into the future plans for the area and will not adversely affect future development in the area. 4. Every dwelling unit need not front on a public street but shall have access to a public street directly or via a court, walkway, public area, or area owned by a homeowners association: All dwelling units will have direct access to a public street or public alley. 5. The development includes provision of adequate public improvements, including, but not limited to parks, schools, and other public facilities: The Concept Plan and associated Parks Plan were presented to the City’s Parks and Recreation Advisory Board and recommended for approval. The proposal includes extensive public trails connecting greenways, the Lick Creek hike and bike facility, and the future Southeast Park; large public greenspaces; linear parks along Bird Pond Road and Rock Prairie Road; and pocket parks throughout. Public spaces will be owned by the City of College Station as parkland, but maintained by the Municipal Management District. 6. The development will not be detrimental to the public health, safety, welfare, or materially injurious to properties or improvements in the vicinity: The proposed development will not be detrimental to the public health, safety, welfare, or materially injurious to properties or improvements in the vicinity. 7. The development will not adversely affect the safety and convenience of vehicular, bicycle, or pedestrian circulation in the vicinity, including traffic reasonably expected to be generated by the proposed use and other uses reasonably anticipated in the area considering existing zoning and land uses in the area: The Concept Plan includes an extensive trail network, sidewalks on all streets, and bike lanes on thoroughfares. A more urban environment potentially allows for residents to shop, dine, and work near where the live, reducing traffic congestion on nearby streets and encouraging a more walkable environment. STAFF RECOMMENDATION Staff recommends approval of the Planned Development District rezoning request to allow for a master-planned mixed-use development. SUPPORTING MATERIALS 1. Concept Plan Planning & Zoning Commission Page 17 of 17 April 6, 2017 2. Conceptual Parks Plan 3. Land Use Map 4. Rezoning Map 5. Concept Plan Imagery City Hall 1101 Texas Ave College Station, TX 77840 College Station, TX Legislation Details (With Text) File #: Version:317-0150 Name:Emerald Point CPA Status:Type:Comprehensive Plan Agenda Ready File created:In control:3/27/2017 Planning and Zoning Commission Regular On agenda:Final action:4/6/2017 Title:Public hearing, presentation, possible action, and discussion regarding an ordinance amending the Comprehensive Plan-Future Land Use & Character Map from Suburban Commercial to General Commercial for approximately 11.3 acres located at 3005 Earl Rudder Freeway South, generally located at the southeast intersection of Earl Rudder Freeway South and Emerald Parkway. Case #CPA2017-000001 (Note: Final action on this item is scheduled for the April 27, 2017 City Council meeting - subject to change) Sponsors:Jenifer Paz Indexes: Code sections: Attachments:Staff Report Application Comp Plan Exhibit Action ByDate Action ResultVer. Public hearing, presentation, possible action, and discussion regarding an ordinance amending the Comprehensive Plan- Future Land Use & Character Map from Suburban Commercial to General Commercial for approximately 11.3 acres located at 3005 Earl Rudder Freeway South, generally located at the southeast intersection of Earl Rudder Freeway South and Emerald Parkway. Case #CPA2017-000001 (Note: Final action on this item is scheduled for the April 27, 2017 City Council meeting - subject to change) College Station, TX Printed on 3/31/2017Page 1 of 1 powered by Legistar™ Planning & Zoning Commission Page 1 of 10 April 6, 2017 COMPREHENSIVE PLAN AMENDMENT FOR Emerald Point Lot 1 thru 5 CPA2017-000001 REQUEST: Suburban Commercial to General Commercial SCALE: Approximately 11.3 acres LOCATION: 3005 Earl Ruder Freeway South, generally located at the southeast intersection of Earl Rudder Freeway South and Emerald Parkway. APPLICANT: Mike Gentry; West, Webb, Allbritton & Gentry, P.C. PROJECT MANAGER: Jenifer Paz, AICP, Senior Planner jpaz@cstx.gov RECOMMENDATION: Staff recommends approval of the Future Land Use and Character Map amendment. Planning & Zoning Commission Page 2 of 10 April 6, 2017 Planning & Zoning Commission Page 3 of 10 April 6, 2017 Planning & Zoning Commission Page 4 of 10 April 6, 2017 Planning & Zoning Commission Page 5 of 10 April 6, 2017 NOTIFICATIONS Advertised Commission Hearing Date: April 6, 2017 Advertised Council Hearing Dates: April 27, 2017 The following neighborhood organizations that are registered with the City of College Station’s Neighborhood Services have received a courtesy letter of notification of this public hearing: Emerald Forest HOA Foxfire HOA Contacts in support: None at the time of this staff report Contacts in opposition: One (1) at the time of the staff report Inquiry contacts: One (1) at the time of the staff report ADJACENT LAND USES Direction Comprehensive Plan Zoning Land Use North (across Emerald Parkway) Suburban Commercial O Office Office/Medical Office South Suburban Commercial & General Commercial M-1 Light Industrial & GC General Commercial Vacant East (across Corsair Drive) Suburban Commercial M-1 Light Industrial Vacant West N/A N/A State Highway 6 S DEVELOPMENT HISTORY Annexation: 1971 & 1977 Zoning: M-1 Light Industrial Final Plat: Emerald Point Subdivision Lot 1-5 Site development: Offices PROPOSAL The applicant is requesting an amendment to the Future Land Use and Character Map in the Comprehensive Plan to General Commercial for approximately 11.3 acres located at Emerald Point Subdivision Lot 1 thru 5, near the southeast intersection of Earl Rudder Freeway South frontage road and Emerald Parkway. The subject and surrounding properties are primarily designated Suburban Commercial on the Comprehensive Plan Future Land Use and Character Map. REVIEW CRITERIA Planning & Zoning Commission Page 6 of 10 April 6, 2017 1. Changed or changing conditions in the subject area or the City: The subject property and adjacent surrounding properties are designated as Suburban Commercial on the Comprehensive Plan Future Land Use and Character Map. As shown below, just south of the subject area is a property where the Comprehensive Plan and Zoning Map were recently amended. In December 2016 the future land use designation on Century Hill Development, Lot 9 changed from Suburban Commercial to General Commercial. Additionally, the property was rezoned from M-1 Light Commercial to GC General Commercial. This is similar to the properties to the south along Pavilion Avenue and the frontage road. Since the adoption of the Comprehensive Plan, Corsair Drive, a 2-lane major collector, has been extended to connect to Emerald Parkway, 4-lane minor arterial westbound and a 2- lane minor arterial eastbound. Corsair Drive now provides access to through traffic from Earl Rudder Freeway frontage road to Emerald Parkway, by way of Pavilion Avenue, another 2- lane major collector. Properties to the south, currently zoned General Commercial, were identified as an area of Planning & Zoning Commission Page 7 of 10 April 6, 2017 interest by Economic Development for preservation of General Commercial. Staff will pursue City initiated Comprehensive Plan Amendments in many areas around the City for land that is suitable to higher intensity commercial uses. While this is not one of those areas, the proposed amendment is consistent with the City’s economic development goals for this area. 2. Scope of the request: The request is to amend the Comprehensive Plan Future Land Use and Character Map designation for approximately 11.3 acres from Suburban Commercial to General Commercial. If approved by City Council, the applicant intends to pursue a rezoning of the property from M-1 Light Industrial to GC General Commercial. A request for rezoning was submitted for consideration and will be heard following this item. 3. Availability of adequate information: General Commercial land use designation allows for the future development of commercial activities, including retail sale and service uses, which serve the nearby residents and larger community or region. Properties in this area are served by College Station Utilities (CSU). Domestic water and sanitary sewer service is available to serve the future development in this area, but additional infrastructure improvements may be needed with site development. A Traffic Impact Analysis (TIA) was not provided nor required with this request but is provided with the rezoning request. 4. Consistency with the goals and strategies set forth in the Plan: The goal for College Station’s Future Land Use and Character is to create a community with strong, unique neighborhoods, protected rural areas, special districts, distinct corridors, and a protected and enhanced natural environment. A relevant strategy identified to achieve this goal is to develop and maintain, through regular review, a land use plan that identifies, establishes, and enhances community character. The subject area is near property that was recently amended to General Commercial and property zoned GC General Commercial. This land use will also be more compatible with the Suburban Commercial land use across Corsair Circle that serves as a land use step down from the residential land use to the east. Additionally, the goals of economic development in College Station are to provide a diversified economy generating quality, stable, full-time jobs; bolstering the sales and property tax base; and contributing to a high quality of life. A relevant strategy identified to achieve this goal is to promote and support new investment that serve regional market opportunities. City staff has identified areas along State Highway 6 to provide opportunity for businesses that need highway access. While there will not be a City initiated Comprehensive Plan Amendment for this area, as properties closest to State Highway 6 are currently zoned GC General Commercial, staff recognizes the value of having General Commercial on the Future Land Use and Character Map at this intersection. The Map is conceptual in nature and this amendment will allow for the subject property to be rezoned keeping in character with adjacent property to the south. The current designation of Suburban Commercial is suitable for commercial uses that serve the nearby community and are compatible with residential uses. Since the subject property, Planning & Zoning Commission Page 8 of 10 April 6, 2017 and those surrounding, are currently entitled for a broader range of uses than would be allowed with Suburban Commercial, it is unlikely these properties will be downzoned in the future. An amendment to the Future Land Use and Character Map will be more in line with existing entitled uses and the regional opportunity provided by proximity to State Highway 6. 5. Consideration of the Future Land Use & Character and/or Thoroughfare Plans: The subject property is currently designated as Suburban Commercial on the Comprehensive Plan Future Land Use and Character Map. The proposed amendment is to General Commercial. The current land use of Suburban Commercial is intended for concentrations of commercial activities that cater primarily to nearby residents versus the larger community or region. Generally, these areas tend to be small in size and located adjacent to major roads (arterials and collectors). Design of Suburban Commercial structures is to be compatible in size, roof type and pitch, architecture, and lot coverage with the surrounding single-family residential use. The proposed land use of General Commercial is intended for concentrations of commercial activities that cater both to nearby residents and to the larger community or region. Generally, these areas tend to be large in size and located near the intersection of two regionally significant roads (arterials and freeways). Corsair Circle is designated a 2-lane major collector on the City’s Thoroughfare Plan. This collector was recently extended to Emerald Parkway. This extension now allows through connection from State Highway 6 to Emerald Parkway by way of Pavilion Avenue, also a 2- lane major collector. Given its location, the subject property is suitable for a General Commercial land use designation. 6. Compatibility with the surrounding area: The proposed amendment to General Commercial would allow for the property to be zoning for commercial uses that serve the general community and region. Properties to the south, along the frontage road and Pavilion Avenue are currently zoned GC General Commercial. Properties directly adjacent and to the southeast between the subject property and Emerald Forest Subdivision and Sebesta Road, are currently zoned M-1 Light Industrial which provides for office, research and development activities, as well as high technological, light manufacturing, non-polluting industries that are self-contained. Other specific potential uses include but are not limited to wholesales, scientific testing/research laboratory, facilities with outdoor storage for equipment and materials, and warehousing/distribution centers. Both of these zoning districts have been in place since the 1970s and these properties are entitled to develop under their current zoning districts. Existing businesses in the area include storage, office, and light manufacturing. Planning & Zoning Commission Page 9 of 10 April 6, 2017 Amending the Comprehensive Plan to General Commercial in this area would be more in line with the existing zoning in the area. A Comprehensive Plan Designation of Suburban Commercial would require the SC Suburban Commercial zoning district if these properties were to be rezoned in the future. That zoning district would allow fewer uses and require more intense development standards than what the properties are currently entitled to. With convenient access to State Highway 6, it is unlikely the properties will downzone to SC Suburban Commercial in the future. 7. Impacts on infrastructure including water, wastewater, drainage, and the transportation network: W ater service will be served by College Station Utilities. There is an existing 12-inch waterline along frontage of Earl Rudder Freeway, and an 8-inch water line along Corsair Drive. Sanitary Sewer service is available via existing 6-inch sewer main running in between the subject lots. Additionally, the property is in the Bee Creek drainage basin. Sites are generally draining towards frontage of Earl Rudder Freeway. Detention will be required with site development of vacant lots. Drainage and other public infrastructure required with site development shall be designed and constructed in accordance with the B/CS Unified Design Guidelines. A Traffic Impact Analysis is not required with this Comprehensive Plan Planning & Zoning Commission Page 10 of 10 April 6, 2017 Amendment. Infrastructure appears to have capacity to adequately serve the proposed change in land use at this time. 8. Impact on the City’s ability to provide, fund, and maintain services: The proposed amendment for the subject property does not negatively impact the City’s ability to provide, fund, and maintain services. 9. Impact on environmentally sensitive and natural areas: The subject property is located in the Bee Creek drainage basin. As lots within the subject area develop or redevelop, drainage will be studied. Additionally, detention will be required at the time of site development of vacant lots. 10. Contribution to the overall direction and character of the community as captured in the Plan’s vision and goals: The goal for College Station’s Future Land Use and Character is to create a community with strong, unique neighborhoods, protected rural areas, special districts, distinct corridors, and a protected and enhanced natural environment. The proposed amendment from Suburban Commercial to General Commercial on approximately 11.3 acres is in line with the Comprehensive Plan given that it will fulfill the economic development goals of the Comprehensive Plan. STAFF RECOMMENDATION Staff recommends approval of the Future Land Use and Character Map amendment request. SUPPORTING MATERIALS 1. Application 2. Comprehensive Plan Map City Hall 1101 Texas Ave College Station, TX 77840 College Station, TX Legislation Details (With Text) File #: Version:317-0157 Name:Emerald Point REZ Status:Type:Rezoning Agenda Ready File created:In control:3/27/2017 Planning and Zoning Commission Regular On agenda:Final action:4/6/2017 Title:Public hearing, presentation, possible action, and discussion regarding an ordinance amending Chapter 12, "Unified Development Ordinance," Section 12-4.2, "Official Zoning Map," of the Code of Ordinances of the City of College Station, Texas by changing the zoning district boundaries from M-1 Light Commercial to GC General Commercial and SC Suburban Commercial for approximately 16.8 acres being Lots 1-6 situated in the Emerald Point Subdivision, College Station, Brazos County, Texas, recorded in Volume 13606, Page 14 of the Official Public Records of Brazos County, Texas, generally located at 3005 Earl Rudder Freeway South and 3105 Corsair Circle. Case #REZ2017- 000001 (Note: Final action on this item is scheduled for the April 27, 2017 City Council meeting - subject to change) Sponsors:Jenifer Paz Indexes: Code sections: Attachments:Application Staff Report Rezoning Exhibit Letter of Concern Action ByDate Action ResultVer. Public hearing, presentation, possible action, and discussion regarding an ordinance amending Chapter 12, "Unified Development Ordinance," Section 12-4.2, "Official Zoning Map," of the Code of Ordinances of the City of College Station, Texas by changing the zoning district boundaries from M-1 Light Commercial to GC General Commercial and SC Suburban Commercial for approximately 16.8 acres being Lots 1-6 situated in the Emerald Point Subdivision, College Station, Brazos County, Texas, recorded in Volume 13606, Page 14 of the Official Public Records of Brazos County, Texas, generally located at 3005 Earl Rudder Freeway South and 3105 Corsair Circle. Case #REZ2017- 000001 (Note: Final action on this item is scheduled for the April 27, 2017 City Council meeting - subject to change) College Station, TX Printed on 3/31/2017Page 1 of 1 powered by Legistar™ Planning & Zoning Commission Page 1 of 10 April 6, 2017 REZONING REQUEST for Emerald Point Lots 1 thru 6 REZ2017-000001 REQUEST: M-1 Light Industrial to GC General Commercial (approximately 11.3 acres) and SC Suburban Commercial (approximately 5.5 acres) SCALE: Approximately 16.8 acres LOCATION: 3005 Earl Rudder Freeway South and 3105 Corsair Circle, more generally located at the southeast intersection of Earl Rudder Freeway S and Emerald Parkway and Corsair Drive. APPLICANT: Mike Gentry, West, Webb, Allbritton & Gentry, P.C. PROJECT MANAGER: Jenifer Paz, AICP Senior Planner jpaz@cstx.gov RECOMMENDATION: Staff recommends approval of the rezoning request. Planning & Zoning Commission Page 2 of 10 April 6, 2017 Planning & Zoning Commission Page 3 of 10 April 6, 2017 Planning & Zoning Commission Page 4 of 10 April 6, 2017 Planning & Zoning Commission Page 5 of 10 April 6, 2017 Planning & Zoning Commission Page 6 of 10 April 6, 2017 NOTIFICATIONS Advertised Commission Hearing Date: April 6, 2017 Advertised Council Hearing Date: April 27, 2017 The following neighborhood organizations that are registered with the City of College Station’s Neighborhood Services have received a courtesy notification of this public hearing: Emerald Forest HOA Foxfire HOA Property owner notices mailed: 30 Contacts in support: None at the time of staff report. Contacts in opposition: One (1) at the time of staff report. Resident of Emerald Forest Subdivision along Driftwood Drive has expressed concern and opposition to rezoning of Lot 6. Letter of objection is provided with the packet. Inquiry contacts: One (1) at the time of staff report ADJACENT LAND USES Direction Comprehensive Plan Zoning Land Use North (across Emerald Parkway) Suburban Commercial O Office Office/Medical Office South Suburban Commercial & General Commercial M-1 Light Industrial & GC General Commercial Vacant East (across Corsair Drive) Suburban Commercial M-1 Light Industrial Vacant West N/A N/A Earl Rudder Freeway DEVELOPMENT HISTORY Annexation: 1971 & 1977 Zoning: M-1 Light Industrial Final Plat: Emerald Point Subdivision Lot 1-6 Site development: Property is partially vacant and undeveloped. Lot 2, 3 and 5 (approximately 6.1 acres) are developed as office uses. The remainder (lots 1, 4 and 6) is vacant. Planning & Zoning Commission Page 7 of 10 April 6, 2017 REZONING REVIEW CRITERIA 1. Consistency with the Comprehensive Plan: It should be noted lots 1 thru 5 are under consideration for a Comprehensive Plan amendment from Suburban Commercial to General Commercial. If the amendment is approved the rezoning request will be in compliance. If denied, the GC General Commercial zoning request will not be in compliance with the Comprehensive Plan. Lot 6, proposed to be rezoned to SC Suburban Commercial, is presently in compliance with the land use designation in the Comprehensive plan and therefore is not part of the Comprehensive Plan amendment. The proposed designation, General Commercial, is intended for concentrations of commercial activities that cater both to nearby residents and to the larger community or region. Generally, these areas tend to be large in size and located near the intersection of two regionally significant roads (arterials and freeways). The proposed land use designation would allow for the proposed GC General Commercial zoning district on Lots 1-5, at the corner of Emerald Parkway (arterial) and the frontage road (freeway). Suburban Commercial, the existing land use designation, is intended for concentrations of commercial activities that cater primarily to nearby residents rather than the larger community or region. Generally, these areas tend to be small in size and located adjacent to major roads (arterials and collectors). The design of Suburban Commercial structures Planning & Zoning Commission Page 8 of 10 April 6, 2017 are compatible in size, roof type and pitch, architecture, and lot coverage with surrounding single-family residential uses. Lot 6 is not suited for GC General Commercial given the broad land uses allowed and design requirement not consistent with single-family residential uses. The SC Suburban Commercial, zoning proposed on Lot 6, along Corsair Drive (collector), is consistent with this land use designation given the zoning district requires low-density commercial uses to be compatible with the character of adjacent suburban single-family neighborhoods. 2. Compatibility with the present zoning and conforming uses of nearby property and with the character of the neighborhood: The current zoning district of the subject properties is M-1 Light Industrial, which allows for office, research and development activities, as well as high technological, light manufacturing, non-polluting industries that are self-contained. Other specific potential uses include but are not limited to wholesales, scientific testing/research laboratory, facilities with outdoor storage for equipment and materials, and warehousing/distribution centers. Due to the nature of the uses permitted in M-1 Light Industrial, developments are exempt from the Non-Residential Architectural Standards of the Unified Development Ordinance, which among other architectural standards regulates building materials. The proposed amendment to GC General Commercial, for Lots 1-5, would allow for commercial purposes, such as retail sales and service uses that function to serve the entire community and its visitors. To the south, properties along the frontage road and Pavilion Avenue, are zoned GC General Commercial. Properties directly adjacent of the subject lots, are zoned M-1 Light Industrial. Both of these zoning districts have been in place since the 1970s and these properties are entitled to develop under their current zoning districts. Existing businesses in the area include storage, office, and light manufacturing. The proposed SC Suburban Commercial zoning district, on Lot 6, will be directly abutting the single-family lot of Emerald Forest Subdivision zoned GS General Suburban. This zoning district will allow for low-density commercial uses that provide services to nearby neighborhoods and is intended to be compatible with the character of neighborhoods. The district allows for a range of uses, with the impacts mitigated through buffering and architecture of the building. GC General Commercial zoning proposed on Lots 1-5, at the intersection of the frontage road and Emerald Parkway (arterial), is consistent in character with the existing GC General Commercial in the vicinity. Additionally, the existing uses on the subject properties, permitted under M-1 Light Industrial, will be conforming to the proposed zoning and compatible with uses of nearby property. The SC Suburban Commercial zoning district proposed on Lot 6, serves as a step-down zoning between the proposed GC General Commercial and the abutting single-family residential. The proposed zoning district is better suited on this lot than the existing zoning of M-1 Light Industrial, which is not compatible with the abutting residential lots. 3. Suitability of the property affected by the amendment for uses permitted by the district that would be made applicable by the proposed amendment: Lots 1-5 are located at the intersection of Earl Rudder Freeway and an arterial street, Emerald Parkway. Lots 2 and 5 also have access to Corsair Drive, a collector street. Corsair Circle was recently extended to Emerald Parkway and now provides access to through traffic from the frontage road by way of Pavilion Avenue, also a collector. General commercial uses are Planning & Zoning Commission Page 9 of 10 April 6, 2017 generally more appropriate adjacent to freeways and arterial thoroughfares because they tend to serve both nearby residential and the larger region. Due to its location, lots 1-5 are suitable for general commercial uses. Lot 6 is abutting Emerald Forest Subdivision, a medium density single-family residential neighborhoods, and has frontage only to Corsair Drive. The property also has direct access to the Earl Rudder Freeway via Emerald Parkway and from Pavilion Avenue. Suburban Commercial uses tend to be more appropriate for properties with access to major roadways but also near residential neighborhoods they serve. Additionally, the SC Suburban Commercial zoning serves as a step down zoning from the proposed GC General Commercial, given its mitigations required in the zoning district. 4. Suitability of the property affected by the amendment for uses permitted by the district applicable to the property at the time of the proposed amendment: The subject lots are partially developed as office uses, with the remainder vacant and undeveloped. The current zoning district allows uses such as office, research and development activities, as well as high technological, light manufacturing, non-polluting industries that are self- contained. This could also include uses such as, but not limited to, wholesales, scientific testing/research laboratory, facilities with outdoor storage for equipment and materials, and warehousing/distribution centers. Given the properties direct access to Earl Rudder Freeway and within a half-mile of several residential neighborhoods (Emerald Forest, Sandstone, and Foxfire), the site is suitable for uses that provide goods and service to the nearby residents and general community. Additionally, given the nature of the existing zoning district, M-1 Light Industrial, the proposed zoning district on Lot 6, SC Suburban Commercial, will provide aesthetic compatibility with the abutting residential properties. 5. Marketability of the property affected by the amendment for uses permitted by the district applicable to the property at the time of the proposed amendment: The subject property, and the adjacent lots are marketable under the current designations due to their locations on City Thoroughfares. The applicant has indicated the properties proximity to Emerald Forest Subdivision, the marketability of the property for many potential light industrial uses is limited and an incompatible use. 6. Availability of water, wastewater, stormwater, and transportation facilities generally suitable and adequate for the proposed use: Water service will be served by College Station Utilities. There is an existing 12-inch waterline along frontage of Earl Rudder Freeway, and an 8-inch water line along Corsair Drive. Sanitary Sewer service is available via existing 6-inch sewer main running in between the subject lots. Additionally, the property is in the Bee Creek drainage basin. Sites are generally draining towards frontage of Earl Rudder Freeway. Detention will be required with site development of vacant lots. Drainage and other public infrastructure required with site development shall be designed and constructed in accordance with the B/CS Unified Design Guidelines. Existing utility infrastructure appears to have capacity to adequately serve the proposed change of use at this time. Planning & Zoning Commission Page 10 of 10 April 6, 2017 The subject properties have frontage to the following roadways on the Thoroughfare Plan: Earl Rudder Freeway S, a Freeway; Emerald Parkway, a four-lane Minor Arterial in this area; and Corsair Drive, a two-lane Major Collector. A traffic impact analysis (TIA) was submitted that analyzed the following 8 street intersections for traffic-related impact as a result of potential development and redevelopment of the properties: Harvey Mitchell Parkway/SH 6 Southbound Frontage Road; Emerald Parkway/ SH 6 Northbound Frontage Road; Emerald Parkway/Emerald Plaza; Emerald Parkway/Corsair Drive; Emerald Parkway with Driftwood Drive/Amber Ridge Drive; Corsair Drive/Pavilion Avenue; Pavilion Avenue/Sebesta Road; and Pavilion Avenue/SH 6 Northbound Frontage Road. The TIA also analyzed 4 intersections with existing and future driveways: Emerald Parkway/existing driveway #1; Emerald Parkway/existing driveway #2; Corsair Drive/future driveway #1; and SH 6 Northbound Frontage Road/future driveway #2. The TIA found that all intersections operated at an acceptable level of service except for the Emerald Parkway/Harvey Mitchell Parkway intersections with the Earl Rudder Freeway northbound and southbound frontage roads at a point 5-years in the future with assumed traffic growth and development in the area. The TIA provided a scenario where a traffic signal is installed in the future and showed the intersections would operate at better level of service. A traffic signal is not needed at this time and should be installed in the future when warranted based on guidelines in the Manual of Uniform Traffic Control Devices (MUTCD). Unlike traffic signals along other TxDOT roadways within the City limits, Earl Rudder traffic signals are operated by TxDOT. They have indicated a traffic signal would be installed if warranted in the future. STAFF RECOMMENDATION Staff recommends approval of the rezoning request. SUPPORTING MATERIALS 1. Application 2. Rezoning Map 3. Letter of Opposition (8908 Driftwood Dr.) From:hb2pvalen@suddenlink.net To:Jenifer Paz Subject:ReZoning of Lot 6 on Corsair Date:Sunday, March 26, 2017 5:29:26 PM ***** This is an email from an EXTERNAL source. DO NOT click links or open attachments without positive sender verification of purpose. Never enter USERNAME, PASSWORD or sensitive information on linked pages from this email. ***** Jennifer, I would like to express my concerns for the rezoning of Lot 6 of Emerald Point Subdivision which is located directly adjacent to Emerald Forest Subdivision. I live at 8908 Driftwood Drive and I am already seeing additional run off of water since the construction of Nu Tech building on Corsair. The natural flow of the land is to the southeast corner of this property and also the property known as Lot 6. There are residents that would like a brick/stone wall built between EF subdivision and offices or whatever is constructed to act as a buffer. If this is done it would be beneficial for the homeowners next to the wall. The wall would not continue all the way to Sebesta Road which is where water flows to go to the creek which is a tributary to Carter Creek. This is a major concern to me. Water would tend to flow southeast and hit the wall and go directly toward the property owners of Emerald Forest at the southeast corner. I would like to request that a wall not only be built to buffer the EF homeowners, but also be built on the southeast corner between the current buildings and this lot. Please consider all issues when rezoning this property and all issues of how to keep our properties from flooding. Sincerely, Patty Valen 8908 Driftwood Drive (residence) College Station, Texas 8907 Driftwood Drive (rental property) City Hall 1101 Texas Ave College Station, TX 77840 College Station, TX Legislation Details (With Text) File #: Version:117-0137 Name:Water Master Plan Update Status:Type:Comprehensive Plan Agenda Ready File created:In control:3/24/2017 Planning and Zoning Commission Regular On agenda:Final action:4/6/2017 Title:Public hearing, presentation, possible action, and discussion regarding an ordinance to amend the Comprehensive Plan by adopting the updated Water System Master Plan . Case #CPA2017-000003 (Note: Final action on this item is scheduled for the April 27, 2017 City Council meeting - subject to change) Sponsors:David Coleman Indexes: Code sections: Attachments:Memo - Water MP Implementation Plan - Water Action ByDate Action ResultVer. Public hearing, presentation, possible action, and discussion regarding an ordinance to amend the Comprehensive Plan by adopting the updated Water System Master Plan . Case #CPA2017-000003 (Note: Final action on this item is scheduled for the April 27, 2017 City Council meeting - subject to change) College Station, TX Printed on 3/31/2017Page 1 of 1 powered by Legistar™ Planning & Development Services  1101 Texas Avenue, PO Box 9960  College Station, TX 77840 Office 979.764.3570 / Fax 979.764.3496 MEMORANDUM March 13, 2017 TO: Members of the Planning & Zoning Commission FROM: David Coleman, Director of Water Services SUBJECT: Comprehensive Plan Amendment – Water System Master Plan Item: Public hearing, presentation, discussion, and possible action to consider an ordinance to amend the Comprehensive Plan by adopting the updated Water System Master Plan. Summary: The proposed ordinance would adopt an updated Water System Master Plan, as a component of the Comprehensive Plan, which was updated in 2015. The new master plan reflects water lines needed as development occurs to serve growth corridors and existing areas where water lines are in need of rehabilitation. The updated master plan also identifies major water line connections needed within the existing system that will allow the water production system and the distribution system to operate more efficiently and also abide by all TCEQ regulations. The line locations and sizes have been determined through system models produced by engineering consultants in coordination with the College Station Water Service Department. The water master plan maps identify water lines to be constructed by private development as it occurs, with the opportunity for oversize participation. The respective plan maps are the result of various engineering studies performed for the City over the last 10 years. The utility line sizes are based on existing development trends and the current comprehensive land use plan. Property owners requesting land use plan amendments and/or zoning map amendments (rezoning) will be required to assess the impact of the amendment with regard to the Water Master Plans and propose changes as necessary. Attachments: 1. The Water System Master Plan is on file at the City Secretary’s Office 2. Implementation Plan 2016 Water Master Plan – Implementation & Administration This Water Master Plan is being formulated to support the long term needs and goals of the City as envisioned in the Comprehensive Plan. This section summarizes the methodology to turn recommendations into reality to ensure that the potable water needs of the community are met as the City grows and changes over the next decade. This section outlines the timeframe envisioned by this plan, the roles of the various parties involved in its implementation, provides an overview of the costs associated with the plan and begins the discussion of how these costs will be funded, details how the plan will be implemented, and finally explains how the plan will be monitored over time and kept relevant. Timeframe of Master Plan Implementation of the Water Master Plan is anticipated to take ten or more years and is expected to lay the foundation for the next several decades of the city’s on-going efforts at delivering the citizen’s a safe and reliable potable water supply. Many outside influences directly impact the City’s ability to obtain adequate water supply, such as: Permit requirements from the Brazos Valley Groundwater Conservation District; The potential System Operations Permit for the Brazos River Authority; State legislation on groundwater systems; Pumping by other water providers in the Simsboro aquifer; Establishment of a Desired Future Condition for the Simsboro aquifer by Groundwater Management Area #12 Board; Provisions of the Region G and State Water Plan adopted by the Texas Water Development Board; and regulation promulgated by the Texas Commission on Environmental Quality. These factors will be monitored closely over the next decade and beyond, and this plan will be updated as any legislative or regulatory initiatives dictate. Implementation and Coordination Roles A variety of parties will need to be involved in the implementation of this plan to realize its successful completion. This includes various government departments as well as development interests and residents and business owners. Outlined in the following are several of the key parties and the types of actions in which they should participate. City Council will take the lead in the following areas:  Adopt and amend the Water Master Plan by ordinance after receiving recommendations from the Planning & Zoning Commission;  Support and champion the Plan;  Adopt new or amended ordinances and regulations to implement the Plan;  Approve inter-local agreements that implement the Plan;  Consider and approve the funding commitments that will be required to implement the Plan;  Provide final approval of projects and activities with associated costs during the budget process;  Adopt and amend policies that support and help implement the Plan  Conduct an annual public hearing regarding the implementation of this Plan; and  Provide policy direction to the Planning & Zoning Commission, other appointed City boards and commissions, and City staff Planning & Zoning Commission will take the lead in the following areas:  Recommend changes in codes and standards to the City Council that reflect the goals and action items;  Make recommendations regarding the Plan for subsequent approval and adoption by the City Council;  Review Capital Improvement Plans and make recommendations to the City Council;  Conduct an annual public hearing regarding the implementation of this Plan;  Function as the City’s Capital Improvement Advisory Committee (CIAC) to make recommendations regarding possible Impact Fees, and  Review development applications for consistency with this Plan and the Comprehensive Plan. City Staff will take the lead in the following areas:  Manage day-to-day implementation of the Plan;  Support and carry out capital improvement plan efforts and programming;  Manage the drafting of new or amended regulations and ordinances that further the goals of the Plan;  Conduct necessary studies and develop additional plans where appropriate;  Review development applications for consistency with this Plan and the Comprehensive Plan;  Negotiate the details of any necessary inter-local agreements;  Administer collaborative programs and ensure open channels of communication with various private, public, and non-profit implementation partners; and  Maintain an inventory of potential plan amendments as suggested by City staff and others for consideration during annual and periodic plan review and updates to the Planning & Zoning Commission and City Council. City Residents, Development Interests, Business Owners, and others will take the lead in the following areas:  Support and implement the plan;  Develop and carry-out development projects consistent with this Plan and the Comprehensive Plan;  Assist in the monitoring of the Plan and participate in the annual review process of the Plan, and  Assist staff in developing new programs and project opportunities to aid in implementation of the Plan. Costs and Funding Understanding and accurately projecting the costs of implementing this Plan are critical to its success. Failure to adequately project costs and secure funding to implement this Plan could both impact the dependability of the City’s potable water supply and could constrain future development opportunities. Costs were projected for design, construction and maintenance of the facilities contained within this Plan. Please note that the new facilities listed below are dictated by TCEQ Regulation for public water supply systems, based on certain demand parameters, and will be mandatory as the City’s water demand increases. The Rehabilitation projects are necessary to keep customer service at a high standard, which includes water service dependability and water quality (such as taste, color, etc). These projections should only be used as a preliminary guide with further study needed to arrive at more accurate cost projections. Figure 1 provides cost projections for facilities providing additional system capacity and for rehabilitation of aging infrastructure. Costs associated with each facility are provided based on 2010 dollars. As noted, additional detailed analysis will be needed to ensure all factors and issues are considered before actually developing a project budget and allocating funds. Figure 1 - CIP SUMMARY Figure 2 – REHABILITATION SUMMARY The availability of funding to implement the Plan will play an integral role in its success. Historically, the development of the City’s potable water supply and distribution system has been accomplished by developers installing water system components within a new development, and the City funding the major system components like water wells and collection/transmission lines. Under this system, expansions of the capacity of the water supply system have relied solely on the rate payers. Due to budget constraints, concerns with rates, etc. it is increasingly becoming expected that capacity related expansions (production, treatment, and distribution) will rely upon development activities for funding and implementation. The exclusive source of funding for implementation of this Plan is the Water Fund, which is an Enterprise Fund within the City. The Water Fund obtains revenue from the following sources:  Revenue collected by rates assessed to the system users  Various Fees charged to individuals, primarily developers, including Impact Fees  Utility Revenue Bonds – Issued as needed for long-term assets  Certificates of Obligation – Issued as needed to long-term assets  Other sources that may be used by Council action, such as: o Public Improvement Districts – These districts use property assessments to finance public improvement projects within a specified area, or district. Properties within the designated area are generally assessed proportional to the assessed value of their property. The additional funds would be used to fund a specific public improvement project. o Tax Increment Financing Districts – These districts use taxes generated from redevelopment through private investment to finance public improvement projects within the specified district. o State and Federal Governments/Grants – Funding opportunities from the state and federal government are also available. Implementation Methods The recommendations described in this Plan will require several methods to progress from a concept into constructed facilities and programs. This section provides a description of each of these methods: Policy, Regulations, and Standards For the City’s water system to meet future demands and keep pace with the City’s growth and development, adopting clear policies, regulations, and standards that support the goals and actions of this Plan and the Comprehensive Plan are vital, particularly in light of existing budgetary challenges and the limited supply of water. As development occurs, land use, development, and utility policies, regulations, and standards can have a positive and long-lasting impact. Adopting and amending existing policies, regulations, and standards will be necessary to successfully implement this Plan. One recent example of such an action was the City’s decision to adopt a conservation rate approach to pricing the demand on the potable water supply. Future examples will include consideration of a city-wide water utility impact fee and expansion of xeriscape options for development landscaping. Capital Improvements Programming A Capital Improvements Program is a multi-year plan (in College Station typically five years in length) that identifies budgeted capital projects such as water mains and wells and the purchase of major equipment. Identifying and budgeting for major capital improvements is essential to implementing this Plan. Decisions regarding the prioritization of proposed capital improvements should be directly based on the guidance provided in this Plan and in the Comprehensive Plan. Special projects, programs, and initiatives Special projects, programs, and initiatives include initiating or adjusting City programs, interlocal agreements, citizen participation programs, training, and other types of special projects that will further the successful implementation of this plan. Two good examples currently used by the City is the current efforts at water conservation education and the water reclamation project. Plan Administration The development of this Plan involved time and input by various agencies, departments, staff, and stakeholders. These parties must maintain their commitment and be given opportunities to remain involved to successfully implement this Plan. Most importantly, the plan must remain relevant, addressing the needs of today while preparing for those of the future. The City’s Comprehensive Plan is built on the assumption that the City’s various neighborhood, corridor, district, and master plans expect nothing less. It is critical that the City Council remain active in monitoring and evaluating the Plan and where necessary, making adjustments. Monitoring & Evaluation As part of any planning process, on-going evaluation must be incorporated into the implementation program. Continued evaluation of conditions and opportunities associated with the City’s water system allows the plan to adapt and remain relevant over the course of the Plan’s life. Successful evaluation incorporates the establishment of descriptive indicators that track the efficacy of the proposed actions, understanding changed conditions, and potential reprioritization of actions and funding based on the findings of the evaluation. Annual Report To ensure the on-going relevance of the Water Master Plan, the Plan should be evaluated annually. This annual evaluation should include at least the following components:  Updated existing conditions;  Progress toward reaching goals, as determined through specific indicators;  Report on any completed actions;  Status updates of all actions underway for the current implementation period;  Outline of remaining actions scheduled for the remainder of the current implementation period;  Potential changes to costs, and  Recommendations for changes in implementation schedule or actions.  Stakeholders, the Planning and Zoning Commission, and the City Council should be involved in the annual review of the Plan. Interim Amendments Occasionally, it may be necessary to consider a minor amendment independent of the annual review. In such instances, the amendments should be tested for consistency with the goals stated in this Plan as well as the Comprehensive Plan. Specific care should be used to guard against changes that are site- specific that could negatively impact adjacent areas and uses. Factors worth considering when processing such interim amendments should at a minimum include:  Consistency with the goals and strategies set forth in this Plan and the Comprehensive Plan;  Further the objectives of the Future Land Use & Character Plan, the Thoroughfare Plan, and any adopted neighborhood, corridor, or district plan;  Promote a land use pattern compatible with the surrounding area;  Impact on other infrastructure systems;  Impact on the City’s ability to fund and maintain the necessary service;  Impact on environmentally sensitive and natural areas, and  Contribution to the overall direction and character of the community as captured in the Comprehensive Plan’s vision and goals. Five-Year Update An evaluation and appraisal report should be prepared every five years by the City with input from various department, the Planning and Zoning Commission, stakeholders, and any other appropriate boards and commissions. The report should involve evaluation of the existing plan and assessing how successful it has been in achieving the stated goals. The purpose of the report is to identify the successes and shortcomings of the Plan, consider changing conditions, and recommend appropriate modifications; at a detail much more substantial than that associated with the annual review. At a minimum, this report should include detailed information on the following:  Major actions and interim plan amendments undertaken over the preceding five years;  Major water-related trends in the community and how these have changed over time;  Changes in the assumptions and base study data, and  Ability of the Plan to continue to support progress toward achieving the community’s goals CONCLUSION The implementation of this Water Master Plan relies primarily on two factors:  The pace of development within the City’s water service area, and  The willingness of City Council to generate the revenue to fund the infrastructure requirements generated by that development, while properly maintaining the existing system The infrastructure needs are clearly defined by TCEQ Regulation, based on population and water demands. This plan anticipates those needs, and defines the infrastructure requirements that are consistent with the Comprehensive Plan. As always, the City’s goal is to provide outstanding utility services to our customers, and this plan will help us achieve that goal. City Hall 1101 Texas Ave College Station, TX 77840 College Station, TX Legislation Details (With Text) File #: Version:217-0142 Name:Wastewater Master Plan Status:Type:Comprehensive Plan Agenda Ready File created:In control:3/24/2017 Planning and Zoning Commission Regular On agenda:Final action:4/6/2017 Title:Public hearing, presentation, possible action, and discussion regarding an ordinance to amend the Comprehensive Plan by adopting the updated Wastewater Master Plan . Case #CPA2017-000003 (Note: Final action on this item is scheduled for the April 27, 2017 City Council meeting - subject to change) Sponsors:David Coleman Indexes: Code sections: Attachments:Memo - Wastewater MP Implementation Plan - WW Action ByDate Action ResultVer. Public hearing, presentation, possible action, and discussion regarding an ordinance to amend the Comprehensive Plan by adopting the updated Wastewater Master Plan. Case #CPA2017-000003 (Note: Final action on this item is scheduled for the April 27, 2017 City Council meeting - subject to change) College Station, TX Printed on 3/31/2017Page 1 of 1 powered by Legistar™ Planning & Development Services  1101 Texas Avenue, PO Box 9960  College Station, TX 77840 Office 979.764.3570 / Fax 979.764.3496 MEMORANDUM March 13, 2017 TO: Members of the Planning & Zoning Commission FROM: David Coleman, Director of Water Services SUBJECT: Comprehensive Plan Amendment – Wastewater Master Plan Item: Public hearing, presentation, discussion, and possible action to consider an ordinance to amend the Comprehensive Plan by adopting the updated Wastewater Master Plan. Summary: The proposed ordinance would adopt an updated Wastewater System Master Plan, as a component of the Comprehensive Plan, which was updated in 2016. The new master plan reflects sewer lines needed as development occurs to serve growth corridors and existing areas where sewer lines are in need of rehabilitation. The updated master plan also identifies major sewer line connections needed within the existing system that will allow the wastewater collection system and treatment plants to operate more efficiently and also abide by all TCEQ regulations. The line locations and sizes have been determined through system models produced by engineering consultants in coordination with the College Station Water Service Department. The wastewater master plan maps identify sewer lines to be constructed by private development as it occurs, with the opportunity for oversize participation. The plan addresses future utility needs within the City as well as areas where the City has the Certificate of Public Convenience and Necessity for wastewater service. The respective plan maps are the result of various engineering studies performed for the City over the last 10 years. The utility line sizes are based on existing development trends and the current comprehensive land use plan. Property owners requesting land use plan amendments and/or zoning map amendments (rezoning) will be required to assess the impact of the amendment with regard to the Wastewater Master Plans and propose changes as necessary. Attachments: 1. The Wastewater Master Plan is on file at the City Secretary’s Office 2. Implementation Plan 2016 Wastewater Master Plan - Implementation & Administration This Wastewater Master Plan is being formulated to support the long term needs and goals of the City as envisioned in the Comprehensive Plan. This section summarizes the methodology to turn recommendations into reality to ensure that the wastewater collection/treatment needs of the community are met as the City grows and changes over the next decade. This section outlines the timeframe embraced by this plan, the roles of the various parties involved in its implementation, provides an overview of the costs associated with the plan, begins the discussion of how these costs will be funded, details how the plan will be implemented, and finally explains how the plan will be monitored over time and kept relevant. Timeframe of Master Plan Implementation of the Wastewater Master Plan is anticipated to take ten or more years and is expected to lay the foundation for the next several decades of the city’s on-going efforts at delivering the citizen’s a reliable wastewater collection/treatment system. Many outside influences directly impact the City’s ability to provide adequate a wastewater collection/treatment, such as: The potential nutrient removal parameters/permit requirements from the Texas Commission on Environmental Quality; Updated state/federal design regulations on expanding treatment plant capacities; More dense developments depicted in the comprehensive plan that require larger collections lines to be installed; etc. These factors will be monitored closely over the next decade and beyond, and this plan will be updated as any initiatives dictate. Implementation and Coordination Roles A variety of parties will need to be involved in the implementation of this plan to realize its successful completion. This includes various government departments as well as development interests and residents and business owners. Outlined in the following are several of the key parties and the types of actions in which they should participate. City Council will take the lead in the following areas:  Adopt and amend the Wastewater Master Plan by ordinance after receiving recommendations from the Planning & Zoning Commission;  Support and champion the Plan;  Adopt new or amended ordinances and regulations to implement the Plan;  Approve inter-local agreements that implement the Plan;  Consider and approve the funding commitments that will be required to implement the Plan;  Provide final approval of projects and activities with associated costs during the budget process;  Adopt and amend policies that support and help implement the Plan  Conduct an annual public hearing regarding the implementation of this Plan; and  Provide policy direction to the Planning & Zoning Commission, other appointed City boards and commissions, and City staff Planning & Zoning Commission will take the lead in the following areas:  Recommend changes in codes and standards to the City Council that reflect the goals and action items;  Make recommendations regarding the Plan for subsequent approval and adoption by the City Council;  Review Capital Improvement Plans and make recommendations to the City Council;  Conduct an annual public hearing regarding the implementation of this Plan;  Function as the City’s Capital Improvement Advisory Committee (CIAC) to make recommendations regarding possible Impact Fees, and  Review development applications for consistency with this Plan and the Comprehensive Plan. City Staff will take the lead in the following areas:  Manage day-to-day implementation of the Plan;  Support and carry out capital improvement plan efforts and programming;  Manage the drafting of new or amended regulations and ordinances that further the goals of the Plan;  Conduct necessary studies and develop additional plans where appropriate;  Review development applications for consistency with this Plan and the Comprehensive Plan;  Negotiate the details of any necessary inter-local agreements;  Administer collaborative programs and ensure open channels of communication with various private, public, and non-profit implementation partners; and  Maintain an inventory of potential plan amendments as suggested by City staff and others for consideration during annual and periodic plan review and updates to the Planning & Zoning Commission and City Council. City Residents, Development Interests, Business Owners, and others will take the lead in the following areas:  Support and implement the plan;  Develop and carry-out development projects consistent with this Plan and the Comprehensive Plan;  Assist in the monitoring of the Plan and participate in the annual review process of the Plan, and  Assist staff in developing new programs and project opportunities to aid in implementation of the Plan. Costs and Funding Understanding and accurately projecting the costs of implementing this Plan are critical to its success. Failure to adequately project costs and secure funding to implement this Plan could both impact the dependability of the City’s wastewater collection and treatment, which could constrain future development opportunities. Costs were projected for design, construction and maintenance of the facilities contained within this Plan. These projections should only be used as a preliminary guide with further study needed to arrive at more accurate cost projections. Figure 1 - CIP SUMMARY Figure 2 – REHABILITATION SUMMARY The availability of funding to implement the Plan will play an integral role in its success. Historically, the development of the City’s wastewater treatment/collection has been accomplished by developers installing wastewater system components within a new development, and the City funding the major system components like treatment plants and trunk lines. Under this system, expansion of the capacity of the wastewater treatment plants and large trunk line networks has relied solely on the rate payers. Due to budget constraints, concerns with rates, etc. it is increasingly becoming expected that capacity related expansions (collection, treatment) will rely upon development activities for funding and implementation. The exclusive source of funding for implementation of this Plan is the Wastewater Fund, which is an Enterprise Fund within the City. The Wastewater Fund obtains revenue from the following sources:  Revenue collected by rates assessed to the system users  Various Fees charged to individuals, primary developers, including Impact Fees  Utility Revenue Bonds – Issued as needed for long-term assets  Certificates of Obligation – Issued as needed to long-term assets  Other sources that may be used by Council action: o Public Improvement Districts – These districts use property assessments to finance public improvement projects within a specified area, or district. Properties within the designated area are generally assessed proportional to the assessed value of their property. The additional funds would be used to fund a specific public improvement project. o Tax Increment Financing Districts – These districts use taxes generated from redevelopment through private investment to finance public improvement projects within the specified district. o State and Federal Governments/Grants – Funding opportunities from the state and federal government are also available. Implementation Methods The recommendations described in this Plan will require several methods to progress from a concept into constructed facilities and programs. This section provides a description of each of these methods: Policy, Regulations, and Standards For the City’s wastewater system to meet future demands and keep pace with the City’s growth and development, adopting clear policies, regulations, and standards that support the goals and actions of this Plan and the Comprehensive Plan are vital, particularly in light of existing budgetary challenges and the increased demand on the existing system. As development occurs, land use, development, and utility policies, regulations, and standards can have a positive and long-lasting impact. Adopting and amending existing policies, regulations, and standards will be necessary to successfully implement this Plan. For example, we must consider the long-range impacts of new restrictions on our Discharge Permits, such a Nutrient Removal. If TCEQ places further restrictions on Nitrogen or Phosphorous concentrations, then major components of the treatment system would need to be added, at significant capital cost. Capital Improvements Programming A Capital Improvements Program is a multi-year plan (in College Station typically five years in length) that identifies budgeted capital projects such as wastewater trunk lines, treatment plant capacity expansions, and the purchase of major equipment. Identifying and budgeting for major capital improvements is essential to implementing this Plan. Decisions regarding the prioritization of proposed capital improvements should be directly based on the guidance provided in this Plan and in the Comprehensive Plan. Special projects, programs, and initiatives Special projects, programs, and initiatives include initiating or adjusting City programs, inter-local agreements, citizen participation programs, training, and other types of special projects that will further the successful implementation of this plan. Plan Administration The development of this Plan involved time and input by various agencies, departments, staff, and stakeholders. These parties must maintain their commitment and be given opportunities to remain involved to successfully implement this Plan. Most importantly, the plan must remain relevant, addressing the needs of today while preparing for those of the future. The City’s Comprehensive Plan is built on the assumption that the City’s various neighborhood, corridor, district, and master plans expect nothing less. It is critical that the City Council remain active in monitoring and evaluating the Plan and where necessary, making adjustments. Monitoring & Evaluation As part of any planning process, on-going evaluation must be incorporated into the implementation program. Continued evaluation of conditions and opportunities associated with the City’s wastewater system allows the plan to adapt and remain relevant over the course of the Plan’s life. Successful evaluation incorporates the establishment of descriptive indicators that track the efficacy of the proposed actions, understanding changed conditions, and potential reprioritization of actions and funding based on the findings of the evaluation. Annual Report To ensure the on-going relevance of the Wastewater Master Plan, the Plan should be evaluated annually. This annual evaluation should include at least the following components:  Updated existing conditions;  Progress toward reaching goals, as determined through specific indicators;  Report on any completed actions;  Status updates of all actions underway for the current implementation period;  Outline of remaining actions scheduled for the remainder of the current implementation period;  Potential changes to costs, and  Recommendations for changes in implementation schedule or actions.  Stakeholders, the Planning and Zoning Commission, and the City Council should be involved in the annual review of the Plan. Interim Amendments Occasionally, it may be necessary to consider a minor amendment independent of the annual review. In such instances, the amendments should be tested for consistency with the goals stated in this Plan as well as the Comprehensive Plan. Specific care should be used to guard against changes that are site- specific that could negatively impact adjacent areas and uses. Factors worth considering when processing such interim amendments should at a minimum include:  Consistency with the goals and strategies set forth in this Plan and the Comprehensive Plan;  Further the objectives of the Future Land Use & Character Plan, the Thoroughfare Plan, and any adopted neighborhood, corridor, or district plan;  Promote a land use pattern compatible with the surrounding area;  Impact on other infrastructure systems;  Impact on the City’s ability to fund and maintain the necessary service;  Impact on environmentally sensitive and natural areas, and  Contribution to the overall direction and character of the community as captured in the Comprehensive Plan’s vision and goals. Five-Year Update An evaluation and appraisal report should be prepared every five years by the City with input from various department, the Planning and Zoning Commission, stakeholders, and any other appropriate boards and commissions. The report should involve evaluation of the existing plan and assessing how successful it has been in achieving the stated goals. The purpose of the report is to identify the successes and shortcomings of the Plan, consider changing conditions, and recommend appropriate modifications; at a detail much more substantial than that associated with the annual review. At a minimum, this report should include detailed information on the following:  Major actions and interim plan amendments undertaken over the preceding five years;  Major wastewater-related trends in the community and how these have changed over time;  Changes in the assumptions and base study data, and  Ability of the Plan to continue to support progress toward achieving the community’s goals CONCLUSION The implementation of this Wastewater Master Plan relies primarily on two factors:  The pace of development within the City’s wastewater service area, and  The willingness of City Council to generate the revenue to fund the infrastructure requirements generated by that development, while properly maintaining the existing system The infrastructure needs are clearly defined by TCEQ Regulation, based on population and wastewater demands. This plan anticipates those needs, and defines the infrastructure requirements that are consistent with the Comprehensive Plan. As always, the City’s goal is to provide outstanding utility services to our customers, and this plan will help us achieve that goal.