HomeMy WebLinkAboutFY 2010-2011 Capital Improvements Program Budgetwww.cstx.gov City of College Station CAPITAL IMPROVEMENTS PROGRAM BUDGET FOR FISCAL YEAR 2011 OCTOBER 1, 2010 to SEPTEMBER 30, 2011 Home of Texas A&M University ® TABLE OF CONTENTS Executive Summary ............................................................................................................. 1 General Government Capital Improvement Projects Streets, Traffic, Sidewalks and Trails ........................................................................ 11 Street Rehabilitation Projects ................................................................... 16 Street Extension Projects ......................................................................... 20 Street TxDOT Projects ............................................................................. 37 Traffic Projects ......................................................................................... 42 Sidewalks and Trails ................................................................................ 59 CDBG Funded Street Projects ................................................................. 69 Parks and Recreation Projects .................................................................................. 71 Wolf Pen Creek Parks and Recreation Projects ......................................... 98 American Recovery and Reinvestment of 2009 (ARRA) Projects ............ 100 CDBG Funded Parks and Recreation Projects ........................................ 103 General Government Facilities and Technology ..................................................... 107 Public Facilities ......................................................................................... 110 Technology Projects .................................................................................. 117 Convention Center Projects ...................................................................... 127 Drainage Utility ........................................................................................................ 131 Special Revenue Capital Improvement Projects Parkland Dedication ................................................................................................ 145 Enterprise Funds Capital Improvement Projects Electric Service ........................................................................................................ 173 Water Service .......................................................................................................... 177 Production Projects ................................................................................ 182 Distribution ............................................................................................. 201 Rehabilitation Projects ........................................................................... 217 TABLE OF CONTENTS Wastewater Service ........................................................................................... 227 Collection ........................................................................................... 232 Rehabilitation Projects ...................................................................... 239 Treatment .......................................................................................... 241 Estimated Operations and Maintenance (O&M) Costs General Government Capital Improvement Projects O&M Costs. .......................... 270 Special Revenue Capital Improvement Projects O&M Costs .................................. 271 Enterprise Funds Capital Improvement Projects O&M Costs .................................. 272 Index by Project/Work Order Name .................................................................................... 273 Index by Project/Work Order Number ................................................................................. 275 Fiscal Year 2010 – 2011   Capital Improvements Program Budget  Executive Summary  The following is the annual City of College Station Capital Improvements Program (CIP) Budget document. The CIP budget provides the framework for capital improvement projects to be conducted in the 2011 fiscal year that begins October 1, 2010 and ends on September 30, 2011. On an annual basis, the City of College Station prepares a five-year Capital Improvements Program (CIP). The CIP is presented for City Council review as part of the annual budget process. The program consolidates all anticipated capital needs for which funding authorization exists, while separating the projects into several sections depending on the services provided and the respective funding source. Once the budget is approved by the City Council, the assigned project managers manage their respective projects with budgetary oversight from the Office of Budget and Strategic Planning and the Finance Department. Summary capital project schedules have been included in the annual College Station Approved Budget; however, this CIP budget document permits greater communication among City staff, administration, Council and citizens regarding capital projects. Areas of enhanced information conveyed within this document include individual project detail pages and corresponding maps, where applicable. The project sheets detail the project number, project manager, funding source(s), description of purpose and need, funding per year and category, and the estimated impact, if any, on future operating budgets. The maps provide citizens and officials a greater understanding of the scope and the impact of the specific projects through the illustration of the planned action. The projects presented in this document are grouped according to major funding source. For example, projects for which the major funding source is the Streets Capital Improvement Projects Fund are included in the Streets, Traffic, Sidewalks and Trails section of the document. A number of projects included in this document have multiple funding sources. The project sheets for these projects include an expenditure summary for each funding source as well as a combined expenditure summary that reflects the total projected expenditures for the project. The project sheets for projects with multiple funding sources are included in the section of the CIP document that reflects the project’s primary funding source. CAPITAL PROJECTS FUNDING The City operates under the laws of the State of Texas and the City of College Station's Home Rule Charter. Two categories of capital expenditures are defined by the City. The first category of capital expenditure is for major capital projects. Major capital projects are projects that cost more than $50,000 and provide a fixed asset or equipment that has a useful life of three years or more. The second category of capital expenditure is for minor capital projects. Minor capital projects are projects that cost more than $5,000 and less than $50,000 and provide a fixed asset or equipment that has a useful life of three years or more. The approved Capital Improvements Budget for FY11 totals $25,233,026 for all funds that include capital projects. This budget amount does not, however, reflect all projected capital expenditures for FY11. In the case of projects for which funds have already been approved and budgeted, the City may continue to spend money to complete these projects without including the projected FY11 expense as a new appropriation. The project budgets that have been appropriated carry forward until the project is complete. Only portions of the projects that have not been previously appropriated are included as new appropriations in the FY11 budget. The total projected to be spent in FY11 on capital projects including both new appropriations as well as existing appropriations is approximately $47,000,000. The City only has legal authority to issue General Obligation (GO) debt after a successful citizen referendum. GO debt is debt that obligates the City to repay the issue with ad valorem tax revenues. The City uses GO debt for the acquisition and development of parks and recreation facilities; rights-of-way acquisition; construction and reconstruction of streets; and for public buildings such as City offices, libraries, swimming pools and other general use facilities. The most recent General Obligation bond election was held in November of 2008. Voters approved $76,950,000 in General Obligation Bond (GOB) authorization to be issued over 7-years for streets, traffic, and fire station projects, the Library expansion project, and parks projects including an addition at the Lincoln Center and the Lick Creek Park Nature Center. In November 2003, the citizens of College Station approved $38,405,000 in GOB authorization for street, traffic, police and fire station projects, the City Center project, and parks projects including the second phase of Veterans Park. A small amount of the 03 GOB debt remains to be issued. 1 In FY10, the City issued $19,635,000 in GOB debt for various General Government capital projects. Of this, $12,525,000 was issued for street, traffic and sidewalk projects. This includes $1,080,000 in oversize participation funds, which will be used toward the Holleman Extension project. It is anticipated that a portion of these funds will be recovered through the assessment process following the completion of the project as the area develops. $2,185,000 is included for the extension of Victoria Avenue. $875,000 is included for the construction of a high and bike trail. $400,000 is included to be used toward the extension of Jones-Butler Drive and $6,925,000 is included for the Barron Road Widening Phase II project. $1,000,000 has been included for improvements to Royder Road and Greens Prairie Trail. It is anticipated that approximately $300,000 of the project cost will be recovered through a voluntary assessment of CSISD. Finally, $60,000 was issued for the Rock Prairie Road West right-of-way project. $870,000 was issued for Park and Recreation projects. This included $720,000 for the skate park construction and $150,000 for the design of improvements at Stephen C. Beachy Central Park. Finally, $6,240,000 in GOB debt was issued for the construction of Fire Station #6. This fire station will serve the busy University Drive corridor. The FY11 Approved Budget includes the projected issuance of $6,080,000 in GO’s. Included is $3,400,000 for street, sidewalk, traffic and transportation projects. This includes $440,000 for street oversize participation projects. These funds will be used toward building increased capacity into the streets that are being constructed by developers. $1,100,000 is projected to be used toward the construction of the Jones-Butler extension. This project includes the design and construction of a major collector from the intersection of Luther Street & Jones-Butler to the intersection of George Bush & Penberthy Road. An additional $600,000 has been included for new traffic signal projects throughout the City. $1,000,000 has been projected for authorization related to the Barron Road Widening Phase II project. Depending on the construction bids received, these funds may be needed for this project. $210,000 is projected for the Barron Road East/Lakeway project which will extend Barron Road from State highway 6 east at the existing Barron Road to a future intersection with the extension of Lakeway Drive. Finally, $50,000 is projected for preliminary work related to the Lick Creek Hike and Bike Trail. GOB debt in the amount of $2,180,000 is projected for Parks and Recreation projects. $220,000 is included for the purchase of land for neighborhood parks. $380,000 is estimated to be issued for improvements to various neighborhood parks throughout the City. Additionally, $780,000 is included for the construction of improvements at Stephen C. Beachy Central Park. These include a new concession complex and restroom building. $700,000 has been projected for the East District Maintenance Shop Replacement. These funds will be used to replace the existing shop. Finally, $100,000 is included for the preliminary design work on the Lick Creek Nature Center. Facility projects for which debt is scheduled to be issued in FY11 include $500,000 for Municipal Complex Expansion facility improvements. These funds will come from debt authorized as part of the 2003 GOB election. The City has statutory authority, and City Council policy allows for the use of non-voter authorized debt instruments such as certificates of obligation and contract obligations (generally referred to as CO's). City Council policy allows the City to use such instruments for capital items such as the following: • The purchase and replacement of major computer systems and other technology-based items that have useful lives of not more than ten years. • The purchase and replacement of major equipment items such as firefighting equipment. The City has, however, developed policies and procedures to provide almost all of this equipment without issuing debt. • The purchase of land and development of land for economic development uses. • In the last 3 years, at the recommendation of the City’s financial advisors, the City has issued CO’s in lieu of Utility Revenue Bonds, for the Electric, Water and Wastewater utilities. In FY10, the City issued $3,900,000 in CO debt. Included is $410,000 for two technology projects. $150,000 is included for Server Consolidation. This project provides additional hardware to accommodate the increasing demands for additional electronic storage and the software to better manage the data. In addition, $260,000 is projected for a Fiber Optic Infrastructure project. This project will support the installation of fiber optic cable to continue expansion of the city's network to new buildings and facilities, and to permit the connection of existing facilities that are not currently on the network. An additional $520,000 was issued for the purchase of the Arts Council of Brazos Valley building. 2 $2,830,000 in CO debt was issued in FY10 for Utility projects. Utility Revenue Bond debt is typically used for the Utility projects. However, based on the recommendations from the City’s financial advisors, and due to the marketability of the bonds as well as the volatility of the bond market, CO debt was issued for these projects in FY09. $2,530,000 was issued for Electric projects and $300,000 for Wastewater projects. Finally, $140,000 was issued to cover debt issuance costs. The FY11 Approved Budget includes the issue of $1,380,000 in CO debt for General Government projects. The amount includes $200,000 for the i5 Enhancement project. This project will upgrade the City’s mid-range computer system. Also included is $180,000 for the Fiber Optic Infrastructure project. This project will support the installation of fiber optic cable to continue expansion of the city's network to new buildings and facilities, and to permit the connection of existing facilities that are not currently on the network. In addition, $1,000,000 is scheduled to be issued for the purchase of several Fire vehicles. These include the replacement of the existing ladder truck and the purchase of an ambulance and engine. The latter two vehicles will be used at the new Fire Station #6. The cost of these vehicles is being supplemented with debt remaining from a previous debt issue as well as funds received from the sale of Fire Station #3. Combined Utility Revenue Bonds are traditionally issued to provide for capital expansion and replacements for the various utility services. In FY11, either Utility Revenue Bonds or Certificates of Obligation will be issued for Utility capital projects. Funds in the amount of $5,450,000 are estimated for Water capital projects and funds in the amount of $6,425,000 are estimated for Wastewater capital projects. GOVERNMENTAL CAPITAL PROJECTS   Below are descriptions of the governmental capital projects included in the FY11 Approved Budget. The funds expended on these projects are considered significant and nonroutine. STREETS, TRAFFIC, SIDEWALKS AND TRAIL CAPITAL PROJECTS  Street Rehabilitation Projects  In FY11, funds in the amount of $1,408,564 are included for the Tauber and Stasney Rehabilitation project. These streets are located in the Northgate area. The project includes the rehabilitation of Tauber Street and Stasney Street from University Drive to Cherry Street as well as the design and construction of new sidewalks on College Main. The project also includes the water and wastewater line rehabilitation. Funds in the amount of $422,225 are also projected in FY11 for other street rehabilitation projects that may arise in the Northgate area. These funds reflect the balance of the Church Avenue rehabilitation project, which came in under budget. The construction funds for these Northgate area rehabilitation projects were authorized as part of the 2003 GO bond election. Street Extension Projects  $9,215,974 is the estimated expenditure included in the FY11 Approved Budget for various street extension and widening projects. $472,611 is estimated for oversize participation projects that may arise throughout the fiscal year. These funds are used for building increased capacity into the streets that are being constructed by developers. $2,014,747 is projected for the extension of Victoria Avenue. Victoria Avenue will be extended from Southern Plantation Drive to connect with William D. Fitch Parkway (SH40), aligning with the existing Victoria Avenue on the south side of William D. Fitch Parkway (SH40). The roadway will be a major collector consisting of two travel lanes and a center turn lane with bike lanes, sidewalks, landscaping and storm drainage. This project is being completed in advance of the new College Station ISD (CSISD) high school, which is expected to open in the fall of 2012. An estimated $841,850 is projected for the extension of Jones-Butler Drive. This project includes the design and construction of a major collector from the intersection of Luther Street & Jones- Butler to the intersection of George Bush & Penberthy Road. The project will also include sidewalks, bike lanes and an equestrian crossing. $900,000 is projected in FY11 for improvements to Royder Road and Greens Prairie Trail. CSISD is presently constructing Greens Prairie Elementary School, which will be located on the southwest corner of Royder Road and Greens Prairie Trail. The elementary school is scheduled to open in August 2011. Improvements will be made to Royder Road and Greens Prairie Trail for better access and to facilitate traffic at the site. It is anticipated that approximately $300,000 of the project cost will be recovered through a voluntary assessment of CSISD. The budget also includes an estimated FY11 expenditure of $866,766 for the Rock Prairie Road East Widening project. These funds will be used for design and right-of-way acquisition costs related to the future widening of Rock Prairie Road. Construction funds are not included in the project budget. $15,000 is the projected FY11 expenditure for the Rock Prairie Road West right-of-way project. This project includes the purchase of additional right-of-way from State Highway 6 to 3 Normand Drive to provide for the future widening of that section of Rock Prairie Road. In addition, $3,895,000 is the estimated FY11 expenditure for the phase II of construction to Barron Road from Decatur Drive to William D. Fitch Parkway. This project will widen Barron Road from Decatur Drive to Barron Cutoff Road on the southwest side of William D. Fitch. The existing Barron Road is a two lane rural road. Upon completion of this project, Barron Road will be expanded to a divided four lane minor arterial roadway with medians, bicycle lanes and sidewalks. In addition, new traffic signals will be installed at the intersection of Barron Road and Victoria Avenue and at Barron Road and William D. Fitch. This project is anticipated to be completed in advance of the opening of the new CSISD high school in the fall of 2012. Finally, $210,000 is included for preliminary design work on the Barron Road East/Lakeway extension project. This project will extend Barron Road from State Highway 6 east at the existing Barron Road to a future intersection with the extension of Lakeway Drive. The Barron Road extension will be combined with the Lakeway Drive extension. Street TxDOT Projects  Projected expenditures include $3,875 for the Wellborn Road Landscaping project. Funds were paid to TxDOT in FY08 for this landscaping, but it is anticipated that the City’s cost will be slightly higher than what has been paid. Traffic Projects  The FY11 Approved Budget includes an estimated $1,172,198 for new traffic projects throughout the City. Included is an estimated $913,627 for new traffic signals throughout the City. A signal warrant study was completed in FY09 which indicated the need for new signals at the following locations: William D. Fitch Parkway (SH40) at Barron Road, William D. Fitch Parkway (SH40) at Arrington Road, Texas Avenue at Krenek Tap Road, George Bush East at Dominik and SH30 at Copperfield. The signal William D. Fitch Parkway (SH40) at Arrington Road was completed in FY10. The signal at William D. Fitch Parkway (SH40) at Barron Road is underway and should be completed as part of the Barron Road Widening Phase II project. The remaining signals are included in the FY11 Approved Budget. In addition, funds for a signal to be constructed at Victoria and Barron are also included. Finally, $40,000 is included for an additional signal warrant study. $51,036 is included for traffic system safety improvement projects and $55,535 is included for traffic signal communication projects. These projects support traffic signal connectivity as well as other City data and voice services.   Sidewalk and Trail Projects  The City of College Station has worked over the years to ensure adequate transportation infrastructure is constructed for pedestrians and bicyclists. The City has an adopted Bicycle, Pedestrian and Greenways Master Plan. $595,000 is the projected expenditure for the completion of the City’s bike loop. This project will consist of signed bike routes, on-street bike lanes, and off-street bike paths to link the Texas A&M campus, City of College Station parks and local housing areas. In addition, the project included improvements for pedestrians and bicyclists at the Longmire/FM 2818 intersection. A portion of the expenditures for the Bike Loop project will be reimbursed by TxDOT as part of an Intermodal Surface Transportation Efficiency Act (ISTEA) grant received by the City. As new development occurs, sidewalks are an important aspect that must be considered. In FY11, $100,000 is included for sidewalk improvement projects throughout the City. $571,608 is included for the completion of the hike and bike trail as identified by the Hike and Bike Task Force. This multiuse trail will be constructed along the north side of FM 2818 from Welsh to Longmire. The sidewalk will also be extended from Texas Avenue to Longmire Drive. Upon completion of this project, the multiuse trail and sidewalk extension will provide complete connectivity between Texas Avenue and Welsh Avenue along FM 2818. In addition, $50,000 is projected for the Lick Creek Hike and Bike Trail. This project is for the construction of approximately three miles of hike and bike trails along Lick Creek between Westfield Park and Lick Creek Park. The trails will connect residential neighborhoods and CSISD property. PARKS AND RECREATION CAPITAL PROJECTS  In FY11, expenditures in the amount of $2,949,723 are estimated for Parks and Recreation capital improvement projects. Included is $78,431 for field redevelopment projects. A portion of the funds will be used for replacement and repairs to numerous athletic facilities and parks throughout the City. The funds for these projects are collected from the fees paid by players and teams from both City leagues and outside user groups. The funds are used to pay for replacement items and facility upgrades at City athletic facilities. $410,000 is estimated for improvements to various neighborhood parks throughout the City. Parks at which these improvements are scheduled include Emerald Forest Park, Anderson Park, Castlegate Park, Steeplechase Park and University Park. Also included are funds for lighting improvements at Merry Oaks Park and the installation of a swing set at Lemontree Park. Funds are also included for a shade cover at Sandstone Park. In addition, $596,292 has been included for the construction of the skate park to be located at Southwood Valley Athletic Complex. $780,000 is included for improvements at Stephen C. Beachy Central Park. These include the construction of a new concession complex and restroom building. $700,000 has been included for the East District Maintenance Shop Replacement. These funds will be used to replace the existing shop. Finally, $100,000 is included for the preliminary design work on the Lick Creek Nature 4 Center. This center, proposed to be built at Lick Creek Park, will serve as a nature center for visitors who want to learn more about the park. GENERAL GOVERNMENT AND CAPITAL EQUIPMENT CAPITAL PROJECTS  General government and capital equipment projects are planned assets that have value to more than one specific area of City operations. The two main divisions within this category are public facilities and technology projects. In FY11, it is projected that $2,925,998 will be spent on public facility projects. Included in this amount is $500,000 for design and improvements of Municipal Complex facilities. In addition, $2,315,000 is estimated to be used for the construction of Fire Station #6. Fire Station #6 will serve the busy University Drive corridor. Construction is expected to begin in FY11 and be completed in FY12. $40,000 is included for the purchase of library books. The funds for the purchase of these books come from donations collected for this purpose. Also included in the facility project estimate is $70,998 for capital improvement projects in the Northgate area. The FY11 Approved Budget also includes a projected expenditure of $3,004,926 for technology projects. Included is $100,000 for the replacement of the City’s Mobile Data Terminal system. This project is for the replacement of the electronic equipment that provides the interface between the radio frequency system (800 MHz radio system) and the Internet Protocol system (Computer Aided Dispatch). The goal of the project is to provide a public safety radio system that meets current and anticipated needs. Also included is $200,000 for the upgrade of the City’s i5 system. The goal of this project is to ensure the City’s mid-range computer system is capable of running the required software applications and has the capacity to meet the City’s computing and data storage needs. The last system upgrade was completed in 2005. $16,040 is included for Uninterruptible Power Supply (UPS) replacement. These units support the City’s telephone, computer network and radio systems. Funds are budgeted each year for replacement of a portion of the units and associated battery cabinets. The funds for the replacement of the units are transferred in from the Equipment Replacement Fund, where they are set aside for this purpose. An estimated expenditure of $1,250,000 has been included for the replacement of the City’s 800 MHz radio system. A portion of the budget for this project ($2,310,000) came from the Equipment Replacement Fund where they were set aside for this purpose. The remainder will come from CO’s. The City, along with a number of local entities, was awarded a federal grant that will help fund a County-wide radio system. The funds received for this project will be used toward the City’s portion of the system. $38,886 is projected for the Wireless Infrastructure project which will provide funds for the installation of equipment that will allow wireless access by City employees at various locations throughout the City. $150,000 is the FY11 projected expenditure for Server Consolidation. This project provides additional hardware to accommodate the increasing demands for additional electronic storage and the software to better manage the data. The hardware upgrades will permit a doubling of the current storage allotted to each employee. $150,000 is projected for a Fiber Optic Infrastructure project. This project will support the installation of fiber optic cable to continue expansion of the city's network to new buildings and facilities, and to permit the connection of existing facilities that are not currently on the network. Finally, $215,000 has been included for an Aerial Topographic Mapping project. This project will collect aerial imagery, topographic data and will provide updated planimetrics (data on certain permanent features in the City). The aerial mapping imagery reflects both inside City limits and within the Extra-Territorial Jurisdiction (ETJ). The last imagery and topographic survey was taken in 2005. Funding for this project will come from one time funds available in the General Fund ($150,000) and funds available in the Drainage Fund ($65,000). DRAINAGE PROJECTS  Drainage capital projects are funded by revenue generated through a drainage utility fee that is collected from residential and commercial utility users. The FY11 drainage capital projects budget includes a projected expenditure of $899,894 for capital improvements. Significant projects include a projected $164,624 for Bee Creek IV and V. This project is for storm drainage improvements to the flow capacity of Bee Creek Tributary “A.” A recently completed benefit/cost study is under review. The study compares the costs associated with this project against the benefits. Upon review and acceptance of the findings in this report, Staff will either proceed with construction as planned, revise the scope of the project, or cancel the project. $419,700 is projected for Greenways land acquisition throughout the City. The City’s Greenways Master Plan calls for future trail development in urban and suburban greenways. $200,000 is included for Minor Drainage Improvement projects. These funds are used for minor unscheduled drainage projects that arise throughout the fiscal year. $65,500 is included for an erosion management study of the Wolf Pen Creek trail area. The results of the study should provide recommendations as to how to best handle potential future erosion in the Wolf Pen Creek area and may result in recommended capital improvement projects. These will be considered as part of future CIP plans. Finally, $50,070 is included for Stormwater Mapping projects. These funds will be used for mapping of the City’s stormwater infrastructure. CONVENTION CENTER CAPITAL PROJECTS The Convention Center Fund accounts for the receipt and expenditure of funds received by the City for the operation and maintenance of a convention center. In FY11, there is projected expenditure of $125,000 that has been included for maintenance costs related to the Chimney Hill property on which the convention center will be built. These expenses will be 5 offset by lease revenue received from existing tenants. In addition, $50,000 has been included for preliminary work on the Convention Center. SPECIAL REVENUE CAPITAL PROJECTS Below are descriptions of the special revenue capital projects included in the FY11 Approved Budget. The funds expended on these projects are considered significant and nonroutine. Park Land Dedication Capital Improvement Projects The Park Land Dedication Funds account for the receipt and expenditure of funds received by the City from residential land developers who dedicate land, or money in lieu of land, for use in the development of neighborhood parks in residential areas. The projects in the Park Land Dedication Capital Improvement Projects Funds are funded using the dedicated park land funds. Park Land dedication funds must be used for the development of parks within the zone to which the funds are dedicated. In FY11, expenditures for Park Land Dedication projects are estimated at $1,290,630 for projects that are anticipated to be completed in the various park zones. Funds in the amount of $12,000 are included for improvements at University Park. These improvements will include additional parking and a retaining wall at the large dog pond. The Park Land Dedication funds for this project will be supplemented with Neighborhood Park Improvement bond funds. An estimated $267,780 is included for improvements at Southwest Park. The plan is to include features typical of a neighborhood park, such as parking, picnic areas, fencing, landscaping, etc, at Southwest Park. $73,500 is projected in Zone 6 for improvements at W. A. Tarrow Park. These improvements include the renovation of a swing set, the replacement of a drinking fountain and the addition of irrigated trees. In addition to the Park Land Dedication funds, Community Development Block Grant (CDBG) funds in the amount of $60,000 will be used for the replacement of the playground at W.A. Tarrow Park. Both the playground and swing set will include a rubber cushioned surface. $58,350 is the estimated FY11 expenditure for phase III of John Crompton Park. These funds will be used for the addition of a playground at the park. $58,000 is projected for improvements at Emerald Forest Park. These improvements include renovations to the playground, drainage and sidewalks in the park. Finally, $30,000 is included in the proposed budget for improvements at Woodland Hills Park. These improvements include the addition of fencing, landscaping and a sidewalk. Additional funds are projected in a number of Park Land zones but these funds have not yet been obligated to specific projects. These funds are available to be used for projects that arise throughout the year within the applicable zones. Funds not used in the fiscal year will carry over to future fiscal years.   Wolf Pen Creek TIF Capital Projects  The Wolf Pen Creek (WPC) TIF Fund accounts for ad valorem tax and other revenues that are accrued to the WPC TIF District. The fund also accounts for expenditures on projects that take place in the district. The TIF expired on December 31, 2009. However, expenditures on the Wolf Pen Creek Festival Site and Water Feature capital project are projected to occur in FY10 and FY11 using the balance of the WPC TIF funds. This project is for the development of a festival site and water feature which will adjoin the amphitheater. This project will serve as a major attraction for the corridor. The project may include parking, pavilions, fencing, plaza, landscaping, etc. A total of $3,500,000 is budgeted for this project, of which $1,200,000 will be spent on the water feature. A projected $3,033,313 is estimated to be expended in FY11. UTILITY CAPITAL PROJECTS Below are descriptions of the utility capital projects included in the FY11 Approved Budget. The funds expended on these projects are considered significant and nonroutine. Electric Capital Projects  $5,923,215 is the budgeted appropriation for electric capital projects in FY11. As the electric capital projects are considered competitive matter under Texas Senate Bill No. 7, details of these projects cannot be outlined in this summary, but have been provided to the City Council. Water Capital Projects In FY11, $3,967,963 is the new appropriation included for water capital projects. Appropriations from prior years carry forward on capital projects. Therefore, the FY11 projected expenditures exceed the new appropriations included for FY11. Total expenditures in FY11 for Water capital projects are projected to be $10,828,964. Water production projects include an estimated FY11 expenditure of $2,126,500. $200,000 is included for the purchase of land for future well sites. As capacity needs grow, the City is preparing for the construction of new wells. A component of this is the land acquisition for new future wells. $815,000 is included for high service water pump improvements. This project will increase the pumping capacity of the Dowling Road Pump Station. This project is in response to analysis of the water system capacities in relation to Texas 6 Commission on Environmental Quality (TCEQ) requirements. It is anticipated that these improvements will be completed in FY12. An additional $144,000 is estimated for the removal, inspection, and rehabilitation of the pumps and motors for four Simsboro water wells. The pumps in these wells have reached their expected service life and need to be inspected and rehabilitated. $300,000 is included for the replacement of the cooling tower media. This project will replace the media material in the drinking water cooling towers. The media material maximizes the surface area exposure to aid in the cooling of the water. The existing media has reached the end of its service life. In addition, $80,000 is included for control upgrades at wells 1, 2, 3 and 5. These upgrades include the changing out of the motor control section of the Motor Control Centers on wells 1, 2, 3 and 5. $400,000 is included for the 3 Million Gallon Ground Storage Reservoir (MG GSR) Rehabilitation project. As part of this project, the interior coating of the reservoir will be replaced and some structural upgrades will be made to ensure that it meets TCEQ guidelines. $37,500 is included for the design of renovations at the Utility Service Center. The cost of the renovations is being shared by the Electric, Water and Wastewater utilities as all three are housed in the facility. It is anticipated that the renovations will occur in future fiscal years. Finally, $150,000 is projected for the Supervisory Control and Data Acquisition (SCADA) man machine interface project. This project is for the evaluation, procurement and implementation of software packages available to improve the SCADA man machine interface or graphical software. New servers are included to increase flexibility and reduce vulnerabilities and down time. Funds in the amount of $4,799,833 are projected to be expended on Distribution projects in FY11. This includes $100,000 of general oversize participation (OP) funds. These funds are used to help meet future capacity needs by oversizing water lines above the minimum size required to serve a development. $3,001,058 is included in the FY11 budget for construction on the Reclaimed Water project. This is a multi-phase project to deliver irrigation water to major users in College Station, thereby decreasing the demand for potable water. Phase I includes delivery of reclaimed water to Veterans Park. $935,400 is the projected FY11 expenditure for the Wellborn Widening project. This project was for the relocation of water lines outside of future pavement areas in conjunction with Wellborn Widening. A final phase is expected to be completed in FY11 and FY12. A portion of the expenditures for this project will be reimbursed by TxDOT. It is estimated that approximately $2,000,000 will be received in FY13 following the completion of the project. Approximately $2,400,000 was received in FY10 for a portion of the project that has already been completed. $450,000 is included for the Barron Road water line extension project. The goal of this project is to loop the existing 18” line on Barron Road to provide service to the annexed areas and to reduce flushing. In addition, $218,375 is included for water line improvements along Victoria Avenue. This project is being completed in conjunction with the corresponding street extension project. Finally, $95,000 is estimated for the FM 2818/Jones Butler water line conflict project. An existing 30" City of College Station water transmission line located at the intersection of FM 2818 and Jones-Butler Road and within state ROW was uncovered during the excavation of the drainage ditch. The City will need to either relocate the line or build a subsurface drainage system to accommodate the storm water runoff for the area. Rehabilitation projects included in the FY11 Approved Budget include $311,107 for the replacement of water lines along Tauber Street and Stasney Street. This project is being completed in connection with the street rehabilitation project. The existing infrastructure is being replaced and capacity should increase as a result. $1,787,755 is projected for the South Knoll/The Glade project. This project is for the replacement of water lines in the area bounded by Haines, Southwest Parkway, Glade and Langford. These aging lines were identified in a 2003 water study as in need of replacement. In addition, $1,558,500 has been estimated for the Southwood 5-7 project. This project is for the replacement of water lines in an area bounded by Southwest Parkway, Harvey Mitchell Parkway, Welsh and Shadowood. Contingency in the amount of $150,000 has been included in the FY11 Approved Budget. These funds will be available for use on unanticipated projects as well as to offset project overruns. Finally, $10,000 has been included for the meter replacement program that was implemented in FY08. This program is for the replacement of water meters on a routine basis to ensure efficient water readings. The FY11 Approved Budget includes an estimated $5,250,000 in current revenues that will be transferred from operations to fund water capital projects. Additionally, a debt issue of $5,450,000 is projected in FY11 for water capital projects. Wastewater Capital Projects The FY11 Approved Budget includes $883,461 in new appropriations for numerous wastewater capital projects. Appropriations from prior years carry forward on capital projects. Therefore, the projected expenditures exceed the new appropriations included for FY11. Total expenditures in FY11 for Wastewater capital projects are projected to be $7,265,117. Collection projects include $100,000 for oversize participation and planning. These funds are available to meet future anticipated capacity in the construction of wastewater lines above the minimum size needed to serve the development. An estimate of $523,995 is included for replacement of wastewater lines along Tauber Street and Stasney Street. This project is being completed in connection with the street rehabilitation project. Funds totaling $1,658,695 are projected for the South Knoll/The Glade project. This project is for the replacement of wastewater lines in the area bounded by Haines, 7 Southwest Parkway, Glade and Langford. These aging lines were identified in a 2003 wastewater study as in need of replacement. Finally, $2,011,500 has been included for the Southwood 5-7 project. This project is for the replacement of wastewater lines in an area bounded by Southwest Parkway, Harvey Mitchell Parkway, Welsh and Shadowood. Funds in the amount of $2,715,628 have been projected for Treatment and Disposal projects. $327,126 is projected for the construction of catwalks around the Lick Creek clarifiers. The catwalks will provide safe access for the operators to operate and maintain the clarifiers. An estimated $403,000 is included for centrifuge improvements at the Lick Creek Wastewater Treatment Plant (LCWWTP). Improvements include installing a larger sludge discharge hopper, a sludge conveyor and a work platform around the centrifuge. $325,000 is included for completion of the Lick Creek Sludge Holding Tank Improvements. This project will ultimately expand the size of the waste sludge holding tank at the Lick Creek Wastewater Treatment Plant. An additional $129,700 is estimated for ATAD improvements at the Carters Creek Wastewater Treatment Plant (CCWWTP). This includes replacing the ATAD motor operated valves. $177,000 is projected for Lick Creek Return Activated Sludge Improvements. This project is for the hiring of an engineer and to modify the existing pumps, flow measurement and sludge waste set up and for the implementation of necessary modifications. Funds in the amount of $210,302 are estimated for the SCADA replacement project. This project will replace the control equipment that has exceeded its useful life. $886,000 is the projected expenditure for the Carters Creek Lab and SCADA Building project. The existing building no longer meets laboratory standards. The funds estimated in FY11 will be for the construction of the new building. In addition, $140,000 is estimated for Process Control Improvements at LCWWTP. This project will be for the purchase and installation of improved process control instrumentation at the Plant. An additional $80,000 has been included in FY11 for the installation of SCADA at the new lift stations. This will allow for monitoring and alarming of the new lift stations. $37,500 is included for the design of renovations at the Utility Service Center. The cost of the renovations is being shared by the Electric, Water and Wastewater utilities as all three are housed in the facility. It is anticipated that the renovations will occur in future fiscal years. Finally, contingency in the amount of $150,000 has been included in the FY11 Approved Budget. These funds will be available for use on unanticipated projects as well as to offset project overruns. A total of $825,000 in current revenues from operations is estimated to be used to fund wastewater capital projects. Additionally, a debt issue of $6,425,000 is projected in FY11 for wastewater capital projects. Additional O&M Costs The FY11 Approved Budget includes a number of capital projects that have been recently completed and have added operations and maintenance (O&M) expense. In particular, the City’s general fund has been and will continue to be impacted by capital projects as they come online. In some situations, the O&M cost of a project is minimal and can be absorbed by the City department that is benefiting the most from the project. In other situations, the O&M cost is more significant and funding for these additional expenses is addressed through the Service Level Adjustment (SLA) process. In these situations, SLAs are submitted for the O&M needs of the capital projects and funding is considered as part of the budget process. Departments are expected to consider the impact of current and planned capital improvement projects on operations and maintenance (O&M) budgets. This analysis is a component of the 5-year Strategic Business Plans that are completed by all City departments. Projections as to the impact of capital projects on O&M budgets that are included in the Strategic Business Plans are used by the Finance Office in financial forecasting. Due to the limited availability of funds for FY11, increases in budgets for O&M related to capital projects were limited. Instead, departments were asked to evaluate current operations and make adjustments that would allow service levels to be met without a corresponding increase in budget. It is anticipated that the availability of funding for the O&M costs, particularly in the General Fund, will be limited in upcoming years. Therefore, departments will continue to evaluate current operations before increases in budget will be approved. Recommendations may also be made to delay projects for which O&M funding does not exist. Governmental Projects O&M The FY11 Approved Budget includes setting aside funds that will be used toward the anticipated operations and maintenance (O&M) costs associated with the opening of Fire Station #6. $619,898 has been included in the FY11 budget for this purpose. This includes funds for nine firefighters to be hired halfway through the fiscal year. Also included are funds for training and supplies. In addition, funds have been budgeted for the purchase of an ambulance. Funds will continue to be allocated each year so that the station can be operated once opened. Other facility projects for which funds have been approved include the O&M related to the Radio System Replacement project. These funds are used toward a professional services contract with the Brazos Valley Council of Government. Street projects for which O&M funds have been included in the FY11 Approved Budget include landscaping funds for Holleman Extension and the City of College Station Beautification Improvements 8 project as well as funds for utilities related to new traffic signals. Park and Recreation projects for which funds are approved include the Pebble Creek Basketball Pavilion, Merry Oaks Park area lights, Castlegate Park. These funds are for utilities and maintenance costs associated with the projects. In addition, funds have been included for the operations and maintenance of the Skate Park. These funds are for temporary/seasonal personnel, supplies, maintenance and utility costs. Funds have also been budgeted for landscaping costs related to the Neighborhood Parks Revolving Fund project. Due to the limited availability of funds for FY11, other increases in budgets for O&M related to governmental capital projects were not included. Instead, departments were asked to evaluate current operations and make adjustments that would allow service levels to be met without a corresponding increase in budget. Special Revenue Projects O&M Funds have been included in the FY11 Approved Parks and Recreation budget for estimated FY11 O&M costs associated with the WPC Festival Site and Water Feature. $56,667 has been included for this purpose. Estimated costs include funds for temporary/seasonal personnel, supplies, contract labor and utility costs. This budget reflects an estimated one-third of the annual cost as the project is not estimated to be completed until later in the fiscal year. Future fiscal year budgets will have to be adjusted to reflect the full estimated O&M costs. Utility Projects O&M The City of College Station strives to provide superior electric, water, and wastewater services to its citizens. Part of this effort includes investment in the capital that makes up the infrastructure. These investments take place in the form of capital improvement projects. Some of these improvements require additional operating and maintenance (O&M) costs. These costs are identified and ultimately become part of the cost of providing these utility services. As part of the budget process, the Water Services Department evaluated current operations to determine if adjustments could be made that would allow service levels to be met without a corresponding increase in budget. No increases were made to the FY11 budget for additional O&M costs related to new capital projects. Instead, as part of the budget process, the Water Services Department evaluated current operations to determine if adjustments could be made that would allow service levels to be met without a corresponding increase in budget. More detailed sheets that reflect the estimated O&M costs associated with the capital projects have been included in the final section of the CIP document. 9 Home of Texas A&M University ® 10 GENERAL GOVERNMENT- STREETS, TRAFFIC, SIDEWALK AND TRAIL CAPITAL IMPROVEMENT PROJECTS FISCAL YEAR 2010-2011 THROUGH FISCAL YEAR 2015-2016 11 GENERAL GOVERNMENT STREETS, TRAFFIC, SIDEWALKS, AND TRAILS CAPITAL IMPROVEMENT PROJECTS FISCAL YEAR 2010-2011 THROUGH FISCAL YEAR 2015-2016 PROJECT REVISED APPROVED PROJECT BUDGET APPROPRIATIONS FY 09 -10 FY 10 -11 NUMBER AMOUNT THROUGH FY09 APPROPRIATIONS APPROPRIATIONS BEGINNING FUND BALANCE:21,035,025 17,758,173 ADDITIONAL RESOURCES: GENERAL OBLIGATION BONDS (03 GOB)1,080,000 440,000 GENERAL OBLIGATION BONDS (08 GOB)8,592,500 2,960,000 CERTIFICATES OF OBLIGATIONS - - INTERGOVERNMENTAL TRANSFERS - - INTRAGOVERNMENTAL TRANSFERS - - INVESTMENT EARNINGS 77,000 160,000 OTHER - - SUBTOTAL ADDITIONAL RESOURCES 9,749,500$ 3,560,000$ TOTAL RESOURCES AVAILABLE 30,784,525$ 21,318,173$ STREET REHABILITATION PROJECTS 2 NORTHGATE STREET REHAB ST0518 422,225 422,225 - - 1/2 TAUBER AND STASNEY REHAB/NG SIDEWALKS ST0505 2,252,110 2,252,110 - - CLOSED PROJECTS SUBTOTAL 2,674,335$ -$ -$ STREET EXTENSION PROJECTS 2 OVERSIZE PARTICIPATION ST0519 472,611 - - 472,611 2 HOLLEMAN EXTENSION ST0913 2,125,000 1,003,546 1,121,454 - DISCOVERY DRIVE EXTENSION ST0804 2,000,000 2,000,000 - - 3 VICTORIA AVENUE EXT ST0903 2,455,000 300,000 2,155,000 - 3 JONES BUTLER (PENBERTHY) EXTENSION ST0905 3,283,500 8,500 360,865 2,914,135 3 ROYDER ROAD IMPROVEMENTS ST1037 1,000,000 - 1,000,000 - ROCK PRAIRIE ROAD PROJECTS - 2 ROCK PRAIRIE RD WIDENING - DESIGN & ROW ST0417 2,969,000 2,969,000 - - 3 ROCK PRAIRIE RD WEST ROW ST1025 740,000 - 115,000 - BARRON ROAD PROJECTS - * BARRON ROAD RIGHT OF WAY ST0006 481,000 481,000 - - 3 BARRON ROAD WIDENING PHASE II ST1026 10,415,000 - 10,415,000 - 3 BARRON ROAD EAST/LAKEWAY ST1101 15,135,000 - - 210,000 ** CLOSED PROJECTS 125,000 - SUBTOTAL 6,762,046$ 15,292,319$ 3,596,746$ STREET TXDOT PROJECTS TX AVE STREETSCAPE PH II ST9915 549,352 549,352 - - WELLBORN RD WIDENING LANDSCAPING - 2818 to 40 ST0812 96,859 96,859 - - WELLBORN WIDENING REIMBURSEMENT ST0510 780,633 780,633 - - TX AVENUE WIDENING ROW ST9820 595,962 595,962 - - CLOSED TXDOT PROJECTS - - - SUBTOTAL 2,022,806$ -$ -$ BUDGET APPROPRIATIONS 12 GENERAL GOVERNMENT STREETS, TRAFFIC, SIDEWALKS, AND TRAILS CAPITAL IMPROVEMENT PROJECTS FISCAL YEAR 2010-2011 THROUGH FISCAL YEAR 2015-2016 PROJECT EXPENDITURES ACTUAL ESTIMATE PROJECTED PROJECTED PROJECTED PROJECTED PROJECTED PROJECTED THROUGH FY08 FY 08-09 FY 09-10 FY 10-11 FY 11-12 FY 12-13 FY 13-14 FY 14-15 FY 15-16 24,388,395 13,747,959 17,758,173 6,845,521 2,629,874 1,925,825 1,753,145 1,720,645 655,000 1,080,000 440,000 - - - - - 395,000 11,445,000 2,960,000 4,510,000 9,500,000 16,885,000 600,000 - - - - - - - - 17,543 5,500 - - - - - - 130,671 - - 400,000 100,000 100,000 100,000 100,000 382,129 140,000 160,000 71,000 23,000 15,000 14,000 14,000 7,000 6,135 - - - - - - 1,587,343$ 12,676,635$ 3,560,000$ 4,981,000$ 9,623,000$ 17,000,000$ 714,000$ 114,000$ 25,975,738$ 26,424,595$ 21,318,173$ 11,826,521$ 12,252,874$ 18,925,825$ 2,467,145$ 1,834,645$ - - - 422,225 - - - - - 278,743 183,241 381,563 1,408,564 2,354,152 144,474 - - - - - - 278,743$ 2,537,392$ 526,037$ 1,830,789$ -$ -$ -$ -$ -$ - - - 472,611 - - - - - - 77,364 2,047,636 - - - - - - 46,919 347,000 1,606,081 - - - - - - - 78,104 362,149 2,014,747 - - - - - - 7,769 25,000 841,850 2,408,881 - - - - - - 100,000 900,000 - - - - - 741,917 5,109 55,000 866,766 886,766 413,442 - - - - - 45,000 15,000 300,000 380,000 - - - 278,256 52,800 149,944 - - - - - - - - 230,000 3,895,000 2,800,000 - - - - - - - 210,000 760,000 4,684,320 9,480,680 - - 7,011,319 885,434 - - - - - - 1,067,092$ 7,579,466$ 5,506,244$ 9,215,974$ 7,155,647$ 5,477,762$ 9,480,680$ -$ -$ 379,153 9,341 160,858 - - - - - - 92,984 - - 3,875 - - - - - 453,680 - 234,666 - - 92,287 - - - 496,715 - 99,247 - - - - - - 382,054 1,422,531$ 391,395$ 494,771$ 3,875$ -$ 92,287$ -$ -$ -$ PROJECTED EXPENDITURES 13 GENERAL GOVERNMENT STREETS, TRAFFIC, SIDEWALKS, AND TRAILS CAPITAL IMPROVEMENT PROJECTS FISCAL YEAR 2010-2011 THROUGH FISCAL YEAR 2015-2016 PROJECT REVISED APPROVED PROJECT BUDGET APPROPRIATIONS FY 09 -10 FY 10 -11 NUMBER AMOUNT THROUGH FY09 APPROPRIATIONS APPROPRIATIONS BUDGET APPROPRIATIONS TRAFFIC PROJECTS 2 TRAFFIC SYSTEM SAFETY IMPR. ST0511 71,036 71,036 - - 2 UNIVERSITY/ASBURY IMPROVEMENTS ST1036 14,000 14,000 - - 2 NEW TRAFFIC SIGNAL PROJECTS (2003 GOB) ST0512 - - - - 2/3 SIGNAL @ ARRINGTON/SH40 ST1030 343,991 243,991 100,000 - 2 SIGNAL @ BARRON/SH40 ST1029 75,000 - 75,000 - 2 SIGNAL @ VICTORIA/BARRON TBD 75,000 - 75,000 - SIGNAL @ GB DRIVE EAST & DOMINIK ST0205 170,000 133,000 37,000 - 3 NEW TRAFFIC SIGNAL PROJECTS (2008 GOB) ST1027 1,873,500 - - 545,000 3 SIGNAL @ WELLBORN/F&B ST1031 250,000 - 250,000 - 2/3 SIGNAL @ TEXAS/KRENEK TAP ST1105 200,000 95,937 61,063 - 3 SIGNAL @ SH30/COPPERFIELD ST1106 200,000 - - - 3 SIGNAL WARRANT STUDY ST1107 40,000 - - - 3 SIGNAL @2818/FM 60 TBD 380,000 - - - 3 SIGNAL @ UNIVERSITY DR/UNIVERSITY TOWN CTR TBD 100,000 - - - 2 TRAFFIC SIGNAL COMMUNICATIONS ST0411 83,090 83,090 - - 2 TEXAS AVENUE FIBER ST0906 35,000 35,000 - - CLOSED PROJECTS SUBTOTAL 676,054$ 598,063$ 545,000$ SIDEWALKS & TRAILS 2005 BIKE LOOP - BIKE LOOP COMPLETION ST0530 327,202 327,202 - - MISC. BIKE TRAILS - BIKE LOOP COMPLETION ST9803 169,000 169,000 - - 2 HIKE AND BIKE TRAILS - LONGMIRE IMPROVEMENTS ST0521 1,033,624 1,033,624 - - 2 SIDEWALK IMPROVEMENTS (2003 GOB) ST0517 114,112 114,112 - - 2/3 LINCOLN SIDEWALKS ST0910 149,167 49,167 100,000 - 3 SIDEWALK IMPROVEMENTS (2008 GOB) ST1028 200,000 - - - 3 HIKE AND BIKE TRAIL COMPLETION ST0904 1,000,000 333,000 667,000 - 3 LICK CREEK HIKE AND BIKE TRAIL ST1104 4,410,000 - - - 3 UNIVERSITY DR PEDESTRIAN IMP Ph II TBD 7,055,000 - - - CLOSED PROJECTS SUBTOTAL 2,026,105$ 767,000$ -$ CAPITAL PROJECTS SUBTOTAL 14,161,346$ 16,657,382$ 4,141,746$ OTHER - 538,691 DEBT ISSUANCE COSTS 45,000 12,000 GENERAL & ADMIN. CHARGES 415,624 377,517 TOTAL EXPENDITURES 17,118,006$ 5,069,954$ CAFR Adjustment ENDING FUND BALANCE:13,666,519$ 16,248,219$ * - Indicates projects funded through November 1998 G.O. Bond Authorization ** - Closed Projects includes balance of ST0211 - Dartmouth Extension. 1 - Funded through CDBG Funds. 2 - Indicates projects funded through 2003 G.O. Bond Authorization 3 - Indicates projects funded through 2008 G.O. Bond Authorization 14 GENERAL GOVERNMENT STREETS, TRAFFIC, SIDEWALKS, AND TRAILS CAPITAL IMPROVEMENT PROJECTS FISCAL YEAR 2010-2011 THROUGH FISCAL YEAR 2015-2016 PROJECT EXPENDITURES ACTUAL ESTIMATE PROJECTED PROJECTED PROJECTED PROJECTED PROJECTED PROJECTED THROUGH FY08 FY 08-09 FY 09-10 FY 10-11 FY 11-12 FY 12-13 FY 13-14 FY 14-15 FY 15-16 PROJECTED EXPENDITURES - - 20,000 51,036 - - - - - - - 14,000 - - - - - - - - - - - - - - 138 343,854 - - - - - - - 138 74,862 - - - - - - - - - 75,000 - - - - - 33,373 - - 136,627 - - - - - - - - 262,000 70,000 550,000 500,000 491,500 - - - 250,000 - - - - - - - - - 200,000 - - - - - - - - 200,000 - - - - - - - - 40,000 - - - - - - - - - 380,000 - - - - - - - - 100,000 - - - - 27,555 - - 55,535 - - - - - - 6,575 28,425 - - - - - - 347,413 142,817 152,000 - - - - - 60,928$ 354,262$ 873,958$ 1,172,198$ 550,000$ 550,000$ 500,000$ 491,500$ -$ 214 (214) - 327,202 - - - - - 34,610 24,453 - 109,937 - - - - - 62,026 758,492 55,245 157,861 - - - - - 14,112 - - 100,000 - - - - - - 82 49,085 - 100,000 - - - - - - - - - 100,000 100,000 - - - 41,392 387,000 571,608 - - - - - - - - 50,000 425,000 388,000 3,547,000 - - - - - - 546,000 3,319,000 3,190,000 - - 88,292 266,908 - - - - - - 110,963$ 912,497$ 758,238$ 1,316,608$ 1,071,000$ 3,807,000$ 6,837,000$ -$ -$ 2,940,258$ 11,775,012$ 8,159,247$ 13,539,444$ 8,776,647$ 9,927,049$ 16,817,680$ 491,500$ -$ 29,022 31,550 538,691 - - - - - 1,067 60,000 17,000 20,000 50,000 80,000 5,000 - 612,535 415,624 377,517 400,000 350,000 275,000 250,000 100,000 12,417,636$ 8,666,421$ 14,472,652$ 9,196,647$ 10,327,049$ 17,172,680$ 746,500$ 100,000$ 189,857 13,747,959$ 17,758,173$ 6,845,521$ 2,629,874$ 1,925,825$ 1,753,145$ 1,720,645$ 1,734,645$ 15 STREET REHABILITATION PROJECTS 16 PROJECT: NORTHGATE STREET REHAB PROJECT #: ST0518 FUND: 139 - STREETS CAPITAL PROJECTS PROJECT BUDGET: $422,225 PROJECT MANAGER: TBD FUNDING SOURCES: 2003 Bond Authorization (GOB's) PROJECT CLIENT: Public Works Rehabilitation of Streets in the Northgate Area of the City to include portions of Church Street, Boyett, Cross, Lodge, Nagle, Patricia, Stasney, Tauber, and Spruce. This project is a funding source for smaller projects that are being completed in the Northgate area. The funds have been used as follows: Original project budget = $4,104,000 $422,225 transferred back from ST0523 - $800,000 transferred to ST0523 (Church Street Rehab) in FY05. balance of project - FY09 $2,000,000 transferred to ST0505 (Tauber and Stasney Rehab) in FY07. $887,063 transferred to ST0523 (Church Street Rehab) in FY07. $416,937 transferred to ST0416 (Univ Dr Pedestrian Improvements) in FY08. FISCAL YEAR LAND ENG. CONSTR. MISC. PROJECT TOTAL Prior Years $0 $0 $0 $0 $0 2009-10 $0 2010-11 422,225 $422,225 2011-12 $0 2012-13 $0 PROJECT DESCRIPTION/STATUS PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR 2013-14 $0 2014-15 $0 2015-16 $0 TOTAL $0 $0 $422,225 $0 $422,225 Total Personnel $0 Supplies $0 Service $0 Capital $0 TOTAL $0 OPERATING COSTS First Fiscal Year Annually $0 $0 17 PROJECT: Tauber/Stasney Rehab and Northgate Sidewalks FUND(S): PROJECT NUMBERS & BUDGET: 139 - Streets Capital Fund Streets:ST0505 $2,252,110 238 - Water Capital Fund Water: WF0625888 $415,044 239 - Wastewater Capital Fund Wastewater: WF0625893 $793,772 Total Project Budget: $3,460,926 PROJECT MANAGER:Edward McDonald FUNDING PROJECT SOURCES:Streets - CDBG, GOB's CLIENT:Public Works W/WW - Long Term Debt/Utility Revenue Streets Funding: $252,110 from CDBG funding & $2,000,000 transferred from ST0518 in FY07. This project is for the rehabilitation of Tauber and Stasney Street from University Drive to Cherry Street. This project will include eight foot sidewalks to be placed on the east and west sides of Stasney between University Drive and Church Avenue. This project also includes the rehabilitation of water and wastewater lines in the northgate area, in the vicinity of Tauber Street and Stasney Street. Several sanitary sewer lines are in need of replacement due to an increase in service disruptions caused by deteriorating lines, shallow lines, and poor access. The water distribution lines are in need of replacement due to an increase in service disruptions caused by deteriorating lines and inadequate fire protection due to the existance of smaller lines within the respective area. PROJECT DESCRIPTION/STATUS Project Total FISCAL YEAR LAND ENG. CONSTR. MISC. OVERHEAD PROJECT TOTAL Prior Years 104,733 239,234 224,457 589 0 2009-10 44,500 110,000 465,727 0 28,020 2010-11 0 118,192 2,034,056 0 91,418 2011-12 0 0 0 0 0 2012-13 0 0 0 0 0 2013-14 0 0 0 0 0 2014-15 0 0 0 0 0 2015-16 0 0 0 0 0 $569,013 $648,247 $0 $0 $0 $2,243,666 $0 $0 $119,438PROJECT TOTAL $3,460,926$149,233 $467,426 $2,724,240 $589 PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR 18 Streets Portion FISCAL YEAR LAND ENG. CONSTR. MISC. OVERHEAD PROJECT TOTAL Prior Years 104,733$ 132,205$ 224,457$ 589$ -$ $461,984 2009-10 100,000 275,000 6,563 $381,563 2010-11 113,192 1,271,146 24,226 $1,408,564 2011-12 $0 2012-13 $0 2013-14 $0 2014-15 $0 2015-16 $0 Streets Total $104,733 $345,397 $1,770,603 $589 $30,788 $2,252,110 Water Portion FISCAL YEAR LAND ENG. CONSTR. MISC. OVERHEAD PROJECT TOTAL Prior Years -$ 21,403$ -$ -$ -$ $21,403 2009-10 5,000 70,894 6,641 $82,534 2010-11 2,500 283,575 25,032 $311,107 2011-12 $0 2012-13 $0 2013-14 $0 2014-15 $0 2015-16 $0 Water Total $0 $28,903 $354,469 $0 $31,672 $415,044 Wastewater Portion FISCAL YEAR LAND ENG. CONSTR. MISC. OVERHEAD PROJECT TOTAL Prior Years -$ 85,626$ -$ -$ -$ $85,626 2009-10 44,500 5,000 119,834 14,817 $184,150 2010-11 2,500 479,334 42,161 $523,995 2011-12 $0 PROJECT: PROJECT CALENDAR OF EXPENDITURES BY FUND Tauber/Stasney Rehab and Northgate Sidewalks 2012-13 $0 2013-14 $0 2014-15 $0 2015-16 $0 Wastewater Total $44,500 $93,126 $599,168 $0 $56,977 $793,772 First Fiscal Year Annually Total Personnel $0 Supplies $0 Service $0 Capital $0 TOTAL $0 $0 $0 OPERATING COSTS $589 $119,438 $3,460,926PROJECT TOTAL $149,233 $467,426 $2,724,240 19 STREET EXTENSION PROJECTS 20 PROJECT: Oversize Participation PROJECT #: ST0519 FUND: 139 - Streets CIP Fund PROJECT BUDGET: $472,611 PROJECT MANAGER:Alan Gibbs FUNDING SOURCES: 2003 GO Bonds PROJECT CLIENT: Public Works Parent Project Funds provided for City-wide oversize participation projects. Original project budget = $2,700,000. $256,046 transferred back from ST0612 in FY09 $516,569 transferred to Corsair/AMS Street Extension (ST0612) in FY06. $23,431 transferred to Waterwood OP in FY06. $740,000 transferred to ST0913 in FY10 $187,569 transferred back from ST0612 in FY07. $1,364,000 to be transferred to ST0913 in FY10 $27,004 transferred to ST0802 - FY08. FISCAL YEAR LAND ENG. CONSTR. MISC. PROJECT TOTAL Prior Years $0 $0 $0 $0 $0 2009-10 $0 2010-11 472,611 $472,611 2011-12 $0 2012-13 $0 2013-14 $0 2014-15 $0 2015-16 $0 TOTAL $0 $0 $472,611 $0 $472,611 PROJECT DESCRIPTION/STATUS PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR Total Personnel $0 Supplies $0 Service $0 Capital $0 TOTAL $0 OPERATING COSTS First Fiscal Year Annually $0 $0 21 PROJECT: Hollemen Extension FUND(S): PROJECT NUMBERS & BUDGET: 139 - Streets Capital Fund Streets:ST0913 $2,125,000 238 - Water Capital Fund Water: WF1254634 $130,000 Total Project Budget: $2,255,000 PROJECT MANAGER:Daniel Beamon FUNDING PROJECT SOURCES:Streets - GOB CLIENT:Public Works Water - Long Term Debt/Utility Revenue This project is for the extension of Holleman Drive so that it connects to Jones Butler which would provide access to FM 2818 at the signalized intersection with Holleman. As part of this project, a water line will be extended. Project Total FISCAL YEAR LAND ENG. CONSTR. MISC. OVERHEAD PROJECT TOTAL Prior Years $0 $77,364 $0 $0 $0 2009-10 $0 $151,000 $2,026,636 $0 $0 2010-11 $0 $0 $0 $0 $0 $77,364 $2,177,636 $0 PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR PROJECT DESCRIPTION/STATUS $$$$$ 2011-12 $0 $0 $0 $0 $0 2012-13 $0 $0 $0 $0 $0 2013-14 $0 $0 $0 $0 $0 2014-15 $0 $0 $0 $0 $0 2015-16 $0 $0 $0 $0 $0 $2,026,636 $0 $0 $ $0 $0 $0 $0 $0 PROJECT TOTAL $2,255,000$0 $228,364 Fm 2154 Harvey Mitchell Pkwy SWe ll b o rn RdHol l eman Dr WJones-but l er RdC hristine Ln Fm 2 1 5 4Harvey RdW illiam D. Fitch PkwyTexas Ave SW ell b orn R d Fm 158 22 Streets Portion FISCAL YEAR LAND ENG. CONSTR. MISC. PROJECT TOTAL Prior Years $0 $77,364 $0 $0 $77,364 2009-10 $151,000 $1,896,636 $2,047,636 2010-11 $0 2011-12 $0 2012-13 $0 2013-14 $0 2014-15 $0 2015-16 $0 Streets Total $0 $228,364 $1,896,636 $0 $2,125,000 Water Portion FISCAL YEAR LAND ENG. CONSTR. MISC. OVERHEAD PROJECT TOTAL Prior Years $0 $0 $0 $0 $0 2009-10 $130,000 $130,000 2010-11 $0 2011-12 $0 2012-13 $0 2013-14 $0 2014-15 $0 2015-16 $0 Water Total $0 $0 $130,000 $0 $0 $130,000 First Fiscal Year Annually Total PROJECT TOTAL OPERATING COSTS $0 $0 $2,255,000 PROJECT: PROJECT CALENDAR OF EXPENDITURES BY FUND Hollemen Extension $0 $228,364 $2,026,636 y Personnel $0 Supplies $0 Service 16,695 $16,695 Capital $0 TOTAL $0 $16,695 $16,695 23 PROJECT: Discovery Drive Extension PROJECT #: ST0804 FUND: 139 - Streets CIP PROJECT BUDGET: $2,000,000 PROJECT MANAGER:Jeff Haeber FUNDING SOURCES: Certificates of Obligation PROJECT CLIENT: Public Works FISCAL YEAR LAND ENG. CONSTR. MISC. OVERHEAD PROJECT TOTAL Prior Years $0 $369,843 $24,076 $393,919 2009-10 105,659 1,500,422 $1,606,081 2010-11 $0 2011-12 $0 2012-13 $0 2013-14 $0 2014-15 $0 2015-16 $0 TOTAL $0 $475,502 $1,524,498 $0 $0 $2,000,000 PROJECT DESCRIPTION/STATUS PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR This project will extend Discovery Drive north of Raymond Stotzer to a point where it will terminate just past the driveway entrance to the new TIPS building along with a dedicated right turn lane and traffic signal modifications. The project will include design, bidding, and construction of approximately 350 LF of concrete curb and gutter roadway with waterline bore and extension, storm sewer, driveway, right turn lane, and traffic signal modifications. Total Personnel $0 Supplies $0 Service $0 Capital $0 TOTAL $0$0 $0 OPERATING COSTS First Fiscal Year Annually Fm 2 1 5 4Harvey RdWilliam D. Fitch PkwyTexas Ave SWellb o r n R d Fm 158 Wellb o r n R dUniversity DrGeorge Bush Dr24 Home of Texas A&M University ® 25 PROJECT: Victoria Avenue Extension FUND(S): PROJECT NUMBERS & BUDGET: 139 - Streets Capital Fund Streets:ST0903 $2,455,000 238 - Water Capital Fund Water: WF1158553 $228,375 239 - Wastewater Capital Fund Wastewater: WF1158560 $25,556 Total Project Budget: $2,708,931 PROJECT MANAGER:Donald Harmon FUNDING PROJECT SOURCES:Streets - 08 G.O.B.: $2,455,000 CLIENT:Public Works W/WW - URB Water Sevices: Stephen Maldonado, Jr Project Total FISCAL YEAR LAND ENG. CONSTR. MISC. OVERHEAD PROJECT TOTAL Prior Years $0 $86,156 $0 $254 $0 2009 10 $200 000 $145 879 $23 521 $20 000 $0 This project will extend Victoria Avenue from Southern Plantation Drive to connect with State Highway 40, aligning with the existing Victoria Avenue on the south side of State Highway 40. The roadway will be a major collector consisting of two travel lanes and a center turn lane with bike lanes, sidewalks, landscaping, and storm drainage. Water and wastewater line upgrades will also be made as part of this project. PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR PROJECT DESCRIPTION/STATUS $86,409 $389 4002009-10 $200,000 $145,879 $23,521 $20,000 $0 2010-11 $0 $80,000 $2,133,122 $20,000 $0 2011-12 $0 $0 $0 $0 $0 2012-13 $0 $0 $0 $0 $0 2013-14 $0 $0 $0 $0 $0 2014-15 $0 $0 $0 $0 $0 2015-16 $0 $0 $0 $0 $0 $0 $0 $0 $2,233,122 $0 $389,400 PROJECT TOTAL $2,708,931$200,000 $312,035 $2,156,643 $40,254 $0 $0 Victoria AvenueState Hwy 6Fm 2154R o c k P ra irie R d Fm 21 5 4Harvey RdWilliam D. Fitch PkwyTexas Ave SWell b o r n R d Fm 158 26 Streets Portion FISCAL YEAR LAND ENG. CONSTR. MISC. OVERHEAD PROJECT TOTAL Prior Years $0 $77,851 $0 $254 $0 $78,104 2009-10 $200,000 $142,149 $0 $20,000 $0 $362,149 2010-11 $0 $80,000 $1,914,747 $20,000 $0 $2,014,747 2011-12 $0 2012-13 $0 2013-14 $0 2014-15 $0 2015-16 $0 Streets Total $200,000 $300,000 $1,914,747 $40,254 $0 $2,455,000 Water Portion FISCAL YEAR LAND ENG. CONSTR. MISC. OVERHEAD PROJECT TOTAL Prior Years $0 $6,270 $0 $0 $0 $6,270 2009-10 $0 $3,730 $0 $0 $0 $3,730 2010-11 $0 $0 $218,375 $0 $0 $218,375 2011-12 $0 2012-13 $0 2013-14 $0 2014-15 $0 2015-16 $0 Water Total $0 $10,000 $218,375 $0 $0 $228,375 Wastewater Portion FISCAL YEAR LAND ENG. CONSTR. MISC. OVERHEAD PROJECT TOTAL Prior Years $0 $2,035 $0 $0 $0 $2,035 2009-10 $0 $0 $23,521 $0 $0 $23,521 2010-11 $0 2011 12 $0 PROJECT: PROJECT CALENDAR OF EXPENDITURES BY FUND Victoria Avenue Extension 2011-12 $0 2012-13 $0 2013-14 $0 2014-15 $0 2015-16 $0 Wastewater Total $0 $2,035 $23,521 $0 $0 $25,556 First Fiscal Year Annually Total Personnel $0 Supplies $0 Service 13,125 $13,125 Capital $0 TOTAL -$ 13,125$ $13,125 PROJECT TOTAL $200,000 OPERATING COSTS $2,156,643 $40,254 $0 $2,708,931$312,035 27 PROJECT: Jones Butler (Penberthy) Extension PROJECT #: ST0905 FUND: 139 - Streets Capital Projects Fund PROJECT BUDGET: $3,283,500 PROJECT FUNDING MANAGER: Jeff Haeber SOURCES: 2008 General Obligation Bonds PROJECT CLIENT: Public Works FISCAL YEAR LAND ENG. CONSTR. MISC. OVERHEAD PROJECT TOTAL Prior Years $0 $6,020 $0 $1,749 $0 $7,769 2009-10 25,000 $25,000 2010-11 341,850 500,000 $841,850 2011-12 33,881 2,375,000 $2,408,881 2012-13 $0 2013-14 $0 2014 15 $0 PROJECT DESCRIPTION/STATUS PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR This project makes an important connection between high density student housing and TAMU campus. Penberthy will extend from Luther / Jones-Butler intersection across TAMU property to the George Bush / Penberthy intersection. The project will require an equestrian crossing to accomodate universtiy operations. A traffic signal will need to be installed at the George Bush / Penberthy Intersection. The project includes design, bidding, and construction of approximately 2,100 LF of concrete curb and gutter roadway with necessary storm sewer extensions. A bridge class culvert will need to be installed for the White's Creek Tributary crossing along with a livestock crossing underneath the roadway. Original budget = $3,275,000; $8,500 transferred from ST0507 - FY09 2014-15 $0 2015-16 $0 TOTAL $0 $406,751 $2,875,000 $1,749 $0 $3,283,500 Total Personnel $0 Supplies $0 Service $12,075 Capital $0 TOTAL $12,075 NET INCREASE IN OPERATING COSTS First Fiscal Year Annually $0 12,075 $12,075 We ll b o r n Rd Harve y M i t c h e l l Pkwy S Jon es-but le r R dWelsh AveOlsen Blvd Christin e L n P enberth y Bl v d Village DrDiscovery DrD etr oit S tRese a r c h PkwyBarbara Bus h D r A riz o n a S tBurt StFm 2 1 5 4Harvey RdWilliam D. Fitch PkwyTexas Ave SWell b o r n R d Fm 158 28 PROJECT: Royder Road Improvements PROJECT #: ST1037 FUND: 139 - Streets CIP PROJECT BUDGET: $1,000,000 PROJECT MANAGER:Jeff Haeber FUNDING SOURCES:2008 General Obligation Bonds PROJECT CLIENT: Public Works FISCAL YEAR LAND ENG. CONSTR. MISC. OVERHEAD PROJECT TOTAL Prior Years $0 $0 $0 $0 2009-10 95,000 5,000 $100,000 2010-11 875,000 25,000 $900,000 2011-12 $0 2012-13 $0 2013-14 $0 2014-15 $0 2015-16 $0 TOTAL $0 $95,000 $875,000 $30,000 $0 $1,000,000 PROJECT DESCRIPTION/STATUS PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR This project will make partial improvements to Royder Road to facilitate the new elementary school at the corner of Royder Road and Greens Prairie Trail. The improvements to Royder Road include partial drainage improvements, partial curb and gutter roadway, and new driveways into the school site. The improvements to Greens Prairie Trail include drainage improvements, deceleration lane into the school, and a left turn lane into the school site. The intersection at Royder and Greens Prairie Trail will be improved with concrete pavement to better withstand the increased traffic. Total Personnel $0 Supplies $0 Service $0 Capital $0 TOTAL $0 OPERATING COSTS First Fiscal Year Annually $0 $0 Fm 2154Harvey RdW illiam D. Fitch PkwyArrington RdRoyder RdGr e e n s P ra irie Rd WFm 2154Gus Roy Rd29 PROJECT: Rock Prairie Road East Widening PROJECT #: ST0417 Design & ROW FUND: 139 - Street Capital Projects PROJECT BUDGET: $2,969,000 PROJECT Jeff Haeber MANAGER: FUNDING SOURCES: 2003 GOB's PROJECT CLIENT: Public Works This project is for design services related to the widening of Rock Prairie East to a minor arterial section as shown on the Thoroughfare Plan from SH 6 Frontage Road to W. D. Fitch Parkway. This includes design for the minor arterial section, sidewalks, storm drain facilities, lighting plan, etc. This budget also includes funds for all Right of Way (ROW) acquisition for the full minor arterial section. The project consists of design and ROW only. No funds are included in this budget for construction. Bleyl & Associates was awarded the engineering design by the City Council on February 10, 2005 for $795,000. This is a professional services contract for the engineering design for the proposed widening of Rock Prairie Road to a minor arterial from Highway 6 to W. D. Fitch Parkway. The conceptual design will include topographic and utility surveys and provide an assessment of the interrelationship between rights-of-way, utilities, existing easements and drainage. The contract includes development of plans, specifications and final cost estimates. It will also provide survey work and legal descriptions for purchase of right-of-way. FISCAL YEAR LAND ENG. CONSTR. MISC. OVERHEAD PROJECT TOTAL Prior Years $11,525 $724,512 $0 $10,990 $0 $747,026 2009-10 50,000 5,000 55,000 2010-11 851,766 10,000 5,000 866,766 2011-12 851,766 30,000 5,000 886,766 2012-13 378,442 30,000 5,000 413,442 2013-14 0 PROJECT DESCRIPTION/STATUS PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR 2013 14 0 2014-15 0 2015-16 0 TOTAL $2,143,499 $794,512 $0 $30,990 $0 $2,969,000 Total Personnel $0 Supplies $0 Service $0 Capital $0 TOTAL $0 OPERATING COSTS First Fiscal Year Annually $0 $0 30 PROJECT: Rock Prairie Road West ROW PROJECT #: ST1025 FUND: 139 - Streets Capital Projects Fund PROJECT BUDGET: $740,000 PROJECT FUNDING MANAGER: Jeff Haeber SOURCES: 2008 General Obligation Bonds PROJECT CLIENT: Public Works FISCAL YEAR LAND ENG. CONSTR. MISC. PROJECT TOTAL Prior Years $0 $0 $0 $0 $0 2009-10 40,000 5,000 $45,000 2010-11 10,000 5,000 $15,000 2011-12 280,000 5,000 15,000 $300,000 2012-13 365,000 15,000 $380,000 2013-14 $0 2014 15 $0 PROJECT DESCRIPTION/STATUS PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR This project includes the purchase of additional right-of-way from State Highway 6 to Normand Drive to provide for the future widening of that section of Rock Prairie Road. 2014-15 $0 2015-16 $0 TOTAL $645,000 $55,000 $0 $40,000 $740,000 Total Personnel $0 Supplies $0 Service $0 Capital $0 TOTAL $0$0 $0 NET INCREASE IN OPERATING COSTS First Fiscal Year Annually Fm 2 1 5 4Harvey RdWilliam D. Fitch PkwyTexas Ave SWell b o r n R d Fm 158 R o c k P ra irie R d S H 6 S Fro n t a g e 6 Rd EPi er r e Pl To d d T rlNormand Dr AlleyGail PlA ust in Av eA rn o ld R d P in o n D rSandy Ci r S u s s e x D r 31 PROJECT: BARRON ROAD RIGHT OF WAY PROJECT #: ST0006 FUND: 139 - Street Capital Projects PROJECT BUDGET: $481,000 PROJECT MANAGER: Daniel Beamon FUNDING SOURCES: 1998 General Obligation PROJECT Bond Funds CLIENT: Public Works This project will upgrade Barron Road from a two lane rural highway to a minor arterial road as reflected on the Thoroughfare Plan. This project will establish an alignment and acquire the necessary right-of-way. Original budget = $316,000 $50,000 transferred from ST0409 - FY10 2003 budget amendment added $115,000 for land purchase FISCAL YEAR LAND ENG. CONSTR. MISC. PROJECT TOTAL Prior Years $293,948 $37,106 $0 $2 $331,056 2009-10 $144,944 $5,000 $149,944 2010-11 $0 2011-12 $0 2012-13 $0 2013-14 $0 2014-15 $0 2015-16 $0 TOTAL $438,892 $42,106 $0 $2 $481,000 Total PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR PROJECT DESCRIPTION/STATUS OPERATING COSTS First Fiscal Year Annually Total Personnel $0 Supplies $0 Service $0 Capital $0 TOTAL $0 First Fiscal Year Annually $0 $0 32 Home of Texas A&M University ® 33 Barron Road Widening Phase 2 FUND(S): 139 - Streets Capital Projects Fund PROJECT NUMBERS & BUDGET: 238 - Water Capital Fund Streets: ST1026 $10,415,000 Water: TBD $50,000 Total Project Budget: $10,465,000 PROJECT MANAGER:Daniel Beamon FUNDING PROJECT SOURCES:2008 General Obligation Bonds CLIENT:Public Works Water - Long Term Debt/Utility Revenue Water Services (Ed Savage) Streets Budget: Original budget = $11,415,000; $1,000,000 transferred to ST1037 - FY10. Streets component of the project is projected to come in under budget. This project includes the upgrade of Barron Road from a two lane rural highway to a four lane road with sidewalks, raised center median, landscaping, storm sewers and street lighting. In 2003, voters approved funds for the design of this section of roadway as well as to purchase necessary right of way. In 2008, voters approved funds to construct Barron from Decatur Drive to William D Fitch Parkway. The upgrade of Barron Road will include landscaping, street lighting, and raised median center. This project includes the addition of signals at Barron/Victoria and Barron/SH40. The project will also include some improvements to the water system. Water lines and meters will be relocated as required. This portion of the project will be funded by Water Capital Projects Fund. PROJECT DESCRIPTION/STATUS PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR Project Total FISCAL YEAR LAND ENG. CONSTR. MISC. OVERHEAD PROJECT TOTAL Prior Years 0 0 0 0 0 2009-10 0 30,000 250,000 0 0 2010-11 0 10,000 3,885,000 0 0 2011-12 0 10,000 2,790,000 0 0 2012-13 0 0 0 0 0 2013-14 0 0 0 0 0 2014-15 0 0 0 0 0 2015-16 0 0 0 0 0 PROJECT TOTAL $0 $50,000 $6,925,000 $0 $0 $2,800,000 $3,895,000 $280,000 $0 $0 $6,975,000 $0 $0 $0 PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR Fm 2154W i l l i a m D F i t c h P wBarron RdDecatur DrVi ct or i a AvFm 2 15 4Harvey RdWilliam D. Fitch PkwyTexas Ave SWell b o r n R d Fm 158 34 Streets Portion FISCAL YEAR LAND ENG. CONSTR. MISC. OVERHEAD PROJECT TOTAL Prior Years $0 $0 $0 $0 $0 $0 2009-10 30,000 200,000 $230,000 2010-11 10,000 3,885,000 $3,895,000 2011-12 10,000 2,790,000 $2,800,000 2012-13 $0 2013-14 $0 2014-15 $0 2015-16 $0 Streets Total $0 $50,000 $6,875,000 $0 $0 $6,925,000 Water Portion FISCAL YEAR LAND ENG. CONSTR. MISC. OVERHEAD PROJECT TOTAL Prior Years $0 $0 $0 $0 $0 $0 2009-10 50,000 $50,000 2010-11 $0 2011-12 $0 2012-13 $0 2013-14 $0 2014-15 $0 2015-16 $0 Water Total $0 $0 $50,000 $0 $0 $50,000 First Fiscal Year Annually Total Personnel $0 Supplies $0 Service 37,643 $37,643 Capital $0 PROJECT: PROJECT CALENDAR OF EXPENDITURES BY FUND Barron Road Widening Phase 2 OPERATING COSTS Capital $0 TOTAL $0 $37,643 $37,643 35 PROJECT: Barron Road East/Lakeway Drive PROJECT #: ST1101 FUND: 139 - Streets Capital Projects Fund PROJECT BUDGET: $15,135,000 PROJECT FUNDING MANAGER: Ed McDonald SOURCES: 2008 General Obligation Bonds PROJECT CLIENT: Public Works FISCAL YEAR LAND ENG. CONSTR. MISC. PROJECT TOTAL Prior Years $0 $0 $0 $0 $0 2009-10 $0 2010-11 200,000 10,000 $210,000 2011-12 735,000 25,000 $760,000 PROJECT DESCRIPTION/STATUS PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR This project is the extension of Barron Road from SH 6 east at the existing Barron Road to a future intersection with the extension of Lakeway. The Barron extension will be combined with the Lakeway extension. The portion of Lakeway included extends from its intersection with Barron southward to connect to Lakeway that will be built by private development. 2012-13 175,800 4,483,520 25,000 $4,684,320 2013-14 100,000 9,330,680 50,000 $9,480,680 2014-15 $0 2015-16 $0 TOTAL $0 $1,210,800 $13,814,200 $110,000 $15,135,000 Total Personnel $0 Supplies $0 Service $32,655 Capital $0 TOTAL $32,655 NET INCREASE IN OPERATING COSTS First Fiscal Year Annually $0 32,655 $32,655 Fm 2 1 54Harvey RdWilliam D. Fitch PkwyTexas Ave SWell b o r n R d Fm 158 L a k e wa y D r.Barron RdS H 6 S F r o nt age 6 Rd E Rock Prairie Rd Barron RdLo n gmire DrDecatur D r William D. Fitch PkwySpearman DRitchey RdAgate DrOffra m p 6 SNorfolk Ct36 STREET TXDOT PROJECTS 37 PROJECT: TEXAS AVENUE STREETSCAPE PROJECT #: ST9915 PHASE II FUND: 139 - Streets Capital Projects PROJECT BUDGET: $549,352 PROJECT MANAGER: TROY ROTHER FUNDING SOURCES: STREETS CIP PROJECT CLIENT: Public Works This is a part of the Texas Avenue Widening Phase II project. This is for the cost of streetscape improvements such as raised medians and streetscape light poles. Project combined with George Bush Drive Median project in FY06. FISCAL YEAR LAND ENG. CONSTR. MISC. PROJECT TOTAL Prior Years $0 $1,497 $386,542 $454 $388,494 2009-10 160,858 160,858 2010-11 0 2011-12 0 2012-13 0 2013-14 0 2014-15 0 2015-16 0 TOTAL $0 $1,497 $547,400 $454 $549,352 Total PROJECT DESCRIPTION/STATUS PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR OPERATING COSTS First Fiscal Year Annually Total Personnel $0 Supplies $0 Service $10,000 Capital $0 TOTAL $10,000 First Fiscal Year Annually $0 10,000 $10,000 Fm 2 1 54Harvey RdWilliam D. Fitch PkwyTexas Ave SWell b o r n R d Fm 158 T e x a s Av Texas Av SSouthwest PwHolleman DrD a rt mout h S tA n derson St Manuel DrGlade St 38 PROJECT: TxDOT Landscaping - Wellborn Rd PROJECT #: ST0812 FM 2818 to SH 40 FUND: 139 - Streets Capital Projects PROJECT BUDGET: $96,859 PROJECT MANAGER: Ross Albrecht FUNDING SOURCES: Street CIP - Fund Balance PROJECT CLIENT: Public Works This project is an Advance Funding Agreement (AFA) with the Texas Department of Transportation (TxDOT) to install, as part of the Wellborn Road Widening project, landscape and hardscape improvements on Wellborn Road from FM 2818 to SH 40. The AFA is for cost participation by the city in the design and construction of the landscape hardscape elements, and also indicates that the city will take over maintenance and responsibilities in the future. The majority of the landscape and hardscape improvements will be located in raised medians. Construction of these improvements is anticipated to be complete in FY11. FISCAL YEAR LAND ENG. CONSTR. MISC. OVERHEAD PROJECT TOTAL Prior Years $0 $0 $92,984 $0 $92,984 2009-10 0 2010-11 3,875 3,875 2011-12 0 2012-13 0 2013-14 0 2014-15 0 2015-16 0 TOTAL $0 $0 $96,859 $0 $0 $96,859 PROJECT DESCRIPTION/STATUS PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR Total Personnel $0 Supplies $0 Service $12,000 Capital $0 TOTAL $12,000 OPERATING COSTS First Fiscal Year Annually 12,000 $12,000 39 PROJECT: Wellborn Rd Widening PROJECT #: ST0510 FUND: 139 - Streets Capital Projects PROJECT BUDGET: $780,633 PROJECT FUNDING MANAGER: Charles McLemore SOURCES: Streets Capital Projects Fund Funds for this project are designated to pay the City's portion of right-of-way costs for TxDot's Wellborn Road Widening project. FISCAL YEAR LAND ENG. CONSTR. MISC. PROJECT TOTAL Prior Years $0 $0 0 $453,680 $453,680 2009-10 234,666 234,666 2010-11 0 2011-12 0 2012-13 92,287 92,287 2013-14 0 2014-15 0 2015-16 0 TOTAL $0 $0 $0 $780,633 $780,633 Total PROJECT DESCRIPTION/STATUS PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR OPERATING COSTS First Fiscal Year Annually Total Personnel $0 Supplies $0 Service $0 Capital $0 TOTAL $0 First Fiscal Year Annually $0 $0 40 PROJECT: Texas Avenue Widening ROW PROJECT #: ST9820 FUND: 139 - Streets Capital Projects PROJECT BUDGET: $595,962 PROJECT FUNDING MANAGER: Charles McLemore SOURCES: Streets Capital Projects Fund Funds for this project are designated to pay the City's portion of right-of-way costs for TxDot's Texas Avenue Widening project. FISCAL YEAR LAND ENG. CONSTR. MISC. PROJECT TOTAL Prior Years $0 $0 0 $496,715 $496,715 2009-10 99,247 99,247 2010-11 0 2011-12 0 2012-13 0 2013-14 0 2014-15 0 2015-16 0 TOTAL $0 $0 $0 $595,962 $595,962 Total PROJECT DESCRIPTION/STATUS PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR OPERATING COSTS First Fiscal Year Annually Total Personnel $0 Supplies $0 Service $0 Capital $0 TOTAL $0$0 $0 First Fiscal Year Annually 41 TRAFFIC PROJECTS 42 PROJECT: Traffic System Safety Improvements PROJECT #: ST0511 FUND: 139 - Streets CIP Fund PROJECT BUDGET: $71,036 PROJECT Holding Account MANAGER: Lee Robinson FUNDING SOURCES: 2003 GOB - $500,000 PROJECT CLIENT: Public Works As new projects are created, funds will be allocated to those projects and this project balance will be reduced. FISCAL YEAR LAND ENG. CONSTR. MISC. PROJECT TOTAL Prior Years $0 $0 $0 $0 $0 2009-10 20,000 $20,000 2010-11 51,036 $51,036 2011-12 $0 2012-13 $0 2013-14 $0 2014-15 $0 2015-16 $0 TOTAL $0 $0 $0 $71,036 $71,036 PROJECT DESCRIPTION/STATUS PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR This project serves to hold funds for traffic system safety improvement projects. Original budget was $500,000. This project serves as a holding account for new traffic safety improvements projects. These funds are critical to meeting needs that arise throughout the year. Median improvements have been made to improve safety at high crash locations. Intersection improvements have been made to improve signal operation and safety. Pedestrian improvements have been made at intersections to facilitate safety near schools. Total Personnel $0 Supplies $0 Service $0 Capital $0 TOTAL $0 OPERATING COSTS First Fiscal Year Annually $0 $0 43 PROJECT: University Drive/Asbury Improvements PROJECT #: ST1036 FUND: 139 - Streets CIP Fund PROJECT BUDGET: $14,000 PROJECT MANAGER: Troy Rother FUNDING SOURCES: 2003 GO Bonds - ST0511 PROJECT CLIENT: Public Works This project is for the design of traffic safety improvements at the intersection of University Drive and Asbury. It is anticipated that Texas A&M will reimburse the City for half of the design cost. FISCAL YEAR LAND ENG. CONSTR. MISC. OVERHEAD PROJECT TOTAL Prior Years $0 $0 $0 $0 $0 $0 2009-10 14,000 $14,000 2010-11 $0 2011-12 $0 2012-13 $0 PROJECT DESCRIPTION/STATUS PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR 2012 13 $0 2013-14 $0 2014-15 $0 2015-16 $0 TOTAL $0 $14,000 $0 $0 $0 $14,000 Total Personnel $0 Supplies $0 Service $0 Capital $0 TOTAL $0$0 $0 OPERATING COSTS First Fiscal Year Annually University DrChurch AveAsbury St Ireland St T a ube r St College Main Boyett St N e w S tStasney StSecond St Ho uston S tR o s s S tH o g g S tLodge StFirst StFm 2154Harvey RdWil liam D. Fitch Pkwy44 PROJECT: New Traffic Signal Projects (2003 GOB) PROJECT #: ST0512 FUND: 139 - Streets Capital Projects PROJECT BUDGET: $0 PROJECT MANAGER: Lee Robinson FUNDING SOURCES: 2003 GOB PROJECT CLIENT: Public Works This project serves to hold funds for new traffic signal projects. Original budget was $2,250,000. As new signal projects are created, funds are allocated to those projects and this project balance is reduced. All funds from this project have been allocated. FISCAL YEAR LAND ENG. CONSTR. MISC. PROJECT TOTAL Prior Years $0 $0 $0 $0 $0 2008-09 $0 2009-10 $0 2010-11 $0 2011-12 $0 2012-13 $0 2013-14 $0 2014-15 $0 TOTAL $0 $0 $0 $0 $0 PROJECT DESCRIPTION/STATUS PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR TOTAL $0 $0 $0 $0 $0 Total Personnel $0 Supplies $0 Service $0 Capital $0 TOTAL $0 OPERATING COSTS First Fiscal Year Annually $0 $0 45 PROJECT: Arrington/SH40 Signal PROJECT #: ST1030 FUND: 139 - Streets CIP Fund PROJECT BUDGET: $343,991 PROJECT MANAGER:Troy Rother FUNDING SOURCES: ($243,991) 2003 GO Bonds - ST0512 PROJECT ($100,000) 2008 GO Bonds - ST1027 CLIENT: Public Works This project is for the installation of a signal at the intersection of Arrington and State Highway 40. FISCAL YEAR LAND ENG. CONSTR. MISC. OVERHEAD PROJECT TOTAL Prior Years $0 $0 $138 $0 $138 2009-10 343,854 $343,854 2010-11 $0 2011-12 $0 2012-13 $0 PROJECT DESCRIPTION/STATUS PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR 2013-14 $0 2014-15 $0 2015-16 $0 TOTAL $0 $0 $343,991 $0 $0 $343,991 Total Personnel $0 Supplies $0 Service $1,800 Capital $0 TOTAL $1,800$0 1,800 $1,800 OPERATING COSTS First Fiscal Year Annually Fm 21 5 4Harvey RdWilliam D. Fitch PkwyTexas Ave SWell b o r n R d Fm 158 S H 6 SFro ntag e 6 Rd WFronta g e 6 Rd EAr r i ng t o n RdAlleyDecatur Dr S H 4 0 / W i ll ia m D F i t c h P k w y Lakeway DrOld Arrington RdOfframp 6 NHeath Dr46 PROJECT: Barron/SH40 Signal PROJECT #: ST1029 FUND: 139 - Streets CIP Fund PROJECT BUDGET: $75,000 PROJECT MANAGER:Troy Rother FUNDING SOURCES: 2008 GO Bonds - ST1027 PROJECT CLIENT: Public Works This project is for the installation of a signal at the intersection of Barron and State Highway 40. An additional $150,000 is budgeted for this signal as part of the Barron Rd Widening Phase II project (ST1026). The funds from ST1030 will be used for advance equipment purchases. FISCAL YEAR LAND ENG. CONSTR. MISC. OVERHEAD PROJECT TOTAL Prior Years $0 $0 $138 $0 $138 2009-10 74,862 $74,862 2010-11 $0 2011-12 $0 2012-13 $0 PROJECT DESCRIPTION/STATUS PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR 2013-14 $0 2014-15 $0 2015-16 $0 TOTAL $0 $0 $75,000 $0 $0 $75,000 Total Personnel $0 Supplies $0 Service $1,800 Capital $0 TOTAL $1,800 OPERATING COSTS First Fiscal Year Annually $0 1,800 $1,800 Fm 21 5 4Harvey RdWilliam D. Fitch PkwyTexas Ave SWell b o r n R d Fm 158 Barron RdS H 40 / William D Fitch Pkwy R en ee LnVi ctoria AveEagle AvePassendale LnDelrey Dr I n c o u rt L a n e Jamey LnS H 40 / William D Fitch Pk w y 47 PROJECT:Victoria/Barron Signal PROJECT #: TBD FUND: 139 - Streets CIP Fund PROJECT BUDGET: $75,000 PROJECT MANAGER:Troy Rother FUNDING SOURCES: 2008 GO Bonds - ST1027 PROJECT CLIENT: Public Works This project is for the installation of a signal at the intersection of Barron Rd and Victoria. An additional $150,000 is budgeted for this signal as part of the Barron Rd Widening Phase II project (ST1026). The funds from this project will be used for advance equipment purchases. FISCAL YEAR LAND ENG. CONSTR. MISC. OVERHEAD PROJECT TOTAL Prior Years $0 $0 $0 $0 $0 2009-10 $0 2010-11 75,000 $75,000 2011-12 $0 2012-13 $0 PROJECT DESCRIPTION/STATUS PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR 2013-14 $0 2014-15 $0 2015-16 $0 TOTAL $0 $0 $75,000 $0 $0 $75,000 Total Personnel $0 Supplies $0 Service $1,800 Capital $0 TOTAL $1,800$0 1,800 $1,800 OPERATING COSTS First Fiscal Year Annually Fm 21 5 4Harvey RdWilliam D. Fitch PkwyTexas Ave SWell b o r n R d Fm 158 Barron RdVi ct or i a AveEagle AveRen ee LnNewport LnAl e x a n d ri a Av e Passendale LnDelrey DrIn c o u rt L a n e Jamey LnPomel Dr N ig h t Rain Dr Bracey CtMallory Ct48 PROJECT: SIGNAL @ GEORGE BUSH/DOMINIK PROJECT #: ST0205 FUND: 139 - Streets Capital Projects PROJECT BUDGET: $170,000 PROJECT FUNDING MANAGER: LEE ROBINSON SOURCES: 1998 G.O. BONDS CIP FUNDS Since the widening of G Bush East a new traffic warrant study was conducted, at that time the intersection did not meet traffic volumes to warrant a signal. It has been decided to do another warrant study after Texas Avenue Phase II project is completed. Most all materials are in-stock to build this traffic signal. More than likely if this location meets warrants during the next study it will be built in 2010-2011 fiscal year. FISCAL YEAR LAND ENG. CONSTR. MISC. PROJECT TOTAL Prior Years $0 $5,309 20,032 $8,033 $33,373 2009-10 $0 2010-11 136,627 $136,627 2011-12 $0 2012-13 $0 2013-14 $0 2014-15 $0 2015-16 $0 TOTAL $0 $5,309 $156,659 $8,033 $170,000 PROJECT DESCRIPTION/STATUS PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR OPERATING COSTS Total Personnel $0 Supplies $0 Service $1,800 Capital $0 TOTAL $1,800$0 $1,800 OPERATING COSTS Annually 1,800 First Fiscal Year Fm 2154Harvey RdWilliam D. Fitch PkwyT e x a s Av e SWe ll b o r n R d Fm 158 Harvey RdT e x a s Av e S T e x a s A v eFo st er Ave Dominik DrFrancis DrHolleman Dr EUniversity Oaks BlvdPur y e a r Dr Mil n er Dr Richards StGilc h r i s t A v e Re d m o n d D rWalton D r Kyle Ave49 PROJECT: New Traffic Signal Projects (2008 GOB) PROJECT #: ST1027 FUND: 139 - Streets Capital Projects PROJECT BUDGET: $1,873,500 PROJECT MANAGER: Lee Robinson FUNDING SOURCES: 2008 GOB PROJECT CLIENT: Public Works This project serves to hold funds for new traffic signal projects. Original budget was $3,000,000 ($500,000 per year FY 10 thru 15). As new signal projects are created, funds will be allocated to those projects and this project balance will be reduced. Original project budget = $3,000,000 FISCAL YEAR LAND ENG. CONSTR. MISC. PROJECT TOTAL Prior Years $0 $0 $0 $0 $0 2009-10 $0 2010-11 262,000 $262,000 2011-12 70,000 $70,000 2012-13 550,000 $550,000 2013-14 500,000 $500,000 2014-15 491,500 $491,500 2015-16 $0 TOTAL $0 $0 $1 873 500 $0 $1 873 500 PROJECT DESCRIPTION/STATUS PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR TOTAL $0 $0 $1,873,500 $0 $1,873,500 Total Personnel $0 Supplies $0 Service $3,600 Capital $0 TOTAL $3,600$0 3,600 $3,600 OPERATING COSTS First Fiscal Year Annually 50 PROJECT: Wellborn/F&B Signal PROJECT #: ST1031 FUND: 139 - Streets CIP Fund PROJECT BUDGET: $250,000 PROJECT MANAGER:Troy Rother FUNDING SOURCES: 2008 GO Bonds - ST1027 PROJECT CLIENT: Public Works This project is for the installation of a signal at the intersection of Wellborn and F&B. This signal will be installed as part of an ILA with the City of Bryan. Both cities will participate in the cost of the signal. FISCAL YEAR LAND ENG. CONSTR. MISC. OVERHEAD PROJECT TOTAL Prior Years $0 $0 $0 $0 $0 2009-10 250,000 $250,000 2010-11 $0 2011-12 $0 2012-13 $0 PROJECT DESCRIPTION/STATUS PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR 2013-14 $0 2014-15 $0 2015-16 $0 TOTAL $0 $0 $250,000 $0 $0 $250,000 Total Personnel $0 Supplies $0 Service $1,800 Capital $0 TOTAL $1,800$0 1,800 $1,800 OPERATING COSTS First Fiscal Year Annually Fm 21 5 4Harvey RdWilliam D. Fitch PkwyTexas Ave SWell b o r n R d Fm 158 University DrRaymond Stotzer PwW ellb orn R dWellb o r n R d F & B RdA gro n o m y R d R o s s S tTurk R d Hense l D rInlow Blvd51 PROJECT: Krenek Tap/Texas Avenue Signal PROJECT #: ST1105 FUND: 139 - Streets CIP Fund PROJECT BUDGET: $200,000 PROJECT MANAGER:Troy Rother FUNDING SOURCES: 2008 GO Bonds - ST1027 PROJECT CLIENT: Public Works This project is for the installation of a signal at the intersection of Krenek Tap and Texas Avenue. FISCAL YEAR LAND ENG. CONSTR. MISC. OVERHEAD PROJECT TOTAL Prior Years $0 $0 $0 $0 $0 2009-10 $0 2010-11 200,000 $200,000 2011-12 $0 2012-13 $0 PROJECT DESCRIPTION/STATUS PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR 2013-14 $0 2014-15 $0 2015-16 $0 TOTAL $0 $0 $200,000 $0 $0 $200,000 Total Personnel $0 Supplies $0 Service $1,800 Capital $0 TOTAL $1,800 OPERATING COSTS First Fiscal Year Annually $0 1,800 $1,800 Fm 21 5 4Harvey RdWilliam D. Fitch PkwyTexas Ave SWell b o r n R d Fm 158 T e x a s AvHarvey RdTexas Av ST e x a s Av e SGlade St A n derson St F r o n t a g e 6 Rd WDart mout h St Krenek Tap RdHollem a n D r E Manuel DrLaura LnH a in e s D rColgate DrAl l eyAlley 52 PROJECT: SH30/Copperfield Signal PROJECT #: ST1106 FUND: 139 - Streets CIP Fund PROJECT BUDGET: $200,000 PROJECT MANAGER:Troy Rother FUNDING SOURCES: 2008 GO Bonds - ST1027 PROJECT CLIENT: Public Works This project is for the installation of a signal at the intersection of State Highway 30/Copperfield. FISCAL YEAR LAND ENG. CONSTR. MISC. OVERHEAD PROJECT TOTAL Prior Years $0 $0 $0 $0 $0 2009-10 $0 2010-11 200,000 $200,000 2011-12 $0 2012-13 $0 PROJECT DESCRIPTION/STATUS PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR 2013-14 $0 2014-15 $0 2015-16 $0 TOTAL $0 $0 $200,000 $0 $0 $200,000 Total Personnel $0 Supplies $0 Service $1,800 Capital $0 TOTAL $1,800$0 1,800 $1,800 OPERATING COSTS First Fiscal Year Annually Harvey RdUniversity DrHarvey RdOld Ti RdVista LnCopp erfield Pkwy Lori LnRanchero RdLinda LnFm 21 5 4Harvey RdWilliam D. Fitch PkwyTexas Ave SWell b o r n R d Fm 158 53 PROJECT: New Signal Warrant Study PROJECT #: ST1107 FUND: 139 - Streets CIP Fund PROJECT BUDGET: $40,000 PROJECT MANAGER: Troy Rother FUNDING SOURCES: 2008 GO Bonds - ST1027 PROJECT CLIENT: Public Works This project is for the study intersections to determine whether signals are warranted. FISCAL YEAR LAND ENG. CONSTR. MISC. OVERHEAD PROJECT TOTAL Prior Years $0 $0 $0 $0 $0 2009-10 $0 2010-11 40,000 $40,000 2011-12 $0 2012-13 $0 PROJECT DESCRIPTION/STATUS PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR 2012 13 $0 2013-14 $0 2014-15 $0 2015-16 $0 TOTAL $0 $40,000 $0 $0 $40,000 Total Personnel $0 Supplies $0 Service $0 Capital $0 TOTAL $0 OPERATING COSTS First Fiscal Year Annually $0 $0 Fm 2 1 5 4Harvey RdWilliam D. Fitch PkwyTexas Ave SWell b o r n R d Fm 158 54 PROJECT: 2818/FM 60 Signal PROJECT #: TBD FUND: 139 - Streets CIP Fund PROJECT BUDGET: $380,000 PROJECT MANAGER:Troy Rother FUNDING SOURCES: 2008 GO Bonds - ST1027 PROJECT CLIENT: Public Works This project is for the installation of a signal at the intersection of 2818 and FM60. FISCAL YEAR LAND ENG. CONSTR. MISC. OVERHEAD PROJECT TOTAL Prior Years $0 $0 $0 $0 $0 2009-10 $0 2010-11 $0 2011-12 380,000 $380,000 2012-13 $0 PROJECT DESCRIPTION/STATUS PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR 2013-14 $0 2014-15 $0 2015-16 $0 TOTAL $0 $0 $380,000 $0 $0 $380,000 Total Personnel $0 Supplies $0 Service $1,800 Capital $0 TOTAL $1,800$0 1,800 $1,800 OPERATING COSTS First Fiscal Year Annually George Bush DrWe ll bor n RdRaymond Stotzer PwW ellb orn R d Fm 21 5 4Harvey RdWilliam D. Fitch PkwyTexas Ave SWell b o r n R d Fm 158 55 PROJECT: University Drive/University Town PROJECT #: TBD Center Signal FUND: 139 - Streets CIP Fund PROJECT BUDGET: $100,000 PROJECT MANAGER:Troy Rother FUNDING SOURCES: 2008 GO Bonds - ST1027 PROJECT CLIENT: Public Works This project is for the installation of a signal at the intersection of University Drive and University Town Center. FISCAL YEAR LAND ENG. CONSTR. MISC. OVERHEAD PROJECT TOTAL Prior Years $0 $0 $0 $0 $0 2009-10 $0 2010-11 $0 2011-12 100,000 $100,000 2012-13 $0 PROJECT DESCRIPTION/STATUS PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR 2013-14 $0 2014-15 $0 2015-16 $0 TOTAL $0 $0 $100,000 $0 $0 $100,000 Total Personnel $0 Supplies $0 Service $1,800 Capital $0 TOTAL $1,800$0 1,800 $1,800 OPERATING COSTS First Fiscal Year Annually Fm 21 5 4Harvey RdWilliam D. Fitch PkwyTexas Ave SWell b o r n R d Fm 158 Tar r ow St U n iv e r s it y D r E Lincoln AveS p r i n g L o o p Mu n s o n Av eAlleyRose CirChimney Hill DrTarro w St E Vassar CtApril B loom Chur c hi l l St 56 PROJECT: Traffic Signal Communications PROJECT #: ST0411 FUND: 139 - Streets Capital Projects PROJECT BUDGET: $83,090 PROJECT Holding Account MANAGER: Lee Robinson FUNDING SOURCES: 2003 GOB - $250,000 PROJECT CLIENT: Public Works This project is a general holding project for specific traffic signal communication project locations. This project will consist of installing fiber optics to interconnect traffic signals and, in some cases, will utilize wireless technology. Presently 15 signals are not interconnected. Communications provides instant upload and download of data, ability to monitor the system and possible make repairs from the signal shop.Installed wireless radios on Texas, installed conduit for fiber optics at Holleman & G Bush. Udgrades from copper cables to fiber optics will continue to be made and communications will be made to signals that are currently without. Original project budget = $250,000 $50,000 transferred to ST0607 in FY06 $240 transferred from ST0703 - FY08 (balance of project) $50,000 transferred to ST0608 in FY06 $35,000 transferred to ST0906 - FY09 $10,000 transferred to ST0703 in FY07 $22,150 transferred to ST0915 - FY09 FISCAL YEAR LAND ENG. CONSTR. MISC. PROJECT TOTAL Prior Years $0 $0 $27,555 $0 $27,555 2009-10 $0 2010-11 55,535 $55,535 2011-12 $0 2012-13 $0 2013-14 $0 2014 15 $0 PROJECT DESCRIPTION/STATUS PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR 2014-15 $0 2015-16 $0 TOTAL $0 $0 $83,090 $0 $83,090 Total Personnel $0 Supplies $0 Service $0 Capital $0 TOTAL $0$0 $0 OPERATING COSTS AnnuallyFirst Fiscal Year 57 PROJECT: Texas Avenue Fiber PROJECT #: ST0906 FUND: 139 - Streets Capital Projects PROJECT BUDGET: $35,000 PROJECT MANAGER: Lee Robinson FUNDING SOURCES: 2003 GOB - ST0411 PROJECT CLIENT: Public Works This project is needed to restore traffic signal communications that were removed from power poles during the Texas Avenue Phase II widening. Currently communication is occurring through wireless radios. Conduit was installed during the construction and now the fiber optics cable must be installed. This communications media will provide connectivty to the signals and will also provide IT Communications with a additional backup ring for the telephone system. FISCAL YEAR LAND ENG. CONSTR. MISC. PROJECT TOTAL Prior Years $0 $0 $6,575 $0 $6,575 2009-10 28,425 $28,425 2010-11 $0 2011-12 $0 2012-13 $0 2013-14 $0 2014-15 $0 2015-16 $0 TOTAL $0 $0 $35,000 $0 $35,000 PROJECT DESCRIPTION/STATUS PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR TOTAL $0 $0 $35,000 $0 $35,000 Total Personnel $0 Supplies $0 Service $0 Capital $0 TOTAL $0$0 $0 OPERATING COSTS First Fiscal Year Annually 58 SIDEWALKS AND TRAILS 59 PROJECT: BIKE LOOP - 2005 PROJECT #: ST0530 FUND: 139 - Streets Capital Projects PROJECT BUDGET: $327,202 PROJECT MANAGER: Danielle Charbonnet FUNDING SOURCES: 1989 GOB PROJECT CLIENT: Public Works Funds from ST9803 and ST0521 are expected to be spent in conjunction with this project's funds to complete the bike loop project, 2005 Bike Loop Phase II -- Bike Loop Completion. FISCAL YEAR LAND ENG. CONSTR. MISC. OVERHEAD PROJECT TOTAL Prior Years $0 $0 $0 $0 0 $0 2009-10 $0 2010-11 327,202 $327,202 2011-12 $0 2012-13 $0 2013-14 $0 2014-15 $0 PROJECT DESCRIPTION/STATUS PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR This project will complete the final phase of the College Station Bike Loop Project (ST-9409), which was implemented to construct a bike loop system connecting the Texas A&M University campus, various city parks, and local residential areas. This phase of the project will create a significant connection with existing bike facilities in Bee Creek Park that will provide over 4.5 miles of continuous bicycle facilities within College Station. The project will connect the existing bike path that terminates in Bee Creek Park to the Bee Creek Bridge crossing near Longmire Court and also will provide a connection from the bridge to Anderson Street. The project will undergo review with TxDOT for environmental clearance and design approval. 2015-16 $0 TOTAL $0 $0 $327,202 $0 $0 $327,202 Total Personnel $0 Supplies $0 Service $1,000 Capital $0 TOTAL $1,000$0 1,000 $1,000 OPERATING COSTS First Fiscal Year Annually Fm 2 1 5 4Harvey RdWilliam D. Fitch PkwyTexas Ave SWell b o r n R d Fm 158 60 PROJECT: MISC BIKE TRAILS - BIKE LOOP PROJECT #: ST9803 FUND: 139 - Streets CIP Fund PROJECT BUDGET: $169,000 PROJECT MANAGER: Danielle Charbonnet FUNDING SOURCES: 98 GOB PROJECT CLIENT: Public Works This project serves to hold funds for bike trail projects. Original budget was $180,000. As new bike trail projects are created, funds will be allocated to those projects and this project balance will be reduced. Projects on which these funds have been used include the Anderson Street Sidewalks and remaining funds will be used on the 2005 Bike Loop project. (See project ST-0530 for additional project information.) FISCAL YEAR LAND ENG. CONSTR. MISC. OVERHEAD PROJECT TOTAL Prior Years $0 $36,097 $22,752 $214 $59,063 2009-10 $0 2010-11 109,937 $109,937 2011-12 $0 2012-13 $0 2013-14 $0 2014-15 $0 2015-16 $0 TOTAL $0 $36 09 $132 689 $214 $169 000 PROJECT DESCRIPTION/STATUS PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR TOTAL $0 $36,097 $132,689 $214 $169,000 Total Personnel $0 Supplies $0 Service $0 Capital $0 TOTAL $0 OPERATING COSTS First Fiscal Year Annually $0 $0 Fm 2 1 5 4Harvey RdWilliam D. Fitch PkwyTexas Ave SWell b o r n R d Fm 158 61 PROJECT: PROJECT #: ST0521 FUND: 139 - Streets CIP Fund PROJECT BUDGET: $1,033,624 PROJECT MANAGER: FUNDING SOURCES: 2003 GOB PROJECT CLIENT: Public Works - Troy Rother FISCAL YEAR LAND ENG. CONSTR. MISC. OVERHEAD PROJECT TOTAL Prior Years $0 $90,956 $712,146 $17,417 $0 $820,518 2009-10 29,950 1,000 24,295 $55,245 2010-11 111,861 4,000 42,000 $157,861 2011-12 $0 2012-13 $0 2013-14 $0 2014-15 $0 2015-16 $0 PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR Hike & Bike Trails - Longmire Imp The majority of these funds were spent on the 2005 Bike Loop Phase I Project-- Longmire Improvements, which included pedestrian improvements to FM 2818 and Longmire intersection, bike lanes on Longmire, and a bridge over Bee Creek. The balance of the funds will be used to complete the CS Bike Loop project, which is Phase II to this project. NOTE: $75,000 transferred in FY2004-05 to Brison Park Bike & Ped Path ST0524. $2625 was approved for as a match for a grant for a Safe Routes to School course at the 2-24-05 Council meeting. $56,624 transferred from ST0524 in FY07 - project completed under budget. PROJECT DESCRIPTION/STATUS Danielle Charbonnet 2015-16 $0 TOTAL $0 $120,906 $824,007 $22,417 $66,295 $1,033,624 Total Personnel $0 Supplies $0 Service $200 Capital $0 TOTAL $200 OPERATING COSTS First Fiscal Year Annually $0 200 $200 Fm 2 1 54Harvey RdWilliam D. Fitch PkwyTexas Ave SWell b o r n R d Fm 158 62 PROJECT: Sidewalk Improvements (2003 GOB) PROJECT #: ST0517 FUND: 139 - Streets CIP Fund PROJECT BUDGET: $114,112 PROJECT MANAGER: Charles McLemore FUNDING SOURCES: 2003 GO Bonds - $500,000 PROJECT CLIENT: Public Works Funds provided for sidewalk improvement projects throughout the City. Plan to build sidewalks along thoroughfares and collectors and to retrofit older neighborhoods. Original Budget = $500,000; $4,078 transferred back to ST0517 from ST0609 - $86,400 transferred to ST0529 FY05 balance of proj - FY07 $36,000 transferred to ST0609 FY06 $28,580 transferred to ST0702 - FY08 $50,036 transferred to ST0516 FY06 $75,700 transferred to ST0803 - FY08 $11,349 transferred to WP9905 FY06 $44,623 transferred to ST0805 - FY08 $50,000 transferred to ST0516 in FY07 $73,005 transferred back to ST0517 from ST0803 - FY08 $2,058 transferred to ST0529 - FY07 $35,377 transferred to ST0805 - FY08 $3,700 transferred to ST0529 FY07 & FY09 $30,000 transferred to ST0813 - FY08 $2,720 transferred to ST072 FY07 $42,739 transferred from ST0805 (balance of project) - FY08 $49,167 transferred to ST0910 - FY09 FISCAL YEAR LAND ENG. CONSTR. MISC. PROJECT TOTAL Prior Years $0 $512 $13,600 $0 $14,112 2009-10 $0 2010-11 100,000 $100,000 2011-12 $0 2012-13 $0 PROJECT DESCRIPTION/STATUS PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR 2013-14 $0 2014-15 $0 2015-16 $0 TOTAL $0 $512 $113,600 $0 $114,112 Total Personnel $0 Supplies $0 Service $0 Capital $0 TOTAL $0 OPERATING COSTS First Fiscal Year Annually $0 $0 Fm 2 1 5 4Harvey RdWilliam D. Fitch PkwyTexas Ave SWellb o r n R d Fm 158 63 PROJECT: Lincoln Sidewalk Improvements PROJECT #: ST0910 FUND: 139 - Streets Capital Projects Fund PROJECT BUDGET: $149,167 PROJECT FUNDING MANAGER: Gary Balmain SOURCES: ($49,167) - ST0517 - 03 GOB ($100,000) - ST1028 - 08 GOB PROJECT CLIENT: Public Works This project is for the acquisition of right-of-way and the construction of sidewalks on the north side of Lincoln Avenue extending from Avenue A to University Drive. FISCAL YEAR LAND ENG. CONSTR. MISC. PROJECT TOTAL Prior Years $0 $82 $0 $0 $82 2009-10 49,085 $49,085 2010-11 $0 2011-12 100,000 $100,000 2012-13 $0 2013-14 $0 2014-15 $0 2015-16 $0 TOTAL $0 $82 $149,085 $0 $149,167 PROJECT DESCRIPTION/STATUS PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR Total Personnel $0 Supplies $0 Service $0 Capital $0 TOTAL $0$0 $0 OPERATING COSTS First Fiscal Year Annually Lincoln AveFrancis DrUniversity Dr E Texas AveDominik DrMunson AveP u ry e a r D rMil n er DrFront StS p r i n g L oop Cooner StPolo RdCarol StKyle AveAsh StRampChimney Hill DrFor est D r Fm 2 1 5 4Harvey RdWilliam D. Fitch PkwyTexas Ave SWell b o r n R d Fm 158 64 PROJECT: Sidewalk Improvements (2008 GOB)PROJECT #: ST1028 FUND: 139 - Streets CIP Fund PROJECT BUDGET: $200,000 PROJECT MANAGER: Gary Balmain FUNDING SOURCES: 2008 GO Bonds - $300,000 PROJECT CLIENT: Public Works Funds provided for sidewalk improvement projects throughout the City. Plan to build sidewalks along thoroughfares and collectors and to retrofit older neighborhoods. $100,000 per year FY 10 thru 12 Original Budget = $300,000 $100,000 transferred to ST0910 - FY10 FISCAL YEAR LAND ENG. CONSTR. MISC. OVERHEAD PROJECT TOTAL Prior Years $0 $0 $0 $0 $0 2009-10 $0 2010-11 $0 2011-12 $0 2012-13 $100,000 $100,000 2013-14 $100,000 $100,000 2014-15 $0 2015-16 $0 PROJECT DESCRIPTION/STATUS PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR 2015-16 $0 TOTAL $0 $0 $200,000 $0 $0 $200,000 Total Personnel $0 Supplies $0 Service $0 Capital $0 TOTAL $0 OPERATING COSTS First Fiscal Year Annually $0 $0 Fm 2 154Harvey RdWilliam D. Fitch PkwyTexas Ave SWell b o r n R d Fm 158 65 PROJECT: Hike and Bike Trail Completion PROJECT #: ST0904 FUND: 139 - Streets Capital Projects Fund PROJECT BUDGET: $1,000,000 PROJECT MANAGER: Danielle Charbonnet FUNDING SOURCES: 2008 General Obligation Bonds PROJECT CLIENT: P&DS - Venessa Garza FISCAL YEAR LAND ENG. CONSTR. MISC. OVERHEAD ROJECT TOTAL Prior Years $0 $41,392 $0 $0 $0 $41,392 2009-10 $43,000 $300,000 $5,000 $39,000 $387,000 2010-11 $44,000 $471,000 $10,000 $46,608 $571,608 2011-12 $0 2012-13 $0 2013-14 $0 2014-15 $0 2015-16 $0 PROJECT DESCRIPTION/STATUS PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR This project is for the construction of a 10' wide multi-use trail along FM 2818 from Welsh Avenue to Longmire Drive. The sidewalk will also be extended from Texas Avenue to Longmire Drive. One million dollars was allocated through the November 2008 Bond for the implementation of projects identified by the Hike and Bike Task Force and adopted by City Council on November 23, 2004. High priority trail projects identified by the Hike and Bike Task Force in 2004 that have not been completed included a portion of this multi-use path from Welsh to Bee Creek. The trail will provide connectivity to key destinations along the corridor, including A&M Consolidated High School, Bee Creek Park, and residential and commercial properties. Phase II of this project will be constructed from Welsh Avenue to the Campus Village trail and through Southwest Park. The second phase will create a continuous trail system from Texas Avenue to Southwest Parkway. 2015-16 $0 TOTAL $0 $128,392 $771,000 $15,000 $85,608 $1,000,000 Total Personnel $0 Supplies $0 Service $1,000 Capital $0 TOTAL $1,000 1000 $1,000 NET INCREASE IN OPERATING COSTS First Fiscal Year Annually Fm 2 1 5 4Harvey RdWilliam D. Fitch PkwyTexas Ave SWell b o r n R d Fm 158 Welsh Av e Texas Ave SGl ade St Harvey Mi t c h e ll P k w y SHolleman DrD e a c o n D rLongmire D r A nderson St Alley La wyer St Dexter Dr S H a in e s D rLee AveChri s tin e L n T r e e h o u s e T r lKrenek Tap RdNavarro DrMil e DrMorgans LnNevada StT h o m a s S t66 PROJECT: Lick Creek Hike and Bike Trail PROJECT #: ST1104 FUND: 139 - Streets Capital Projects Fund PROJECT BUDGET: $4,410,000 PROJECT MANAGER: Danielle Charbonnet FUNDING SOURCES: 2008 General Obligation Bonds PROJECT CLIENT: P&DS - Venessa Garza FISCAL YEAR LAND ENG. CONSTR. MISC. OVERHEAD PROJECT TOTAL Prior Years $0 $0 $0 $0 $0 $0 2009-10 $0 2010-11 50,000 $50,000 2011-12 92,000 305,000 5,000 23,000 $425,000 2012-13 92,000 16,000 240,000 5,000 35,000 $388,000 2013-14 3,500,000 5,000 42,000 $3,547,000 2014-15 $0 2015-16 $0 PROJECT DESCRIPTION/STATUS PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR The Lick Creek Hike and Bike Trail project will construct about 3 miles of Hike and Bike Trails along Lick Creek between Westfield Park and Lick Creek Park connecting residential neighborhoods and CSISD property. This project is on the City's Bikeway Master Plan and was ranked as a High priority project by the Bike and Hike Task Force. 2015-16 $0 TOTAL $184,000 $371,000 $3,740,000 $15,000 $100,000 $4,410,000 Total Personnel $0 Supplies $0 Service $3,000 Capital $0 TOTAL $3,000 3,000 $3,000 NET INCREASE IN OPERATING COSTS First Fiscal Year Annually S H 6 S Fr o n t age 6 R d E Fronta ge 6 R d WBarron RdFm 2154Rock Prairie Rd L ongmir e D r Graham RdVictoria AveLakeway Dr S H 40 / Wil l ia m D F itc h P k w y Olden LnP o n d e ro sa D rS t A n dre w s D r Cas t l e g at e D r Carll LnRitchey RdAster DrDover DrFm 2 1 5 4Harvey RdWilliam D. Fitch PkwyTexas Ave SWell b o r n R d Fm 158 67 PROJECT: University Drive Pedestrian PROJECT #: TBD Improvements Phases 2-5 FUND: 139 - Streets Capital Projects Fund PROJECT BUDGET: $7,055,000 PROJECT MANAGER: Danielle Charbonnet FUNDING SOURCES: 2008 General Obligation Bonds PROJECT CLIENT: Public Works - Troy Rother FISCAL YEAR LAND ENG. CONSTR. MISC. OH PROJECT TOTAL Prior Years $0 $0 $0 $0 $0 2009-10 $0 2010-11 $0 2011-12 50,000 469,000 5,000 22,000 $546,000 2012-13 200,000 3,075,000 5,000 39,000 $3,319,000 2013-14 3,151,000 5,000 34,000 $3,190,000 2014-15 $0 2015-16 $0 TOTAL $50,000 $669,000 $6,226,000 $15,000 $95,000 $7,055,000 PROJECT DESCRIPTION/STATUS PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR This project consists of implementing the remaining phases (2 through 5) of the Pedestrian Improvements on University Drive. The project developed a plan to improve pedestrian travel in the Northgate area of College Station, especially to facilitate pedestrian movement across and along University Drive between Boyett Street and South College Avenue. This project was ranked as a High priority project by City staff. Total Personnel $0 Supplies $0 Service $0 Capital $0 TOTAL TBD$0 TBD First Fiscal Year Annually NET INCREASE IN OPERATING COSTS University DrRoss S tChurch AveFirst St Nagle StBoyett StCherry StTauber StW ellb orn R d N Stasney StBizz ell StP olo RdS pence StIreland St Jone s S tAsbury StSpruce StA grono m y R d C o ke St L a m a r S tR a m p Bizzell St La m ar S tFm 2 1 5 4Harvey RdWilliam D. Fitch PkwyTexas Ave SWell b o r n R d Fm 158 68 COMMUNITY DEVELOPMENT BLOCK GRANT FUNDED (CDBG) STREET PROJECTS 69 PROJECT: College Main Rehabilitation PROJECT #: ST1102 FUND: 122 - CDBG Fund PROJECT BUDGET: $398,000 PROJECT MANAGER:Philip Bargas FUNDING SOURCES: CDBG Funds PROJECT CLIENT: Public Works FISCAL YEAR LAND ENG. CONSTR. MISC. OVERHEAD PROJECT TOTAL Prior Years $0 $0 $0 $0 2009-10 $0 2010-11 48,000 350,000 $398,000 2011-12 $0 2012-13 $0 2013-14 $0 2014-15 $0 2015-16 $0 TOTAL $0 $48,000 $350,000 $0 $0 $398,000 PROJECT DESCRIPTION/STATUS PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR This project is for the upgrade a portion of College Main between the City limit and about halfway between Spruce & Cherry Streets. This section of College Main was not rehabilitated back in the 1990's and the City of Bryan is working on rehabilitating the portion of College Main in its city limits. This section of roadway proposed to be rehabilitated by the City of College Station is about 230 feet long. The project scope includes the replacement of all of the existing roadway, sidewalks and drainage infrustructure to a maintenance overlay and sidewalk extension project. Total Personnel $0 Supplies $0 Service $0 Capital $0 TOTAL $0 OPERATING COSTS First Fiscal Year Annually $0 $0 Nagl e StCollege Main College Main St Cherry StT a u b e r StStasney St Spruce StBoyett St Aspen St Cross StFoch St Cross StNORTHGATE PARKNORTHGATE PARK Nagl e StTauber StFm 2154Harvey RdW illiam D. Fitch Pkwy70 GENERAL GOVERNMENT- PARKS AND RECREATION CAPITAL IMPROVEMENT PROJECTS FISCAL YEAR 2010-2011 THROUGH FISCAL YEAR 2015-2016 71 1 2 3 4 5 6 7 8 9 10 11 1213 14 1516 17 18 19 20 21 22 23 24 25 26 27 28 29 Grimes County Burleson County Legend Neighborhood Park Zones TAMU Property CS City Limits Parkland Dedication Zones N Adopted by City Council Oct.23,2008 72 Home of Texas A&M University ® 73 GENERAL GOVERNMENT PARKS AND RECREATION PROJECTS CAPITAL IMPROVEMENT PROJECTS FISCAL YEAR 2010-2011 THROUGH FISCAL YEAR 2015-2016 PROJECT REVISED APPROVED PROJECT BUDGET APPROPRIATIONS FY 09-10 FY 10-11 NUMBER AMOUNT THROUGH FY09 APPROPRIATIONS APPROPRIATIONS BEGINNING FUND BALANCE:$2,881,819 $904,245 ADDITIONAL RESOURCES: GENERAL OBLIGATION BONDS (2003 GOB)- - GENERAL OBLIGATION BONDS (2008 GOB)1,586,000 2,180,000 CERTIFICATES OF OBLIGATIONS - - INTERGOVERNMENTAL TRANSFERS - - INTRAGOVERNMENTAL TRANSFERS - 235,910 INVESTMENT EARNINGS 5,000 7,000 OTHER 110,800 81,600 SUBTOTAL ADDITIONAL RESOURCES $1,701,800 $2,504,510 TOTAL RESOURCES AVAILABLE $4,583,619 $3,408,755 PARK PROJECTS FIELD REDEVELOPMENT PK0300 ANNUAL 26,800 140,840 1 CREEK VIEW NEIGHBORHOOD PARK PK0906 515,000 515,000 - - 1 NEIGHBORHOOD PARK IMPROVEMENTS PK0910 - - 4,000 310,000 1 PEBBLE CREEK BBALL PAVILION PK0914 246,423 246,423 - - 1 EMERALD FOREST PARK IMPROVEMENTS PK0713 106,000 - 106,000 - 1 BROTHERS POND PARK IMPROVEMENTS PK1003 160,000 - 160,000 - 1 MERRY OAKS PARK AREA LIGHTS PK1105 25,000 - - - 1 LEMONTREE PARK SWING SET PK1106 25,000 - - - 1 ANDERSON PARK IMPROVEMENTS PK1002 100,000 - - - 1 UNIVERSITY PARK IMPROVEMENTS PK0410 93,000 - - - 1 CASTLEGATE PARK IMPROVEMENTS PK1107 15,000 - - - 1 SANDSTONE SHADE COVER PK1108 15,000 - - - 1 STEEPLECHASE PARK IMPROVEMENTS PK1109 41,000 - - - 1 SKATE PARK PK0911 920,000 920,000 - - 1 NEIGHBORHOOD PARKS REVOLVING FUND PK0912 1,000,000 500,000 500,000 1 BEACHY CENTRAL PARK IMPROVEMENTS PK1001 930,000 - 150,000 780,000 1 LICK CREEK PK IRON BRIDGE TRAIL COMPL TBD 100,000 - - - 1 LINCOLN CENTER ADDITION TBD 4,285,000 - - - 1 EAST DISTRICT MAINTENANCE SHOP REP PK1101 1,645,000 - - 1,645,000 1 LICK CREEK NATURE CENTER PK1102 2,495,000 - - 100,000 CLOSED PROJECTS 5,227 187,177 - CAPITAL PROJECTS SUBTOTAL $2,213,450 $1,248,017 $2,835,000 MISCELLANEOUS - - DEBT ISSUANCE COST 10,000 10,000 GENERAL & ADMIN. CHARGES 65,665 52,759 TOTAL EXPENDITURES $1,323,682 $2,897,759 CAFR Adjustment ENDING FUND BALANCE:$3,259,937 $510,996 1 - Indicates projects funded through 2008 G.O. Bond Authorization BUDGET APPROPRIATIONS 74 GENERAL GOVERNMENT PARKS AND RECREATION PROJECTS CAPITAL IMPROVEMENT PROJECTS FISCAL YEAR 2010-2011 THROUGH FISCAL YEAR 2015-2016 PROJECT EXPENDITURES ACTUAL ESTIMATE PROJECTED PROJECTED PROJECTED PROJECTED PROJECTED PROJECTED THROUGH FY08 FY 08-09 FY 09-10 FY 10-11 FY 11-12 FY 12-13 FY 13-14 FY 14-15 FY 15-16 $1,815,256 $1,335,947 $904,245 $396,274 $364,379 $152,419 $134,752 $120,068 - - - - - - - - 1,535,000 870,000 2,180,000 2,650,000 1,320,000 395,000 3,840,000 - - - - - - - - - - - - - - - - - 89,961 - 235,910 - - - - - 23,920 14,000 7,000 7,000 5,000 3,000 3,000 2,000 89,800 80,000 81,600 83,200 84,900 86,600 88,300 90,100 $1,738,681 $964,000 $2,504,510 $2,740,200 $1,409,900 $484,600 $3,931,300 $92,100 $3,553,937 $2,299,947 $3,408,755 $3,136,474 $1,774,279 $637,019 $4,066,052 $212,168 52,940 119,880 78,431 68,384 276,860 62,267 65,984 103,290 - 3,289 30,000 - 481,711 - - - - - - - - - - - - - - 18,226 228,197 - - - - - - - - 10,000 96,000 - - - - - - - 160,000 - - - - 25,000 - - - - - - - - 25,000 - - - - - - - - 100,000 - - - - - - - - 93,000 - - - - - - - - 15,000 - - - - - - - - 15,000 - - - - - - - - 41,000 - - - - - - 28,708 295,000 596,292 - - - - - - 417,400 297,600 285,000 - - - - - - - 150,000 780,000 - - - - - - - - - 100,000 - - - - - - - - - 50,000 395,000 3,840,000 - - - - 700,000 945,000 - - - - - - - 100,000 1,125,000 1,270,000 - - - 1,626,120 34,360 - - - - - - $0 $2,146,684 $1,325,037 $2,949,723 $2,720,095 $1,596,860 $457,267 $3,905,984 $103,290 - - - - - - - - 1,534 5,000 10,000 12,000 5,000 5,000 20,000 - 78,969 65,665 52,759 40,000 20,000 40,000 20,000 10,000 $2,227,187 $1,395,702 $3,012,482 $2,772,095 $1,621,860 $502,267 $3,945,984 $113,290 9,197 $1,335,947 $904,245 $396,274 $364,379 $152,419 $134,752 $120,068 $98,878 PROJECTED EXPENDITURES 75 PROJECT: Field Redevelopment Projects PROJECT #: PK0300 FUND: 138 - Parks CIP PROJECT BUDGET:Annual PROJECT Peter Lamont/Pete Vanacek FUNDING MANAGER: SOURCES: Field Redevelopment Fees PROJECT CLIENT: Parks and Recreation FISCAL YEAR LAND ENG. CONSTR. MISC. PROJECT TOTAL Prior Years $0 $0 $0 $344,108 $344,108 2009-10 119,880 $119,880 2010-11 78,431 $78,431 2011-12 68,384 $68,384 2012-13 276,860 $276,860 2013-14 62,267 $62,267 2014-15 65,984 $65,984 2015-16 103,290 $103,290 TOTAL $0 $0 $0 $1,119,204 $1,119,204 PROJECT DESCRIPTION/STATUS PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR This project will include replacement and repairs to numerous athletic facilities throughout the City. Items include drinking fountains, shade covers, light and base replacement as well as fence and bleacher repairs. Additions to turf maintenance are also included for several fields. These funds are collected from user groups and PARD programs specifically for these purposes. Total Personnel $0 Supplies $0 Service $0 Capital $0 TOTAL $0 OPERATING COSTS First Fiscal Year Annually $0 $0 76 PROJECT: CREEK VIEW NEIGHBORHOOD PARK PROJECT #: PK0906 FUND: PROJECT BUDGET: $515,000 PROJECT FUNDING MANAGER: SOURCES: Bonds PROJECT CLIENT: Parks and Recreation FISCAL YEAR LAND ENG. CONSTR. MISC. PROJECT TOTAL Prior Years $0 $2,931 $0 $358 $3,289 2009-10 30,000 $30,000 2010-11 $0 2011-12 5,000 476,711 $481,711 2012-13 $0 2013-14 $0 2014-15 $0 2015-16 $0 TOTAL $0 $37,931 $476,711 $358 $515,000 2008 General Obligation 138 - Parks CIP Fund Pete Vanecek PROJECT DESCRIPTION/STATUS This neighborhood park project is located adjacent to the recently completed CSISD Elementery School. Current City park property will be combined with property leased from CSISD to constitute the park. The park will serve the surrounding neighborhood and assist the CSISD elementery school activities. The project may include a playground, picnic pavilion, lighting, bridges, landscaping, practice ballfields, sidewalks, etc. PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR Total Personnel $30,000 Supplies $1,340 Service $9,500 Capital $750 TOTAL $41,590$0 $41,590 1,340 9,500 First Fiscal Year Annually $750 $30,000 NET INCREASE IN OPERATING COSTS Proposed Zone 10 Park 77 PROJECT: PROJECT #: PROJECT FUND: BUDGET: $0 PROJECT MANAGER: FUNDING SOURCES: PROJECT Bonds CLIENT: Parks and Recreation Original budget = $900,000 $93,000 transferred to PK0410 - FY11 $246,423 transferred to PK0914 - FY09 $15,000 transferred to Castlegate Park $43,577 transferred to PK0913 - FY09 Improvements - FY11 $30,000 transferred to PK0713 - FY09 $15,000 transferred to Sandstone $106,000 transferred to PK0713 - FY10 Shade Cover - FY11 $160,000 transferred to PK1003 - FY10 $41,000 transferred to Steeplechase $100,000 transferred to Anderson Park Imp - FY11 Park Improvements - FY11 $25,000 transferred to Merry Oaks Park Area Lights - FY11 $25,000 transferred to Lemontree Park Swing Set - FY11 FISCAL YEAR LAND ENG. CONSTR. MISC. PROJECT TOTAL Prior Years $0 $0 $0 $0 $0 2009-10 $0 2010-11 $0 2011-12 $0 2012-13 $0 2013-14 $0 2014 15 $0 PK0910 IMPROVEMENTS NEIGHBORHOOD PARK 2008 General Obligation 138 - Parks CIP Fund TBD This project would address Neighborhood Park improvements, bringing older parks up to current standards. Projects will be identified by the Parks and Recreation Department. PROJECT DESCRIPTION/STATUS PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR 2014-15 $0 2015-16 $0 TOTAL $0 $0 $0 $0 $0 Total Personnel $0 Supplies Service Capital $0 TOTAL NET INCREASE IN OPERATING COSTS $0 $0 AnnuallyFirst Fiscal Year Fm 2154Harvey RdWilliam D. Fitch PkwyTe x a s Ave SWe ll b o r n R d Fm 158 78 PROJECT: PROJECT #: PROJECT FUND: BUDGET: $246,423 PROJECT MANAGER:FUNDING SOURCES: PROJECT Bonds CLIENT: Parks and Recreation The budget for this project was transferred from PK0910 - Neighborhood Park Improvements. FISCAL YEAR LAND ENG. CONSTR. MISC. PROJECT TOTAL Prior Years $0 $18,226 $0 $18,226 2009-10 8,324 219,873 $228,197 2010-11 $0 2011-12 $0 2012-13 $0 2013-14 $0 2014-15 $0 2015-16 $0 TOTAL $0 $26,550 $219,873 $0 $246,423 Pebble Creek Basketball Pavilion PK0914 138 - Parks CIP Fund David Wood 2008 General Obligation PROJECT DESCRIPTION/STATUS This project is for the construction of a new, covered basketball court and pavilion in Pebble Creek Park. PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR NET INCREASE IN OPERATING COSTS Total Personnel $1,200 Supplies $0 Service $1,200 Capital $0 TOTAL $2,400$0 $2,400 $1,200 0 1,200 First Fiscal Year Annually NET INCREASE IN OPERATING COSTS William D. Fitch PkwyFron ta g e 6 R d E Ro y a l A d e la d e D r Agate DrLakeway Dr A u g u s t a C i r St Andrews Dr Q u a lit y CirFm 215 4Harvey RdWilliam D. Fitch PkwyTexas Ave SWell b o r n R d Fm 158 79 PROJECT: Emerald Forest Park Improvements FUND(S): PROJECT NUMBERS & BUDGET: 138 - Parks CIP Fund Parks CIP: PK0713 $106,000 178 - Zone 8 Parkland Dedication Fund Parkland Ded: PK0713 $63,000 Total Project Budget: $169,000 PROJECT MANAGER:Jeff Haeber FUNDING PROJECT SOURCES:138 - 2008 General Obligation Bond CLIENT:Parks and Recreation 178 - Zone 8 Parkland Dedication The Parks CIP budget for this project was transferred from PK0910 - Neighborhood Park Improvements. Project Total FISCAL YEAR LAND ENG. CONSTR. MISC. PROJECT TOTAL Prior Years 0 0 0 0 2009-10 0 10,000 5,000 0 2010-11 0 0 154 000 0 PROJECT DESCRIPTION/STATUS This neighborhood park project is for renovations to the playground, drainage, and sidewalks within the Park. The existing sidewalk will be replaced and built at a higher elevation. The existing playground unit will be replaced and elevated. Drainage issues within the park will be addressed. PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR $0 $15,000 $154 0002010-11 0 0 154,000 0 2011-12 0 0 0 0 2012-13 0 0 0 0 2013-14 0 0 0 0 2014-15 0 0 0 0 2015-16 0 0 0 0 $154,000 $0 $0 $0 $0 $169,000 $0 PROJECT TOTAL $0 $10,000 $159,000 $0 80 Parks CIP FISCAL YEAR LAND ENG. CONSTR. MISC. PROJECT TOTAL Prior Years 0 0 0 0 $0 2009-10 10,000 $10,000 2010-11 96,000 $96,000 2011-12 $0 2012-13 $0 2013-14 $0 2014-15 $0 2015-16 $0 Parks Total $0 $10,000 $96,000 $0 $106,000 Parkland Dedication Portion FISCAL YEAR LAND ENG. CONSTR. MISC. PROJECT TOTAL Prior Years 0 0 0 0 $0 2009-10 5,000 $5,000 2010-11 58,000 $58,000 2011-12 $0 2012-13 $0 2013-14 $0 2014-15 $0 2015-16 $0 Parkland Total $0 $0 $63,000 $0 $63,000 First Fiscal Year Annually Total PROJECT: Emerald Forest Park Improvements PROJECT CALENDAR OF EXPENDITURES BY FUND PROJECT TOTAL $0 $10,000 $159,000 $0 $169,000 OPERATING COSTS First Fiscal Year Annually Total Personnel $0 Supplies $0 Service $0 Capital $0 TOTAL $0 $0 $0 81 PROJECT: PROJECT # PROJECT FUND: BUDGET: $160,000 PROJECT MANAGER: FUNDING SOURCES: PROJECT CLEINT: CSPARD The budget for this project was transferred from PK0910 - Neighborhood Park Improvements. FISCAL YEAR LAND ENG. CONSTR. MISC. PROJECT TOTAL Prior Years $0 $0 $0 $0 $0 2009-10 8,000 152,000 $160,000 2010-11 $0 2011-12 $0 2012-13 $0 2013-14 $0 2014-15 $0 2015-16 $0 TOTAL $0 $8,000 $152,000 $0 $160,000 BROTHERS POND PARK IMPROVEMENTS PK1003 138 - Parks CIP Fund DAVID WOOD 2008 GOB - ST0910 PROJECT DESCRIPTION/STATUS This neighborhood park project is for renovations to the trail/sidewalk system within the Park. The existing sidewalk will be widened to 8 feet to accommodate bicycle traffic.The existing gravel trail will be converted to 6 feet wide concrete walk. Additional lighting will be added. The park will serve the surrounding neighborhood and assist the CSISD elementery school activities. PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR Total Personnel $0 Supplies $0 Service $0 Capital $0 TOTAL $0 OPERATING COSTS First Fiscal Year Annually $0 $0 82 PROJECT: MERRY OAKS PARK AREA LIGHTS PROJECT #: PK1105 FUND: PROJECT BUDGET: $25,000 PROJECT FUNDING MANAGER: David Wood SOURCES: PROJECT CSPARD CLIENT: This project is for the installation of additional area lights in Merry Oaks Park. The budget for this project will be transferred from PK0910 - Neighborhood Park Improvements. FISCAL YEAR LAND ENG. CONSTR. MISC. PROJECT TOTAL Prior Years $0 $0 $0 $0 $0 2009-10 $0 2010-11 2,500 22,500 $25,000 2011-12 $0 2012-13 $0 2013-14 $0 2014-15 $0 2015-16 $0 TOTAL $0 $2,500 $22,500 $0 $25,000 138 - Parks CIP Fund 2008 GOB - ST0910 PROJECT DESCRIPTION/STATUS PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR Total Personnel $0 Supplies $250 Service $1,500 Capital $0 TOTAL $1,750 OPERATING COSTS 250 First Fiscal Year Annually $0 1,500 $1,750 83 PROJECT: LEMONTREE PARK SWING SET PROJECT #: PK1106 FUND: PROJECT BUDGET: $25,000 PROJECT FUNDING MANAGER: David Wood SOURCES: PROJECT CSPARD CLIENT: This project is for the installation of a swing set in Lemontree Park. The budget for this project will be transferred from PK0910 - Neighborhood Park Improvements. FISCAL YEAR LAND ENG. CONSTR. MISC. PROJECT TOTAL Prior Years $0 $0 $0 $0 $0 2009-10 $0 2010-11 2,500 22,500 $25,000 2011-12 $0 2012-13 $0 2013-14 $0 2014-15 $0 2015-16 $0 TOTAL $0 $2,500 $22,500 $0 $25,000 2008 GOB - ST0910 PROJECT DESCRIPTION/STATUS PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR 138 - Parks CIP Fund Total Personnel $0 Supplies $0 Service $0 Capital $0 TOTAL $0 OPERATING COSTS First Fiscal Year Annually $0 $0 84 PROJECT: Anderson Park Walking Loop PROJECT #: PK1002 FUND: PROJECT BUDGET: $100,000 PROJECT FUNDING MANAGER: David Wood SOURCES: PROJECT CSPARD CLIENT: This park project is for construction of a new sidewalk and trees around the soccer fields at Anderson Park. The budget for this project was transferred from PK0910 - Neighborhood Park Improvements. FISCAL YEAR LAND ENG. CONSTR. MISC. PROJECT TOTAL Prior Years $0 $0 $0 $0 $0 2009-10 $0 2010-11 5,000 95,000 $100,000 2011-12 $0 2012-13 $0 2013-14 $0 2014-15 $0 2015-16 $0 TOTAL $0 $5,000 $95,000 $0 $100,000 Total Personnel $0 Supplies $0 138 - Parks CIP Fund 2008 GOB - ST0910 PROJECT DESCRIPTION/STATUS PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR OPERATING COSTS First Fiscal Year Annually Supplies $0 Service $1,000 Capital $0 TOTAL $1,000$0 $1,000 0 1,000 85 PROJECT: University Park - Phase II FUND(S): PROJECT NUMBERS & BUDGET: 138 - Parks CIP Fund Parks CIP: PK0410 $93,000 172 - Zone 2 Parkland Dedication Fund Parkland Ded: PK0410 $12,000 Total Project Budget: $105,000 PROJECT MANAGER:Philip Bargas FUNDING PROJECT SOURCES:138 - 2008 General Obligation Bond CLIENT:Parks and Recreation 172 - Zone 2 Parkland Dedication The Parks CIP budget for this project was transferred from PK0910 - Neighborhood Park Improvements. Project Total FISCAL YEAR LAND ENG. CONSTR. MISC. PROJECT TOTAL Prior Years 0 0 0 0 2009-10 0 0 0 0 2010-11 0 9,000 96,000 0 2011-12 0 0 0 0 2012-13 0 0 0 0 2013-14 0 0 0 0 PROJECT DESCRIPTION/STATUS This neighborhood park project is for additional parking and a retaining wall at the large dog pond. PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR $0 $0 $105,000 $0 $0 $0 2014-15 0 0 0 0 2015-16 0 0 0 0 $ $0 $0 $105,000PROJECT TOTAL $0 $9,000 $96,000 $0 86 Parks CIP FISCAL YEAR LAND ENG. CONSTR. MISC. PROJECT TOTAL Prior Years 0 0 0 0 $0 2009-10 $0 2010-11 9,000 84,000 $93,000 2011-12 $0 2012-13 $0 2013-14 $0 2014-15 $0 2015-16 $0 Parks Total $0 $9,000 $84,000 $0 $93,000 Parkland Dedication Portion FISCAL YEAR LAND ENG. CONSTR. MISC. PROJECT TOTAL Prior Years 0 0 0 0 $0 2009-10 $0 2010-11 12,000 $12,000 2011-12 $0 2012-13 $0 2013-14 $0 2014-15 $0 2015-16 $0 Parkland Total $0 $0 $12,000 $0 $12,000 First Fiscal Year Annually Total Personnel $0 Supplies $0 Service $0 PROJECT: University Park - Phase II PROJECT CALENDAR OF EXPENDITURES BY FUND PROJECT TOTAL $0 $9,000 $96,000 $0 $105,000 OPERATING COSTS $ Capital $0 TOTAL $0 $0 $0 87 PROJECT: Castlegate Park Improvements PROJECT #: PK1107 FUND: PROJECT BUDGET: $15,000 PROJECT FUNDING MANAGER: Pete Vanecek SOURCES: PROJECT CSPARD CLIENT: This park project is for drinking fountain and a wheelchair accessible sidewalk. The budget for this project was transferred from PK0910 - Neighborhood Park Improvements. FISCAL YEAR LAND ENG. CONSTR. MISC. PROJECT TOTAL Prior Years $0 $0 $0 $0 $0 2009-10 $0 2010-11 15,000 $15,000 2011-12 $0 2012-13 $0 2013-14 $0 2014-15 $0 2015-16 $0 TOTAL $0 $0 $15,000 $0 $15,000 138 - Parks CIP Fund 2008 GOB - ST0910 PROJECT DESCRIPTION/STATUS PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR Total Personnel $0 Supplies $0 Service $240 Capital $0 TOTAL $240 First Fiscal Year Annually OPERATING COSTS $0 $240 0 240 Fm 2 1 5 4Harvey RdWilliam D. Fitch PkwyTexas Ave SWell b o r n R d Fm 158 CASTLEGATE PARKCASTLEGATE PARK Castlegate DrCrayke Pl Roc k c l i f f e L o o p Ravenst on e L o o p Kendal Gree n C i r Greens Prairie Rd WRockingham L oop A l n w i c k C t D a n b y C t 88 PROJECT: Sandstone Park Shade Cover PROJECT #: PK1108 FUND: PROJECT BUDGET: $15,000 PROJECT FUNDING MANAGER: Pete Vanecek SOURCES: PROJECT CSPARD CLIENT: This park project is for a shade cover over the playground. The budget for this project was transferred from PK0910 - Neighborhood Park Improvements. FISCAL YEAR LAND ENG. CONSTR. MISC. PROJECT TOTAL Prior Years $0 $0 $0 $0 $0 2009-10 $0 2010-11 15,000 $15,000 2011-12 $0 2012-13 $0 2013-14 $0 2014-15 $0 2015-16 $0 TOTAL $0 $0 $15,000 $0 $15,000 138 - Parks CIP Fund 2008 GOB - ST0910 PROJECT DESCRIPTION/STATUS PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR Total Personnel $0 Supplies $0 Service $0 Capital $0 TOTAL $0 First Fiscal Year Annually OPERATING COSTS $0 $0 Fm 2 1 5 4Harvey RdWilliam D. Fitch PkwyTexas Ave SWell b o r n R d Fm 158 SANDSTONE PARKSANDSTONE PARK Sebesta RdE m e r a ld P k w y Bent Tree Dr Sandstone DrAlley Drift wood DrCorsair CirO a k w o o d T rlGreenleaf DrTopaz Ct B r ia r R o s e C t Jade Ct 89 PROJECT: Steeplechase Park Improvements PROJECT #: PK1109 FUND: PROJECT BUDGET: $41,000 PROJECT FUNDING MANAGER: David Wood SOURCES: PROJECT CSPARD CLIENT: This park project is for small dog fencing, benches and concrete walks. The budget for this project was transferred from PK0910 - Neighborhood Park Improvements. FISCAL YEAR LAND ENG. CONSTR. MISC. PROJECT TOTAL Prior Years $0 $0 $0 $0 $0 2009-10 $0 2010-11 4,000 37,000 $41,000 2011-12 $0 2012-13 $0 2013-14 $0 2014-15 $0 2015-16 $0 TOTAL $0 $4,000 $37,000 $0 $41,000 138 - Parks CIP Fund 2008 GOB - ST0910 PROJECT DESCRIPTION/STATUS PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR Total Personnel $0 Supplies $400 Service $200 Capital $0 TOTAL $600 First Fiscal Year Annually OPERATING COSTS $0 $600 400 200 STEEPLECHASE PARKSTEEPLECHASE PARK Navarro DrFm 2154Axis Ct Antelope Ln Pronghorn LoopPintail LnPheasant Ln Durango CtSallie LnPin ta il L o o p Fm 2 1 5 4Harvey RdWilliam D. Fitch PkwyTexas Ave SWell b o r n R d Fm 158 90 PROJECT: PROJECT #: PROJECT FUND: BUDGET: $920,000 PROJECT MANAGER: FUNDING SOURCES: PROJECT Bonds CLIENT: Parks and Recreation FISCAL YEAR LAND ENG. CONSTR. MISC. PROJECT TOTAL Prior Years $0 $27,522 $0 $1,186 $28,708 2009-10 95,000 200,000 $295,000 2010-11 66,000 530,292 $596,292 2011-12 $0 2012-13 $0 2013-14 $0 2014-15 $0 2015-16 $0 TOTAL $0 $188,522 $730,292 $1,186 $920,000 SKATE PARK PK0911 138 - Parks CIP Fund Edward McDonald 2008 General Obligation PROJECT DESCRIPTION/STATUS This project is for the design and construction of an in-ground, concrete skate park. The Skate Park will be located at the Southwood Athletic Complex. The project may include the skate facility, outdoor pavilions, fencing, landscaping, water fountains, lighting, seating areas, etc. PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR Total Personnel $25,200 Supplies $1,200 Service $2,400 Capital $0 TOTAL $30,600$10,200 $20,400 $8,400 $16,800 600 1,200 1,200 2,400 First Fiscal Year Annually NET INCREASE IN OPERATING COSTS F m 2154 R ock Prairie R d Fr ont age 6 Rd ENavarro DrAlleyPi er r e Pl Eagle A veM ortier DrH artford D rHaley P lNormand Dr Gail PlSchaffer RdSophia LnKernstown LnCarmel PlBri d l e CtPinon DrF m 2154Harvey RdWilliam D. Fitch PkwyT e x a s A v e SWe ll b o r n Rd Fm 158 91 PROJECT: PROJECT #: PROJECT FUND: BUDGET: $1,000,000 PROJECT MANAGER: FUNDING SOURCES: PROJECT Bonds CLIENT: Parks and Recreation FISCAL YEAR LAND ENG. CONSTR. MISC. PROJECT TOTAL Prior Years $416,918 $482 $0 $0 $417,400 2009-10 275,100 15,000 7,500 $297,600 2010-11 285,000 $285,000 2011-12 $0 2012-13 $0 2013-14 $0 2014-15 $0 2015-16 $0 TOTAL $977,018 $15,482 $0 $7,500 $1,000,000 Total PK0912 FUND NET INCREASE IN OPERATING COSTS NEIGHBORHOOD PARKS REVOLVING 2008 General Obligation 138 - Parks CIP Fund David Schmitz PROJECT DESCRIPTION/STATUS This fund is for acquiring properties for neighborhood parks in advance of development. As the land develops, the fund will be reimbursed through park land dedication. PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR AnnuallyFirst Fiscal Year Total Personnel $0 Supplies $0 Service $3,000 Capital $0 TOTAL $3,000$0 $3,000 3,000 AnnuallyFirst Fiscal Year Fm 21 54Harvey RdWilliam D. Fitch PkwyT e x a s Av e SWe ll b o r n R d Fm 158 92 PROJECT: PROJECT #: PROJECT FUND: BUDGET: $930,000 PROJECT MANAGER: FUNDING SOURCES: PROJECT Bonds CLIENT: Parks and Recreation FISCAL YEAR LAND ENG. CONSTR. MISC. PROJECT TOTAL Prior Years $0 $0 $0 $0 $0 2009-10 150,000 $150,000 2010-11 780,000 $780,000 2011-12 $0 2012-13 $0 2013-14 $0 2014-15 $0 2015-16 $0 TOTAL $0 $150,000 $780,000 $0 $930,000 PROJECT DESCRIPTION/STATUS This project is for the demolition and construction of a new softball concession complex and restroom building at the softball fields in Stephen C. Beachy Central Park. The new building will include restrooms, concession area, storage and a meeting room. PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR PK1001 IMPROVEMENTS NET INCREASE IN OPERATING COSTS 138 - Parks CIP Fund Daniel Beamon 2008 General Obligation BEACHY CENTRAL PARK Total Personnel $0 Supplies $0 Service $0 Capital $0 TOTAL $0 AnnuallyFirst Fiscal Year $0 $0 NET INCREASE IN OPERATING COSTS 93 PROJECT: PROJECT #: PROJECT FUND: BUDGET: $100,000 PROJECT MANAGER:FUNDING SOURCES: PROJECT Bonds CLIENT: Parks and Recreation FISCAL YEAR LAND ENG. CONSTR. MISC. PROJECT TOTAL Prior Years $0 $0 $0 $0 $0 2009-10 $0 2010-11 $0 2011-12 3,000 97,000 $100,000 2012-13 $0 2013-14 $0 2014-15 $0 2015-16 $0 TOTAL $0 $3,000 $97,000 $0 $100,000 TBD TRAIL COMPLETION NET INCREASE IN OPERATING COSTS LICK CREEK PARK IRON BRIDGE 2008 General Obligation 138 - Parks CIP Fund David Wood PROJECT DESCRIPTION/STATUS This park project is for construction of a compacted gravel trail over the existing dirt trail in Lick Creek Park. PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR Total Personnel $1,200 Supplies $1,000 Service Capital TOTAL $2,200 NET INCREASE IN OPERATING COSTS $2,200 1,000 Annually $1,200 First Fiscal Year 94 PROJECT: LINCOLN CENTER ADDITION PROJECT #: TBD FUND: PROJECT BUDGET: $4,285,000 PROJECT MANAGER:FUNDING SOURCES: PROJECT Bonds CLIENT: Parks and Recreation FISCAL YEAR LAND ENG. CONSTR. MISC. PROJECT TOTAL Prior Years $0 $0 $0 $0 $0 2009-10 $0 2010-11 $0 2011-12 $0 2012-13 50,000 $50,000 2013-14 395,000 $395,000 2014-15 3,840,000 $3,840,000 2015-16 $0 TOTAL $0 $445,000 $3,840,000 $0 $4,285,000 Ttl 2008 General Obligation 138 - Parks CIP Fund Daniel Beamon Fi t Fi l Y All PROJECT DESCRIPTION/STATUS NET INCREASE IN OPERATING COSTS This project is for the expansion of the Lincoln Center building, to include additional space for programming, storage and inclusion of a Police Department substation. PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR Total Personnel $39,000 Supplies $20,000 Service $65,800 Capital $0 TOTAL $124,800$0 20,000 65,800 $124,800 First Fiscal Year Annually 39,000 95 PROJECT: PROJECT #: PROJECT FUND: BUDGET: $1,645,000 PROJECT MANAGER: FUNDING SOURCES: PROJECT Bonds CLIENT: Parks and Recreation FISCAL YEAR LAND ENG. CONSTR. MISC. PROJECT TOTAL Prior Years $0 $0 $0 $0 $0 2009-10 $0 2010-11 200,000 500,000 $700,000 2011-12 945,000 $945,000 2012-13 $0 2013-14 $0 2014-15 $0 2015-16 $0 TOTAL $0 $200,000 $1,445,000 $0 $1,645,000 Total PK1101 REPLACEMENT NET INCREASE IN OPERATING COSTS 138 - Parks CIP Fund Daniel Beamon 2008 General Obligation EAST DISTRICT MAINTENANCE SHOP PROJECT DESCRIPTION/STATUS This project is for the construction of a new East District maintenance shop. The new building will include restrooms, work areas, open bays, office area, storage, and a meeting room. PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR AnnuallyFirst Fiscal Year Total Personnel $0 Supplies $0 Service $0 Capital $0 TOTAL $0$0 $0 AnnuallyFirst Fiscal Year 96 PROJECT: PROJECT PROJECT FUND: BUDGET: $2,495,000 PROJECT MANAGER: FUNDING SOURCES PROJECT Bonds CLIENT: Parks and Recreation FISCAL YEAR LAND ENG. CONSTR. MISC. PROJECT TOTAL Prior Years $0$0 $0$0 $0 2009-10 $0 2010-11 100,000 $100,000 2011-12 375,000 750,000 $1,125,000 2012-13 1,270,000 $1,270,000 2013-14 $0 2014-15 $0 2015-16 $0 TOTAL $0 $475 000 $2 020 000 $0 $2 495 000 Lick Creek Nature Center PK1102 138 - Parks CIP Fund Danielle Charbonnet 2008 General Obligation PROJECT DESCRIPTION/STATUS This project is for the design and construction of a Nature Center building and area at Lick Creek Park. The project may include the building facility, kiosks, landscaping, lighting, seating areas, etc. PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR TOTAL $0 $475,000 $2,020,000 $0 $2,495,000 Total Personnel $125,708 Supplies $50,000 Service $50,000 Capital $0 TOTAL 0 $225,708 First Fiscal Year Annually NET INCREASE IN OPERATING COSTS $125,708 50,000 50,000 0 $0 $225,708 Wi lliam D. Fitch PkwyS H 4 0 / Wi l l i a m D F itc h P k wyFrontage 6 Rd E Olden L n O a k s D r SBradley RdR o y a l A d e la d e D rAl le yAlley Fm 2154Harvey RdWilli am D. Fitch Pkwy97 ########## FY10 FY10 FY11 FY11 % Change in FY09 Revised Year-End Approved Approved Budget from Actual Budget Estimate Base Budget Budget FY10-FY11 BEGINNING BALANCE 1,586,438$ 2,587,367$ 2,587,367$ 3,316,634$ 3,316,634$ REVENUES Ad Valorem Taxes COCS 248,716$ 304,827$ 301,674$ -$ -$ -100.00% Ad Valorem Taxes CSISD 493,613 600,997 586,236 - - -100.00% Ad Valorem Taxes Brazos County 230,684 276,599 272,297 - - -100.00% Investment Earnings 35,379 20,000 29,000 15,000 15,000 -25.00% Total Revenues 1,008,391$ 1,202,423$ 1,189,207$ 15,000$ 15,000$ -98.75% TOTAL FUNDS AVAILABLE 2,594,829$ 3,789,790$ 3,776,574$ 3,331,634$ 3,331,634$ -12.09% EXPENDITURES & TRANSFERS Additional Capital Projects WPC Festival Site/Water Feature 6,747$ 3,400,000$ 459,940$ 3,033,313$ 3,033,313$ -10.78% Debt Service - - - - - N/A Other 715 - - - - N/A Total Expenditures & Transfers 7,462$ 3,400,000$ 459,940$ 3,033,313$ 3,033,313$ -10.78% Increase (Decrease) in Fund Balance 1,000,929$ (2,197,577)$ 729,267$ (3,018,313)$ (3,018,313)$ 37.35% ENDING FUND BALANCE 2,587,367$ 389,790$ 3,316,634$ 298,321$ 298,321$ City of College Station Wolf Pen Creek TIF Fund Fund Summary Investment  Earnings 100% Wolf Pen Creek TIF Fund ‐Sources Wolf Pen Creek TIF Fund ‐Uses The Wolf Pen Creek (WPC) TIF Fund accounts for ad valorem tax and other revenues that are accrued to the WPC TIF District. The fund also accounts for expenditures on projects that take place in the district. This fund is prepared on the modified accrual basis of accounting. Under this basis, revenues are recognized when they become measurable and available to finance expenditures of the current period. Expenditures are recognized when the related fund liability is incurred with the exception of several items. The full listing of these exceptions can be found in the Financial Policies on page F-1. The TIF expired on December 31, 2009. Therefore, no ad valorem revenue is estimated to be received in FY11. In years past, the TIF received ad valorem taxes from the City of College Station, College Station Independent School District and Brazos County on the incremental increase in assessed valuation (captured value) over the base year (1989). The FY10 year-end estimate includes expenditures totaling $459,940 for the construction of a Festival Site and Water Feature in the Wolf Pen Creek area. A total of $3,500,000 is budgeted for this project. The balance of the total budget is estimated to be expended in FY11. The FY11 estimated ending fund balance is anticipated to decrease 91% when compared to the FY10 estimated ending fund balance. This is due to the expiration of the TIF, with no new ad valorem revenue to be received. In additon, the majority of the TIF fund balance will be expended in FY11 on the WPC Festival Site and Water Feature project. Investment  Earnings 100% Wolf Pen Creek TIF Fund ‐Sources WPC  Festival  Site/Water  Feature 100% Wolf Pen Creek TIF Fund ‐Uses 98 PROJECT: PROJECT #: PROJECT FUND: BUDGET: $3,500,000 PROJECT MANAGER: FUNDING SOURCES: PROJECT CLIENT: Parks and Recreation FISCAL YEAR LAND ENG. CONSTR. MISC. PROJECT TOTAL Prior Years $0 $6,551 $0 $197 $6,747 2009-10 $0 $439,940 $0 $20,000 $459,940 2010-11 $0 $80,000 $2,933,313 $20,000 $3,033,313 2011-12 $0 2012-13 $0 2013-14 $0 2014-15 $0 2015-16 $0 TOTAL $0 $526,491 $2,933,313 $40,197 $3,500,000 Total Personnel $70,000 WOLF PEN CREEK WP0901 FESTIVAL SITE & WATER FEATURE WPC TIF Donald Harmon WPC TIF PROJECT DESCRIPTION/STATUS This project is for the development of the Wolf Pen Creek Festival Site and Water Feature, to adjoin the amphitheater. This project can be done in phases and will serve as a major attraction for the corridor. The project may include parking, pavilions, fencing, plaza, landscaping, etc. PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR NET INCREASE IN OPERATING COSTS First Fiscal Year Annually $23,400 $70,000Personnel $70,000 Supplies $20,000 Service $50,000 Capital $30,000 TOTAL $170,000 $23,400 $70,000 6,600 20,000 16,667 50,000 10,000 30,000 $56,667 $170,000 99 AMERICAN RECOVERY AND REINVESTMENT ACT OF 2009 (ARRA) PARKS AND RECREATION PROJECTS 100 PROJECT: Stephen C. Beachy Central PROJECT #: GG1012 Park - Stimulus Grant Project FUND: PROJECT BUDGET: $210,000 PROJECT FUNDING MANAGER: SOURCES: ARRA (American PROJECT Recovery and Reinvestment CLIENT: Parks and Recreation Act of 2009) Components of the project include: LIGHTING: Retro-fit area and parking lot lights with solar powered LED lighting. TRASH COLLECTION & RECYCLING: Replace several "regular" trash recepticles with solar powered trash compactors and recycling units. FISCAL YEAR LAND ENG. CONSTR. MISC. PROJECT TOTAL Prior Years $0 $0 $0 $0 $0 2009-10 210,000 $210,000 2010-11 $0 2011-12 $0 Federal Stimulus Grant 117 - ARRA Fund David Wood PROJECT DESCRIPTION/STATUS This project is to update of Stephen C. Beachy Central Park irrigation, area and parking lot lighting, trash collection and recycling, and add Rainwater Harvesting to some irrigation. This project is to enhance the efficiency, economics, and environmental aspects in the park. PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR IRRIGATION: Change Master Valves and add Flow Sensors that will give the capability to control and monitor water flow through an irrigation computer program. Consolidate and upgrade controllers into ones that have the capability of irrigation system computer program accessibility, and can tie into the Weather Station system; and add a Rainwater Harvesting system that supplies the office complex connected to the new irrigation system. 2011 12 $0 2012-13 $0 2013-14 $0 2014-15 $0 2015-16 $0 TOTAL $0 $0 $210,000 $0 $210,000 Total Personnel $0 Supplies $0 Service $0 Capital $0 TOTAL $0$0 $0 First Fiscal Year Annually NET INCREASE IN OPERATING COSTS CENTRAL PARKCENTRAL PARK F r o n t a g e 6 Rd WKrenek Tap RdEar l Rudder Fwy SFm 2154Harvey RdWilli am D. Fitch Pkwy101 PROJECT:Veterans Park and Athletic PROJECT #: GG1013 Complex - Stimulus Grant Project FUND: PROJECT BUDGET: $295,000 PROJECT FUNDING MANAGER: SOURCES: ARRA (American PROJECT Recovery and Reinvestment CLIENT: Parks and Recreation Act of 2009) Components of the project include: LIGHTING: Retro-fit area and parking lot lights with solar powered LED lighting. TRASH COLLECTION & RECYCLING: Replace several "regular" trash recepticles with solar powered trash compactors and recycling units. FISCAL YEAR LAND ENG. CONSTR. MISC. PROJECT TOTAL Prior Years $0 $0 $0 $0 $0 2009-10 5,000 290,000 $295,000 2010-11 $0 2011-12 $0 2012-13 $0 2013-14 $0 David Wood PROJECT DESCRIPTION/STATUS This project is to update of Veterans Park and Athletic Complex irrigation, area and parking lot lighting, and trash collection and recycling. This project is to enhance the efficiency, economics, and environmental aspects in the park. 117 - ARRA Fund Federal Stimulus Grant IRRIGATION: Change water meters to isolate irrigation systems from the other potable water; consolidate and upgrade controllers into ones that have the capability of irrigation system computer program accessibility, and can tie into the Weather Station system; upgrade to remote controlled valves; and add Weather Station system for evapotranspiration data and control. PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR 2014-15 $0 2015-16 $0 TOTAL $0 $5,000 $290,000 $0 $295,000 Total Personnel $0 Supplies $0 Service $0 Capital $0 TOTAL $0 NET INCREASE IN OPERATING COSTS First Fiscal Year $0 $0 Annually Fm 2154Harvey RdWillia m D. Fitch PkwyHarvey RdU n iv e rs ity D r E Old Ti RdFro n tage 6 R d E Ranchero RdCop perfield Pk wy Glenhaven D r 102 COMMUNITY DEVELOPMENT BLOCK GRANT FUNDED (CDBG) PARKS AND RECREATION PROJECTS 103 PROJECT: W.A. Tarrow Improvements FUND(S): PROJECT NUMBERS & BUDGET: 122 - CDBG Funds CDBG CIP: PK1103 $60,000 176 - Zone 6 Parkland Dedication Fund Parkland Ded: PK1103 $73,500 Total Project Budget: $133,500 PROJECT MANAGER:Pete Vanecek FUNDING PROJECT SOURCES:122 - CDBG Funds CLIENT:Parks and Recreation 176 - Zone 6 Parkland Dedication Project Total FISCAL YEAR LAND ENG. CONSTR. MISC. PROJECT TOTAL Prior Years 0 0 0 0 2009-10 0 0 0 0 2010-11 0 700 132 800 0 PROJECT DESCRIPTION/STATUS This project is to replace a playground and to aesthetically renovate a swingset, with a rubber cushioned surface for both, drinking fountain and irrigated trees. PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR $0 $0 $133 5002010-11 0 700 132,800 0 2011-12 0 0 0 0 2012-13 0 0 0 0 2013-14 0 0 0 0 2014-15 0 0 0 0 2015-16 0 0 0 0 $133,500 $0 $0 $0 $0 $133,500 $0 PROJECT TOTAL $0 $700 $132,800 $0 104 CDBG CIP FISCAL YEAR LAND ENG. CONSTR. MISC. PROJECT TOTAL Prior Years 0 0 0 0 $0 2009-10 $0 2010-11 60,000 $60,000 2011-12 $0 2012-13 $0 2013-14 $0 2014-15 $0 2015-16 $0 Parks Total $0 $0 $60,000 $0 $60,000 Parkland Dedication Portion FISCAL YEAR LAND ENG. CONSTR. MISC. PROJECT TOTAL Prior Years 0 0 0 0 $0 2009-10 $0 2010-11 700 72,800 $73,500 2011-12 $0 2012-13 $0 2013-14 $0 2014-15 $0 2015-16 $0 Parkland Total $0 $700 $72,800 $0 $73,500 First Fiscal Year Annually Total PROJECT: W.A. Tarrow Improvements PROJECT CALENDAR OF EXPENDITURES BY FUND PROJECT TOTAL $0 $700 $132,800 $0 $133,500 OPERATING COSTS First Fiscal Year Annually Total Personnel $0 Supplies $0 Service $0 Capital $0 TOTAL $0 $0 $0 105 PROJECT: Georgie K. Fitch Improvements PROJECT #: PK1104 FUND: CDBG PROJECT BUDGET: $103,500 PROJECT FUNDING MANAGER: Pete Vanecek SOURCES: CDBG Funds PROJECT CSPARD CLIENT: This project is for a lighted concrete walking jogging loop, with trees. FISCAL YEAR LAND ENG. CONSTR. MISC. PROJECT TOTAL Prior Years $0 2009-10 1,000 102,500 $103,500 2010-11 $0 2011-12 $0 2012-13 $0 2013-14 $0 2014-15 $0 2015-16 $0 TOTAL $0 $1,000 $102,500 $0 $103,500 PROJECT DESCRIPTION/STATUS PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR Total Personnel $0 Supplies $250 Service $1,200 Capital $0 TOTAL $1,450 OPERATING COSTS First Fiscal Year Annually $0 $1,450 250 1,200 Fm 2154Harvey RdWil liam D. Fitch PkwyH a rv e y M itc h e ll P w We l s h A v B a lc o n e s D rRi o Grande Bl Nueces Dr Navarro DrSan Saba DrA irlin e D rSan Benito DrBlanco DrGEORGIE K FITCH PARKGEORGIE K FITCH PARKWels h A v e Pe dernales Dr 106 GENERAL GOVERNMENT- FACILITY AND TECHNOLOGY CAPITAL IMPROVEMENT PROJECTS FISCAL YEAR 2010-2011 THROUGH FISCAL YEAR 2015-2016 107 GENERAL GOVERNMENT FACILITIES AND TECHNOLOGY CAPITAL IMPROVEMENT PROJECTS FISCAL YEAR 2010-2011 THROUGH FISCAL YEAR 2015-2016 PROJECT REVISED APPROVED BUDGET APPROPRIATIONS FY09-10 FY10-11 AMOUNT THROUGH FY08 APPROPRIATIONS APPROPRIATIONS BEGINNING FUND BALANCE:9,118,722$ 11,507,268$ ADDITIONAL RESOURCES: GENERAL OBLIGATION BONDS (03 GOB)250,000$ 500,000$ GENERAL OBLIGATION BONDS (08 GOB)4,932,000 - CERTIFICATES OF OBLIGATIONS 425,000 380,000 INTERGOVERNMENTAL TRANSFERS - - INTRAGOVERNMENTAL TRANSFERS - 231,040 INVESTMENT EARNINGS 47,000 133,000 OTHER - - SUBTOTAL ADDITIONAL RESOURCES 5,654,000$ 1,244,040$ TOTAL RESOURCES AVAILABLE 14,772,722$ 12,751,308$ PUBLIC FACILITIES LIBRARY BOOK DONATIONS GG9901 291,348 291,348 - - 1 MUNICIPAL COMPLEX EXPANSION GG0408 4,300,000 645,000 203,535 - NORTHGATE IMPROVEMENTS GG0803 180,495 180,495 - - 2 FIRE STATION #6 GG0903 6,990,000 6,990,000 - - 2 LIBRARY EXPANSION GG1010 8,385,000 - 932,000 - ARTS COUNCIL BUILDING PURCHASE TBD 520,000 - 520,000 - *CLOSED PROJECTS FACILITY PROJECTS SUBTOTAL 8,106,843$ 1,655,535$ -$ TECHNOLOGY PROJECTS MDT SYSTEM REPLACEMENT CO0701 100,000 100,000 - - i5 ENHANCEMENT CO1101 200,000 - - 200,000 UPS REPLACEMENT CO0603 189,120 73,869 7,111 16,040 RADIO SYSTEM REPLACEMENT CO0601 4,885,000 4,885,000 - - WIRELESS INFRASTRUCTURE CO0704 200,000 200,000 - - SERVER CONSOLIDATION CO0901 150,000 150,000 - - FIBER OPTIC INFRASTRUCTURE CO0902 1,008,559 158,296 189,263 25,534 AERIAL TOPOGRAPHIC MAPPING CO1102 215,000 - - 215,000 **MISC INFORMATION TECHNOLOGY PROJECTS CO0801 20,055 20,055 - - *CLOSED PROJECTS 55,000 - IT PROJECTS SUBTOTAL 5,587,220$ 251,374$ 456,574$ CAPITAL PROJECTS SUBTOTAL 13,694,063$ 1,906,909$ 456,574$ DEBT ISSUANCE COSTS 27,000$ 5,000$ TRANSFERS - 735,910 OTHER - - GENERAL & ADMIN. CHARGES 91,147 92,942 TOTAL EXPENDITURES 2,025,056$ 1,290,426$ CAFR Adjustment ENDING FUND BALANCE:12,747,666$ 11,460,882$ 1 - Indicates projects funded through 2003 G.O. Bond Authorization 2 - Indicates projects funded through 2008 G.O. Bond Authorization * - Closed projects includes balance of GG0401 - Fire Station #3 Relocation ** - Miscellaneous Information Technology Projects includes balances from closed IT projects. BUDGET APPROPRIATIONS 108 GENERAL GOVERNMENT FACILITIES AND TECHNOLOGY CAPITAL IMPROVEMENT PROJECTS FISCAL YEAR 2010-2011 THROUGH FISCAL YEAR 2015-2016 PROJECT EXPENDITURES ACTUAL ESTIMATE PROJECTED PROJECTED PROJECTED PROJECTED PROJECTED PROJECTED THROUGH FY08 FY 08-09 FY 09-10 FY 10-11 FY 11-12 FY 12-13 FY 13-14 FY 14-15 FY 15-16 12,308,858$ 9,118,722$ 11,507,268$ 5,986,532$ 1,165,247$ 1,029,207$ 985,700$ 857,189$ -$ -$ 500,000$ 1,655,000$ 1,500,000$ -$ -$ -$ 750,000 6,240,000 - 700,000 4,800,000 2,885,000 - - 3,260,000 930,000 380,000 160,000 150,000 135,000 - - - - - - - - - 22,749 - 231,040 30,440 39,240 22,420 - - 187,969 80,000 133,000 76,000 22,000 20,000 19,000 18,000 534,350 - - - - - - - 4,755,068$ 7,250,000$ 1,244,040$ 2,621,440$ 6,511,240$ 3,062,420$ 19,000$ 18,000$ 17,063,926$ 16,368,722$ 12,751,308$ 8,607,972$ 7,676,487$ 4,091,627$ 1,004,700$ 875,189$ 159,078 19,643 20,000 40,000 20,000 20,000 12,627 - - 188,535 - 25,000 500,000 2,000,000 1,586,465 - - - 8,992 70,505 30,000 70,998 - - - - - - 9,715 250,000 2,315,000 4,415,285 - - - - - - - - 685,000 4,799,575 2,900,425 - - - - 520,000 - - - - - - 6,234,812 914,488 - - - - - - 356,605$ 6,334,675$ 1,759,488$ 2,925,998$ 7,120,285$ 6,406,040$ 2,913,052$ -$ -$ - - - 100,000 - - - - - - - - 200,000 - - - - - 51,265 23,664 6,051 16,040 30,440 39,240 22,420 - - 75,382 34,463 2,640,156 1,250,000 - - - - - - 76,114 85,000 38,886 - - - - - - - 150,000 - - - - - - 33,093 190,000 150,000 180,000 160,000 150,455 145,011 - - - - 215,000 - - - - - - - 20,055 - - - - 1,302,104 34,557 885,000 - - - - - 126,647$ 1,469,438$ 2,975,819$ 3,004,926$ 210,440$ 199,240$ 172,875$ 145,011$ -$ 7,804,112$ 4,735,307$ 5,930,924$ 7,330,725$ 6,605,280$ 3,085,927$ 145,011$ -$ 12,051$ 35,000$ 5,000$ 12,000$ 32,000$ 15,000$ -$ -$ - - 735,910 - - - - 28,887 - - - - - - - 189,074 91,147 92,942 100,000 10,000 5,000 2,500 2,500 8,034,124$ 4,861,454$ 6,764,776$ 7,442,725$ 6,647,280$ 3,105,927$ 147,511$ 2,500$ 88,920$ 9,118,722$ 11,507,268$ 5,986,532$ 1,165,247$ 1,029,207$ 985,700$ 857,189$ 872,689$ PROJECTED EXPENDITURES 109 PUBLIC FACILITIES 110 PROJECT: LIBRARY BOOK DONATIONS PROJECT #: GG9901 FUND: General Government, CIP PROJECT BUDGET: $291,348 PROJECT MANAGER: David Gerling FUNDING SOURCES: Funds raised by donations PROJECT for library materials CLIENT: Parks and Recreation FISCAL YEAR HARDWARE SOFTWARE CONS/TRAIN OTHER PROJECT TOTAL Prior Years $0 $0 $0 $178,721 $178,721 2009-10 $20,000 $20,000 2010-11 $40,000 $40,000 2011-12 $20,000 $20,000 2012-13 $20,000 $20,000 2013-14 $12,627 $12,627 2014-15 $0 2015-16 $0 TOTAL $0 $0 $0 $291 348 $291 348 PROJECT DESCRIPTION/STATUS This money was raised through donations for adding to the collection of books and other items in the Larry J. Ringer Library. Based on history we anticipate spending $20,000 per year until the funds are depleted. PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR TOTAL $0 $0 $0 $291,348 $291,348 Total Personnel $0 Supplies $0 Service $0 Capital $0 TOTAL $0$0 $0 First Fiscal Year Annually OPERATING COSTS Larry J. Ringer Library 111 PROJECT: Municipal Complex Expansion PROJECT #: GG0408 FUND: 137 - General Government CIP PROJECT 4,300,000 BUDGET: PROJECT MANAGER: Chuck Gilman FUNDING 2003 General Obligation SOURCES: Bonds PROJECT CLIENT: CMO Phase I of city hall improvements. FISCAL YEAR LAND ENG. CONSTR. MISC. PROJECT TOTAL Prior Years $10,737 $114,778 $63,020 $188,535 2009-10 25,000 $25,000 2010-11 500,000 $500,000 2011-12 2,000,000 $2,000,000 2012-13 1,586,465 $1,586,465 2013-14 $0 2014-15 $0 2015-16 $0 TOTAL $10,737 $639,778 $3,586,465 $63,020 $4,300,000 Total PROJECT DESCRIPTION/STATUS PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR OPERATING COSTS First Fiscal Year Annually Total Personnel $0 Supplies $0 Service $0 Capital $0 TOTAL TBDTBD TBD First Fiscal Year Annually Fm 2 1 54Harvey RdWilliam D. Fitch PkwyTexas Ave SWe l l b o r n R d Fm 158 112 PROJECT: Northgate Improvements PROJECT #: GG0803 FUND: 137 - General Government CIP PROJECT BUDGET: $180,495 PROJECT MANAGER: David Gwin FUNDING SOURCES: 2005 Certificates PROJECT of Obligation CLIENT: Economic Development Construction of improvements in the Northgate area. FISCAL YEAR LAND ENG. CONSTR. MISC. PROJECT TOTAL Prior Years $863 $78,634 $79,497 2009-10 $30,000 $30,000 2010-11 $70,998 $70,998 2011-12 $0 2012-13 $0 2013-14 $0 2014-15 $0 2015-16 $0 TOTAL $0 $863 $0 $179,632 $180,495 Total PROJECT DESCRIPTION/STATUS PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR OPERATING COSTS First Fiscal Year Annually Total Personnel $0 Supplies $0 Service $0 Capital $0 TOTAL TBD First Fiscal Year Annually TBD TBD 113 PROJECT: Fire Station No. 6 PROJECT #: GG0903 FUND: 137 - General Government CIP Fund PROJECT BUDGET: $6,990,000 PROJECT MANAGER: Donald Harmon FUNDING SOURCES: 2008 General Obligation Bonds PROJECT CLIENT: Fire Department FISCAL YEAR LAND ENG. CONSTR. MISC. PROJECT TOTAL Prior Years $0 $9,715 $0 $0 $9,715 2009-10 $230,000 $0 $20,000 $250,000 2010-11 $235,000 $2,000,000 $80,000 $2,315,000 2011-12 $140,000 $4,175,285 $100,000 $4,415,285 2012-13 $0 2013-14 $0 2014-15 $0 2015-16 $0 TOTAL $0 $614,715 $6,175,285 $200,000 $6,990,000 Total PROJECT DESCRIPTION/STATUS PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR NET INCREASE IN OPERATING COSTS First Fiscal Year Annually This project is for the construction of a new fire station as identified for the 2008 bond election during a facilities planning session in early 2004. Fire Station No. 6 will be located on the southwest corner of the University Drive and Tarrow Street intersection, and will provide the department improved coverage and response time to the University Drive corridor. Operating costs reflect estimated recurring annual cost following full implementation which is projected for FY17. Total Personnel $1,084,632 Supplies $29,129 Service $35,000 Capital $180,207 TOTAL * ** $1,328,967 *Amount included in FY11 Approved Budget for Fire Station #6 O&M. **Estimated annual recurring expense as of FY13. $624,302 29,129 35,000 180,207 $1,328,967 126,406 251,150 1,084,632 2,500 First Fiscal Year Annually 244,246 Fm 2 1 5 4Harvey RdWilliam D. Fitch PkwyTexas Ave SWell b o r n R d Fm 158 U n iv e r s it y D r E Lincoln AveTarrow St Ni mi tz StCooner StW a lton D rTexas AvePasler StEi senhower St Franc is D rAlleyAsh StAs hbur n Av eChimney Hill DrTar ro w St E Vassar CtChurchi l l St 114 PROJECT: PROJECT #: PROJECT FUND: BUDGET: PROJECT MANAGER: FUNDING SOURCES: PROJECT Bonds CLIENT: Parks and Recreation FISCAL YEAR LAND ENG. CONSTR. MISC. PROJECT TOTAL Prior Years $0 $0 $0 $0 2009-10 $0 2010-11 $0 2011-12 $650,000 $35,000 $685,000 2012-13 $199,575 $4,500,000 $100,000 $4,799,575 2013-14 $150,425 $2,500,000 $250,000 $2,900,425 2014-15 $0 2015-16 $0 TOTAL $0 $1,000,000 $7,000,000 $385,000 $8,385,000 PROJECT DESCRIPTION/STATUS This project is for the expansion of the Larry J. Ringer College Station Library on Harvey Mitchell Parkway (FM 2818). The project may include the building facility expansion, furniture and shelving, parking, landscaping, lighting, seating areas, etc. PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR GG1010 NET INCREASE IN OPERATING COSTS 137 - General Government CIP Jeff Haeber 2008 General Obligation LARRY J. RINGER LIBRARY EXPANSION $8,385,000 Total Personnel $121,000 Supplies $20,000 Service $65,000 Capital $0 TOTAL $0 $206,000 65,000 20,000 Annually $121,000 $206,000 First Fiscal Year NET INCREASE IN OPERATING COSTS Larry J. Ringer Library 115 PROJECT: Arts Council Building Purchase PROJECT #: TBD FUND: 137 - General Government CIP PROJECT BUDGET: $520,000 PROJECT MANAGER: CMO FUNDING SOURCES: 2010 Certificates PROJECT of Obligation CLIENT: CMO Purchase of the Arts Council of the Brazos Valley Building. FISCAL YEAR LAND ENG. CONSTR. MISC. PROJECT TOTAL Prior Years $0 2009-10 $520,000 $520,000 2010-11 $0 2011-12 $0 2012-13 $0 2013-14 $0 2014-15 $0 2015-16 $0 TOTAL $0 $0 $0 $520,000 $520,000 Total PROJECT DESCRIPTION/STATUS PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR OPERATING COSTS First Fiscal Year Annually Total Personnel $0 Supplies $0 Service $0 Capital $0 TOTAL TBD First Fiscal Year Annually TBD TBD Fm 2154Harvey RdWilliam D. Fitch PkwyTexas Ave SWe ll b o r n R d Holleman Dr EDartmouth StColgate DrHarvey RdManuel DrRichards StCypress Dr116 TECHNOLOGY PROJECTS 117 PROJECT: MDT SYSTEM REPLACEMENT PROJECT #: CO0701 FUND: 137 - GENERAL GOVERNMENT CIP PROJECT BUDGET: $100,000 PROJECT FUNDING MANAGER: Ben Roper SOURCES: EQUIPMENT REPLACEMENT FUND PROJECT CLIENT: Fire, PD, Utilities FISCAL YEAR Hardware Software Cons/Training Other PROJECT TOTAL Prior Years $0 $0 $0 $0 $0 2009-10 $0 2010-11 50,000 30,000 15,000 5,000 $100,000 2011-12 $0 2012-13 $0 $ PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR upgrade.To a lesser extent, the data system is experiencing the same coverage limitations as the voice system addressed by project CO0601. If the data side requires expansion to a multisite system to support current and projected City growth costs will likely exceed the budget amount. PROJECT DESCRIPTION/STATUS This project replaces the electronic equipment that provides the interface between radio frequency system (800 MHz radio system) and the Internet Protocol system (Computer Aided Dispatch). This equipment is located at the Radio Tower and is anticipated to be upgraded following the Radio System Replacement. Current funding is estimated as sufficient to replace existing infrastructure, not enhance or The goal of this project is to provide Public Safety Radio System data that meets the current and Responders. anticipated coverage needs of Fire, PD and Emergency Responders. The current system does not provide complete coverage in key areas that are experiencing growth. 2013-14 $0 2014-15 $0 2015-16 $0 TOTAL $50,000 $30,000 $15,000 $5,000 $100,000 Total Personnel $0 Supplies $0 Service $20,000 Capital $0 TOTAL $20,000$0 $20,000 20,000 OPERATING COSTS First Fiscal Year Annually 118 PROJECT: i5 ENHANCEMENT PROJECT #: CO1101 FUND: 137 - GENERAL GOVERNMENT CIP PROJECT BUDGET: $200,000 PROJECT MANAGER: ROGER EARWOOD FUNDING PROJECT SOURCES: Future Certificates CLIENT: Information Technology of Obligation The goal of this project is to ensure the city's mid range computer system is capable of running the required software applications, and has the capacity to meet the city's computing and data storage needs. The city's midrange computer system consists of two IBM i5 computers and the i5OS operating system to run several of the City's key operational databases and software applications. Some of these include Utility Customer Service, Finance, Budget, Fleet Management, and Development Services. An upgrade to the hardware is anticipated every three to four years to ensure that the system is performing at the level of efficiency required for its daily use. The project will provide the necessary funding to upgrade the system during the particular year of implementation. The last replacement to these machines occurred in January of 2005. Those systems' capabilities have allowed the postponment of the replacement funding. There is a need to replace the machines in FY2011. FISCAL YEAR HARDWARE SOFTWARE CONS/TRAIN OTHER PROJECT TOTAL Prior Years $0 $0 $0 $0 $0 2009-10 $0 2010-11 150,000 30,000 20,000 $200,000 2011-12 $0 2012 13 $0 PROJECT DESCRIPTION/STATUS PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR 2012-13 $0 2013-14 $0 2014-15 $0 2015-16 $0 TOTAL $150,000 $30,000 $20,000 $0 $200,000 Total Personnel $0 Supplies $0 Service $0 Capital $0 TOTAL $0 *The annual HW maintnance cost is projected to be $18,000 when the next upgrade is implemented in FY11. OPERATING COSTS First Fiscal Year Annually* $0 $0 119 PROJECT: UPS Replacment PROJECT #: CO0603 FUND: 137 - General Government CIP PROJECT BUDGET: $189,120 PROJECT MANAGER: Ben Roper FUNDING PROJECT SOURCES: Equipment Replacement Fund CLIENT: City Wide FISCAL YEAR Hardware Software Cons/Training Other PROJECT TOTAL Prior Years $72,348 $0 $0 $2,581 $74,929 2009-10 $6,051 $6,051 2010-11 $14,040 $2,000 $16,040 2011-12 $28,440 $2,000 $30,440 2012-13 $39,240 $39,240 2013-14 $20,420 $2,000 $22,420 PROJECT DESCRIPTION/STATUS PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR Replacement of Uninterruptible Power Supply (UPS) units and associated Battery Cabinets supporting the City's telephone, computer network, and radio systems. Recommended replacement schedule of 9 years for UPS units and every 3 years for associated Battery Cabinets. 2013 14 $20,420 $2,000 $22,420 2014-15 $0 2015-16 $0 TOTAL $180,539 $0 $0 $8,581 $189,120 Total Personnel $0 Supplies $0 Service $0 Capital $0 TOTAL $0 OPERATING COSTS First Fiscal Year Annually $0 $0 120 PROJECT: RADIO SYSTEM REPLACEMENT PROJECT #: CO0601 FUND: 137 - General Government CIP PROJECT BUDGET: $4,885,000 PROJECT MANAGER: Ben Roper FUNDING PROJECT SOURCES: Equipment Replacement Fund CLIENT: Information Technology Certificates of Obligation The Brazos Valley Wide Area Communications System (BVWACS) is currently in testing. New radios were purchased in 2010. The City also entered into an Interlocal Agreement with Brazos County to raise the height of the Millican Radio Tower to provide enhanced coverage in the southern parts of the city. Original budget = $4,900,000 $15,000 transferred to Area Wide Communications System (CO 0706) - FY 07 Project is anticipated to come in under budget. FISCAL YEAR HARDWARE SOFTWARE CONS/TRAIN OTHER PROJECT TOTAL Prior Years $69,154 $0 $36,377 $4,314 $109,844 2009-10 1,800,000 500,000 300,000 40,156 $2,640,156 2010-11 500,000 150,000 500,000 100,000 $1,250,000 2011-12 $0 2012-13 $0 2013-14 $0 2014-15 $0 PROJECT DESCRIPTION/STATUS PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR The City's 800 MHz radio system was installed in 1996. It was scheduled to begin its replacement in FY07. Project costs are based on replacing the existing radio system with equivalent features. A RFQ was issued on 9/18/2006 for a consultant to assist in analysis and recommendations for a replacement system. The unilateral replacement of the radio system was deferred while the city explored the option of participating in a wide area interoperable communications system. This option was ultimately selected, and a federal grant received to fund infrastructure upgrades. 2014-15 $0 2015-16 $0 TOTAL $2,369,154 $650,000 $836,377 $144,470 $4,000,000 Total Personnel $0 Supplies $0 Service $341,352 Capital $0 TOTAL $341,352 130,541 OPERATING COSTS First Fiscal Year Annually $130,541 210,811 $210,811 121 PROJECT: Wireless Infrastructure PROJECT #: CO0704 FUND: 137 - General Government CIP PROJECT $200,000 BUDGET: PROJECT MANAGER: Ben Roper FUNDING Certificates of Obligation SOURCES: PROJECT CLIENT: Information Technology FISCAL YEAR Hardware Software Cons/Training Other PROJECT TOTAL Prior Years $18,868 $0 $0 $57,246 $76,114 2009-10 30,000 10,000 5,000 40,000 $85,000 2010-11 15,000 23,886 $38,886 2011-12 $0 2012-13 $0 2013-14 $0 2014-15 $0 2015-16 $0 TOTAL $63,868 $10,000 $5,000 $121,132 $200,000 PROJECT DESCRIPTION/STATUS PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR This project will allow the use of Wireless Fidelity (WiFi), by city employees in selected areas of the city, both internal to buildings and externally in designated "hot zones". A revised wireless plan was approved by Council in November 2008. This plan included staff and citizen wireless access inside designated city facilities, a pilot video surveillance project in northgate, the creation of hot zones for staff and citizen access in select locations throughout the city. At the end of CY 09, wireless access is available in city hall, the CSU meeting and training facility, and parts of Veterans Park. Additionally the Northgate video surveillance pilot project is operational. TOTAL $63,868 $10,000 $5,000 $121,132 $200,000 Total Personnel $0 Supplies $5,000 Service $5,000 Capital $10,000 TOTAL $20,000$0 5,000 5,000 10,000 $20,000 OPERATING COSTS First Fiscal Year Annually 122 PROJECT: Server Consolidation PROJECT #: CO0901 FUND: 137 - General Government CIP PROJECT BUDGET: $150,000 PROJECT FUNDING MANAGER: Erik Bodholt SOURCES: Certificates of Obligation FISCAL YEAR Hardware Software Cons/Training Other PROJECT TOTAL Prior Years $0 $0 $0 $0 $0 2009-10 $0 2010-11 55,000 45,000 25000 25000 $150,000 2011-12 $0 2012-13 $0 2013-14 $0 2014-15 $0 PROJECT DESCRIPTION/STATUS PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR The goal of this project is to increase server utilization and efficiency while simutaneously reducing cost decreasing the number of servers that must be maintained and also to decrease the cost associated with data storage by eliminating duplicate information and providing better management of data. This project allows the city to continue migration to virtual servers, and also provides additional hardware to accommodate the increasing demands for additional electronic storage and the software to better manage the data. The hardware upgrades will permit better more efficient server utilization. The software will assist in data management by storing only a single copy of each file or document and assist uses to better manage and delete old files. 2014-15 $0 2015-16 $0 TOTAL $55,000 $45,000 $25,000 $25,000 $150,000 Total Personnel $0 Supplies $0 Service $0 Capital $0 TOTAL $0$0 $0 OPERATING COSTS First Fiscal Year Annually 123 PROJECT: Fiber Optic Infrastructure PROJECT #: CO0902 FUND: 137 - General Government CIP PROJECT BUDGET: $1,008,559 PROJECT FUNDING MANAGER: Ben Roper SOURCES: Certificates of Obligation FISCAL YEAR Hardware Software Cons/Training Other PROJECT TOTAL Prior Years $17,269 $0 $0 $15,824 $33,093 2009-10 100,000 50,000 40,000 $190,000 2010-11 70,000 50,000 30,000 $150,000 2011-12 70,000 80,000 30,000 $180,000 2012-13 70,000 60,000 30,000 $160,000 2013-14 70,455 50,000 30,000 $150,455 2014-15 68,104 50,000 26,907 $145,011 2015-16 $0 TOTAL $465,828 $0 $340,000 $202,731 $1,008,559 PROJECT DESCRIPTION/STATUS This project will support the installation of fiber optic cable to continue expansion of the city's network to new buildings and facilities, and to permit the connection of existing facilities that are not currently on the network. Original budget = $1,000,000 $455 transferred from CO1001 - FY10 $8,104 transferred from CO0703 - FY10 Total Personnel $0 Supplies $0 Service $0 Capital $0 TOTAL $0 $0 OPERATING COSTS First Fiscal Year Annually $0 0 0 0 $0 124 PROJECT: Aerial Topographic Mapping PROJECT #: CO1102 FUND: 001 - General Fund PROJECT 912 - Drainage Fund BUDGET: $215,000 PROJECT FUNDING MANAGER: Brett Blankner SOURCES: General Fund ($150,000) Drainage Fund ($65,000) PROJECT P&DS/Utilities CLIENT: This project will update the city's aerial imagery inside the city limits and the ETJ. The last low level aerial data was gathered in 2005. Development has rendered much of this data obsolete. This project will provide high quality low level aerial imagery, including topographic and plainimetric data (allows for accurate horizontal distance measurements between features). Imagery to be gathered in January or February when tree folige is at a minimum. This project will update the layer of topology data in the Geographic Information System (GIS). This is important as the city's topology has been altered by development in the years since the last aerial data was gathered in 2005.It is also necessary in order to gather the topological data in the most recently annexed areas and areas that may be annexed in the next five years, and in the ETJ. FISCAL YEAR Hardware Software Cons/Training Other PROJECT TOTAL Prior Years 0 $0 2009-10 $0 2010-11 215,000 $215,000 2011-12 $0 2012-13 $0 2013-14 $0 PROJECT DESCRIPTION/STATUS PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR 2013-14 $0 2014-15 $0 2015-16 $0 TOTAL $0 $0 $0 $215,000 $215,000 Total Personnel $0 Supplies $0 Service $0 Capital $0 TOTAL $0$0 $0 OPERATING COSTS First Fiscal Year Annually 125 PROJECT: Miscellaneous IT Projects PROJECT #: CO0801 FUND: 137 - General Government CIP PROJECT BUDGET: $20,055 PROJECT FUNDING MANAGER: TBD SOURCES: Certificates of Obligation These funds in this project reflect remaining balances of closed projects for which debt was issued. The balance can be used on other IT projects for which additional funds are needed. $257 transferred from CO0702 - FY09 $19,798 transferred from CO0522 - FY10 FISCAL YEAR Hardware Software Cons/Training Other PROJECT TOTAL Prior Years $0 $0 $0 $0 $0 2009-10 20,055 $20,055 2010-11 $0 2011-12 $0 2012-13 $0 2013-14 $0 2014-15 $0 2015-16 $0 TOTAL $0 $0 $0 $20,055 $20,055 PROJECT DESCRIPTION/STATUS PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR Total Personnel $0 Supplies $0 Service $0 Capital $0 TOTAL $0 0 $0 $0 $0 0 0 OPERATING COSTS First Fiscal Year Annually 126 CONVENTION CENTER PROJECTS 127 GENERAL GOVERNMENT CONVENTION CENTER CAPITAL IMPROVEMENT PROJECTS FISCAL YEAR 2010-2011 THROUGH FISCAL YEAR 2015-2016 PROJECT REVISED APPROVED PROJECT BUDGET APPROPRIATIONS FY09-10 FY10-11 NUMBER AMOUNT THROUGH FY09 APPROPRIATIONS APPROPRIATIONS BEGINNING FUND BALANCE:1,204,543$ 1,502,929$ ADDITIONAL RESOURCES: CERTIFICATES OF OBLIGATION -$ -$ INTERGOVERNMENTAL - - INTRAGOVERNMENTAL TRANSFERS 2,700,000 - INVESTMENT EARNINGS 23,600 24,600 OTHER 355,892 400,000 SUBTOTAL ADDITIONAL RESOURCES 3,079,492$ 424,600$ TOTAL RESOURCES AVAILABLE 4,284,035$ 1,927,529$ PUBLIC FACILITIES CONVENTION CNTR GG0907 TBD 9,600,000$ 376,385$ -$ CLOSED PROJECTS CAPITAL PROJECTS SUBTOTAL 376,385$ -$ OTHER 200,000 125,000 TRANSFER OUT 223,615 - DEBT ISSUANCE COSTS - - GENERAL & ADMIN CHARGES - - TOTAL EXPENDITURES 800,000$ 125,000$ ENDING FUND BALANCE:3,484,035$ 1,802,529$ BUDGET APPROPRIATIONS 128 GENERAL GOVERNMENT CONVENTION CENTER CAPITAL IMPROVEMENT PROJECTS FISCAL YEAR 2010-2011 THROUGH FISCAL YEAR 2015-2016 PROJECT EXPENDITURES ACTUAL ESTIMATE PROJECTED PROJECTED PROJECTED PROJECTED PROJECTED PROJECTED THROUGH FY08 FY 08-09 FY 09-10 FY 10-11 FY 11-12 FY 12-13 FY 13-14 FY 14-15 FY 15-16 341,251$ 1,286,665$ 1,502,929$ 1,752,529$ 2,065,829$ 2,385,429$ 2,711,429$ 3,043,929$ 3,220,000$ -$ -$ -$ -$ -$ -$ -$ - - - - - - - - 7,141,641 - - - - - - - (36,127) 16,300 24,600 38,300 44,600 51,000 57,500 64,100 476,490 399,963 400,000 400,000 400,000 400,000 400,000 400,000 10,802,003$ 416,263$ 424,600$ 438,300$ 444,600$ 451,000$ 457,500$ 464,100$ 11,143,254$ 1,702,929$ 1,927,529$ 2,190,829$ 2,510,429$ 2,836,429$ 3,168,929$ 3,508,029$ -$ 9,639,985$ -$ 50,000$ -$ -$ -$ -$ -$ -$ 9,639,985$ -$ 50,000$ -$ -$ -$ -$ -$ 85,933 200,000 125,000 125,000 125,000 125,000 125,000 125,000 130,671 - - - - - - - - - - - - - - - - - - - - - 9,856,589$ 200,000$ 175,000$ 125,000$ 125,000$ 125,000$ 125,000$ 125,000$ 1,286,665$ 1,502,929$ 1,752,529$ 2,065,829$ 2,385,429$ 2,711,429$ 3,043,929$ 3,383,029$ PROJECTED EXPENDITURES 129 PROJECT: PROJECT #: GG0907 PROJECT FUND: 128 - Convention Center Fund BUDGET: TBD PROJECT FUNDING MANAGER: SOURCES: Certificates of Obligation PROJECT CLIENT: CMO FISCAL YEAR LAND ENG. CONSTR. MISC. PROJECT TOTAL Prior Years $9,639,985 $0 $0 $0 $9,639,985 2009-10 $0 2010-11 50,000 $50,000 2011-12 $0 2012-13 $0 2013-14 $0 2014-15 $0 2015-16 $0 TOTAL $9,639,985 $0 $0 $50,000 $9,689,985 Convention Center Ph III TBD Design and construction of Convention Center. The goal of this project is to create new business opportunities and spur economic development through the realization of a Convention Center. It is anticipated that the Convention Center will increase the visitor experience to College Station, promote tourism, generate tax revenue and create jobs. PROJECT DESCRIPTION/STATUS PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR TOTAL $9,639,985 $0 $0 $50,000 $9,689,985 Total Personnel TBD Supplies TBD Service TBD Capital TBD TOTAL TBD OPERATING COSTS First Fiscal Year Annually TBD TBD 130 GENERAL GOVERNMENT- DRAINAGE CAPITAL IMPROVEMENT PROJECTS FISCAL YEAR 2010-2011 THROUGH FISCAL YEAR 2015-2016 131 DRAINAGE UTILITY CAPITAL IMPROVEMENT PROJECTS FISCAL YEAR 2010-2011 THROUGH FISCAL YEAR 2015-2016 PROJECT REVISED APPROVED PROJECT BUDGET APPROPRIATIONS FY09-10 FY10-11 NUMBER AMOUNT THROUGH FY09 APPROPRIATIONS APPROPRIATIONS BEGINNING FUND BALANCE:2,932,126$ 2,216,320$ ADDITIONAL RESOURCES: UTILITY REVENUES 1,838,100$ 1,886,800$ INTEREST ON INVESTMENTS 14,000 29,900 BOND PROCEEDS - - INTERGOVERNMENTAL TRANSFERS - - INTRAGOVERNMENTAL TRANSFERS - 14,000 TRANSFERS OUT - - OTHER - - SUBTOTAL ADDITIONAL RESOURCES 1,852,100$ 1,930,700$ TOTAL RESOURCES AVAILABLE 4,784,226$ 4,147,020$ BEE CREEK PH. IV & V. SD0001 1,400,000$ - - - GREENWAYS PROJECTS SD9903 3,640,000$ 3,640,000 - - MINOR DRAINAGE IMPROVEMENTS SD1101 ANNUAL - - 200,000 W. KING COLE CULVERT REPLACEMENT SD0904 217,880$ 217,880 - - EMERALD FOREST DRAINAGE IMP SD1006 47,120$ 47,120 - - SUN MEADOWS DRAINAGE IMP SD1007 105,855$ - 105,855 - WOLF PEN CREEK EROSION MGMT STUDY SD1102 65,500$ - - 65,500 STORMWATER MAPPING SD0523 67,070$ 34,070 - 16,000 MTIGATION FENCING - ARRINGTON/DECATUR SD0901 100,000$ 100,000 - - CLOSED PROJECTS - 111,145 - CAPITAL PROJECTS SUBTOTAL 217,000$ 281,500$ OTHER COSTS 7,200 7,200 BEE CREEK MITIGATION MONITORING/REPORTING (SD0902)36,000 13,000 DRAINAGE MAINTENANCE ANNUAL 862,110 869,531 DRAINAGE SLA'ANNUAL BUDGET APPROPRIATIONS DRAINAGE SLA's ANNUAL - - TRANSFERS OUT - 65,000 GENERAL & ADMIN. 542,461 528,373 TOTAL EXPENDITURES 1,664,771$ 1,764,604$ Measurement Focus Adjustment ENDING FUND BALANCE: 3,119,455$ 2,382,416$ 132 DRAINAGE UTILITY CAPITAL IMPROVEMENT PROJECTS FISCAL YEAR 2010-2011 THROUGH FISCAL YEAR 2015-2016 PROJECT EXPENDITURES ACTUAL ESTIMATED PROJECTED PROJECTED PROJECTED PROJECTED PROJECTED PROJECTED THROUGH FY08 FY 08-09 FY 09-10 FY 10-11 FY 11-12 FY 12-13 FY 13-14 FY 14-15 FY 15-16 3,054,197$ 2,932,126$ 2,216,320$ 1,764,022$ 780,470$ 1,056,670$ 1,436,070$ 1,855,870$ 1,793,174$ 1,831,807$ 1,886,800$ 1,943,400$ 2,001,700$ 2,061,800$ 2,123,700$ 2,187,400$ 56,828 30,000 29,900 26,000 18,000 25,000 32,000 40,000 - - - - - - - - - - - - - - - - - - 14,000 - - - - - - - - - - - - - - - - - - - - - 1,850,002$ 1,861,807$ 1,930,700$ 1,969,400$ 2,019,700$ 2,086,800$ 2,155,700$ 2,227,400$ 4,904,199$ 4,793,933$ 4,147,020$ 3,733,422$ 2,800,170$ 3,143,470$ 3,591,770$ 4,083,270$ 196,333 16,091 92,000 164,624 875,152 55,800 - - - 2,326,101 30,300 463,899 419,700 400,000 - - - - - - - 200,000 200,000 200,000 200,000 200,000 200,000 - 2,000 215,880 - - - - - - - - 47,120 - - - - - - - - 105,855 - - - - - - - - - 65,500 - - - - - - - - 50,070 17,000 - - - - - 1,004 51,885 - - - - - - 302,465 170,277 351,860$ 1,146,916$ 899,894$ 1,492,152$ 255,800$ 200,000$ 200,000$ 200,000$ 16,414 7,200 7,200 7,200 7,200 7,200 7,200 7,200 3,200 36,000 13,000 8,000 8,000 - - - 1,099,336 845,036 869,531 895,600 922,500 950,200 978,700 1,008,100 PROJECTED EXPENDITURES - - - - - - - - - - 65,000 - - - - - 501,425 542,461 528,373 550,000 550,000 550,000 550,000 550,000 1,972,235$ 2,577,613$ 2,382,998$ 2,952,952$ 1,743,500$ 1,707,400$ 1,735,900$ 1,765,300$ 161 2,932,126$ 2,216,320$ 1,764,022$ 780,470$ 1,056,670$ 1,436,070$ 1,855,870$ 2,317,970$ 133 PROJECT: Bee Creek IV and V FUND(S): PROJECT NUMBERS & BUDGET: 238 - Water Capital Fund Drainage: SD0001 $1,400,000 239 - Wastewater Capital Fund Water: TBD $120,000 912 - Drainage Utility Fund Wastewater: TBD $300,000 Total Project Budget: $1,820,000 PROJECT MANAGER:Danielle Charbonnet FUNDING PROJECT SOURCES:Drainage - Drainage Utility CLIENT:Public Works: Gary Balmain W/WW - Long Term Debt/Utility Revenue Water Services: Ed Savage Credits paid to the Robertson County Mitigation Bank are being proposed in lieu of mitigation on this project. PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR Project Total FISCAL YEAR LAND ENG. CONSTR. MISC. OVERHEAD PROJECT TOTAL Prior Years 0 210,704 0 1,720 0 $212,424 2009-10 0 80,000 0 0 12,000 $92,000 PROJECT DESCRIPTION/STATUS Channel improvements to Bee Creek Tributary "A" including bank stabilization and increased flow capacity from Brothers Boulevard to Texas Avenue. Water and sewer line relocations are included with this project. The construction estimate includes $38,000 for the purchase of mitigation bank credits in lieu of on-site compensatory mitigation. ,,, 2010-11 106,624 0 425,000 38,000 15,000 $584,624 2011-12 0 15,000 820,152 0 40,000 $875,152 2012-13 0 0 40,000 5,800 10,000 $55,800 2013-14 0 0 0 0 0 $0 2014-15 0 0 0 0 0 $0 2015-16 0 0 0 0 0 $0 $77,000PROJECT TOTAL $106,624 $305,704 $1,285,152 $45,520 $1,820,000 134 Drainage Portion FISCAL YEAR LAND ENG. CONSTR. MISC. OVERHEAD PROJECT TOTAL Prior Years $0 $210,704 $0 $1,720 $0 $212,424 2009-10 80,000 12,000 $92,000 2010-11 106,624 50,000 8,000 $164,624 2011-12 15,000 820,152 40000 $875,152 2012-13 40000 5,800 $10,000 $55,800 2013-14 $0 2014-15 $0 2015-16 $0 Drainage Total $106,624 $305,704 $910,152 $7,520 $70,000 $1,400,000 Water Portion FISCAL YEAR LAND ENG. CONSTR. MISC. OVERHEAD PROJECT TOTAL Prior Years $0 $0 $0 $0 $0 $0 2009-10 $0 2010-11 $0 2011-12 100,000 18,000 2,000 $120,000 2012-13 $0 2013-14 $0 2014-15 $0 2015-16 $0 Water Total $0 $0 $100,000 $18,000 $2,000 $120,000 Wastewater Portion FISCAL YEAR LAND ENG. CONSTR. MISC. OVERHEAD PROJECT TOTAL Prior Years $0 $0 $0 $0 $0 $0 2009-10 $0 2010-11 $0 2011-12 275,000 20,000 5,000 $300,000 PROJECT: Bee Creek IV and V PROJECT CALENDAR OF EXPENDITURES BY FUND ,,,, 2012-13 $0 2013-14 $0 2014-15 $0 2015-16 $0 Wastewater Total $0 $0 $275,000 $20,000 $5,000 $300,000 First Fiscal Year Annually Total Personnel $0 Supplies $0 Service $0 Capital $0 TOTAL $0 $0 $0 OPERATING COSTS $45,520 $77,000 $1,820,000PROJECT TOTAL $106,624 $305,704 $1,285,152 135 PROJECT: GREENWAYS PROJECTS PROJECT #: SD9903 FUND: 912 - DRAINAGE UTILITY FUND PROJECT BUDGET: $3,640,000 PROJECT FUNDING MANAGER:Venessa Garza SOURCES: General Obligation Bonds PROJECT CLIENT: Planning & Development Services This project serves to hold funds for new greenways projects. Original budget was $3,640,000. $1,194,124 of Greenways funds were spent on the City Center land purchase. FISCAL YEAR LAND ENG. CONSTR. MISC. PROJECT TOTAL Prior Years $2,295,207 $55,957 0 $5,237 $2,356,401 2009-10 $408,899 50,000 $5,000 $463,899 2010-11 $364,700 50,000 $5,000 $419,700 2011-12 $345,000 50,000 $5,000 $400,000 2012-13 $0 2013-14 $0 2014-15 $0 2015-16 $0 TOTAL $3,413,806 $205,957 $0 $20,237 $3,640,000 PROJECT DESCRIPTION/STATUS PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR TOTAL $3,413,806 $205,957 $0 $20,237 $3,640,000 Total Personnel $0 Supplies $0 Service $0 Capital $0 TOTAL $0$0 $0 OPERATING COSTS First Fiscal Year Annually 136 PROJECT: MINOR DRAINAGE PROJECT #: SD1101 IMPROVEMENTS PROJECT FUND: 912 - DRAINAGE FUND BUDGET:ANNUAL PROJECT FUNDING MANAGER: Gary Balmain SOURCES: DRAINAGE UTILITY FUND PROJECT CLIENT: Public Works Funds budgeted on an annual basis as available for minor drainage improvements throughout the City. FY11 budget = $200,000 FISCAL YEAR LAND ENG. CONSTR. MISC. PROJECT TOTAL Prior Years 2009-10 2010-11 200,000 $200,000 2011-12 200,000 $200,000 2012-13 200,000 $200,000 2013-14 200,000 $200,000 2014-15 200 000 $200 000 PROJECT DESCRIPTION/STATUS PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR The funds are used to construct improvements to our storm drainage system and to replace drainage infrustructure that is no longer adequate either due to it wearing out or due to increased capacity demand. Projects that have been done in the past include the Camelot Subdivision channel improvements, repairs to a washed out culvert on Rock Prairie West, replacement of aged culvert on Southwest Parkway, instllation of concrete valley gutter in the Raintree subdivision and repairs to erosion on Wolf Pen Creek. Current projects funded through Minor Drainage Improvements include the King Cole Culvert Replacement and Emerald Foreast Draiange Improvements. Additional projects may come out of planned neighborhood rehab projects in the eastgate area. 2014-15 200,000 $200,000 2015-16 200,000 $200,000 TOTAL $0 $0 $1,200,000 $0 $1,200,000 Total Personnel $0 Supplies $0 Service $0 Capital $0 TOTAL $0 OPERATING COSTS First Fiscal Year Annually $0 $0 137 PROJECT: W. King Cole Culvert Replacement PROJECT #: SD0904 PROJECT FUND: 912 - DRAINAGE FUND BUDGET: $217,880 PROJECT FUNDING MANAGER: Gary Balmain SOURCES: DRAINAGE UTILITY FUND PROJECT CLIENT: Public Works Replace, redesign and resize the collapsed culvert under W. King Cole at the Police Department. FISCAL YEAR LAND ENG. CONSTR. MISC. PROJECT TOTAL Prior Years $0 $2,000 $0 $0 $2,000 2009-10 215,880 $215,880 2010-11 $0 2011-12 $0 2012-13 $0 2013-14 $0 2014-15 $0 2015-16 $0 TOTAL $0 $2,000 $215,880 $0 $217,880 PROJECT DESCRIPTION/STATUS PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR OPERATING COSTS Total Personnel $0 Supplies $0 Service $0 Capital $0 TOTAL $0$0 $0 OPERATING COSTS First Fiscal Year Annually T e x a s Av e SKrenek Tap RdAnder son St Harvey Mitchell P k w y S Morgans LnValley View D rSouthwest Pkwy ES o ut h w o o d Dr William King Cole DrYale CtFm 2 1 5 4Harvey RdWilliam D. Fitch PkwyTexas Ave SWell b o r n R d Fm 158 138 PROJECT: Emerald Forest Drainage PROJECT #: SD1006 Improvements Design PROJECT FUND: 912 - DRAINAGE FUND BUDGET: $47,120 PROJECT FUNDING MANAGER: Jeff Haeber SOURCES: DRAINAGE UTILITY FUND PROJECT CLIENT: Public Works FISCAL YEAR LAND ENG. CONSTR. MISC. PROJECT TOTAL Prior Years $0 $0 $0 $0 $0 2009-10 47,120 $47,120 2010-11 $0 2011-12 $0 2012-13 $0 2013-14 $0 PROJECT DESCRIPTION/STATUS PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR This project is for the design of drainage improvements in Emerald Forest. The area of proposed improvements is situated in the common back lot line of Emerald Forest Phases Three and Four, specifically adjacent to the common utility easement from Emerald Parkway to Sebesta Road. Residents concerned about standing water, erosion and the stability of some of the existing retaining walls contacted the City for help. This project will require authorization from the U.S. Army Corps of Engineers under Nationwide Permits for impacts to waters of the U.S. 2013-14 $0 2014-15 $0 2015-16 $0 TOTAL $0 $47,120 $0 $0 $47,120 Total Personnel $0 Supplies $0 Service $0 Capital $0 TOTAL $0 OPERATING COSTS First Fiscal Year Annually $0 $0 Fm 2 1 5 4Harvey RdWilliam D. Fitch PkwyTexas Ave SWell b o r n R d Fm 158 E m e r a ld P kwySebesta RdFrontage 6 Rd ESands t one Dr Fro s t D r Foxfire DrAppoma tt ox DrOakwood TrlBent Oak StAlleyOnramp 6 NCorsair CirAmber R id g e D rDrift w ood DrFoxfire Dr139 PROJECT: Sun Meadows Drainage Improvements PROJECT #: SD1007 PROJECT FUND: 912 - DRAINAGE FUND BUDGET: $105,855 PROJECT FUNDING MANAGER: Gary Balmain SOURCES: DRAINAGE UTILITY FUND PROJECT CLIENT: Public Works FISCAL YEAR LAND ENG. CONSTR. MISC. PROJECT TOTAL Prior Years $0 $0 $0 $0 $0 2009-10 105,855 $105,855 2010-11 $0 2011-12 $0 2012-13 $0 2013-14 $0 PROJECT DESCRIPTION/STATUS PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR This project is for the construction of drainage improvements in the Sun Meadows subdivision. Valley gutters will be constructed in the ditch that runs between Arnold Road and Orchid Street in the subdivision. 2013-14 $0 2014-15 $0 2015-16 $0 TOTAL $0 $0 $105,855 $0 $105,855 Total Personnel $0 Supplies $0 Service $0 Capital $0 TOTAL $0 OPERATING COSTS First Fiscal Year Annually $0 $0 Fm 2 1 5 4Harvey RdWilliam D. Fitch PkwyTexas Ave SWell b o r n R d Fm 158 Graham RdR o c k P ra irie R d Vi ct ori a AveLon gmir e DrGail PlAlleyEde l w eiss Ave Aster DrB a hia D r W elsh A ve Orchid StDove Landing AveA rn o ld R d Sh ir e D r Crystal Dove Ave140 PROJECT: Wolf Pen Creek Erosion Mgmt Study PROJECT #: SD1102 PROJECT FUND: 912 - DRAINAGE FUND BUDGET: $65,500 PROJECT FUNDING MANAGER: TBD SOURCES: DRAINAGE UTILITY FUND PROJECT CLIENT: Public Works FISCAL YEAR LAND ENG. CONSTR. MISC. PROJECT TOTAL Prior Years $0 $0 $0 $0 $0 2009-10 $0 2010-11 65,500 $65,500 2011-12 $0 2012-13 $0 2013-14 $0 PROJECT DESCRIPTION/STATUS PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR This project is for the completion of a study to evaluate Wolf Pen Creek between George Bush and Dartmouth in order to determine the best course of action to protect the area from further erosion damage. Options to consider will include stream stabilization, as well as relocation of the trails and other improvements to be done to protect the trails, irrigation, benches and other improvements in the upper trails area from erosion. There are some locations that are more urgent than others. 2013-14 $0 2014-15 $0 2015-16 $0 TOTAL $0 $65,500 $0 $0 $65,500 Total Personnel $0 Supplies $0 Service $0 Capital $0 TOTAL $0$0 $0 OPERATING COSTS First Fiscal Year Annually Fm 2154Harvey RdWilliam D. Fitch PkwyTexas Ave SWe ll b o r n R d WOLF PEN CREEK PARKWOLF PEN CREEK PARK Dar t mout h St Colgate DrManuel DrH o l l e m a n D r E Sterling StCypress DrAlleyAzalea CtRichards StC a m e llia CtCrest StKalanchoe Ct141 PROJECT: STORMWATER MAPPING PROJECT #: SD0523 FUND: 912 - DRAINAGE FUND PROJECT BUDGET: $67,070 PROJECT FUNDING MANAGER: TBD SOURCES: DRAINAGE UTILITY FUND PROJECT CLIENT: Public Works Original Budget 200,000 $50,000 transferred to SD0703 - FY07 $16,000 transferred to SD0703 - FY10 $7,000 transferred to SD0805 - FY08 $10,000 transferred to SD0703 - FY08 $49,930 transferred to SD1005 - FY10 FISCAL YEAR LAND ENG. CONSTR. MISC. PROJECT TOTAL Prior Years $0 $0 $0 $0 $0 2009-10 50,070 $50,070 2010-11 17,000 $17,000 2011-12 $0 2012-13 $0 2013-14 $0 2014 15 $0 PROJECT DESCRIPTION/STATUS PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR This project provides funds for the mapping of College Station stormwater infrastructure. This project serves as a holding account for specific projects yet to be identified. 2014-15 $0 2015-16 $0 TOTAL $0 $67,070 $0 $0 $67,070 Total Personnel $0 Supplies $0 Service $0 Capital $0 TOTAL $0 OPERATING COSTS First Fiscal Year Annually $0 $0 142 PROJECT: Fence for Mitigation at Arrington/ PROJECT #: SD0901 Decatur FUND: 912 - Drainage Utility Fund PROJECT BUDGET: $100,000 PROJECT FUNDING MANAGER: Jeff Haeber SOURCES: Drainage Utility Funds PROJECT CLIENT: Public Works Project is anticipated to come in under budget. FISCAL YEAR LAND ENG. CONSTR. MISC. PROJECT TOTAL Prior Years $0 $1,004 $0 $0 $1,004 2009-10 12,800 33,785 5,300 $51,885 2010-11 $0 2011-12 $0 2012-13 $0 2013-14 $0 2014-15 $0 2015-16 $0 TOTAL $0 $13 804 $33 785 $5 300 $52 889 PROJECT DESCRIPTION/STATUS PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR The goal of this project is to construct a fence around the TxDOT Conservation Easement in order to maintain the integrity of the easement and protect the endangered Navasota Ladies Tresses plants. The project is for the design, bidding, and construction of approximately 5,200 Linear Feet of barbed wire fence including access gates. TOTAL $0 $13,804 $33,785 $5,300 $52,889 Total Personnel $0 Supplies $0 Service $0 Capital $0 TOTAL $0 OPERATING COSTS First Fiscal Year Annually $0 $0 143 Home of Texas A&M University ® 144 SPECIAL REVENUE - PARKLAND DEDICATION CAPITAL IMPROVEMENT PROJECTS FISCAL YEAR 2010-2011 THROUGH FISCAL YEAR 2015-2016 145 1 2 3 4 5 6 7 8 9 10 11 1213 14 1516 17 18 19 20 21 22 23 24 25 26 27 28 29 Grimes County Burleson County Legend Neighborhood Park Zones TAMU Property CS City Limits Parkland Dedication Zones N Adopted by City Council Oct.23,2008 146 Home of Texas A&M University ® 147 GENERAL GOVERNMENT PARK LAND DEDICATION CAPITAL IMPROVEMENT PROJECTS FISCAL YEAR 2010-2011 THROUGH FISCAL YEAR 2015-2016 PROJECT REVISED APPROVED PROJECT BUDGET APPROPRIATIONS FY 09-10 FY 10-11 NUMBER AMOUNT THROUGH FY09 APPROPRIATIONS APPROPRIATIONS BEGINNING FUND BALANCE:1,489,259$ 1,319,067$ ADDITIONAL RESOURCES: CONTRIBUTIONS 300,000$ 300,000$ INVESTMENT EARNINGS 12,000 16,000 INTRAGOVERNMENTAL TRANSFERS - - OTHER - - SUBTOTAL ADDITIONAL RESOURCES 312,000$ 316,000$ TOTAL RESOURCES AVAILABLE 1,801,259$ 1,635,067$ PARKLAND DEDICATION FUND ZONE 1 PARK PK0051 18,000 - 18,000 18,000 ZONE 2 PARK PK0052 - - - - PC UNIVERSITY PARK PK0410 12,000 12,000 ZONE 3 PARK PK0053 70,000 - 70,506 70,000 CENTRAL PARK POND SIDEWALK PK0805 54,000 54,000 - - CENTRAL PARK IMPROVEMENTS PK1013 50,000 - 50,000 - ZONE 4 PARK PK0054 37,000 - - 37,000 ZONE 5 PARK PK0055 - - - - STEEPLECHASE PARK BENCH TBD 810 810 - - ZONE 6 PARK PK0056 95,000 - - 95,000 SOUTHWEST PARK DEVELOPMENT PK0806 268,000 258,000 - 10,000 PC/CDBG W.A. TARROW PARK IMPROVEMENTS PK1103 73,500 - - 73,500 ZONE 7 PARK PK0057 - - - - JOHN CROMPTON PARK PHASE III PK0904 149,000 114,000 - 35,000 ZONE 8 PARK PK0058 - - - - PC EMERALD FOREST PARK IMP. PK0713 63,000 48,000 - 15,000 ZONE 9 PARK PK0059 - - 33,000 - WOODLAND HILLS IMPROVEMENTS PK0523 30,000 - - 30,000 ZONE 10 PARK PK0060 170,000 - 194,766 170,000 ZONE 11 PARK PK0061 32,000 2,750 32,000 ZONE 12 PARK PK0824 24,000 - 44,500 24,000 BUDGET APPROPRIATIONS ZONE 13 PARK PK0807 - - 50,000 - ZONE 14 PARK PK0717 77,000 - 97,000 77,000 ZONE 15 PARK PK0808 268,000 - 173,000 268,000 ZONE 16 PARK TBD - - - - CLOSED PROJECTS 168,776 - CAPITAL PROJECTS SUBTOTAL 474,810$ 902,298$ 966,500$ OTHER - - GENERAL & ADMIN. CHARGES 14,388 19,513 TOTAL EXPENDITURES 916,686$ 986,013$ CAFR Adjustment ENDING FUND BALANCE:884,573$ 649,054$ PC = Project funded through combination of sources. Project sheet reflected in PARD section of CIP document. PC/CDBG = Project funded through combination of sources. Project sheet reflected in PARD CDBG section of CIP document. 148 GENERAL GOVERNMENT PARK LAND DEDICATION CAPITAL IMPROVEMENT PROJECTS FISCAL YEAR 2010-2011 THROUGH FISCAL YEAR 2015-2016 PROJECT EXPENDITURES ACTUAL ESTIMATE PROJECTED PROJECTED PROJECTED PROJECTED PROJECTED PROJECTED THROUGH FY08 FY 08-09 FY 09-10 FY 10-11 FY 11-12 FY 12-13 FY 13-14 FY 14-15 FY 15-16 1,610,534$ 1,489,259$ 1,319,067$ 324,924$ 275,924$ 277,924$ 276,924$ 275,924$ 237,094$ 300,000$ 300,000$ -$ -$ -$ -$ -$ 32,650 12,000 16,000 15,000 12,000 9,000 9,000 9,000 - - - - - - - - - - - - - - - - 269,744$ 312,000$ 316,000$ 15,000$ 12,000$ 9,000$ 9,000$ 9,000$ 1,880,278$ 1,801,259$ 1,635,067$ 339,924$ 287,924$ 286,924$ 285,924$ 284,924$ - - - 18,000 - - - - - - - - - - - - - - 12,000 - - - 70,000 - - - - - - - - - 54,000 - - - - 50,000 - - - - - - - - 55,548 37,000 - - - - - - - - - - - - - - - - 810 - - - - - - - - - 95,000 - - - - - 220 - - 267,780 - - - - - - - - 73,500 - - - - - - - - - - - - - - - 54,958 35,692 58,350 - - - - - - - - - - - 5,000 58,000 - - - - - - - - - - - - - - - - - 30,000 - - - - - - - - 170,000 - - - - - - - - 32,000 - - - - - - - - 24,000 - - - - - PROJECTED EXPENDITURES - - - - - - - - - - - - 77,000 - - - - - - - - 268,000 - - - - - - - - - - - - - - 326,960 320,754 220$ 381,918$ 467,804$ 1,290,630$ 54,000$ -$ -$ -$ -$ 17,236 - - - - - - - 10,120 14,388 19,513 10,000 10,000 10,000 10,000 10,000 409,274$ 482,192$ 1,310,143$ 64,000$ 10,000$ 10,000$ 10,000$ 10,000$ 18,255$ 1,489,259$ 1,319,067$ 324,924$ 275,924$ 277,924$ 276,924$ 275,924$ 274,924$ 149 PROJECT: ZONE 1 PARK PROJECT #: PK0051 FUND: 171 - Zone 1 Parkland PROJECT BUDGET: $18,000 PROJECT MANAGER: TBD FUNDING SOURCES: Zone 1 Parkland Dedication PROJECT Funds CLIENT: Parks and Recreation FISCAL YEAR LAND ENG. CONSTR. MISC. PROJECT TOTAL Prior Years $0 $0 $0 $0 $0 2009-10 $0 2010-11 18,000 $18,000 2011-12 $0 2012-13 $0 2013-14 $0 2014-15 $0 2015-16 $0 TOTAL $0 $0 $18,000 $0 $18,000 PROJECT DESCRIPTION/STATUS PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR OPERATING COSTS In accordance with the Parkland Dedication Ordinance, these funds have been set aside for park improvements as identified for the Spruce Street property (Northgate Park) in Park Zone 1. Total Personnel $0 Supplies $0 Service $0 Capital $0 TOTAL $0 SS First Fiscal Year Annually $0 $0 150 PROJECT: ZONE 2 PARK PROJECT #: PK0052 FUND: 172 - Zone 2 Parkland PROJECT BUDGET: $0 PROJECT MANAGER: TBD FUNDING SOURCES: Zone 2 Parkland Dedication PROJECT Funds CLIENT: Parks and Recreation In accordance with the Parkland Dedication Ordinance, these funds have been set aside for park improvement and renovation projects as identified in Park Zone 2. FISCAL YEAR LAND ENG. CONSTR. MISC. PROJECT TOTAL Prior Years $0 $0 $0 $0 $0 2009-10 $0 2010-11 $0 2011-12 $0 2012-13 $0 2013-14 $0 2014-15 $0 2015-16 $0 TOTAL $0 $0 $0 $0 $0 Total Personnel $0 PROJECT DESCRIPTION/STATUS PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR OPERATING COSTS First Fiscal Year Annually Supplies $0 Service $0 Capital $0 TOTAL $0$0 $0 151 PROJECT: ZONE 3 PARK PROJECT #: PK0053 FUND: 173 - Zone 3 Parkland PROJECT BUDGET: $70,000 PROJECT MANAGER: TBD FUNDING SOURCES: Zone 3 Parkland Dedication PROJECT Funds CLIENT: Parks and Recreation In accordance with the Parkland Dedication Ordinance, these funds have been set aside for park improvement and renovation projects as identified in Park Zone 3. FISCAL YEAR LAND ENG. CONSTR. MISC. PROJECT TOTAL Prior Years $0 $0 $0 $0 $0 2009-10 $0 2010-11 70,000 $70,000 2011-12 $0 2012-13 $0 2013-14 $0 2014-15 $0 2015-16 $0 TOTAL $0 $0 $70,000 $0 $70,000 PROJECT DESCRIPTION/STATUS PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR OPERATING COSTS Total Personnel $0 Supplies $0 Service $0 Capital $0 TOTAL $0 OPERATING COSTS First Fiscal Year Annually $0 $0 152 PROJECT: Stephen C. Beachy Central Park PROJECT #: PK0805 Pond Sidewalk FUND: 173 - Zone 3 Parkland PROJECT BUDGET: $54,000 PROJECT MANAGER: David Wood FUNDING SOURCES: Zone 3 Parkland Dedication PROJECT Funds CLIENT: Parks and Recreation This park project is for construction of a trail/sidewalk around the third pond at Central Park. FISCAL YEAR LAND ENG. CONSTR. MISC. PROJECT TOTAL Prior Years $0 $0 $0 $0 $0 2009-10 $0 2010-11 $0 2011-12 1,000 53,000 $54,000 2012-13 $0 2013-14 $0 2014-15 $0 2015-16 $0 TOTAL $0 $1,000 $53,000 $0 $54,000 PROJECT DESCRIPTION/STATUS PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR OPERATING COSTS Total Personnel $0 Supplies $0 Service $0 Capital $0 TOTAL $0 OPERATING COSTS First Fiscal Year Annually $0 $0 153 PROJECT: Stephen C. Beachy Central Park PROJECT #: PK1013 Improvements FUND: 173 - Zone 3 Parkland PROJECT BUDGET: $50,000 PROJECT MANAGER: David Wood FUNDING SOURCES: Zone 3 Parkland Dedication PROJECT Funds CLIENT: Parks and Recreation This park project is for landscape and hardscape enhancements at the office and pavilion. FISCAL YEAR LAND ENG. CONSTR. MISC. PROJECT TOTAL Prior Years $0 $0 $0 $0 $0 2009-10 5,000 45,000 $50,000 2010-11 $0 2011-12 $0 2012-13 $0 2013-14 $0 2014-15 $0 2015-16 $0 TOTAL $0 $5,000 $45,000 $0 $50,000 PROJECT DESCRIPTION/STATUS PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR TOTAL $0 $5,000 $45,000 $0 $50,000 Total Personnel $0 Supplies $0 Service $0 Capital $0 TOTAL $0 OPERATING COSTS First Fiscal Year Annually $0 $0 154 PROJECT: ZONE 4 PARK PROJECT #: PK0054 FUND: 174 - Zone 4 Parkland PROJECT BUDGET: $37,000 PROJECT MANAGER: TBD FUNDING SOURCES: Zone 4 Parkland Dedication PROJECT Funds CLIENT: Parks and Recreation In accordance with the Parkland Dedication Ordinance, these funds have been set aside for park improvement and renovation projects as identified in Park Zone 4. FISCAL YEAR LAND ENG. CONSTR. MISC. PROJECT TOTAL Prior Years $0 $0 $0 $0 $0 2009-10 $0 2010-11 37,000 $37,000 2011-12 $0 2012-13 $0 2013-14 $0 2014-15 $0 2015-16 $0 TOTAL $0 $0 $37,000 $0 $37,000 PROJECT DESCRIPTION/STATUS PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR OPERATING COSTS Total Personnel $0 Supplies $0 Service $0 Capital $0 TOTAL $0$0 $0 OPERATING COSTS First Fiscal Year Annually 155 PROJECT: ZONE 5 PARK LAND PROJECT #: PK0055 FUND: 175 - Zone 5 Parkland PROJECT BUDGET: $0 PROJECT MANAGER: TBD FUNDING SOURCES: Zone 5 Parkland Dedication PROJECT Funds CLIENT: Parks and Recreation FISCAL YEAR LAND ENG. CONSTR. MISC. PROJECT TOTAL Prior Years $0 $0 $0 $0 $0 2009-10 $0 2010-11 $0 2011-12 $0 2012-13 $0 2013-14 $0 2014-15 $0 2015-16 $0 TOTAL $0 $0 $0 $0 $0 PROJECT DESCRIPTION/STATUS PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR OPERATING COSTS In accordance with the Parkland Dedication Ordinance, these funds have been set aside for park improvements and renovation projects identified in Zone 5. Total Personnel $0 Supplies $0 Service $0 Capital $0 TOTAL $0$0 $0 OPERATING COSTS First Fiscal Year Annually 156 PROJECT: Steeplechase Park Bench PROJECT #: TBD FUND: 175 - Zone 5 Parkland PROJECT BUDGET: $810 PROJECT MANAGER: David Wood FUNDING SOURCES: Zone 5 Parkland Dedication PROJECT Funds CLIENT: Parks and Recreation FISCAL YEAR LAND ENG. CONSTR. MISC. PROJECT TOTAL Prior Years $0 $0 $0 $0 $0 2009-10 810 $810 2010-11 $0 2011-12 $0 2012-13 $0 2013-14 $0 2014-15 $0 2015-16 $0 TOTAL $0 $0 $0 $810 $810 PROJECT DESCRIPTION/STATUS This project is for the installation of a bench with a concrete pad in Steeplechase Park. PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR OPERATING COSTS Total Personnel $0 Supplies $0 Service $0 Capital $0 TOTAL $0$0 $0 OPERATING COSTS First Fiscal Year Annually 157 PROJECT: ZONE 6 PARK PROJECT #: PK0056 FUND: 176 - Zone 6 Parkland PROJECT BUDGET: $95,000 PROJECT MANAGER: TBD FUNDING SOURCES: Zone 6 Parkland Dedication PROJECT Funds CLIENT: Parks and Recreation In accordance with the Parkland Dedication Ordinance, these funds have been set aside for park improvement and renovation projects as identified in Park Zone 6. FISCAL YEAR LAND ENG. CONSTR. MISC. PROJECT TOTAL Prior Years $0 $0 $0 $0 $0 2009-10 $0 2010-11 95,000 $95,000 2011-12 $0 2012-13 $0 2013-14 $0 2014-15 $0 2015-16 $0 TOTAL $0 $0 $95,000 $0 $95,000 PROJECT DESCRIPTION/STATUS PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR OPERATING COSTS Total Personnel $0 Supplies $0 Service $0 Capital $0 TOTAL $0 OPERATING COSTS First Fiscal Year Annually $0 $0 158 PROJECT: Southwest Park Development PROJECT #: PK0806 FUND: 176 - Zone 6 Parkland PROJECT BUDGET: $268,000 PROJECT MANAGER: David Wood FUNDING SOURCES: Zone 6 Parkland Dedication PROJECT Funds CLIENT: Parks and Recreation FISCAL YEAR LAND ENG. CONSTR. MISC. PROJECT TOTAL Prior Years $0 $0 $0 $220 $220 2009-10 $0 2010-11 13,000 254,780 $267,780 2011-12 $0 2012-13 $0 2013-14 $0 2014-15 $0 2015-16 $0 TOTAL $0 $13,000 $254,780 $220 $268,000 PROJECT DESCRIPTION/STATUS PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR OPERATING COSTS Southwest Park will be developed as a typical neighborhood park, with emphasis on heavy use by college age participants. The project may include parking, picnic pavilions, disc golf, fencing, climbing wall, plaza, landscaping, etc. Total Personnel $11,250 Supplies $2,400 Service $24,350 Capital $0 TOTAL $38,000 $11,250 2,400 $0 $38,000 24,350 OPERATING COSTS First Fiscal Year Annually 159 PROJECT: Zone 7 Parkland PROJECT #: PK0057 FUND: 177 - Zone 7 Parkland PROJECT BUDGET: $0 PROJECT MANAGER: TBD FUNDING SOURCES: Zone 7 Parkland Dedication PROJECT Funds CLIENT: Parks and Recreation FISCAL YEAR LAND ENG. CONSTR. MISC. PROJECT TOTAL Prior Years $0 $0 $0 $0 $0 2009-10 $0 2010-11 $0 2011-12 $0 2012-13 $0 2013-14 $0 2014-15 $0 2015-16 $0 TOTAL $0 $0 $0 $0 $0 PROJECT DESCRIPTION/STATUS PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR OPERATING COSTS In accordance with the Parkland Dedication Ordinance, these funds have been set aside for park improvement and renovation projects in Park Zone 7. Total Personnel $0 Supplies $0 Service $0 Capital $0 TOTAL $0$0 OPERATING COSTS First Fiscal Year Annually 160 PROJECT: John Crompton Park, Phase III PROJECT #: PK0904 FUND: 177 - Zone 7 Parkland PROJECT BUDGET: $149,000 PROJECT MANAGER: Pete Vanecek FUNDING SOURCES: Zone 7 Parkland Dedication PROJECT Funds CLIENT: Parks and Recreation Phase III development of Crompton Park. Improvements include the addition of concrete sidewalks, area lights, signage, land aqusition and a playground. FISCAL YEAR LAND ENG. CONSTR. MISC. PROJECT TOTAL Prior Years $0 $272 $54,686 $0 $54,958 2009-10 35,692 $35,692 2010-11 58,350 $58,350 2011-12 $0 2012-13 $0 2013-14 $0 2014-15 $0 2015-16 $0 TOTAL $0 $272 $148,728 $0 $149,000 PROJECT DESCRIPTION/STATUS PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR Total Personnel $0 Supplies $0 Service $0 Capital $0 TOTAL $0$0 $0 OPERATING COSTS First Fiscal Year Annually John Crompton Pk Ph III 161 PROJECT: ZONE 8 PARK PROJECT #: PK0058 FUND: 178 - Zone 8 Parkland PROJECT BUDGET: $0 PROJECT MANAGER: TBD FUNDING SOURCES: Zone 8 Parkland Dedication PROJECT Funds CLIENT: Parks and Recreation In accordance with the Parkland Dedication Ordinance, these funds have been set aside for park improvement and renovation projects as identified in Park Zone 8. FISCAL YEAR LAND ENG. CONSTR. MISC. PROJECT TOTAL Prior Years $0 $0 $0 $0 $0 2009-10 $0 2010-11 $0 2011-12 $0 2012-13 $0 2013-14 $0 2014-15 $0 2015-16 $0 TOTAL $0 $0 $0 $0 $0 PROJECT DESCRIPTION/STATUS PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR OPERATING COSTS Total Personnel $0 Supplies $0 Service $0 Capital $0 TOTAL $0$0 $0 OPERATING COSTS First Fiscal Year Annually 162 PROJECT: ZONE 9 PARK PROJECT #: PK0059 FUND: 179 - Zone 9 Parkland PROJECT BUDGET: $0 PROJECT MANAGER: TBD FUNDING SOURCES: Zone 9 Parkland Dedication PROJECT Funds CLIENT: Parks and Recreation In accordance with the Parkland Dedication Ordinance, these funds have been set aside for park improvement and renovation projects as identified in Park Zone 9. FISCAL YEAR LAND ENG. CONSTR. MISC. PROJECT TOTAL Prior Years $0 $0 $0 $0 $0 2009-10 $0 2010-11 $0 2011-12 $0 2012-13 $0 2013-14 $0 2014-15 $0 2015-16 $0 TOTAL $0 $0 $0 $0 $0 PROJECT DESCRIPTION/STATUS PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR OPERATING COSTS Total Personnel $0 Supplies $0 Service $0 Capital $0 TOTAL $0 OPERATING COSTS First Fiscal Year Annually $0 $0 163 PROJECT: Woodland Hills Park Improvements PROJECT #: PK0523 FUND: 179 - Zone 9 Parkland PROJECT BUDGET: $30,000 PROJECT MANAGER: TBD FUNDING SOURCES: Zone 9 Parkland Dedication PROJECT Funds CLIENT: Parks and Recreation This project is for additional fencing , landscaping and sidewalk. FISCAL YEAR LAND ENG. CONSTR. MISC. PROJECT TOTAL Prior Years $0 $0 $0 $0 $0 2009-10 $0 2010-11 30,000 $30,000 2011-12 $0 2012-13 $0 2013-14 $0 2014-15 $0 2015-16 $0 TOTAL $0 $0 $30,000 $0 $30,000 PROJECT DESCRIPTION/STATUS PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR OPERATING COSTS Total Personnel $0 Supplies $0 Service $0 Capital $0 TOTAL $0$0 $0 OPERATING COSTS First Fiscal Year Annually 164 PROJECT: PROJECT #: PK0060 FUND: PROJECT BUDGET:$170,000 PROJECT MANAGER: TBD FUNDING SOURCES: Zone 10 Parkland Dedication PROJECT Funds CLIENT: Parks and Recreation FISCAL YEAR LAND ENG. CONSTR. MISC. PROJECT TOTAL Prior Years $0 $0 $0 $0 $0 2009-10 $0 2010-11 170,000 $170,000 2011-12 $0 2012-13 $0 2013-14 $0 2014-15 $0 2015-16 $0 TOTAL $0 $0 $170,000 $0 $170,000 Total Personnel $0 Supplies $0 Service $0 ZONE 10 PARK 180 - Zone 10 Parkland PROJECT DESCRIPTION/STATUS PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR OPERATING COSTS First Fiscal Year Annually In accordance with the Parkland Dedication Ordinance, these funds have been set aside for park improvement and renovation projects as identified in Park Zone 10. Service $0 Capital $0 TOTAL $0$0 $0 165 PROJECT: ZONE 11 PARK PROJECT #: PK0061 FUND: PROJECT BUDGET: $32,000 PROJECT MANAGER: TBD FUNDING SOURCES: Zone 11 Parkland Dedication PROJECT Funds CLIENT: Parks and Recreation In accordance with the Parkland Dedication Ordinance, these funds have been set aside for park improvement and renovation projects as identified in Park Zone 11. FISCAL YEAR LAND ENG. CONSTR. MISC. PROJECT TOTAL Prior Years $0 $0 $0 $0 $0 2009-10 $0 2010-11 32,000 $32,000 2011-12 $0 2012-13 $0 2013-14 $0 2014-15 $0 2015-16 $0 TOTAL $0 $0 $32,000 $0 $32,000 OPERATING COSTS 181 - Zone 11 Parkland PROJECT DESCRIPTION/STATUS PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR Total Personnel $0 Supplies $0 Service $0 Capital $0 TOTAL $0 OPERATING COSTS First Fiscal Year Annually $0 $0 166 PROJECT: ZONE 12 PARK PROJECT #: PK0824 FUND: PROJECT BUDGET:$24,000 PROJECT MANAGER: TBD FUNDING SOURCES: Zone 12 Parkland Dedication PROJECT Funds CLIENT: Parks and Recreation In accordance with the Parkland Dedication Ordinance, these funds have been set aside for park improvement and renovation projects as identified in Park Zone 12. FISCAL YEAR LAND ENG. CONSTR. MISC. PROJECT TOTAL Prior Years $0 $0 $0 $0 $0 2009-10 $0 2010-11 24,000 $24,000 2011-12 $0 2012-13 $0 2013-14 $0 2014-15 $0 2015-16 $0 TOTAL $0 $0 $24,000 $0 $24,000 182 - Zone 12 Parkland PROJECT DESCRIPTION/STATUS PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR Total Personnel $0 Supplies $0 Service $0 Capital $0 TOTAL $0$0 $0 OPERATING COSTS First Fiscal Year Annually 167 PROJECT: ZONE 13 PARK PROJECT #: PK0807 FUND: PROJECT BUDGET: $0 PROJECT MANAGER: TBD FUNDING SOURCES: Zone 13 Parkland Dedication PROJECT Funds CLIENT: Parks and Recreation In accordance with the Parkland Dedication Ordinance, these funds have been set aside for park FISCAL YEAR LAND ENG. CONSTR. MISC. PROJECT TOTAL Prior Years $0 $0 $0 $0 $0 2009-10 $0 2010-11 $0 2011-12 $0 2012-13 $0 2013-14 $0 2014-15 $0 2015-16 $0 TOTAL $0 $0 $0 $0 $0 183 - Zone 13 Parkland improvements and renovation projects as identified in Park Zone 13. PROJECT DESCRIPTION/STATUS PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR OPERATING COSTS Total Personnel $0 Supplies $0 Service $0 Capital $0 TOTAL $0$0 $0 OPERATING COSTS First Fiscal Year Annually L a k e wa yB 1313 1010 1919 2020 1515 1212 55 99 1818 2626 2121Fm 2154Barron RdS H 6 SVi ctori a AveG r e e n s Prairie Rd W Dec at ur DrGraham Rd N Al l eyCain Rd Victoria Ave168 PROJECT: ZONE 14 PARK PROJECT #: PK0717 FUND: PROJECT BUDGET: $77,000 PROJECT MANAGER: PETE VANECEK FUNDING SOURCES: Zone 14 Parkland Dedication PROJECT Funds CLIENT: Parks and Recreation In accordance with the Parkland Dedication Ordinance, these funds have been set aside for park FISCAL YEAR LAND ENG. CONSTR. MISC. PROJECT TOTAL Prior Years $0 $0 $0 $0 $0 2009-10 $0 2010-11 77,000 $77,000 2011-12 $0 2012-13 $0 2013-14 $0 2014-15 $0 2015-16 $0 TOTAL $0 $0 $77,000 $0 $77,000 PROJECT DESCRIPTION/STATUS PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR OPERATING COSTS 184 - Zone 14 Parkland improvements and renovation projects as identified in Park Zone 14. Total Personnel $0 Supplies $0 Service $0 Capital $0 TOTAL $0 OPERATING COSTS First Fiscal Year Annually $0 $0 169 PROJECT: ZONE 15 PARK PROJECT #: PK0808 FUND: PROJECT BUDGET: $268,000 PROJECT MANAGER: TBD FUNDING SOURCES: Zone 15 Parkland Dedication PROJECT Funds CLIENT: Parks and Recreation In accordance with the Parkland Dedication Ordinance, these funds have been set aside for park FISCAL YEAR LAND ENG. CONSTR. MISC. PROJECT TOTAL Prior Years $0 $0 $0 $0 $0 2009-10 $0 2010-11 268,000 $268,000 2011-12 $0 2012-13 $0 2013-14 $0 2014-15 $0 2015-16 $0 TOTAL $0 $0 $268,000 $0 $268,000 185 - Zone 15 Parkland improvements and renovation projects as identified in Park Zone 15. PROJECT DESCRIPTION/STATUS PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR OPERATING COSTS Total Personnel $0 Supplies $0 Service $0 Capital $0 TOTAL $0$0 $0 OPERATING COSTS First Fiscal Year Annually 170 PROJECT: ZONE 16 PARK PROJECT #: TBD FUND: PROJECT BUDGET: $0 PROJECT MANAGER: TBD FUNDING SOURCES: Zone 16 Parkland Dedication PROJECT Funds CLIENT: Parks and Recreation In accordance with the Parkland Dedication Ordinance, these funds have been set aside for park FISCAL YEAR LAND ENG. CONSTR. MISC. PROJECT TOTAL Prior Years $0 $0 $0 $0 $0 2009-10 $0 2010-11 $0 2011-12 $0 2012-13 $0 2013-14 $0 2014-15 $0 2015-16 $0 TOTAL $0 $0 $0 $0 $0 PROJECT DESCRIPTION/STATUS PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR OPERATING COSTS 186 - Zone 16 Parkland improvements and renovation projects as identified in Park Zone 16. Total Personnel $0 Supplies $0 Service $0 Capital $0 TOTAL $0 OPERATING COSTS First Fiscal Year Annually $0 $0 171 Home of Texas A&M University ® 172 ELECTRIC CAPITAL IMPROVEMENT PROJECTS FISCAL YEAR 2010-2011 THROUGH FISCAL YEAR 2014-2015 173 ELECTRIC SERVICE CAPITAL IMPROVEMENT PROJECTS FISCAL YEAR 2010-2011 THROUGH FISCAL YEAR 2014-2015 FY 09-10 ACTUAL REVISED FY 09-10 FY 08-09 BUDGET ESTIMATE BEGINNING FUND BALANCE:$392,526 $994,199 $994,199 SUBTOTAL ADDITIONAL RESOURCES $7,069,506 $8,678,000 $7,677,000 TOTAL RESOURCES AVAILABLE $7,462,032 $9,672,199 $8,671,199 TOTAL EXPENDITURES 6,659,704$ 8,932,210$ 8,135,979$ MEASUREMENT FOCUS ADJUSTMENT 191,871$ ENDING FUND BALANCE:$994,199 $739,989 $535,220 174 ELECTRIC SERVICE CAPITAL IMPROVEMENT PROJECTS FISCAL YEAR 2010-2011 THROUGH FISCAL YEAR 2014-2015 FY10-11 APPROVED PROJECTED PROJECTED PROJECTED PROJECTED BUDGET FY11-12 FY12-13 FY13-14 FY14-15 $535,220 $28,005 $93,005 $30,005 $62,005 $5,416,000 $5,555,000 $9,719,000 $5,914,000 $5,506,000 $5,951,220 $5,583,005 $9,812,005 $5,944,005 $5,568,005 5,923,215$ 5,490,000$ 9,782,000$ 5,882,000$ 5,500,000$ $28,005 $93,005 $30,005 $62,005 $68,005 175 Home of Texas A&M University ® 176 WATER CAPITAL IMPROVEMENT PROJECTS FISCAL YEAR 2010-2011 THROUGH FISCAL YEAR 2015-2016 177 WATER SERVICE CAPITAL IMPROVEMENT PROJECTS FISCAL YEAR 2010-2011 THROUGH FISCAL YEAR 2015-2016 FY11 REVISED APPROVED PROJECT WORK REQUEST APPROVED APPROPRIATIONS FY09-10 FY10 - 11 NUMBER NUMBER BUDGET THROUGH FY09 APPROPRIATIONS APPROPRIATIONS BEGINNING FUND BALANCE:3,642,508$ 66,584$ ADDITIONAL RESOURCES: UTILITY REVENUE BONDS/CERTIFICATES OF OBLIGATION 12,025,000$ 5,450,000$ INTEREST ON INVESTMENTS 18,000 7,200 TRANSFERS FROM OPERATIONS 7,000,000 5,250,000 OTHER 2,344,326 130,000 SUBTOTAL ADDITIONAL RESOURCES 21,387,326$ 10,837,200$ TOTAL RESOURCES AVAILABLE 25,029,834$ 10,903,784$ PRODUCTION PROJECTS SOURCE AND SUPPLY PLANT - WSWOC PARALLEL WELLFIELD COLL LINE PH I - WF0352553 3,217,951 4,212,548 149,327 - LAND ACQUISITION - WELLS WT0206 WF0377324 6,667,217 6,622,614 44,603 - WELL #8 - WF1097966 3,207,954 525,000 4,595,000 - WELL#8 COLLECTION LINE - WF1097967 2,149,717 950,000 2,050,000 - WELL #9 TBD 4,727,000 - - - WELL #9 COLLECTION LINE WF1249597 4,131,831 - 25,000 - WATER PUMPING AND TREATMENT PLANT - WPWOC SANDY POINT CHEMICAL SYS REPLACEMENT - TBD 1,698,964 - - - HIGH SERVICE WATER PUMP IMPROVEMENTS - WF1223117 2,500,000 - 500,000 2,000,000 2010 WELL REHABILITATION - WF1241047 400,000 - 400,000 - COOLING TOWER EXPANSION - TBD 3,170,000 - - - COOLING TOWER MEDIA REPLACEMENT - TBD 300,000 - - 300,000 WELLS 1,2,3, & 5 CONTROLS UPGRADE TBD 80,000 - - 80,000 3 MG GSR REHAB TBD 400,000 - - 400,000 5 MG GSR REHAB TBD 560,000 - - - WATER GENERAL PLANT - WGWOC SCADA REPLACEMENT - WF0742940 259,476 351,751 - - UTILITY SERVICE CENTER RENOVATIONS - TBD 348,000 - - 37,500 SCADA MAN MACHINE INTERFACE TBD 205,000 - - 205,000 CLOSED PROJECTS SUBTOTAL BUDGET APPROPRIATIONS 178 WATER SERVICE CAPITAL IMPROVEMENT PROJECTS FISCAL YEAR 2010-2011 THROUGH FISCAL YEAR 2015-2016 PROJECT EXPENDITURES ACTUAL ESTIMATE PROJECTED PROJECTED PROJECTED PROJECTED PROJECTED PROJECTED THROUGH FY08 FY 08-09 FY 09-10 FY 10-11 FY 11-12 FY 12-13 FY 13-14 FY 14-15 FY 15-16 3,021,021$ 3,642,508$ 66,584$ 74,820$ 47,338$ 41,026$ 81,108$ 61,358$ 7,502,126$ -$ 5,450,000$ 4,175,000$ 1,600,000$ 1,625,000$ 3,225,000$ 4,775,000$ (3,260) 18,000 7,200 9,000 4,000 7,000 7,000 7,000 - 5,200,000 5,250,000 1,325,000 675,000 875,000 1,275,000 1,100,000 3,169,946 2,374,641 130,000 - 1,949,170 - - - 10,668,812$ 7,592,641$ 10,837,200$ 5,509,000$ 4,228,170$ 2,507,000$ 4,507,000$ 5,882,000$ 13,689,833$ 11,235,149$ 10,903,784$ 5,583,820$ 4,275,508$ 2,548,026$ 4,588,108$ 5,943,358$ 203,830 124,121 2,890,000 - - - - - - 3,566,215 1,269,499 500,000 200,000 - - - - - - 232,954 2,975,000 - - - - - - - 209,717 1,940,000 - - - - - - - - - - - - - 870,000 1,828,500 - 25,000 - - - 775,000 1,328,416 - - - - 899,482 799,482 - - 135,000 815,000 1,550,000 - - - - - 256,000 144,000 - - - - - - - - - 1,685,000 1,485,000 - - - - - - 300,000 - - - - - - - - 80,000 - - - - - - 400,000 - - - - - - - 30,000 530,000 - - - 124,476 42,055 92,945 - - - - - - - - - 37,500 - 50,000 260,500 - - - - - 150,000 55,000 - - - - 382,350 3,894,521$ 2,260,696$ 8,813,945$ 2,126,500$ 4,219,482$ 2,864,482$ 260,500$ 1,645,000$ 3,156,916$ PROJECTED EXPENDITURES 179 WATER SERVICE CAPITAL IMPROVEMENT PROJECTS FISCAL YEAR 2010-2011 THROUGH FISCAL YEAR 2015-2016 FY11 REVISED APPROVED PROJECT WORK REQUEST APPROVED APPROPRIATIONS FY09-10 FY10 - 11 NUMBER NUMBER BUDGET THROUGH FY09 APPROPRIATIONS APPROPRIATIONS BUDGET APPROPRIATIONS DISTRIBUTION PROJECTS TRANSMISSION AND DISTRIBUTION PLANT - WTWOC OVERSIZED PARTICIPATION - TBD ANNUAL - - 100,000 WATER RECLAMATION PHASE I WT0110 WF0995711 3,606,730 575,730 3,031,000 - WELLBORN WIDENING - WF0613546 4,850,194 4,250,000 - 600,194 BARRON ROAD WATER SERVICE EXT - WF0379197 1,691,863 1,691,863 - - RAYMOND STOTZER WEST - WF1111167 3,440,000 1,000,000 - - SC VICTORIA AVENUE EXTENSION - WF1158553 228,375 15,000 213,375 - SC HOLLEMAN LINE EXTENSION WF1254634 130,000 - 130,000 - SC BARRON ROAD WIDENING PHASE II - TBD 50,000 - 50,000 - SH 40 WATER LINE - GRAHAM TO BARRON - TBD 2,586,000 - 25,000 - SH 40 WATER LINE - Sonoma Subdivision to Victoria - TBD 643,000 - - - AQUARIUM LINE REPLACEMENT - WF1246445 150,000 - 150,000 - FM2818/JONES BUTLER WATER LINE CONFLICT - WF1272122 145,000 - 145,000 - 2002 ANNEXATION PROJECTS ROCK P RD S OF CARTER LAKE (AREA 5) - WF0805789 178,811 434,000 - - WILLIAM D FITCH EAST (AREA 6) - WF0805807 180,686 522,000 - - DONATED WATER NA - - CLOSED PROJECTS 404,500 SUBTOTAL REHABILITATION PROJECTS: DC BEE CREEK PHASES IV & V TBD 120,000 120,000 - - SC TAUBER & STASNEY - WF0625888 415,044 288,731 126,313 - SOUTH KNOLL/THE GLADE - WF1044480 2,246,738 1,727,449 519,289 - SOUTHWOOD 5-7 - WF1105425 2,197,663 2,197,663 - - EASTGATE REHAB TBD 2,304,930 - - - COLLEGE HEIGHTS REHAB 2,323,988 - - - CLOSED PROJECTS - SUBTOTAL CAPITAL PROJECTS CONTINGENCY - TBD - 150,000 METER REPLACEMENT PROGRAM - WF1128579 360,000 10,000 CAPITAL PROJECTS SUBTOTAL 12,918,407$ 3,882,694$ GENERAL AND ADMINISTRATIVE 80,487 70,269 DEBT ISSUANCE COST 80,000 15,000 TOTAL EXPENDITURES 13,078,894$ 3,967,963$ MEASUREMENT FOCUS ADJUSTMENT ENDING FUND BALANCE:11,950,940$ 6,935,821$ SC Project funded through combination of sources. Project sheet reflected in Streets section of CIP document. DC Project funded through combination of sources. Project sheet reflected in Drainage section of CIP document. 180 WATER SERVICE CAPITAL IMPROVEMENT PROJECTS FISCAL YEAR 2010-2011 THROUGH FISCAL YEAR 2015-2016 PROJECT EXPENDITURES ACTUAL ESTIMATE PROJECTED PROJECTED PROJECTED PROJECTED PROJECTED PROJECTED THROUGH FY08 FY 08-09 FY 09-10 FY 10-11 FY 11-12 FY 12-13 FY 13-14 FY 14-15 FY 15-16 PROJECTED EXPENDITURES - - 100,000 100,000 100,000 100,000 100,000 100,000 100,000 78,217 257,455 270,000 3,001,058 - - - - - 3,309,241 10,953 132,600 935,400 462,000 - - - - 1,178,520 23,342 40,000 450,000 - - - - - - 9,557 55,000 - - - - - 265,000 - 6,270 3,730 218,375 - - - - - - - 130,000 - - - - - - - - 50,000 - - - - - - - - - - - - 448,500 1,068,750 1,068,750 - - - - - - 200,000 443,000 - - - 150,000 - - - - - - 50,000 95,000 - - - - - 158,944 2,187 17,679 - - - - - - 3,942 22,880 153,864 - - - - - - - - - - - - 124,695 152,684 - - - - - - 4,728,866$ 457,339$ 1,305,557$ 4,799,833$ 562,000$ 100,000$ 748,500$ 1,611,750$ 1,433,750$ - - - - 120,000 - - - - 21,403 - 82,534 311,107 - - - - - 134 100,391 358,458 1,787,755 - - - - - 0 124,088 515,075 1,558,500 - - - - - - - - 350,000 1,000,000 954,930 - - - - - - - - 232,988 1,000,000 1,000,000 3,492,711 2,509 21,537$ 3,717,190$ 958,576$ 3,657,362$ 470,000$ 1,000,000$ 1,187,918$ 1,000,000$ 1,000,000$ - - - 150,000 150,000 150,000 150,000 150,000 150,000 - 284,566 10,000 10,000 10,000 10,000 10,000 10,000 10,000 8,644,924$ 6,719,791$ 11,088,078$ 10,743,695$ 5,411,482$ 4,124,482$ 2,356,918$ 4,416,750$ 5,750,666$ 83,757 80,487 70,269 100,000 100,000 100,000 100,000 100,000 2,280 - 15,000 25,000 10,000 10,000 10,000 20,000 6,805,828$ 11,168,565$ 10,828,964$ 5,536,482$ 4,234,482$ 2,466,918$ 4,526,750$ 5,870,666$ (3,241,497)$ 3,642,508$ 66,584$ 74,820$ 47,338$ 41,026$ 81,108$ 61,358$ 72,693$ 181 PRODUCTION PROJECTS 182 WORK ORDER #: WF0352553 PROJECT: Parallel Wellfield Collection Line PROJECT #: WSWOC Phase I FUND: Water Capital Projects PROJECT BUDGET: $3,217,951 PROJECT MANAGER: Philip Bargas FUNDING SOURCES: Long Term Debt/Utility Revenue PROJECT CLIENT: Water Services / Stephen Maldonado FISCAL YEAR LAND ENG. CONSTR. MISC. PROJECT TOTAL Prior Years 222,053 105,899 0 0 $327,951 2009-10 190,000 2,700,000 $2,890,000 2010-11 $0 2011-12 $0 2012-13 $0 2013-14 $0 PROJECT DESCRIPTION/STATUS PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR Construction of a collection line for the water wells parallel to the existing line. The existing line is operating at maximum design capacity with the input of six wells. The construction of Well #7 will require this additional pipeline to deliver water to Sandy Point Pump Station. In addition, will possibly replace the short collection lines (stub outs) for Wells #1 and #2. 2013-14 $0 2014-15 $0 2015-16 $0 TOTAL $222,053 $295,899 $2,700,000 $0 $3,217,951 Total Personnel $0 Supplies $0 Service $0 Capital $0 TOTAL $0$0 $0 OPERATING COSTS First Fiscal Year Annually 183 WORK ORDER #: WF0377324 PROJECT: Land Acquisition - Wells PROJECT #: WT0206 FUND: Water Capital Projects PROJECT BUDGET: $6,667,217 PROJECT MANAGER: Dave Coleman FUNDING SOURCES: Long Term Debt/Utility Revenue PROJECT CLIENT: Water Services FISCAL YEAR LAND ENG. CONSTR. MISC. PROJECT TOTAL Prior Years 4,829,242 0 0 6,472 $4,835,713 2009-10 500,000 $500,000 2010-11 200,000 $200,000 2011-12 $0 2012-13 $0 2013-14 $0 2014-15 $0 Future Years 1,131,504 $1,131,504 TOTAL $6 660 746 $0 $0 $6 472 $6 667 217 PROJECT DESCRIPTION/STATUS PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR Land purchased for Well Site #8, #9, and #10. The construction of Well #8 is presently underway and anticipate being in service by Fall of 2010. College Station Land Agent is negotiating purchase in FY 10 of S. Johnson property for Well #11. TOTAL $6,660,746 $0 $0 $6,472 $6,667,217 Total Personnel $0 Supplies $0 Service $0 Capital $0 TOTAL $0 OPERATING COSTS First Fiscal Year Annually $0 $0 184 WORK ORDER #: WF1097966 PROJECT: Well #8 PROJECT #: WSWOC FUND: Water Capital Projects PROJECT BUDGET: $3,207,954 PROJECT FUNDING MANAGER: Philip Bargas SOURCES: Long Term Debt/Utility Revenue PROJECT CLIENT: Water Services / Brian J. Smith FISCAL YEAR LAND ENG. CONSTR. MISC. PROJECT TOTAL Prior Years 0 232,660 294 0 $232,954 2009-10 175,000 2,800,000 $2,975,000 2010-11 $0 2011-12 $0 PROJECT DESCRIPTION/STATUS This project will construct Water Well Simsboro 8 with its associated electrical, SCADA, security, and drainage infrastructure. Land acquisition costs are included in a separate project known as Land Acquisition - Wells, WF0377324. This project is presently under construction and anticipate being in service in the Fall of 2010. PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR 2011 12 $0 2012-13 $0 2013-14 $0 2014-15 $0 2015-16 $0 TOTAL $0 $407,660 $2,800,294 $0 $3,207,954 Total Personnel $7,000 Supplies $500 Service $60,000 Capital $0 TOTAL $67,500 0 $0 $67,500 $7,000 500 60,000 OPERATING COSTS First Fiscal Year Annually 185 WORK ORDER #: WF1097967 PROJECT: Well #8 Collection Line PROJECT #: WSWOC FUND: Water Capital Projects PROJECT BUDGET: $2,149,717 PROJECT FUNDING MANAGER: Philip Bargas SOURCES: Long Term Debt/Utility Revenue PROJECT CLIENT: Water Services / Brian J. Smith FISCAL YEAR LAND ENG. CONSTR. MISC. PROJECT TOTAL Prior Years $0 $209,717 $0 $0 $209,717 2009-10 140,000 1,800,000 $1,940,000 2010-11 $0 2011-12 $0 2012-13 $0 2013-14 $0 2014-15 $0 PROJECT DESCRIPTION/STATUS Project provides for engineering design and construction of collection line progressing from Water Well #8 to a connection point in the existing wellfield collection line. The additional capacity is required to meet TCEQ regulations for pumping capacity to match projected population. Anticipate construction to be complete by Summer 2010. 2014-15 $0 2015-16 $0 TOTAL $0 $349,717 $1,800,000 $0 $2,149,717 Total Personnel $4,000 Supplies $0 Service $300 Capital $0 TOTAL $4,300 OPERATING COSTS First Fiscal Year Annually $4,000 0 $0 $4,300 300 0 186 WORK ORDER #: TBD PROJECT: Well #9 PROJECT #: WSWOC FUND: Water Capital Projects PROJECT BUDGET: $4,727,000 PROJECT FUNDING MANAGER: Brian J. Smith SOURCES: Long Term Debt/Utility Revenue PROJECT CLIENT: Water Services FISCAL YEAR LAND ENG. CONSTR. MISC. PROJECT TOTAL Prior Years 0 0 0 0 $0 2009-10 $0 2010-11 $0 2011-12 $0 2012-13 $0 2013-14 $0 PROJECT DESCRIPTION/STATUS PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR This project will construct Water Well Simsboro 9 with its associated electrical, SCADA, security, and drainage infrastructure. Land acquisition costs are included in a separate project known as Land Acquisition - Wells, WF0377324. 2014-15 300,000 570,000 $870,000 2015-16 70,000 1,758,500 $1,828,500 Future Years 2,028,500 $2,028,500 TOTAL $0 $370,000 $4,357,000 $0 $4,727,000 Total Personnel $7,000 Supplies $500 Service $60,000 Capital $0 TOTAL $67,500 $7,000 OPERATING COSTS First Fiscal Year Annually $0 500 60,000 0 $67,500 187 WORK ORDER #: WF1249597 PROJECT: Well #9 Collection Line PROJECT #: WSWOC FUND: Water Capital Projects PROJECT BUDGET: $4,131,831 PROJECT FUNDING MANAGER: Brian J. Smith SOURCES: Long Term Debt/Utility Revenue PROJECT CLIENT: Water Services FISCAL YEAR LAND ENG. CONSTR. MISC. PROJECT TOTAL Prior Years $0 $0 $0 $0 $0 2009-10 25,000 $25,000 2010-11 $0 2011-12 $0 2012-13 $0 2013-14 $0 2014-15 206,250 568,750 $775,000 PROJECT DESCRIPTION/STATUS PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR Project provides for land purchase, engineering design, and construction of collection line progressing from Water Well #9 to a connection point in the existing wellfield collection line. The additional capacity is required to meet TCEQ regulations for pumping capacity to match projected population. 2014-15 206,250 568,750 $775,000 2015-16 68,750 1,259,666 $1,328,416 Future Years 2,003,415 $2,003,415 TOTAL $25,000 $275,000 $3,831,831 $0 $4,131,831 Total Personnel $4,000 Supplies $0 Service $300 Capital $0 TOTAL $4,300$0 0 300 0 $4,300 $4,000 OPERATING COSTS First Fiscal Year Annually 188 WORK SANDY POINT PUMP STATION ORDER #: TBD PROJECT: CHEMICAL FEED & STORAGE SYSTEM PROJECT #: WPWOC FUND: Water Capital Projects PROJECT BUDGET: $1,698,964 PROJECT MANAGER: Brian J. Smith FUNDING SOURCES: Long Term Debt/Utility Revenue PROJECT CLIENT: Water Services FISCAL YEAR LAND ENG. CONSTR. MISC. PROJECT TOTAL Prior Years $0 $0 $0 $0 $0 2009-10 $0 2010-11 $0 2011-12 200,000 699,482 $899,482 2012-13 100,000 699,482 $799,482 2013-14 $0 2014-15 $0 2015-16 $0 TOTAL $0 $300,000 $1,398,964 $0 $1,698,964 The Chemical Feed and Storage facilities at Sandy Point Pump Station require upgrading to accommodate current expansion of its Water Production infrastructure and to be in compliance with current fire codes. Engineering investigations supporting the expansion effort have identified the need to replace the existing Chlorine Disinfection System to improve personnel safety and operating reliability and cost efficiency. This project has not yet entered the design phase. PROJECT DESCRIPTION/STATUS PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR Total Personnel $1,200 Supplies $30,000 Service $4,000 Capital $0 TOTAL $35,200 1,200 OPERATING COSTS First Fiscal Year Annually 30,000 0 $0 $35,200 4,000 189 WORK ORDER #: WF1223117 PROJECT: High Service Pump Improvements PROJECT #: WPWOC FUND: Water Capital Projects PROJECT BUDGET: $2,500,000 PROJECT MANAGER: Philip Bargas FUNDING SOURCES: Long Term Debt/Utility Revenue PROJECT CLIENT: Water Services / Brian J. Smith FISCAL YEAR LAND ENG. CONSTR. MISC. PROJECT TOTAL Prior Years $0 $0 $0 $0 $0 2009-10 135,000 $135,000 2010-11 450,000 365,000 $815,000 2011 12 1 550 000 $1 550 000 PROJECT DESCRIPTION/STATUS HDR Consulting Engineers has performed an analysis of our water system capacities in relation to TCEQ requirements. This analysis revealed that we need to increase our high service pump capacity. This project will replace the existing HS #3 & #4 pumps with higher capacity fixed speed pumps. This project will also replace the existing electrical equipment supporting these pumps. The budget numbers are based on the costs to upgrade HS #1 & #2 in 2001. An updated construction budget will be developed as part of the engineering services for this project. PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR 2011-12 1,550,000 $1,550,000 2012-13 $0 2013-14 $0 2014-15 $0 2015-16 $0 TOTAL $0 $585,000 $1,915,000 $0 $2,500,000 Total Personnel $1,281 Supplies $192 Service $228,000 Capital $0 TOTAL $229,473$0 $229,473 1,281 192 228,000 OPERATING COSTS First Fiscal Year Annually 190 WORK ORDER #: WF1241047 PROJECT: 2010 Well Rehab PROJECT #: WPWOC FUND: Water Capital Projects PROJECT BUDGET: $400,000 PROJECT MANAGER: Brian J. Smith FUNDING SOURCES: Long Term Debt/Utility Revenue PROJECT CLIENT: Water Services FISCAL YEAR LAND ENG. CONSTR. MISC. PROJECT TOTAL Prior Years $0 $0 $0 $0 $0 2009-10 256,000 $256,000 2010-11 144,000 $144,000 2011-12 $0 2012 13 $0 PROJECT DESCRIPTION/STATUS This project provides for the removal, inspection, and rehabilitation of the pumps and motors for three Simsboro water wells. The pumps in these wells have reached their expected service life and need to be inspected and rehabilitated before an emergency maintenance event occurs. The production rate for the pump in Well #5 is below the permitted level and needs to be upgraded. This project should begin, and be completed, from October of 2009 through May 2010. This project was previously known as "Wells #1 & #3 Pump/Mtr Rehab". PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR 2012-13 $0 2013-14 $0 2014-15 $0 2015-16 $0 TOTAL $0 $0 $400,000 $0 $400,000 Total Personnel $0 Supplies $0 Service $0 Capital $0 TOTAL $0$0 $0 OPERATING COSTS First Fiscal Year Annually 191 WORK ORDER #: TBD PROJECT: Cooling Tower Expansion PROJECT #: WPWOC FUND: Water Capital Projects PROJECT BUDGET: $3,170,000 PROJECT MANAGER: Brian J. Smith FUNDING SOURCES: Long Term Debt/Utility Revenue PROJECT CLIENT: Water Services This project has not yet entered design phase. FISCAL YEAR LAND ENG. CONSTR. MISC. PROJECT TOTAL Prior Years $0 $0 $0 $0 $0 2009-10 $0 2010-11 $0 2011-12 300,000 1,385,000 $1,685,000 2012-13 100,000 1,385,000 $1,485,000 2013-14 $0 2014-15 $0 2015 16 $0 PROJECT DESCRIPTION/STATUS PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR The engineering design and construction of an additional cooling tower, wet well, and switchgear is needed to satisfy community water production demands. One additional 12.5 MGD Cooling Tower will be initiated in FY 2012 to coincide with the increase in demand beyond firm capacity of 25 MGD. 2015-16 $0 TOTAL $0 $400,000 $2,770,000 $0 $3,170,000 Total Personnel $7,000 Supplies $7,000 Service $127,000 Capital $0 TOTAL $141,000$80,000 3,000 55,000 0 $61,000 4,000 3,000 72,000 OPERATING COSTS First Fiscal Year Annually 4,000 192 WORK ORDER #: TBD PROJECT: Cooling Tower Media Replacement PROJECT #: WPWOC FUND: PROJECT BUDGET: $300,000 PROJECT MANAGER: Brian J. Smith FUNDING SOURCES: Long Term Debt/Utility Revenue PROJECT CLIENT: Water Services / Stephen Maldonado FISCAL YEAR LAND ENG. CONSTR. MISC. PROJECT TOTAL Prior Years 0 0 0 0 $0 2009-10 $0 2010-11 300,000 $300,000 2011-12 $0 2012-13 $0 2013-14 $0 2014-15 $0 2015-16 $0 Water Capital Projects PROJECT DESCRIPTION/STATUS This project will replace the media material in the drinking water cooling towers. The existing media has reached the end of its service life and must be replaced. The Media is made up of multiple layers of corregated plastic sheets, and its function is to maximize surface area exposure to aid in the cooling of the water. No engineering is required for this replace in-kind project. PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR 2015-16 $0 TOTAL $0 $0 $300,000 $0 $300,000 Total Personnel $0 Supplies $0 Service $0 Capital $0 TOTAL $0 OPERATING COSTS First Fiscal Year Annually $0 $0 193 WORK ORDER #: TBD PROJECT: Wells 1, 2, 3, and 5 Motor Control Upgrade PROJECT #: WPWOC FUND: Water Capital Projects PROJECT BUDGET: $80,000 PROJECT MANAGER: Fred Surovik FUNDING SOURCES: Long Term Debt/Utility Revenue PROJECT CLIENT: Water Services FISCAL YEAR LAND ENG. CONSTR. MISC. PROJECT TOTAL Prior Years $0 2009-10 $0 2010-11 65,000 15,000 $80,000 2011-12 $0 2012-13 $0 2013-14 $0 2014-15 $0 PROJECT DESCRIPTION/STATUS PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR The original design of these motor controls for these wells included a Motor Operated Valve on the well discharge. These valves were intgrated into the motor controls and no longer have parts available. Additionally, the control schmatics are no longer accurate, making diagnosis and repair very difficult, especially when the well capacity is needed immediately. Staff has obtained pricing for a wholesale change out of the control section of these Motor Control Centers with current production model controls with appropriate documentaion under the General Services Administration Schedule 70, which is pre competed. Although the existing motor starters will need to be changed out at some point in the future, this addresses the most pressing of our needs and delays the need for the replacement of the entire Motor Control Center for at least a decade at a small percentage of the cost. 2015-16 $0 TOTAL $0 $0 $65,000 $15,000 $80,000 Total Personnel $0 Supplies $0 Service $0 Capital $0 TOTAL $0$0 $0 First Fiscal Year Annually OPERATING COSTS 194 WORK ORDER #: TBD PROJECT: 3 MGSR Rehabilitation PROJECT #: FUND: PROJECT BUDGET: $400,000 PROJECT MANAGER: TBD/Brian J. Smith FUNDING SOURCES: Long Term Debt/Utility Revenue PROJECT CLIENT: Water Services FISCAL YEAR LAND ENG. CONSTR. MISC. PROJECT TOTAL Prior Years $0 2009-10 $0 2010-11 50,000 350,000 $400,000 2011-12 $0 2012-13 $0 PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR WATER CAPITAL PROJECTS PROJECT DESCRIPTION/STATUS This project is needed to replace the interior coating system and make repairs to the overflow structure for the three million gallon ground storage reservoir. We have two separate inspection reports which indicate the interior coatings have started to fail and that the overflow structure which must be upsized. The project budget includes funding for the engineering and construction costs associated with the needed repairs. The engineering scope of work includes assistance with bidding, inspection services and the review and approval of pay applications. The construction scope of work includes replacement of the existing overflow structure as well as the removal and replacement of the interior coatings on the tank. 2012-13 $0 2013-14 $0 2014-15 $0 2015-16 $0 TOTAL $0 $50,000 $350,000 $0 $400,000 Total Personnel $0 Supplies $0 Service $0 Capital $0 TOTAL $0$0 $0 0 0 OPERATING COSTS First Fiscal Year Annually $0 195 WORK ORDER #: TBD PROJECT: 5 MGSR Rehabilitation PROJECT #: FUND: PROJECT BUDGET: $560,000 PROJECT MANAGER: TBD/Brian J. Smith FUNDING SOURCES: Long Term Debt/Utility Revenue PROJECT CLIENT: Water Services FISCAL YEAR LAND ENG. CONSTR. MISC. PROJECT TOTAL Prior Years $0 2009-10 $0 2010-11 $0 2011-12 30,000 $30,000 2012-13 30 000 500000 $530 000 PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR WATER CAPITAL PROJECTS PROJECT DESCRIPTION/STATUS This project is needed to replace the interior coating system and make repairs to the overflow structure for the five million gallon ground storage reservoir. We have two separate inspection reports which indicate the interior coatings have started to fail and that the overflow structure which must be upsized. The project budget includes funding for the engineering and construction costs associated with the needed repairs. The engineering scope of work includes assistance with bidding, inspection services and the review and approval of pay applications. The construction scope of work includes replacement of the existing overflow structure as well as the removal and replacement of the interior coatings on the tank. 2012-13 30,000 500000 $530,000 2013-14 $0 2014-15 0 $0 2015-16 $0 TOTAL $0 $60,000 $500,000 $0 $560,000 Total Personnel $0 Supplies $0 Service $0 Capital $0 TOTAL $0$0 $0 0 0 OPERATING COSTS First Fiscal Year Annually $0 196 WORK ORDER #: WF0742940 PROJECT: SCADA Replacement PROJECT #: WGWOC FUND: Water Capital Projects PROJECT BUDGET: $259,476 PROJECT MANAGER: Michael Kellogg FUNDING SOURCES: Long Term Debt/Utility Revenue PROJECT CLIENT: Water Services This project will facilitate the replacement of control based equipment that has exceeded its useful service life. It will upgrade the control of the plants into a more integrated architecture that will: 1. Reduce development time and cost by the re-use of engineering practices. 2. Maximize returns from existing assets, through greatly improved control and monitoring. 3. Reduce future installation cost by utilizing standard bus technologies. 4. Provide a means of being proactive in maintaining equipment with available diagnostic tools. FISCAL YEAR LAND ENG. CONSTR. MISC. PROJECT TOTAL Prior Years 0 0 166,531 0 $166,531 2009-10 92,945 $92,945 2010-11 $0 2011-12 $0 2012-13 $0 2013-14 $0 2014-15 $0 2015-16 $0 PROJECT DESCRIPTION/STATUS PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR 2015-16 $0 TOTAL $0 $0 $259,476 $0 $259,476 Total Personnel $0 Supplies $0 Service $0 Capital $0 TOTAL $0 $0 OPERATING COSTS First Fiscal Year Annually $0 0 0 $0 197 PROJECT: USC Rennovations FUND(S): PROJECT NUMBERS & BUDGET: Water: TBD $348,000 Wastewater: TBD $348,000 Total Project Budget: $696,000 PROJECT MANAGER: TBD FUNDING PROJECT SOURCES: CLIENT: Water Services Long Term Debt/Utility Revenue WATER CAPITAL PROJECTS WASTEWATER CAPITAL PROJECTS This project Rennovates the USC. Improvements include additional office space, HVAC refurbishments, additional Dispatching facilities made necessary by the Homelands Security act and E.R.C.O.T. The existing facilities are 20 years old and refurbishment is needed to extend the service life. PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR PROJECT DESCRIPTION/STATUS Project Total FISCAL YEAR LAND ENG. CONSTR. MISC. PROJECT TOTAL Prior Years $0 $0 $0 $0 2009-10 0 0 0 0 2010-11 0 0 75,000 0 2011-12 0 0 0 0 2012-13 0 100,000 0 0 2013-14 0 0 521,000 0 2014-15 0 0 0 0 2015-16 0 0 0 0 $100,000 $0 $0 $75,000 $0 $0 PROJECT TOTAL $696,000$0 $100,000 $596,000 $0 $0 $521,000 PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR 198 Water Portion FISCAL YEAR LAND ENG. CONSTR. MISC. PROJECT TOTAL Prior Years $0 $0 $0 $0 $0 2009-10 $0 2010-11 37,500 $37,500 2011-12 $0 2012-13 50,000 $50,000 2013-14 260,500 $260,500 2014-15 $0 2015-16 $0 Water Total $0 $50,000 $298,000 $0 $348,000 Wastewater Portion FISCAL YEAR LAND ENG. CONSTR. MISC. PROJECT TOTAL Prior Years $0 $0 $0 $0 $0 2009-10 $0 2010-11 37,500 $37,500 2011-12 $0 2012-13 50,000 $50,000 2013-14 260,500 $260,500 2014-15 $0 2015-16 $0 Wastewater Total $0 $50,000 $298,000 $0 $348,000 First Fiscal Year Annually Total $696,000PROJECT TOTAL $100,000 $596,000$0 USC RennovationsPROJECT: PROJECT CALENDAR OF EXPENDITURES BY FUND OPERATING COSTS $0 First Fiscal Year Annually Total Personnel $0 Supplies $0 Service $0 Capital $0 TOTAL $0 $0 $0 199 WORK ORDER #: TBD PROJECT: SCADA Man Machine Interface PROJECT #: WGWOC FUND: Water Capital Projects PROJECT BUDGET: $205,000 PROJECT FUNDING MANAGER: Michael Kellogg SOURCES: Long Term Debt/Utility Revenue PROJECT CLIENT: Water Services FISCAL YEAR LAND ENG. CONSTR. MISC. PROJECT TOTAL Prior Years $0 $0 $0 $0 $0 2009-10 $0 2010-11 150,000 $150,000 2011-12 25,000 30,000 $55,000 2012-13 $0 2013-14 $0 PROJECT DESCRIPTION/STATUS PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR This project will evaluate, procure and implement software packages available to improve the SCADA Man Machine Interface or graphical software. New servers are included in the project to increase flexibility and reduce vulnerabilities and downtime. The software must be able to utilize technologies such as Terminal Services, OPC, and be compatible with the existing control hardware. In addition, it will include software and consulting to implement performance indicators, dashboards, and business data analysis to become best in class. The goal is the Integrated Architecture system leverages one common multidisciplined control engine, one development environment, one networking protocol, and one service-oriented architecture (SOA). The architecture provides fully integrated, scalable solutions for the full range of control and information disciplines. 2014-15 $0 2015-16 $0 TOTAL $0 $25,000 $180,000 $0 $205,000 Total Personnel $0 Supplies $7,500 Service $0 Capital $0 TOTAL $7,500 OPERATING COSTS First Fiscal Year Annually $0 7,500 0 $7,500 200 DISTRIBUTION PROJECTS 201 WORK ORDER #: TBD PROJECT: OVERSIZE PARTICIPATION WATER LINES PROJECT #: WTWOC FUND: Water Capital Projects PROJECT BUDGET:Annual PROJECT MANAGER: Stephen Maldonado, Jr. FUNDING SOURCES: Long Term Debt/Utility Revenue PROJECT CLIENT: Water Services These funds are available for oversize participation with developers in the construction of water lines above the minimum size needed to serve the development. This allows lines to be built large enough to meet future development without having to go back and install larger lines. Projects are identified based on development activity. FISCAL YEAR LAND ENG. CONSTR. MISC. PROJECT TOTAL Prior Years $0 $0 $0 $0 $0 2009-10 100,000 $100,000 2010-11 100,000 $100,000 2011-12 100,000 $100,000 2012-13 100 000 $100 000 PROJECT DESCRIPTION/STATUS PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR 2012-13 100,000 $100,000 2013-14 100,000 $100,000 2014-15 100,000 $100,000 2015-16 100,000 $100,000 TOTAL $0 $0 $700,000 $0 $700,000 Total Personnel $0 Supplies $0 Service $0 Capital $0 TOTAL $0$0 $0 OPERATING COSTS First Fiscal Year Annually 202 WORK ORDER #: WF0995711 PROJECT: Water Reclamation (PH I) PROJECT #: WT0110 FUND: Water Capital Projects PROJECT BUDGET: $3,606,730 PROJECT MANAGER: Daniel Beamon FUNDING SOURCES: Long Term Debt/Utility Revenue PROJECT CLIENT: Water Services / Jennifer Nations FISCAL YEAR LAND ENG. CONSTR. MISC. PROJECT TOTAL Prior Years 0 335,672 0 0 $335,672 2009-10 50,000 200,000 20,000 $270,000 2010-11 50,000 2,931,058 20,000 $3,001,058 2011-12 $0 2012-13 $0 2013-14 $0 2014-15 $0 PROJECT DESCRIPTION/STATUS PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR This project will consist of designing and constructing reclaimed water infrastructure from Carters Creek Wastewater Treatment Plant to Veterans Park. Transfer Pumps will be installed and constructed near the CCWWTP effluent outfall that will treat and pump the reclaimed water to ground storage reservoirs at Veteran's Park. Irrigation system improvements will also be made at Veterans Park for irrigation purposes. The overall reclaimed water infrastructure will help to decrease the overall peak water demand on our potable water distribution system. The land costs are for the acquisition of a public utility easement. 2014-15 $0 2015-16 $0 TOTAL $50,000 $585,672 $2,931,058 $40,000 $3,606,730 Total Personnel $20,000 Supplies $26,000 Service $30,000 Capital $0 TOTAL $76,000 20,000 OPERATING COSTS First Fiscal Year Annually $0 26,000 30,000 $76,000 203 WORK ORDER #: WF0613546 PROJECT: Wellborn Widening PROJECT #: WTWOC FUND: Water Capital Projects PROJECT BUDGET: $4,850,194 PROJECT MANAGER: Danielle Charbonnet FUNDING SOURCES: Long Term Debt/Utility Revenue PROJECT CLIENT: Water Services FISCAL YEAR LAND ENG. CONSTR. MISC. PROJECT TOTAL Prior Years 9,248 221,662 3,089,284 $3,320,194 2009-10 90,000 30,600 12,000 $132,600 2010-11 79,900 855,500 $935,400 2011-12 462,000 $462,000 2012-13 $0 2013-14 $0 2014-15 $0 2015-16 $0 PROJECT DESCRIPTION/STATUS PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR This line has been completed from Harvey Mitchell Parkway to N Graham Road. The segment from N Graham to WD Fitch has been delayed by property ownership / easement acquisition disputes. Additional funds are being requested due to construction cost escalation. The amount requested is based on the actual construction cost for initial segment of this line. TXDOT will be widening Wellborn Road. Water lines from FM 2818 to SH 40 must be relocated outside future pavement areas. It is expected that partial reimbursement will be forthcoming from TxDOT on this utility project. 2015-16 $0 TOTAL $99,248 $332,162 $4,418,784 $0 $4,850,194 Total Personnel $0 Supplies $0 Service $0 Capital $0 TOTAL $0$0 $0 OPERATING COSTS First Fiscal Year Annually 204 WORK ORDER #: WF0379197 PROJECT: Barrron Road Water Service Extension PROJECT #: WTWOC FUND: Water Capital Projects PROJECT BUDGET: $1,691,863 PROJECT MANAGER: Philip Bargas FUNDING SOURCES: Long Term Debt/Utility Revenue PROJECT CLIENT: Water Services FISCAL YEAR LAND ENG. CONSTR. MISC. PROJECT TOTAL Prior Years $3,287 $246,290 $952,287 $0 $1,201,863 2009-10 40,000 $40,000 2010-11 450,000 $450,000 2011-12 $0 2012-13 $0 2013-14 $0 2014-15 $0 2015-16 $0 PROJECT DESCRIPTION/STATUS PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR This project is to install the water distribution lines in the Barron Road and Wellborn Road area. The 18" water line along Barron Road from Victoria Road to Wellborn Road has been designed and constructed within previous phases of this project. The remaining portion of the project to be designed and constructed consists of a 12" water line along Barron Cut-Off and a 12" water line along Wellborn Road up to Southern Trace Subdivision. This project provides water service to residents within the City of College Station's Water CCN that are currently served by the Wellborn Special Utility District. 2015-16 $0 TOTAL $3,287 $286,290 $1,402,287 $0 $1,691,863 Total Personnel $0 Supplies $0 Service $0 Capital $0 TOTAL $0 OPERATING COSTS First Fiscal Year Annually $0 $0 205 PROJECT: Raymond Stotzer West FUND(S): WORK ORDER NUMBERS & BUDGET: Water: WF1111167 $3,440,000 Wastewater: WF1111168 $3,788,000 Total Project Budget: $7,228,000 PROJECT MANAGER: Danielle Charbonnet FUNDING PROJECT SOURCES: CLIENT: Water Services / Fred Surovik Project Total FISCAL YEAR LAND ENG. CONSTR. MISC. OVERHEAD PROJECT TOTAL Prior Years $0 $27,799 $0 $0 $0 This project will consist of the design and construction of water and wastewater infrastructure to an area that was annexed by the City of College Station in 1995 that is near the intersection of Raymond Stotzer West and FM2818. The project will consist of a regional lift station, sanitary sewer force main, gravity sewer lines, and water distribution lines. Design, bidding, and construction of the Raymond Stotzer West Project will include approximately 18,400 LF of water distribution line, approximately 15,000 LF of gravity sanitary sewer line, approximately 21,000 LF of sanitary sewer force main, and regional sanitary sewer lift station. Water Capital Projects Wastewater Capital Projects Long Term Debt/Utility Revenue PROJECT DESCRIPTION/STATUS PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR $27,799Prior Years $0 $27,799 $0 $0 $0 2009-10 50,000 100,000 0 0 0 2010-11 0 0 0 0 0 2011-12 0 0 0 0 0 2012-13 0 0 0 0 0 2013-14 0 0 0 0 0 2014-15 0 0 0 0 0 2015-16 0 200,000 676,758 0 0 $0 $0 PROJECT TOTAL $1,054,557$50,000 $327,799 $676,758 $876,758 $150,000 $27,799 $0 $0 $0 $0 $0 206 Water Portion FISCAL YEAR LAND ENG. CONSTR. MISC. OVERHEAD PROJECT TOTAL Prior Years $0 $9,557 $0 $0 $9,557 2009-10 5,000 50,000 $55,000 2010-11 $0 2011-12 $0 2012-13 $0 2013-14 $0 2014-15 $0 2015-16 100,000 165,000 $265,000 Water Total $5,000 $159,557 $165,000 $0 $0 $329,557 Wastewater Portion FISCAL YEAR LAND ENG. CONSTR. MISC. OVERHEAD PROJECT TOTAL Prior Years $0 $18,242 $0 $0 $18,242 2009-10 45,000 50,000 $95,000 2010-11 $0 2011-12 $0 2012-13 $0 2013-14 $0 2014-15 $0 2015-16 100,000 511,758 $611,758 Wastewater Total $45,000 $168,242 $511,758 $0 $0 $725,000 First Fiscal Year Annually Total $1,054,557PROJECT TOTAL $50,000 PROJECT CALENDAR OF EXPENDITURES BY FUND $0 OPERATING COSTS Raymond Stotzer West $0$327,799 $676,758 PROJECT: First Fiscal Year Annually Total Personnel Supplies Service Capital TOTAL TBD TBD TBD 207 WORK ORDER #: TBD PROJECT: SHWY40 Water Line Extension PROJECT #: WTWOC (Barron Rd to Graham Rd) PROJECT FUND: Water Capital Projects BUDGET: $2,586,000 PROJECT FUNDING MANAGER: Stephen Maldonado, Jr. SOURCES: Long Term Debt/Utility Revenue PROJECT CLIENT: Water Services FISCAL YEAR LAND ENG. CONSTR. MISC. PROJECT TOTAL Prior Years $0 $0 $0 $0 $0 2009-10 $0 2010-11 $0 2011-12 $0 2012-13 $0 2013-14 148,500 300,000 $448,500 2014-15 100,000 968,750 $1,068,750 2015-16 1 068 750 $1 068 750 PROJECT DESCRIPTION/STATUS PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR This project consists of an extension of a water distribution line that will complete a section of an existing 24" water distribution line. This connection will assist in proper operation of the distribution system by increasing connectivity between Dowling Road Pump Station and the Greens Prairie Elevated Storage Tank. This portion will connect the existing 24" water distribution line at Barron Rd to a future 24" water distribution line near the intersection of Wellborn Road and Graham Road. Design, bidding, and construction of the SHWY40 Water Line Extension project will include approximately 3,800 LF of 24-inch water distribution line. 2015-16 1,068,750 $1,068,750 TOTAL $148,500 $400,000 $2,037,500 $0 $2,586,000 Total Personnel $0 Supplies $0 Service $0 Capital $0 TOTAL $0$0 $0 OPERATING COSTS First Fiscal Year Annually 208 WORK ORDER #: TBD PROJECT: SHWY40 Water Line Extension PROJECT #: WTWOC (Sonoma Subdivision to Victoria Avenue) PROJECT FUND: Water Capital Projects BUDGET: $643,000 PROJECT FUNDING MANAGER: Stephen Maldonado, Jr. SOURCES: Long Term Debt/Utility Revenue PROJECT CLIENT: Water Services FISCAL YEAR LAND ENG. CONSTR. MISC. PROJECT TOTAL Prior Years $0 $0 $0 $0 $0 2009-10 $0 2010-11 $0 2011-12 $0 2012-13 $0 PROJECT DESCRIPTION/STATUS This project consists of an extension of water distribution line that will complete part of an existing 24" water distribution line. This connection will assist in proper operation of the distribution system by increasing connectivity between Dowling Road Pump Station and the Greens Prairie Elevated Storage Tank. This portion will connect the existing 24" water distribution line at the Sonoma Subdivision to the 24" water distribution line at Victoria Avenue. A portion of this line is currently being constructed as part of the Sonoma PH III Waterline Oversized Participation project. Design, bidding, and construction of the SH40 Water Line Extension project will include approximately 3,100 LF of 24-inch water distribution line. PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR 2012-13 $0 2013-14 100,000 100,000 $200,000 2014-15 443,000 $443,000 2015-16 $0 TOTAL $100,000 $100,000 $443,000 $0 $643,000 Total Personnel $0 Supplies $0 Service $0 Capital $0 TOTAL $0 OPERATING COSTS First Fiscal Year Annually $0 $0 209 WORK Patricia Street Waterline ORDER #: WF1246445 PROJECT: Aquarium Bar PROJECT #: TBD FUND: Water Capital Projects PROJECT BUDGET: WF1246445 PROJECT MANAGER:Danielle Charbonnet FUNDING SOURCES: Long Term Debt/Utility Revenue PROJECT CLIENT: Water Services / Stephen Maldonado FISCAL YEAR LAND ENG. CONSTR. MISC. OH PROJECT TOTAL Prior Years $0 $0 $0 $0 $0 2009-10 142,400 5,000 2,600 $150,000 2010-11 $0 2011-12 $0 2012-13 $0 PROJECT DESCRIPTION/STATUS This project was not included in the FY10 budget. This Northgate location is served by an old 2” water line that is not adequate to provide the fire flow required by law for high-occupancy facilities in this area to operate. On February 11, 2010, Council approved a Joint Project Contract, which will replace a line to enable the development of the Aquarium Bar. The City will replace the line this year, and the developer will pay an engineering firm to design the project, create bid documents, and provide the standard post-award design services. This will compensate the City for the reduced efficiency of replacing this line ahead of all other rehabilitation work that will need to be done in this area in the future. It is expected that the cost of the water line replacement will be under $150,000. Transferred $150,000 from the Parallel Wellfield Collection Line, WF0352553. These funds are available due to construction bids were considerably less than anticipated. PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR 03 $0 2013-14 $0 2014-15 $0 2015-16 $0 TOTAL $0 $0 $142,400 $5,000 $2,600 $150,000 Total Personnel $0 Supplies $0 Service $0 Capital $0 TOTAL $0 OPERATING COSTS First Fiscal Year Annually $0 $0 210 WORK ORDER #: WF1272122 PROJECT: FM 2818 / Jones-Butler Waterline Conflict PROJECT #: SCWOC FUND: Water Capital Projects PROJECT BUDGET: $145,000 PROJECT MANAGER: Daniel Beamon FUNDING SOURCES: Long Term Debt/Utility Revenue PROJECT CLIENT: Water Services / Stephen Maldonado, Jr. FISCAL YEAR LAND ENG. CONSTR. MISC. PROJECT TOTAL Prior Years $0 $0 $0 $0 2009-10 25,000 25,000 $50,000 2010-11 95,000 $95,000 2011-12 $0 2012-13 $0 2013-14 $0 2014-15 $0 2015-16 $0 TOTAL $0 $25 000 $120 000 $0 $145 000 PROJECT DESCRIPTION PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR TXDOT is currently building a grade separation for the intersection of FM 2818 (Harvey Mitchell Pkwy) and FM 2154 (Wellborn Road), which includes a frontage road and drainage ditch on the south side of FM 2818, west of FM 2154. An existing 30" City of College Station water transmission line located at the intersection of FM 2818 and Jones- Butler Road, and within state ROW has been uncovered during the excavation of the aforementioned drainage ditch. This project is for the design and construction of a subsurface drainage system to accommodate the storm water runoff for the area while eliminating the drainage ditch and maintaining cover over the existing 30" water transmission line. TOTAL $0 $25,000 $120,000 $0 $145,000 Total Personnel $0 Supplies $0 Service $0 Capital $0 TOTAL $0$0 $0 OPERATING COSTS First Fiscal Year Annually 211 PROJECT: Rock Prairie Road South of Carter Lake (Area 5) FUND(S): PROJECT NUMBERS & BUDGET: Water: WF0805789 $178,811 Wastewater: WF0805744 $175,000 Total Project Budget: $353,811 PROJECT MANAGER: FUNDING PROJECT SOURCES: CLIENT: Water Services /Fred Surovik Project Total FISCAL YEAR LAND ENG CONSTR MISC OVERHEAD PROJECT TOTAL Installation of waterline, lift station, force main, and gravity line to serve Area 5 (2003). Lift station costs are being shared with Area 6. This project also includes a 4" water line along Rock Prairie Road from W.D. Fitch to Lick Creek Wastewater Treatment Plant to loop the system. PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR PROJECT DESCRIPTION/STATUS Water Capital Projects Wastewater Capital Projects Long Term Debt/Utility Revenue Jeff Haeber FISCAL YEAR LAND ENG.CONSTR.MISC.OVERHEAD PROJECT TOTAL Prior Years 0 46,605 136,720 0 0 2009-10 0 0 170,485 0 0 2010-11 0 0 0 0 0 2011-12 0 0 0 0 0 2012-13 0 0 0 0 0 2013-14 0 0 0 0 0 2014-15 0 0 0 0 0 2015-16 0 0 0 0 0 $170,485 $0 $0 $0 $183,325 $0 $0 $0 $0 PROJECT TOTAL $353,810$0 $46,605 $307,205 $0 212 Water Portion FISCAL YEAR LAND ENG. CONSTR. MISC. OVERHEAD PROJECT TOTAL Prior Years 0 24,483 136,648 0 0 $161,132 2009-10 17,679 $17,679 2010-11 $0 2011-12 $0 2012-13 $0 2013-14 $0 2014-15 $0 2015-16 $0 Water Total $0 $24,483 $154,327 $0 $0 $178,811 Wastewater Portion FISCAL YEAR LAND ENG. CONSTR. MISC. OVERHEAD PROJECT TOTAL Prior Years 0 22,122 72 0 $22,194 2009-10 152,806 $152,806 2010-11 $0 2011-12 $0 2012-13 $0 2013-14 $0 2014-15 $0 2015-16 $0 Wastewater Total $0 $22,122 $152,878 $0 $0 $175,000 First Fiscal Year Annually Total Personnel $0 Supplies $0 Rock Prairie Road South of Carter Lake (Area 5)PROJECT: PROJECT CALENDAR OF EXPENDITURES BY FUND $353,810 OPERATING COSTS $0 $0PROJECT TOTAL $0 $46,605 $307,205 Supplies $0 Service $0 Capital $0 TOTAL $0 $0 $0 213 PROJECT: William D Fitch East (Area 6) FUND(S): PROJECT NUMBERS & BUDGET: Water: WF0805807 $180,686 Wastewater: WF0805756 $750,000 Total Project Budget: $930,686 PROJECT MANAGER: FUNDING PROJECT SOURCES: CLIENT: Water Services /Fred Surovik PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR Long Term Debt/Utility Revenue PROJECT DESCRIPTION/STATUS Water Capital Projects Wastewater Capital Projects Jeff Haeber Installation of lift station, gravity line, and force main to serve Annexation Area 6 (2003). Installation of water line to serve Area 6 in City's CCN. In addition, possible 2007 annexation Area 2 to add to facility. This project formerly known as "Greens Prairie Road Corridor East (Area 6). Project Total FISCAL YEAR LAND ENG. CONSTR. MISC. OVERHEAD PROJECT TOTAL Prior Years 0 63,815 37,935 0 2009-10 0 0 828,936 0 0 2010-11 0 0 0 0 0 2011-12 0 0 0 0 0 2012-13 0 0 0 0 0 2013-14 0 0 0 0 0 2014-15 0 0 0 0 0 2015-16 0 0 0 0 0 $0 $0 PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR $0PROJECT TOTAL $930,686$0 $63,815 $866,871 $0 $0 $0 $0 $101,750 $828,936 $0 214 Water Portion FISCAL YEAR LAND ENG. CONSTR. MISC. OVERHEAD PROJECT TOTAL Prior Years 0 26,750 72 0 $26,822 2009-10 153,864 $153,864 2010-11 $0 2011-12 $0 2012-13 $0 2013-14 $0 2014-15 $0 2015-16 $0 Water Total $0 $26,750 $153,936 $0 $0 $180,686 Wastewater Portion FISCAL YEAR LAND ENG. CONSTR. MISC. OVERHEAD PROJECT TOTAL Prior Years 0 37,065 37,863 0 $74,928 2009-10 675,072 $675,072 2010-11 $0 2011-12 $0 2012-13 $0 2013-14 $0 2014-15 $0 2015-16 $0 Wastewater Total $0 $37,065 $712,935 $0 $0 $750,000 First Fiscal Year Annually Total PROJECT CALENDAR OF EXPENDITURES BY FUND $0 OPERATING COSTS $930,686 William D Fitch East (Area 6) $0 PROJECT: PROJECT TOTAL $0 $63,815 $866,871 First Fiscal Year Annually Total Personnel $0 Supplies $0 Service $0 Capital $0 TOTAL $0 $0 $0 215 Home of Texas A&M University ® 216 REHABILITATION PROJECTS 217 PROJECT: South Knoll / The Glade FUND(S): PROJECT NUMBERS & BUDGET: Water: WF1044480 $2,246,738 Wastewater: WF1044485 $2,052,223 Total Project Budget: $4,298,961 PROJECT MANAGER: Edward McDonald FUNDING PROJECT SOURCES: CLIENT: Water Services / Ed Savage Long Term Debt/Utility Revenue This project includes the rehabilitation of water and wastewater lines in the Southwood area, in the vicinity of Haines Street, Southwest Parkway, Glade Street, Langford Street. The sanitary sewer lines are in need of replacement due to an increase in service disruptions caused by deteriorating lines, shallow lines, and poor access. The water distribution lines are in need of replacement due to an increase in service disruptions caused by deteriorating lines and inadequate fire protection due to the existence of smaller lines within the respective area. Design, bidding, and construction of the South Knoll/The Glade Utility Rehabilitation project will include approximately 9,800 LF of water distribution line and approximately 11,300 LF of sanitary sewer collection line. Water Capital Projects Wastewater Capital Projects PROJECT DESCRIPTION/STATUS Project Total FISCAL YEAR LAND ENG. CONSTR. MISC. PROJECT TOTAL Prior Years 0 167,519 0 0 2009-10 0 184,992 500,000 0 2010-11 0 65,372 3,381,078 0 2011-12 0 0 0 0 2012-13 0 0 0 0 2013-14 0 0 0 0 2014-15 0 0 0 0 2015-16 0 0 0 0 $684,992 PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR $0 $167,519 $3,446,450 $0 $0 PROJECT TOTAL $4,298,961$0 $417,883 $3,881,078 $0 $0 $0 218 Water Portion FISCAL YEAR LAND ENG. CONSTR. MISC. PROJECT TOTAL Prior Years 0 100,525 0 0 $100,525 2009-10 108,458 250,000 $358,458 2010-11 36,677 1,751,078 $1,787,755 2011-12 $0 2012-13 $0 2013-14 $0 2014-15 $0 2015-16 $0 Water Total $0 $245,660 $2,001,078 $0 $2,246,738 Wastewater Portion FISCAL YEAR LAND ENG. CONSTR. MISC. PROJECT TOTAL Prior Years 0 66,994 0 0 $66,994 2009-10 76,534 250,000 $326,534 2010-11 28,695 1,630,000 $1,658,695 2011-12 $0 2012-13 $0 2013-14 $0 2014-15 $0 2015-16 $0 Wastewater Total $0 $172,223 $1,880,000 $0 $2,052,223 First Fiscal Year Annually Total South Knoll / The GladePROJECT: PROJECT CALENDAR OF EXPENDITURES BY FUND OPERATING COSTS $0 $4,298,961PROJECT TOTAL $0 $417,883 $3,881,078 First Fiscal Year Annually Total Personnel $0 Supplies $0 Service $0 Capital $0 TOTAL $0 $0 $0 219 PROJECT: SOUTHWOOD 5 - 7 REHAB FUND(S): PROJECT NUMBERS & BUDGET: Water: WF1105425 $2,197,663 Wastewater: WF1105424 $2,805,515 Total Project Budget: $5,003,178 PROJECT MANAGER: Ed McDonald FUNDING PROJECT SOURCES: CLIENT: Water Services: Ed Savage PROJECT DESCRIPTION/STATUS WATER CAPITAL PROJECTS WASTEWATER CAPITAL PROJECTS Long Term Debt/Utility Revenue This project includes the rehabilitation of water and wastewater lines in the Southwood area, in the vicinity of Southwest Parkway, FM2818, Glade St., Welsh, and Shadowood. The sanitary sewer lines are in need of replacement due to an increase in service disruptions caused by deteriorating lines, shallow lines, and poor access. The water distribution lines are in need of replacement due to an increase in service disruptions caused by deteriorating lines and inadequate fire protection due to the existence of smaller lines within the respective area. Design, bidding, and construction of the Southwood 5-7 Utility Rehabilitation project will include approximately 4,000 LF of 4-inch water distribution line, approximately 2,600 LF of 6-inch water distribution line, approximately 2,000 LF of 8-inch water distribution line, approximately 6,800 LF of 12-inch water distribution line, approximately 1,200 LF of 8-inch sanitary sewer collection line, approximately 1,300 LF of 12-inch sanitary sewer collection line, and approximately 3,200 LF of 18- inch sanitary sewer collection line. Project Total FISCAL YEAR LAND ENG. CONSTR. MISC. PROJECT TOTAL Prior Years 0 235,029 0 0 2009-10 38,000 160,150 1,000,000 0 2010-11 0 83,000 3,487,000 0 2011-12 0 0 0 0 2012-13 0 0 0 0 2013-14 0 0 0 0 2014-15 0 0 0 0 2015-16 0 0 0 0 PROJECT TOTAL $5,003,178$38,000 $478,178 $4,487,000 $0 $0 $235,029 $0 $0 $0 $1,198,150 $3,570,000 $0 PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR 220 Water Portion FISCAL YEAR LAND ENG. CONSTR. MISC. PROJECT TOTAL Prior Years 0 124,088 0 0 $124,088 2009-10 80,075 435,000 $515,075 2010-11 41,500 1,517,000 $1,558,500 2011-12 $0 2012-13 $0 2013-14 $0 2014-15 $0 2015-16 $0 Water Total $0 $245,663 $1,952,000 $0 $2,197,663 Wastewater Portion FISCAL YEAR LAND ENG. CONSTR. MISC. PROJECT TOTAL Prior Years 0 110,940 0 0 $110,940 2009-10 38,000 80,075 565,000 $683,075 2010-11 41,500 1,970,000 $2,011,500 2011-12 $0 2012-13 $0 2013-14 $0 2014-15 $0 2015-16 $0 Wastewater Total $38,000 $232,515 $2,535,000 $0 $2,805,515 $38,000 $478,178 $4,487,000 $0 SOUTHWOOD 5 - 7 REHABPROJECT: PROJECT CALENDAR OF EXPENDITURES BY FUND OPERATING COSTS $5,003,178PROJECT TOTAL First Fiscal Year Annually Total Personnel $0 Supplies $0 Service $0 Capital $0 TOTAL $0 $0 $0 OPERATING COSTS 221 PROJECT: Eastgate Rehab PH IV FUND(S): PROJECT NUMBERS & BUDGET: Water: TBD $2,304,930 Wastewater: TBD $2,468,729 Total Project Budget: $4,773,659 PROJECT MANAGER: Stephen Maldonado, Jr. FUNDING PROJECT SOURCES: Long Term Debt/Utility Revenue CLIENT: Water Services Water Capital Projects Wastewater Capital Projects PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR This project consists of the replacement of water and wastewater lines in the area bounded by Lincoln Avenue to the north, Walton Drive to the east, Francis Drive to the south, and Texas Avenue to the west. The sanitary sewer lines are in need of replacement due to an increase in service disruptions caused by deteriorating materials, shallow lines, and poor access. The sanitary sewer lines were identified by Water Services Department personnel during training exercises for smoke testing that identifies inflow and infiltration. The water distribution lines are in need of replacement due to an increase in service disruptions caused by deteriorating materials and inadequate fire protection. Within certain areas of Eastgate's respective boundary, the existing water distribution does not currently meet the Unified Bryan/College Station Design Guidelines for fire protection because of existing smaller line sizes and inefficient fire hydrant spacing. Please note that the overall Eastgate Rehabilitation project is seperated ihnto Phase IV, Phase V, and Phase VI. PROJECT DESCRIPTION/STATUS Project Total FISCAL YEAR LAND ENG. CONSTR. MISC. PROJECT TOTAL Prior Years $0 $0 $0 $0 2009-10 0 0 0 0 2010-11 0 0 0 0 2011-12 0 700,000 0 0 2012-13 0 100,000 2,018,729 0 2013-14 0 0 1,954,930 0 2014-15 0 0 0 0 2015-16 0 0 0 0 PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR $0 $4,773,659 $0 $0 $700,000 $2,118,729 $1,954,930 $0 $0 PROJECT TOTAL $0 $800,000 $3,973,659 $0 222 Water Portion FISCAL YEAR LAND ENG. CONSTR. MISC. PROJECT TOTAL Prior Years $0 $0 $0 $0 $0 2009-10 $0 2010-11 $0 2011-12 350,000 $350,000 2012-13 50,000 950,000 $1,000,000 2013-14 954,930 $954,930 2014-15 $0 2015-16 $0 Water Total $0 $400,000 $1,904,930 $0 $2,304,930 Wastewater Portion FISCAL YEAR LAND ENG. CONSTR. MISC. PROJECT TOTAL Prior Years $0 $0 $0 $0 $0 2009-10 $0 2010-11 $0 2011-12 350,000 $350,000 2012-13 50,000 1,068,729 $1,118,729 2013-14 1,000,000 $1,000,000 2014-15 $0 2015-16 $0 Wastewater Total $0 $400,000 $2,068,729 $0 $2,468,729 First Fiscal Year Annually Total Personnel $0 PROJECT: Eastgate Rehab PH IV PROJECT CALENDAR OF EXPENDITURES BY FUND OPERATING COSTS $4,773,659PROJECT TOTAL $0 $800,000 $3,973,659 $0 Personnel $0 Supplies $0 Service $0 Capital $0 TOTAL $0 $0 $0 223 PROJECT: College Heights Utility Rehabilitation FUND(S): PROJECT NUMBERS & BUDGET: Water: TBD $2,232,988 Wastewater: TBD $1,288,387 Total Project Budget: $3,521,375 PROJECT MANAGER: Stephen Maldonado, Jr. FUNDING PROJECT SOURCES: CLIENT: Water Services As part of the Capital Improvement Project Identification / Prioritization process, this project should start design in FY 17-18 with construction commencing in FY 18-19. PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR Wastewater Capital Projects This project includes the rehabilitation of water and wastewater lines in the northside area, in the vicinity of Cooner Street, Eisenhower Street, University Drive, Jane Street, and Nimitz Street. The sanitary sewer lines are in need of replacement due to an increase in service disruptions caused by deteriorating lines, shallow lines, and poor access. The water distribution lines are in need of replacement due to an increase in service disruptions caused by deteriorating lines and inadequate fire protection due to the existence of smaller lines within the respective area. Design, bidding, and construction of College Heights Utility Rehabilitation project will include approximately 3,100 LF of 6-inch water distribution line, approximately 2,900 LF of 8-inch water distribution line, approximately 4,300 LF of 12-inch water distribution line, approximately 6,700 LF of 6-inch sanitary sewer collection line, and approximately 2,200 LF of 8-inch sanitary sewer collection line. Long Term Debt/Utility Revenue Water Capital Projects PROJECT DESCRIPTION/STATUS Project Total FISCAL YEAR LAND ENG. CONSTR. MISC. PROJECT TOTAL Prior Years $0 $0 $0 $0 2009-10 0 0 0 0 2010-11 0 0 0 0 2011-12 0 0 0 0 2012-13 0 0 0 0 2013-14 0 521,375 0 0 2014-15 0 0 2,000,000 0 2015-16 0 0 1,000,000 0 $3,000,000 $0 $0 $0 $0 PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR $521,375 $2,000,000 PROJECT TOTAL $3,521,375$0 $521,375 $0 $0 $1,000,000 224 Water Portion FISCAL YEAR LAND ENG. CONSTR. MISC. PROJECT TOTAL Prior Years $0 $0 $0 $0 $0 2009-10 $0 2010-11 $0 2011-12 $0 2012-13 $0 2013-14 232,988 $232,988 2014-15 1,000,000 $1,000,000 2015-16 1,000,000 $1,000,000 Water Total $0 $232,988 $2,000,000 $0 $2,232,988 Wastewater Portion FISCAL YEAR LAND ENG. CONSTR. MISC. PROJECT TOTAL Prior Years $0 $0 $0 $0 $0 2009-10 $0 2010-11 $0 2011-12 $0 2012-13 $0 2013-14 288,387 $288,387 2014-15 1,000,000 $1,000,000 2015-16 $0 Wastewater Total $0 $288,387 $1,000,000 $0 $1,288,387 First Fiscal Year Annually Total PROJECT TOTAL $521,375$0 OPERATING COSTS $0 College Heights Utility RehabilitationPROJECT: PROJECT CALENDAR OF EXPENDITURES BY FUND $3,521,375$3,000,000 First Fiscal Year Annually Total Personnel $0 Supplies $0 Service $0 Capital $0 TOTAL $0 $0 $0 225 Home of Texas A&M University ® 226 WASTEWATER CAPITAL IMPROVEMENT PROJECTS FISCAL YEAR 2010-2011 THROUGH FISCAL YEAR 2015-2016 227 WASTEWATER SERVICE CAPITAL IMPROVEMENT PROJECTS FISCAL YEAR 2010-2011 THROUGH FISCAL YEAR 2015-2016 FY11 REVISED APPROVED PROJECT WORK REQUEST APPROVED APPROPRIATIONS FY09-10 FY10-11 NUMBER NUMBER BUDGET THROUGH FY09 APPROPRIATIONS APPROPRIATIONS BEGINNING FUND BALANCE:522,649$ 76,426$ ADDITIONAL RESOURCES: UTILITY REVENUE BONDS/CERTIFICATES OF OBLIGATION 7,600,000$ 6,425,000$ INTEREST ON INVESTMENTS 25,000 7,900 TRANSFERS FROM OPERATIONS 2,700,000 825,000 INTERGOVERNMENTAL - - OTHER - - SUBTOTAL ADDITIONAL RESOURCES 10,325,000$ 7,257,900$ TOTAL RESOURCES AVAILABLE 10,847,649$ 7,334,326$ COLLECTION PROJECTS COLLECTION PLANT - SCWOC OVERSIZE PARTICIPATION - TBD 100,000 100,000 100,000 WC RAYMOND STOTZER WEST - WF1111168 3,788,000 631,130 - - WESTMINSTER SEWER LINE - WF0786101 202,564 97,000 332,314 - NANTUCKET GRAVITY SEWER WF1094676 417,938 125,000 391,000 - LICK CREEK PARALLEL TRUNK LINE - PHASE I WF0912284 2,825,000 277,615 117,881 SC VICTORIA AVENUE EXTENSION - WF1158560 25,556 5,000 20,556 NORTHEAST SEWER TRUNKLINE TBD 2,830,000 - - - CREEK MEADOWS PRELIMINARY STUDY - WF0954474 10,000 - 10,000 - ANNEXATION PROJECTS WC ROCK P RD S OF CARTER LAKE (AREA 5) - WF0805744 175,000 171,000 - - WC WILLIAM D FITCH EAST (AREA 6) - WF0805756 750,000 688,000 30,000 - SUBTOTAL REHABILITATION PROJECTS EMERALD PKWY / BENT OAK - WF0626151 297,064 297,064 - - DC BEE CREEK PH IV & V WASTEWATER - TBD 300,000 300,000 - - SC TAUBER & STASNEY REHAB - WF0625893 793,772 727,314 66,458 - WC SOUTH KNOLL / THE GLADE - WF1044485 2,052,223 1,565,976 486,247 - WC SOUTHWOOD 5-7 - WF1105424 2,805,515 2,790,294 15,221 - WC EASTGATE REHAB - TBD 2,468,729 - - - WC COLLEGE HEIGHTS REHAB - TBD 1,288,387 - - - CLOSED PROJECTS SUBTOTAL BUDGET APPROPRIATIONS 228 WASTEWATER SERVICE CAPITAL IMPROVEMENT PROJECTS FISCAL YEAR 2010-2011 THROUGH FISCAL YEAR 2015-2016 PROJECT EXPENDITURES ACTUAL ESTIMATE PROJECTED PROJECTED PROJECTED PROJECTED PROJECTED PROJECTED THROUGH FY08 FY 08-09 FY 09-10 FY 10-11 FY 11-12 FY 12-13 FY 13-14 FY 14-15 FY 15-16 3,415,150$ 929,734$ 76,426$ 69,209$ 61,675$ 63,246$ 62,581$ 83,381$ -$ 300,000$ 6,425,000$ 2,775,000$ 3,525,000$ 6,225,000$ 4,900,000$ 3,900,000$ 28,486 25,000 7,900 8,700 11,300 10,800 10,800 10,800 - 4,975,000 825,000 425,000 800,000 575,000 875,000 650,000 - - - - - - - - - - - - - - - - 28,486$ 5,300,000$ 7,257,900$ 3,208,700$ 4,336,300$ 6,810,800$ 5,785,800$ 4,560,800$ 3,443,636$ 6,229,734$ 7,334,326$ 3,277,909$ 4,397,975$ 6,874,046$ 5,848,381$ 4,644,181$ - - 100,000 100,000 100,000 100,000 100,000 100,000 100,000 - 18,242 95,000 - - - - - 611,758 24,524 102,041 76,000 - - - - - - 7,062 26,876 384,000 - - - - - - 10,381 41 100,000 - - 200,000 2,514,578 - 2,035 23,521 - - - - - - - - - 330,000 1,250,000 1,250,000 - - 10,000 - - - - - - 22,103 91 152,806 - - - - - - 28,379 46,549 675,072 - - - - - - 92,449$ 195,874$ 1,616,399$ 100,000$ 100,000$ 300,000$ 2,944,578$ 1,350,000$ 1,961,758$ 5,970 35 291,058 - - - - - - - - - - 300,000 - - - - 19,489 66,138 184,150 523,995 - - - - - 134 66,861 326,534 1,658,695 - - - - 110,940 683,075 2,011,500 - - - - - - - 350,000 1,118,729 1,000,000 - - - - - - 288,387 1,000,000 1,326,387 11,662 25,593$ 1,570,360$ 1,496,479$ 4,194,190$ 650,000$ 1,118,729$ 1,288,387$ 1,000,000$ -$ PROJECTED EXPENDITURES 229 WASTEWATER SERVICE CAPITAL IMPROVEMENT PROJECTS FISCAL YEAR 2010-2011 THROUGH FISCAL YEAR 2015-2016 FY11 REVISED APPROVED PROJECT WORK REQUEST APPROVED APPROPRIATIONS FY09-10 FY10-11 NUMBER NUMBER BUDGET THROUGH FY09 APPROPRIATIONS APPROPRIATIONS BUDGET APPROPRIATIONS TREATMENT & DISPOSAL PROJECTS TREATMENT & DISPOSAL/PUMPING PLANT - SPWOC CARTERS CREEK CLARIFIER IMPROVEMENTS WF1104545 481,390 372,000 - - CARTERS CREEK HEADWORKS IMP WF1223116 2,500,000 125,000 375,000 - CARTERS CREEK SERVICE WATER IMP WF0930104 315,507 450,000 - - LICK CREEK CLARIFIER CATWALKS WF1042497 387,500 250,000 137,500 - SLUDGE TREATMENT & DISPOSAL/PUMPING PLANT - SSWOC LICK CREEK CENTRIFUGE IMPROVEMENTS WF1142617 485,575 50,000 350,000 85,575 LICK CREEK SLUDGE HOLDING TANK IMP WF1142618 409,893 97,514 402,486 - CARTERS CREEK ATAD IMPROVEMENTS WF1104547 914,000 900,000 14,000 - CC GRAVITY THICKENER - WF1104543 236,000 281,000 - - LICK CREEK RETURN ACTIVATED SLUDGE MODIFICATIONS WF1142623 250,000 60,000 190,000 - CC CENTRIFUGE IMPROVEMENTS WF1142617 2,178,000 - - - LICK CREEK SLUDGE BLOWER REPLACEMENT TBD 200,000 - - - CC TREATMENT STRUCTURE COATINGS REPLACEMENT TBD 366,000 - - - CARTERS CREEK ATAD EXPANSION TBD 1,200,000 - - - LICK CREEK DIGESTION FACILITY TBD 4,000,000 - - - LICK CREEK CAPACTIY EXPANSION TBD 6,734,662 - - - CLOSED PROJECTS SEWER GENERAL PLANT - SGWOC SCADA REPLACEMENT - WF0742950 545,340 362,000 83,340 100,000 CARTERS CREEK LAB AND SCADA BUILDING WF1129844 1,165,087 100,000 840,000 225,087 CARTER CREEK PROCESS CONTROL IMPROVEMENTS WF1104553 438,957 330,000 - - LICK CREEK PROCESS CONTROL IMPROVEMENTS WF1142624 203,000 105,500 97,500 - SCADA - NEW LIFT STATIONS TBD 240,000 - 80,000 80,000 REMOTE PLANT SECURITY - WF1219655 300,000 - 300,000 - CC FIBER RING TBD 450,000 - 120,000 - LICK CREEK GENERATOR REPLACEMENT TBD 700,000 - - - CC ELECTRICAL IMPROVEMENTS - TBD 1,300,000 - - - WC UTILITY SERVICE CENTER RENOVATIONS TBD 348,000 - - 37,500 AGGIE ACRES FIBER OPTIC CONDUIT - TBD 76,175 - - - THICKENER BLDG ROOF UPGRADE - TBD 35,000 - 35,000 - CLOSED PROJECTS -100,000 SUBTOTAL CAPITAL PROJECTS CONTINGENCY TBD - 75,000 150,000 CAPITAL PROJECTS SUBTOTAL 4,769,503$ 778,162$ GENERAL AND ADMINISTRATIVE 77,890 70,299 DEBT ISSUANCE COST 30,000 35,000 TOTAL EXPENDITURES 4,877,393$ 883,461$ MEASUREMENT FOCUS ADJUSTMENT ENDING FUND BALANCE:5,970,256$ 6,450,865$ SC Project funded through combination of sources. Project sheet reflected in Streets section of CIP document. WC Project funded through combination of sources. Project sheet reflected in Combo Water/Wastewater section of CIP document. DC Project funded through combination of sources. Project sheet reflected in Drainage section of CIP document. 230 WASTEWATER SERVICE CAPITAL IMPROVEMENT PROJECTS FISCAL YEAR 2010-2011 THROUGH FISCAL YEAR 2015-2016 PROJECT EXPENDITURES ACTUAL ESTIMATE PROJECTED PROJECTED PROJECTED PROJECTED PROJECTED PROJECTED THROUGH FY08 FY 08-09 FY 09-10 FY 10-11 FY 11-12 FY 12-13 FY 13-14 FY 14-15 FY 15-16 PROJECTED EXPENDITURES - 25,690 455,700 - - - - - - - - 135,000 - 1,235,000 1,130,000 - - - - 35,507 280,000 - - - - - - 1,806 6,568 52,000 327,126 - - - - - 4,575 78,000 403,000 - - - - - 4,893 80,000 325,000 - - - - - 10,641 113,600 129,700 660,059 - - - - 15,956 220,044 - - - - - - - 676 72,324 177,000 - - - - - - - - - - 475,000 1,068,000 635,000 - - - - - 200,000 - - - - - - - - - 366,000 - - - - - - - - - - 325,000 875,000 - - - - - - - 1,600,000 1,200,000 - - - - - - - - 300,000 433,290 1,683 115,144 33,894 186,000 210,302 - - - - - - 19,087 260,000 886,000 - - - - - - 85,957 353,000 - - - - - - - 2,811 60,189 140,000 - - - - - - 80,000 80,000 80,000 - - - - - 300,000 - - - - - - - - 120,000 - - - 330,000 - - - - - - - - 70,000 630,000 - - - - - 680,000 620,000 - - - - - 37,500 - 50,000 260,500 - - - - - 76,175 - - - - - - 35,000 - - - - - - 116,950$ 679,544$ 2,882,540$ 2,715,628$ 2,251,234$ 2,701,000$ 2,348,500$ 3,190,000$ 2,375,000$ 75,000 150,000 150,000 150,000 150,000 150,000 150,000 234,992$ 2,445,778$ 6,070,418$ 7,159,818$ 3,151,234$ 4,269,729$ 6,731,465$ 5,690,000$ 4,486,758$ 82,227 77,890 70,299 50,000 50,000 50,000 50,000 50,000 - 5,000 35,000 15,000 15,000 30,000 25,000 20,000 2,528,005$ 6,153,308$ 7,265,117$ 3,216,234$ 4,334,729$ 6,811,465$ 5,765,000$ 4,556,758$ 14,103$ 929,734$ 76,426$ 69,209$ 61,675$ 63,246$ 62,581$ 83,381$ 87,423$ 231 COLLECTION 232 WORK Oversized Participation ORDER #: TBD PROJECT: Wastewater Lines PROJECT #: SCWOC FUND: PROJECT BUDGET:ANNUAL PROJECT MANAGER: Stephen Maldonado, Jr. FUNDING SOURCES: Long Term Debt/Utility Revenue PROJECT CLIENT: Water Services These funds are available for oversize participation with developers in the construction of sewer lines above the minimum size needed to serve the development. This allows lines to be built large enough to meet future development without having to go back and install larger lines. Projects are identified based on development activity. FISCAL YEAR LAND ENG. CONSTR. MISC. PROJECT TOTAL Prior Years $0 $0 $0 $0 $0 2009-10 100,000 $100,000 2010-11 100,000 $100,000 2011-12 100,000 $100,000 2012-13 100 000 $100 000 Wastewater Capital Projects PROJECT DESCRIPTION PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR 2012-13 100,000 $100,000 2013-14 100,000 $100,000 2014-15 100,000 $100,000 2015-16 100,000 $100,000 TOTAL $0 $0 $700,000 $0 $700,000 Total Personnel $0 Supplies $0 Service $0 Capital $0 TOTAL $0 OPERATING COSTS First Fiscal Year Annually $0 $0 233 WORK ORDER #: WF0786101 PROJECT: Westminster Sewer Line PROJECT #: SCWOC FUND: PROJECT BUDGET: $202,564 PROJECT MANAGER: Daniel Beamon FUNDING SOURCES: Long Term Debt/Utility Revenue PROJECT CLIENT: Water Services / Stephen Maldonado, Jr. FISCAL YEAR LAND ENG. CONSTR. MISC. PROJECT TOTAL Prior Years $60,140 $64,533 $1,892 $0 $126,564 2009-10 6,000 70,000 $76,000 2010-11 $0 2011-12 $0 2012-13 $0 2013-14 $0 2014-15 $0 2015 16 $0 Wastewater Capital Projects PROJECT DESCRIPTION TxDOT will be widening Wellborn Road from FM 2818 down to near Barron Road. A gravity sewer line will be designed to serve properties along Wellborn Road and Barron Road. The land acquisition portion of the project was transferred from West Park Wastewater Project, which came in under budget. Staff considers this proposed sanitary sewer line to be of great priority, because customers along Wellborn Road are served by on-site sewerage systems. These on-site systems present potential conflicts between the proposed water line included in the Capital Improvement Project entitled "Barron Road Water Service Extension". Delays have been encountered acquiring land acquisition. PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR 2015-16 $0 TOTAL $60,140 $70,533 $71,892 $0 $202,564 Total Personnel $0 Supplies $0 Service $0 Capital $0 TOTAL $0$0 $0 OPERATING COSTS First Fiscal Year Annually 234 WORK ORDER #: WF1094676 PROJECT: Nantucket Gravity Line PROJECT #: SCWOC FUND: PROJECT BUDGET: $417,938 PROJECT MANAGER: Daniel Beamon FUNDING SOURCES: Long Term Debt/Utility Revenue PROJECT CLIENT: Water Services / Stephen Maldonado, Jr. FISCAL YEAR LAND ENG. CONSTR. MISC. PROJECT TOTAL Prior Years $0 $33,938 $0 $0 $33,938 2009-10 10,000 374,000 $384,000 2010-11 $0 2011-12 $0 2012-13 $0 Wastewater Capital Projects PROJECT DESCRIPTION PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR This work was previously included with the Project titled "Nantucket Lift Station". The work has been separated to clarify the expenditures. This project originally consisted of the removal of the existing Nantucket Lift Station and force main to be replaced with gravity sanitary sewer. During design, it was determined that the gravity sewer line would require a horizontal bore under State Hwy 6 in order to maintain proper gravity sewer grades, therefore, the overall scope and budget of the project have since been updated. This project needs to be completed as promptly as possible as installing the gravity line represents a better value for our ratepayers. 2012-13 $0 2013-14 $0 2014-15 $0 2015-16 $0 TOTAL $0 $43,938 $374,000 $0 $417,938 Total Personnel $0 Supplies $0 Service $0 Capital $0 TOTAL $200 OPERATING COSTS First Fiscal Year Annually $0 200 $200 235 WORK ORDER #: WF0912284 PROJECT: Lick Creek Parallel Trunkline PH I PROJECT #: SCWOC FUND: PROJECT BUDGET: $2,825,000 PROJECT MANAGER: Daniel Beamon FUNDING SOURCES: Long Term Debt/Utility Revenue PROJECT CLIENT: Water Services / Stephen Maldonado, Jr. FISCAL YEAR LAND ENG. CONSTR. MISC. PROJECT TOTAL Prior Years $0 $10,422 $0 $0 $10,422 2009-10 100,000 $100,000 2010-11 $0 2011-12 $0 2012-13 200,000 $200,000 2013-14 100,000 2,414,578 $2,514,578 2014 15 $0 Wastewater Capital Projects PROJECT DESCRIPTION PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR This project will consist of design and contraction of a parallel or replacement trunkline from the southern boundary of Pebble Creek Subdivision to the Lick Creek Wastewater Treatment Plant. This project phase may consist of a parallel line to the existing 18" sewer line, with a possible design to install an ultimate 42" line. This original trunkline serves a large portion of sanitary sewer customers that are south of Barron Road and was originally installed as an 18" line to serve Pebble Creek. Design, bidding, and construction of the Lick Creek Trunkline PH I project will include approximately 5,400 LF of wastewater collection system line. 2014-15 $0 2015-16 $0 TOTAL $0 $410,422 $2,414,578 $0 $2,825,000 Total Personnel $0 Supplies $0 Service $0 Capital $0 TOTAL $0 OPERATING COSTS First Fiscal Year Annually $0 $0 236 WORK ORDER #: TBD PROJECT: Northeast Sewer Trunkline PH I PROJECT #: SCWOC FUND: PROJECT BUDGET: $2,830,000 PROJECT FUNDING MANAGER: Ed Savage SOURCES: Long Term Debt/Utility Revenue PROJECT CLIENT: Water Services FISCAL YEAR LAND ENG. CONSTR. MISC. PROJECT TOTAL Prior Years $0 $0 $0 $0 $0 2009-10 $0 2010-11 $0 Wastewater Capital Projects PROJECT DESCRIPTION/STATUS PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR The Northeast Sewer Trunkline currently serves areas West of SH 6 including Northgate, Hensel Park, Chimney Hills, and the Gateway development. This trunkline also serves areas East of SH 6 spanning from FM 60 south to Carters Creek Wastewater Treatment Plant. Much of the existing trunkline was constructed in 1973 and spans along Carters Creek from SH 6 to the Carters Creek Wastewater Treatment Plant. This project phase will replace the existing line with a larger diameter line, from Harvey Road to the Carters Creek Wastewater Treatment Plant, to increase capacity while also relocating the proposed line further away from the wandering creek bank. This trunkline replacement and relocation is necessary to proactively prevent surcharge events, emergency failures caused by erosion, and possible fines from TCEQ. Water Services is currenting cleaning and inspecting the existing trunkline to determine how quickly this work must be completed. Design, bidding, and construction of the Northeast Trunkline PH I project will include approximately 9,300 LF of wastewater collection system line. 2011-12 $0 2012-13 $0 2013-14 150,000 180,000 $330,000 2014-15 1,250,000 $1,250,000 2015-16 1,250,000 $1,250,000 TOTAL $150,000 $180,000 $2,500,000 $0 $2,830,000 Total Personnel $0 Supplies $0 Service $0 Capital $0 TOTAL $0 OPERATING COSTS First Fiscal Year Annually $0 $0 237 WORK ORDER #: WF0954474 PROJECT: PROJECT #: SCWOC Preliminary Study FUND: PROJECT BUDGET: $10,000 PROJECT MANAGER: Stephen Maldonado, Jr FUNDING SOURCES: Long Term Debt/Utility Revenue PROJECT CLIENT: Water Services FISCAL YEAR LAND ENG. CONSTR. MISC. PROJECT TOTAL Prior Years $0 2009-10 10,000 $10,000 2010-11 $0 2011-12 $0 2012-13 $0 2013-14 $0 2014-15 $0 2015-16 $0 Creek Meadows Lift Station Expansion Wastewater Capital Projects PROJECT DESCRIPTION/STATUS This project consists of a preliminary study for increasing the capacity of the existing Creek Meadows Lift Station in order to serve a larger area. The existing Creek Meadows Lift Station was designed and constructed with the Creek Meadows Subdivision and is located near the intersection of Greens Prairie Trail and Royder Road. PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR 2015-16 $0 TOTAL $0 $10,000 $0 $0 $10,000 Total Personnel $0 Supplies $0 Service $0 Capital $0 TOTAL $0 First Fiscal Year Annually OPERATING COSTS 238 REHABILITATION PROJECTS 239 WORK ORDER #: WF0626151 PROJECT: PROJECT #: SCWOC FUND: PROJECT BUDGET: $297,064 PROJECT MANAGER: Ed Savage FUNDING SOURCES: Long Term Debt/Utility Revenue PROJECT CLIENT: Water Services FISCAL YEAR LAND ENG. CONSTR. MISC. PROJECT TOTAL Prior Years $1,088 $4,918 $6,006 2009-10 291,058 $291,058 2010-11 $0 2011-12 $0 2012-13 $0 2013-14 $0 2014-15 $0 2015-16 $0 TOTAL $1,088 $4,918 $291,058 $0 $297,064 This project consists of a new alignment of a wastewater collection line that will be installed to provide better flow hydraulics and will have sealed and bolted manholes. This construction will correct poor flow conveyance through the particular sewer segment and high levels of infiltration and inflow in the sewer basin upstream of the area. This project is development driven and Water Services will be working with the land owner to construct. Phase I of this project will consist of realigning a segment of the respective line with Phase II consisting of removing and replacing a portion on line in place. Design, bidding, and construction of the Emerald Parkway/Bent Oak Sanitary Sewer Line project will include approximately 1,000 LF of wastewater collection system line. PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR Wastewater Capital Projects Emerald Parkway / Bent Oak PROJECT DESCRIPTION/STATUS TOTAL $1,088 $4,918 $291,058 $0 $297,064 Total Personnel $9,325 Supplies $0 Service $0 Capital $0 TOTAL $9,325 $3,125 OPERATING COSTS First Fiscal Year Annually $6,200 $6,200 $3,125 240 TREATMENT 241 WORK ORDER #: WF1104545 PROJECT:Carters Creek Clarifier Improvements PROJECT #: SPWOC (CC Misc Improvements) FUND: PROJECT BUDGET: $481,390 PROJECT MANAGER: Philip Bargas FUNDING SOURCES: Long Term Debt/Utility Revenue PROJECT CLIENT: Water Services / Doug Wallace FISCAL YEAR LAND ENG. CONSTR. MISC. PROJECT TOTAL Prior Years $0 $13,098 $12,592 $0 $25,690 2009-10 5,700 450,000 $455,700 2010-11 $0 2011-12 $0 Provide funds for improvements to the Carters Creek Wastwater Treatment Plant Clarifiers. This project has been bundled with the Service Water, ATAD, Gravity Thickener, and Process Control Improvements projects to provide a more attractive bid package. Improvements include: PROJECT DESCRIPTION/STATUS PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR Wastewater Capital Projects * Replace clarifier rake drives and walkway surfaces on Clarifiers 2B and 3B * Install safety rails around Clarifiers 2B and 3B. * Engineering to replace clarifier rake drives and walkway surfaces on Clarifiers 2B and 3B * Painting all equipment on clarifiers 2A, 2B, 3A, and 3B * Install an operating platform and replace the walkway surfaces on Clarifiers 2B and 3B 2011-12 $0 2012-13 $0 2013-14 $0 2014-15 $0 2015-16 $0 TOTAL $0 $18,798 $462,592 $0 $481,390 Total Personnel $1,500 Supplies $200 Service $1,000 Capital $0 TOTAL $2,700 $1,500 OPERATING COSTS First Fiscal Year Annually $0 $200 $1,000 $0 $2,700 242 WORK ORDER #: WF1223116 PROJECT: PROJECT #: SPWOC FUND: PROJECT BUDGET: $2,500,000 PROJECT MANAGER:Philip Bargas FUNDING SOURCES: Long Term Debt/Utility Revenue PROJECT CLIENT: Water Services / Doug Wallace FISCAL YEAR LAND ENG. CONSTR. MISC. PROJECT TOTAL Prior Years $0 $0 $0 $0 $0 2009-10 135,000 $135,000 2010-11 $0 2011-12 275,000 960,000 $1,235,000 Carters Creek Headworks Improvements This project is to provide funds for engineering and construction to complete needed improvements to the Carters Creek Wastewater Treatment Plant's Headworks Facility. The completed project will make the headworks facility more efficient and allow for easier maintenance of the individual equipment components. The project scope includes replacing the motorized bar screens with more efficient step screens; designing, constructing, and installing more efficient replacements for the current grit bridges; overhauling the shaftless screw conveyor; and installing mixers in the wells at the end of the grit bridges. PROJECT DESCRIPTION/STATUS PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR Wastewater Capital Projects ,,$, , 2012-13 30,000 1,100,000 $1,130,000 2013-14 $0 2014-15 $0 2015-16 $0 TOTAL $0 $440,000 $2,060,000 $0 $2,500,000 Total Personnel $2,500 Supplies $1,000 Service $80,000 Capital $0 TOTAL $83,500$0 $1,000 $80,000 $83,500 OPERATING COSTS First Fiscal Year Annually $2,500 243 WORK ORDER #: WF0930104 PROJECT: PROJECT #: SPWOC (CC Misc Improvements) FUND: PROJECT BUDGET: $315,507 PROJECT MANAGER: Philip Bargas FUNDING SOURCES: Long Term Debt/Utility Revenue PROJECT CLIENT: Water Services / Doug Wallace FISCAL YEAR LAND ENG. CONSTR. MISC. PROJECT TOTAL Prior Years $0 $35,507 $0 $0 $35,507 2009-10 20,000 260,000 $280,000 2010-11 $0 * An above ground level PVC injection point Carters Creek Service Water Improvements PROJECT DESCRIPTION/STATUS Provide funds for improvements to Carters Creek Service Water System. This project has been bundled with the ATAD, Clarifier, Gravity Thickener, and Process Control Improvements projects to provide a more attractive bid package. Aspects of the project are proposed to include: * Replace the current service water screen with a self-cleaning model Wastewater Capital Projects PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR * An improved bleach pump * A cover for the entire system * A paved drive for the bulk delivery of bleach * Install complete bleach injection system with a bulk liquid bleach tank * Replace the two service water pumps with more efficient model 2010-11 $0 2011-12 $0 2012-13 $0 2013-14 $0 2014-15 $0 2015-16 $0 TOTAL $0 $55,507 $260,000 $0 $315,507 Total Personnel $2,000 Supplies $20,000 Service $6,000 Capital $0 TOTAL $28,000$0 20,000 6,000 $28,000 First Fiscal Year Annually 2,000 OPERATING COSTS 244 WORK ORDER #: WF1042497 PROJECT: Lick Creek Clarifier Catwalks PROJECT #: SPWOC (Lick Creek Misc Improvements) FUND: PROJECT BUDGET: $387,500 PROJECT MANAGER: Philip Bargas FUNDING SOURCES: Long Term Debt/Utility Revenue PROJECT CLIENT: Water Services / Doug Wallace FISCAL YEAR LAND ENG. CONSTR. MISC. PROJECT TOTAL Prior Years $0 $8,374 $0 $0 $8,374 2009-10 25,000 27,000 $52,000 2010-11 12,000 315,126 $327,126 2011-12 $0 2012-13 $0 Wastewater Capital Projects PROJECT DESCRIPTION/STATUS PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR Provide funds for constructing catwalks around the Lick Creek Wastewater Treatment Plant Clarifiers. The catwalks will provide safe access for the operators to operate and maintain the clarifiers. This is an important safety and operational project. This project has been bundled together with the Return Activated Sludge Modifications, Sludge Holding Tank, Centrifuge, and the Process Control Improvements projects to provide a more attractive bid package. 03 $0 2013-14 $0 2014-15 $0 2015-16 $0 TOTAL $0 $45,374 $342,126 $0 $387,500 Total Personnel $0 Supplies $0 Service $0 Capital $0 TOTAL $0$0 0 0 $0 $0 OPERATING COSTS First Fiscal Year Annually 245 WORK Lick Creek Centrifuge Improvements ORDER #: WF1142617 PROJECT:(Lick Creek Misc Improvements)PROJECT #: SSWOC FUND: PROJECT BUDGET: $485,575 PROJECT MANAGER: Philip Bargas FUNDING SOURCES: Long Term Debt/Utility Revenue PROJECT CLIENT: Water Services / Doug Wallace FISCAL YEAR LAND ENG. CONSTR. MISC. OVERHEAD PROJECT TOTAL Prior Years $0 $4,575 $0 $0 $4,575 2009-10 58,000 20,000 $78,000 2010-11 23,000 380,000 $403,000 2011-12 $0 2012-13 $0 2013-14 $0 2014-15 $0 PROJECT DESCRIPTION/STATUS PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR Wastewater Capital Projects Provide funds for improvements to Lick Creek Wastewater Treatment Plant Centrifuge. These include installing a larger sludge discharge hopper, a sludge conveyor replacing the current Moyno pump, and a work platform around the centrifuge. This project has been bundled together with the Return Activated Sludge Modifications, Sludge Holding Tank, Clarifier Catwalks, and the Process Control Improvements projects to provide a more attractive bid package. 05 $0 2015-16 $0 TOTAL $0 $85,575 $400,000 $0 $0 $485,575 Total Personnel $0 Supplies $0 Service $0 Capital $0 TOTAL $0$0 $0 OPERATING COSTS First Fiscal Year Annually 246 WORK ORDER #: WF1142618 PROJECT: PROJECT #: SSWOC (Lick Creek Misc Improvements) FUND: PROJECT BUDGET: $409,893 PROJECT MANAGER:Philip Bargas FUNDING SOURCES: Long Term Debt/Utility Revenue PROJECT CLIENT: Water Services / Doug Wallace FISCAL YEAR LAND ENG. CONSTR. MISC. PROJECT TOTAL Prior Years $0 $4,893 $0 $0 $4,893 2009-10 50,000 30,000 $80,000 2010-11 25,000 300,000 $325,000 2011-12 $0 2012-13 $0 Lick Creek Sludge Holding Tank Improvements PROJECT DESCRIPTION/STATUS Wastewater Capital Projects Provide funds to expand the size of the Waste Sludge Holding Tank at Lick Creek Wastewater Treatment Plant. The construction cost include up-sizing one positive displacement blower to aerate the increased volume of sludge in the holding tank in case two of the current blowers cannot provide the correct amount of aeration. This project has been bundled together with the Return Activated Sludge Modifications, Centrifuge, Clarifier Catwalks, and the Process Control Improvements projects to provide a more attractive bid package. PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR 2012 13 $0 2013-14 $0 2014-15 $0 2015-16 $0 TOTAL $0 $79,893 $330,000 $0 $409,893 Total Personnel $0 Supplies $0 Service $0 Capital $0 TOTAL $0 OPERATING COSTS First Fiscal Year Annually $0 $0 247 WORK ORDER #: WF1104547 PROJECT: Carters Creek ATAD Improvements PROJECT #: SSWOC (CC Misc Improvements) FUND: PROJECT BUDGET: $914,000 PROJECT MANAGER: Philip Bargas FUNDING SOURCES: Long Term Debt/Utility Revenue PROJECT CLIENT: Water Services / Doug Wallace FISCAL YEAR LAND ENG. CONSTR. MISC. PROJECT TOTAL Prior Years $0 $10,353 $0 $288 $10,641 2009-10 3,600 110,000 $113,600 2010-11 95,700 34,000 $129,700 2011-12 25,000 635,059 $660,059 Provide funds for constructing catwalks around the Carters Creek ATAD reactors, replacing the ATAD motor operated valves, and rehabilitating the ATAD cooling water system. This project has been bundled with the Clarifier, Service Water, Gravity Thickener, and the Process Control Improvements projects to provide a more attractive bid package. Improvements include: * Rehabilitate the cooling water system to better cool Reactor 3 and to transfer heat to Reactors 1 and 2 when needed. * Install catwalks to minimize the need for operators to walk across the tops of the reactors to perform day-to- day tasks, increasing safety for the operators and minimizing wear on the insulation and tops of the reactors. * Replace the motor operated valves with more efficient ones. PROJECT DESCRIPTION/STATUS PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR Wastewater Capital Projects ,,$, 2012-13 $0 2013-14 $0 2014-15 $0 2015-16 $0 TOTAL $0 $134,653 $779,059 $288 $914,000 Total Personnel $0 Supplies $0 Service $0 Capital $0 TOTAL $0 OPERATING COSTS First Fiscal Year Annually $0 $0 248 WORK ORDER #: WF1104543 PROJECT:Carters Creek Gravity Thickener PROJECT #: SSWOC (CC Misc Improvements) FUND: PROJECT BUDGET: $236,000 PROJECT MANAGER: Philip Bargas FUNDING SOURCES: Long Term Debt/Utility Revenue PROJECT CLIENT: Water Services / Doug Wallace FISCAL YEAR LAND ENG. CONSTR. MISC. PROJECT TOTAL Prior Years $0 $15,956 $0 $0 $15,956 2009-10 1,600 218,444 $220,044 2010-11 $0 2011-12 $0 2012-13 $0 2013-14 $0 2014-15 $0 2015-16 $0 Wastewater Capital Projects PROJECT DESCRIPTION/STATUS Provide funds for improvements to the Carters Creek Wastwater Ttreatment Plant Gravity Thickener. This project has been bundled with the Service Water, ATAD, Clarifier, and Process Control Improvements projects to provide a more attractive bid package. Improvements include: * Engineering to replace drive and disconnect switch * Conduct assessment and recommend if basin interior requires recoating * Coordinate outages to maintain proper plant operation * These improvements are additive alternates PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR 2015-16 $0 TOTAL $0 $17,556 $218,444 $0 $236,000 Total Personnel $0 Supplies $0 Service $0 Capital $0 TOTAL $0 OPERATING COSTS First Fiscal Year Annually $0 249 WORK Lick Creek Return Activated Sludge ORDER #: WF1142623 PROJECT: Modifications PROJECT #: SPWOC FUND: PROJECT BUDGET: $250,000 PROJECT MANAGER: Philip Bargas FUNDING SOURCES: Long Term Debt/Utility Revenue PROJECT CLIENT: Water Services / Doug Wallace FISCAL YEAR LAND ENG. CONSTR. MISC. PROJECT TOTAL Prior Years $0 $676 $0 $0 $676 2009-10 40,000 32,324 $72,324 2010-11 22,000 155,000 $177,000 2011-12 $0 $ (Lick Creek Misc Improvements) PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR Wastewater Capital Projects PROJECT DESCRIPTION/STATUS Recent increases in plant loading have made it necessary to run both trains of the Lick Creek Wastewater Treatment Plant. It was found that the Return Activated Sludge Pumps will not consistently pump Return Activated Sludge at an appropriate rate. This is a critical function essential to meeting TCEQ mandated treatment requirements. This project will reconfigure the sludge piping so that the pumps will perform acceptably. This project has been bundled together with the Sludge Holding Tanks, Centrifuge, Clarifier Catwalk, and the Process Control Improvements projects to provide a more attractive bid package. 2012-13 $0 2013-14 $0 2014-15 $0 2015-16 $0 TOTAL $0 $62,676 $187,324 $0 $250,000 Total Personnel $0 Supplies $0 Service $0 Capital $0 TOTAL $0$0 $0 First Fiscal Year Annually OPERATING COSTS 250 WORK ORDER #: WF1142617 PROJECT: PROJECT #: SSWOC FUND: PROJECT BUDGET: $2,178,000 PROJECT MANAGER: Brian J. Smith FUNDING SOURCES: Long Term Debt/Utility Revenue PROJECT CLIENT: Water Services FISCAL YEAR LAND ENG. CONSTR. MISC. PROJECT TOTAL Prior Years $0 $0 $0 $0 $0 2009-10 $0 2010-11 $0 2011-12 $0 2012-13 275,000 200,000 $475,000 2013-14 68,000 1,000,000 $1,068,000 Carters Creek Centrifuge Improvements This project is to provide funds for improvements to the existing Carters Creek Wastewater Treatment Plant sludge dewatering system. The scope of this project includes improvements to the existing centrifuges' operational control and energy efficiency. This project also includes the installation of a second, redundant centrifuge. This additional equipment will ensure the critical plant process of dewatering sludge is completed as needed, and thereby minimizing Plant odors. This project has not yet entered the design phase. PROJECT DESCRIPTION/STATUS PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR Wastewater Capital Projects 2013 14 68,000 1,000,000 $1,068,000 2014-15 35,000 600,000 $635,000 2015-16 $0 TOTAL $0 $378,000 $1,800,000 $0 $2,178,000 Total Personnel $0 Supplies $0 Service $0 Capital $0 TOTAL $0 First Fiscal Year Annually OPERATING COSTS $0 $0 251 WORK ORDER #: TBD PROJECT: PROJECT #: SSWOC FUND: PROJECT BUDGET: $200,000 PROJECT MANAGER: Brian J. Smith FUNDING SOURCES: Long Term Debt/Utility Revenue PROJECT CLIENT: Water Services FISCAL YEAR LAND ENG. CONSTR. MISC. PROJECT TOTAL Prior Years $0 2009-10 $0 2010-11 $0 2011-12 200,000 $200,000 2012-13 $0 2013-14 $0 2014-15 $0 2015-16 $0 Wastewater Capital Projects PROJECT DESCRIPTION/STATUS This project will replace the current blower units which are at the end of their service life. New blowers are needed to maintain quality of sludge during storage, before dewatering. The existing sludge blowers are now obsolete, so finding spare parts for these are difficult. PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR Lick Creek Sludge Blower Replacement 2015-16 $0 TOTAL $0 $0 $200,000 $0 $200,000 Total Personnel $0 Supplies $0 Service $0 Capital $0 TOTAL $0$0 $0 First Fiscal Year Annually OPERATING COSTS 252 WORK ORDER #: TBD PROJECT: PROJECT #: SPWOC FUND: PROJECT BUDGET $366 000 CARTERS CREEK TREATMENT STRUCTURE COATINGS REPLACEMENT WASTEWATER CAPITAL PROJECTS BUDGET: $366,000 PROJECT MANAGER: Brian J. Smith FUNDING SOURCES: Long Term Debt/Utility Revenue PROJECT CLIENT: Water Services / Doug Wallace PROJECT DESCRIPTION/STATUS Provide funding for engineering and construction services to install new coatings and perform some minor structural repairsProvide funding for engineering and construction services to install new coatings and perform some minor structural repairs to Plant clarifiers and the gravity thickener. These are issues which were were discovered, and quantified, during the Carters Creek Clarifier Improvement Project, but could not be addressed in that project due to budget constraints. These repairs are necessary to ensure that we realize the full service life of the equipment and we remain in full regulatory compliance. FISCAL YEAR LAND ENG. CONSTR. MISC. PROJECT TOTAL Prior Years $0 $0 $0 $0 $0 2009-10 $0 2010-11 $0 PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR 2010 11 $0 2011-12 $0 2012-13 45,000 321,000 $366,000 2013-14 $0 2014-15 $0 2015-16 $0 TOTAL $0 $25,690 $321,000 $0 $366,000 Total Personnel $0 Supplies $0 Service $0 Capital $0 TOTAL $0 First Fiscal Year Annually OPERATING COSTS $0 $0 $0 $0 $0 $0 253 WORK ORDER #: TBD PROJECT: PROJECT #: SSWOC FUND: PROJECT BUDGET: $1,200,000 PROJECT MANAGER: Brian J. Smith FUNDING SOURCES: Long Term Debt/Utility Revenue PROJECT CLIENT: Water Services FISCAL YEAR LAND ENG. CONSTR. MISC. PROJECT TOTAL Prior Years $0 2009-10 $0 2010-11 $0 2011-12 $0 2012-13 $0 2013-14 $0 2014-15 150,000 175,000 $325,000 2015-16 50,000 825,000 $875,000 Carters Creek ATAD Expansion Wastewater Capital Projects PROJECT DESCRIPTION/STATUS The existing sludge digestion facilities at Carters Creek Wastewater Treatment Plant are at their capacity during peak flows and need to be expanded. This project provides for the expansion of the existing sludge digestion facility capacity to handle increased volumes of future flows and the expected increased strength of future flows. Also, this fourth ATAD reactor will provide some redundancy and flexibility with regards to operational and maintenance tasks. This project has not yet entered the design phase. PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR 2015-16 50,000 825,000 $875,000 TOTAL $0 $0 $200,000 $1,000,000 $1,200,000 Total Personnel $1,200 Supplies $0 Service $30,000 Capital $0 TOTAL $31,200 30,000 $31,200 First Fiscal Year Annually $1,200 OPERATING COSTS 254 WORK ORDER #: TBD PROJECT: PROJECT #: SSWOC FUND: PROJECT BUDGET: $4,000,000 PROJECT MANAGER: Brian J. Smith FUNDING SOURCES: Long Term Debt/Utility Revenue PROJECT CLIENT: Water Services FISCAL YEAR LAND ENG. CONSTR. MISC. PROJECT TOTAL Prior Years $0 2009-10 $0 2010-11 $0 2011-12 $0 2012-13 $0 2013-14 $0 2014-15 200,000 1,400,000 $1,600,000 2015-16 200,000 1,000,000 $1,200,000 Future Years 200 000 1 000 000 $1 200 000 Lick Creek Digestion Facility Wastewater Capital Projects PROJECT DESCRIPTION/STATUS This project will provide sludge digestion facilities for the Lick Creek Wastewater Treatment Plant. The digestion facility will be designed and constructed to produce Class A sludge, per the State Regulatory parameters. Cost numbers are extrapolated out from ATAD system in 1995. PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR Future Years 200,000 1,000,000 $1,200,000 TOTAL $0 $600,000 $3,400,000 $0 $4,000,000 Total Personnel $3,000 Supplies $0 Service $150,000 Capital $0 TOTAL $153,000 150,000 $0 $153,000 First Fiscal Year Annually $3,000 OPERATING COSTS 255 WORK ORDER #: TBD PROJECT: PROJECT #: SPWOC FUND: PROJECT BUDGET: $6,734,662 PROJECT MANAGER: Fred Surovik FUNDING SOURCES: Long Term Debt/Utility Revenue PROJECT CLIENT: Water Services FISCAL YEAR LAND ENG. CONSTR. MISC. PROJECT TOTAL Prior Years $0 2009-10 $0 2010-11 $0 2011-12 $0 2012-13 $0 2013-14 $0 2014-15 $0 2015-16 300,000 $300,000 Lick Creek Capacity Expansion II Wastewater Capital Projects PROJECT DESCRIPTION/STATUS This project will increase the Lick Creek Wastewater Treatment Plant capacity from 2 Million Gallons per Day to 4 Million Gallons per Day. This capacity is needed to serve growth in the LCWWTP service area and maintain compliance with TCEQ regulations. PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR 2015-16 300,000 $300,000 Future Years 600,000 5,824,662 10,000 $6,434,662 TOTAL $0 $900,000 $5,824,662 $10,000 $6,734,662 Total Personnel $0 Supplies $0 Service $0 Capital $0 TOTAL $0 First Fiscal Year Annually OPERATING COSTS 256 WORK ORDER #: WF0742950 PROJECT: SCADA Replacement PROJECT #: SGWOC FUND: PROJECT BUDGET: $545,340 PROJECT MANAGER: Michael Kellogg FUNDING SOURCES: Long Term Debt/Utility Revenue PROJECT CLIENT: Water Services 1. Reduce development time and cost by the re-use of engineering practices. 2. Maximize returns from existing assets, through greatly improved control and monitoring. 3. Reduce future installation cost by utilizing standard bus technologies. 4. Provide a means of being proactive in maintaining equipment with available diagnostic tools. FISCAL YEAR LAND ENG. CONSTR. MISC. PROJECT TOTAL Prior Years $0 $0 $149,038 $0 $149,038 2009-10 186,000 $186,000 2010-11 210,302 $210,302 Wastewater Capital Projects PROJECT DESCRIPTION/STATUS PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR This project will facilitate the replacement of control based equipment that has exceeded its useful service life. It will upgrade the control of the plants into a more integrated architecture that will: Part of this project will include a "radio communications survey". This survey will determine what, if any, additional communications infrastructure may be needed to communicate with new Lift Stations and potential future annexed property. The radio survey has been completed and concluded that we need to errect radio towers at six lift station sites. 2011-12 $0 2012-13 $0 2013-14 $0 2014-15 $0 2015-16 $0 TOTAL $0 $0 $545,340 $0 $545,340 Total Personnel $3,000 Supplies $0 Service $10,000 Capital $0 TOTAL $13,000 $3,000 OPERATING COSTS First Fiscal Year Annually $0 0 10,000 $13,000 257 WORK ORDER#: WF1129844 PROJECT: CCWWTP Laboratory & SCADA Building PROJECT #: SGWOC FUND: PROJECT BUDGET: $1,165,087 PROJECT FUNDING MANAGER: Philip Bargas SOURCES: Long Term Debt/Utility Revenue PROJECT CLIENT: Water Services / Karl Goldapp FISCAL YEAR LAND ENG. CONSTR. MISC. PROJECT TOTAL Prior Years $0 $19,087 $0 $0 $19,087 2009-10 260,000 $260,000 2010-11 886,000 $886,000 2011-12 $0 2012-13 $0 Present building was built in 1982 as a chlorinator building and no longer meets laboratory standards. It is more cost effective to build a new building. The SCADA server room is housed in a "home made" room within the other 1982 shop building that does not maintain temperature or humidity for the computer equipment. There is an advantage to construct a building to house both because each require a clean controlled climate. PROJECT DESCRIPTION/STATUS PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR Wastewater Capital Projects 2012 13 $0 2013-14 $0 2014-15 $0 2015-16 $0 TOTAL $0 $279,087 $886,000 $0 $1,165,087 Total Personnel $0 Supplies $0 Service $900 Capital $0 TOTAL $900$0 900 $900 OPERATING COSTS First Fiscal Year Annually 258 WORK ORDER #: WF1104553 PROJECT: PROJECT #: SGWOC (CC Misc Improvements) FUND: PROJECT BUDGET: $438,957 PROJECT MANAGER: Philip Bargas FUNDING SOURCES: Long Term Debt/Utility Revenue PROJECT CLIENT: Water Services / Doug Wallace FISCAL YEAR LAND ENG. CONSTR. MISC. PROJECT TOTAL Prior Years $0 $85,957 $0 $0 $85,957 2009-10 28,000 325,000 $353,000 2010 11 $0 Carters Creek Process Control Improvements Wastewater Capital Projects PROJECT DESCRIPTION/STATUS Provide funds to purchase and install improved process control instrumentation at Carters Creek Wastewater Treatment Plant. This project has been bundled with the Clarifier Improvements, Service Water Improvements, Gravity Thickener Improvements, and the ATAD Improvements to provide a more attractive bid package. Improvements include: * Flow meters on each plant's influent line, purchase and install positive displacement pumps in each waste sludge line. * In-line solids meters in the sludge processes. * In-line solids meters in the aeration basins. PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR * Dissolved oxygen meters in each aeration basin to replace meters that have reached the end of their service lives, and purchase and install pH meters in the influent and each aeration basin. 2010-11 $0 2011-12 $0 2012-13 $0 2013-14 $0 2014-15 $0 2015-16 $0 TOTAL $0 $113,957 $325,000 $0 $438,957 Total Personnel $0 Supplies $0 Service $0 Capital $0 TOTAL $0$0 $0 OPERATING COSTS First Fiscal Year Annually 259 WORK ORDER #: WF1142624 PROJECT: PROJECT #: SGWOC (Lick Creek Misc Improvements) FUND: PROJECT BUDGET: $203,000 PROJECT MANAGER: Philip Bargas FUNDING SOURCES: Long Term Debt/Utility Revenue PROJECT CLIENT: Water Services / Doug Wallace FISCAL YEAR LAND ENG. CONSTR. MISC. PROJECT TOTAL Prior Years $0 $2,811 $0 $0 $2,811 2009-10 35,000 25,189 $60,189 2010-11 15 000 125 000 $140 000 * Dissolved oxygen meters in each aeration basin to replace meters that have reached the end of their service lives, and purchase and install pH meters in the influent and each aeration basin. Provide funds to purchase and install improved process control instrumentation at Lick Creek Wastewater Treatement Plant. This project has been bundled together with the Sludge Holding Tank, Centrifuge, Clarifier Catwalk, and the Return Activated Sludge Improvements projects to provide a more attractive bid package. Improvements include: PROJECT DESCRIPTION/STATUS PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR Lick Creek Process Control Improvements Wastewater Capital Projects * Flow meters on each plant's influent line, purchase and install positive displacement pumps in each waste sludge line. * In-line solids meters in the sludge processes. * In-line solids meters in the aeration basins. 2010-11 15,000 125,000 $140,000 2011-12 $0 2012-13 $0 2013-14 $0 2014-15 $0 2015-16 $0 TOTAL $0 $52,811 $150,189 $0 $203,000 Total Personnel $0 Supplies $0 Service $0 Capital $0 TOTAL $0 First Fiscal Year Annually $0 $0 OPERATING COSTS 260 WORK ORDER #: TBD PROJECT: PROJECT #: SGWOC FUND: PROJECT BUDGET: $240,000 PROJECT MANAGER: Michael Kellogg FUNDING SOURCES: Long Term Debt/Utility Revenue PROJECT CLIENT: Water Services FISCAL YEAR LAND ENG. CONSTR. MISC. PROJECT TOTAL Prior Years $0 $0 $0 $0 $0 2009-10 80,000 $80,000 2010-11 80,000 $80,000 2011-12 80,000 $80,000 2012-13 $0 2013-14 $0 2014-15 $0 2015-16 $0 TOTAL $0 $0 $240 000 $0 $240 000 SCADA - New Lift Stations Wastewater Capital Projects PROJECT DESCRIPTION/STATUS This project is to provide communications and telemetry hardware to enable critical lift station operations to be remotely monitored. Construction of new lift stations does not include the implementation of monitoring and alarming via the SCADA system. As of 2009, there are Lift Stations in operation that are not within the SCADA system. Subsequent years allow for SCADA implementation of an additional four per year. PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR TOTAL $0 $0 $240,000 $0 $240,000 Total Personnel $0 Supplies $0 Service $0 Capital $0 TOTAL $0 OPERATING COSTS First Fiscal Year Annually $0 $0 261 WORK ORDER #: WF1219655 PROJECT: PROJECT #: SGWOC FUND: PROJECT BUDGET: $300,000 PROJECT MANAGER: Michael Kellogg FUNDING SOURCES: Long Term Debt/Utility Revenue PROJECT CLIENT: Water Services FISCAL YEAR LAND ENG. CONSTR. MISC. PROJECT TOTAL Prior Years $0 $0 $0 $0 $0 2009-10 300,000 $300,000 2010-11 $0 2011-12 $0 2012-13 $0 2013-14 $0 2014-15 $0 2015-16 $0 TOTAL $0 $0 $300 000 $0 $300 000 Remote Plant Security The original security project did not address the security needs of Lick Creek Wastewater Plant and remote package type plants. This project will address the physical access and monitoring of these plants. It will follow the guidelines, procedures, and standards set in the Wastewater Security Project. Strategic Business Plan Citywide Safety and Security Strategy 1. PROJECT DESCRIPTION/STATUS Wastewater Capital Projects PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR TOTAL $0 $0 $300,000 $0 $300,000 Total Personnel $0 Supplies $3,000 Service $0 Capital $0 TOTAL $3,000$0 3,000 $3,000 First Fiscal Year Annually OPERATING COSTS 262 WORK ORDER #: TBD PROJECT: PROJECT #: SGWOC FUND: PROJECT BUDGET: $450,000 PROJECT MANAGER: Michael Kellogg FUNDING SOURCES: Long Term Debt/Utility Revenue PROJECT CLIENT: Water Services FISCAL YEAR LAND ENG. CONSTR. MISC. PROJECT TOTAL Prior Years $0 $0 $0 $0 $0 2009-10 120,000 $120,000 2010-11 $0 2011-12 $0 2012-13 $0 2013-14 330,000 $330,000 2014-15 $0 2015-16 $0 Carters Creek Fiber Ring Wastewater Capital Projects PROJECT DESCRIPTION/STATUS This project will provide for data communication improvements. This will allow for built-in redundancy, wireless communications, mobile work force, and any unforeseen communication plan not related to construction projects. The main focus is to construct fiber loops which provide multiple paths to all facilities. PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR $ TOTAL $0 $0 $450,000 $0 $450,000 Total Personnel $0 Supplies $0 Service $0 Capital $0 TOTAL $0 OPERATING COSTS First Fiscal Year Annually $0 $0 263 WORK ORDER #: TBD PROJECT:Lick Creek Generator Replacement PROJECT #: SGWOC FUND: PROJECT BUDGET: $700,000 PROJECT MANAGER: David Olivarez FUNDING SOURCES: Long Term Debt/Utility Revenue PROJECT CLIENT: Water Services FISCAL YEAR LAND ENG. CONSTR. MISC. PROJECT TOTAL Prior Years $0 $0 $0 $0 $0 2009-10 $0 2010-11 $0 2011-12 $0 2012-13 $0 2013-14 70,000 $70,000 2014-15 70,000 560,000 $630,000 PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR Provide funds to replace and upgrade the existing Lick Creek Wastewater Treatment Plant emergency power generator, which is nearing the end of its service life. The new generator will provide additional power so that more of the routine Plant processes can be completed while under generator power. The larger generator capacity will also provide operational redundancy and accommodate planned Plant Expansion. This project has not yet entered the design phase. This project supports the Council directive of providing essential services during an extended power outage. Wastewater Capital Projects PROJECT DESCRIPTION/STATUS ,,$, 2015-16 $0 TOTAL $0 $140,000 $560,000 $0 $700,000 Total Personnel $0 Supplies $0 Service $0 Capital $0 TOTAL $0 OPERATING COSTS First Fiscal Year Annually $0 $0 264 WORK ORDER #: TBD PROJECT:Carters Creek Electrical Improvements PROJECT #: SGWOC FUND: PROJECT BUDGET: $1,300,000 PROJECT MANAGER:David Olivarez FUNDING SOURCES: Long Term Debt/Utility Revenue PROJECT CLIENT: Water Services FISCAL YEAR LAND ENG. CONSTR. MISC. PROJECT TOTAL Prior Years $0 $0 $0 $0 $0 2009-10 $0 2010-11 $0 2011-12 $0 PROJECT DESCRIPTION/STATUS Wastewater Capital Projects PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR This project will replace electrical infrastructure that has exceeded its service life, or has otherwise failed. This infrastructure must be replaced to maintain the uninterrupted operation of the Wastewater Treatment Plant. The project includes contracting an engineer to design and plan the needed replacements of the Motor Control Centers (MCC's) for Plants 2 and 3, run new conduit and wire from MCC's to clarifiers, including two 2" instrumentation conduits and exterior receptacles. The MS South Switchgear will also be replaced. This project may need to include providing for a temporary power supply for critical equipment during construction. Also, the possible installation of a french drain system around Plant 2 Blower Building to eliminate flooding concerns for this facility during heavy rainfall events. 2012-13 180,000 500,000 $680,000 2013-14 60,000 560,000 $620,000 2014-15 $0 2015-16 $0 TOTAL $0 $240,000 $1,060,000 $0 $1,300,000 Total Personnel $0 Supplies $0 Service $0 Capital $0 TOTAL $0$0 $0 First Fiscal Year Annually OPERATING COSTS 265 WORK ORDER #: TBD PROJECT: PROJECT #: SCWOC FUND: PROJECT BUDGET: $76,175 PROJECT MANAGER: Michael Kellogg FUNDING SOURCES: Long Term Debt/Utility Revenue PROJECT CLIENT: Water Services FISCAL YEAR LAND ENG. CONSTR. MISC. PROJECT TOTAL Prior Years $0 $0 $0 $0 $0 2009-10 $0 2010-11 $0 Aggie Acres Fiber Optic conduit WASTEWATER CAPITAL PROJECTS PROJECT DESCRIPTION/STATUS This project is being executed in response to Council's exception to policy to allow connection of this lift station in the ETJ to the City's sewer system. The fiber optic line will be the most efficient option of meeting TCEQ's requirement that our collection system be "properly maintained and operated". PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR $ 2011-12 76,175 $76,175 2012-13 $0 2013-14 $0 2014-15 $0 2015-16 $0 TOTAL $0 $76,175 $0 $76,175 Total Personnel $0 Supplies $0 Service $0 Capital $0 TOTAL $0 $0 $0 $0 $0 $0 $0 First Fiscal Year Annually OPERATING COSTS 266 WORK ORDER #: WF1227774 PROJECT: Carters Creek Thickener Building PROJECT #: SSWOC Roof Upgrade FUND: PROJECT BUDGET: $35,000 PROJECT MANAGER: Brian Smith FUNDING SOURCES: Long Term Debt/Utility Revenue PROJECT CLIENT: Water Services FISCAL YEAR LAND ENG. CONSTR. MISC. PROJECT TOTAL Prior Years $0 $0 $0 $0 $0 2009-10 5,000 25,000 5,000 $35,000 2010-11 $0 2011-12 $0 2012-13 $0 2013-14 $0 2014-15 $0 2015-16 $0 The Thickener Building at Carters Creek Wastewater Treatment Plant houses the sludge thickening equipment in one section and the electrical equipment for the ATAD Digesters, Digested Sludge Holding Tanks, Ultra Violet Disinfection Equipment and other vital plant equipment in the other section. It was built in 1995 with an expected life span of thirty years. The roof began leaking after the warranty expired and was patched many times with temporary success. It began leaking badly again during last fall’s rainy weather, directly over our electrical equipment. Dunham Engineering was retained to inspect the roof. The resulting report recommended the installation of a urethane foam coating with an acrylic overcoat for weather resistance. This system will repair the leaks and improve the energy efficiency of the roof for the expected life of the building. Wastewater Capital Projects PROJECT DESCRIPTION PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR 2015-16 $0 TOTAL $0 $5,000 $25,000 $5,000 $35,000 Total Personnel $0 Supplies $0 Service $0 Capital $0 TOTAL $0$0 $0 OPERATING COSTS First Fiscal Year Annually 267 Home of Texas A&M University ® 268 ESTIMATED O&M COSTS 269 Projected Projected Projected Projected Projected Projected FY11 FY12 FY13 FY14 FY15 FY16 Comments Street/Traffic Projects Holleman Extension 16,695 17,196 17,712 18,243 18,790 19,354 Street and landscaping maintenance, Utility costs Victoria Avenue Extension - 13,125 13,519 13,924 14,342 14,772 Street and landscaping maintenance, Utility costs Jones Butler Extension - - 12,075 12,437 12,810 13,195 Street and landscaping maintenance, Utility costs Barron Road Widening Phase II - 37,643 38,772 39,935 41,133 Street and landscaping maintenance, Utility costs Barron Road East/Lakeway Drive - - - - 32,655 33,635 Street and landscaping maintenance, Utility costs TxDOT Landscaping - Wellborn: FM 2818 to SH40 - 12,000 12,360 12,731 13,113 13,506 Landscaping and utility costs Signal at SH40/Arrington 1,800 1,854 1,910 1,967 2,026 2,087 Utility costs Signal at SH40/Barron - 1,800 1,854 1,910 1,967 2,026 Utility costs Signal at Barron/Victoria - 1,800 1,854 1,910 1,967 2,026 Utility costs Traffic Signal at George Bush/Dominik - 1,800 1,854 1,910 1,967 2,026 Utility costs New Traffic Signals (2008 GOB) 3,600 5,346 10,582 15,814 21,040 20,861 Utility costs Signal at Wellborn/F&B 1,800 1,854 1,910 1,967 2,026 2,087 Utility costs Signal at Texas/Krenek Tap - 1,800 1,854 1,910 1,967 2,026 Utility costs Signal at SH30/Copperfield - 1,800 1,854 1,910 1,967 2,026 Utility costs Signal at 2818/FM 60 - - 1,800 1,854 1,910 1,967 Utility costs Signal at University Dr/University Town Center - - 1,800 1,854 1,910 1,967 Utility costs COCS Beautification Improvements 12,875 13,261 13,659 14,069 14,491 14,926 Landscaping and utility costs Bike Loop - 2005 - 1,000 1,030 1,061 1,093 1,126 Maintenance costs Hike and Bike Trails - Longmire Improvements - 200 206 212 219 225 Maintenance costs Hike and Bike Trail Completion - 1,000 1,030 1,061 1,093 1,126 Trail Maintenance costs Lick Creek Hike and Bike Trail - - - - 3,000 3,090 Trail Maintenance costs University Drive Pedestrian Improvements Ph II - - - - - - TBD - O&M estimated to begin FY15 Street/Traffic Project Totals 36,770$ 75,836$ 136,505$ 145,514$ 190,286$ $ 195,185 Parks Projects Creek View Neighborhood Park - - 41,590 42,838 44,123 45,447 Personnel, maintenance and utility costs Pebble Creek Basketball Pavillion 2,400 2,472 2,546 2,623 2,701 2,782 Mainteinance costs Merry Oaks Park Area Lights 1,750 1,803 1,857 1,912 1,970 2,029 Maintenance and utility costs Anderson Park Walking Loop - 1,000 1,030 1,061 1,093 1,126 Water cost for irrigation Castlegate Park 240 247 255 262 270 278 Water cost for water fountain Steeplechase Park - 600 618 637 656 675 Supplies and maintenance Skate Park 10,200 20,400 21,012 21,642 22,292 22,960 Maintenance and utility costs Neighborhood Parks Revolving Fund 3,000 3,090 3,183 3,278 3,377 3,478 Maintenance costs Lick Creek Park Iron Bridge Trail Completion - - 2,200 2,266 2,334 2,404 Trail Maintenance costs Lincoln Center Addition - - - - - 124,800 Personnel (1 position plus temp/seasonal funds); utility costs; and facilities maintenance Lick Creek Nature Center - - - 225,708 232,479 239,454 Personnel (2 FT + temp/seasonal); supplies; utility costs; facilities maintenance; and other services Parks Project Totals 17,590$ 29,612$ 74,290$ 302,227$ 311,294$ $ 445,432 Projected Projected Projected Projected Projected Projected FY11 FY12 FY13 FY14 FY15 FY16 Comments Facility and Technology Projects City Hall - - TBD TBD TBD TBD TBD Northgate Improvements TBD TBD TBD TBD TBD TBD TBD Fire Station #6 624,302 2,079,750 1,328,967 1,362,556 1,397,153 1,432,787 Personnel: ambulance company (9 FTE), engine company (9 FTE); vehicles: ambulance and engine truck; vehicle maintenance and replacement; utility and landscaping service costs; and supplies. Library Expansion - - - - 206,000 212,180 Personnel (3 positions); utility costs; book replacement; and facilities maintenance MDT System Replacement - 20,000 20,600 21,218 21,855 22,510 Maintenance contract Wireless Infrastructure - 20,000 20,600 21,218 21,855 22,510 Supplies, Purchased Services and Capital Outlay Server Consolidation - - - - - - Purchased Services - contract CAD Hardware Operating System Upgrade (6,000) (6,000) (6,000) (6,000) (6,000) (6,000) Maintenance reduction Facilities and Technology Project Totals 618,302$ 2,113,750$ 1,364,167$ 1,398,992$ 1,640,862$ $ 1,683,987 Convention Center Convention Center TBD TBD TBD TBD TBD TBD Additional O&M expenses will be incurred as a component of a new convention center. However, estimates will not be available until the project is fully developed. Convention Center Project Totals TBD TBD TBD TBD TBD TBD Total Estimated O&M Costs 672,662$ 2,219,198$ 1,574,962$ 1,846,733$ 2,142,442$ 2,324,605$ Governmental Funds Capital Improvement Projects Estimated Operations and Maintenance Costs* *The Operations and Maintenance costs reflected above are estimates based on anticipated costs associated with each project. In some situations, the O&M cost of a project is minimal and can be absorbed by the City department that is benefiting the most from the project. In other situations, the O&M cost is more significant and funding for these additional expenses is addressed through the Service Level Adjustment (SLA) process. As the projects become better defined, the O&M estimates may be revised. 270 Projected Projected Projected Projected Projected Projected FY11 FY12 FY13 FY14 FY15 FY16 Comments Parkland Dedication Southwest Park Development - 38,000 39,140 40,314 41,524 42,769 Personnel (1 FTE), supplies and landscaping John Crompton Park Ph II - 8,000 8,240 8,487 8,742 9,004 Supplies and additional for landscaping contract Parkland Projects Totals -$ 46,000$ 47,380$ 48,801$ 50,265$ 51,773$ Wolf Pen Creek (WPC) TIF Projects WPC Festival Site and Water Feature 56,667 170,000 180,250 180,508 191,073 201,955 Temporary/seasonal personnel, supplies, chemicals, contract labor and utility costs WPC Projects Totals 56,667$ 170,000$ 180,250$ 180,508$ 191,073$ 201,955$ Total Estimated O&M Costs 56,667$ 216,000$ 227,630$ 229,309$ 241,338$ 253,728$ Special Revenue Funds Capital Improvement Projects d d * *The Operations and Maintenance costs reflected above are estimates based on anticipated costs associated with each project. In some situations, the O&M cost of a project is minimal and can be absorbed by the City department that is benefiting the most from the project. In other situations, the O&M cost is more significant and funding for these additional expenses is addressed through the Service Level Adjustment (SLA) process. As the projects become better defined, the O&M estimates may be revised. 271 Projected Projected Projected Projected Projected Projected FY11 FY12 FY13 FY14 FY15 FY16 Comments Water Projects Well # 8 Collection Line 4,300 4,429 4,562 4,699 4,840 4,985 Line Maintenance Well #9 - - - - - TBD Supplies and utility costs Well #9 Collection Line - - - - - TBD Line Maintenance Dowling Road 10 MG Storage Tank - - - - - - TBD - O&M estimated to begin FY17 SPPS Chemical System Replacement - - - 35,200 36,256 37,344 Personnel (1 FTE), supplies and utility costs High Service Water Pump Improvements - - 229,473 236,357 243,448 250,751 Supplies and utility costs Cooling Tower Expansion - - - 80,000 61,000 62,830 Supplies and utility costs Emergency Electric Generator Expansion - - - - - 10,000 Supplies and utility costs Well 1 Motor Control Center Replacement - - - - - 4,500 Supplies and utility costs Well 2 Motor Control Center Replacement - - - - - 4,500 Supplies and utility costs Well 3 Motor Control Center Replacement - - - - - 4,500 Supplies and utility costs SCADA Man Machine Interface - - 7,500 7,725 7,957 8,195 Software maintenance contract Distribution SCADA - - - - 5,000 5,150 Supply costs Reclaimed Water - Irrigation Phase I - 76,000 78,280 80,628 83,047 85,539 Personnel (1 FTE), supplies, vehicle maintenance, training, utility costs and vehicle (1 pickup truck) Raymond Stotzer - - - - - TBD Supplies and utility costs Water Project Totals 4,300$ 80,429$ 319,815$ 444,609$ 441,548$ 478,294$ Wastewater Projects Raymond Stotzer - - - - - TBD Supplies and utility costs Nantucket Gravity Sewer 200 206 212 219 225 232 Utility costs Emerald Parkway/Bent Oak 6,200 3,125 3,219 3,315 3,415 3,517 Line Maintenance Carters Creek Clarifier Improvements 2,700 2,781 2,864 2,950 3,039 3,130 Supplies and maintenance Carters Creek Headworks Improvements - - - 83,500 86,005 88,585 Supplies, maintenance contract and utility costs Carters Creek Service Water Improvements 28,000 28,840 29,705 30,596 31,514 32,460 Supplies, maintenance contract and utility costs ATAD Expansion - - - - - TBD Personnel and utility costs Digestion Facility - - - - - TBD Personnel and utility costs SCADA Replacement - 13,000 13,390 13,792 14,205 14,632 Maintenance and service contract Carters Creek Lab and SCADA Building - 900 927 955 983 1,013 Janitorial, Maintenance, Utility costs Remote Plant Security 3,000 3,090 3,183 3,278 3,377 3,478 Supply costs Wastewater Project Totals 40,100$ 51,942$ 53,500$ 138,605$ 142,763$ 147,046$ Total Estimated O&M Costs 44,400$ 132,371$ 373,315$ 583,215$ 584,311$ 625,340$ *The Operations and Maintenance costs reflected above are estimates based on anticipated costs associated with each project. In some situations, the O&M cost of a project is minimal and can be absorbed by the City department that is benefiting the most from the project. In other situations, the O&M cost is more significant and funding for these additional expenses is addressed through the Service Level Adjustment (SLA) process. As the projects become better defined, the O&M estimates may be revised. Enterprise Funds Capital Improvement Projects Estimated Operations and Maintenance Costs* 272 Index by Project/Work Order Name Streets Projects Project # Page Facility Projects Project # Page ARRINGTON/SH40 SIGNAL ST1030 46 ARTS COUNCIL BUILDING PURCHASE TBD 116 BARRON ROAD RIGHT OF WAY ST0006 32 FIRE STATION #6 GG0903 114 BARRON RD EAST/LAKEWAY ST1101 36 LARRY J. RINGER LIBRARY EXPANSION GG1010 115 BARRON RD WIDENING PHASE II ST1026 34-35 LIBRARY BOOK DONATIONS GG9901 111 BARRON/SH40 SIGNAL ST1029 47 MUNICIPAL COMPLEX EXPANSION GG0408 112 BIKE LOOP - 2005 ST0530 60 NORTHGATE IMPROVEMENTS GG0803 113 COLLEGE MAIN REHABILITATION ST1102 70 DISCOVERY DRIVE EXTENSION ST0804 24 Technology Projects Project # Page HIKE AND BIKE TRAIL COMPLETION ST0904 66 AERIAL TOPOGRAPHIC MAPPING CO1102 125 HIKE AND BIKE TRAILS - LONGMIRE IMPROVEMENTS ST0521 62 FIBER OPTIC INFRASTRUCTURE CO0902 124 HOLLEMAN EXTENSION ST0913 22-23 i5 ENHANCEMENT CO1101 119 JONES BUTLER (PENBERTHY) EXTENSION ST0905 28 MDT SYSTEM REPLACEMENT CO0701 118 KRENEK TAP/TEXAS AVE SIGNAL ST1105 52 MISC IT PROJECTS CO0801 126 LICK CREEK HIKE AND BIKE TRAIL TBD 67 RADIO SYSTEM REPLACEMENT CO0601 121 LINCLON SIDEWALK IMPROVEMENTS ST0910 64 SERVER CONSOLIDATION CO0901 123 MISC. BIKE TRAILS - BIKE LOOP ST9803 61 UPS REPLACEMENT CO0603 120 NEW SIGNAL WARRANT STUDY ST1107 54 WIRELESS INFRASTRUCTURE CO0704 122 NEW TRAFFIC SIGNAL PROJECTS (2003 GOB) ST0512 45 NEW TRAFFIC SIGNAL PROJECTS (2008 GOB) ST1027 50 Drainage Projects Project # Page NORTHGATE STREET REHAB ST0518 17 BEE CREEK PH. IV & V. SD0001 134-135 OVERSIZE PARTICIPATION ST0519 21 EMERALD FOREST DRAINAGE IMP DESIGN SD1006 139 ROCK PRAIRIE RD WEST ROW ST1025 31 FENCE FOR MITIGATION @ ARRINGTON/DECATUR SD0901 143 ROCK PRAIRIE RD EAST WIDENING - DESIGN AND ROW ST0417 30 GREENWAYS PROJECTS SD9903 136 ROYDER ROAD IMPROVEMENTS ST1037 29 MINOR DRAINAGE IMPROVEMENTS SD1101 137 SH30/COPPERFIELD SIGNAL ST1106 53 STORMWATER MAPPING SD0523 142 SIDEWALK IMPROVEMENTS (2003 GOB) ST0517 63 SUN MEADOWS DRAINAGE IMPROVEMENTS SD1007 140 SIDEWALK IMPROVEMENTS (2008 GOB) ST1028 65 W. KING COLE CULVERT REPLACEMENT SD0904 138 SIGNAL @ GB DRIVE EAST & DOMINIK ST0205 49 WOLF PEN CREEK EROSION MGMT STUDY SD1102 141 TAUBER AND STASNEY REHAB/NG SIDEWALKS ST0505 18-19 TEXAS AVENUE FIBER ST0906 58 Convention Center Projects Project # Page TRAFFIC SIGNAL COMMUNICATIONS ST0411 57 CONVENTION CENTER GG0907 130 TRAFFIC SYSTEM SAFETY IMPR. ST0511 43 TX AVE STREETSCAPE PH II ST9915 38 Parkland Dedication Projects Project # Page TX AVE WIDENING ROW ST9820 41 EMERALD FOREST PARK IMP. PK0713 80-81 TxDOT - WELLBORN RD LANDSCAPING - 2818 to 40 ST0812 39 JOHN CROMPTON PARK PHASE III PK0904 161 UNIVERSITY DR PEDESTRIAN IMPROVEMENTS PH 2-5 TBD 68 SOUTHWEST PARK DEVELOPMENT PK0806 159 UNIVERSITY DR/ASBURY IMPROVEMENTS ST1036 44 STEEPLECHASE PARK BENCH TBD 157 UNIVERSITY DR/UNIVERSITY TOWN CTR SIGNAL TBD 56 STEPHEN C. BEACHY CENTRAL PK IMPROVEMENTS PK1013 154 VICTORIA AVENUE EXTENSION ST0903 26-27 STEPHEN C. BEACHY CENTRAL PK POND SW PK0805 153 VICTORIA/BARRON SIGNAL TBD 48 UNIVERSITY PARK - PHASE II PK0410 86-87 WELLBORN/F&B SIGNAL ST1031 51 W.A. TARROW IMPROVEMENTS PK1103 104-105 WELLBORN RD WIDENING ST0510 40 WOODLAND HILLS PARK IMPROVEMENTS PK0523 164 2818/FM 60 SIGNAL TBD 55 ZONE 1 PARK PK0051 150 ZONE 2 PARK PK0052 151 Parks Projects Project # Page ZONE 3 PARK PK0053 152 ANDERSON PARK WALKING LOOP PK1002 85 ZONE 4 PARK PK0054 155 BEACHY CENTRAL PARK IMPROVEMENTS PK1001 93 ZONE 5 PARK PK0055 156 BROTHERS POND PARK IMPROVEMENTS PK1003 82 ZONE 6 PARK PK0056 158 CASTLEGATE PARK IMPROVEMENTS PK1107 88 ZONE 7 PARK PK0057 160 CENTRAL PARK - STIMULUS GRANT PROJECT PK1012 101 ZONE 8 PARK PK0058 162 CREEK VIEW NEIGHBORHOOD PARK PK0906 77 ZONE 9 PARK PK0059 163 EAST DISTRICT MAINTENANCE SHOP REPLACEMENT PK1101 96 ZONE 10 PARK PK0060 165 EMERALD FOREST IMPROVEMENTS PK0713 80-81 ZONE 11 PARK PK0061 166 FIELD REDEVELOPMENT PK0300 76 ZONE 12 PARK PK0824 167 G.K. FITCH PARK IMPROVEMENTS PK1104 106 ZONE 13 PARK PK0807 168 LEMONTREE PARK SWING SET PK1106 84 ZONE 14 PARK PK0717 169 LICK CREEK NATURE CENTER PK1102 97 ZONE 15 PARK PK0808 170 LICK CREEK PARK IRON BRIDGE TRAIL COMPLETION TBD 94 ZONE 16 PARK TBD 171 LINCOLN CENTER ADDITION TBD 95 MERRY OAKS PARK AREA LIGHTS PK1105 83 Water Projects Work Order # Page NEIGHBORHOOD PARK IMPROVEMENTS PK0910 78 BARRON ROAD WATER SERVICE EXT WF0379197 205 NEIGHBORHOOD PARKS REVOLVING FUND PK0912 92 BARRON ROAD WIDENING PH II TBD 34-35 PEBBLE CREEK BASKETBALL PAVILION PK0914 79 BEE CREEK PHASES IV & V TBD 134-135 SANDSTONE PARK SHADE COVER PK1108 89 COLLEGE HEIGHTS UTILITY REHAB TBD 224-225 SKATE PARK PK0911 91 COOLING TOWER EXPANSION TBD 192 STEEPLECHASE PARK PK1109 90 COOLING TOWER MEDIA REPLACEMENT TBD 193 UNIVERSITY PARK - PHASE II PK0410 86-87 EASTGATE REHAB TBD 222-223 VETERANS PARK - STIMULUS GRANT PROJECT PK1013 102 FM 2818/JONES-BUTLER WATER LINE CONFLICT WF1272122 211 W.A. TARROW IMPROVEMENTS PK1103 104-105 HIGH SERVICE WATER PUMP IMPROVEMENTS WF1223117 190 WOLF PEN CREEK FESTIVAL SITE/WATER FEATURE WP0901 99 SOUTH KNOLL / THE GLADE WF10444485 218-219 273 Index by Project/Work Order Name Water Projects (con't) Work Order # Page Wastewater Projects (con't) Work Order # Page HOLLEMAN EXTENSION WF1254634 22-23 SOUTHWOOD 5-7 WF1105424 220-221 LAND ACQUISITION - WELLS WF0377324 184 TAUBER & STASNEY REHAB WF0625893 18-19 OVERSIZED PARTICIPATION TBD 202 USC RENOVATIONS TBD 198-199 PARALLEL WELLFIELD COLL LINE PH I WF0352553 183 VICTORIA AVENUE EXTENSION WF1158560 26-27 PATRICIA STREET WATER LINE (AQUARIUM BAR) WF1246445 210 WESTMINSTER SEWER LINE WF0786101 234 RAYMOND STOTZER WEST WF1111167 206-207 WILLIAM D FITCH EAST (AREA 6) WF0805756 214-215 ROCK P RD S OF CARTER LAKE (AREA 5) WF0805789 212-213 SCADA MAN MACHINE INTERFACE TBD 200 SCADA REPLACEMENT WF0742940 197 SH 40 WATER LINE- BARRON RD TO GRAHAM RD TBD 208 SH 40 WATER LINE - SONOMA TO VICTORIA TBD 209 SOUTH KNOLL/THE GLADE WF1044480 218-219 SOUTHWOOD 5-7 REHAB WF1105425 220-221 SPPS CHEMICAL SYSTEM REPLACEMENT TBD 189 TAUBER AND STASNEY REHAB WF0625888 18-19 USC RENOVATIONS TBD 198-199 VICTORIA AVENUE EXTENSION WF1158553 26-27 WATER RECLAMATION (PHASE I) WF0995711 203 WELL #8 WF1097966 185 WELL #8 COLLECTION LINE WF1097967 186 WELL #9 TBD 187 WELL #9 COLLECTION LINE WF1249597 188 WELLBORN WIDENING WF0613546 204 WELLS 1, 2, 3 AND 5 MOTOR CONTROL UPGRADE TBD 194 WILLIAM D FITCH EAST (AREA 6) WF0805807 214-215 2010 WELL REHAB WF1241047 191 3 MGSR REHABILITATION TBD 195 5 MGSR REHABILITATION TBD 196 Wastewater Projects Work Order # Page AGGIE ACRES FIBER OPTIC CONDUIT TBD 266 BARRON ROAD WIDENING PH II TBD 34-35 BEE CREEK PH IV & V WASTEWATER TBD 134-135 CARTERS CREEK ATAD EXPANSION TBD 254 CARTERS CREEK ATAD IMPROVEMENTS WF1104547 248 CARTERS CREEK CENTRIFUGE IMP WF1142617 251 CARTERS CREEK CLARIFIER IMPROVEMENTS WF1104545 242 CARTERS CREEK ELECTRICAL IMPROVEMENTS TBD 265 CARTERS CREEK FIBER RING TBD 263 CARTERS CREEK GRAVITY THICKENER WF1104543 249 CARTERS CREEK HEADWORKS IMP WF1223116 243 CARTERS CREEK LAB AND SCADA BUILDING WF1129844 258 CARTERS CREEK PROCESS CONTROL IMPROVEMENTS WF1104553 259 CARTERS CREEK SERVICE WATER IMP WF0930104 244 CARTERS CREEK THICKENER BLDG ROOF UPGRADE WF1227774 267 CC TREATMENT STRUCTURE COATINGS REPLACEMENT TBD 253 COLLEGE HEIGHTS UTILITY REHAB TBD 224-225 CREEK MEADOWS LS EXPANSION PRELIM STUDY WF0954474 238 EASTGATE REHAB TBD 222-223 EMERALD PKWY / BENT OAK WF0626151 240 LICK CREEK CAPACITY EXPANSION II TBD 256 LICK CREEK CENTRIFUGE IMPROVEMENTS WF1142617 246 LICK CREEK CLARIFIER CATWALKS WF1042497 245 LICK CREEK DIGESTION FACILITY TBD 255 LICK CREEK GENERATOR REPLACEMENT TBD 264 LICK CREEK PARALLEL TRUNKLINE - PH I WF0912284 236 LICK CREEK PROCESS CONTROL IMPROVEMENTS WF1142624 260 LICK CREEK RETURN ACTIVATED SLUDGE IMP WF1142623 250 LICK CREEK SLUDGE BLOWER REPLACEMENT TBD 252 LICK CREEK SLUDGE HOLDING TANK IMPROVEMENTS WF1142618 247 NANTUCKET GRAVITY SEWER WF1094676 235 NORTHEAST SEWER TRUNKLINE - PH I TBD 237 OVERSIZE PARTICIPATION TBD 233 RAYMOND STOTZER WEST WF1111168 206-207 REMOTE PLANT SECURITY WF1219655 262 ROCK P RD S OF CARTER LAKE (AREA 5) WF0805744 212-213 SCADA - NEW LIFT STATIONS TBD 261 SCADA REPLACEMENT WF0742950 257 274 Index by Project/Work Order Number Project # Streets Projects Page Project # Facility Projects Page ST0006 BARRON ROAD RIGHT OF WAY 32 GG0408 MUNICIPAL COMPLEX EXPANSION 112 ST0205 SIGNAL @ GB DRIVE EAST & DOMINIK 49 GG0803 NORTHGATE IMPROVEMENTS 113 ST0411 TRAFFIC SIGNAL COMMUNICATIONS 57 GG0903 FIRE STATION #6 114 ST0417 ROCK PRAIRIE RD EAST WIDENING - DESIGN AND ROW 30 GG1010 LARRY J. RINGER LIBRARY EXPANSION 115 ST0505 TAUBER AND STASNEY REHAB/NG SIDEWALKS 18-19 GG9901 LIBRARY BOOK DONATIONS 111 ST0510 WELLBORN RD WIDENING 40 TBD ARTS COUNCIL BUILDING PURCHASE 116 ST0511 TRAFFIC SYSTEM SAFETY IMPR. 43 ST0512 NEW TRAFFIC SIGNAL PROJECTS (2003 GOB) 45 Project # Technology Projects Page ST0517 SIDEWALK IMPROVEMENTS (2003 GOB) 63 CO0601 RADIO SYSTEM REPLACEMENT 121 ST0518 NORTHGATE STREET REHAB 17 CO0603 UPS REPLACEMENT 120 ST0519 OVERSIZE PARTICIPATION 21 CO0701 MDT SYSTEM REPLACEMENT 118 ST0521 HIKE AND BIKE TRAILS - LONGMIRE IMPROVEMENTS 62 CO0704 WIRELESS INFRASTRUCTURE 122 ST0530 BIKE LOOP - 2005 60 CO0801 MISC IT PROJECTS 126 ST0804 DISCOVERY DRIVE EXTENSION 24 CO0901 SERVER CONSOLIDATION 123 ST0812 TxDOT - WELLBORN RD LANDSCAPING - 2818 to 40 39 CO0902 FIBER OPTIC INFRASTRUCTURE 124 ST0903 VICTORIA AVENUE EXTENSION 26-27 CO1101 i5 ENHANCEMENT 119 ST0904 HIKE AND BIKE TRAIL COMPLETION 66 CO1102 AERIAL TOPOGRAPHIC MAPPING 125 ST0905 JONES BUTLER (PENBERTHY) EXTENSION 28 ST0906 TEXAS AVENUE FIBER 58 Project # Drainage Projects Page ST0910 LINCLON SIDEWALK IMPROVEMENTS 64 SD0001 BEE CREEK PH. IV & V. 134-135 ST0913 HOLLEMAN EXTENSION 22-23 SD0523 STORMWATER MAPPING 142 ST1025 ROCK PRAIRIE RD WEST ROW 31 SD0901 FENCE FOR MITIGATION @ ARRINGTON/DECATUR 143 ST1026 BARRON RD WIDENING PHASE II 34-35 SD0904 W. KING COLE CULVERT REPLACEMENT 138 ST1027 NEW TRAFFIC SIGNAL PROJECTS (2008 GOB) 50 SD1006 EMERALD FOREST DRAINAGE IMP DESIGN 139 ST1028 SIDEWALK IMPROVEMENTS (2008 GOB) 65 SD1007 SUN MEADOWS DRAINAGE IMPROVEMENTS 140 ST1029 BARRON/SH40 SIGNAL 47 SD1101 MINOR DRAINAGE IMPROVEMENTS 137 ST1030 ARRINGTON/SH40 SIGNAL 46 SD1102 WOLF PEN CREEK EROSION MGMT STUDY 141 ST1031 WELLBORN/F&B SIGNAL 51 SD9903 GREENWAYS PROJECTS 136 ST1036 UNIVERSITY DR/ASBURY IMPROVEMENTS 44 ST1037 ROYDER ROAD IMPROVEMENTS 29 Project # Convention Center Projects Page ST1101 BARRON RD EAST/LAKEWAY 36 GG0907 CONVENTION CENTER 130 ST1102 COLLEGE MAIN REHABILITATION 70 ST1105 KRENEK TAP/TEXAS AVE SIGNAL 52 Project # Parkland Dedication Projects Page ST1106 SH30/COPPERFIELD SIGNAL 53 PK0051 ZONE 1 PARK 150 ST1107 NEW SIGNAL WARRANT STUDY 54 PK0052 ZONE 2 PARK 151 ST9803 MISC. BIKE TRAILS - BIKE LOOP 61 PK0053 ZONE 3 PARK 152 ST9820 TX AVE WIDENING ROW 41 PK0054 ZONE 4 PARK 155 ST9915 TX AVE STREETSCAPE PH II 38 PK0055 ZONE 5 PARK 156 TBD 2818/FM 60 SIGNAL 55 PK0056 ZONE 6 PARK 158 TBD LICK CREEK HIKE AND BIKE TRAIL 67 PK0057 ZONE 7 PARK 160 TBD UNIVERSITY DR PEDESTRIAN IMPROVEMENTS PH 2-5 68 PK0058 ZONE 8 PARK 162 TBD UNIVERSITY DR/UNIVERSITY TOWN CTR SIGNAL 56 PK0059 ZONE 9 PARK 163 TBD VICTORIA/BARRON SIGNAL 48 PK0060 ZONE 10 PARK 165 PK0061 ZONE 11 PARK 166 Project # Parks Projects Page PK0410 UNIVERSITY PARK - PHASE II 86-87 PK0300 FIELD REDEVELOPMENT 76 PK0523 WOODLAND HILLS PARK IMPROVEMENTS 164 PK0410 UNIVERSITY PARK - PHASE II 86-87 PK0713 EMERALD FOREST PARK IMP. 80-81 PK0713 EMERALD FOREST IMPROVEMENTS 80-81 PK0717 ZONE 14 PARK 169 PK0906 CREEK VIEW NEIGHBORHOOD PARK 77 PK0805 STEPHEN C. BEACHY CENTRAL PK POND SW 153 PK0910 NEIGHBORHOOD PARK IMPROVEMENTS 78 PK0806 SOUTHWEST PARK DEVELOPMENT 159 PK0911 SKATE PARK 91 PK0807 ZONE 13 PARK 168 PK0912 NEIGHBORHOOD PARKS REVOLVING FUND 92 PK0808 ZONE 15 PARK 170 PK0914 PEBBLE CREEK BASKETBALL PAVILION 79 PK0824 ZONE 12 PARK 167 PK1001 BEACHY CENTRAL PARK IMPROVEMENTS 93 PK0904 JOHN CROMPTON PARK PHASE III 161 PK1002 ANDERSON PARK WALKING LOOP 85 PK1013 STEPHEN C. BEACHY CENTRAL PK IMPROVEMENTS 154 PK1003 BROTHERS POND PARK IMPROVEMENTS 82 PK1103 W.A. TARROW IMPROVEMENTS 104-105 PK1012 CENTRAL PARK - STIMULUS GRANT PROJECT 101 TBD STEEPLECHASE PARK BENCH 157 PK1013 VETERANS PARK - STIMULUS GRANT PROJECT 102 TBD ZONE 16 PARK 171 PK1101 EAST DISTRICT MAINTENANCE SHOP REPLACEMENT 96 PK1102 LICK CREEK NATURE CENTER 97 Work Order # Water Projects Page PK1103 W.A. TARROW IMPROVEMENTS 104-105 WF0352553 PARALLEL WELLFIELD COLL LINE PH I 183 PK1104 G.K. FITCH PARK IMPROVEMENTS 106 WF0377324 LAND ACQUISITION - WELLS 184 PK1105 MERRY OAKS PARK AREA LIGHTS 83 WF0379197 BARRON ROAD WATER SERVICE EXT 205 PK1106 LEMONTREE PARK SWING SET 84 WF0613546 WELLBORN WIDENING 204 PK1107 CASTLEGATE PARK IMPROVEMENTS 88 WF0625888 TAUBER AND STASNEY REHAB 18-19 PK1108 SANDSTONE PARK SHADE COVER 89 WF0742940 SCADA REPLACEMENT 197 PK1109 STEEPLECHASE PARK 90 WF0805789 ROCK P RD S OF CARTER LAKE (AREA 5) 212-213 WP0901 WOLF PEN CREEK FESTIVAL SITE/WATER FEATURE 99 WF0805807 WILLIAM D FITCH EAST (AREA 6) 214-215 TBD LICK CREEK PARK IRON BRIDGE TRAIL COMPLETION 94 WF0995711 WATER RECLAMATION (PHASE I) 203 TBD LINCOLN CENTER ADDITION 95 TBD LICK CREEK DIGESTION FACILITY 255 275 Index by Project/Work Order Number Work Order # Water Projects (con't) Page Work Order # Wastewater Projects (con't) Page WF1044480 SOUTH KNOLL/THE GLADE 218-219 TBD LICK CREEK GENERATOR REPLACEMENT 264 WF1097966 WELL #8 185 TBD LICK CREEK SLUDGE BLOWER REPLACEMENT 252 WF1097967 WELL #8 COLLECTION LINE 186 TBD NORTHEAST SEWER TRUNKLINE - PH I 237 WF1105425 SOUTHWOOD 5-7 REHAB 220-221 TBD OVERSIZE PARTICIPATION 233 WF1111167 RAYMOND STOTZER WEST 206-207 TBD SCADA - NEW LIFT STATIONS 261 WF1158553 VICTORIA AVENUE EXTENSION 26-27 TBD USC RENOVATIONS 198-199 WF1223117 HIGH SERVICE WATER PUMP IMPROVEMENTS 190 WF1241047 2010 WELL REHAB 191 WF1246445 PATRICIA STREET WATER LINE (AQUARIUM BAR) 210 WF1249597 WELL #9 COLLECTION LINE 188 WF1254634 HOLLEMAN EXTENSION 22-23 WF1272122 FM 2818/JONES-BUTLER WATER LINE CONFLICT 211 TBD 3 MGSR REHABILITATION 195 TBD 5 MGSR REHABILITATION 196 TBD BARRON ROAD WIDENING PH II 34-35 TBD BEE CREEK PHASES IV & V 134-135 TBD COLLEGE HEIGHTS UTILITY REHAB 224-225 TBD COOLING TOWER EXPANSION 192 TBD COOLING TOWER MEDIA REPLACEMENT 193 TBD EASTGATE REHAB 222-223 TBD OVERSIZED PARTICIPATION 202 TBD SCADA MAN MACHINE INTERFACE 200 TBD SH 40 WATER LINE - SONOMA TO VICTORIA 209 TBD SH 40 WATER LINE- BARRON RD TO GRAHAM RD 208 TBD SPPS CHEMICAL SYSTEM REPLACEMENT 189 TBD USC RENOVATIONS 198-199 TBD WELL #9 187 TBD WELLS 1, 2, 3 AND 5 MOTOR CONTROL UPGRADE 194 Work Order # Wastewater Projects Page WF0625893 TAUBER & STASNEY REHAB 18-19 WF0626151 EMERALD PKWY / BENT OAK 240 WF0742950 SCADA REPLACEMENT 257 WF0786101 WESTMINSTER SEWER LINE 234 WF0805744 ROCK P RD S OF CARTER LAKE (AREA 5) 212-213 WF0805756 WILLIAM D FITCH EAST (AREA 6) 214-215 WF0912284 LICK CREEK PARALLEL TRUNKLINE - PH I 236 WF0930104 CARTERS CREEK SERVICE WATER IMP 244 WF0954474 CREEK MEADOWS LS EXPANSION PRELIM STUDY 238 WF1042497 LICK CREEK CLARIFIER CATWALKS 245 WF10444485 SOUTH KNOLL / THE GLADE 218-219 WF1094676 NANTUCKET GRAVITY SEWER 235 WF1104543 CARTERS CREEK GRAVITY THICKENER 249 WF1104545 CARTERS CREEK CLARIFIER IMPROVEMENTS 242 WF1104547 CARTERS CREEK ATAD IMPROVEMENTS 248 WF1104553 CARTERS CREEK PROCESS CONTROL IMPROVEMENTS 259 WF1105424 SOUTHWOOD 5-7 220-221 WF1111168 RAYMOND STOTZER WEST 206-207 WF1129844 CARTERS CREEK LAB AND SCADA BUILDING 258 WF1142617 CARTERS CREEK CENTRIFUGE IMP 251 WF1142617 LICK CREEK CENTRIFUGE IMPROVEMENTS 246 WF1142618 LICK CREEK SLUDGE HOLDING TANK IMPROVEMENTS 247 WF1142623 LICK CREEK RETURN ACTIVATED SLUDGE IMP 250 WF1142624 LICK CREEK PROCESS CONTROL IMPROVEMENTS 260 WF1158560 VICTORIA AVENUE EXTENSION 26-27 WF1219655 REMOTE PLANT SECURITY 262 WF1223116 CARTERS CREEK HEADWORKS IMP 243 WF1227774 CARTERS CREEK THICKENER BLDG ROOF UPGRADE 267 TBD AGGIE ACRES FIBER OPTIC CONDUIT 266 TBD BARRON ROAD WIDENING PH II 34-35 TBD BEE CREEK PH IV & V WASTEWATER 134-135 TBD CARTERS CREEK ATAD EXPANSION 254 TBD CARTERS CREEK ELECTRICAL IMPROVEMENTS 265 TBD CARTERS CREEK FIBER RING 263 TBD CC TREATMENT STRUCTURE COATINGS REPLACEMENT 253 TBD COLLEGE HEIGHTS UTILITY REHAB 224-225 TBD EASTGATE REHAB 222-223 TBD LICK CREEK CAPACITY EXPANSION II 256 276