Loading...
HomeMy WebLinkAboutFY 2005-2006 Capital Improvements Program BudgetHEART OF THE RESEARCH VALLEY CITY OF COLLEGE STATION www.cstx.gov Embracing the Past, Exploring the Future! CCiittyy ooff CCoolllleeggee SSttaattiioonn CCAAPPIITTAALL IIMMPPRROOVVEEMMEENNTT PPRROOJJEECCTT BBUUDDGGEETT FFOORR FFIISSCCAALL YYEEAARR 22000066 OOCCTTOOBBEERR 11,, 22000055 ttoo SSEEPPTTEEMMBBEERR 3300,, 22000066 HEART OF THE RESEARCH VALLEY TABLE OF CONTENTS Executive Summary ............................................................................................................. 1 General Government Capital Improvement Projects Streets, Traffic, Sidewalks and Trails .......................................................................... 7 Street Rehabilitation Projects................................................................... 12 Street Extension Projects......................................................................... 21 Street TxDOT Projects............................................................................. 37 Traffic Projects ......................................................................................... 41 Sidewalks and Trails ................................................................................ 54 Parks Projects ........................................................................................................... 65 Parkland Dedication.................................................................................................. 91 General Government Facilities and Technology ..................................................... 117 Public Facilities ......................................................................................... 120 Technology Projects.................................................................................. 131 Convention Center .................................................................................................. 153 Business Park ......................................................................................................... 159 Utility Capital Improvement Projects Utilities Capital Projects Budget .............................................................................. 165 Electric Service........................................................................................................ 167 Water Service.......................................................................................................... 171 Production Projects................................................................................ 176 Distribution ............................................................................................. 196 Rehabilitation Projects ........................................................................... 221 Wastewater Service ................................................................................................ 243 Collection................................................................................................ 248 Rehabilitation Projects ........................................................................... 267 Treatment............................................................................................... 288 Drainage Utility ........................................................................................................ 303 HEART OF THE RESEARCH VALLEY The following is the annual City of College Station Capital Improvement Project (CIP) Budget document. The CIP budget provides the framework for capital improvement projects to be conducted in the 2006 fiscal year that begins October 1, 2005 and ends on September 30, 2006. While summary capital project schedules have been included in the annual College Station Approved Budget, this CIP budget document permits greater communication among City staff, administration, Council and citizens regarding capital projects. Areas of enhanced information conveyed within this document include individual project detail pages and corresponding maps, where applicable. The project sheets detail the project number, project manager, funding source(s), description of purpose and need, funding per year and category, and the impact, if any, on future operating budgets. The maps provide citizens and officials a greater understanding of the scope and the impact of the specific projects through the illustration of the planned action. The City of College Station develops and adopts a five-year Capital Improvements Project List. The list is updated annually and is presented for City Council review as a part of the annual budget process. The list consolidates all anticipated capital needs for which funding authorization exists, while separating the projects into several sections depending on the services provided and the respective funding source. Once the budget is approved by the City Council, the assigned project managers manage their respective projects with budgetary oversight from the Office of Budget and Strategic Planning and the Finance Department. CAPITAL PROJECT FUNDING The City operates under the laws of the State of Texas and the City of College Station's Home Rule Charter. The City has legal authority to issue General Obligation debt only after a positive vote of the citizens. General Obligation (GO) debt is debt that obligates the City to repay the issue with ad valorem tax revenues. The City uses GO debt for the acquisition and development of parks and recreation facilities, rights-of-way and construction of arterial streets, reconstruction of major arterial streets, and for public buildings such as City offices, libraries, swimming pools and other general use facilities. In November 2003, the citizens of College Station approved a $38 million general government bond authorization. Information provided to citizens suggested that the City would issue the debt so as to retain the existing debt service tax rate or its effective equivalent. The current plan is to issue the voter approved debt over five years. This will allow the City to construct the projects included in the bond authorization and meet the goal of maintaining the debt service ad valorem tax rate based on the debt requirement and the increase in taxable property values in College Station. In FY 05, the City issued $5,710,000 in GO debt for various General Government capital projects. Of this $1,310,000 will fund the relocation of Fire Station #3. $850,000 will fund Parks projects with $690,000 funding the design phase of the Veterans Park Phase II development. $3,550,000 will fund streets and traffic projects. The FY 06 Budget includes issuing $8,912,000 in GO debt. This includes $2,577,000 for street projects. Included is $1,000,000 for improvements to Barron Road, $500,000 for the Rock Prairie Road widening project and $540,000 for oversize participation projects. An additional $100,000 has been approved for sidewalk improvements and $200,000 approved for hike and bike trails throughout the City. $137,000 is included for new traffic signal projects and $100,000 was approved for traffic system safety improvements. Also included is $6,335,000 for Parks projects. $6,235,000 will go toward Phase II of the Veterans Park and $100,000 is for the New Forestry Shop Construction. Existing City Council policies allow the City to continue to utilize other types of debt instruments for items such as computers and the College Station Business Park. Alternative debt instruments are planned for authorized uses and FISCAL YEAR 2005-2006 CAPITAL IMPROVEMENT PROJECT BUDGET EXECUTIVE SUMMARY 1 the debt service for those issues is included in the analysis of the appropriate debt service funds. The City has authority, and City Council policies allow for the use of non-voter authorized debt issuance such as certificates of obligation, contract obligations and other instruments (generally referred to as CO's). The policy authorized by the City Council allows the City to use such instruments for capital items such as the following: ¾ The purchase and replacement of major computer systems and other technology- based items that have useful lives of not more than 10 years. ¾ The purchase and replacement of major equipment items such as firefighting equipment. The City has developed policies and procedures to provide almost all of this equipment without issuing debt. ¾ The purchase of land and development of land for economic development uses. The FY06 Budget includes the issue of $7,499,000 in CO debt. This amount includes $1,200,000 for the College Park/Breezy Heights street rehabilitation project. An additional $400,000 of CO debt is approved for the development of University Park. $2,670,000 of CO debt is approved for facility and technology projects. This includes $2,070,000 for a new City cemetery, $300,000 of additional funds for the Police Station Additions and $300,000 for a Wolf Pen Creek Water Feature. Also included is $1,000,000 that was approved for the Convention Center project and $2,229,000 for Phase IA of the Spring Creek Corporate Campus in the Business Park. The other type of debt that the City will generally use is revenue bonds. Revenue bonds are issued any time there is a need for financing capital construction or acquisition. This type of debt is also used when the asset will reside in one or more of the City's enterprise funds. Generally, revenue bonds do not require voter approval. The FY06 Budget includes a revenue bond debt issue of $6,000,000 is for water capital projects and an issue of $3,000,000 for wastewater capital projects. Utility projects are funded through the issuance of revenue bond which is repaid through the rates of the various utilities and/or through the use of operating revenues generated by the utilities. Other resources to fund capital projects include the Wolf Pen Creek Tax Increment Financing District, the Drainage Utility, and Parkland Dedication Funds. Each will provide resources that will be used to complete a number of projects over the next 5 years. Community Development Block Grant funds are also used to fund capital projects. CAPITAL IMPROVEMENT PROJECTS The Approved Capital Improvements Budget for FY06 totals $50,474,565 for all funds that include capital projects. However, this budget amount does not reflect all projected capital expenditures for FY06. In the case of projects for which funds have already been approved and budgeted, the city may continue to spend money to complete these projects without including the projected FY06 expense as a new appropriation. The project budgets that have been appropriated carry forward until the project is complete. Only portions of the projects that have not been appropriated previously are included in the FY06 Budget. GENERAL CAPITAL PROJECTS The following is a brief summary of some of the key general government projects scheduled for FY06. STREET REHABILITATION PROJECTS In FY06, $2,166,120 is projected for rehabilitation to streets in the Southside area. This is a multi-year effort to rehabilitate the infrastructure in older parts of College Station. Additionally, in the Northgate area, funds will be used for phase II of the Church Street rehabilitation project and for rehabilitation efforts on Tauber and Stasney. STREET EXTENSION PROJECTS $2,040,000 is budgeted in FY06 for various street extension and widening projects. This includes $1,000,000 for improvements to Barron Road. An additional $540,000 is budgeted for oversize participation efforts throughout the City as authorized in the 2003 bond election. 2 $3,463,237 is projected in FY06 for phase II of the extension of Dartmouth Drive and $500,000 is projected for the Rock Prairie Road Widening project. These street projects will help to address traffic issues that have been highlighted in the citizen survey and other feedback received from College Station citizens. STREET TxDOT PROJECTS Working in cooperation with the Texas Department of Transportation, in FY06, the City expects to complete the medians on George Bush Drive. TxDOT timing on projects will determine when these expenditures will be made. The City pays ten percent of right-of-way costs, and also pays for any enhancements, such as the application of any streetscaping desired in the project. TRAFFIC PROJECTS In FY06, funds have been budgeted for traffic signal enhancements including new traffic signal projects. New signals are being constructed at the intersections of Rock Prairie Road and Rio Grande and at Welsh and Holleman. Funds for safety improvements to the traffic system are also budgeted for FY06. SIDEWALKS AND TRAILS PROJECTS The City of College Station has worked over the years to ensure adequate transportation infrastructure for pedestrians and bicyclists. The City has an adopted sidewalk and bike loop plan. As new development occurs, sidewalks are an important aspect that must be considered. In FY06, $100,000 has been budgeted for new sidewalk projects throughout the City. In addition, $200,000 is budgeted for hike and bike trails throughout the City. PARKS CAPITAL PROJECTS In FY06, the most significant parks project will be beginning the construction of phase II of Veterans Park. $6,235,000 is estimated to be spent over the next two fiscal years for this project. Other parks projects for which funding has been approved in FY06 Budget include the development of University Park and the construction of a new forestry shop. It has been projected that funds will also be used for Steeplechase Park and for the Lincoln Center’s Splash Park. PARKLAND DEDICATION CAPITAL PROJECTS Parkland dedication funds can be used for projects in neighborhood parks within the various park zones. These funds come from a dedication required as new development occurs in College Station. In FY06, $692,722 has been budgeted for projects that are anticipated to be completed in the various park zones. GENERAL GOVERNMENT AND CAPITAL EQUIPMENT CAPITAL PROJECTS General government and capital equipment projects are planned assets that have value to more than one specific area of City operations. The two main divisions within this category are public facilities and technology projects. In FY06, it is projected that $7,624,401 will be spent on public facilities. Included in this amount is $3,325,000 for the addition to the police station; $1,489,401 for the relocation of Fire Station #3; and $2,170,000 for a new City cemetery. In addition, $625,000 is projected for projects planned in the Northgate area. These include entry features, a water feature and public restrooms. It is estimated that $874,612 will be spent on technology projects in FY06. These include $160,000 for automated citations, $453,172 for ATM network replacement and $40,000 for a kiosk at which citizens can pay utility bills and fines. Also budgeted is $100,000 for the replacement of the City’s radios. It is estimated that the total of this project will be $4,900,000. The initial $100,000 will be used for the study of system needs. BUSINESS PARK PROJECTS In FY06, it is estimated that $1,214,400 will be spent on a technology-based business incubator. In collaboration with the Bryan Business Council and the Research Valley Partnership, this project will help to support and generate the start up of new companies in the community. Funds are also projected for the continuation of the development of the Spring Creek Corporate Campus. $1,309,000 has been budgeted in FY06 for this effort. 3 UTILITY CAPITAL PROJECTS The following is a brief summary of some of the utility capital projects scheduled for FY 06. These capital projects are funded either through existing revenues from these funds, through the issuance of Utility Revenue Bonds, or through drainage utility funds. ELECTRIC CAPITAL PROJECTS $14,227,272 is the budgeted expenditure amount for electric capital projects in FY06. As the electric capital projects are considered competitive matter, details of these projects cannot be outlined in this summary, but will be provided to the City Council. WATER CAPITAL PROJECTS In FY06, $13,515,161 is the approved expenditure for water capital projects. Included is $1,900,000 for the construction of three shallow wells that will allow our water production to meet projected peak demand capacity. Funds have been projected for the three additional shallow wells to be constructed over the next two fiscal years. The shallow wells will sustain production levels until a deep well can be constructed. Other significant production projects include the replacement of the chlorine disinfection system at the Dowling Road Pump Station. It is estimated that $2,452,000 will be spent over the next two fiscal years for this project. In addition it is projected that $1,211,000 will be spent on water plant security upgrades in FY06 and FY07. Significant distribution projects include $540,000 projected for FY06 for the Wellborn Road Widening project. The total cost of this project is anticipated to be $2,740,000, but it is expected that the City will be partially reimbursed by TxDOT for the cost of this project upon completion. $2,302,000 is projected to be spent in FY06 for the extension of water service into areas annexed in recent years. These extensions include Rock Prairie/Bird Pond, Arrington Road, Barron Road and Lick Creek/Rock Prairie. Rehabilitation projects budgeted for in FY06 include $100,000 for the replacement of the Barron Road water line and meters in conjunction with the upgrade of Barron Road to a minor arterial. $267,554 is budgeted for FY06 for the relocation of water lines along Texas Avenue as a result of the TxDOT widening project. Additionally, $3,119,095 is projected in FY06 and FY07 for Southside rehabilitation projects. The Approved FY06 Budget includes $1,000,000 in current revenues that will be transferred from operations to fund water capital projects. Additionally, a debt issue of $6,000,000 is projected for issuance in FY06 for water capital projects. WASTEWATER CAPITAL PROJECTS The FY06 Approved Budget includes $7,454,628 in expenditures for numerous wastewater capital projects. Collection projects include $468,000 for phase I of the Northeast Trunk Expansion. This project will replace the sewer line at Highway 6 near the FM 60 interchange and will have a total cost of $715,500. Funds are also projected in FY06 for the Lick Creek Parallel Trunk Line. $250,000 is projected to be spent in FY06 for this project. An additional $1,000,000 is projected for FY07 and $1,750,000 for FY08. $566,000 is budgeted in FY06 for recently annexed areas. $500,000 is projected in FY06 for the completion of the replacement of the Carters Creek Screw Lift System. Consistent with the Water capital projects, significant funds are projected for Southside sewer upgrades in FY06 and in future years. Treatment and disposal projects include a budgeted $550,000 in FY06 and FY07 for odor control improvements at the Carters Creek Treatment Plant. $550,000 is also projected over the next two fiscal years for UV treatment improvements at the plant. It is estimated that $652,000 will be spent in FY06 for sludge processing improvements and an additional $50,000 is budgeted in FY06 for sludge facility improvements. Other anticipated improvements include the replacement of the SCADA system and the construction of a dedicated maintenance building. A total of $2,000,000 in current revenues from operations is budgeted to be used to fund wastewater capital projects. Additionally, a debt issue of $3,000,000 is projected for issuance in FY06 for wastewater capital projects. 4 DRAINAGE CAPITAL PROJECTS The approved FY06 drainage capital projects budget includes a projected $4,600,613 for improvements to the City’s drainage system. Significant projects include a projected $1,959,898 for improvements to the Bee Creek main channel. Consistent with the other capital funds, $945,000 is budgeted to be spent in FY06 and in FY07 for Southside drainage improvements. Funds are also included for drainage improvements on Wolf Pen Creek. Additionally, $210,000 is budgeted for a drainage detention project on University Drive. 5 HEART OF THE RESEARCH VALLEY 6 GGEENNEERRAALL GGOOVVEERRNNMMEENNTT-- SSTTRREEEETT PPRROOJJEECCTTSS CCAAPPIITTAALL IIMMPPRROOVVEEMMEENNTT PPRROOJJEECCTTSS FFIISSCCAALL YYEEAARR 22000055--22000066 TTHHRROOUUGGHH FFIISSCCAALL YYEEAARR 22001100--22001111 7 GENERAL GOVERNMENT STREETS, TRAFFIC, SIDEWALKS, AND TRAILS CAPITAL IMPROVEMENT PROJECTS FISCAL YEAR 2005-2006 THROUGH FISCAL YEAR 2010-2011 PROJECT REVISED PROJECT BUDGET ACTUAL FY 04-05 BUDGET NUMBER AMOUNT FY 03-04 APPROPRIATION BEGINNING FUND BALANCE:20,740,014 19,160,317 ADDITIONAL RESOURCES: GENERAL OBLIGATION BONDS 1,600,000 3,550,000 CERTIFICATES OF OBLIGATIONS 0 1,150,000 INTERGOVERNMENTAL TRANSFERS 311,963 580,000 INTRAGOVERNMENTAL TRANSFERS 1,355,875 652,624 INVESTMENT EARNINGS 318,946 300,000 OTHER 767,151 0 SUBTOTAL ADDITIONAL RESOURCES 4,353,935$ 6,232,624$ TOTAL RESOURCES AVAILABLE 25,093,949$ 25,392,941$ STREET REHABILITATION PROJECTS 1 FIRST & MAPLE STREET REHABILITATION ST0201 969,000 881,166 0 DOMINIK ST REHABILITATION ST0216 960,000 8,900 0 WEST PARK (SOUTHSIDE)ST0400 1,200,000 35,916 0 ANNEXATION OVERLAYS ST0401 200,000 193,480 200,000 COLLEGE PARK/BREEZY HEIGHTS (SOUTHSIDE)ST0507 2,500,000 0 1,230,000 2 NORTHGATE STREET REHAB ST0518 3,304,000 0 0 2 CHURCH STREET REHAB PHASE II ST0523 800,000 0 800,000 TAUBER AND STASNEY REHAB/NG SIDEWALKS ST0505 252,110 0 252,110 CLOSED PROJECTS 238,046 SUBTOTAL 1,357,507$ 2,482,110$ STREET EXTENSION PROJECTS * JONES-BUTLER RD SOUTH - PH II ST0005 2,036,000 0 0 * VICTORIA OP ST9928 626,000 22,986 0 DARTMOUTH EXTENSION PHASE II ST0211 3,600,000 3,082 0 UNIVERSITY DR (FM 60) WIDENING ST0213 247,000 0 0 2 OVERSIZE PARTICIPATION ST0519 2,700,000 0 540,000 CENTRAL PARK LANE EXTENSION ST0509 150,000 0 150,000 ROCK PRAIRIE ROAD PROJECTS ROCK PRAIRIE ROAD REALIGNMENT ST9923 982,000 7,881 0 2 ROCK PRAIRIE RD WIDENING ST0417 2,969,000 786 500,000 LONGMIRE ROAD PROJECTS * LONGMIRE EXT-GRAHAM-CYPRESS MEADOWS ST0100 2,813,000 208,343 0 BARRON ROAD PROJECTS * BARRON ROAD RIGHT OF WAY ST0006 431,000 1,752 0 BARRON ROAD INTERCHANGE ST0212 709,973 120,494 0 2 BARRON ROAD IMPROVEMENTS ST0409 3,000,000 2,566 500,000 GREENS PRAIRIE ROAD PROJECTS GREENS PRAIRIE RD. WIDENING ST0214 3,759,000 2,140,601 0 GREENS PRAIRIE RD/ARRINGTON/FOREST RIDGE ACCESS ST0304 1,350,000 196,356 0 2 GREENS PRAIRIE WIDENING PH II ST0520 3,300,000 0 0 CLOSED PROJECTS 425,176 0 SUBTOTAL 3,130,022$ 1,690,000$ 8 GENERAL GOVERNMENT STREETS, TRAFFIC, SIDEWALKS, AND TRAILS CAPITAL IMPROVEMENT PROJECTS FISCAL YEAR 2005-2006 THROUGH FISCAL YEAR 2010-2011 APPROVED ESTIMATE FY 05-06 BUDGET PROJECTED PROJECTED PROJECTED PROJECTED PROJECTED PROJECTED FY 04-05 APPROPRIATION FY 05-06 FY 06-07 FY 07-08 FY 08-09 FY 09-10 FY 10-11 19,160,317 16,931,888 16,931,888 7,067,868 2,012,408 1,074,405 773,405 531,405 3,550,000 2,577,000 2,577,000 4,092,000 6,392,000 2,769,000 0 0 1,150,000 1,200,000 1,200,000 0 0 0 0 0 580,000 0 0 0 0 0 0 0 652,624 0 0 0 25,000 50,000 75,000 0 417,437 234,000 234,000 90,000 31,000 19,000 13,000 8,000 0 0 0 0 0 0 0 0 6,350,061$ 4,011,000$ 4,011,000$ 4,182,000$ 6,448,000$ 2,838,000$ 88,000$ 8,000$ 25,510,378$ 20,942,888$ 20,942,888$ 11,249,868$ 8,460,408$ 3,912,405$ 861,405$ 539,405$ 2,405 0 0 0 0 0 0 0 897,509 0 0 0 0 0 0 0 385,464 0 798,120 0 0 0 0 0 200,000 0 0 0 0 0 0 0 127,000 1,270,000 1,368,000 1,005,000 0 0 0 0 0 0 0 1,652,000 1,652,000 0 0 0 80,000 0 270,000 450,000 0 0 0 0 10,000 0 242,110 0 0 0 0 0 0 0 0 0 0 0 1,702,378$ 1,270,000$ 2,678,230$ 3,107,000$ 1,652,000$ 0$ 0$ 0$ 112,450 0 255,390 1,380,000 244,003 0 0 0 36,987 0 506,584 0 0 0 0 0 0 0 3,463,237 0 0 0 0 0 1,000 0 244,889 0 0 0 0 0 0 540,000 1,080,000 540,000 540,000 540,000 0 0 150,000 0 0 0 0 0 0 0 31,791 0 0 0 0 0 0 0 500,000 500,000 500,000 500,000 0 1,469,000 0 0 1,148,452 0 0 0 0 0 0 0 0 0 115,000 173,785 0 0 0 0 97,000 0 155,000 331,756 0 0 0 0 410,000 1,000,000 1,343,717 1,243,717 0 0 0 0 1,230,569 0 0 0 0 0 0 0 882,037 0 206,486 0 0 0 0 0 0 0 0 0 3,300,000 0 0 0 0 0 0 0 0 0 4,600,286$ 2,040,000$ 7,870,303$ 4,169,258$ 4,084,003$ 2,009,000$ 0$ 0$ 9 GENERAL GOVERNMENT STREETS, TRAFFIC, SIDEWALKS, AND TRAILS CAPITAL IMPROVEMENT PROJECTS FISCAL YEAR 2005-2006 THROUGH FISCAL YEAR 2010-2011 PROJECT REVISED PROJECT BUDGET ACTUAL FY 04-05 BUDGET NUMBER AMOUNT FY 03-04 APPROPRIATION STREET TXDOT PROJECTS TX AVE STREETSCAPE PH II ST9915 500,000 0 0 GEORGE BUSH DRIVE MEDIANS ST0102 499,552 0 0 WELLBORN ROAD WIDENING ST0510 190,000 0 190,000 SUBTOTAL 0$ 190,000$ TRAFFIC PROJECTS * TRAFFIC MGMT. IMPROVE.ST0011 154,290 0 0 HOLLEMAN INTERSECTION IMPROVEMENTS DESIGN ST0403 9,710 3,355 0 GB EAST DRIVE@DOMINIK ST0205 133,000 0 0 GB EAST EAST @HOLLEMAN ST0206 110,000 66,280 0 VEHICLE DETECTION ST0302 50,000 475 0 2 TRAFFIC SYSTEM SAFETY IMPR.ST0511 465,710 0 65,710 2 GEORGE BUSH MEDIAN - ROSEMARY TO HOUSTON ST0525 34,290 0 34,290 PEDESTRIAN SIGNAL DARTMTH/HARVEY ST0410 22,000 12,866 0 2 NEW TRAFFIC SIGNAL PROJECTS ST0512 2,010,000 0 453,000 2 NEW SIGNAL @ROCK PRAIRIE/RIO GRANDE ST0414 120,000 0 0 2 NEW SIGNAL @WELSH/HOLLEMAN ST0415 120,000 0 0 2 TRAFFIC SIGNAL COMMUNICATIONS ST0411 250,000 0 0 CLOSED PROJECTS 177,613 0 SUBTOTAL 260,588$ 553,000$ SIDEWALKS & TRAILS BIKE LOOP - 2005 ST0530 327,202 0 0 MISC. BIKE TRAILS ST9803 169,000 0 0 NEIGHBORHOOD CIP (TRAFFIC CALMING)ST0012 ANNUAL 869 0 PARKVIEW DR TRAFFIC CALMING ST0526 75,000 0 75,000 2 PEDESTRIAN IMPROVEMENTS ON UNIVERSITY DRIVE ST0416 407,000 242 357,000 GATEWAY IMPROVEMENTS ST0515 ANNUAL 0 150,000 PEDESTRIAN IMPROVEMENTS ON FM 2818 ST0516 50,000 0 50,000 2 SIDEWALK IMPROVEMENTS ST0517 500,000 0 100,000 2 HIKE AND BIKE TRAILS ST0521 925,000 0 0 2 BRISON PARK BIKE & PED TRAILS ST0524 75,000 0 75,000 CLOSED PROJECTS 559,591 125,514 SUBTOTAL 560,703$ 932,514$ OTHER 8,474 0 DEAN INTERNATIONAL 252,450 264,000 DEBT ISSUANCE COSTS 13,888 30,000 GENERAL & ADMIN. CHARGES 350,000 519,549 TOTAL EXPENDITURES 5,933,632$ 6,661,173$ GAAP 0 ENDING FUND BALANCE:19,160,317$ 18,731,768$ * - Indicates projects funded through November 1998 G.O. Bond Authorization 1 - Funded through CDBG Funds. 2 - Indicates projects funded through 2003 G.O. Bond Authorization 10 GENERAL GOVERNMENT STREETS, TRAFFIC, SIDEWALKS, AND TRAILS CAPITAL IMPROVEMENT PROJECTS FISCAL YEAR 2005-2006 THROUGH FISCAL YEAR 2010-2011 APPROVED ESTIMATE FY 05-06 BUDGET PROJECTED PROJECTED PROJECTED PROJECTED PROJECTED PROJECTED FY 04-05 APPROPRIATION FY 05-06 FY 06-07 FY 07-08 FY 08-09 FY 09-10 FY 10-11 315,733 0 184,267 0 0 0 0 0 175,000 324,552 324,552 0 0 0 0 0 190,000 0 0 0 0 0 0 0 680,733$ 324,552$ 508,819$ 0$ 0$ 0$ 0$ 0$ 0 0 15,000 15,000 15,000 15,000 15,000 15,000 6,355 0 0 0 0 0 0 0 0 0 50,000 0 50,000 0 0 0 0 0 0 0 0 0 0 0 19,000 0 6,000 0 0 0 0 0 65,710 100,000 100,000 100,000 100,000 100,000 0 0 34,290 0 0 0 0 0 0 0 49,174 0 0 0 0 0 0 0 50,000 137,000 600,000 500,000 500,000 360,000 0 0 1,000 0 117,000 0 0 0 0 0 3,000 0 115,000 0 0 0 0 0 12,000 0 50,000 78,000 60,000 50,000 0 0 0 0 0 0 0 0 240,529$ 237,000$ 1,053,000$ 693,000$ 725,000$ 525,000$ 15,000$ 15,000$ 1,000 0 8,000 318,202 0 0 0 0 0 0 169,000 0 0 0 0 0 0 0 25,000 25,000 25,000 50,000 75,000 0 75,000 0 0 0 0 0 0 0 217,715 0 189,043 0 0 0 0 0 50,000 0 100,000 150,000 150,000 150,000 150,000 150,000 50,000 0 0 0 0 0 0 0 100,000 100,000 100,000 100,000 100,000 100,000 0 0 2,625 200,000 322,375 200,000 200,000 200,000 0 0 35,000 0 40,000 0 0 0 0 0 0 0 0 0 0 0 0 0 531,340$ 300,000$ 953,418$ 793,202$ 475,000$ 500,000$ 225,000$ 150,000$ 0 0 0 0 0 0 0 0 264,000 264,000 264,000 0 0 0 0 0 39,676 80,000 80,000 25,000 50,000 15,000 0 0 519,549 467,250 467,250 450,000 400,000 90,000 90,000 90,000 8,578,490$ 4,982,802$ 13,875,020$ 9,237,460$ 7,386,003$ 3,139,000$ 330,000$ 255,000$ 16,931,888$ 15,960,086$ 7,067,868$ 2,012,408$ 1,074,405$ 773,405$ 531,405$ 284,405$ 11 SSTTRREEEETT RREEHHAABBIILLIITTAATTIIOONN PPRROOJJEECCTTSS 12 PROJECT: FIRST, MAPLE AND LOUISE PROJECT #: ST0201 STREET REHABILITATION FUND: STREETS CAPITAL PROJECTS PROJECT BUDGET: $969,000 PROJECT FUNDING MANAGER: LAURA HARRIS SOURCES: STREETS CIP & CDBG Rehabilitation of inadequate pavement structure and installation of storm drain facilities in the Northgate Area including First Street (from Church Avenue to the City Limits), Maple Avenue (from Wellborn Road to First Street), and Louise Avenue (from Wellborn Road to Boyett Street). Project complete September 2004. 2005 expenses occurred with release of retainage 30 days after project completion. FISCAL YEAR LAND ENG. CONSTR. MISC. PROJECT TOTAL Prior Years $0 $118,002 $850,268 $8,277 $976,547 2004-05 0 1,955 0 450 $2,405 2005-06 $0 2006-07 $0 2007-08 $0 2008-09 $0 2009-10 $0 2010-11 $0 TOTAL $0 $119,957 $850,268 $8,727 $978,952 Total Personnel $0 Supplies $0 Service $0 Capital $0 TOTAL $0 PROJECT DESCRIPTION/STATUS PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR OPERATING COSTS First Fiscal Year Annually $0 $0 13 PROJECT: Dominik Street Rehabilitation PROJECT #: ST0216 FUND: Streets Capital Project PROJECT BUDGET: $960,000 PROJECT FUNDING MANAGER: Craig Jordan SOURCES: Nov. 98 G.O. Bond Authorization $260,000 came from Longmire Project Nov 2004 Rehabilitation of Dominik from Munson to the end (cul-de-sac) from the existing section of 37' pavement to new section of 31' pavement with one 6' sidewalk on north side of street. This rehab section will be assigned as a bike route (with no marked bike lanes). Texcon, Inc was awarded the construction project on Dominik Street Rehabilitation Project on August 26, 2004 in amount of $871,838.35 FISCAL YEAR LAND ENG. CONSTR. MISC.PROJECT TOTAL Prior Years 0 62,070 0 421 $62,491 2004-05 9,650 886,659 1,200 $897,509 2005-06 $0 2006-07 $0 2007-08 $0 2008-09 $0 2009-10 $0 2010-11 $0 TOTAL $0 $71,720 $886,659 $1,621 $960,000 Total Personnel $0 Supplies $0 Service $0 Capital $0 TOTAL $0$0 $0 PROJECT DESCRIPTION/STATUS PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR OPERATING COSTS First Fiscal Year Annually 14 PROJECT: WEST PARK (SOUTHSIDE)PROJECT #: ST0400 FUND: STREETS CAPITAL PROJECTS PROJECT BUDGET: $1,200,000 PROJECT FUNDING MANAGER: LAURA HARRIS SOURCES: GENERAL OBLIGATION BONDS Rehabilitation of streets and drainage infrastructure in the West Park area of Southside bounded by George Bush Drive, Luther Street, Wellborn Road, and Fairview Avenue. April 2005 Status: In Design Construction Award of Construction Contract: Summer 2005 FISCAL YEAR LAND ENG. CONSTR. MISC. PROJECT TOTAL Prior Years $0 $16,345 $0 $71 $16,416 2004-05 80,535 300,000 4,929 $385,464 2005-06 23,120 765,000 10,000 $798,120 2006-07 $0 2007-08 $0 2008-09 $0 2009-10 $0 2010-11 $0 TOTAL $0 $120,000 $1,065,000 $15,000 $1,200,000 Total Personnel $0 Supplies $0 Service $0 Capital $0 TOTAL $0$0 $0 PROJECT DESCRIPTION/STATUS PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR OPERATING COSTS First Fiscal Year Annually 15 PROJECT: Annexation Overlays PROJECT #: ST0401 FUND: 139 - Streets CIP Fund PROJECT BUDGET: $200,000 PROJECT FUNDING MANAGER: Charles McLemore SOURCES: Streets Capital Projects 22 lane miles of streets were added to the street inventory in the 2002 annexation. This project will be ongoing for a period of 5 years. Each year 4.4 lane miles of street will be overlaid to meet city standards and completed in the 5th year. 2005 is the second year of a five year plan. $200,000 provided in 2004 (year 1) and $200,000 provided in 2005 (year 2) from 139 - Streets CIP Fund. $200,000 to be provided in 2006 (year 3) from 001 - General Fund. FISCAL YEAR LAND ENG. CONSTR. MISC. PROJECT TOTAL Prior Years $0 2004-05 200,000 $200,000 2005-06 $0 2006-07 $0 2007-08 $0 2008-09 $0 2009-10 $0 2010-11 $0 TOTAL $0 $0 $200,000 $0 $0 $200,000 Total Personnel $0 Supplies $0 Service $0 Capital $0 TOTAL $0$0 $0 PROJECT DESCRIPTION/STATUS PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR OPERATING COSTS First Fiscal Year Annually 16 PROJECT: COLLEGE PARK/BREEZY HEIGHTS PROJECT #: ST0507 STREET IMPROVEMENTS FUND: STREETS CAPITAL PROJECTS PROJECT BUDGET: $2,500,000 PROJECT FUNDING MANAGER: LAURA HARRIS SOURCES: GENERAL OBLIGATION BONDS Street improvements in area bounded by George Bush Drive, West Dexter Drive, Hereford Street, Holleman Drive, Eleanor Street, and Fairview Avenue. April 2005 Status: In Design Council Award of Construction Contract: Spring 2006 FISCAL YEAR LAND ENG. CONSTR. MISC. PROJECT TOTAL Prior Years $0 $0 $0 $0 $0 2004-05 125,000 2,000 $127,000 2005-06 95,000 1,260,000 13,000 $1,368,000 2006-07 1,000,000 5,000 $1,005,000 2007-08 $0 2008-09 $0 2009-10 $0 2010-11 $0 TOTAL $0 $220,000 $2,260,000 $20,000 $2,500,000 Total Personnel $0 Supplies $0 Service $0 Capital $0 TOTAL $0 PROJECT DESCRIPTION/STATUS PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR OPERATING COSTS First Fiscal Year Annually $0 $0 17 PROJECT: NORTHGATE STREET REHAB PROJECT #: ST0518 FUND: 139 - STREETS CAPITAL PROJECTS PROJECT BUDGET: $3,304,000 PROJECT FUNDING MANAGER: TBD SOURCES: 2003 Bond Authorization (GOB's) Rehabilitation of Streets in the Northgate Area of the City to include portions of Church Street, Boyett, Cross, Lodge, Nagle, Patricia, Stasney, Tauber, and Spruce. FISCAL YEAR LAND ENG. CONSTR. MISC.PROJECT TOTAL Prior Years 0 0 0 0 $0 2004-05 $0 2005-06 $0 2006-07 198,000 1,404,000 50,000 $1,652,000 2007-08 198,000 1,404,000 50,000 $1,652,000 2008-09 $0 2009-10 $0 2010-11 $0 TOTAL $0 $396,000 $2,808,000 $100,000 $3,304,000 Total Personnel $0 Supplies $0 Service $0 Capital $0 TOTAL $0$0 $0 PROJECT DESCRIPTION/STATUS PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR OPERATING COSTS First Fiscal Year Annually 18 PROJECT: Church Avenue Rehabilitation - Phase II PROJECT #: ST0523 FUND: 2003 Bond Funds PROJECT BUDGET: $800,000 PROJECT FUNDING 2003 General Obligation MANAGER:Donald Harmon SOURCES: Bond Funds ($800,000) Church Avenue will be rehabilitated between College Main and Nagle. FISCAL YEAR LAND ENG. CONSTR. MISC.PROJECT TOTAL Prior Years $0 $0 $0 $0 $0 2004-05 60,000 20,000 $80,000 2005-06 30,000 220,000 20,000 $270,000 2006-07 10,000 400,000 40,000 $450,000 2007-08 $0 2008-09 $0 2009-10 $0 2010-11 $0 TOTAL $0 $100,000 $620,000 $80,000 $800,000 Total Personnel $0 Supplies $0 Service $0 Capital $0 TOTAL $0$0 $0 PROJECT DESCRIPTION/STATUS PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR OPERATING COSTS First Fiscal Year Annually 19 PROJECT: Tauber/Stasney Street Rehabilitation PROJECT #: ST0505 and Northgate Sidewalks FUND: Streets Capital Projects PROJECT BUDGET: $252,110 PROJECT FUNDING MANAGER: Edward McDonald SOURCES: CDBG Design for rehabilitation of Tauber and Stasney Street from University Drive to Cherry Street Design and construction of new sidewalks on College Main SOQ's have been received from local professional services firms, projected award of contract for A/E serivces is June 2005 FISCAL YEAR LAND ENG. CONSTR. MISC. PROJECT TOTAL Prior Years $0 2004-05 $10,000 $10,000 2005-06 155,000 $87,110 $242,110 2006-07 $0 2007-08 $0 2008-09 $0 2009-10 $0 2010-11 $0 TOTAL $0 $165,000 $87,110 $0 $0 $252,110 Total Personnel $0 Supplies $0 Service $0 Capital $0 TOTAL $0$0 $0 PROJECT DESCRIPTION/STATUS PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR OPERATING COSTS First Fiscal Year Annually 20 SSTTRREEEETT EEXXTTEENNSSIIOONN PPRROOJJEECCTTSS 21 PROJECT: JONES BUTLER PHASE II PROJECT #: ST0005 FUND: STREETS CAPITAL PROJECTS PROJECT BUDGET: $2,036,000 PROJECT FUNDING MANAGER: Danielle Charbonnet SOURCES: Nov. 98 G.O. Bond Authorization Jones Butler Road will be extended southward from Holleman Drive to intersect with FM 2818 and align with Marion Pugh. This project is needed to provide a north-south route paralleling Wellborn Road. The length of the roadway will be approximately 2,600 feet with a 90 foot wide right-of-way. The project will include drainage facilities, sidewalks, and street lighting. Right-of-way acquisition nearing completion. Project design to commence beginning FY05-06. FISCAL YEAR LAND ENG. CONSTR. MISC.PROJECT TOTAL Prior Years $36,362 $5,760 $0 $2,035 $44,157 2004-05 45,000 61,450 6,000 $112,450 2005-06 245,790 9,600 $255,390 2006-07 1,288,000 92,000 $1,380,000 2007-08 197,638 46,365 $244,003 2008-09 $0 2009-10 $0 2010-11 $0 TOTAL $81,362 $313,000 $1,485,638 $156,000 $2,036,000 Total Personnel $0 Supplies $0 Service $0 Capital $0 TOTAL $0 PROJECT DESCRIPTION/STATUS PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR OPERATING COSTS First Fiscal Year Annually $0 $0 22 PROJECT:Victoria Oversize Participation PROJECT #: ST9928 FUND: 139 - Streets CIP Fund PROJECT BUDGET: $626,000 PROJECT FUNDING MANAGER: Bob Mosley SOURCES: 1998 GO Bonds This project will extend Victoria Street from its current termination at Graham Road south to Barron Road. The street will be a major thoroughfare with a 54 foot width in a 70 foot right-of-way and an approximate length of 4,200 feet. A significant drainage structure will be required. Developer participation is anticipated for right-of-way donation with City oversize participation with street width in excess of 39 feet. The street will provide north-south access to a future CSISD school. Projects include: ST0407 - Victoria Ave OP; ST0419 - Victoria OP Westfield Ph 3; and ST0420 - Victoria OP Reatta Meadows Ph I. FISCAL YEAR LAND ENG. CONSTR. MISC. PROJECT TOTAL Prior Years 82,429 $82,429 2004-05 36,987 $36,987 2005-06 506,584 $506,584 2006-07 $0 2007-08 $0 2008-09 $0 2009-10 $0 2010-11 $0 TOTAL $0 $0 $626,000 $0 $0 $626,000 Total Personnel $0 Supplies $0 Service $0 Capital $0 TOTAL $0 PROJECT DESCRIPTION/STATUS PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR OPERATING COSTS First Fiscal Year Annually $0 $0 23 PROJECT: DARTMOUTH EXTENSION PHASE II PROJECT #: ST0211 FUND: STREETS CAPITAL PROJECTS PROJECT BUDGET: $3,600,000 PROJECT FUNDING MANAGER: DONALD HARMON SOURCES: CERTIFICATES OF OBLIGATION ($3,600,000) Dartmouth Drive will be extended from Krenek Tap Road to Harvey Mitchell Parkway. FISCAL YEAR LAND ENG. CONSTR. MISC.PROJECT TOTAL Prior Years 7,892 122,170 0 6,701 $136,763 2004-05 0 0 0 0 $0 2005-06 0 27,830 3,401,949 33,458 $3,463,237 2006-07 $0 2007-08 $0 2008-09 $0 2009-10 $0 2010-11 $0 TOTAL $7,892 $150,000 $3,401,949 $40,159 $3,600,000 Total Personnel $0 Supplies $0 Service $0 Capital $0 TOTAL $0$0 $0 PROJECT DESCRIPTION/STATUS PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR OPERATING COSTS First Fiscal Year Annually 24 PROJECT: UNIVERSITY DR (FM 60) WIDENING PROJECT #: ST0213 FUND: STREETS CAPITAL PROJECTS PROJECT BUDGET: $247,000 PROJECT FUNDING MANAGER: Danielle Charbonnet SOURCES: Certificates of Obligation Design of widening of University Drive East (FM 60) between Highway 6 and FM 158 to a major arterial. Includes sidewalks and lighting. This is a joint effort with TxDOT and the City of Bryan (contributing $250,000). FISCAL YEAR LAND ENG. CONSTR. MISC. PROJECT TOTAL Prior Years $0 $0 $0 $1,111 $1,111 2004-05 1,000 $1,000 2005-06 244,889 $244,889 2006-07 $0 2007-08 $0 2008-09 $0 2009-10 $0 2010-11 $0 TOTAL $0 $244,889 $0 $2,111 $247,000 Total Personnel $0 Supplies $0 Service $0 Capital $0 TOTAL $0$0 $0 PROJECT DESCRIPTION/STATUS PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR OPERATING COSTS First Fiscal Year Annually 25 PROJECT: Oversize Participation PROJECT #: ST0519 FUND: 139 - Streets CIP Fund PROJECT BUDGET: $2,700,000 PROJECT FUNDING MANAGER: Bob Mosley SOURCES: 2003 GO Bonds ($2,700,000) Funds provided for City-wide oversize participation projects. FISCAL YEAR LAND ENG. CONSTR. MISC. PROJECT TOTAL Prior Years $0 2004-05 $0 2005-06 1,080,000 $1,080,000 2006-07 540,000 $540,000 2007-08 540,000 $540,000 2008-09 540,000 $540,000 2009-10 $0 2010-11 $0 TOTAL $0 $0 $2,700,000 $0 $0 $2,700,000 Total Personnel $0 Supplies $0 Service $0 Capital $0 TOTAL $0 PROJECT DESCRIPTION/STATUS PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR OPERATING COSTS First Fiscal Year Annually $0 $0 26 PROJECT: Central Park Lane Extension PROJECT #: ST0509 FUND: 139 - Street Capital Projects PROJECT BUDGET: $150,000 PROJECT FUNDING MANAGER: Danielle Charbonnet SOURCES: Certificates of Obligation (2005 Issue - $150,000) Central Park Lane will be extended to provide the final connection between Southwest Parkway and Krenek Tap Road. In order for this project to be constructed the right-of-way must be dedicated by the Lutheran Church and the property owner of the one acre tract which fronts on Krenek Tap Road. Design is complete. Right-of-way dedication in progress. Construction expected to be complete by end of FY04-05. FISCAL YEAR LAND ENG. CONSTR. MISC.PROJECT TOTAL Prior Years $0 $0 $0 $0 $0 2004-05 $15,000 $120,000 $15,000 $150,000 2005-06 $0 2006-07 $0 2007-08 $0 2008-09 $0 2009-10 $0 2010-11 $0 TOTAL $0 $15,000 $120,000 $15,000 $150,000 Total Personnel $0 Supplies $0 Service $0 Capital $0 TOTAL $0$0 $0 PROJECT DESCRIPTION/STATUS PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR OPERATING COSTS First Fiscal Year Annually 27 PROJECT: Rock Prairie Rd Realignment PROJECT #: ST9923 FUND: 139 - Streets CIP Fund PROJECT BUDGET: $982,000 PROJECT FUNDING MANAGER: Bob Mosley SOURCES: 1998 GO Bonds This project provides for the realignment from the east side of the Hwy 6 intersection to join the existing roadway near its intersection with Stonebrook. The roadway will require traffic signal modifications at the east side of the Hwy 6 frontage road. Reasons for the project include safety considerations for the elimination of the roadway offset and to accommodate the high volume traffic from refuse vehicles. FISCAL YEAR LAND ENG. CONSTR. MISC. PROJECT TOTAL Prior Years $144,210 $210,848 563,396 $15,934 $934,387 2004-05 1,116 30,675 $31,791 2005-06 $0 2006-07 $0 2007-08 $0 2008-09 $0 2009-10 $0 2010-11 $0 TOTAL $144,210 $211,963 $563,396 $46,609 $0 $966,179 Total Personnel $0 Supplies $0 Service $0 Capital $0 TOTAL $0 PROJECT DESCRIPTION/STATUS PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR OPERATING COSTS First Fiscal Year Annually $0 $0 28 PROJECT: Rock Prairie Road East Widening & PROJECT #: ST0417 Design & ROW FUND: PROJECT BUDGET: $2,969,000 PROJECT Craig Jordan FUNDING 2002 Bond Election MANAGER: SOURCES: All design services for the widening of Rock Prairie East to a minor arterial section as shown on the Thoroughfare Plan from SH 6 Frontage Road to Greens Prairie Road. This includes design for the minor arterial section, sidewalks, storm drain facilities, lighting plan, etc. This budget also includes monies for all Right of Way Acquisition for the full minor arterial section. This is design and ROW money only. No money for construction. Bleyl & Associates was awarded the engineering design by the City Council on February 10, 2005 for $795,000. This is a professional services contract for the engineering design for the proposed widening of Rock Prairie Road to a minor arterial from Highway 6 to Greens Prairie Road. The conceptual design will include topographic and utility surveys and provide an assessment of the interrelationship between rights-of-way, utilities, existing easements and drainage. The contract includes development of plans, specifications and final cost estimates. It will also provide survey work and legal descriptions for purchase of right-of-way. FISCAL YEAR LAND ENG. CONSTR. MISC. PROJECT TOTAL Prior Years 551 245 $796 2004-05 499,204 $499,204 2005-06 500,000 $500,000 2006-07 500,000 $500,000 2007-08 $0 2008-09 1,469,000 $1,469,000 2009-10 $0 2010-11 $0 TOTAL $0 $551 $2,968,204 $245 $0 $2,969,000 Total Personnel $0 Supplies $0 Service $0 Capital $0 TOTAL $0$0 $0 PROJECT DESCRIPTION/STATUS PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR OPERATING COSTS First Fiscal Year Annually 29 PROJECT: LONGMIRE - GRAHAM TO CYPRESS PROJECT #: ST0100 FUND: STREETS CAPITAL PROJECTS PROJECT BUDGET: $2,813,000 PROJECT FUNDING MANAGER: DONALD HARMON SOURCES: 1998 GENERAL OBLIGATION BOND FUNDS ($2,813,000) This project will connect Longmire from Graham Road to the existing section of Longmire Road in the Oak Brook subdivision north of Barron Road. The project is planned as a 48 foot wide road within a 70 foot right- of-way with a length of approximately 4,200 feet. The street will include sidewalks on both sides. The Longmire South project is currently included in the Thoroughfare plan as a major collector roadway. The roadway is needed to provide a north-south route paralleling the Hwy 6 frontage road. This project was approved by Council for paving assessments to landowners. FISCAL YEAR LAND ENG. CONSTR. MISC. PROJECT TOTAL Prior Years $218,230 $243,918 $382,834 $6,565 $851,548 2004-05 11,770 48,248 1,000,000 88,434 $1,148,452 2005-06 $0 2006-07 $0 2007-08 $0 2008-09 $0 2009-10 $0 2010-11 $0 TOTAL $230,000 $292,166 $1,382,834 $94,999 $2,000,000 Total Personnel $0 Supplies $0 Service $0 Capital $0 TOTAL $0 PROJECT DESCRIPTION/STATUS PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR OPERATING COSTS First Fiscal Year Annually $0 $0 30 PROJECT: BARRON ROAD RIGHT OF WAY PROJECT #: ST0006 FUND: STREETS CAPITAL PROJECTS PROJECT BUDGET: $431,000 PROJECT FUNDING MANAGER: DONALD HARMON SOURCES: 1998 General Obligation Bond Funds ($316,000) Barron Road would be upgraded from a two lane rural highway to a minor arterial road as reflected on the Thoroughfare Plan. This project would establish an alignment and acquire the necessary right-of-way. Original budget = $316,000 2003 budget amendment added $115,000 for land purchase FISCAL YEAR LAND ENG. CONSTR. MISC. PROJECT TOTAL Prior Years $123,303 $11,046 $0 $7,866 $142,215 2004-05 $0 2005-06 $115,000 $115,000 2006-07 $163,785 $10,000 $173,785 2007-08 $0 2008-09 $0 2009-10 $0 2010-11 $0 TOTAL $402,088 $11,046 $0 $17,866 $431,000 Total Personnel $0 Supplies $0 Service $0 Capital $0 TOTAL $0$0 $0 PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR PROJECT DESCRIPTION/STATUS OPERATING COSTS First Fiscal Year Annually 31 PROJECT: BARRON ROAD INTERCHANGE PROJECT #: ST0212 DESIGN FUND: STREETS CAPITAL PROJECTS PROJECT $709,973 BUDGET: PROJECT FUNDING MANAGER: Craig Jordan SOURCES: Certificates of Obligation The Project is for an outside private consultant to design a TxDot Highway Interchange at the intersection of Highway 6 and Barron Road. This interchange will move traffic east to west with no off ramps. The City of College Station is providing a 100% design plans of this Interchange as per TxDOT specifications. Epsilon Engineering, Inc. was awarded the design of Barron Road Interchange for $699,973.00 by City Council onFebruary 12, 2003. Budget transfer of $10,000 from Greens Prairie Widening, ST0304 to this project in May 2005. FISCAL YEAR LAND ENG. CONSTR. MISC. PROJECT TOTAL Prior Years $126,217 0 $0 $126,217 2004-05 $95,000 $2,000 $97,000 2005-06 $150,000 $5,000 $155,000 2006-07 $328,756 $3,000 $331,756 2007-08 $0 2008-09 $0 2009-10 $0 2010-11 $0 TOTAL $0 $699,973 $0 $10,000 $709,973 Total Personnel $0 Supplies $0 Service $0 Capital $0 TOTAL $0 PROJECT DESCRIPTION/STATUS PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR OPERATING COSTS First Fiscal Year Annually $0 $0 32 PROJECT: BARRON ROAD IMPROVEMENTS PROJECT #: ST0409 FUND: 139 - STREETS CAPITAL PROJECTS PROJECT BUDGET: $3,000,000 PROJECT FUNDING MANAGER: DONALD HARMON SOURCES: 2003 GENERAL OBLIGATION BOND FUNDS ($3,000,000) Barron Road would be upgraded from a two lane rural highway to a minor arterial road as reflected on the Thoroughfare Plan. This project would provide design services for the entire project and first phase of construction. FISCAL YEAR LAND ENG. CONSTR. MISC. PROJECT TOTAL Prior Years $0 $2,222 $0 $344 $2,566 2004-05 400,000 0 10,000 $410,000 2005-06 200,000 1,123,717 20,000 $1,343,717 2006-07 100,000 1,123,717 20,000 $1,243,717 2007-08 $0 2008-09 $0 2009-10 $0 2010-11 $0 TOTAL $0 $702,222 $2,247,434 $50,344 $3,000,000 Total Personnel $0 Supplies $0 Service $0 Capital $0 TOTAL $0 PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR PROJECT DESCRIPTION/STATUS OPERATING COSTS First Fiscal Year Annually $0 $0 33 PROJECT: GREENS PRAIRIE WIDENING PROJECT #: ST0214 FUND: STREETS CAPITAL PROJECTS PROJECT $3,759,000 BUDGET: PROJECT FUNDING 2002-2003 Capital Improvement MANAGER: Craig Jordan SOURCES: Project Budget This project will widen Greens Prairie Road from 2 lanes to 4 lanes with a median and turn pockets. Construction will be completed June 2005 and there is no expenditures in 2005-2006 budget As per the FY2002-2003 Capital Improvement Project Budget, $3,930,000 was allocated by an ad valorem tax increase of 3 cents per $100 valuation to incur the dept to cover the cost of this and other high priority street projects. Transfered $600,000 from this Project (ST-0214) to Greens Prairie Road/Arrington Road Project No. ST-0304 in May 2005 Transferred $10,000 from this Project (ST-0214) to Barron Road Interchange Design, Project No. ST-0212, in May 2005. FISCAL YEAR LAND ENG. CONSTR. MISC. PROJECT TOTAL Prior Years 0 447,043 2,070,237 11,151 $2,528,430 2004-05 76,000 902,569 252,000 $1,230,569 2005-06 $0 2006-07 $0 2007-08 $0 2008-09 $0 2009-10 $0 2010-11 $0 TOTAL $0 $523,043 $2,972,806 $263,151 $3,759,000 Total Personnel $0 Supplies $0 Service $0 Capital $0 TOTAL $0$0 $0 PROJECT DESCRIPTION/STATUS PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR OPERATING COSTS irst Fiscal Yea Annually 34 PROJECT: GREENS PRAIRIE/ARRINGTON PROJECT #: ST0304 & FOREST RIDGE SCHOOL ACCESS PROJECT $1,350,000 FUND:STREETS CAPITAL PROJECTS BUDGET: FUNDING C.O. $750,000 PROJECT SOURCES: MANAGER: CRAIG JORDAN -Transfer $600,000 FROM STO214 to ST0304 - BRAZOS $80000 to be deposited - Crowley $350,000 to be deposited end of project This project is for the Engineering design for the realignment of Greens Prairie Road 2500 feet west of Highway 6 to connect with future Arrington Road which will connect with future Highway 40. The length of Greens Prairie Road to be constructed is 1844 feet and the length of Arrington Road to be constructed is 605 feet. Existing sections of Greens Prairie Road are to be removed. The design fee for this is $155,203. In addition, the scope of design includes the design of left turn lanes in front of the Forest Ridge Elementary School. The design final budget for this is $49,600. This budget includes approximately 1500 feet of a new 16 foot wide asphalt concrete lane for Greens Prairie Road. An agreement between the City and the Developer, Mr Crowley, for $350,000 will be settled and determined after the There is an agreement between the City and Brazos County but the $80,000 has not been transferred yet. Young Contractors, Inc was the low bidder for this construction project at $1,031,196.12 $600,000 transferred from Greens Prairie Road Widening, Project No. ST-0214 to this project May 2005 FISCAL YEAR LAND ENG. CONSTR. MISC. PROJECT TOTAL Prior Years 67,560 193,331 586 $261,477 2004-05 16,049 849,988 16,000 $882,037 2005-06 200,000 6,486 $206,486 2006-07 $0 2007-08 $0 2008-09 $0 2009-10 $0 2010-11 $0 TOTAL $67,560 $209,380 $1,049,988 $23,072 $1,350,000 Total Personnel $0 Supplies $0 Service $0 Capital $0 TOTAL $0$0 $0 PROJECT DESCRIPTION/STATUS PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR OPERATING COSTS First Fiscal Year Annually 35 PROJECT: GREENS PRAIRIE WIDENING PH II PROJECT #: ST0520 FUND: STREETS CAPITAL PROJECTS PROJECT BUDGET: $3,300,000 PROJECT FUNDING MANAGER: Craig Jordan SOURCES: 2003 Bond Authorization Widening of Greens Prairie Road between Pebble Creek Parkway and Rock Prairie Road. FISCAL YEAR LAND ENG. CONSTR. MISC. PROJECT TOTAL Prior Years 0 0 0 0 $0 2004-05 $0 2005-06 $0 2006-07 $0 2007-08 50,000 396,000 2,804,000 50,000 $3,300,000 2008-09 $0 2009-10 $0 2010-11 $0 TOTAL $50,000 $396,000 $2,804,000 $50,000 $3,300,000 Total Personnel $0 Supplies $0 Service $0 Capital $0 TOTAL $0 PROJECT DESCRIPTION/STATUS PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR OPERATING COSTS First Fiscal Year Annually $0 $0 36 SSTTRREEEETT TTXXDDOOTT PPRROOJJEECCTTSS 37 PROJECT: TEXAS AVENUE STREETSCAPE PROJECT #: ST9915 PHASE II FUND: STREETS CAPITAL PROJECTS PROJECT BUDGET: $500,000 PROJECT FUNDING MANAGER: TROY ROTHER SOURCES: STREETS CIP This is a part of the Texas Avenue Widening Phase II project. This is for the cost of streetscape improvements such as raised medians and streetscape light poles. FISCAL YEAR LAND ENG. CONSTR. MISC.PROJECT TOTAL Prior Years $0 $0 $0 $0 $0 2004-05 198,595 117,138 $315,733 2005-06 184,267 $184,267 2006-07 $0 2007-08 $0 2008-09 $0 2009-10 $0 2010-11 $0 TOTAL $0 $0 $198,595 $301,405 $500,000 Total Personnel $0 Supplies $0 Service $0 Capital $0 TOTAL $0$0 $0 PROJECT DESCRIPTION/STATUS PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR OPERATING COSTS First Fiscal Year Annually 38 PROJECT: GEORGE BUSH MEDIANS PROJECT #: ST0102 FUND: STREETS CAPITAL PROJECTS PROJECT BUDGET: $499,552 PROJECT FUNDING MANAGER: TROY ROTHER SOURCES: STREETS CIP FUND This project is an advanced funding agreement with the Texas Department of Transportation for construction of a landscaped median along George Bush Drive between Rosemary Lane and Houston Street. FISCAL YEAR LAND ENG. CONSTR. MISC. PROJECT TOTAL Prior Years $0 $0 $0 $0 $0 2004-05 175,000 $175,000 2005-06 324,552 $324,552 2006-07 $0 2007-08 $0 2008-09 $0 2009-10 $0 2010-11 $0 TOTAL $0 $0 $499,552 $0 $499,552 Total Personnel $0 Supplies $0 Service $0 Capital $0 TOTAL $0 PROJECT DESCRIPTION/STATUS PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR OPERATING COSTS First Fiscal Year Annually $0 $0 39 PROJECT: Wellborn Rd Widening PROJECT #: ST0510 FUND: 139 PROJECT BUDGET: $190,000 PROJECT FUNDING MANAGER: Bob Mosley SOURCES: Streets Capital Projects Funds for this project are designated to pay the City's portion of right-of-way costs for TxDot's Wellborn Road Widening project. FISCAL YEAR LAND ENG. CONSTR. MISC. PROJECT TOTAL Prior Years $0 2004-05 $190,000 $190,000 2005-06 $0 2006-07 $0 2007-08 $0 2008-09 $0 2009-10 $0 2010-11 $0 TOTAL $0 $0 $0 $190,000 $0 $190,000 Total Personnel $0 Supplies $0 Service $0 Capital $0 TOTAL $0$0 $0 PROJECT DESCRIPTION/STATUS PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR OPERATING COSTS First Fiscal Year Annually 40 TTRRAAFFFFIICC PPRROOJJEECCTTSS 41 PROJECT: Traffic Management Improvements PROJECT #: ST0011 FUND: 139 PROJECT BUDGET: $154,290 PROJECT FUNDING MANAGER: Lee Robinson SOURCES: Streets Capital Projects This project serves to hold funds for new traffic management projects. As new projects are created, funds will be allocated to those projects and this project balance will be reduced. $15,000 projected through FY 15 $4,290 projected in FY 16 FISCAL YEAR LAND ENG. CONSTR. MISC. PROJECT TOTAL Prior Years $0 2004-05 0 $0 2005-06 15,000 $15,000 2006-07 15,000 $15,000 2007-08 15,000 $15,000 2008-09 15,000 $15,000 2009-10 15,000 $15,000 2010-11 15,000 $15,000 TOTAL $0 $90,000 $0 $0 $0 $90,000 Total Personnel $0 Supplies $0 Service $0 Capital $0 TOTAL $0 PROJECT DESCRIPTION/STATUS PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR OPERATING COSTS First Fiscal Year Annually $0 $0 42 PROJECT: Holleman Intersection Improvements - PROJECT #: ST0403 Design PROJECT FUND: 139 - Streets CIP BUDGET: $9,710 PROJECT FUNDING MANAGER: Lee Robinson SOURCES: Streets CIP Holleman at Texas is a offset intersection with only one through lane share with right turns heading westbound The idea intersection layout would provide for two through lanes with a separate right turn lane. To accomplish this layout it would require acquisition of property on both the east and west side of Texas Avenue. The widen ing of Texas will provide for a right turn lane which will help move traffic on the east side of Texas. Engineering surveys and preliminary design laid out the intersection to were is would be a true "TEE." FISCAL YEAR LAND ENG. CONSTR. MISC.PROJECT TOTAL Prior Years $3,355 $3,355 2004-05 6,355 $6,355 2005-06 $0 2006-07 $0 2007-08 $0 2008-09 $0 2009-10 $0 2010-11 $0 TOTAL $0 $9,710 $0 $0 $0 $9,710 Total Personnel $0 Supplies $0 Service $0 Capital $0 TOTAL $0$0 $0 PROJECT DESCRIPTION/STATUS PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR OPERATING COSTS First Fiscal Year Annually 43 PROJECT: SIGNAL @ GEORGE BUSH/DOMINIK PROJECT #: ST0205 FUND: STREETS CAPITAL PROJECTS PROJECT BUDGET: $133,000 PROJECT FUNDING MANAGER: LEE ROBINSON SOURCES: 1998 G.O. BONDS CIP FUNDS Installation of a new fully actuated traffic signal, Dominik and G. Bush East is presently a four-way stop. Increased traffic through this intersection especially during peak periods of the day warrants a traffic signal. Due to the widening of G Bush East the construction phase of this signal will be delayed until completion of the widening project. Update since the widening of G. Bush East the latest warrant study did not warrant a traffic signal, we will continue to monitor the intersection for increase traffic. It's not clear how soon the signal will be installed. FISCAL YEAR LAND ENG. CONSTR. MISC.PROJECT TOTAL Prior Years 13,000 20,000 $33,000 2004-05 $0 2005-06 50,000 $50,000 2006-07 $0 2007-08 50,000 $50,000 2008-09 $0 2009-10 $0 2010-11 $0 TOTAL $0 $13,000 $50,000 $70,000 $133,000 Total Personnel $0 Supplies $0 Service Utilities $1,800 Capital $0 TOTAL $1,800$0 1,800 $1,800 PROJECT DESCRIPTION/STATUS PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR OPERATING COSTS First Fiscal Year Annually 44 PROJECT: SIGNAL @ GEORGE BUSH AND PROJECT #: ST0206 HOLLEMAN FUND: STREETS CAPITAL PROJECTS PROJECT BUDGET: $110,000 PROJECT FUNDING MANAGER: LEE ROBINSON SOURCES: 1998 CIP FUNDS The extension of G. Bush East from Harvey Rd to Holleman has created a need to accommodate increased vehicular traffic at this intersection. In order to decrease vehicle delays during peak traffic periods of the day a traffic signal is warranted. This project is completed, signal operational as of January 8, 2004 FISCAL YEAR LAND ENG. CONSTR. MISC. PROJECT TOTAL Prior Years 2,393 94,855 7,867 $105,115 2004-05 $0 2005-06 $0 2006-07 $0 2007-08 $0 2008-09 $0 2009-10 $0 2010-11 $0 TOTAL $0 $2,393 $94,855 $7,867 $105,115 Total Personnel $0 Supplies $0 Service utilities $1,800 Capital $0 TOTAL $1,800$0 1,800 $1,800 PROJECT DESCRIPTION/STATUS PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR OPERATING COSTS First Fiscal Year Annually 45 PROJECT:Vehicle Detection Upgrade PROJECT #: ST0302 FUND: 139 - Streets CIP Fund PROJECT BUDGET: $50,000 PROJECT FUNDING MANAGER: Lee Robinson SOURCES: Streets CIP Vehicle detection is one of the most critical component of a vehicle acutated signal system. Road failures and roadway construction are the main reasons wire wound loops embedded in the roadway fails. The advantage of utilizing cameras are numerous no long term workzone blocking traffic, the zones can program with via a mouse, unlike cut loops the location is permanent. One camera can detect several vehicle movements. We are gradually replacing failed loops with video cameras. FISCAL YEAR LAND ENG. CONSTR. MISC.PROJECT TOTAL Prior Years $24,900 $24,900 2004-05 19,000 $19,000 2005-06 6,000 $6,000 2006-07 $0 2007-08 $0 2008-09 $0 2009-10 $0 2010-11 $0 TOTAL $0 $0 $0 $49,900 $0 $49,900 Total Personnel $0 Supplies $0 Service $0 Capital $0 TOTAL $0 PROJECT DESCRIPTION/STATUS PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR OPERATING COSTS First Fiscal Year Annually $0 $0 46 PROJECT: Traffic System Safety Improvements PROJECT #: ST0511 FUND: 139 - Streets CIP Fund PROJECT BUDGET: $465,710 PROJECT FUNDING MANAGER: Lee Robinson SOURCES: Streets Capital Projects This project serves to hold funds for new traffic signal projects. Original budget was $500,000. As new signal projects are created, funds will be allocated to those projects and this project balance will be reduced. Projects on which these funds are currently used include: ST0525 - $34,290 FISCAL YEAR LAND ENG. CONSTR. MISC. PROJECT TOTAL Prior Years $0 2004-05 6,571 59,139 $65,710 2005-06 10,000 90,000 $100,000 2006-07 10,000 90,000 $100,000 2007-08 10,000 90,000 $100,000 2008-09 10,000 90,000 $100,000 2009-10 $0 2010-11 $0 TOTAL $0 $46,571 $419,139 $0 $0 $465,710 Total Personnel $0 Supplies $0 Service $0 Capital $0 TOTAL $0 PROJECT DESCRIPTION/STATUS PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR OPERATING COSTS First Fiscal Year Annually $0 $0 47 PROJECT: G. BUSH MEDIAN - ROSEMARY PROJECT #: ST0525 FUND: STREETS CAPITAL PROJECTS PROJECT BUDGET: $34,290 PROJECT FUNDING MANAGER: TROY ROTHER SOURCES: 2003 GOB $34,290 transferred from ST0511 - Traffic System Safety Improvements FISCAL YEAR LAND ENG. CONSTR. MISC. PROJECT TOTAL Prior Years 0 0 0 0 $0 2004-05 34,290 $34,290 2005-06 $0 2006-07 $0 2007-08 $0 2008-09 $0 2009-10 $0 2010-11 $0 TOTAL $0 $0 $34,290 $0 $0 $34,290 Total Personnel $0 Supplies $0 Service $0 Capital $0 TOTAL $0 PROJECT DESCRIPTION/STATUS PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR OPERATING COSTS First Fiscal Year Annually The City of College Station requested and approved an Advance Funding Agreement to have TxDOT construct, as part of the Texas Avenue widening project, a permanent on George Bush Drive between Texas Avenue and Rosemary Lane to prevent the dangerous condition created by motorists turning left into and out of the developments in this location. $0 $0 48 PROJECT: Pedestrian Signal Dartmouth/Harvey PROJECT #: ST0410 FUND: Streets Capital Project PROJECT BUDGET: $22,000 PROJECT FUNDING 2003 GOB MANAGER: Lee Robinson SOURCES: CIP Funds Install pedestrian signals & push buttons to safely cross Harvey Rd and Dartmouth.. There are no cross walks or pedestrian crossing between The Mall West signal and G Bush East. This project would provide safe access for pedestrians to and from apartments and shopping centers. A vehicle/pedestrian accident occurred 4 months ago at Stallings crossing Harvey Rd. This project will also link close to 1,000ft of sidewalks and ADA ramps to make this intersection accessible to all pedestrians. Project completed February 2005 FISCAL YEAR LAND ENG. CONSTR. MISC. PROJECT TOTAL Prior Years 0 12,733 0 133 $12,866 2004-05 49,174 $49,174 2005-06 $0 2006-07 $0 2007-08 $0 2008-09 $0 2009-10 $0 2010-11 $0 TOTAL $0 $12,733 $49,174 $133 $62,040 Total Personnel $0 Supplies $0 Service $0 Capital $0 TOTAL $0$0 $0 PROJECT DESCRIPTION/STATUS PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR OPERATING COSTS First Fiscal Year Annually 49 PROJECT: New Traffic Signal Projects PROJECT #: ST0512 FUND:139 PROJECT BUDGET: $2,010,000 PROJECT FUNDING MANAGER: Lee Robinson SOURCES: Streets Capital Projects This project serves to hold funds for new traffic signal projects. Original budget was $2,250,000. As new signal projects are created, funds will be allocated to those projects and this project balance will be reduced. Projects on which these funds are currently used include: ST0415 - $120,000 ST0414 - $120,000 FISCAL YEAR LAND ENG. CONSTR. MISC.PROJECT TOTAL Prior Years $0 2004-05 5,000 45,000 $50,000 2005-06 60,000 540,000 $600,000 2006-07 50,000 450,000 $500,000 2007-08 50,000 450,000 $500,000 2008-09 36,000 324,000 $360,000 2009-10 $0 2010-11 $0 TOTAL $0 $201,000 $1,809,000 $0 $0 $2,010,000 Total Personnel $0 Supplies $0 Service $0 Capital $0 TOTAL $0 PROJECT DESCRIPTION/STATUS PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR OPERATING COSTS First Fiscal Year Annually $0 $0 50 PROJECT: New Traffic Signal Rio Grande/PROJECT #: ST0414 Rock Prairie PROJECT FUND: 139 - Streets CIP Fund BUDGET: $120,000 PROJECT FUNDING 2003 GOB MANAGER: Lee Robinson SOURCES: CIP Funds Continued growth in the City along with new development dictates the need for safer intersections. Upon further studies and investigations the locations of the next group of signals has been determined. Two local intersections in College Station has met warrants for the installation of Traffic Signals Rio Grande at Rock Prairie and Holleman at Welsh Final signal design should be completed by mid June '05, construction should get under way late fall of this year. $120,000 transferred from ST0512. FISCAL YEAR LAND ENG. CONSTR. MISC.PROJECT TOTAL Prior Years 0 0 0 0 $0 2004-05 1,000 $1,000 2005-06 5,000 55,000 57,000 $117,000 2006-07 $0 2007-08 $0 2008-09 $0 2009-10 $0 2010-11 $0 TOTAL $0 $6,000 $55,000 $57,000 $118,000 Total Personnel $0 Supplies $0 Service $1,100 Capital $0 TOTAL $1,100$0 $1,100 $1,100 PROJECT DESCRIPTION/STATUS PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR OPERATING COSTS First Fiscal Year Annually 51 PROJECT: New Traffic Signal at Welsh/Holleman PROJECT #: ST0415 FUND: Traffic Signal Capital Project PROJECT BUDGET: $120,000 PROJECT FUNDING MANAGER: Lee Robinson SOURCES: 2003 GOB CIP Funds Continued growth in the City along with new development dictates the need for safer intersections. Upon further studies and investigations the locations of the next group of signals has been determined. Two local intersections in College Station has met warrants for the installation of Traffic Signals Rio Grande at Rock Prairie and Holleman at Welsh Final signal design should be completed by mid June '05, construction should get under way late fall of this year. $120,000 transferred from ST0512. FISCAL YEAR LAND ENG. CONSTR. MISC.PROJECT TOTAL Prior Years 0 0 0 0 $0 2004-05 3,000 $3,000 2005-06 3,000 55,000 57,000 $115,000 2006-07 $0 2007-08 $0 2008-09 $0 2009-10 $0 2010-11 $0 TOTAL $0 $6,000 $55,000 $57,000 $118,000 Total Personnel $0 Supplies $0 Service $1,100 Capital $0 TOTAL $1,100 PROJECT DESCRIPTION/STATUS PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR OPERATING COSTS First Fiscal Year Annually $0 $1,100 $1,100 52 PROJECT: Traffic Signal Communications PROJECT #: ST0411 FUND: Streets Capital Project PROJECT BUDGET: $250,000 PROJECT FUNDING 2003 GOB MANAGER: Lee Robinson SOURCES: CIP Funds This project will consist of installing fiber optics to interconnect traffic signals and in some cases we will utilize wireless technology. Presently we have 15 signals that are not interconnected. Communications provides instant upload and download of data, ability to monitor the system and possible make repairs from the signal shop. Installed wireless radios on Texas, installed conduit for fiber optics at Holleman & G Bush. Will continue to to udgrade from copper cables to fiber optics and add communications to signals without. FISCAL YEAR LAND ENG. CONSTR. MISC. PROJECT TOTAL Prior Years 0 0 0 0 $0 2004-05 12,000 $12,000 2005-06 50,000 $50,000 2006-07 18,000 50,000 10,000 $78,000 2007-08 10,000 50,000 $60,000 2008-09 50,000 $50,000 2009-10 $0 2010-11 $0 TOTAL $0 $28,000 $212,000 $10,000 $250,000 Total Personnel $0 Supplies $0 Service $0 Capital $0 TOTAL $0$0 $0 PROJECT DESCRIPTION/STATUS PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR OPERATING COSTS First Fiscal Year Annually 53 SSIIDDEEWWAALLKKSS AANNDD TTRRAAIILLSS 54 PROJECT: 2005 BIKE LOOP PROJECT #: ST0530 FUND: STREET CAPITAL FUNDS PROJECT BUDGET: $327,202 PROJECT FUNDING MANAGER: TBD SOURCES: 1989 GOB Construction of a bike loop system consisting of signed bike routes, on-street bike lanes, and off-street bike paths to link the Texas A&M University (TAMU) Campus, City of College Station Parks, and local housing areas. Loop may cross under Texas Avenue at Bee Creek. Phases I & II complete This project is a break-out project of ST9409. FISCAL YEAR LAND ENG. CONSTR. MISC. PROJECT TOTAL Prior Years 2004-05 1,000 $1,000 2005-06 7,000 1,000 $8,000 2006-07 3,000 307,202 8,000 $318,202 2007-08 $0 2008-09 $0 2009-10 $0 2010-11 $0 TOTAL $0 $11,000 $307,202 $9,000 $327,202 Total Personnel $0 Supplies $0 Service $0 Capital $0 TOTAL $0$0 $0 PROJECT DESCRIPTION/STATUS PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR OPERATING COSTS First Fiscal Year Annually 55 PROJECT: MISC BIKE TRAILS PROJECT #: ST9803 FUND: STREET CAPITAL FUNDS PROJECT BUDGET: $169,000 PROJECT FUNDING MANAGER: TBD SOURCES: 98 GOB This project serves to hold funds for bike trail projects. Original budget was $180,000. As new bike trail projects are created, funds will be allocated to those projects and this project balance will be reduced. Projects on which these funds have been used include: ST0203 - Anderson Street Sidewalks NOTE : These funds are expected to be spent upon completion of the Bee Creek drainage improvement project. They will provide a bike trail along one side of the improved channel FISCAL YEAR LAND ENG. CONSTR. MISC. PROJECT TOTAL Prior Years $0 2004-05 $0 2005-06 169,000 $169,000 2006-07 $0 2007-08 $0 2008-09 $0 2009-10 $0 2010-11 $0 TOTAL $0 $0 $169,000 $0 $169,000 Total Personnel $0 Supplies $0 Service $0 Capital $0 TOTAL $0 PROJECT DESCRIPTION/STATUS PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR OPERATING COSTS First Fiscal Year Annually $0 $0 56 PROJECT: NEIGHBORHOOD CIP PROJECT #: ST0012 FUND: STREETS CAPITAL PROJECTS PROJECT BUDGET: ANNUAL PROJECT FUNDING MANAGER: TROY ROTHER SOURCES: Streets CIP Neighborhood CIP is one means of addressing infrastructure needs identified through small area plans and through the neighborhood traffic calming program. Improvements may include traffic calming measures such as speed cushions and landscaped medians. FISCAL YEAR LAND ENG. CONSTR. MISC.PROJECT TOTAL Prior Years $0 $4,077 $64,224 $19,910 $88,211 2004-05 $0 2005-06 25,000 $25,000 2006-07 25,000 $25,000 2007-08 25,000 $25,000 2008-09 50,000 $50,000 2009-10 75,000 $75,000 2010-11 $0 TOTAL $0 $4,077 $264,224 $19,910 $288,211 Total Personnel $0 Supplies $0 Service $0 Capital $150,000 TOTAL $150,000 PROJECT DESCRIPTION/STATUS PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR OPERATING COSTS First Fiscal Year Annually $75,000 75000 $75,000 75000 57 PROJECT: PARKVIEW DRIVE TRAFFIC CALMING PROJECT #: ST0526 FUND: STREETS CAPITAL PROJECTS PROJECT BUDGET: $75,000 PROJECT FUNDING MANAGER: TROY ROTHER SOURCES: STREETS CAP PROJECTS - NEIGHBORHOOD CIP FISCAL YEAR LAND ENG. CONSTR. MISC. PROJECT TOTAL Prior Years 0 0 0 0 $0 2004-05 75,000 $75,000 2005-06 $0 2006-07 $0 2007-08 $0 2008-09 $0 2009-10 $0 2010-11 $0 TOTAL $0 $0 $75,000 $0 $0 $75,000 Total Personnel $0 Supplies $0 Service $0 Capital $0 TOTAL $0 PROJECT DESCRIPTION/STATUS PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR Parkview Drive in Pebble Creek was chosen to be the second location in the City to implement traffic calming in order to decrease traffic speeds along the roadway. OPERATING COSTS First Fiscal Year Annually $0 $0 58 PROJECT: PEDESTRIAN IMPROVEMENTS PROJECT #: ST0416 ON UNIVERSITY DRIVE FUND: STREETS CAPITAL PROJECTS PROJECT BUDGET: $407,000 PROJECT FUNDING MANAGER: TROY ROTHER SOURCES: 2003 Bond Authorization (GOB's) FISCAL YEAR LAND ENG. CONSTR. MISC. PROJECT TOTAL Prior Years $0 $0 $0 $242 $242 2004-05 217,715 $217,715 2005-06 189,043 $189,043 2006-07 $0 2007-08 $0 2008-09 $0 2009-10 $0 2010-11 $0 TOTAL $0 $217,715 $189,043 $242 $407,000 Total Personnel $0 Supplies $0 Service $0 Capital $0 TOTAL $0 PROJECT DESCRIPTION/STATUS PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR OPERATING COSTS First Fiscal Year Annually The project consists of developing a plan to improve pedestrian travel in the Northgate area of College Station. Pedestrian improvements are needed to facilitate movement across and along University Drive between College Avenue and Wellborn Road. $0 $0 59 PROJECT: GATEWAY IMPROVEMENTS PROJECT #: ST0515 FUND: SIDEWALKS & TRAILS PROJECT BUDGET:ANNUAL PROJECT FUNDING MANAGER: TROY ROTHER SOURCES: GENERAL FUND FISCAL YEAR LAND ENG. CONSTR. MISC. PROJECT TOTAL Prior Years $0 2004-05 50,000 $50,000 2005-06 100,000 $100,000 2006-07 50,000 100,000 $150,000 2007-08 50,000 100,000 $150,000 2008-09 50,000 100,000 $150,000 2009-10 50,000 100,000 $150,000 2010-11 50,000 100,000 $150,000 TOTAL $0 $300,000 $600,000 $0 $900,000 Total Personnel $0 Supplies $0 Service $0 Capital $0 TOTAL $0$0 $0 PROJECT DESCRIPTION/STATUS PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR This project involves a gateway spanning over a state owned roadway at one or more of the entrances into the city. OPERATING COSTS First Fiscal Year Annually 60 PROJECT: Pedestrian Improvements on FM 2818 PROJECT #: ST0516 FUND: Sidewalks and Trails PROJECT BUDGET: $50,000 PROJECT FUNDING MANAGER: TROY ROTHER SOURCES: CO Pedestrian improvements will be installed at the intersection of FM 2818 and Welsh as well as the approaches to the intersection. TxDOT will design the project and the City of College Station will construct the project. FISCAL YEAR LAND ENG. CONSTR. MISC. PROJECT TOTAL Prior Years $0 $0 $0 $0 $0 2004-05 45,000 5,000 $50,000 2005-06 $0 2006-07 $0 2007-08 $0 2008-09 $0 2009-10 $0 2010-11 $0 TOTAL $0 $0 $45,000 $5,000 $50,000 Total Personnel $0 Supplies $0 Service $0 Capital $0 TOTAL $0$0 $0 PROJECT DESCRIPTION/STATUS PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR OPERATING COSTS First Fiscal Year Annually 61 PROJECT: Sidewalk Improvements PROJECT #: ST0517 FUND: 139 - Streets CIP Fund PROJECT BUDGET: $500,000 PROJECT FUNDING MANAGER: Bob Mosley SOURCES: 2003 GO Bonds ($500,000) Funds provided for sidewalk improvement projects throughout the City. Plan to build sidewalks along thoroughfares and collectors and to retrofit older neighborhoods. FISCAL YEAR LAND ENG. CONSTR. MISC.PROJECT TOTAL Prior Years $0 2004-05 13,600 86,400 $100,000 2005-06 100,000 $100,000 2006-07 100,000 $100,000 2007-08 100,000 $100,000 2008-09 100,000 $100,000 2009-10 $0 2010-11 $0 TOTAL $0 $13,600 $486,400 $0 $0 $500,000 Total Personnel $0 Supplies $0 Service $0 Capital $0 TOTAL $0$0 $0 PROJECT DESCRIPTION/STATUS PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR OPERATING COSTS First Fiscal Year Annually 62 PROJECT:PROJECT #: ST0521 FUND: Street Capital Project PROJECT BUDGET: $925,000 PROJECT FUNDING MANAGER: SOURCES: General Obligation Bonds FISCAL YEAR LAND ENG. CONSTR. MISC. PROJECT TOTAL Prior Years $0 2004-05 $2,625 $2,625 2005-06 $322,375 $322,375 2006-07 $200,000 $200,000 2007-08 $200,000 $200,000 2008-09 $200,000 $200,000 2009-10 $0 2010-11 $0 TOTAL $0 $0 $922,375 $2,625 $0 $925,000 Total Personnel $0 Supplies $0 Service $0 Capital $0 TOTAL $0 Hike & Bike Trails Kristan Weaver $75,000 transferred in FY2004-05 to Brison Park Bike & Ped Path ST0524. $2625 was approved for as a match for a grant for a Safe Routes to School course at the 2-24-05 Council meeting. PROJECT DESCRIPTION/STATUS PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR OPERATING COSTS First Fiscal Year Annually $0 $0 63 PROJECT: BRISON PARK BIKE & PEDESTRIAN PROJECT #: ST0524 TRAILS FUND: STREET CAPITAL PROJECTS PROJECT BUDGET: $75,000 PROJECT FUNDING MANAGER: LAURA HARRIS SOURCES: GENERAL OBLIGATION BONDS Bike and Pedestrian Trail from the proposed cul-de-sac on Old Jersey Street to the Dexter/Old Jersey street access to the Church parking lot. April 2005 Status: In Design Council Award of Construction Contract: Late Summer/Early Fall 2005 FISCAL YEAR LAND ENG. CONSTR. MISC. PROJECT TOTAL Prior Years $0 $0 0 $0 $0 2004-05 14,000 20,000 1,000 $35,000 2005-06 4,000 35,000 1,000 $40,000 2006-07 $0 2007-08 $0 2008-09 $0 2009-10 $0 2010-11 $0 TOTAL $0 $18,000 $55,000 $2,000 $0 $75,000 Total Personnel $0 Supplies $0 Service $0 Capital $0 TOTAL $0 PROJECT DESCRIPTION/STATUS PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR OPERATING COSTS First Fiscal Year Annually $0 $0 64 GGEENNEERRAALL GGOOVVEERRNNMMEENNTT-- PPAARRKKSS PPRROOJJEECCTTSS CCAAPPIITTAALL IIMMPPRROOVVEEMMEENNTT PPRROOJJEECCTTSS FFIISSCCAALL YYEEAARR 22000055--22000066 TTHHRROOUUGGHH FFIISSCCAALL YYEEAARR 22001100--22001111 65 GENERAL GOVERNMENT PARKS PROJECTS CAPITAL IMPROVEMENT PROJECTS FISCAL YEAR 2005-2006 THROUGH FISCAL YEAR 2010-2011 PROJECT REVISED PROJECT BUDGET ACTUAL FY 04-05 BUDGET ESTIMATE NUMBER AMOUNT FY 03-04 APPROPRIATION FY 04-05 BEGINNING FUND BALANCE:315,442$ 386,336$ 386,336$ ADDITIONAL RESOURCES: GENERAL OBLIGATION BONDS 150,000$ 800,000$ 850,000$ CERTIFICATES OF OBLIGATIONS 0 975,000 975,000 INTERGOVERNMENTAL TRANSFERS 31,465 0 0 INTRAGOVERNMENTAL TRANSFERS 585,375 370,000 370,000 INVESTMENT EARNINGS 3,505 7,000 12,319 OTHER 60,743 68,300 68,300 SUBTOTAL ADDITIONAL RESOURCES 831,088$ 2,220,300$ 2,275,619$ TOTAL RESOURCES AVAILABLE 1,146,530$ 2,606,636$ 2,661,954$ PARK PROJECTS BILLIE MADELEY PARK DEV.PK9706 45,000 0 0 0 RAINTREE PARK IMPR. PK0068 44,000 0 0 0 FIELD REDEVELOPMENT PK0300 ANNUAL 53,569 8,000 8,000 * LINCOLN CENTER EXPANSION PK0319 973,000 427,288 0 6,000 EASTGATE PARK IMPR - PH I PK0404 40,000 20,667 0 19,594 CENTRAL PARK (SOCCER LIGHTS - 3 FIELDS) PK0406 305,000 15,800 285,000 224,174 PARKWAY PARK PK0409 50,000 350 0 45,830 UNIVERSITY PARK DEVELOPMENT PK0410 400,000 0 0 0 # VETERANS PARK PHASE II PK0501 6,925,000 0 690,000 690,000 STEEPLECHASE NEIGHBORHOOD PK0502 315,000 0 315,000 200,000 LINCOLN CENTER - SPLASH PARK PK0503 170,000 0 170,000 170,000 VETERAN'S PARK(SOCCER LIGHTS - 4 FIELDS) PK0511 400,000 0 400,000 291,970 BASKETBALL COVER AT CS ELEMENTARY SITE PK0512 175,000 0 175,000 175,000 # INTERGENERATIONAL PARK UPGRADES PK0513 310,000 0 160,000 310,000 # NEW FORESTRY SHOP CONSTRUCTION PK0520 670,000 0 0 0 # CENTRAL PARK SHOP RENOVATION PK0521 200,000 0 0 0 WOODLAND HILLS DEVELOPMENT PK0523 315,000 0 0 0 EASTGATE PARK IMPROVEMENTS PHII TBD 180,000 0 0 0 * LINCOLN CENTER BLDG TO PARKING COVER PK0602 45,000 0 0 0 * LIONS PARK IRON FENCE PK0603 25,000 0 0 0 * LIONS PARK BASKETBALL COURT & COVER PK0604 220,000 0 0 0 CLOSED PROJECTS 211,720 0 0 DEBT ISSUANCE COST 10,800 0 24,210 GENERAL & ADMIN. CHARGES 20,000 10,000 10,000 TOTAL EXPENDITURES 760,194$ 2,213,000$ 2,174,778$ GAAP 0 ENDING FUND BALANCE:386,336$ 393,636$ 487,176$ * - FUNDED THROUGH COMMUNITY DEVELOPMENT BLOCK GRANT # - Indicates projects funded through November 2003 G.O. Bond Authorization 66 GENERAL GOVERNMENT PARKS PROJECTS CAPITAL IMPROVEMENT PROJECTS FISCAL YEAR 2005-2006 THROUGH FISCAL YEAR 2010-2011 APPROVED FY 05-06 PROJECTED PROJECTED PROJECTED PROJECTED PROJECTED PROJECTED APPROPRIATIONS FY 05-06 FY 06-07 FY 07-08 FY 08-09 FY 09-10 FY 10-11 487,176$ 487,176$ 3,403,604$ 329,434$ 379,380$ 531,380$ 616,380$ 6,335,000$ 6,335,000$ 570,000$ 200,000$ 0$ 0$ 0$ 400,000 400,000 315,000 180,000 0 0 0 0 0 0 0 0 0 0 290,000 290,000 0 0 0 0 0 38,000 38,000 36,500 6,500 78,000 11,000 12,500 69,700 69,700 71,100 72,500 74,000 74,000 75,500 7,132,700$ 7,132,700$ 992,600$ 459,000$ 152,000$ 85,000$ 88,000$ 7,619,876$ 7,619,876$ 4,396,204$ 788,434$ 531,380$ 616,380$ 704,380$ 0 5,634 0 0 0 0 0 0 13,765 0 0 0 0 0 39,000 39,000 15,000 4,000 0 0 0 0000 000 0000 000 0000 000 0000 000 400,000 400,000 0 0 0 0 0 6,235,000 3,100,000 3,135,000 0 0 0 0 0 115,000 0 0 0 0 0 0 75,000 0 0 0 0 0 0000 000 0000 000 0000 000 100,000 100,000 570,000 0 0 0 0 0 0 0 200,000 0 0 0 0 0 315,000 0 0 0 0 0 0 0 180,000 0 0 0 45,000 45,000 0 0 0 0 0 25,000 25,000 0 0 0 0 0 220,000 220,000 0 0 0 0 0 0000 000 70,000 70,000 11,771 5,054 0 0 0 7,873 7,873 20,000 20,000 0 0 0 7,141,873$ 4,216,272$ 4,066,771$ 409,054$ 0$ 0$ 0$ 478,003$ 3,403,604$ 329,434$ 379,380$ 531,380$ 616,380$ 704,380$ 67 PPAARRKKSS PPRROOJJEECCTTSS 68 PROJECT: BILLIE MADELEY PARK PROJECT #: PK9706 DEVELOPMENT FUND: PARKS CAPITAL PROJECTS PROJECT BUDGET: $45,000 PROJECT FUNDING MANAGER: PETER VANECEK SOURCES: 1999 GOB Funding for minimal development of Billie Madeley Park. FISCAL YEAR LAND ENG. CONSTR. MISC.PROJECT TOTAL Prior Years $987 $8,704 $0 $29,675 $39,366 2004-05 $0 2005-06 5,634 $5,634 2006-07 $0 2007-08 $0 2008-09 $0 2009-10 $0 2010-11 $0 TOTAL $987 $8,704 $5,634 $29,675 $45,000 Total Personnel $3,000 Supplies $1,000 Service $0 Capital $0 TOTAL $4,000 PROJECT DESCRIPTION/STATUS PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR OPERATING COSTS First Fiscal Year Annually $3,000 $3,000 1,000 1,000 $4,000 $4,000 69 PROJECT: RAINTREE PARK IMPROVEMENTS PROJECT #: PK0068 FUND: PARKS CAPITAL PROJECTS PROJECT BUDGET: $44,000 PROJECT FUNDING MANAGER: PETER VANECEK SOURCES: General Obligation Bonds 99 Improvements to include installation of a basketball court and playground replacement. The basketball FISCAL YEAR LAND ENG. CONSTR. MISC. PROJECT TOTAL Prior Years $0 $906 $28,178 $1,150 $30,235 2004-05 $0 2005-06 13,765 $13,765 2006-07 $0 2007-08 $0 2008-09 $0 2009-10 $0 2010-11 $0 TOTAL $0 $906 $41,943 $1,150 $44,000 Total Personnel $0 Supplies $0 Service $0 Capital $0 TOTAL $0$0 $0 PROJECT DESCRIPTION/STATUS PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR OPERATING COSTS First Fiscal Year Annually will be used for installation of additional sidewalks in the park. court will not be built until additional land is available to properly place the court. The remaining funds 70 PROJECT: FIELD REDEVELOPMENT PROJECT #: PK0300 FUND: FIELD REDEVELOPMENT FUND PROJECT BUDGET:ANNUAL PROJECT FUNDING MANAGER: PETER LAMONT SOURCES: Field Redevelopment Fees Various projects for facility improvement, to include: Central Park Softball Fields: Upgrade scoreboards - $11,000; Entry way improvements - $8,000 (2007) Central Park Switch Leg (Electrical) - $5,000 (2007); Soccer goals - $10,000 (2007) Wayne Smith Drinking Fountain Repairs - $4,000 (2008) FISCAL YEAR LAND ENG. CONSTR. MISC.PROJECT TOTAL Prior Years $0 $0 $33,705 $50,434 $84,139 2004-05 8,000 $8,000 2005-06 39,000 $39,000 2006-07 15000 $15,000 2007-08 4,000 $4,000 2008-09 $0 2009-10 0 $0 2010-11 $0 TOTAL $0 $0 $99,705 $50,434 $150,139 Total Personnel $0 Supplies $0 Service $0 Capital $0 TOTAL $0 PROJECT DESCRIPTION/STATUS PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR OPERATING COSTS First Fiscal Year Annually Southwood Athletic Park Adult Soccer Fields: Replace irrigation - $20,000 $0 $0 71 PROJECT: LINCOLN CENTER EXPANSION PROJECT #: PK0319 FUND: PARKS CAPITAL PROJECTS PROJECT BUDGET: $973,000 PROJECT FUNDING MANAGER: RIC PLOEGER SOURCES: PROJECT DESCRIPTION/STATUS and expansion. Remaining funds will move to construction in FY 04. Also, included are additional parking FISCAL YEAR LAND ENG. CONSTR. MISC. PROJECT TOTAL Prior Years $0 $57,538 $369,269 $408,504 $835,311 2004-05 6,000 $6,000 2005-06 $0 2006-07 $0 2007-08 $0 2008-09 $0 2009-10 $0 2010-11 $0 TOTAL $0 $63,538 $369,269 $408,504 $841,311 Total Personnel $22,000 Supplies $640 Service $4,570 Capital $0 TOTAL $27,210 PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR FY 02 and FY 03 Community Development OPERATING COSTS PROJECT DESCRIPTION and a multi-purpose pavilion. This project is complete. First Fiscal Year Annually $22,000 $0 640 4,570 $27,210 72 PROJECT:PROJECT #: PK0404 FUND: FY 2004 GENERAL FUND PROJECT BUDGET: $40,000 PROJECT FUNDING MANAGER: DAVID WOOD SOURCES: Brazos Beautiful/Zone 2 Funds FISCAL YEAR LAND ENG. CONSTR. MISC. PROJECT TOTAL Prior Years $0 $0 $20,667 $0 $20,667 2004-05 19,594 $19,594 2005-06 $0 2006-07 $0 2007-08 $0 2008-09 $0 2009-10 $0 2010-11 $0 TOTAL $0 $0 $40,261 $0 $40,261 Total Personnel $0 Supplies $2,000 Service $8,000 Capital $0 TOTAL $10,000$0 2,000 8,000 $10,000 EASTGATE PARK IMPROVEMENTS Landscape improvements to Eastgate Park to hide the unsightly commercial buildings on the west side. PROJECT DESCRIPTION/STATUS PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR OPERATING COSTS First Fiscal Year Annually This project is complete. 73 PROJECT: CENTRAL PARK SOCCER LIGHTS PROJECT #: PK0406 FUND: 138 - PARKS CIP FUND PROJECT BUDGET: $305,000 PROJECT FUNDING MANAGER: PETE VANECEK SOURCES: CO's Installation of lights for three (3) Central Park soccer fields. FISCAL YEAR LAND ENG. CONSTR. MISC.PROJECT TOTAL Prior Years $0 $19,750 $0 $0 $19,750 2004-05 224,174 $224,174 2005-06 $0 2006-07 $0 2007-08 $0 2008-09 $0 2009-10 $0 2010-11 $0 TOTAL $0 $19,750 $224,174 $0 $243,924 Total Personnel $0 Supplies $2,000 Service $10,000 Capital $0 TOTAL $12,000$12,000 $12,000 10,000 10,000 2,000 2,000 PROJECT DESCRIPTION/STATUS PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR OPERATING COSTS First Fiscal Year Annually Project complete May 2005. 74 PROJECT: Parkway Park Site Improvements PROJECT #: PK0409 FUND: 138 - Parks CIP Fund PROJECT BUDGET: $50,000 PROJECT FUNDING MANAGER: Peter B.Vanecek SOURCES: Parks CIP Site improvements at Parkway Park, includes sidewalks,fountain,bridge,trees,concrete rail fence,& lights FISCAL YEAR LAND ENG. CONSTR. MISC. PROJECT TOTAL Prior Years 350 $350 2004-05 45830.44 $45,830 2005-06 $0 2006-07 $0 2007-08 $0 2008-09 $0 2009-10 $0 2010-11 $0 TOTAL $0 $0 $46,181 $0 $0 $46,181 Total Personnel $0 Supplies $0 Service $0 Capital $0 TOTAL $0$0 $0 PROJECT DESCRIPTION/STATUS PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR OPERATING COSTS First Fiscal Year Annually 75 PROJECT: UNIVERSITY PARK DEVELOPMENT PROJECT #: PK0410 FUND: PARKS CAPITAL PROJECTS PROJECT BUDGET: $400,000 PROJECT FUNDING MANAGER: DAVID WOOD SOURCES: FUTURE COB FISCAL YEAR LAND ENG. CONSTR. MISC. PROJECT TOTAL Prior Years $0 $0 $0 $0 $0 2004-05 $0 2005-06 400,000 $400,000 2006-07 $0 2007-08 $0 2008-09 $0 2009-10 $0 2010-11 $0 TOTAL $0 $0 $400,000 $0 $400,000 Total Personnel $25,000 Supplies $5,000 Service $5,000 Capital $0 TOTAL $35,000$0 5,000 5,000 $35,000 PROJECT DESCRIPTION/STATUS PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR Neighborhood park development to include a fenced "Bark Park" for unleashed dogs. Other amenities will be typical of Neighborhood Parks, including walks, benches, drinking fountains, tables, lights and small shelter. In addition, a small parking lot and restrooms would be required. Potential location could be the 10-acre undeveloped neighborhood park site in Park Zone 2. This site is located adjacent to Bourton Creek in the University Park Subdivision. First Fiscal Year Annually $25,000 OPERATING COSTS 76 PROJECT:PROJECT #: PK0501 PROJECT FUND: 138 - Parks CIP Fund BUDGET: $6,925,000 PROJECT FUNDING MANAGER: ERIC PLOEGER SOURCES: 2003 General Obligation Bonds FISCAL YEAR LAND ENG. CONSTR. MISC.PROJECT TOTAL Prior Years $0 $0 $0 $0 $0 2004-05 690,000 $690,000 2005-06 3,100,000 $3,100,000 2006-07 3,135,000 $3,135,000 2007-08 $0 2008-09 $0 2009-10 $0 2010-11 $0 TOTAL $0 $690,000 $6,235,000 $0 $6,925,000 Total Personnel $0 Supplies $0 Service $0 Capital $0 TOTAL $204,000 VETERANS PARK & ATHLETIC COMPLEX, PHASE II Phase II of Veterans Park & Athletic Complex to include parking, utilities, shop addition, Veterans Parkway extension, three (3) soccer fields, three (3) softball fields, large group pavilion, and a softball concession stand/restroom building. Project design began in January 2005. PROJECT DESCRIPTION/STATUS PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR OPERATING COSTS First Fiscal Year Annually $0 $0 77 PROJECT: STEEPLECHASE NEIGHBORHOOD PROJECT #: PK0502 PARK DEVELOPMENT FUND: PARKS CAPITAL PROJECTS PROJECT BUDGET: $315,000 PROJECT FUNDING MANAGER: SOURCES: FISCAL YEAR LAND ENG. CONSTR. MISC. PROJECT TOTAL Prior Years $0 $0 $0 $0 $0 2004-05 200,000 $200,000 2005-06 115,000 $115,000 2006-07 $0 2007-08 $0 2008-09 $0 2009-10 $0 2010-11 $0 TOTAL $0 $0 $315,000 $0 $315,000 Total Personnel $20,000 Supplies $5,000 Service $5,000 Capital $0 TOTAL $30,000 CDBG FUNDS AND FUTURE COB PETE VANECEK Typical neighborhood park development. Items such as walks, benches, lights, tables, drinking fountains, trees, landscape improvements and signage. This park site includes 9-acres and it is located in Park Zone 5 on Westridge Street. PROJECT DESCRIPTION/STATUS PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR OPERATING COSTS First Fiscal Year Annually $20,000 $0 5,000 5,000 $30,000 78 PROJECT:PROJECT #: PK0503 FUND: PARKS CAPITAL PROJECTS PROJECT BUDGET: $170,000 PROJECT FUNDING MANAGER: ERIC PLOEGER SOURCES: CDBG FUNDS Add'l $75,000 to be transferred from PK0319 (balance of Lincoln Ctr Expansion). FISCAL YEAR LAND ENG. CONSTR. MISC. PROJECT TOTAL Prior Years $0 $0 $0 $0 $0 2004-05 20,000 150,000 $170,000 2005-06 75,000 $75,000 2006-07 $0 2007-08 $0 2008-09 $0 2009-10 $0 2010-11 $0 TOTAL $0 $20,000 $225,000 $0 $245,000 Total Personnel $0 Supplies $5,000 Service $25,000 Capital $0 TOTAL $30,000$0 5,000 25,000 $30,000 A spray park for Lincoln Center. This is part of the approved W.A. Tarrow Park Master Plan. This will be a zero (0) depth area for water play. The spray park would provide a water-based recreation facility that can be utilized throughout the year and will not require on-site lifeguards. Land is designated for this project within Tarrow Park. LINCOLN CENTER SPLASH PARK First Fiscal Year Annually PROJECT DESCRIPTION/STATUS PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR OPERATING COSTS 79 PROJECT:VETERANS PARK SOCCER LIGHTS PROJECT #: PK0511 FUND: PARKS CAPITAL PROJECTS PROJECT BUDGET: $400,000 PROJECT FUNDING MANAGER: PETE VANECEK SOURCES: COB Installation of lighting for four (4) soccer fields at Veterans Park. FISCAL YEAR LAND ENG. CONSTR. MISC.PROJECT TOTAL Prior Years $0 $0 $0 $0 $0 2004-05 21,500 270,470 $291,970 2005-06 $0 2006-07 $0 2007-08 $0 2008-09 $0 2009-10 $0 2010-11 $0 TOTAL $0 $21,500 $270,470 $0 $291,970 Total Personnel $0 Supplies $0 Service $9,000 Capital $1,300 TOTAL $10,300 PROJECT DESCRIPTION/STATUS PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR OPERATING COSTS First Fiscal Year Annually $0 $10,300 9,000 1,300 80 PROJECT: JACK & DOROTHY MILLER PARK PROJECT #: PK0512 BASKETBALL COURT COVER FUND: PARKS CAPITAL PROJECTS PROJECT BUDGET: $175,000 PROJECT FUNDING MANAGER: PETE VANECEK SOURCES: COB Installation of a metal roof over the basketball court at Jack & Dorothy Miller Park. FISCAL YEAR LAND ENG. CONSTR. MISC.PROJECT TOTAL Prior Years $0 $0 $0 $0 $0 2004-05 20,000 155,000 $175,000 2005-06 $0 2006-07 $0 2007-08 $0 2008-09 $0 2009-10 $0 2010-11 $0 TOTAL $0 $20,000 $155,000 $0 $175,000 Total Personnel $0 Supplies $1,000 Service $2,000 Capital $0 TOTAL $3,000 PROJECT DESCRIPTION/STATUS PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR OPERATING COSTS First Fiscal Year Annually 1,000 1,000 $3,000 $3,000 2,000 2,000 81 PROJECT:PROJECT #: PK0513 FUND: PARKS CAPITAL PROJECTS PROJECT BUDGET: $310,000 PROJECT FUNDING MANAGER: SOURCES: FISCAL YEAR LAND ENG. CONSTR. MISC. PROJECT TOTAL Prior Years $0 $0 $0 $0 $0 2004-05 310,000 $310,000 2005-06 $0 2006-07 $0 2007-08 $0 2008-09 $0 2009-10 $0 2010-11 $0 TOTAL $0 $0 $310,000 $0 $310,000 Total Personnel $0 Supplies $0 Service $0 Capital $0 TOTAL $0 INTERGENERATIONAL PARK UPGRADES FY 2003 General Obligation PETE VANECEK Intergenerational enhancements to neighborhood parks to include lighting, landscaping, benches, sidewalks, drinking fountains, and shade covers. PROJECT DESCRIPTION/STATUS PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR OPERATING COSTS First Fiscal Year Annually $0 $0 82 PROJECT:PROJECT #: PK0520 FUND: PARKS CAPITAL PROJECTS PROJECT BUDGET: $670,000 PROJECT FUNDING MANAGER: SOURCES: FISCAL YEAR LAND ENG. CONSTR. MISC. PROJECT TOTAL Prior Years $0 $0 $0 $0 $0 2004-05 $0 2005-06 100,000 $100,000 2006-07 570,000 $570,000 2007-08 $0 2008-09 $0 2009-10 $0 2010-11 $0 TOTAL $0 $100,000 $570,000 $0 $670,000 Total Personnel $0 Supplies $3,000 Service $0 Capital $0 TOTAL $3,000 NEW FORESTRY SHOP CONSTRUCTION FY 2003 General Obligation BondsERIC PLOEGER Construction of a new Forestry Shop with equipment and supply storage. PROJECT DESCRIPTION/STATUS PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR OPERATING COSTS First Fiscal Year Annually $0 $0 83 PROJECT:PROJECT #: PK0521 FUND: PARKS CAPITAL PROJECTS PROJECT BUDGET: $200,000 PROJECT FUNDING MANAGER: SOURCES: FISCAL YEAR LAND ENG. CONSTR. MISC. PROJECT TOTAL Prior Years $0 $0 $0 $0 $0 2004-05 $0 2005-06 $0 2006-07 $0 2007-08 20,000 180,000 $200,000 2008-09 $0 2009-10 $0 2010-11 $0 TOTAL $0 $20,000 $180,000 $0 $200,000 Total Personnel $0 Supplies $0 Service $5,000 Capital $0 TOTAL $5,000 FY 2003 General Obligation BondsERIC PLOEGER CENTRAL PARK SHOP RENOVATION PROJECT DESCRIPTION/STATUS PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR OPERATING COSTS Renovation of the Central Park Shop following the Forestry Division's move to a new shop. This will increase restroom size and modify the building for use by Parks Operations. First Fiscal Year Annually 5,000 $5,000 5,000 $5,000 84 PROJECT:PROJECT #: PK0523 FUND: PARKS CAPITAL PROJECTS PROJECT BUDGET: PROJECT FUNDING MANAGER: SOURCES: FISCAL YEAR LAND ENG. CONSTR. MISC. PROJECT TOTAL Prior Years $0 $0 $0 $0 $0 2004-05 $0 2005-06 $0 2006-07 315,000 $315,000 2007-08 $0 2008-09 $0 2009-10 $0 2010-11 $0 TOTAL $0 $0 $315,000 $0 $315,000 Total Personnel $20,000 Supplies $5,000 Service $5,000 Capital $0 TOTAL $30,000$0 5,000 5,000 $30,000 WOODLAND HILLS PARK DEVELOPMENT First Fiscal Year PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR OPERATING COSTS Typical neighborhood park development to include a playground, bridges, basketball court, shelter, walks, area lights, etc. Annually $20,000 PROJECT DESCRIPTION/STATUS $315,000 FUTURE COBPETE VANECEK 85 PROJECT: EASTGATE PARK IMPROVEMENTS PROJECT #: N/A PHASE II FUND: PROJECT BUDGET: $180,000 PROJECT FUNDING MANAGER: David Wood SOURCES: Unfunded This project includes lighting, concrete walks, landscaping, irrigation, benches, water feature and signage. Unfunded. FISCAL YEAR LAND ENG. CONSTR. MISC. PROJECT TOTAL Prior Years $0 $0 $0 $0 $0 2003-04 $0 2004-05 $0 2005-06 $0 2006-07 $0 2007-08 180,000 $180,000 2008-09 $0 2009-10 $0 TOTAL $0 $0 $180,000 $0 $180,000 Total Personnel $5,000 Supplies $1,000 Service $5,000 Capital $0 TOTAL $11,000$0 1,000 5,000 $11,000 $5,000 PROJECT DESCRIPTION/STATUS PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR OPERATING COSTS First Fiscal Year Annually 86 PROJECT:PROJECT #: PROJECT FUND:BUDGET: $45,000 PROJECT FUNDING MANAGER: TBD SOURCES: FISCAL YEAR LAND ENG. CONSTR. MISC.PROJECT TOTAL Prior Years $0 2004-05 $0 2005-06 5,000 40,000 $45,000 2006-07 $0 2007-08 $0 2008-09 $0 2009-10 $0 2010-11 $0 TOTAL $0 $5,000 $40,000 $0 $45,000 Total Personnel $0 Supplies 2,000 $0 Service 6,000 $0 Capital $0 TOTAL 8000 $8,000 PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR OPERATING COSTS First Fiscal Year Annually Lincoln Center Building to Parking PK0602 138 - Parks CIP Fund $0 $0 This project would construct a cover over the walkway from Lincoln Center to the parking lot. This would provide weather protection and improve the appearance of the north entrance. PROJECT DESCRIPTION/STATUS Cover CDBG Funds 87 PROJECT:PROJECT #: PROJECT FUND:BUDGET: PROJECT FUNDING MANAGER: TBD SOURCES: FISCAL YEAR LAND ENG. CONSTR. MISC.PROJECT TOTAL Prior Years $0 2004-05 $0 2005-06 25,000 $25,000 2006-07 $0 2007-08 $0 2008-09 $0 2009-10 $0 2010-11 TOTAL $0 $0 $25,000 $0 $25,000 Total Personnel $0 Supplies $0 Service $0 Capital $0 TOTAL 0$0 CDBG Funds This project would provide 700 feet of six-foot fencing on three sides of Lions Park in order to upgrade the appearance of the park. Lions Park Iron Fence PK0603 138 - Parks CIP Fund $25,000 $0 $0 PROJECT DESCRIPTION/STATUS PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR OPERATING COSTS First Fiscal Year Annually 88 PROJECT:PROJECT #: PROJECT FUND:BUDGET: PROJECT FUNDING MANAGER: TBD SOURCES: FISCAL YEAR LAND ENG. CONSTR. MISC.PROJECT TOTAL Prior Years $0 2004-05 $0 2005-06 22,000 198,000 $220,000 2006-07 $0 2007-08 $0 2008-09 $0 2009-10 $0 2010-11 TOTAL $0 $22,000 $198,000 $0 $220,000 Total Personnel $0 Supplies 1,000 $0 Service 5,000 $0 Capital $0 TOTAL 6000 $6,000 PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR OPERATING COSTS First Fiscal Year Annually $0 $0 Lions Park PK0604 138 - Parks CIP Fund $220,000 Covered Basketball Court CDBG Funds This would remove the half court basketball court and replace it with a covered full court, with an upgraded appearance that would be appropriate for the site. PROJECT DESCRIPTION/STATUS 89 HEART OF THE RESEARCH VALLEY 90 GGEENNEERRAALL GGOOVVEERRNNMMEENNTT-- PPAARRKKLLAANNDD DDEEDDIICCAATTIIOONN CCAAPPIITTAALL IIMMPPRROOVVEEMMEENNTT PPRROOJJEECCTTSS FFIISSCCAALL YYEEAARR 22000055--22000066 TTHHRROOUUGGHH FFIISSCCAALL YYEEAARR 22001100--22001111 91 GENERAL GOVERNMENT PARKLAND DEDICATION CAPITAL IMPROVEMENT PROJECTS FISCAL YEAR 2005-2006 THROUGH FISCAL YEAR 2010-2011 PROJECT REVISED PROJECT BUDGET ACTUAL FY 04-05 BUDGET ESTIMATE NUMBER AMOUNT FY 03-04 APPROPRIATIONS FY 04-05 BEGINNING FUND BALANCE:1,592,297 1,667,629 1,667,629 ADDITIONAL RESOURCES: CONTRIBUTIONS 304,829$ 50,000$ 50,000$ INVESTMENT EARNINGS 28,156 30,000 38,801 INTRAGOVERNMENTAL TRANSFERS 4,500 0 0 OTHER 210 0 0 SUBTOTAL ADDITIONAL RESOURCES 337,695$ 80,000$ 88,801$ TOTAL RESOURCES AVAILABLE 1,929,992$ 1,747,629$ 1,756,430$ PARKLAND DEDICATION FUND ZONE 1 PARK PK0051 200,500 0 179,000 0 ZONE 2 PARK PK0052 56,862 0 51,044 0 EASTGATE PARK IMPROVEMENTS PK0404 0 4,322 0 0 THOMAS PARK TRACK PK0526 86,956 0 86,956 86,956 RICHARD CARTER PARK LANDSCAPE PK0529 15,000 0 15,000 15,000 ZONE 3 PARK PK0053 52,560 0 50,000 0 CY MILLER PARK PK0532 6,000 0 6,000 6,000 ZONE 4 PARK PK0054 22,000 0 21,000 0 ZONE 5 PARK PK0055 24,000 0 62,145 0 J&D MILLER TRAIL LIGHTS PK0408 46,530 351 3,855 46,179 ZONE 6 PARK PK0056 85,800 0 82,100 0 LEMONTREE PARK - DISC GOLF PK0527 5,000 0 5,000 5,000 LINCOLN CENTER IMPROVEMENTS PK0531 2,900 0 2,900 2,900 ZONE 7 PARK PK0057 0 0 0 0 JOHN CROMTON PARK PK9803 787,000 5,704 0 776,477 ZONE 8 PARK PK0058 41,000 0 40,000 0 ZONE 9 PARK PK0059 34,000 0 33,000 0 ZONE 10 PARK PK0060 135,000 0 0 0 ZONE 11 PARK PK0061 41,000 0 30,000 0 CLOSED PROJECTS 246,987 0 0 TRANSFER PROJECT 0 0 0 GENERAL & ADMIN. CHARGES 5,000 5,000 5,000 TOTAL EXPENDITURES 262,363$ 673,000$ 943,512$ ENDING FUND BALANCE:1,667,629$ 1,074,629$ 812,918$ 92 GENERAL GOVERNMENT PARKLAND DEDICATION CAPITAL IMPROVEMENT PROJECTS FISCAL YEAR 2005-2006 THROUGH FISCAL YEAR 2010-2011 APPROVED FY 05-06 BUDGET PROJECTED PROJECTED PROJECTED PROJECTED PROJECTED PROJECTED APPROPRIATIONS FY 05-06 FY 06-07 FY 07-08 FY 08-09 FY 09-10 FY 10-11 812,918 812,918 129,196 131,196 134,196 137,196 140,196 0$ 0$ 0$ 0$ 0$ 0$ 0$ 9,000 9,000 2,000 3,000 3,000 3,000 3,000 0 0 0 0 0 0 0 0 0 0 0 0 0 0 9,000$ 9,000$ 2,000$ 3,000$ 3,000$ 3,000$ 3,000$ 821,918$ 821,918$ 131,196$ 134,196$ 137,196$ 140,196$ 143,196$ 200,500 200,500 0 0 0 0 0 56,862 56,862 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 52,560 52,560 0 0 0 0 0 0 0 0 0 0 0 0 22,000 22,000 0 0 0 0 0 24,000 24,000 0 0 0 0 0 0 0 0 0 0 0 0 85,800 85,800 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 41,000 41,000 0 0 0 0 0 34,000 34,000 0 0 0 0 0 135,000 135,000 0 0 0 0 0 41,000 41,000 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 692,722$ 692,722$ 0$ 0$ 0$ 0$ 0$ 129,196$ 129,196$ 131,196$ 134,196$ 137,196$ 140,196$ 143,196$ 93 PPAARRKKLLAANNDD DDEEDDIICCAATTIIOONN FFUUNNDD 94 55 88 44 66 99 1111 22 33 1414 1010 1313 1212 77 11 1515 1616 1212 Parkland Dedication Zones 1-16 95 HEART OF THE RESEARCH VALLEY 96 PROJECT: ZONE 1 PARK PROJECT #: PK0051 FUND: PARKLAND DEDICATION CAPITAL PROJECT BUDGET: $200,500 PROJECT FUNDING MANAGER:RIC PLOEGER SOURCES: Fund 171: Park Escrow - Zone 1 In accordance with the Parkland Dedication Ordinance, these funds have been set aside for park improvement and renovation projects as identified in Park Zone 1. These funds are intended for a Northgate Park. FISCAL YEAR LAND ENG. CONSTR. MISC.PROJECT TOTAL Prior Years $0 $0 $0 $0 $0 2004-05 $0 2005-06 200,500 $200,500 2006-07 $0 2007-08 $0 2008-09 $0 2009-10 $0 2010-11 $0 TOTAL $200,500 $0 $0 $0 $200,500 Total Personnel $0 Supplies $0 Service $0 Capital $0 TOTAL $0$0 $0 PROJECT DESCRIPTION/STATUS PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR OPERATING COSTS First Fiscal Year Annually 97 PROJECT: ZONE 2 PARK PROJECT #: PK0052 FUND: PARKLAND DEDICATION CAPITAL PROJECT BUDGET: $56,862 PROJECT FUNDING MANAGER: RIC PLOEGER SOURCES: Fund 172: Park Escrow - Zone 2 In accordance with the Parkland Dedication Ordinance, these funds have been set aside for park improvement and renovation projects as identified in Park Zone 2. FISCAL YEAR LAND ENG. CONSTR. MISC. PROJECT TOTAL Prior Years $0 $0 $0 $0 $0 2004-05 $0 2005-06 56,862 $56,862 2006-07 $0 2007-08 $0 2008-09 $0 2009-10 $0 2010-11 $0 TOTAL $0 $0 $56,862 $0 $0 $56,862 Total Personnel $0 Supplies $0 Service $0 Capital $0 TOTAL $0 PROJECT DESCRIPTION/STATUS PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR OPERATING COSTS First Fiscal Year Annually $0 $0 98 PROJECT:PROJECT #: PK0404 FUND:FY 2004 GENERAL FUND PROJECT BUDGET:$0 * PROJECT FUNDING MANAGER: DAVID WOOD SOURCES: Brazos Beautiful/ Zone 2 Funds *Project budget = $40,000 - reflected in Parks CIP. Funds required above the $40,000 were funded with Zone 2 funds ($4,322). FISCAL YEAR LAND ENG. CONSTR. MISC. PROJECT TOTAL Prior Years $0 $0 $4,270 $52 $4,322 2004-05 $0 2005-06 $0 2006-07 $0 2007-08 $0 2008-09 $0 2009-10 $0 2010-11 $0 TOTAL $0 $0 $4,270 $52 $4,322 Total Personnel $0 Supplies $0 Service $0 Capital $0 TOTAL $0$0 $0 PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR OPERATING COSTS First Fiscal Year Annually EASTGATE PARK IMPROVEMENTS PROJECT DESCRIPTION/STATUS Landscape improvements to Eastgate Park to hide the unsightly commercial buildings on the west side. 99 PROJECT: Thomas Park Track PROJECT #: PK0526 FUND: 172 - Zone 2 Parkland Dedication PROJECT BUDGET: $86,956 PROJECT FUNDING MANAGER: David Wood SOURCES: Zone 2 Parkland Dedication The project consists of installation of concrete sidewalk and rubber sidewalk surfacing. Removal and hauling of granite gravel and steel edging. FISCAL YEAR LAND ENG. CONSTR. MISC. PROJECT TOTAL Prior Years $0 2004-05 86,956 $86,956 2005-06 $0 2006-07 $0 2007-08 $0 2008-09 $0 2009-10 $0 2010-11 $0 TOTAL $0 $0 $86,956 $0 $0 $86,956 Total Personnel $0 Supplies $0 Service $0 Capital $0 TOTAL $0 PROJECT DESCRIPTION/STATUS PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR OPERATING COSTS First Fiscal Year Annually $0 $0 100 PROJECT: Richard Carter Park - Landscape and PROJECT #: PK0529 Irrigation FUND: 172 - Zone 2 Parkland Dedication PROJECT BUDGET: $15,000 PROJECT FUNDING MANAGER: Pete Vanecek SOURCES: 172 - Parkland Dedication Landscaping and irrigation renovation project for Richard Carter Park. FISCAL YEAR LAND ENG. CONSTR. MISC. PROJECT TOTAL Prior Years $0 2004-05 15,000 $15,000 2005-06 $0 2006-07 $0 2007-08 $0 2008-09 $0 2009-10 $0 2010-11 $0 TOTAL $0 $0 $15,000 $0 $0 $15,000 Total Personnel $0 Supplies $0 Service $0 Capital $0 TOTAL $0$0 $0 PROJECT DESCRIPTION/STATUS PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR OPERATING COSTS First Fiscal Year Annually 101 PROJECT: ZONE 3 PARK PROJECT #: PK0053 FUND: PARKLAND DEDICATION CAPITAL PROJECT BUDGET: $52,560 PROJECT FUNDING MANAGER: RIC PLOEGER SOURCES: Fund 173: Park Escrow - Zone 3 In accordance with the Parkland Dedication Ordinance, these funds have been set aside for park improvement and renovation projects as identified in Park Zone 3. FISCAL YEAR LAND ENG. CONSTR. MISC. PROJECT TOTAL Prior Years $0 2004-05 $0 2005-06 52,560 $52,560 2006-07 $0 2007-08 $0 2008-09 $0 2009-10 $0 2010-11 $0 TOTAL $0 $0 $0 $52,560 $0 $52,560 Total Personnel $5,000 Supplies $0 Service $0 Capital $0 TOTAL $5,000$0 $5,000 PROJECT DESCRIPTION/STATUS PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR $5,000 OPERATING COSTS First Fiscal Year Annually 102 PROJECT: Cy Miller Park PROJECT #: PK0532 FUND: 173 - Parkland Dedication Zone 3 PROJECT BUDGET: $6,000 PROJECT FUNDING MANAGER: Pete Vanecek SOURCES: Parkland Dedication To fund a new sign and sign bed for Cy Miller Park. The existing sign was removed for the Texas Avenue Widening project. FISCAL YEAR LAND ENG. CONSTR. MISC. PROJECT TOTAL Prior Years $0 2004-05 6,000 $6,000 2005-06 $0 2006-07 $0 2007-08 $0 2008-09 $0 2009-10 $0 2010-11 $0 TOTAL $0 $0 $6,000 $0 $0 $6,000 Total Personnel $5,000 Supplies $0 Service $0 Capital $0 TOTAL $5,000$0 $5,000 $5,000 PROJECT DESCRIPTION/STATUS PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR OPERATING COSTS First Fiscal Year Annually 103 PROJECT: ZONE 4 PARK PROJECT #: PK0054 FUND: PARKLAND DEDICATION CAPITAL PROJECT BUDGET: $22,000 PROJECT FUNDING MANAGER: RIC PLOEGER SOURCES: Fund 174: Park Escrow - Zone 4 In accordance with the Parkland Dedication Ordinance, these funds have been set aside for park improvement and renovation projects as identified in Park Zone 4. FISCAL YEAR LAND ENG. CONSTR. MISC. PROJECT TOTAL Prior Years $0 $0 $0 $0 $0 2004-05 $0 2005-06 22,000 $22,000 2006-07 $0 2007-08 $0 2008-09 $0 2009-10 $0 2010-11 $0 TOTAL $0 $0 $22,000 $0 $0 $22,000 Total Personnel $0 Supplies $0 Service $0 Capital $0 TOTAL $0 PROJECT DESCRIPTION/STATUS PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR OPERATING COSTS First Fiscal Year Annually $0 $0 104 PROJECT: ZONE 5 PARK PROJECT #: PK0055 FUND: PARKLAND DEDICATION CAPITAL PROJECT BUDGET: $24,000 PROJECT FUNDING MANAGER: RIC PLOEGER SOURCES: Fund 175: Parks Escrow - Zone 5 In accordance with the Parkland Dedication Ordinance, these funds have been set aside for park improvement and renovation projects as identified in Park Zone 5. FISCAL YEAR LAND ENG. CONSTR. MISC. PROJECT TOTAL Prior Years $0 $0 $0 $0 $0 2004-05 $0 2005-06 24,000 $24,000 2006-07 $0 2007-08 $0 2008-09 $0 2009-10 $0 2010-11 $0 TOTAL $0 $0 $24,000 $0 $0 $24,000 Total Personnel $0 Supplies $0 Service $0 Capital $0 TOTAL $0$0 $0 PROJECT DESCRIPTION/STATUS PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR OPERATING COSTS First Fiscal Year Annually 105 PROJECT: Jack & Dorothy Miller Park Trail lights PROJECT #: PK0408 FUND: 175 - Parkland Dedication Zone 5 PROJECT BUDGET: $46,530 PROJECT FUNDING MANAGER: Peter Vanecek SOURCES: Zone 5 funds Trail lighting for Jack & Dorothy Miller park jogging trail and lighting for the shelter FISCAL YEAR LAND ENG. CONSTR. MISC. PROJECT TOTAL Prior Years $351 $351 2004-05 $46,179 $46,179 2005-06 $0 2006-07 $0 2007-08 $0 2008-09 $0 2009-10 $0 2010-11 $0 TOTAL $0 $0 $46,179 $351 $0 $46,530 Total Personnel $0 Supplies $0 Service $0 Capital $0 TOTAL $0 PROJECT DESCRIPTION/STATUS PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR OPERATING COSTS First Fiscal Year Annually $0 $0 106 PROJECT: ZONE 6 PARK PROJECT #: PK0056 FUND: PARKLAND DEDICATION CAPITAL PROJECT BUDGET: $85,800 PROJECT FUNDING MANAGER: RIC PLOEGER SOURCES: Fund 176: Park Escrow - Zone 6 In accordance with the Parkland Dedication Ordinance, these funds have been set aside for park improvement and renovation projects as identified in Park Zone 6. FISCAL YEAR LAND ENG. CONSTR. MISC. PROJECT TOTAL Prior Years $0 $0 $0 $0 $0 2004-05 $0 2005-06 85,800 $85,800 2006-07 $0 2007-08 $0 2008-09 $0 2009-10 $0 2010-11 $0 TOTAL $0 $0 $85,800 $0 $85,800 Total Personnel $0 Supplies $0 Service $0 Capital $0 TOTAL $0$0 $0 PROJECT DESCRIPTION/STATUS PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR OPERATING COSTS First Fiscal Year Annually 107 PROJECT: Lemontree Park - Disc Golf PROJECT #: PK0527 FUND: 176 - Zone 6 PROJECT BUDGET: $5,000 PROJECT FUNDING MANAGER: Pete Vanecek SOURCES: Zone 6 Parkland Dedication Purchase disc golf equipment and concrete for a 9 hole disc golf course at Lemontree Park. Equipment bids will be obtained by March 2005. Installation to be completed by April 30, 2005. FISCAL YEAR LAND ENG. CONSTR. MISC. PROJECT TOTAL Prior Years $0 2004-05 $5,000 $5,000 2005-06 $0 2006-07 $0 2007-08 $0 2008-09 $0 2009-10 $0 2010-11 $0 TOTAL $0 $0 $0 $5,000 $5,000 Total Personnel $0 Supplies $0 Service $0 Capital $0 TOTAL $0 . PROJECT DESCRIPTION/STATUS PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR OPERATING COSTS First Fiscal Year Annually $0 $0 108 PROJECT: Lincoln Center Improvements PROJECT #: PK0531 FUND: 176 - Parkland Dedication Zone 6 PROJECT BUDGET: $2,900 PROJECT FUNDING MANAGER: Pete Vanecek SOURCES: Parkland Dedication Funds to purchase and install a mist sprayer cooling station for basketball players and to repair a fountain at the Lincoln Center. FISCAL YEAR LAND ENG. CONSTR. MISC. PROJECT TOTAL Prior Years $0 $0 $0 $0 $0 2004-05 2,900 $2,900 2005-06 $0 2006-07 $0 2007-08 $0 2008-09 $0 2009-10 $0 2010-11 $0 TOTAL $0 $0 $2,900 $0 $2,900 Total Personnel $0 Supplies $0 Service $0 Capital $0 TOTAL $0 PROJECT DESCRIPTION/STATUS PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR OPERATING COSTS First Fiscal Year Annually $0 $0 109 PROJECT: Zone 7 Parkland PROJECT #: PK9803 FUND: 177 - Parkland Dedication Zone 7 PROJECT BUDGET: $0 PROJECT FUNDING MANAGER: RIC PLOEGER SOURCES: Zone 7 Funds In accordance with the Parkland Dedication Ordinance, these funds have been set aside for park improvement and renovation projects as identified in Park Zone 7. FISCAL YEAR LAND ENG. CONSTR. MISC. PROJECT TOTAL Prior Years $0 2004-05 $0 2005-06 $0 2006-07 $0 2007-08 $0 2008-09 $0 2009-10 $0 2010-11 $0 TOTAL $0 $0 $0 $0 $0 Total Personnel $18,000 Supplies $2,000 Service $1,000 Capital $1,000 TOTAL $22,000 PROJECT DESCRIPTION/STATUS PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR OPERATING COSTS First Fiscal Year Annually $18,000 2,000 $0 $22,000 1,000 1,000 110 PROJECT: JOHN CROMPTON PARK PROJECT #: PK9803 FUND: PARKLAND DEDICATION CAPITAL PROJECT BUDGET: $787,000 PROJECT FUNDING MANAGER: RIC PLOEGER SOURCES: Fund 177: Park Escrow - Zone 7 In accordance with the Parkland Dedication Ordinance, these funds have been set aside for park improvement and renovation projects as identified in Park Zone 7. This project will provide a major neighborhood park for park zone 7. Potential features include a pavilion, sports courts, walks, lights, drinking fountains and landscaping. Also, a parking lot and restrooms may be included. FISCAL YEAR LAND ENG. CONSTR. MISC. PROJECT TOTAL Prior Years $4,750 $5,370 $0 $404 $10,523 2004-05 85,000 691,477 $776,477 2005-06 $0 2006-07 $0 2007-08 $0 2008-09 $0 2009-10 $0 2010-11 $0 TOTAL $89,750 $5,370 $691,477 $404 $787,000 Total Personnel $18,000 Supplies $2,000 Service $1,000 Capital $1,000 TOTAL $22,000 PROJECT DESCRIPTION/STATUS PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR $18,000 OPERATING COSTS First Fiscal Year Annually $0 2,000 1,000 1,000 $22,000 111 PROJECT: ZONE 8 PARK PROJECT #: PK0058 FUND: PARKLAND DEDICATION CAPITAL PROJECT BUDGET: $41,000 PROJECT FUNDING MANAGER: RIC PLOEGER SOURCES: Fund 178: Park Escrow - Zone 8 In accordance with the Parkland Dedication Ordinance, these funds have been set aside for park improvement and renovation projects as identified in Park Zone 8. FISCAL YEAR LAND ENG. CONSTR. MISC. PROJECT TOTAL Prior Years $0 $0 $0 $0 $0 2004-05 $0 2005-06 41,000 $41,000 2006-07 $0 2007-08 $0 2008-09 $0 2009-10 $0 2010-11 $0 TOTAL $0 $0 $41,000 $0 $0 $41,000 Total Personnel $0 Supplies $0 Service $0 Capital $0 TOTAL $0 PROJECT DESCRIPTION/STATUS PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR OPERATING COSTS First Fiscal Year Annually $0 $0 112 PROJECT: ZONE 9 PARK PROJECT #: PK0059 FUND: PARKLAND DEDICATION CAPITAL PROJECT BUDGET: $34,000 PROJECT FUNDING MANAGER: RIC PLOEGER SOURCES: Fund 179: Park Escrow - Zone 9 In accordance with the Parkland Dedication Ordinance, these funds have been set aside for park improvement and renovation projects as identified in Park Zone 9. FISCAL YEAR LAND ENG. CONSTR. MISC. PROJECT TOTAL Prior Years $0 $0 $0 $0 $0 2004-05 $0 2005-06 34,000 $34,000 2006-07 $0 2007-08 $0 2008-09 $0 2009-10 $0 2010-11 $0 TOTAL $0 $0 $34,000 $0 $34,000 Total Personnel $0 Supplies $0 Service $0 Capital $0 TOTAL $0$0 $0 PROJECT DESCRIPTION/STATUS PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR OPERATING COSTS First Fiscal Year Annually 113 PROJECT:PROJECT #: PK0600 FUND: PROJECT BUDGET: $135,000 PROJECT FUNDING Fund 180 MANAGER: TBD SOURCES: Park Escrow - Zone 10 FISCAL YEAR LAND ENG. CONSTR. MISC. PROJECT TOTAL Prior Years $0 2004-05 $0 2005-06 $135,000 $135,000 2006-07 $0 2007-08 $0 2008-09 $0 2009-10 $0 2010-11 TOTAL $0 $0 $135,000 $0 $135,000 Total Personnel $0 Supplies $0 Service $0 Capital $0 TOTAL $0$0 $0 PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR OPERATING COSTS First Fiscal Year Annually In accordance with the Parkland Dedication Ordinance, these funds have been set aside for park improvement and renovation projects as identified in Park Zone 10. ZONE 10 PARK 180 - Parkland Dedication Zone 10 PROJECT DESCRIPTION/STATUS 114 PROJECT: ZONE 11 PARK PROJECT #: PK0061 FUND: PARKLAND DEDICATION CAPITAL PROJECT BUDGET: $41,000 PROJECT FUNDING MANAGER: RIC PLOEGER SOURCES: Fund 181: Park Escrow - Zone 11 In accordance with the Parkland Dedication Ordinance, these funds have been set aside for park improvement and renovation projects as identified in Park Zone 11. FISCAL YEAR LAND ENG. CONSTR. MISC. PROJECT TOTAL Prior Years $0 2004-05 $0 2005-06 41,000 $41,000 2006-07 $0 2007-08 $0 2008-09 $0 2009-10 $0 2010-11 $0 TOTAL $0 $0 $41,000 $0 $0 $41,000 Total Personnel $0 Supplies $0 Service $0 Capital $0 TOTAL $0$0 $0 PROJECT DESCRIPTION/STATUS PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR OPERATING COSTS First Fiscal Year Annually 115 HEART OF THE RESEARCH VALLEY 116 GGEENNEERRAALL GGOOVVEERRNNMMEENNTT-- FFAACCIILLIITTIIEESS AANNDD TTEECCHHNNOOLLOOGGYY CCAAPPIITTAALL IIMMPPRROOVVEEMMEENNTT PPRROOJJEECCTTSS FFIISSCCAALL YYEEAARR 22000055--22000066 TTHHRROOUUGGHH FFIISSCCAALL YYEEAARR 22001100--22001111 117 GENERAL GOVERNMENT FACILITIES AND TECHNOLOGY CAPITAL IMPROVEMENT PROJECTS FISCAL YEAR 2005-2006 THROUGH FISCAL YEAR 2010-2011 PROJECT REVISED TOTAL BUDGET ACTUAL FY 04-05 BUDGET ESTIMATE AMOUNT FY 03-04 APPROPRIATIONS FY 04-05 BEGINNING FUND BALANCE:4,726,156$ 6,473,135$ 6,473,135$ ADDITIONAL RESOURCES: GENERAL OBLIGATION BONDS 4,355,000$ 1,310,000$ 1,310,000$ CERTIFICATES OF OBLIGATIONS 0 1,575,000 2,175,000 INTERGOVERNMENTAL TRANSFERS 0 0 0 INTRAGOVERNMENTAL TRANSFERS 103,204 592,470 2,061,470 INVESTMENT EARNINGS 80,489 90,000 134,933 OTHER 2,599 0 0 SUBTOTAL ADDITIONAL RESOURCES 4,541,292$ 3,567,470$ 5,681,403$ TOTAL RESOURCES AVAILABLE 9,267,448$ 10,040,605$ 12,154,537$ PUBLIC FACILITIES LIBRARY BOOK DONATIONS GG9901 291,348 0 0 10,000 NEW CEMETERY GG9905 3,270,000 0 0 0 CITY CENTER LAND ACQUISITION GG0002 1,560,000 1,654,751 0 5,000 FIRE STATION # 5 GG0201 1,795,000 614,434 227,470 905,477 1 RELOCATION OF FIRE STATION #3 GG0401 1,710,000 3,768 1,070,000 216,831 1 POLICE STATION NEW ADDITION GG0402 3,610,000 61,064 3,310,000 223,936 1 CITY CENTER BUILDING GG0408 4,300,000 2,371 0 100,000 NORTHGATE GATEWAY ENTRY FEATURES GG0520 150,000 0 150,000 0 NORTHGATE PROMENADE WATER FEATURE GG0521 175,000 0 175,000 0 NORTHGATE PUBLIC RESTROOM FACILITIES GG0522 300,000 0 300,000 0 CLOSED PROJECTS 55,188 0 0 SUBTOTAL 2,391,575$ 5,232,470$ 1,461,244$ TECHNOLOGY PROJECTS PUBLIC SAFETY SYSTEM CO0022 723,500 27,079 0 91,060 RECORDS STORAGE CO0024 326,000 59,959 0 64,000 AUTOMATED CUSTOMER SERVICE CO0102 207,000 0 0 11,037 PBX (PHONE SYSTEM) REPLACEMENT CO0400 990,328 0 0 966,328 FIRE TONE OUT SYSTEM CO0401 50,000 6,200 0 43,800 PARD AUTOMATION CO0402 113,000 97,528 0 4,000 TOPOGRAPHIC/AERIAL MAPS CO0403 365,000 0 265,000 286,000 MOBILE DATA TERMINAL REPLACEMENTS CO0501 283,725 0 283,725 283,725 AUTOMATED CITATIONS CO0503 258,000 0 0 98,000 AS400 ENHANCEMENT CO0504 450,000 0 200,000 200,000 ATM NETWORK REPLACEMENT CO0522 453,172 0 453,172 0 POLICE BOOKING CO0515 141,000 0 0 141,000 POLICE FIELD REPORTING CO0516 250,500 0 0 250,500 HTE BROWSER FRONTEND CO0523 121,775 0 0 121,775 VIDEO ARRAIGNMENT CO0524 20,000 0 20,000 20,000 RADIO REPLACEMENT CO0601 4,900,000 0 0 0 FIBER OPTIC LOOP* ME9701 400,000 13,827 0 0 KIOSKS TBD 40,000 0 0 0 MDT RADIO SYSTEM REPLACEMENT TBD 100,000 0 0 0 UPS REPLACEMENT TBD 50,918 0 0 0 CLOSED PROJECTS 28,283 0 0 SUBTOTAL 232,876$ 1,221,897$ 2,581,225$ DEBT ISSUANCE COSTS 31,131$ 17,000$ 27,664$ TRANSFERS 000 OTHER 18,011 0 0 GENERAL & ADMIN. CHARGES 120,720 202,557 202,557 TOTAL EXPENDITURES 2,794,313$ 6,673,924$ 4,272,690$ GAAP ADJUSTMENT 0$ ENDING FUND BALANCE:6,473,135$ 3,366,681$ 7,881,847$ *ME9701 - Total project budget is $1,500,000 - add'l $1,100,000 from fund 211 1 - Indicates projects funded through 2003 G.O. Bond Authorization 118 GENERAL GOVERNMENT FACILITIES AND TECHNOLOGY CAPITAL IMPROVEMENT PROJECTS FISCAL YEAR 2005-2006 THROUGH FISCAL YEAR 2010-2011 APPROVED FY 05-06 BUDGET PROJECTED PROJECTED PROJECTED PROJECTED PROJECTED PROJECTED APPROPRIATIONS FY 05-06 FY 06-07 FY 07-08 FY 08-09 FY 09-10 FY 10-11 7,881,847$ 7,881,847$ 1,826,987$ 145,958$ 98,858$ 85,858$ 77,858$ 0$ 0$ 1,800,000$ 1,855,000$ 0$ 0$ 0$ 2,670,000 2,670,000 2,535,000 250,000 0 0 0 0 0 0 0 0 0 0 171,676 171,676 2,269,892 5,324 109,026 0 0 96,000 96,000 20,000 2,000 2,000 2,000 1,000 0 0 0 0 0 0 0 2,937,676$ 2,937,676$ 6,624,892$ 2,112,324$ 111,026$ 2,000$ 1,000$ 10,819,523$ 10,819,523$ 8,451,879$ 2,258,282$ 209,884$ 87,858$ 78,858$ 15,000 15,000 15,000 15,000 10,000 10,000 10,000 2,170,000 2,170,000 1,100,000 0 0 0 0 0000000 0000000 240,000 1,489,401 0 0 0 0 0 300,000 3,325,000 0 0 0 0 0 0 0 2,342,629 1,855,000 0 0 0 0 150,000 0 0 0 0 0 0 175,000 0 0 0 0 0 0 300,000 0 0 0 0 0 0000 0 0 2,725,000$ 7,624,401$ 3,457,629$ 1,870,000$ 10,000$ 10,000$ 10,000$ 0000000 0000000 0 78,764 0 0 0 0 0 0000000 0000000 0 11,000 0 0 0 0 0 0000000 0000000 0 160,000 0 0 0 0 0 0 0 0 250,000 0 0 0 0 453,172 0 0 0 0 0 0000000 0000000 0000000 0000000 100,000 100,000 4,800,000 0 0 0 0 0000000 40,000 40,000 0 0 0 0 0 0 0 0 0 100,000 0 0 31,676 31,676 4,892 5,324 9,026 0 0 0000000 171,676$ 874,612$ 4,804,892$ 255,324$ 109,026$ 0$ 0$ 20,700$ 20,700$ 23,400$ 24,100$ 0$ 0$ 0$ 300,000 300,000 0 0 0 0 0 0000000 172,823 172,823 20,000 10,000 5,000 0 0 3,390,199$ 8,992,536$ 8,305,921$ 2,159,424$ 124,026$ 10,000$ 10,000$ 7,429,324$ 1,826,987$ 145,958$ 98,858$ 85,858$ 77,858$ 68,858$ 119 PPUUBBLLIICC FFAACCIILLIITTIIEESS 120 PROJECT: Library book donations PROJECT # GG9901 FUND: 137 - GENERAL GOVERNMENT CIP PROJECT BUDGET: $291,348 PROJECT FUNDING MANAGER: Olivia Burnside SOURCES: Funds raised by donations Kim Foutz This money was raised through donations for adding to the collection of books and other items in the College Station Library . FISCAL YEAR HARDWARE SOFTWARE CONS/TRAIN OTHER PROJECT TOTAL Prior Years $0 $0 $0 $89,334 $89,334 2004-05 $10,000 $10,000 2005-06 $15,000 $15,000 2006-07 $15,000 $15,000 2007-08 $15,000 $15,000 2008-09 $10,000 $10,000 2009-10 $10,000 $10,000 2010-11 $10,000 $10,000 TOTAL $0 $0 $0 $174,334 $0 $174,334 Total Personnel $0 Supplies $0 Service $0 Capital $0 TOTAL $0$0 $0 PROJECT DESCRIPTION/STATUS PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR OPERATING COSTS First Fiscal Year Annually 121 PROJECT:PROJECT #: GG9905 FUND:PROJECT BUDGET: $3,270,000 PROJECT FUNDING MANAGER: SOURCES: Certificates of Obligation $275,000 appropriated in 1999 $925,000 appropriated in 2005 ($600,000 in CO's and $325,000 from 001) $2,070,000 appropriated in 2006 (CO's) FISCAL YEAR LAND ENG. CONSTR. MISC. PROJECT TOTAL Prior Years $0 $0 $0 $0 $0 2004-05 $0 2005-06 1,120,000 150,000 900,000 $2,170,000 2006-07 100,000 1,000,000 $1,100,000 2007-08 $0 2008-09 $0 2009-10 $0 2010-11 $0 TOTAL $1,120,000 $250,000 $1,900,000 $0 $3,270,000 Total Personnel $0 Supplies $0 Service $0 Capital $0 TOTAL $0$0 $0 PROJECT DESCRIPTION/STATUS PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR OPERATING COSTS Development of a future city cemetery. First Fiscal Year Annually NEW CEMETERY FY 2003 GENERAL OBLIGATION General Government CIPTBD 122 PROJECT:PROJECT #: GG0002 FUND: PROJECT Secondary - 912 - DRAINAGE FUND BUDGET: $1,560,000 PROJECT FUNDING MANAGER: SOURCES: GENERAL GOV'T CIP & DRAINAGE FUND $1,194,124.82 add'l expenditures from the Drainage fund (912). FISCAL YEAR LAND ENG. CONSTR. MISC. PROJECT TOTAL Prior Years $1,658,156 $35,602 $0 $0 $1,693,758 2004-05 $5,000 $5,000 2005-06 $0 2006-07 $0 2007-08 $0 2008-09 $0 2009-10 $0 2010-11 $0 TOTAL $1,663,156 $35,602 $0 $0 $0 $1,698,758 Total Personnel $0 Supplies $0 Service $0 Capital $0 TOTAL $0 PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR OPERATING COSTS First Fiscal Year Annually PROJECT DESCRIPTION/STATUS Funding for future City Center site. This is for land acquisition costs only. CITY CENTER LAND ACQUISITION Primary - 137-GENERAL GOV'T CIP MARK MCAULIFFE 123 PROJECT: FIRE STATION No. 5 PROJECT #: GG0201 FUND: 137 - GENERAL GOVERNMENT CIP PROJECT BUDGET: $1,795,000 PROJECT FUNDING MANAGER:DONALD HARMON SOURCES: GENERAL OBLIGATION BONDS 1998 ($1,567,000) SERVICE LEVEL ADJUSTMENT FIRE ($176,000) GENERAL FUND ($52,000) Fire Station No. 5 will be located at 601 Greens Prairie Road to provide services to a high growth area of the City. The facility is expected to have two equipment bays of 2,300 square feet with an additional estimated 7,100 square feet for living quarters, training, kitchen, storage, exercise and decontamination areas. The operating costs include additional engine company to operate the aerial apparatus on a 24 hour 7 day per week schedule. FISCAL YEAR LAND ENG. CONSTR. MISC. PROJECT TOTAL Prior Years $181,270 $124,206 $574,388 $9,660 $889,523 2004-05 862,477 43,000 $905,477 2005-06 $0 2006-07 $0 2007-08 $0 2008-09 $0 2009-10 $0 2010-11 $0 TOTAL $181,270 $124,206 $1,436,865 $52,660 $0 $1,795,000 Total Personnel $1,012,000 Supplies $40,000 Service $110,000 Capital $600,000 TOTAL $1,762,000 PROJECT DESCRIPTION PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR $506,000 $40,000 OPERATING COSTS First Fiscal Year Annually $506,000 $1,166,000 $20,000 $70,000 $596,000 $20,000 $600,000 124 PROJECT: FIRE STATION No. 3 PROJECT #: GG0401 FUND: 137 - GENERAL GOVERNMENT CIP PROJECT BUDGET: $1,710,000 PROJECT FUNDING MANAGER: DONALD HARMON SOURCES: 2003 GENERAL OBLIGATION BOND FUNDS ($1,710,000) Fire Station No. 3 will be located at 1900 Barron Road to provide services to a high growth area of the City. The facility is expected to have two equipment bays of 2,300 square feet with an additional estimated 7,100 square feet for living quarters, training, kitchen, storage, exercise and decontamination areas. The operating costs include additional engine company to operate the aerial apparatus on a 24 hour 7 day per week schedule. FISCAL YEAR LAND ENG. CONSTR. MISC. PROJECT TOTAL Prior Years $43 $3,725 $0 $0 $3,768 2004-05 156,831 40,000 20,000 $216,831 2005-06 69,401 1,400,000 20,000 $1,489,401 2006-07 $0 2007-08 $0 2008-09 $0 2009-10 $0 2010-11 $0 TOTAL $156,874 $113,126 $1,400,000 $40,000 $0 $1,710,000 Total Personnel $1,012,000 Supplies $40,000 Service $110,000 Capital $600,000 TOTAL $1,762,000 PROJECT DESCRIPTION/STATUS PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR $506,000 $40,000 OPERATING COSTS First Fiscal Year Annually $506,000 $1,166,000 $20,000 $70,000 $596,000 $20,000 $600,000 125 PROJECT: POLICE STATION ADDITIONS PROJECT #: GG0402 FUND: 137 - GENERAL GOVERNMENT CIP PROJECT BUDGET: $3,610,000 PROJECT FUNDING 2003 GENERAL OBLIGATION MANAGER: DONALD HARMON SOURCES: BOND FUNDS ($3,310,000) 2006 CERTIFICATES OF OBLIGATION ($300,000) This project provides for the expansion of the Police Department into the space vacated by Municipal Court and renovation of the existing facility. FISCAL YEAR LAND ENG. CONSTR. MISC. PROJECT TOTAL Prior Years $60,394 $670 $61,064 2004-05 209,606 0 14,330 $223,936 2005-06 30,000 2,960,000 335,000 $3,325,000 2006-07 $0 2007-08 $0 2008-09 $0 2009-10 $0 2010-11 $0 TOTAL $0 $300,000 $2,960,000 $350,000 $0 $3,610,000 Total Personnel Supplies Service Capital TOTAL PROJECT DESCRIPTION/STATUS PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR OPERATING COSTS First Fiscal Year Annually 126 PROJECT: City Center Building PROJECT #: GG0408 FUND: 137 - General Government CIP PROJECT 4,300,000 BUDGET: PROJECT FUNDING 2003 General Obligation MANAGER: Glenn Brown SOURCES: Bonds Phase I of a new city hall. FISCAL YEAR LAND ENG. CONSTR. MISC. PROJECT TOTAL Prior Years $237 $0 $2,134 $0 $2,371 2004-05 $100,000 $100,000 2005-06 $0 2006-07 $2,342,629 $2,342,629 2007-08 $1,855,000 $1,855,000 2008-09 $0 2009-10 $0 2010-11 $0 TOTAL $237 $100,000 $4,199,763 $0 $4,300,000 Total Personnel $0 Supplies $0 Service $0 Capital $0 TOTAL $0$0 $0 PROJECT DESCRIPTION/STATUS PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR OPERATING COSTS First Fiscal Year Annually 127 PROJECT: Northgate Gateway Entry Features PROJECT #: GG0520 FUND: 137 - General Government CIP PROJECT BUDGET: $150,000 PROJECT FUNDING MANAGER: TBD SOURCES: 2005 Certificates of Obligation Construction of entry features in the Northgate area. FISCAL YEAR LAND ENG. CONSTR. MISC. PROJECT TOTAL Prior Years $0 2004-05 $0 2005-06 150,000 $150,000 2006-07 $0 2007-08 $0 2008-09 $0 2009-10 $0 2010-11 $0 TOTAL $0 $0 $150,000 $0 $0 $150,000 Total Personnel $0 Supplies $0 Service $0 Capital $0 TOTAL $0$0 $0 PROJECT DESCRIPTION/STATUS PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR OPERATING COSTS First Fiscal Year Annually 128 PROJECT: Northgate Water Feature PROJECT #: GG0521 FUND: 137 - General Government CIP PROJECT BUDGET: $175,000 PROJECT FUNDING MANAGER: Kim Foutz SOURCES: Certificates of Obligation (2005 Issue - $175,000) This project includes design and construction of a water fountain to be developed in the Patricia Street Promenade. The City has contracted with Waterscape Consultants, Inc. for the design of the project. Design is anticipated to be complete by summer 2005. Construction is anticipated to begin at the end of summer or early fall 2005. FISCAL YEAR LAND ENG. CONSTR. MISC.PROJECT TOTAL Prior Years $0 2004-05 $0 2005-06 15,250 159,750 $175,000 2006-07 $0 2007-08 $0 2008-09 $0 2009-10 $0 2010-11 $0 TOTAL $0 $15,250 $159,750 $0 $0 $175,000 Total Personnel $0 Supplies $0 Service $0 Capital $5,000 TOTAL $5,000$0 5,000 $5,000 PROJECT DESCRIPTION/STATUS PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR OPERATING COSTS First Fiscal Year Annually 129 PROJECT: Northgate Restroom Facilities PROJECT #: GG0522 FUND: 137 - General Government CIP PROJECT BUDGET: $300,000 PROJECT FUNDING MANAGER: Don Fazzino SOURCES: 2005 Certificates of Obligation The Northgate restroom project is currently in the planning stage. The restrooms will be generally located on the City's surface parking lot on Church Street however, a specific location has not been determined to date. A team made up of staff from the Parks, Public Works, and Economic Development Departments has been organized to work with local merchants to determine a specific location for the facility. FISCAL YEAR LAND ENG. CONSTR. MISC.PROJECT TOTAL Prior Years $0 $0 $0 $0 $0 2004-05 $0 2005-06 30,000 270,000 $300,000 2006-07 $0 2007-08 $0 2008-09 $0 2009-10 $0 2010-11 $0 TOTAL $0 $30,000 $270,000 $0 $0 $300,000 Total Personnel $0 Supplies $5,000 Service $25,000 Capital $0 TOTAL $30,000$30,000 $5,000 $25,000 $30,000 $5,000 PROJECT DESCRIPTION/STATUS PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR $25,000 OPERATING COSTS First Fiscal Year Annually 130 TTEECCHHNNOOLLOOGGYY PPRROOJJEECCTTSS 131 PROJECT: PUBLIC SAFETY SYSTEM PROJECT #: CO0022 FUND: 137 - GENERAL GOVERNMENT CIP PROJECT BUDGET: $723,500 PROJECT FUNDING MANAGER: TIM CLARK SOURCES: CERTIFICATES OF OBLIGATION The Computer Aided Dispatch, Police Reporting, EMS Reporting, and Fire Reporting have been replaced as a part of this project. The prior version of the system was ten years old and difficult to work with. The remaining portion of this project includes the implementation of the Mapping integrated with CAD and migrating to the GUI version of Police Records after the Police Field Reporting project is completed. The mapping integration with CAD involves a thorough audit and update of street information between the GIS and CAD systems. The mapping should be completed by the end of the first quarter of FY06. The GUI for the Police Records depends on the Field Reporting Project. Expect to complete this project by the end of the first quarter in FY06. Original project budget = $800,000 $55,000 transferred to CO0503 in 2005 $21,500 transferred to CO0516 in 2005 FISCAL YEAR HARDWARE SOFTWARE CONS/TRAIN OTHER Prior Years $154,564 $369,988 $103,906 $3,982 $632,440 2004-05 79,794 9,100 2,166 $91,060 2005-06 $0 2006-07 $0 2007-08 $0 2008-09 $0 2009-10 $0 2010-11 $0 TOTAL $154,564 $449,782 $113,006 $6,148 $723,500 Personnel $0 Supplies $0 Service $54,000 Capital $0 TOTAL $54,000 PROJECT TOTAL Total PROJECT DESCRIPTION/STATUS PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR OPERATING COSTS First Fiscal Year Annually $0 54,000 $54,000 132 PROJECT: RECORDS STORAGE PROJECT #: CO0024 FUND: 137 - GENERAL GOVERNMENT CIP PROJECT BUDGET: $326,000 PROJECT FUNDING General Government MANAGER: CASEY CHRISTENSEN SOURCES: CIP Fund This project provides imaging throughout the City and will enable departments to move from a paper form of record storage and retrieval to electronic. Documents stored in this system may be made available over the internet to the general public as appropriate. Departmental implementation of this software system will be concluded by the end of FY05. FISCAL YEAR HARDWARE SOFTWARE CONS/TRAIN OTHER PROJECT TOTAL Prior Years $86,000 $122,000 $54,000 $0 $262,000 2004-05 4,000 24,000 36,000 $64,000 2005-06 $0 2006-07 $0 2007-08 $0 2008-09 $0 2009-10 $0 2010-11 $0 TOTAL $90,000 $146,000 $54,000 $36,000 $326,000 Total Personnel $32,000 Supplies $3,000 Service $28,000 Capital $0 TOTAL $63,000 This project is currently being implemented in the last two departments that have requested to begin document imaging. HTE and Laserfiche have not completed the interface that would provide the capability to link records in HTE with documents in Laserfiche and to view and print, to scan in documents and add to links. This capability was one of the project objectives and has been promised for almost 3 years. Both companies state that the interface will be available by end of FY at latest. We also have the option to use remaining program funds to purchase and install Laserfiche Agenda Manager to automate Council and City Committee agenda preparation and minute processes. A decision on which option to pursue will is expected to be made in May 2005. PROJECT DESCRIPTION/STATUS PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR 32,000 OPERATING COSTS First Fiscal Year Annually 0 $0 3,000 28,000 $63,000 0 0 133 PROJECT: Automated Customer Service PROJECT #: CO0102 FUND: 137 - General Government CIP PROJECT BUDGET: $207,000 PROJECT FUNDING MANAGER: Erin Provazek SOURCES: Electric Fund This project is to place interactive processes on the City's website so that citizens can do business with the City over the Internet and the telephone 24 hours a day. Payments can be taken online by Utility Customer Service and Municipal Court and charged to credit cards. Additional interactive processes will be added as feasible. FISCAL YEAR HARDWARE SOFTWARE CONS/TRAIN OTHER PROJECT TOTAL Prior Years $93,608 $23,591 $0 $0 $117,199 2004-05 11,037 $11,037 2005-06 78,764 $78,764 2006-07 $0 2007-08 $0 2008-09 $0 2009-10 $0 2010-11 $0 TOTAL $93,608 $34,628 $0 $78,764 $207,000 Total Personnel $0 Supplies $0 Service $35,000 Capital $0 TOTAL $35,000$0 $35,000 35,000 PROJECT DESCRIPTION/STATUS PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR OPERATING COSTS First Fiscal Year Annually 134 PROJECT: PBX REPLACEMENT PROJECT #CO0400 FUND: GENERAL GOVERNMENT PROJECT PROJECTS BUDGET: $990,328 PROJECT FUNDING MANAGER: Jon Schlandt SOURCES: General Government CIP/ Equip Replacement Fund Original project budget = $917,000 $46,828 transferred from CO0522 in 2005 $26,500 transferred from CO0523 in 2005 FISCAL YEAR HARDWARE SOFTWARE CONS/TRAIN OTHER PROJECT TOTAL Prior Years $1,000 $0 $23,000 $0 $24,000 2004-05 902,294 34,350 29,684 $966,328 2005-06 $0 2006-07 $0 2007-08 $0 2008-09 $0 2009-10 $0 2010-11 $0 TOTAL $903,294 $0 $57,350 $29,684 $0 $990,328 Total Personnel $0 Supplies $0 Service $34,000 Capital $0 TOTAL $34,000 Annually $34,000 First Fiscal Year $0 $34,000 PROJECT DESCRIPTION/STATUS This project provides for the scheduled replacement of the city's PBX phone system. As of FY04, the system was 10 years old and had reached the end of its expected service life. As of April 2005, the project is in contract negotiation with the primary vendor selected by the RFP process. It is anticipated that installation of a new Voice-over-IP phone system will be complete in FY05. In April 2005, $46,828 was moved from Project CO0522 (ATM Network Replacement) to this project to fund network related upgrades. PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR OPERATING COSTS 135 PROJECT: FIRE TONE OUT SYSTEM PROJECT #CO0401 FUND: 137 - GENERAL GOVERNMENT CIP PROJECT BUDGET: $50,000 PROJECT FUNDING MANAGER: SOURCES: Certificates of Obligation reducing response times and potential for human error. FISCAL YEAR HARDWARE SOFTWARE CONS/TRAIN OTHER PROJECT TOTAL Prior Years $0 $6,200 $0 $0 $6,200 2004-05 43,800 $43,800 2005-06 $0 2006-07 $0 2007-08 $0 2008-09 $0 2009-10 $0 2010-11 $0 TOTAL $0 $6,200 $0 $43,800 $0 $50,000 Total Personnel $0 Supplies $0 Service $8,000 Capital $0 TOTAL $8,000 The new system is expected to be online at all 5 Fire Stations by the end of July 2005. As of April 2005, engineering is complete, installation is ongoing. Mike Hare This project will replace the current tone out system which is more than ten years old. The current system requires the dispatcher to manually alert Fire Stations via console buttons. The new system will allow Public Safety's Computer Aided Dispatch (CAD) system to automatically initiate station alerting based on call type and location, PROJECT DESCRIPTION/STATUS $0 8,000 $8,000 PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR OPERATING COSTS First Fiscal Year Annually 136 PROJECT: PARD AUTOMATION PROJECT #:CO0402 FUND: 137 - GENERAL GOVERNMENT CIP PROJECT BUDGET: $113,000 PROJECT FUNDING MANAGER: KEVIN JOYNER SOURCES: General Government CIP This project will provide for the automation of many processes in the Parks and Recreation Department, such as registrations, scheduling of facilities, team scheduling and pass management. These processes must be automated prior to integrating them with the Automated Customer Service system through the internet and phone. PARD software began integration with the City's financial system in March of 2005. The system will begin the planning process of integrating it with the Automated Customer Service system in the fourth quarter of FY05. The vendor is contractually bound to providing a means for that integration. Once done, the project's contract will be complete. Project completion is estimated at the end of the first quarter of FY06. Original budget = $171,000 $58,000 transferred to CO0503 in 2005 FISCAL YEAR HARDWARE SOFTWARE CONS/TRAIN OTHER PROJECT TOTAL Prior Years $12,000 $84,000 $0 $2,000 $98,000 2004-05 4,000 $4,000 2005-06 5,000 6,000 $11,000 2006-07 $0 2007-08 $0 2008-09 $0 2009-10 $0 2010-11 $0 TOTAL $21,000 $90,000 $0 $2,000 $113,000 Total Personnel $0 Supplies $0 Service $12,000 Capital $0 TOTAL $12,000$0 12,000 $12,000 PROJECT DESCRIPTION/STATUS PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR OPERATING COSTS First Fiscal Year Annually 137 PROJECT: TOPOGRAPHICAL MAPS PROJECT #:CO0403 FUND: 137 - GENERAL GOVERNMENT CIP PROJECT BUDGET: 365,000$ PROJECT FUNDING MANAGER: BRETT BLANKNER SOURCES: Electric Fund This project provides updating of Aerial Photos & Topographical Information. As the City continues to grow it is vital that we update this information. The last full Aerial was flown in February 1994. None of the City's Topographical Information has been updated since then. It is anticipated that this project will come in $79,000 under budget. Remaining funds will be returned to the Electric Fund. FISCAL YEAR HARDWARE SOFTWARE CONS/TRAIN OTHER PROJECT TOTAL Prior Years $0 $0 $0 $0 $0 2004-05 286,000 $286,000 2005-06 $0 2006-07 $0 2007-08 $0 2008-09 $0 2009-10 $0 2010-11 $0 TOTAL $0 $0 $0 $286,000 $0 $286,000 Total Personnel $0 Supplies $0 Service $0 Capital $0 TOTAL $0 The project is expected to be completed in September 2005. The contract was awarded in December 2004 to Kucera International in Ohio. The aerial survey was flown in February and the film is being processed. The processing will take approximately 4-5 months. Delivery of final products is expected in September 2005. PROJECT DESCRIPTION/STATUS PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR OPERATING COSTS First Fiscal Year Annually $0 $0 138 PROJECT: MDT Replacements PROJECT #: CO0501 FUND: 137 - General Government CIP PROJECT BUDGET: $283,725 PROJECT FUNDING MANAGER: Tracy Price SOURCES: Equipment Replacement Fund This project provides for the replacement of MDTs in the Police, Fire and EMS vehicles. The equipment will reach its expected life of seven years and should be replaced. Dollars have been placed in the equipment replacement fund and no additional on-going costs are anticipated. Funding has moved up by one year in order to replace MDT equipment for the Automated Citation and Budget is processing Budget Adjustment to move $90,000 from FY06 to FY05 to cover Fire Dept. costs $55,000 moved from Automated Citations CO0503 in Feb 2005 Police Field Reporting will not run on the older MDTs. Waiting on delivery of 7 new partol cars and 7 new motocycles due by the end of May 05. Police decided to hold off installing Toughbooks in the 2 SRO cars until the cars are replaced (currently they have no MDT due TO MW520 units dying). All Fire vehicle installs are complete. Project 7 cars and 7 motorcycle installs to be complete by then end of the 3rd quarter. Original project budget = $227,000 $55,000 transferred from CO0503 in 2005 $1,725 transferred from CO0523 in 2005 FISCAL YEAR HARDWARE SOFTWARE CONS/TRAIN OTHER PROJECT TOTAL Prior Years $0 $0 $0 $0 $0 2004-05 214,992 68,733 $283,725 2005-06 $0 2006-07 $0 2007-08 $0 2008-09 $0 2009-10 $0 2010-11 $0 TOTAL $214,992 $0 $0 $68,733 $283,725 Total Personnel $0 Supplies $0 Service $0 Capital $0 TOTAL $0$0 $0 Annually PROJECT DESCRIPTION/STATUS PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR OPERATING COSTS First Fiscal Year 139 PROJECT: Automated Citations PROJECT #: CO0503 FUND: 137 - General Government CIP PROJECT BUDGET: $258,000 PROJECT FUNDING MANAGER: Don Davis SOURCES: General Government Court Technology This will allow officers in the field to use a device to enter citation information which will be downloaded into both the Police Report Management System and the Municipal Court Case System. This will save data entry time in both Police and Court, get greater accuracy and provide instant feedback to the officers. Contract negotiations with the highest ranking vendor from the RFP. Responses currently in progress. Implementation is expected to begin in the 1st quarter of FY06, with full completion by the end of the third quarter of FY06. Completion of this project is dependent on completion of the Message Switch upgrade part of project CO0516, which must be implemented first. FISCAL YEAR HARDWARE SOFTWARE CONS/TRAIN OTHER PROJECT TOTAL Prior Years $0 $0 $0 $0 $0 2003-04 $0 2004-05 7,000 90,000 1,000 $98,000 2005-06 100,000 25,000 10,000 25,000 $160,000 2006-07 $0 2007-08 $0 2008-09 $0 2009-10 $0 2010-11 $0 TOTAL $107,000 $115,000 $10,000 $26,000 $258,000 Total Personnel $0 Supplies $0 Service $20,000 Capital $0 TOTAL $20,000 PROJECT DESCRIPTION/STATUS PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR OPERATING COSTS First Fiscal Year Annually $0 $20,000 $20,000 140 PROJECT: AS400 ENHANCEMENT PROJECT #CO0504 FUND: 137 - GENERAL GOVERNMENT CIP PROJECT BUDGET: $450,000 PROJECT FUNDING 2005 Certificates MANAGER: ROGER EARWOOD SOURCES: of Obligation ($200,000) Future Certificates of Obligation ($250,000) The AS400 is the computer system that runs several of the City's key operational databases and software. Some of these include Utility Customer Service, Finance, Budget, Fleet Management, and Development Services. An upgrade to the hardware is anticipated every three to four years to ensure that the system is performing at the level of efficiency required for its daily use. The project will provide for the funding to make such changes which will be determined for the particular year of implementation. The replaced hardware is now referred to as an IBM i5. The AS/400 was replaced in January of 2005 with 2 IBM i5s. Additional software was also purchased to enable replication of data from one i5 to the other. This ensures data access on the primary machine 24/7 and provides business continuity and disaster recovery for this system in the event that the city needs such. The FY 05 phase of this project was over budget by $19,000. This was funded from OTIS MIS account 001-6026-674-70-20, bringing the 2005 project total to $219,000. Work on this project has concluded and will be revisited in budget preparations for FY08. FISCAL YEAR HARDWARE SOFTWARE CONS/TRAIN OTHER PROJECT TOTAL Prior Years $0 $0 $0 $0 $0 2004-05 139,000 34,000 5,000 22,000 $200,000 2005-06 $0 2006-07 $0 2007-08 173,000 62,000 10,000 5,000 $250,000 2008-09 $0 2009-10 $0 2010-11 $0 TOTAL $312,000 $96,000 $15,000 $27,000 $0 $450,000 Total Personnel $0 Supplies $0 Service $20,000 Capital $0 TOTAL $20,000 *The annual operating cost will increase to $28,000 when the next upgrade is implemented in FY08. PROJECT DESCRIPTION/STATUS PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR OPERATING COSTS First Fiscal Year Annually* $0 20,000 $20,000 141 PROJECT: ATM NETWORK REPLACEMENT*PROJECT #: C00522 *Asynchronous transmission mode FUND:137 - GENERAL GOVERNMENT CIP PROJECT BUDGET: $453,172 PROJECT FUNDING MANAGER: Jon Schlandt SOURCES: 2005 Certificates of Obligation Original project budget = $500,000 $46,828 transferred to CO0400 in 2005 FISCAL YEAR HARDWARE SOFTWARE CONS/TRAIN OTHER PROJECT TOTAL Prior Years $0 $0 $0 $0 $0 2004-05 $0 2005-06 453,172 $453,172 2006-07 $0 2007-08 $0 2008-09 $0 2009-10 $0 2010-11 $0 TOTAL $453,172 $0 $0 $0 $0 $453,172 Total Personnel $0 Supplies $0 Service $0 Capital $0 TOTAL $0$0 $0 The City began construction of a high speed network in 1996 that supports data, communication, and traffic systems. The network system's backbone Asynchronous Transmission Mode (ATM) switching equipment will need to be replaced in FY06. It is anticipated that a faster and more cost effective Gigabit Ethernet switching network will be installed in FY06 to support existing services as well as provide greater capability to support future communications. Although approved for FY 05 start, project was placed on hold pending completion of the telephone replacement project. In April 2005, $46,828 was moved from this project to project CO0400 (Phone System) to fund network related upgrades. This transfer reduced the original project budget from $500,000 to $453,172. PROJECT DESCRIPTION/STATUS AnnuallyFirst Fiscal Year PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR OPERATING COSTS 142 PROJECT: POLICE BOOKING PROJECT #CO0515 FUND: 137 - GENERAL GOVERNMENT CIP PROJECT BUDGET: $141,000 PROJECT FUNDING MANAGER: TIM CLARK SOURCES: Certificates of Obligation This will automate the booking of detainees in the City's jail facility. It will include live scan of fingerprints, thus making it possible to immediately compare detainee fingerprints to those on file. This should speed up the booking process, allowing officers to return to patrol duty quicker. A contract is being negotiated with the vendor that ranked highest from the RFP Responses. Implementation and completion should take place in the 4th quarter of FY05. The project is expected to be completed by the end of the fourth quarter of FY05. FISCAL YEAR HARDWARE SOFTWARE CONS/TRAIN OTHER PROJECT TOTAL Prior Years $0 $0 $0 $0 $0 2004-05 20,000 15,000 10,000 96,000 $141,000 2005-06 $0 2006-07 $0 2007-08 $0 2008-09 $0 2009-10 $0 2010-11 $0 TOTAL $20,000 $15,000 $10,000 $96,000 $0 $141,000 Total Personnel $0 Supplies $0 Service $21,000 Capital $0 TOTAL $21,000$0 $21,000 21,000 PROJECT DESCRIPTION/STATUS PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR OPERATING COSTS First Fiscal Year Annually 143 PROJECT: POLICE FIELD REPORTING PROJECT #CO0516 FUND: 137 - GENERAL GOVERNMENT CIP PROJECT BUDGET: $250,500 PROJECT FUNDING MANAGER: TIM CLARK SOURCES: Certificates of Obligation This project will allow police officers to fill out report forms electronically as the data is collected. This will mean less time spent in the Police offices filling out reports. The Police Department has decided to use Geac's Field Reporting Application. The application requires upgraded computer hardware in the vehicles, therefore prior to implementation, the MDT Replacement project must be complete. The Scope of Work, to be incorporated into an addendum to the Master agreement, with Geac is in progress. Implementation of the application should begin by July 2005. Project completion is expected by the end of the second quarter in FY06. Original project budget = $229,000 ($129,000 from CO0404 - Add'l Technology Improvements) $21,500 transferred from CO0022 in 2005 FISCAL YEAR HARDWARE SOFTWARE CONS/TRAIN OTHER PROJECT TOTAL Prior Years $0 $0 $0 $0 $0 2004-05 10,000 142,500 60,000 38,000 $250,500 2005-06 $0 2006-07 $0 2007-08 $0 2008-09 $0 2009-10 $0 2010-11 $0 TOTAL $10,000 $142,500 $60,000 $38,000 $250,500 Total Personnel $0 Supplies $0 Service $23,000 Capital $0 TOTAL $23,000 PROJECT DESCRIPTION/STATUS PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR 0 OPERATING COSTS First Fiscal Year Annually $0 23,000 $23,000 144 PROJECT: H.T.E. Browser Frontend PROJECT #: CO0523 FUND: 137 - General Government CIP PROJECT BUDGET: $121,775 PROJECT FUNDING MANAGER: Erin Provazek SOURCES: 2005 Certificates of Obligation H.T.E will add functionality to all its applications ONLY through the browser based frontend called Naviline. The product must be purchased by application and the end users can choose to use the old green screen or the new browser based version. Installation of the product (Naviline) will begin the week of April 18th. Implementation to the Utility Billing Division users will begin the following week. Implementation of Naviline to HTE application users will be completed by the end of the 4th quarter of FY05. Original project budget = $150,000 $1,725 transferred to CO0501 in 2005 $26,500 transferred to CO0400 in 2005 FISCAL YEAR HARDWARE SOFTWARE CONS/TRAIN OTHER PROJECT TOTAL Prior Years $0 $0 $0 $0 $0 2004-05 48,274 68,501 5,000 $121,775 2005-06 $0 2006-07 $0 2007-08 $0 2008-09 $0 2009-10 $0 2010-11 $0 TOTAL $48,274 $68,501 $5,000 $0 $121,775 Total Personnel $0 Supplies $0 Service $20,000 Capital $0 TOTAL $20,000 PROJECT DESCRIPTION/STATUS PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR OPERATING COSTS First Fiscal Year Annually $20,000 $20,000 145 PROJECT:Video Arraignment PROJECT #: CO0524 FUND: Court Time Efficiency Fee Fund PROJECT BUDGET: $20,000 PROJECT Erik Bodholt FUNDING Court Time MANAGER: SOURCES: Efficiency Fee Fund This project was moved forward from FY 06. Project started February 2, 2005 Order and Receive Equipment - Complete by March 2, 2005 Installation - 2-30 March 2005 Testing - 1-15 April 2005 Training - 18 April - 6 May FISCAL YEAR Hardware Software Cons/Training Other PROJECT TOTAL Prior Years $0 $0 $0 $0 $0 2004-05 10,000 3,000 1,000 6,000 $20,000 2005-06 $0 2006-07 $0 2007-08 $0 2008-09 $0 2009-10 $0 2010-11 $0 TOTAL $10,000 $3,000 $1,000 $6,000 $20,000 Total Personnel $0 Supplies $1,000 Service $1,000 Capital $0 TOTAL $2,000 PROJECT DESCRIPTION/STATUS This project will allow the Municipal Judge to arraign detainees without the need to transport the detained persons physically to the Municipal Court. The equipment in the holding jail will also be used to allow the arraignment of detained persons by County judges. The City's partnership in the BVCnet makes this possible. Project is 90 per cent complete. All equipment has been purchased and installation will be completed the first week in May. Final equipment configuration is being worked with Municipal Court judge. Completion is anticipated by May 20th. This project is expected to be complete by the end of May 2005. PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR OPERATING COSTS First Fiscal Year Annually 1000 $0 $2,000 1000 146 PROJECT: RADIO SYSTEM REPLACEMENT PROJECT #CO0601 FUND: 137 - GENERAL GOVERNMENT CIP PROJECT BUDGET: $4,900,000 PROJECT FUNDING MANAGER: Mike Hare SOURCES:Equipment Replacement Fund Certificates of Obligation Staff has stated that it is willing to wait for another year or two in order to get the more robust system. Projections revised due to problems with signal loss. Now projected for FY 05-06 and FY 06-07. FISCAL YEAR HARDWARE SOFTWARE CONS/TRAIN OTHER PROJECT TOTAL Prior Years $0 $0 $0 $0 $0 2004-05 $0 2005-06 100,000 $100,000 2006-07 4,800,000 $4,800,000 2007-08 $0 2008-09 $0 2009-10 $0 2010-11 $0 TOTAL $4,800,000 $0 $100,000 $0 $0 $4,900,000 Total Personnel $0 Supplies $0 Service $0 Capital $0 TOTAL $0 PROJECT DESCRIPTION/STATUS PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR OPERATING COSTS First Fiscal Year Annually The City's 800 MHz radio system was installed in 1996. It is scheduled to begin its replacement in FY07. Project costs are based on replacing the existing radio system with equivalent features. Public Safety Staff have raised the issue of upgrading the current radio system with a more robust, dynamic system which would improve the current, inadequate coverage in south College Station. OTIS staff recommends hiring a consultant to determine best alternative to provide adequate coverage, single or multi-antenna system. $0 $0 147 PROJECT: FIBER OPTIC LOOP PROJECT #ME9701 FUND: 137 - GENERAL GOVERNMENT CIP PROJECT Gen'l Gov't CIP $400,000 BUDGET: Electric Fund $1,100,000 Total $1,500,000 PROJECT FUNDING General Gov't CIP MANAGER: Jon Schlandt SOURCES:Electric Fund Fiber cable is being supplied to the secondary facilities as work schedules and weather permit. FY 04-05 and FY 05-06 expenditures will be funded with Electric (211) funds. FISCAL YEAR HARDWARE SOFTWARE CONS/TRAIN OTHER PROJECT TOTAL Prior Years $15,000 $1,000 $86,000 $1,302,000 $1,404,000 2004-05 75,000 $75,000 2005-06 21,000 $21,000 2006-07 $0 2007-08 $0 2008-09 $0 2009-10 $0 2010-11 $0 TOTAL $15,000 $1,000 $86,000 $1,398,000 $0 $1,500,000 Total Personnel $0 Supplies $0 Service $0 Capital $0 TOTAL $0 The final phase consisting of the addition of some minor facilities and traffic signal connectivity is anticipated to be complete in FY06. There are 2 parts to this funding. $1,100,000 was from the Electric Fund and this has been spent. The original project had $500,000 from the General Fund, but this was reduced by $100,000 between the FY01 and FY02 budgets. $60,000 of that $100,000 was used for Website redesign. PROJECT DESCRIPTION/STATUS Project funding is being used to complete a fiber optic infrastructure plan to support the City's facilities and communication services. Previously, the City's data, communication, and traffic systems were fed from a linear fiber optic backbone. A fiber optic ring has been installed with all major City facilities served, providing greatly enhanced reliability through fiber optic cable path redundancy. Secondary facilities are fed radially from these major facilities. PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR AnnuallyFirst Fiscal Year OPERATING COSTS $0 $0 148 PROJECT: KIOSKS PROJECT #TBD FUND: 005 - COURT TECHNOLOGY FUND PROJECT BUDGET: $40,000 PROJECT FUNDING MANAGER: TBD SOURCES:COURT TECHNOLOGY FUND FISCAL YEAR Hardware Software Cons/Training Other PROJECT TOTAL Prior Years $0 $0 $0 $0 $0 2004-05 $0 2005-06 17,500 19,500 1,000 2,000 $40,000 2006-07 $0 2007-08 $0 2008-09 $0 2009-10 $0 2010-11 $0 TOTAL $17,500 $19,500 $1,000 $2,000 $0 $40,000 Total Personnel $0 Supplies $500 Service $1,000 Capital $5,000 TOTAL $6,500 5,000 $0 $6,500 500 1,000 PROJECT DESCRIPTION/STATUS PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR OPERATING COSTS First Fiscal Year Annually This project will place one kiosk initially, possibly expanding to three areas. The kiosks will be available 24 hours a day, 7 days a week (if housed in a building the hours the building is open will determine hours of availability). Kiosks may accept utility bill and citation payments by credit card, cash, check and electronic bank draft 149 PROJECT: MDT RADIO SYSTEM REPLACEMENT PROJECT #: TBD FUND: 225 - EQUIPMENT PROJECT $100,000 REPLACEMENT FUND BUDGET: PROJECT FUNDING MANAGER: TBD SOURCES: EQUIPMENT REPLACEMENT FUND FISCAL YEAR Hardware Software Cons/Training Other PROJECT TOTAL Prior Years $0 $0 $0 $0 $0 2004-05 $0 2005-06 $0 2006-07 $0 2007-08 $0 2008-09 15,000 2,000 5,000 78,000 $100,000 2009-10 $0 2010-11 $0 TOTAL $15,000 $2,000 $5,000 $78,000 $0 $100,000 Total Personnel $0 Supplies $0 Service $0 Capital $0 TOTAL $0$0 $0 PROJECT DESCRIPTION/STATUS PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR OPERATING COSTS First Fiscal Year Annually The infrastructure to support the public safety mobile computing will be ten years old in FY2008 which is the expected life of this type of equipment. 150 PROJECT: UPS Replacment PROJECT #: TBD FUND: 225 - Equipment Replacement Fund PROJECT BUDGET: $50,918 PROJECT FUNDING MANAGER: Jon Schlandt SOURCES: Equipment Replacement Fund FISCAL YEAR Hardware Software Cons/Training Other PROJECT TOTAL Prior Years $0 2004-05 $0 2005-06 31,676 $31,676 2006-07 4,892 $4,892 2007-08 5,324 $5,324 2008-09 9,026 $9,026 2009-10 $0 2010-11 $0 TOTAL $50,918 $0 $0 $0 $0 $50,918 Total Personnel $0 Supplies $0 Service $0 Capital $0 TOTAL $0 PROJECT DESCRIPTION/STATUS PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR Replacement of Uninterruptible Power Supply (UPS) units and associated Battery Cabinets supporting the City's telephone, computer network, and radio systems. Recommended replacement schedule of 9 years for UPS units and every 3 years for associated Battery Cabinets. Attached spreadsheet details UPS inventory and replacement schedule. OPERATING COSTS First Fiscal Year Annually $0 $0 151 HEART OF THE RESEARCH VALLEY 152 GGEENNEERRAALL GGOOVVEERRNNMMEENNTT-- CCOONNVVEENNTTIIOONN CCEENNTTEERR CCAAPPIITTAALL IIMMPPRROOVVEEMMEENNTT PPRROOJJEECCTTSS FFIISSCCAALL YYEEAARR 22000055--22000066 TTHHRROOUUGGHH FFIISSCCAALL YYEEAARR 22001100--22001111 153 GENERAL GOVERNMENT CONVENTION CENTER CAPITAL IMPROVEMENT PROJECTS FISCAL YEAR 2005-2006 THROUGH FISCAL YEAR 2010-2011 PROJECT REVISED PROJECT BUDGET ACTUAL FY 04-05 BUDGET ESTIMATE NUMBER AMOUNT FY 03-04 APPROPRIATIONS FY 04-05 BEGINNING FUND BALANCE:6,954,316$ 833,990$ 833,990$ ADDITIONAL RESOURCES: CERTIFICATES OF OBLIGATION 0$ 0$ 0$ INTRAGOVERNMENTAL TRANSFERS 0 1,200,000 1,200,000 INVESTMENT EARNINGS 49,845 18,000 18,000 OTHER 2 0 0 SUBTOTAL ADDITIONAL RESOURCES 49,847$ 1,218,000$ 1,218,000$ TOTAL RESOURCES AVAILABLE 7,004,163$ 2,051,990$ 2,051,990$ PUBLIC FACILITIES CONVENTION CNTR - PH III GG0523 25,000,000 0 0 0 PRIOR PROJECT INFRASTRUCTURE * HWY 30/60 INFRASTRUCTURE GG0105 4,850,000 1,345,683 1,200,000 1,407,313 CLOSED PROJECTS 442 OTHER 1,392 0 0 DEBT SERVICE 4,781,316 0 0 DEBT ISSUANCE COSTS 0 0 0 GENERAL & ADMIN CHARGES 41,340 0 0 TOTAL EXPENDITURES 6,170,173$ 1,200,000$ 1,407,313$ GAAP 0 ENDING FUND BALANCE:833,990$ 851,990$ 644,677$ *Hwy 30/60 Corridor development costs funded through $1,560,000 Electric Fund, $1,690,000 Water Fund, $400,000 Wastewater Fund, and $1,200,000 from DE0002. 154 GENERAL GOVERNMENT CONVENTION CENTER CAPITAL IMPROVEMENT PROJECTS FISCAL YEAR 2005-2006 THROUGH FISCAL YEAR 2010-2011 APRROVED FY 05-06 BUDGET PROJECTED PROJECTED PROJECTED PROJECTED PROJECTED PROJECTED APPROPRIATIONS FY 05-06 FY 06-07 FY 07-08 FY 08-09 FY 09-10 FY 10-11 644,677$ 644,677$ 85,652$ 11,967,652$ 51,652$ 57,352$ 63,152$ 1,000,000$ 1,000,000$ 24,000,000$ 0$ 0$ 0$ 0$ 0 0 0 0 0 0 7,500 7,500 82,000 84,000 5,700 5,800 6,000 0 0 0 0 0 0 0 1,007,500$ 1,007,500$ 24,082,000$ 84,000$ 5,700$ 5,800$ 6,000$ 1,652,177$ 1,652,177$ 24,167,652$ 12,051,652$ 57,352$ 63,152$ 69,152$ 1,000,000 1,000,000 12,000,000 12,000,000 0 0 0 0 531,525 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 10,000 10,000 200,000 0 0 0 0 25,000 25,000 0 0 0 0 0 1,035,000$ 1,566,525$ 12,200,000$ 12,000,000$ 0$ 0$ 0$ 617,177$ 85,652$ 11,967,652$ 51,652$ 57,352$ 63,152$ 69,152$ 155 PROJECT:PROJECT #: GG0523 PROJECT FUND: 128 - Convention Center Fund BUDGET: $25,000,000 PROJECT FUNDING MANAGER: SOURCES: Certificates of Obligation $25,000,000 FISCAL YEAR LAND ENG. CONSTR. MISC. PROJECT TOTAL Prior Years $0 2004-05 $0 2005-06 1,000,000 $1,000,000 2006-07 12,000,000 $12,000,000 2007-08 12,000,000 $12,000,000 2008-09 $0 2009-10 $0 2010-11 $0 TOTAL $0 $1,000,000 $24,000,000 $0 $0 $25,000,000 Total Personnel $0 Supplies $0 Service $0 Capital $0 TOTAL TBD Convention Center Ph III TBD Development of a Convention Center. Location TBD. PROJECT DESCRIPTION/STATUS PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR OPERATING COSTS First Fiscal Year Annually $0 $0 156 PROJECT: HIGHWAY 30/60 INFRASTRUCTURE PROJECT #: GG0105 FUND: 128 - CONVENTION CENTER FUND PROJECT BUDGET: PROJECT FUNDING MANAGER: Bob Mosley/Craig Jordan SOURCES: Electric Fund, Water Fund, Wastewater Fund This project includes the design and construction of a new roadway (Copperfield Parkway) between Hwy 60 and Hwy 30 connecting Copperfield Drive in Bryan to Linda Lane in College Station. Also included is a water main extension. Sewer and other utilities will also be constructed for availability to the future development. Copperfield Parkway and the water main extension are a 100% completed and constructed. For the purposes of this project sheet, the remaining project is Highway 30/60 Infrastructure Phase II which will be to construct a looped road within a 137-acre tract with a cul-de-sac at the end. It will extend sewer, water and storm drain for its entire length of approximately 3400 feet. The proposed road will be 38 feet wide with curb, gutter and sidewalk on both sides. Highway 30/60 Infrastructure Phase II final construction bid was awarded to Dudley Construction in the amount of $1,404,004.52. FISCAL YEAR LAND ENG. CONSTR. MISC.PROJECT TOTAL Prior Years $10,341 $1,203,329 $1,696,134 $1,359 $2,911,162 2004-05 $10,000 $1,387,313 $10,000 $1,407,313 2005-06 $5,000 $526,525 $531,525 2006-07 $0 2007-08 $0 2008-09 $0 2009-10 $0 2010-11 $0 TOTAL $10,341 $1,218,329 $3,609,972 $11,359 $4,850,000 Total Personnel $0 Supplies $0 Service $0 Capital $0 TOTAL $0 $4,850,000 $0 $0 PROJECT DESCRIPTION PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR OPERATING COSTS First Fiscal Year Annually 157 HEART OF THE RESEARCH VALLEY 158 GGEENNEERRAALL GGOOVVEERRNNEEMMEENNTT-- BBUUSSIINNEESSSS PPAARRKK CCAAPPIITTAALL IIMMPPRROOVVEEMMEENNTT PPRROOJJEECCTTSS FFIISSCCAALL YYEEAARR 22000055--22000066 TTHHRROOUUGGHH FFIISSCCAALL YYEEAARR 22001100--22001111 159 GENERAL GOVERNMENT BUSINESS PARK CAPITAL IMPROVEMENT PROJECTS FISCAL YEAR 2005-2006 THROUGH FISCAL YEAR 2010-2011 PROJECT REVISED TOTAL PROJECT BUDGET ACTUAL FY 04-05 BUDGET ESTIMATE NUMBER AMOUNT FY 03-04 APPROPRIATIONS FY 04-05 BEGINNING FUND BALANCE:2,308,510$ 2,843,393$ 2,843,393$ ADDITIONAL RESOURCES: CERTIFICATES OF OBLIGATIONS 500,000$ 3,150,000$ 500,000$ INTRAGOVERNMENTAL TRANSFERS 0 0 0 INVESTMENT EARNINGS 40,932 70,000 73,965 OTHER 125 0 0 SUBTOTAL ADDITIONAL RESOURCES 541,057$ 3,220,000$ 573,965$ TOTAL RESOURCES AVAILABLE 2,849,567$ 6,063,393$ 3,417,358$ BUSINESS PARK FUND NEW BUSINESS CENTER B (INCUBATOR)DE0002 1,560,000 0 0 345,600 SPRING CREEK CORPORATE CAMPUS PHASE IA DE0300 2,779,000 4,372 220,000 215,628 BUSINESS PARK SIGN IMPROVEMENTS GG0302 50,000 1,083 0 48,625 CLOSED PROJECTS 719 0 0 OTHER 0 0 5,000 DEBT ISSUANCE COST 0 0 5,659 TRANSFER OUT 0 1,200,000 1,200,000 GENERAL & ADMIN CHARGES 0 29,200 29,200 TOTAL EXPENDITURES 6,174$ 1,449,200$ 1,849,712$ GAAP ADJUSTMENT 0 ENDING FUND BALANCE:2,843,393$ 4,614,193$ 1,567,646$ 160 GENERAL GOVERNMENT BUSINESS PARK CAPITAL IMPROVEMENT PROJECTS FISCAL YEAR 2005-2006 THROUGH FISCAL YEAR 2010-2011 APPROVED FY 05-06 BUDGET PROJECTED PROJECTED PROJECTED PROJECTED PROJECTED PROJECTED APPROPRIATIONS FY 05-06 FY 06-07 FY 07-08 FY 08-09 FY 09-10 FY 10-11 1,567,646$ 1,567,646$ 1,246,301$ 9,301$ 10,401$ 11,501$ 12,601$ 2,229,000$ 2,229,000$ 0$ 0$ 0$ 0$ 0$ 0 0 0 0 0 0 0 28,000 28,000 13,000 1,100 1,100 1,100 1,100 0 0 0 0 0 0 0 2,257,000$ 2,257,000$ 13,000$ 1,100$ 1,100$ 1,100$ 1,100$ 3,824,646$ 3,824,646$ 1,259,301$ 10,401$ 11,501$ 12,601$ 13,701$ 0 1,214,400 00000 1,309,000 1,309,000 1,250,000 0 0 0 0 0000000 0000000 0000000 29,945 29,945 00000 0000000 25,000 25,000 0 0 0 0 0 1,363,945$ 2,578,345$ 1,250,000$ 0$ 0$ 0$ 0$ 2,460,701$ 1,246,301$ 9,301$ 10,401$ 11,501$ 12,601$ 13,701$ 161 PROJECT: Incubator PROJECT #: DE0002 FUND: CS Business Park Fund PROJECT BUDGET: $1,560,000 PROJECT FUNDING MANAGER: Kim Foutz SOURCES: Certificates of Obligation This project involves the development of a College Station incubator. The anticipated size of the project is 15,000 square feet of which only a portion would initially be finished out. This project is currently in the conceptual stage with background research underway. The purpose of this project is to harness the knowledge and entrepreneurial energy of the community to create new companies in the Community. While little progress has been made over the last three to four years in attracting out of town technology businesses, this project provides a mechanism to grow jobs internally. Thus providing a long term source of quality jobs for the community and providing graduating students a reason to stay in College Station. Funding for the project is primarily tied to funds that were to be used for development of a Class "B" industrial park. Based on the fact that 80% of new jobs are created by start-ups and small businesses, City staff and staff from the Bryan Business Council and the Research Valley Partnership are recommending to move forward with an incubator in order to support and generate the start up of new companies in the community. Although a specific location has not been identified, staff is proposing to develop the project in Northgate in an effort to accomplish multiple strategic goals through one project. Discussions are underway with the CEO of the Bryan Business Council and the Research Valley Partnership in an effort to identify joint funding for ongoing operations and a management structure for the incubator. The Bryan Business Council has identified some possible Bryan locations. The goal is to have separate facilities in both Cities with one manager whose salaries and expenses would be shared between the different entities. Funding for the project includes $240,000 of operational funding for the first three years of operations after which it is anticipated that the majority of operational costs will be paid for through revenues received from incubator tenants. FISCAL YEAR LAND ENG. CONSTR. MISC. PROJECT TOTAL Prior Years 0 0 $0 2004-05 180,000 165,600 $345,600 2005-06 1,214,400 $1,214,400 2006-07 $0 2007-08 $0 2008-09 $0 2009-10 $0 2010-11 $0 TOTAL $180,000 $165,600 $1,214,400 $0 $1,560,000 Total Personnel $0 Supplies $0 Service $0 Capital $0 TOTAL $80,000$0 $80,000 PROJECT DESCRIPTION/STATUS PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR 80,000 OPERATING COSTS First Fiscal Year Annually 162 PROJECT: SPRING CREEK CORPORATE CAMPUS PROJECT #: DE0300 PHASE I FUND: CERTIFICATES OF OBLIGATION PROJECT BUDGET: $2,779,000 PROJECT FUNDING MANAGER: DONALD HARMON SOURCES: CERTIFICATES OF OBLIGATION $2,729,000 Spring Creek Corporate Campus is generally located at the intersection of Highway 6 and Greens Prairie Road in south College Station. This project includes all infrastructure aspects of the Master Plan including, but not limited to, roadways, water lines, sewer lines, natural gas lines, storm drainage, lighting, sidewalks, and curb and gutter. The project also includes design of an entrance feature, signage, landscaping, detention system, paths and trails, and any necessary relocation of utility lines. Original Project Budget = $2,729,000; $50,000 transferred from Business Park Sign Improvements FISCAL YEAR LAND ENG. CONSTR. MISC. PROJECT TOTAL Prior Years $0 $4,025 $0 $347 $4,372 2004-05 $200,000 $0 $15,628 $215,628 2005-06 $150,000 $1,100,000 $59,000 $1,309,000 2006-07 $50,000 $1,150,000 $50,000 $1,250,000 2007-08 $0 2008-09 $0 2009-10 $0 2010-11 $0 TOTAL $0 $404,025 $2,250,000 $124,975 $0 $2,779,000 Total Personnel $0 Supplies $0 Service $0 Capital $0 TOTAL $0 PROJECT DESCRIPTION/STATUS PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR OPERATING COSTS First Fiscal Year Annually $0 $0 163 PROJECT: Business Park Sign Improvements PROJECT #: GG0302 FUND: 911 - Business Park Fund PROJECT BUDGET: $50,000 PROJECT FUNDING MANAGER: Pete Vanecek SOURCES: Business Park Fund Funds for sign improvements at the Business Park. FISCAL YEAR LAND ENG. CONSTR. MISC. PROJECT TOTAL Prior Years $0 $666 $0 $1,967 $2,633 2004-05 $48,346 $279 $48,625 2005-06 $0 2006-07 $0 2007-08 $0 2008-09 $0 2009-10 $0 2010-11 $0 TOTAL $0 $666 $48,346 $2,246 $0 $51,258 Total Personnel $0 Supplies $0 Service $0 Capital $0 TOTAL $0 PROJECT DESCRIPTION/STATUS PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR OPERATING COSTS First Fiscal Year Annually $0 $0 164 Utilities Capital Projects Budget The City of College Station develops and adopts a five year Capital Improvement Projects (CIP) List. The list is updated annually and is presented for City Council review as a part of the annual budget process. The list consolidates all anticipated capital needs for which funding authorization exists. The list is divided into several sections depending on the services provided and the funding source. Outlined in this section of the CIP Budget document are the capital projects of the Water, Wastewater and Drainage funds. Revenue bonds are authorized to be issued any time there is a need for financing capital construction or acquisition and where the asset will reside in one or more of the City's enterprise funds. Generally, revenue bonds do not require voter approval. The bonds are repaid from revenues generated by the utilities. Revenue bonds in the amount of $6,000,000 are projected to be issued for the water capital improvement projects and revenue bonds in the amount of $3,000,000 are projected to be issued for wastewater capital improvement projects in FY06. Among the decisions and proposals that accompany capital project recommendations is an analysis of potential ongoing costs and any potential impact on utility rates that a project may have. UTILITY CAPITAL PROJECTS Electric Capital Projects $14,227,272 is the budgeted expenditure amount for electric capital projects in FY06. As the electric capital projects are considered competitive matter, details of these projects cannot be outlined in this summary, but will be provided to the City Council. Water Capital Projects In FY06, $13,515,161 is the approved expenditure for water capital projects. Included is $1,900,000 for the construction of three shallow wells that will allow our water production to meet projected peak demand capacity. Funds have been projected for the three additional shallow wells to be constructed over the next two fiscal years. The shallow wells will sustain production levels until a deep well can be constructed. Other significant production projects include the replacement of the chlorine disinfection system at the Dowling Road Pump Station. It is estimated that $2,452,000 will be spent over the next two fiscal years for this project. In addition it is projected that $1,211,000 will be spent on water plant security upgrades in FY06 and FY07. Significant distribution projects include $540,000 projected for FY06 for the Wellborn Road Widening project. The total cost of this project is anticipated to be $2,740,000, but it is expected that the City will be partially reimbursed by TxDOT for the cost of this project upon completion. $2,302,000 is projected to be spent in FY06 for the extension of water service into areas annexed in recent years. These extensions include Rock Prairie/Bird Pond, Arrington Road, Barron Road and Lick Creek/Rock Prairie. Rehabilitation projects budgeted for in FY06 include $100,000 for the replacement of the Barron Road water line and meters in conjunction with the upgrade of Barron Road to a minor arterial. $267,554 is budgeted for FY06 for the relocation of water lines along Texas Avenue as a result of the TxDOT widening project. Additionally, $3,119,095 is projected in FY06 and FY07 for Southside rehabilitation projects. The Approved FY06 Budget includes $1,000,000 in current revenues that will be transferred from operations to fund water capital projects. Additionally, a debt issue of $6,000,000 is projected for issuance in FY06 for water capital projects. Wastewater Capital Projects The FY06 Approved Budget includes $7,454,628 in expenditures for numerous wastewater capital projects. Collection projects include $468,000 for phase I of the Northeast Trunk Expansion. This project will replace the sewer line at Highway 6 near the FM 60 interchange and will have a total cost of $715,500. Funds are also projected in FY06 for the Lick Creek Parallel Trunk Line. $250,000 is projected to be spent in FY06 for this project. An additional $1,000,000 is projected for FY07 and $1,750,000 for FY08. $566,000 is budgeted in FY06 for recently annexed areas. $500,000 is projected in FY06 for the completion of the replacement of the Carters Creek Screw Lift System. Consistent with the Water capital projects, significant funds are projected for Southside sewer upgrades in FY06 and in future years. Treatment and disposal projects include a budgeted $550,000 in FY06 and FY07 for odor control improvements at the Carters Creek Treatment Plant. $550,000 is also projected over the next two fiscal years for UV treatment improvements at the plant. It is estimated that $652,000 will be spent in FY06 for sludge processing improvements and an additional $50,000 is 165 budgeted in FY06 for sludge facility improvements. Other anticipated improvements include the replacement of the SCADA system and the construction of a dedicated maintenance building. A total of $2,000,000 in current revenues from operations is budgeted to be used to fund wastewater capital projects. Additionally, a debt issue of $3,000,000 is projected for issuance in FY06 for wastewater capital projects. Drainage Capital Projects The approved FY06 drainage capital projects budget includes a projected $4,600,613 for improvements to the City’s drainage system. Significant projects include a projected $1,959,898 for improvements to the Bee Creek main channel. Consistent with the other capital funds, $945,000 is budgeted to be spent in FY06 and in FY07 for Southside drainage improvements. Funds are also included for drainage improvements on Wolf Pen Creek. Additionally, $210,000 is budgeted for a drainage detention project on University Drive. ADDITIONAL O&M COSTS The City of College Station strives to provide superior electric, water, and wastewater services to its citizens. Part of this effort includes investment in the capital that makes up the infrastructure. These investments take place in the form of capital improvement projects. Some of these improvements require additional operating and maintenance costs. These costs are identified and ultimately become part of the cost of providing these utility services. 166 EELLEECCTTRRIICC SSEERRVVIICCEE CCAAPPIITTAALL IIMMPPRROOVVEEMMEENNTT PPRROOJJEECCTTSS FFIISSCCAALL YYEEAARR 22000055--22000066 TTHHRROOUUGGHH FFIISSCCAALL YYEEAARR 22000099--22001100 167 ELECTRIC SERVICE CAPITAL IMPROVEMENT PROJECTS FISCAL YEAR 2005-2006 THROUGH FISCAL YEAR 2009-2010 APPROVED ACTUAL APPROPRIATIONS TOTAL ESTIMATE FY 03-04 FY 04-05 FY 04-05 7,777,165$ 9,855,413$ 9,855,413$ SUBTOTAL ADDITIONAL RESOURCES 5,538,727$ 4,040,491$ 4,145,000$ TOTAL RESOURCES AVAILABLE 13,315,892$ 13,895,904$ 14,000,413$ TOTAL EXPENDITURES 3,654,791$ 10,118,977$ 9,459,334$ GAAP ADJUSTMENT 194,312$ ENDING FUND BALANCE:9,855,413$ 3,776,927$ 4,541,079$ 168 ELECTRIC SERVICE CAPITAL IMPROVEMENT PROJECTS FISCAL YEAR 2005-2006 THROUGH FISCAL YEAR 2009-2010 APPROVED BUDGET FY 05-06 PROJECTED PROJECTED PROJECTED PROJECTED PROJECTED APPROPRIATION FY 05-06 FY 06-07 FY 07-08 FY08-09 FY09-10 4,541,079$ 4,541,079$ 824,177$ 946,177$ 544,177$ 976,577$ 10,510,370$ 10,510,370$ 9,942,000$ 9,139,000$ 8,814,400$ 8,814,300$ 15,051,449$ 15,051,449$ 10,766,177$ 10,085,177$ 9,358,577$ 9,790,877$ 14,227,272$ 14,227,272$ 9,820,000$ 9,541,000$ 8,382,000$ 9,261,000$ 824,177$ 824,177$ 946,177$ 544,177$ 976,577$ 529,877$ 169 HEART OF THE RESEARCH VALLEY 170 WWAATTEERR SSEERRVVIICCEE CCAAPPIITTAALL IIMMPPRROOVVEEMMEENNTT PPRROOJJEECCTTSS FFIISSCCAALL YYEEAARR 22000055--22000066 TTHHRROOUUGGHH FFIISSCCAALL YYEEAARR 22001100--22001111 171 WATER SERVICE CAPITAL IMPROVEMENT PROJECTS FISCAL YEAR 2005-2006 THROUGH FISCAL YEAR 2010-2011 REVISED PROJECT REVISED PROJECT WORK REQUEST BUDGET ACTUAL FY 04-05 BUDGET NUMBER NUMBER AMOUNT FY 03-04 APPROPRIATIONS BEGINNING FUND BALANCE:6,917,440$ 4,834,698$ ADDITIONAL RESOURCES: UTILITY REVENUE BONDS 0$ 4,600,000$ INTEREST ON INVESTMENTS 229,050 225,000 INTRAGOVERNMENTAL TRANSFERS 5,400,000 6,000,000 OTHER 0 0 SUBTOTAL ADDITIONAL RESOURCES 5,629,050$ 10,825,000$ TOTAL RESOURCES AVAILABLE 12,546,490$ 15,659,698$ PRODUCTION PROJECTS SOURCE AND SUPPLY PLANT - WSWOC WELL #6 AND LINE WT0004 WF0352591 2,871,875 181,170$ 0$ WELL #7 WT0106 WF0353607 4,193,238 57,953 470,000 WELL #7 COLLECTION LINE WT0203 WF0353621 2,636,877 60,148 788,650 PARALLEL WELLFIELD COLL LINE PH I - WF0352553 4,260,192 285 0 PARALLEL WATER TRANSMISSION WT0005 WF0350259 7,740,293 3,195,389 0 WATER TRANSMISSION-SH21 - VILLA MARIA WT0116 WF0352317 7,906,863 291,345 790,000 LAND ACQUISITION - WELLS WT0206 WF0377324 2,200,474 474 0 WATER RESOURCES - MINOR AQUIFERS - WF0652289 2,050,000 0 0 WATER RESOURCES - APPURTENANCES - TBD 4,150,000 0 0 WATER PUMPING AND TREATMENT PLANT - WPWOC COOLING TOWERS EXPANSION - TBD 1,829,000 0 0 DOWLING ROAD 10MG GST WT0117 WF0353631 7,452,238 137,617 1,143,000 DOWLING ROAD PUMP/CHEMICAL SYSTEM - WF0499740 3,207,397 155,397 1,252,000 WELLS 4 & 5 PUMP REPLACEMENTS - WF0539245 155,674 674 0 EMERGENCY ELECTRIC POWER - WF0499606 1,579,411 62,711 238,000 SANDY POINT CHEMICAL SYS REPLACEMENT - TBD 1,698,964 0 0 SANDY POINT PUMP STATION & WELLFIELD EROSION - WF0461924 279,461 7,961 0 WATER GENERAL PLANT - WGWOC SCADA REPLACEMENT - TBD 70,500 0 0 WATER PLANT SECURITY - WF0466439 1,420,032 59,032 0 SPPS FIBER OPTIC LINE - TBD 500,000 0 0 SUBTOTAL 4,210,156$ 4,681,650$ DISTRIBUTION PROJECTS TRANSMISSION AND DISTRIBUTION PLANT - WTWOC OVERSIZED LINES PARTICIPATION & PLANNING - WF0592456 ANNUAL 200,000$ QUALITY INN PONDEROSA OP - WF0592456/001 30,067 0 0 CENTRAL PARK LANE EXTENSION OP - WF0592456/002 3,674 0 0 COTTON DARTMOUTH EXTENSION OP - WF0592456/003 6,175 0 0 DOVE CROSSING SUBDIVISION, PH I OP - WF0592456/004 14,336 0 0 SHENANDOAH PH 9 WF0472465 16,143 16,143 0 WESTFIELD VILLAGE PH 6 WF0472458 8,325 8,325 0 SHENANDOAH PH 8A WF0477949 8,957 8,957 0 SHENANDOAH PH 12 & 13 WF0579115 7,532 7,532 0 VICTORIA WATER OP - WF0537425 100,000 0 0 BARRON ROAD WATER OP - WF0356035 153,518 45,272 0 WESTSIDE WATER SERVICES WT9703 WF0353641 2,372,508 1,525,992 0 FM 60 WIDENING RELOCATION - TBD 535,000 0 0 172 WATER SERVICE CAPITAL IMPROVEMENT PROJECTS FISCAL YEAR 2005-2006 THROUGH FISCAL YEAR 2010-2011 TOTAL PROPOSED ESTIMATE FY 05-06 PROJECTED PROJECTED PROJECTED PROJECTED PROJECTED PROJECTED FY 04-05 APPROPRIATIONS FY 05-06 FY 06-07 FY 07-08 FY 08-09 FY 09-10 FY 10-11 4,834,698$ 6,991,201$ 6,991,201$ 550,040$ 400,288$ 314,786$ 498,786$ 291,922$ 4,600,000$ 6,000,000$ 6,000,000$ 12,250,000$ 5,400,000$ 500,000$ 6,000,000$ 8,000,000$ 225,000 74,000 74,000 12,000 12,000 13,000 12,000 10,000 6,000,000 1,000,000 1,000,000 2,500,000 1,000,000 1,000,000 0 0 0 0 0 75,000 0 2,055,000 100,000 0 10,825,000$ 7,074,000$ 7,074,000$ 14,837,000$ 6,412,000$ 3,568,000$ 6,112,000$ 8,010,000$ 15,659,698$ 14,065,201$ 14,065,201$ 15,387,040$ 6,812,288$ 3,882,786$ 6,610,786$ 8,301,922$ 0$ 0$ 0$ 0$ 0$ 0$ 0$ 0$ 33,150 262,238 1,500,000 750,000 0 0 0 0 5,565 0 0000 00 0 0 0 0 0 0 0 0 0 00000 00 760,000 0 0 3,192,002 3,192,002 0 0 0 0 0 0 0 0 600,000 600,000 1,000,000 150,000 1,900,000 1,900,000 0 0 0 0 0 0 1,150,000 1,150,000 3,000,000 0 0 0 0 0 00000 00 210,000 0 0 0 0 847,000 3,152,000 2,962,000 600,000 945,397 1,652,000 800,000 0 0 0 0 155,000 0 0 0 0 0 0 0 642,000 178,711 242,000 0 290,000 0 342,700 0 0 00000259,164 1,439,800 125,000 145,000 145,000 0 0 0 0 0 0 15,000 15,000 53,000 2,500 0 0 0 150,000 615,032 711,000 500,000 0 0 0 0 0 500,000 500,000 0 0 0 0 0 2,830,715$ 5,711,378$ 7,815,000$ 8,295,002$ 3,484,502$ 1,447,000$ 4,353,864$ 5,401,800$ 145,748$ 200,000$ 200,000$ 200,000$ 200,000$ 200,000$ 200,000$ 200,000$ 30,067 0 0 0 0 0 0 0 3,674 0 0000 00 6,175 0 0000 00 14,336 0 0000 00 0 00000 00 0 00000 00 0 00000 00 0 00000 00 100,000 0 0000 00 70,000 0 0000 00 66 00000 00 0 0 0 0 0 50,000 40,000 445,000 173 WATER SERVICE CAPITAL IMPROVEMENT PROJECTS FISCAL YEAR 2005-2006 THROUGH FISCAL YEAR 2010-2011 REVISED PROJECT REVISED PROJECT WORK REQUEST BUDGET ACTUAL FY 04-05 BUDGET NUMBER NUMBER AMOUNT FY 03-04 APPROPRIATIONS HWY 6 WATER IMPACT FEE WT9905 WF0607933 356,474 0 212,000 PARK PLACE ELEVATED STORAGE TANK WT0012 WF0353817 3,718,428 4,287 0 PUMP INTERCONNECT -TBD 150,000 0 0 WATER RECLAIM / IRRIGATION WT0110 TBD 3,807,173 0 0 DARTMOUTH WATER EXTENSION PII -WF0350795 220,000 0 0 FIRE STATION #3 - BARRON ROAD WF0632255 25,000 0 0 JONES-BUTLER WATER EXT PHII -TBD 40,000 0 0 RAYMOND STOTZER WEST -TBD 1,000,000 0 0 SPRING CREEK CORPORATE CAMPUS -WF0622507 156,000 0 7,000 WELLBORN WIDENING -WF0613546 2,740,000 0 0 ROCK PRAIRIE WATER SERVICE EXT WT0102 WF0352094 2,617,205 25,677 167,238 ARRINGTON RD WATER SERVICE EXT -WF0379145 644,056 18,437 0 BARRON ROAD WATER SERVICE EXT -WF0379197 2,384,475 82,969 409,000 LICK CREEK/ROCK PRAIRIE SERVICE EXT -WF0379226 158,056 18,437 31,000 2002 ANNEXATION PROJECTS WELLBORN RD N OF GANDY (AREA 1)-WF0395455 448,000 0 0 GREENS PR. W. OF ARRINGTON (AREA 2)-WF0395464 347,000 0 0 NANTUCKET E. OF HARPER'S FERRY (AREA 3)-TBD 80,000 0 0 ROCK P RD S OF CARTER LAKE (AREA 5)-TBD 670,000 0 67,000 GREENS PR. RD CORRIDOR EAST (AREA 6)-TBD 612,000 0 61,000 SUBTOTAL 1,762,028$ 1,154,238$ REHABILITATION PROJECTS: DISTRIBUTION SYSTEM REHAB -WF0608079 ANNUAL $285,000 CENTRAL PARK LANE EXTENSION -WF0624648 49,000 0 0 HARVEY 12" EMERGENCY WATER LINE -WF0608258 155,000 0 0 PARK PLACE STORAGE TANK 12" FEED -WF0565771 58,560 0 0 UNIVERSITY DRIVE PUMP STATION DEMO -WF0532532 49,000 640 0 BARRON ROAD REHAB -WF0654325 250,000 0 0 CHURCH STREET REHAB - PHASE II -WF0632256 12,000 0 0 FIRST & MAPLE STREETS REHAB WT0212 WF0351786 205,744 187,240 0 GEORGE BUSH E WIDENING -WF0390567 100,811 100,657 0 GREENS PRAIRIE WTR LINE LOWERING -WF0351806 184,018 181,508 0 TAUBER & STASNEY -WF0625888 120,000 0 0 TEXAS AVE. RELOCATION SOUTH WT1012 WF0351282 1,725,000 26,998 270,000 WELSH & FM2818 WATER LINE -TBD 150,000 0 0 SOUTHSIDE WATER REHAB A -WF0379021 115,208 111,109 0 WEST PARK -WF0427233 1,250,000 16,158 0 COLLEGE PARK/BREEZY HEIGHTS -WF0595915 1,640,000 0 12,700 SOUTH KNOLL/THE GLADE -TBD 1,355,000 0 0 SOUTHWOOD 5-7 -TBD 1,185,000 0 0 McCULLOCH -TBD 1,400,000 0 0 THE KNOLL -TBD 1,170,000 0 0 SUBTOTAL 624,310$ 567,700$ GENERAL AND ADMINISTRATIVE 275,000 180,638 DEBT ISSUANCE COST 0 36,000 TOTAL EXPENDITURES 10,600,781$ 6,871,494$ 6,620,226$ GAAP ADJUSTMENT (840,298)$ ENDING FUND BALANCE:4,834,698$ 9,039,472$ 174 WATER SERVICE CAPITAL IMPROVEMENT PROJECTS FISCAL YEAR 2005-2006 THROUGH FISCAL YEAR 2010-2011 TOTAL PROPOSED ESTIMATE FY 05-06 PROJECTED PROJECTED PROJECTED PROJECTED PROJECTED PROJECTED FY 04-05 APPROPRIATIONS FY 05-06 FY 06-07 FY 07-08 FY 08-09 FY 09-10 FY 10-11 212,000 0 0000 00 46 00000 00 100,000 50,000 50,000 0 0 0 0 0 0 00000 00 0 0 220,000 0 0 0 0 0 1,000 24,000 24,000 0 0 0 0 0 2,000 0 3,000 25,000 10,000 0 0 0 0 00000 01,000,000 7,000 149,000 149,000 0 0 0 0 0 200,000 540,000 540,000 2,000,000 0 0 0 0 1,378,300 366,144 1,018,000 0 0 0 0 0 45,000 0 30,000 549,000 0 0 0 0 1,100,000 339,630 1,200,000 0 0 0 0 0 84,000 650 54,000 0 0 0 0 0 0 0 45,000 22,000 381,000 0 0 0 0 0 35,000 312,000 0 0 0 0 0 0 0 0 80,000 0 0 0 0 0 67,000 335,000 268,000 0 0 0 0 0 122,000 245,000 245,000 0 0 0 3,499,412$ 1,669,424$ 3,757,000$ 3,688,000$ 1,184,000$ 250,000$ 240,000$ 1,645,000$ $24,000 $285,000 $285,000 $285,000 $285,000 $285,000 $285,000 $285,000 49,000 0 0 0 0 0 0 0 155,000 0 0000 00 58,560 0 0 0 0 0 0 0 48,060 0 0 0 0 0 0 0 0 100,000 100,000 75,000 75,000 0 0 0 1,000 11,000 11,000 0 0 0 0 0 0 00000 00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 5,000 65,000 65,000 50,000 0 0 0 0 1,224,000 267,554 267,554 0 0 0 0 0 25,000 125,000 125,000 0 0 0 0 0 0 0 0 0 0 0 0 0 388,247 175,000 845,595 0 0 0 0 0 81,500 27,250 27,250 1,531,250 0 0 0 0 0 0 0 715,000 640,000 0 0 0 0 0 0 0 625,000 560,000 0 0 0 0 0 0 0 737,000 663,000 0 0 0 0 0 0 0 617,000 553,000 2,059,367$ 1,055,804$ 1,726,399$ 2,656,250$ 1,625,000$ 1,582,000$ 1,565,000$ 838,000$ 180,638 156,762 156,762 225,000 150,000 100,000 100,000 100,000 98,365 60,000 60,000 122,500 54,000 5,000 60,000 61,000 8,668,497$ 8,653,368$ 13,515,161$ 14,986,752$ 6,497,502$ 3,384,000$ 6,318,864$ 8,045,800$ 6,991,201$ 5,411,833$ 550,040$ 400,288$ 314,786$ 498,786$ 291,922$ 256,122$ 175 PPRROODDUUCCTTIIOONN PPRROOJJEECCTTSS 176 WORK ORDER #: WF0352591 PROJECT: WELL #6 AND COLLECTION LINE PROJECT #: WT0004 FUND: WATER CAPITAL PROJECTS PROJECT BUDGET: $2,871,875 PROJECT FUNDING MANAGER: DALE SCHEPERS SOURCES: Utility Revenue Bonds Construct additional 4 MGD water well and connecting collection line to transfer pump station. The aditional capacity was required to meet TCEQ regulations for pumping capacity to match projected population. PROJECT COMPLETE FISCAL YEAR LAND ENG. CONSTR. MISC. PROJECT TOTAL Prior Years 8,870 759,440 2,094,565 9,000 $2,871,875 2004-05 $0 2005-06 $0 2006-07 $0 2007-08 $0 2008-09 $0 2009-10 $0 2010-11 $0 TOTAL $8,870 $759,440 $2,094,565 $9,000 $2,871,875 Total Personnel $0 Supplies $0 Service $0 Capital $0 TOTAL $0 PROJECT DESCRIPTION/STATUS PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR OPERATING COSTS First Fiscal Year Annually $0 $0 177 WORK ORDER #: WF0353607 PROJECT: WELL #7 PROJECT #: WT0106 FUND: WATER CAPITAL PROJECT PROJECT BUDGET: $4,193,238 PROJECT FUNDING MANAGER: FRED SUROVIK SOURCES: Utility Revenue Bonds Purchase land, conduct engineering design, and construction of additional 4 MGD water well. The additional capacity is required to meet TCEQ regulations for pumping capacity to match projected population. Brazos Valley Ground Water Conservation District rule changes directly effect land acquisition. Anticipate Design in FY 2013-14, projected budget amount $91,000. Anticipate Construction to begin FY2014-15, projected budget amount $1,620,000. FISCAL YEAR LAND ENG. CONSTR. MISC. PROJECT TOTAL Prior Years 23,710 175,378 $199,088 2004-05 33,000 150 $33,150 2005-06 1,500,000 $1,500,000 2006-07 750,000 $750,000 2007-08 $0 2008-09 $0 2009-10 $0 2010-11 $0 TOTAL $2,306,710 $175,528 $0 $0 $2,482,238 Total Personnel $4,000 Supplies $2,000 Service $90,000 Capital $0 TOTAL $96,000$3,000 1,000 90,000 $93,000 1,000 PROJECT DESCRIPTION/STATUS PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR 2,000 OPERATING COSTS First Fiscal Year Annually 2,000 178 WORK ORDER #: WF0353621 PROJECT: WELL #7 COLLECTION LINE PROJECT #: WT0203 FUND: WATER CAPITAL PROJECTS PROJECT BUDGET: $2,636,877 PROJECT FUNDING MANAGER: FRED SUROVIK SOURCES: Utility Revenue Bonds Project provides for land purchase, engineering design, and construction of collection line progressing from Water Well #7 approximately 10,400 linear feet to a connection point in the existing wellfield collection line. The additional capacity is required to meet TCEQ regulations for pumping capacity to match projected population. Anticipate Land in FY 2011-12, projected budget amount $263,400. Anticipate Design in FY 2013-14, projected budget amount $90,000. Anticipate Construction to begin FY 2014-15, projected budget amount $2,132,000. FISCAL YEAR LAND ENG. CONSTR. MISC. PROJECT TOTAL Prior Years 9,613 136,299 0 0 $145,912 2004-05 5,565 $5,565 2005-06 $0 2006-07 $0 2007-08 $0 2008-09 $0 2009-10 $0 2010-11 $0 TOTAL $9,613 $141,864 $0 $0 $151,477 Total Personnel $0 Supplies $0 Service $0 Capital $0 TOTAL $0 PROJECT DESCRIPTION/STATUS PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR OPERATING COSTS First Fiscal Year Annually $0 $0 179 WORK ORDER #: WF0352553 PROJECT: PARALLEL WELLFIELD COLLECTION PROJECT #: WSWOC LINE PHASE I FUND: WATER CAPITAL PROJECTS PROJECT BUDGET: $4,260,192 PROJECT FUNDING MANAGER:TBD SOURCES: Utility Revenue Bonds Construction of a collection line for the water wells parallel to the existing line. The existing line is operating at maximum design capacity with the input of six wells. The construction of Well #7 will require this additional pipeline to deliver water to Sandy Point Pump Station. Anticipate Design in FY 2013-14, projected budget amount $464,500. Anticipate Construction to begin FY 2014-15, projected budget amount $3,523,000. FISCAL YEAR LAND ENG. CONSTR. MISC. PROJECT TOTAL Prior Years 6,308 11,384 $17,692 2004-05 $0 2005-06 $0 2006-07 $0 2007-08 $0 2008-09 $0 2009-10 $0 2010-11 $0 TOTAL $6,308 $11,384 $0 $0 $17,692 Total Personnel $0 Supplies $0 Service $0 Capital $0 TOTAL $0$0 $0 PROJECT DESCRIPTION/STATUS PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR OPERATING COSTS First Fiscal Year Annually 180 WORK ORDER #: WF0350259 PROJECT: PARALLEL WATER TRANSMISSION PROJECT #: WT0005 FUND: WATER CAPITAL PROJECTS PROJECT BUDGET: $7,740,293 PROJECT FUNDING MANAGER:DALE SCHEPERS SOURCES: Utility Revenue Bonds CONSTRUCTION PH II: Construct parallel water transmission along FM1687 from the Sandy Point Pump Station to FM2818, then south along FM2818 to SH21; approx 17,314 LF of 48" diameter pipe. CONSTRUCTION PH IV: Construct parallel water transmission pipeline along FM2818 from Villa Maria Road south to the Dowling Road Pump Station; approx 22,400 LF of 36" diameter pipe. The additional capacity was required to meet TCEQ regulations for pumping capacity to match projected population. This project was constructed concurrent with the Westside Water Services Project - WF0353641 (WT9703). PROJECT COMPLETE FISCAL YEAR LAND ENG. CONSTR. MISC. PROJECT TOTAL Prior Years 352,893 1,064,116 6,323,284 $7,740,293 2004-05 $0 2005-06 $0 2006-07 $0 2007-08 $0 2008-09 $0 2009-10 $0 2010-11 $0 TOTAL $352,893 $1,064,116 $6,323,284 $0 $7,740,293 Total Personnel $2,000 Supplies $1,000 Service $0 Capital $0 TOTAL $3,000$1,500 500 $1,500 500 PROJECT DESCRIPTION/STATUS PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR 1000 OPERATING COSTS First Fiscal Year Annually 1000 181 WORK ORDER #: WF0352317 PROJECT: WATER TRANSMISSION SH 21 VILLA MARIA PROJECT #: WT0116 FUND: WATER CAPITAL PROJECTS PROJECT BUDGET: $7,906,863 PROJECT FUNDING MANAGER: ED SAVAGE SOURCES: Utility Revenue Bonds Construct parallel water transmission line along FM2818 from Hwy 21 south to Villa Maria Road; approximately 21,000 LF of 36" diameter pipe. The additional system capacity required to support Northgate area and provide water service to annexed area west of FM2818 along FM60. Project supports additional water distribution interconnection with TAMU. Project has been deferred 3 years due to land acquisition. FISCAL YEAR LAND ENG. CONSTR. MISC. PROJECT TOTAL Prior Years 356,820 394,592 11,447 $762,859 2004-05 750,000 10,000 $760,000 2005-06 $0 2006-07 225,000 126,000 2,841,002 $3,192,002 2007-08 125,000 3,067,002 $3,192,002 2008-09 $0 2009-10 $0 2010-11 $0 TOTAL $1,331,820 $655,592 $5,919,451 $0 $7,906,863 Total Personnel $0 Supplies $0 Service $0 Capital $0 TOTAL $0$0 $0 PROJECT DESCRIPTION/STATUS PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR OPERATING COSTS First Fiscal Year Annually 182 WORK ORDER #: WF0377324 PROJECT: LAND ACQUISITION PROJECT #: WSWOC FUND: WATER CAPITAL PROJECTS PROJECT BUDGET: $2,200,474 PROJECT FUNDING MANAGER: FRED SUROVIK SOURCES: Utility Revenue Bonds Land to be purchased for future well site #8. FISCAL YEAR LAND ENG. CONSTR. MISC. PROJECT TOTAL Prior Years 474 $474 2004-05 $0 2005-06 $0 2006-07 $0 2007-08 $0 2008-09 600,000 $600,000 2009-10 600,000 $600,000 2010-11 1,000,000 $1,000,000 TOTAL $2,200,474 $0 $0 $0 $2,200,474 Total Personnel $0 Supplies $0 Service $0 Capital $0 TOTAL $0$0 $0 PROJECT DESCRIPTION/STATUS PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR OPERATING COSTS First Fiscal Year Annually 183 WORK WATER RESOURCES - ORDER #: WF0652289 PROJECT: MINOR AQUIFERS PROJECT #: WSWOC FUND: WATER CAPITAL PROJECTS PROJECT BUDGET: $2,050,000 PROJECT FUNDING MANAGER: FRED SUROVIK SOURCES: Utility Revenue Bonds Current Brazos Valley Ground Water Conservation rules do not require the control of substantial acreage to obtain water from wells drilled in aquifers other than the Simsborough. This project will allow us to: 1) Drill wells on property already owned by the City 2) Meet immediate needs in a timely fashion 3) Develop additional water resources in the local area 4) Reduce the amount of infrastructure needed for the next increment of production capacity. FISCAL YEAR LAND ENG. CONSTR. MISC. PROJECT TOTAL Prior Years $0 2004-05 150,000 $150,000 2005-06 50,000 1,850,000 $1,900,000 2006-07 $0 2007-08 $0 2008-09 $0 2009-10 $0 2010-11 $0 TOTAL $0 $200,000 $1,850,000 $0 $0 $2,050,000 Total Personnel $0 Supplies $3,000 Service $33,000 Capital $0 TOTAL $36,000$0 3,000 33,000 $36,000 PROJECT DESCRIPTION/STATUS PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR OPERATING COSTS First Fiscal Year Annually 184 WORK ORDER #: TBD PROJECT: WATER RESOURCES - PROJECT #: WSWOC MINOR AQUIFERS & APPURENANCES FUND: WATER CAPITAL PROJECTS PROJECT BUDGET: $4,150,000 PROJECT FUNDING MANAGER: FRED SUROVIK SOURCES: Utility Revenue Bonds Current Brazos Valley Ground Water Conservation rules do not require the control of substantial acreage to obtain water from wells drilled in aquifers other than the Simsborough. This project will allow us to: 1) Drill wells on property already owned by the City 2) Meet immediate needs in a timely fashion 3) Develop additional water resources in the local area 4) Reduce the amount of infrastructure needed for the next increment of production capacity. FISCAL YEAR LAND ENG. CONSTR. MISC. PROJECT TOTAL Prior Years $0 2004-05 $0 2005-06 225,000 925,000 $1,150,000 2006-07 50,000 2,950,000 $3,000,000 2007-08 $0 2008-09 $0 2009-10 $0 2010-11 $0 TOTAL $0 $275,000 $3,875,000 $0 $0 $4,150,000 Total Personnel $0 Supplies $3,000 Service $33,000 Capital $0 TOTAL $36,000 PROJECT DESCRIPTION/STATUS PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR OPERATING COSTS First Fiscal Year Annually $0 3,000 33,000 $36,000 185 WORK ORDER #: TBD PROJECT: COOLING TOWER EXPANSION PROJECT #: WPWOC FUND: WATER CAPITAL PROJECTS PROJECT BUDGET: $1,829,000 PROJECT FUNDING MANAGER: FRED SUROVIK SOURCES: Utility Revenue Bonds The engineering design and construction of an additional cooling tower, wet well, and switchgear is needed to satisfy community water production demands. One additional 12.5 MGD Cooling Tower will be initiated in FY 2022-23 to coincide with the increase in demand beyond firm capacity of 25 MGD. Water Production demands exceeding the three (3) Cooling Tower capacity (37.5 MGD) are not forecasted until FY 2043-44. Anitcipate Design in FY 2022-23, projected budget amount $187,000. Anitcipate Construction to begin in FY 2023-23, projected budget amount $1,642,000. FISCAL YEAR LAND ENG. CONSTR. MISC. PROJECT TOTAL Prior Years $0 2004-05 $0 2005-06 $0 2006-07 $0 2007-08 $0 2008-09 $0 2009-10 $0 2010-11 $0 TOTAL $0 $0 $0 $0 $0 Total Personnel $8,000 Supplies $8,000 Service $144,000 Capital $0 TOTAL $160,000 PROJECT DESCRIPTION/STATUS PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR 4,000 72,000 OPERATING COSTS First Fiscal Year Annually 4,000 $80,000 4,000 72,000 $80,000 4,000 186 WORK ORDER #: WF0353631 PROJECT: DOWLING ROAD TEN MILLION TANK PROJECT #: WT0117 FUND: WATER CAPITAL PROJECTS PROJECT BUDGET: $7,452,238 PROJECT FUNDING MANAGER:FRED SUROVOK SOURCES: Utility Revenue Bonds Construct new Ground Storage Tank of 10 MG capacity at the Dowling Road Pump Station. The additional capacity is required to meet TCEQ regulations for storage and pumping capacity to satisfy water service driven by community growth. Engineering investigations supporting the expansion effort have identified the need to modify existing buried water supply and discharge pipes, valves, and appurtences to improve personnel safety, operating reliability, and cost efficiency. The relocation of the tank site, which was previously planned to be adjacent to the existing tanks will necessitate additional piping. FISCAL YEAR LAND ENG. CONSTR. MISC. PROJECT TOTAL Prior Years 3,263 277,975 $281,238 2004-05 190,000 20,000 $210,000 2005-06 $0 2006-07 $0 2007-08 $0 2008-09 80,000 767,000 $847,000 2009-10 152,000 3,000,000 $3,152,000 2010-11 2,962,000 $2,962,000 TOTAL $193,263 $529,975 $6,729,000 $0 $7,452,238 Total Personnel $400 Supplies $0 Service $30,000 Capital $0 TOTAL $30,400 PROJECT DESCRIPTION/STATUS PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR $200 OPERATING COSTS First Fiscal Year Annually $200 $200 $30,000 $30,200 187 WORK ORDER #: WF0499740 PROJECT: DOWLING ROAD PUMP STATION PROJECT #: WPWOC CHEMICAL FEED & STORAGE SYSTEM FUND: WATER CAPITAL PROJECTS PROJECT BUDGET: $3,207,397 PROJECT FUNDING MANAGER: FRED SUROVIK SOURCES: Utility Revenue Bonds The Chemical Feed and Storage facilities at Dowling Road Pump Station require upgrading to accommodate current expansion of its Water Production infrastructure and to be in compliance with current fire codes. Engineering investigations supporting the expansion effort have identified the need to replace the existing Chlorine Disinfection System to improve personnel safety and operating realibility and cost efficiency. February 26, 2004, Engineering Contract #04-062 approved by Council, Item #11.7. Anticipate construction to begin Summer 2005. FISCAL YEAR LAND ENG. CONSTR. MISC. PROJECT TOTAL Prior Years 155,397 $155,397 2004-05 100,000 500,000 $600,000 2005-06 152,000 1,500,000 $1,652,000 2006-07 800,000 $800,000 2007-08 $0 2008-09 $0 2009-10 $0 2010-11 $0 TOTAL $0 $407,397 $2,800,000 $0 $3,207,397 Total Personnel $0 Supplies $0 Service $0 Capital $0 TOTAL $0 PROJECT DESCRIPTION/STATUS PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR OPERATING COSTS First Fiscal Year Annually $0 $0 188 WORK ORDER #: WF0539245 PROJECT: WELLS 4 & 5 PUMP REPLACEMENTS PROJECT #: WPWOC FUND: WATER CAPITAL PROJECTS PROJECT BUDGET: $155,674 PROJECT FUNDING MANAGER: FRED SUROVIK SOURCES: Utility Revenue Bonds Install new replacement pumps in Water Well Numbers 4 and 5 to increase production capacities and meet community's growing demand for drinking water services. Existing pump on Water Well #4 has been operating in continuous service since the well was drilled in 1989. The pump was reconditioned in 1999 concurrent with a project to correct a well subsidence deficiency. Existing pump on Water Well #5 has been in service since the well was drilled in 1996. FISCAL YEAR LAND ENG. CONSTR. MISC. PROJECT TOTAL Prior Years 0 0 674 0 $674 2004-05 155,000 $155,000 2005-06 $0 2006-07 $0 2007-08 $0 2008-09 $0 2009-10 $0 2010-11 $0 TOTAL $0 $0 $155,674 $0 $155,674 Total Personnel $0 Supplies $0 Service $0 Capital $0 TOTAL $0$0 $0 PROJECT DESCRIPTION/STATUS PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR OPERATING COSTS First Fiscal Year Annually 189 WORK ORDER #: WF0499606 PROJECT: EMERGENCY ELECTRIC POWER PROJECT #: WPWOC FUND: WATER CAPITAL PROJECTS PROJECT BUDGET: $1,579,411 PROJECT FUNDING MANAGER: FRED SUROVIK SOURCES: Utility Revenue Bonds Provide emergency electric power production equipment to ensure minimum essential water production and distribution services can be maintained in the event of a primary electric service blackout. Emergency electric power production capability will serve the following locations: Dowling Road Pump Station, Sandy Point Pump Station, and two Water Wells. City currently unable to satisfy community's water service demand during periods of electric system blackout. February 26, 2004 Engineering Contract #04-062 approved by Council, Item #11.7. FISCAL YEAR LAND ENG. CONSTR. MISC. PROJECT TOTAL Prior Years 62,050 661 $62,711 2004-05 92,000 550,000 $642,000 2005-06 42,000 200,000 $242,000 2006-07 $0 2007-08 290,000 $290,000 2008-09 $0 2009-10 342,700 $342,700 2010-11 $0 TOTAL $0 $196,050 $1,383,361 $0 $1,579,411 Total Personnel $18,000 Supplies $73,000 Service $12,000 Capital $34,000 TOTAL $137,000 PROJECT DESCRIPTION/STATUS PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR 14,000 3,000 OPERATING COSTS First Fiscal Year Annually 4,000 $32,000 55,000 9,000 27,000 $105,000 18,000 7,000 190 WORK ORDER #: TBD PROJECT: SANDY POINT PUMP STATION PROJECT #: WPWOC CHEMICAL FEED & STORAGE SYSTEM FUND: WATER CAPITAL PROJECTS PROJECT BUDGET: $1,698,964 PROJECT FUNDING MANAGER: FRED SUROVIK SOURCES: Utility Revenue Bonds The Chemical Feed and Storage facilities at Sandy Point Pump Station require upgrading to accommodate current expansion of its Water Production infrastructure and to be in compliance with current fire codes. Engineering investigations supporting the expansion effort have identified the need to replace the existing Chlorine Disinfection System to improve personnel safety and operating realibility and cost efficiency. FISCAL YEAR LAND ENG. CONSTR. MISC. PROJECT TOTAL Prior Years $0 2004-05 $0 2005-06 $0 2006-07 $0 2007-08 $0 2008-09 $0 2009-10 259,164 $259,164 2010-11 1,439,800 $1,439,800 TOTAL $0 $259,164 $1,439,800 $0 $1,698,964 Total Personnel $0 Supplies $0 Service $0 Capital $0 TOTAL $0$0 $0 PROJECT DESCRIPTION/STATUS PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR OPERATING COSTS First Fiscal Year Annually 191 WORK SANDY POINT PUMP STATION ORDER #: WF0461924 PROJECT: AND WELLFIELD EROSION PROJECT #: WPWOC IMPROVEMENTS FUND: WATER CAPITAL PROJECTS PROJECT BUDGET: $279,461 PROJECT FUNDING MANAGER: FRED SUROVIK SOURCES: Utility Revenue Bonds This project will remediate erosion damage to downstream property as well as provide infrastructure to control discharges and thereby limit the potential for future damage. FISCAL YEAR LAND ENG. CONSTR. MISC. PROJECT TOTAL Prior Years 6,397 3,064 $9,461 2004-05 75,000 50,000 $125,000 2005-06 45,000 100,000 $145,000 2006-07 $0 2007-08 $0 2008-09 $0 2009-10 $0 2010-11 $0 TOTAL $0 $126,397 $150,000 $3,064 $279,461 Total Personnel $0 Supplies $0 Service $0 Capital $0 TOTAL $0 PROJECT DESCRIPTION/STATUS PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR OPERATING COSTS First Fiscal Year Annually $0 $0 192 WORK ORDER #: TBD PROJECT: SCADA REPLACEMENT PROJECT #: WGWOC FUND: WATER CAPITAL PROJECTS PROJECT BUDGET: $70,500 PROJECT FUNDING MANAGER: MIKE KELLOGG SOURCES: Utility Revenue Bonds This project will facilitate the replacement of control based equipment that has exceeded its useful service life. It will upgrade the control of the plants into a more integrated architecture that will: 1. Reduce development time and cost by the re-use of engineering practices. 2. Maximize returns from existing assets, through greatly improved control and monitoring. 3. Reduce future installation cost by utilizing standard bus technologies. 4. Provide a means of being proactive in maintaining equipment with available diagnostic tools. FISCAL YEAR LAND ENG. CONSTR. MISC. PROJECT TOTAL Prior Years $0 2004-05 $0 2005-06 15,000 $15,000 2006-07 53,000 $53,000 2007-08 2,500 $2,500 2008-09 $0 2009-10 $0 2010-11 $0 TOTAL $0 $0 $70,500 $0 $0 $70,500 Total Personnel $0 Supplies $0 Service $0 Capital $0 TOTAL $0$0 $0 PROJECT DESCRIPTION/STATUS PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR OPERATING COSTS First Fiscal Year Annually 193 WORK ORDER #: WF0466439 PROJECT: WATER PLANT SECURITY PROJECT #: WGWOC FUND: WATER CAPITAL PROJECTS PROJECT BUDGET: $1,420,032 PROJECT FUNDING MANAGER: MICHAEL KELLOGG SOURCES: Utility Revenue Bonds Design, construct, and install equipment and systems to strengthen security and minimize risks of potential terrorists activities and other threats to City's Water Production infrastructure including geographically isolated water wells, pumping stations, and storage reservoirs. Vulnerability Assessment consultant contract 03-66 mandated by the U.S. Department of Homeland Security, the Centers for Disease Control and Prevention (CDC), and Environmental Protection Agency (EPA) approved by City Council 03-13-03. February 26, 2004 Engineering Contract #04-062 approved by Council, Item #11.7 FISCAL YEAR LAND ENG. CONSTR. MISC. PROJECT TOTAL Prior Years 39,974 19,058 $59,032 2004-05 120,000 30,000 $150,000 2005-06 50,000 550,000 111,000 $711,000 2006-07 50,000 400,000 50,000 $500,000 2007-08 $0 2008-09 $0 2009-10 $0 2010-11 $0 TOTAL $0 $259,974 $999,058 $161,000 $1,420,032 Total Personnel $0 Supplies $0 Service $0 Capital $0 TOTAL $0 PROJECT DESCRIPTION/STATUS PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR OPERATING COSTS First Fiscal Year Annually $0 $0 194 WORK ORDER #: TBD PROJECT: SANDY POINT FIBER OPTIC PROJECT #: WGWOC FUND: WATER CAPITAL PROJECTS PROJECT BUDGET: $500,000 PROJECT FUNDING MANAGER: MICHAEL KELLOGG SOURCES: Utility Revenue Bonds Design, procure, and install fiber optic communications between Dowling Road Pump Station and Sandy Point Pump Station. This link will allow for data communications for Plant Control, Security and Computer Workstations. The approximate length of fiber is 17 miles and allows for 24 fibers minimum. This project to be coordinated with the Water Transmission SH 21 to Villa Maria Project - WF0352317. FISCAL YEAR LAND ENG. CONSTR. MISC. PROJECT TOTAL Prior Years $0 2004-05 $0 2005-06 100,000 400,000 $500,000 2006-07 $0 2007-08 $0 2008-09 $0 2009-10 $0 2010-11 $0 TOTAL $0 $100,000 $400,000 $0 $500,000 Total Personnel $0 Supplies $0 Service $0 Capital $0 TOTAL $0 PROJECT DESCRIPTION/STATUS PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR OPERATING COSTS First Fiscal Year Annually $0 $0 195 DDIISSTTRRIIBBUUTTIIOONN PPRROOJJEECCTTSS 196 WORK ORDER #: WF0592456 PROJECT: OVERSIZE WATER LINES PROJECT #: WTWOC FUND: WATER CAPITAL PROJECTS PROJECT BUDGET:Annual PROJECT FUNDING MANAGER: ED SAVAGE SOURCES: Utility Revenue Bonds These funds are available for oversize participation with developers in the construction of water lines above the minimum size needed to serve the development. This allows lines to be built large enough to meet future development without having to go back and install larger lines. Projects are identified based on development activity. Total OP annual funding $200,000. Projects funded for FY 04-05 - WF0592456: Quality Inn Ponderosa $30,067.00 WF0592456 / 001 Central Park Lane Extension $3,674.00 WF0592456 / 002 Cotton - Dartmouth Dr Extension $6,174.55 WF0592456 / 003 Dove Crossing Subdivision, Phase I $14,336.00 WF0592456 / 004 Year to date remaining balance available: $145,748. Total OP annual funding $200,000. Projects funded for FY 03-04 - WF0472461: Shenandoah Phase 9 $16,142.82 WF0472465 Westfield Village Phase 6 $8,324.60 WF0472458 Shenandoah Phase 8A $8,957.20 WF0477949 Shenandoah Phase 12 & 13 $7,531.60 WF0579115 FISCAL YEAR LAND ENG. CONSTR. MISC. PROJECT TOTAL Prior Years $105,000 $370,000 $475,000 2004-05 50,000 95,748 $145,748 2005-06 50,000 150,000 $200,000 2006-07 50,000 150,000 $200,000 2007-08 50,000 150,000 $200,000 2008-09 50,000 150,000 $200,000 2009-10 50,000 150,000 $200,000 2010-11 50,000 150,000 $200,000 TOTAL $0 $455,000 $1,365,748 $0 $1,820,748 Total Personnel $0 Supplies $0 Service $0 Capital $0 TOTAL $0$0 $0 PROJECT DESCRIPTION/STATUS PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR OPERATING COSTS First Fiscal Year Annually 197 WORK ORDER #: WF0537425 PROJECT:VICTORIA STREET OP PROJECT #: WTWOC FUND: WATER CAPITAL PROJECTS PROJECT BUDGET: $100,000 PROJECT FUNDING MANAGER: SPENCER THOMPSON SOURCES: Utility Revenue Bonds This project will extend Victoria Street water line from Barron Road to SH40. It will be necessary to extend oversized 12" water approximately 3,000 linear feet. This project will be coordinated with Streets Project ST9928, which is needed to provide a north-south access to a future CSISD school. Projects funded from this Victoria Street Water OP Project: FY 03-04: Westfield Village Phases 2 & 3 $18,061.20 WF0537425 / 001 FISCAL YEAR LAND ENG. CONSTR. MISC. PROJECT TOTAL Prior Years $0 2004-05 100,000 $100,000 2005-06 $0 2006-07 $0 2007-08 $0 2008-09 $0 2009-10 $0 TOTAL $0 $0 $100,000 $0 $100,000 Total Personnel $0 Supplies $0 Service $0 Capital $0 TOTAL $0 PROJECT DESCRIPTION/STATUS PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR OPERATING COSTS First Fiscal Year Annually $0 $0 198 WORK ORDER #: WF0356035 PROJECT: BARRON ROAD WATER LINE PROJECT #: WTWOC OVERSIZED PARTICIPATION FUND: WATER CAPITAL PROJECTS PROJECT BUDGET: $153,518 PROJECT FUNDING MANAGER: SPENCER THOMPSON SOURCES: Utility Revenue Bonds The project is to provide Oversized Participation requests for development along Barron Road. Projects funded from this Barron Road OP: FY 02-03: Alexandria Phase 5 OP $38,246.20 WF0356035 / 001 FY 03-04: Reatta Meadows OP $49,233.30 WF0356035 / 002 FISCAL YEAR LAND ENG. CONSTR. MISC. PROJECT TOTAL Prior Years 83,518 $83,518 2004-05 70,000 $70,000 2005-06 $0 2006-07 $0 2007-08 $0 2008-09 $0 2009-10 $0 2010-2011 $0 TOTAL $0 $0 $153,518 $0 $153,518 Total Personnel $0 Supplies $0 Service $0 Capital $0 TOTAL $0$0 $0 PROJECT DESCRIPTION/STATUS PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR OPERATING COSTS First Fiscal Year Annually 199 WORK ORDER #: WF0353641 PROJECT: WESTSIDE WATER SERVICE PROJECT #: WT9703 FUND: WATER CAPITAL PROJECTS PROJECT BUDGET: $2,372,508 PROJECT FUNDING MANAGER: ED SAVAGE SOURCES: Utility Revenue Bonds Due to annexation, development, and expected future development, water services were needed. They did not exist west of FM 2818. This project was constructed concurrently with the Parallel Water Transmission Line, WF0350259 (WT0005). PROJECT COMPLETE FISCAL YEAR LAND ENG. CONSTR. MISC. PROJECT TOTAL Prior Years $17,293 $390,332 $1,963,897 $920 $2,372,442 2004-05 66 $66 2005-06 $0 2006-07 $0 2007-08 $0 2008-09 $0 2009-10 $0 2010-11 $0 TOTAL $17,293 $390,332 $1,963,963 $920 $2,372,508 Total Personnel $0 Supplies $0 Service $0 Capital $0 TOTAL $0 PROJECT DESCRIPTION/STATUS PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR OPERATING COSTS First Fiscal Year Annually $0 $0 200 WORK ORDER #: TBD PROJECT: FM 60 WIDENING WATER RELOCATION PROJECT #: WTWOC FUND: WATER CAPITAL PROJECTS PROJECT BUDGET: $535,000 PROJECT FUNDING MANAGER:DANIELLE CHARBONNET SOURCES: Utility Revenue Bonds University Drive East (FM 60) will be widened between State Highway 6 and FM 158 to a major arterial. Water lines will need to be relocated into an easement outside of the right-of-way. This project will be coordinated with Streets Project ST0213. FISCAL YEAR LAND ENG. CONSTR. MISC. PROJECT TOTAL Prior Years $0 2004-05 $0 2005-06 $0 2006-07 $0 2007-08 $0 2008-09 50,000 $50,000 2009-10 40,000 $40,000 2010-11 445,000 $445,000 TOTAL $50,000 $40,000 $445,000 $0 $0 $535,000 Total Personnel $0 Supplies $0 Service $0 Capital $0 TOTAL $0$0 $0 PROJECT DESCRIPTION/STATUS PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR OPERATING COSTS First Fiscal Year Annually 201 WORK ORDER #: WF0607933 PROJECT: HWY 6 WATER IMPACT FEE LINE PROJECT #: WT9905 FUND: WATER CAPITAL PROJECTS PROJECT BUDGET: $356,474 PROJECT FUNDING MANAGER: DANIELLE CHARBONNET SOURCES: Utility Revenue Bonds Project to extend water distribution line along east side of State Highway 6 from Barron Road to Rock Prairie Road. Project partially complete. Remaining portion to be constructed FY 04-05. FISCAL YEAR LAND ENG. CONSTR. MISC. PROJECT TOTAL Prior Years 15,760 128,714 $144,474 2004-05 15,000 197,000 $212,000 2005-06 $0 2006-07 $0 2007-08 $0 2008-09 $0 2009-10 $0 2010-11 $0 TOTAL $0 $30,760 $325,714 $0 $356,474 Total Personnel $0 Supplies $0 Service $0 Capital $0 TOTAL $0 PROJECT DESCRIPTION/STATUS PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR OPERATING COSTS First Fiscal Year Annually $0 $0 202 WORK ORDER #: WF0353817 PROJECT: PARK PLACE ELEVATED STORAGE TANK PROJECT #: WT0012 FUND: WATER CAPITAL PROJECTS PROJECT BUDGET: $3,718,428 PROJECT FUNDING MANAGER:FRED SUROVIK SOURCES: Utility Revenue Bonds Relocate and construct a new 3 million gallon elevated water storage tank increasing capacity from 1 million to 3 million gallons. The additional capacity is required to meet TCEQ regulations for storage capacity to match project population. The demolition of the 1 million gallon tank is included in this project. Sale of property = $821,175.00 PROJECT COMPLETE FISCAL YEAR LAND ENG. CONSTR. MISC. PROJECT TOTAL Prior Years 262,048 393,042 3,052,980 10,312 $3,718,382 2004-05 46 $46 2005-06 $0 2006-07 $0 2007-08 $0 2008-09 $0 2009-10 $0 2010-11 $0 TOTAL $262,048 $393,042 $3,053,026 $10,312 $3,718,428 Total Personnel $1,000 Supplies $1,000 Service $4,800 Capital $0 TOTAL $6,800 PROJECT DESCRIPTION/STATUS PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR 500 2,400 OPERATING COSTS First Fiscal Year Annually 500 $3,400 500 2,400 $3,400 500 203 WORK ORDER #: TBD PROJECT: PUMP INTERCONNECT PROJECT #: WTWOC FUND: WATER CAPITAL PROJECTS PROJECT BUDGET: $150,000 PROJECT FUNDING MANAGER: SPENCER THOMPSON SOURCES: Utility Revenue Bonds Joint project with City of Bryan to construct an interconnect to supply water to either City in emergency situations. i.e.: Water transmission line outage, storage tank problems, distribution line problems, well or well field problems. This interconnect would be located in the vicinity of 29th Street, Tarrow, and the joining City limit line. FISCAL YEAR LAND ENG. CONSTR. MISC. PROJECT TOTAL Prior Years $0 2004-05 100,000 $100,000 2005-06 50,000 $50,000 2006-07 $0 2007-08 $0 2008-09 $0 2009-10 $0 2010-11 $0 TOTAL $0 $0 $150,000 $0 $150,000 Total Personnel $0 Supplies $0 Service $0 Capital $0 TOTAL $0$0 $0 PROJECT DESCRIPTION/STATUS PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR OPERATING COSTS First Fiscal Year Annually 204 WORK ORDER #: TBD PROJECT: WATER RECLAIMED - IRRIGATION PROJECT #: WT0110 FUND: WATER CAPITAL PROJECTS PROJECT BUDGET: $3,807,173 PROJECT FUNDING MANAGER: TBD SOURCES: Utility Revenue Bonds Engineering, design, and construction of the Irrigation Water System from Carters Creek Wastewater Treatment Plant to Veterans Park, Central Park, and other major water use parks with the City. This will be a multi-phase project to deliver irrigation water to major users throughout College Station. Study Phase has been completed. Anticipate Design in FY 2011-12, projected budget amount $340,000. Anticipate Construction in FY 2012-13, projected budget amount $3,426,000. FISCAL YEAR LAND ENG. CONSTR. MISC. PROJECT TOTAL Prior Years 41,173 $41,173 2004-05 $0 2005-06 $0 2006-07 $0 2007-08 $0 2008-09 $0 2009-10 $0 2010-11 $0 TOTAL $0 $41,173 $0 $0 $41,173 Total Personnel $20,000 Supplies $26,000 Service $30,000 Capital $0 TOTAL $76,000$0 26,000 30,000 $76,000 PROJECT DESCRIPTION/STATUS PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR 20,000 OPERATING COSTS First Fiscal Year Annually 205 WORK ORDER #: WF0350795 PROJECT: DARTMOUTH DRIVE WATER EXT - PH II PROJECT #: WTWOC FUND: WATER CAPITAL PROJECTS PROJECT BUDGET: $220,000 PROJECT FUNDING MANAGER: DONALD E. HARMON JR. SOURCES: Utility Revenue Bonds Dartmouth Drive will be extended from Krenek Tap Road to Harvey Mitchell Parkway (FM 2818). It will be necessary to extend 2,300 linear feet of 12" water line. This project will be coordinated with Streets Project ST0211. FISCAL YEAR LAND ENG. CONSTR. MISC. PROJECT TOTAL Prior Years $0 2004-05 $0 2005-06 20,000 200,000 $220,000 2006-07 $0 2007-08 $0 2008-09 $0 2009-10 $0 2010-11 $0 TOTAL $0 $20,000 $200,000 $0 $220,000 Total Personnel $0 Supplies $0 Service $0 Capital $0 TOTAL $0 PROJECT DESCRIPTION/STATUS PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR OPERATING COSTS First Fiscal Year Annually $0 $0 206 WORK ORDER #: WF0632255 PROJECT: FIRE STATION #3 - BARRON ROAD PROJECT #: WTWOC FUND: WATER CAPITAL PROJECTS PROJECT BUDGET: $25,000 PROJECT FUNDING MANAGER: DONALD E. HARMON JR. SOURCES: Utility Revenue Bonds Water service extension for new Fire Station #3 will be located at 1900 Barron Road. This project will be coordinated with General Governmental Project GG0401. FISCAL YEAR LAND ENG. CONSTR. MISC. PROJECT TOTAL Prior Years $0 2004-05 1,000 $1,000 2005-06 1,000 23,000 $24,000 2006-07 $0 2007-08 $0 2008-09 $0 2009-10 $0 2010-11 $0 TOTAL $0 $2,000 $23,000 $0 $0 $25,000 Total Personnel $0 Supplies $0 Service $0 Capital $0 TOTAL $0$0 $0 PROJECT DESCRIPTION/STATUS PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR OPERATING COSTS First Fiscal Year Annually 207 WORK ORDER #: TBD PROJECT: JONES-BUTLER RD. WTR EXT. PH. II PROJECT #: WTWOC FUND: WATER CAPITAL PROJECTS PROJECT BUDGET: $40,000 PROJECT FUNDING MANAGER: DANIELLE CHARBONNET SOURCES: Utility Revenue Bonds Jones-Butler Road will extended southward from Holleman Drive to intersect with FM 2818 and align with Marion Pugh. It will be necessary to extend the 8" and 16" dead-end water lines 100 feet across Jones-Butler Road for future development. This project will be coordinated with Streets Project ST0005. FISCAL YEAR LAND ENG. CONSTR. MISC. PROJECT TOTAL Prior Years $0 2004-05 2,000 $2,000 2005-06 3,000 $3,000 2006-07 25,000 $25,000 2007-08 10,000 $10,000 2008-09 $0 2009-10 $0 2010-11 $0 TOTAL $0 $5,000 $35,000 $0 $40,000 Total Personnel $0 Supplies $0 Service $0 Capital $0 TOTAL $0$0 $0 PROJECT DESCRIPTION/STATUS PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR OPERATING COSTS First Fiscal Year Annually 208 WORK ORDER #: TBD PROJECT: RAYMOND STOTZER WEST PROJECT #: WTWOC FUND: WATER CAPITAL PROJECTS PROJECT BUDGET: $1,000,000 PROJECT FUNDING MANAGER: ED SAVAGE SOURCES: Utility Revenue Bonds Due to annexation, development, and expectued future development, water services will be necessary. FISCAL YEAR LAND ENG. CONSTR. MISC. PROJECT TOTAL Prior Years $0 2004-05 $0 2005-06 $0 2006-07 $0 2007-08 $0 2008-09 $0 2009-10 $0 2010-11 100,000 900,000 $1,000,000 TOTAL $0 $100,000 $900,000 $0 $0 $1,000,000 Total Personnel $0 Supplies $0 Service $0 Capital $0 TOTAL $0$0 $0 PROJECT DESCRIPTION/STATUS PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR OPERATING COSTS First Fiscal Year Annually 209 WORK ORDER #: WF0622507 PROJECT: SPRING CREEK CORPORATE CAMPUS PROJECT #: WTWOC FUND: WATER CAPITAL PROJECTS PROJECT BUDGET: $156,000 PROJECT FUNDING MANAGER: DONALD E. HARMON JR. SOURCES: Utility Revenue Bonds Extension of 12" water line from Greens Prairie Road into new business park along Pebble Creek Parkway toward Hwy 6. FISCAL YEAR LAND ENG. CONSTR. MISC. PROJECT TOTAL Prior Years $0 2004-05 7,000 $7,000 2005-06 5,000 144,000 $149,000 2006-07 $0 2007-08 $0 2008-09 $0 2009-10 $0 2010-11 $0 TOTAL $0 $12,000 $144,000 $0 $156,000 Total Personnel $0 Supplies $0 Service $0 Capital $0 TOTAL $0 PROJECT DESCRIPTION/STATUS PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR OPERATING COSTS First Fiscal Year Annually $0 $0 210 WORK ORDER #: WF0613546 PROJECT: WELLBORN WIDENING PROJECT #: WTWOC FUND: WATER CAPITAL PROJECTS PROJECT BUDGET: $2,740,000 PROJECT FUNDING MANAGER: SPENCER THOMPSON SOURCES: Utility Revenue Bonds TXDOT will be widening Wellborn Road. Water lines from FM 2818 to SH 40 must be relocated outside future pavement areas. It is expected that partial reimbursement will be forthcoming from TxDOT on this utility project. FY04-05 Transferred $200,000 from Rock Prairie Road / Bird Pond - WF0352094. FISCAL YEAR LAND ENG. CONSTR. MISC. PROJECT TOTAL Prior Years $0 2004-05 200,000 $200,000 2005-06 40,000 500,000 $540,000 2006-07 2,000,000 $2,000,000 2007-08 $0 2008-09 $0 2009-10 $0 2010-11 $0 TOTAL $0 $240,000 $2,500,000 $0 $0 $2,740,000 Total Personnel $0 Supplies $0 Service $0 Capital $0 TOTAL $0$0 $0 PROJECT DESCRIPTION/STATUS PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR OPERATING COSTS First Fiscal Year Annually 211 WORK ORDER #: WF0352094 PROJECT: ROCK PRAIRIE/BIRD POND PROJECT #: WT0102 FUND: WATER CAPITAL PROJECTS PROJECT BUDGET: $2,617,205 PROJECT FUNDING MANAGER: SPENCER THOMPSON SOURCES: Utility Revenue Bonds Extend 18" water line along Rock Prairie from Stonebrook to the intersection of Rock Prairie Road and Greens Prairie Road. Then along Greens Prairie near Pebble Creek Development. FY04-05 Transferred $120,000 to Texas Avenue Relocation - WF0351282. FY04-05 Transferred $200,000 to Wellborn Road Widening - WF0613546. FISCAL YEAR LAND ENG. CONSTR. MISC. PROJECT TOTAL Prior Years 16,143 45,354 159,408 $220,905 2004-05 32,000 1,346,300 $1,378,300 2005-06 18,000 1,000,000 $1,018,000 2006-07 $0 2007-08 $0 2008-09 $0 2009-10 $0 2010-11 $0 TOTAL $16,143 $95,354 $2,505,708 $0 $2,617,205 Total Personnel $0 Supplies $0 Service $0 Capital $0 TOTAL $0 PROJECT DESCRIPTION/STATUS PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR OPERATING COSTS First Fiscal Year Annually $0 $0 212 WORK ORDER #: WF0379145 PROJECT: ARRINGTON ROAD WATER MAIN PROJECT #: WTWOC FUND: WATER CAPITAL PROJECTS PROJECT BUDGET: $644,056 PROJECT FUNDING MANAGER: SPENCER THOMPSON SOURCES: Utility Revenue Bonds This project will install a 12" water line along Arrington Road and Hwy 6. This project provides water service to properties along SH 6 that are currently served by Wellborn Special Utility District. FISCAL YEAR LAND ENG. CONSTR. MISC. PROJECT TOTAL Prior Years 20,056 $20,056 2004-05 45,000 $45,000 2005-06 30,000 $30,000 2006-07 549,000 $549,000 2007-08 $0 2008-09 $0 2009-10 $0 2010-11 $0 TOTAL $30,000 $65,056 $549,000 $0 $644,056 Total Personnel $0 Supplies $0 Service $0 Capital $0 TOTAL $0 PROJECT DESCRIPTION/STATUS PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR OPERATING COSTS First Fiscal Year Annually $0 $0 213 WORK ORDER #: WF0379197 PROJECT: BARRON ROAD EXTENSION PROJECT #: WTWOC FUND: WATER CAPITAL PROJECTS PROJECT BUDGET: $2,384,475 PROJECT FUNDING MANAGER: SPENCER THOMPSON SOURCES: Utility Revenue Bonds This project will install a 18" water line along Barron Road, a 12" water along Barron Cut Off, and an 8" water line along Wellborn Road. This project provides water service to residents within College Station's Water CCN who are currently served by Wellborn Special Utility District. FISCAL YEAR LAND ENG. CONSTR. MISC. PROJECT TOTAL Prior Years 84,475 $84,475 2004-05 200,000 900,000 $1,100,000 2005-06 1,200,000 $1,200,000 2006-07 $0 2007-08 $0 2008-09 $0 2009-10 $0 2010-11 $0 TOTAL $0 $284,475 $2,100,000 $0 $2,384,475 Total Personnel $0 Supplies $0 Service $0 Capital $0 TOTAL $0$0 $0 PROJECT DESCRIPTION/STATUS PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR OPERATING COSTS First Fiscal Year Annually 214 WORK ORDER #: WF0379226 PROJECT: LICK CREEK/ROCK PRAIRIE PROJECT #: WTWOC FUND: WATER CAPITAL PROJECTS PROJECT BUDGET: $158,056 PROJECT FUNDING MANAGER: SPENCER THOMPSON SOURCES: Utility Revenue Bonds This project will install an 8" water line from the Lick Creek Wastewater Treatment Plant to Rock Prairie Road. This project provides water service to residents within College Station's Water CCN who are currently served by Wellborn Special Utility District. FISCAL YEAR LAND ENG. CONSTR. MISC. PROJECT TOTAL Prior Years 20,056 $20,056 2004-05 34,000 50,000 $84,000 2005-06 54,000 $54,000 2006-07 $0 2007-08 $0 2008-09 $0 2009-10 $0 2010-11 $0 TOTAL $0 $54,056 $104,000 $0 $158,056 Total Personnel $0 Supplies $0 Service $0 Capital $0 TOTAL $0$0 $0 PROJECT DESCRIPTION/STATUS PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR OPERATING COSTS First Fiscal Year Annually 215 WORK ORDER #: WF0395455 PROJECT: WELLBORN ROAD NORTH GANDY PROJECT #: WTWOC FUND: WATER CAPITAL PROJECTS PROJECT BUDGET: $448,000 PROJECT FUNDING MANAGER: SPENCER THOMPSON SOURCES: Utility Revenue Bonds Installation of water lines to serve residents annexed in 2002. Installation of 12" water line crossings to be installed at Navarro and Gandy. Delayed FISCAL YEAR LAND ENG. CONSTR. MISC. PROJECT TOTAL Prior Years $0 2004-05 $0 2005-06 45,000 $45,000 2006-07 22,000 $22,000 2007-08 381,000 $381,000 2008-09 $0 2009-10 $0 2010-11 $0 TOTAL $22,000 $45,000 $381,000 $0 $448,000 Total Personnel $0 Supplies $0 Service $0 Capital $0 TOTAL $0 PROJECT DESCRIPTION/STATUS PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR OPERATING COSTS First Fiscal Year Annually $0 $0 216 WORK ORDER #: WF0395464 PROJECT: GREENS PRAIRIE RD W. OF ARRINGTON PROJECT #: WTWOC FUND: WATER CAPITAL PROJECTS PROJECT BUDGET: $347,000 PROJECT FUNDING MANAGER: SPENCER THOMPSON SOURCES: Utility Revenue Bonds Installation of water lines to serve residents annexed in 2002. Installation of 12" water line from Castlegate to White's Creek. Delayed FISCAL YEAR LAND ENG. CONSTR. MISC. PROJECT TOTAL Prior Years $0 2004-05 $0 2005-06 35,000 $35,000 2006-07 312,000 $312,000 2007-08 $0 2008-09 $0 2009-10 $0 2010-11 $0 TOTAL $0 $35,000 $312,000 $0 $347,000 Total Personnel $0 Supplies $0 Service $0 Capital $0 TOTAL $0$0 $0 PROJECT DESCRIPTION/STATUS PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR OPERATING COSTS First Fiscal Year Annually 217 WORK NANTUCKET EAST OF ORDER #: TBD PROJECT: HARPER'S FERRY PROJECT #: WTWOC FUND: WATER CAPITAL PROJECTS PROJECT BUDGET: $80,000 PROJECT FUNDING MANAGER: SPENCER THOMPSON SOURCES: Utility Revenue Bonds Installation of water lines to serve residents annexed in 2002. Installation of 8" water line along Nantucket Drive. Delayed FISCAL YEAR LAND ENG. CONSTR. MISC. PROJECT TOTAL Prior Years $0 2004-05 $0 2005-06 $0 2006-07 $0 2007-08 80,000 $80,000 2008-09 $0 2009-10 $0 2010-11 $0 TOTAL $0 $0 $80,000 $0 $80,000 Total Personnel $0 Supplies $0 Service $0 Capital $0 TOTAL $0 PROJECT DESCRIPTION/STATUS PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR OPERATING COSTS First Fiscal Year Annually $0 $0 218 WORK ORDER #: TBD PROJECT: ROCK PRAIRIE S. OF CARTER LAKE PROJECT #: WTWOC FUND: WATER CAPITAL PROJECTS PROJECT BUDGET: $670,000 PROJECT FUNDING MANAGER: SPENCER THOMPSON SOURCES: Utility Revenue Bonds Installation of water lines to serve residents annexed in 2002. Installation of 16" water line across Greens Prairie Road from Rock Prairie Road. Delayed FISCAL YEAR LAND ENG. CONSTR. MISC. PROJECT TOTAL Prior Years $0 2004-05 $0 2005-06 67,000 $67,000 2006-07 67,000 268,000 $335,000 2007-08 268,000 $268,000 2008-09 $0 2009-10 $0 2010-11 $0 TOTAL $67,000 $67,000 $536,000 $0 $670,000 Total Personnel $0 Supplies $0 Service $0 Capital $0 TOTAL $0$0 $0 PROJECT DESCRIPTION/STATUS PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR OPERATING COSTS First Fiscal Year Annually 219 WORK ORDER #: TBD PROJECT: GREENS PRAIRIE RD. CORRIDOR PROJECT #: WTWOC EAST FUND: WATER CAPITAL PROJECTS PROJECT BUDGET: $612,000 PROJECT FUNDING MANAGER: SPENCER THOMPSON SOURCES: Utility Revenue Bonds Installation of water lines to serve residents annexed in 2002. Installation of 12" water line along Greens Prairie Road East. Delayed FISCAL YEAR LAND ENG. CONSTR. MISC. PROJECT TOTAL Prior Years $0 2004-05 $0 2005-06 61,000 61,000 $122,000 2006-07 245,000 $245,000 2007-08 245,000 $245,000 2008-09 $0 2009-10 $0 2010-11 $0 TOTAL $61,000 $61,000 $490,000 $0 $612,000 Total Personnel $0 Supplies $0 Service $0 Capital $0 TOTAL $0$0 $0 PROJECT DESCRIPTION/STATUS PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR OPERATING COSTS First Fiscal Year Annually 220 RREEHHAABBIILLIITTAATTIIOONN PPRROOJJEECCTTSS 221 WORK ORDER #: WF0608079 PROJECT: DISTRIBUTION SYSTEM REHABILITATION PROJECT #: WTWOC FUND: WATER CAPITAL PROJECTS PROJECT BUDGET:ANNUAL PROJECT FUNDING MANAGER:ED SAVAGE SOURCES: Utility Revenue Bonds These funds for the general rehabilitation of the water distribution system. Projects are identified on an annual basis. Total Distribution Rehab annual funding $285,000. Projects funded for FY 04-05 - WF0608079: Park Place Storage Tank Secondary Feed $58,560 WF0565771 Harvey Road 12" Emergency Repair $155,000 WF0608258 Central Park Lane Extension $49,000 WF0624648 Year to date remaining balance available: $24,000 Total Distribution Rehab annual funding $285,000. Projects funded for FY 03-04 - WF0532532: University Drive Pump Station Demolition $49,000.00 WF0532532 FISCAL YEAR LAND ENG. CONSTR. MISC. PROJECT TOTAL Prior Years 570,000 $570,000 2004-05 24,000 $24,000 2005-06 285,000 $285,000 2006-07 285,000 $285,000 2007-08 285,000 $285,000 2008-09 285,000 $285,000 2009-10 285,000 $285,000 2010-11 285,000 $285,000 TOTAL $0 $0 $2,304,000 $0 $2,304,000 Total Personnel $0 Supplies $0 Service $0 Capital $0 TOTAL $0 PROJECT DESCRIPTION/STATUS PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR OPERATING COSTS First Fiscal Year Annually $0 $0 222 WORK ORDER #: WF0624648 PROJECT: CENTRAL PARK LANE EXTENSION PROJECT #: WTWOC FUND: WATER CAPITAL PROJECTS PROJECT BUDGET: $49,000 PROJECT FUNDING MANAGER: DANIELLE CHARBONNET SOURCES: Utility Revenue Bonds Central Park Lane will be extended to provide the final connection between Southwest Parkway and Krenek Tap Road. The 12" water line will be extended from its current location across from Waterwood Townhomes to tie in with the 8" water line running parallel to Krenek Tap Road. This project is being coordinated with Streets Project ST0509. FY04-05 funded $49,000 from Distribution Rehabilitation Fund - WF060879. FISCAL YEAR LAND ENG. CONSTR. MISC. PROJECT TOTAL Prior Years $0 2004-05 49,000 $49,000 2005-06 $0 2006-07 $0 2007-08 $0 2008-09 $0 2009-10 $0 2010-11 $0 TOTAL $0 $0 $49,000 $0 $0 $49,000 Total Personnel $0 Supplies $0 Service $0 Capital $0 TOTAL $0$0 $0 PROJECT DESCRIPTION/STATUS PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR OPERATING COSTS First Fiscal Year Annually 223 WORK ORDER #: WF0608258 PROJECT: HARVEY 12' WATER LINE PROJECT #: WTWOC FUND: WASTEWATER CAPITAL PROJECTS PROJECT BUDGET: $155,000 PROJECT FUNDING MANAGER: ED SAVAGE SOURCES: Utility Revenue Bonds This project involves the emergency replacement of 1,127 feet of 12" water line along Harvey Road with numerous failures due to corrosive soils. The section of water line between Scarlet O'Hara and Hwy 6 feeder has experienced six failures in four weeks. FY04-05 funded $155,000 from Distribution Rehab Funds - WF0608079. Council Approval - February 24, 2005, Regular Agenda Item #13.3 FISCAL YEAR LAND ENG. CONSTR. MISC.PROJECT TOTAL Prior Years $0 2004-05 155,000 $155,000 2005-06 $0 2006-07 $0 2007-08 $0 2008-09 $0 2009-10 $0 2010-11 $0 TOTAL $0 $0 $155,000 $0 $0 $155,000 Total Personnel $0 Supplies $0 Service $0 Capital $0 TOTAL $0 PROJECT DESCRIPTION/STATUS PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR OPERATING COSTS First Fiscal Year Annually $0 $0 224 WORK PARK PLACE STORAGE TANK ORDER #: WF0565771 PROJECT: 12" SECONDARY FEED PROJECT #: WTWOC FUND: WATER CAPITAL PROJECTS PROJECT BUDGET: $58,560 PROJECT FUNDING MANAGER: EDWARD McDONALD SOURCES: Utility Revenue Bonds Installation of new 12" water line from JB-004 to line 23666. The line will complete a service loop around the Park Place Elevated Storage Tank. Anticipate construction to be complete June 2005. FY04-05 funded $58,560 from Distribution Rehab Funds - WF0608079. FISCAL YEAR LAND ENG. CONSTR. MISC. PROJECT TOTAL Prior Years $0 2004-05 4,000 54,560 $58,560 2005-06 $0 2006-07 $0 2007-08 $0 2008-09 $0 2009-10 $0 2010-11 $0 TOTAL $0 $4,000 $54,560 $0 $58,560 Total Personnel $0 Supplies $0 Service $0 Capital $0 TOTAL $0$0 $0 PROJECT DESCRIPTION/STATUS PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR OPERATING COSTS First Fiscal Year Annually 225 WORK UNIVERSITY DRIVE PUMP STATION ORDER #: WF0532532 PROJECT: DEMOLITION PROJECT #: WPWOC FUND: WATER CAPITAL PROJECTS PROJECT BUDGET: $49,000 PROJECT FUNDING MANAGER: ED SAVAGE SOURCES: Utility Revenue Bonds Demolition of abandoned water pump station. FISCAL YEAR LAND ENG. CONSTR. MISC. PROJECT TOTAL Prior Years 940 $940 2004-05 4,230 43,830 $48,060 2005-06 $0 2006-07 $0 2007-08 $0 2008-09 $0 2009-10 $0 2010-11 $0 TOTAL $0 $5,170 $43,830 $0 $0 $49,000 Total Personnel $0 Supplies $0 Service $0 Capital $0 TOTAL $0 PROJECT DESCRIPTION/STATUS PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR OPERATING COSTS First Fiscal Year Annually $0 $0 226 WORK ORDER #: WF0654325 PROJECT: BARRON ROAD REHAB PROJECT #: WTWOC FUND: WATER CAPITAL PROJECTS PROJECT BUDGET: $250,000 PROJECT FUNDING MANAGER: DONALD E. HARMON JR. SOURCES: Utility Revenue Bonds Barron Road will be upgraded from a two lane rural highway to a minor arterial road as reflected on the Thorough Plan. Water lines and meters will be relocated. This project will be coordinated with Streets Project #ST0409. FISCAL YEAR LAND ENG. CONSTR. MISC. PROJECT TOTAL Prior Years $0 2004-05 $0 2005-06 25,000 75,000 $100,000 2006-07 75,000 $75,000 2007-08 75,000 $75,000 2008-09 $0 2009-10 $0 2010-11 $0 TOTAL $0 $25,000 $225,000 $0 $250,000 Total Personnel $0 Supplies $0 Service $0 Capital $0 TOTAL $0 PROJECT DESCRIPTION/STATUS PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR OPERATING COSTS First Fiscal Year Annually $0 $0 227 WORK CHURCH AVENUE REHABILIBATION ORDER #: WF0632256 PROJECT: PHASE II PROJECT #: WTWOC FUND: WATER CAPITAL PROJECTS PROJECT BUDGET: $12,000 PROJECT FUNDING MANAGER: DONALD E. HARMON JR. SOURCES: Utility Revenue Bonds Water lines and meters along Church Avenue will be rehabilitated between College Main and Nagle. This project will be coordinated with Streets Project ST0523. FISCAL YEAR LAND ENG. CONSTR. MISC. PROJECT TOTAL Prior Years $0 2004-05 1,000 $1,000 2005-06 1,000 10,000 $11,000 2006-07 $0 2007-08 $0 2008-09 $0 2009-10 $0 2010-11 $0 TOTAL $0 $2,000 $10,000 $0 $0 $12,000 Total Personnel $0 Supplies $0 Service $0 Capital $0 TOTAL $0 PROJECT DESCRIPTION/STATUS PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR OPERATING COSTS First Fiscal Year Annually $0 $0 228 WORK ORDER #: WF0351786 PROJECT: FIRST AND MAPLE WATER REHAB PROJECT #: WT0212 FUND: WATER CAPITAL PROJECTS PROJECT BUDGET: $205,744 PROJECT FUNDING MANAGER: LAURA HARRIS SOURCES: Utility Revenue Bonds Rehabilitation of 350 linear feet of 8" water lines was needed for First and Maple Streets. This project was coordinated with Streets Project ST0201. Warranty Period expires October 2005. PROJECT COMPLETE FISCAL YEAR LAND ENG. CONSTR. MISC. PROJECT TOTAL Prior Years 326 20,340 185,078 $205,744 2004-05 $0 2005-06 $0 2006-07 $0 2007-08 $0 2008-09 $0 2009-10 $0 2010-11 $0 TOTAL $326 $20,340 $185,078 $0 $205,744 Total Personnel $0 Supplies $0 Service $0 Capital $0 TOTAL $0$0 $0 PROJECT DESCRIPTION/STATUS PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR OPERATING COSTS First Fiscal Year Annually 229 WORK ORDER #: WF0390567 PROJECT: GEORGE BUSH EAST WIDENING PROJECT #: WTWOC FUND: WATER CAPITAL PROJECTS PROJECT BUDGET: $100,811 PROJECT FUNDING MANAGER: DONALD E. HARMON JR. SOURCES: Utility Revenue Bonds George Bush Drive East was widened from Texas Avenue to Dominik Drive. A 2" water line was upgraded to an 8" water line. This project was coordinated with Streets Project ST9804. PROJECT COMPLETE FISCAL YEAR LAND ENG. CONSTR. MISC. PROJECT TOTAL Prior Years 100,811 $100,811 2004-05 $0 2005-06 $0 2006-07 $0 2007-08 $0 2008-09 $0 2009-10 $0 2010-11 $0 TOTAL $0 $0 $100,811 $0 $100,811 Total Personnel $0 Supplies $0 Service $0 Capital $0 TOTAL $0 PROJECT DESCRIPTION/STATUS PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR OPERATING COSTS First Fiscal Year Annually $0 $0 230 WORK ORDER #: WF0351806 PROJECT: GREENS PRAIRIE LOWERING PROJECT #: WTWOC FUND: WATER CAPITAL PROJECTS PROJECT BUDGET: $184,018 PROJECT FUNDING MANAGER: KIMBERLY CARTER SOURCES: Utility Revenue Bonds Relocation of a 24" water line to facilitate the construction of TxDOT's SH 40 project just west of Highway 6 at Greens Prairie Road. Received partial TXDOT reimbursement in the amount of $133,253.44 PROJECT COMPLETE FISCAL YEAR LAND ENG. CONSTR. MISC. PROJECT TOTAL Prior Years 0 4,483 179,535 $184,018 2004-05 $0 2005-06 $0 2006-07 $0 2007-08 $0 2008-09 $0 2009-10 $0 2010-11 $0 TOTAL $0 $4,483 $179,535 $0 $184,018 Total Personnel $0 Supplies $0 Service $0 Capital $0 TOTAL $0$0 $0 PROJECT DESCRIPTION/STATUS PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR OPERATING COSTS First Fiscal Year Annually 231 WORK ORDER #: WF0625888 PROJECT: TAUBER & STASNEY REHAB PROJECT #: WTWOC FUND: WATER CAPITAL PROJECTS PROJECT BUDGET: $120,000 PROJECT FUNDING MANAGER:EDWARD McDONALD SOURCES: Utility Revenue Bonds Water line rehabilitation on Tauber and Stasney from University Drive to Cherry Street. Replacement of existing lines on Tauber and Stasney with 8" lines. FISCAL YEAR LAND ENG. CONSTR. MISC. PROJECT TOTAL Prior Years $0 2004-05 5,000 $5,000 2005-06 15,000 50,000 $65,000 2006-07 50,000 $50,000 2007-08 $0 2008-09 $0 2009-10 $0 2010-11 $0 TOTAL $0 $20,000 $100,000 $0 $0 $120,000 Total Personnel $0 Supplies $0 Service $0 Capital $0 TOTAL $0$0 $0 PROJECT DESCRIPTION/STATUS PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR OPERATING COSTS First Fiscal Year Annually 232 WORK ORDER #: WF0351282 PROJECT: TX AVE. RELOCATION SOUTH PH II PROJECT #: WT1012 FUND: WATER CAPITAL PROJECTS PROJECT BUDGET: $1,725,000 PROJECT FUNDING MANAGER: DONALD E. HARMON JR. SOURCES: Utility Revenue Bonds Texas Avenue will be widened from Dominik to Harvey Mitchell Parkway. Water lines will need to be relocated into an easement under the proposed development. Coordinated with Sewer Project WF0351341 (SS0003). FY04-05 Transferred $120,000 from Rock Prairie / Bird Pond Project - WF0352094. FISCAL YEAR LAND ENG. CONSTR. MISC. PROJECT TOTAL Prior Years 93,102 140,344 $233,446 2004-05 24,000 1,200,000 $1,224,000 2005-06 7,554 260,000 $267,554 2006-07 $0 2007-08 $0 2008-09 $0 2009-10 $0 2010-11 $0 TOTAL $0 $124,656 $1,600,344 $0 $1,725,000 Total Personnel $0 Supplies $0 Service $0 Capital $0 TOTAL $0 PROJECT DESCRIPTION/STATUS PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR OPERATING COSTS First Fiscal Year Annually $0 $0 233 WORK ORDER #: TBD PROJECT: WELSH & FM 2818 WATER LINE PROJECT #: WTWOC FUND: WATER CAPITAL PROJECTS PROJECT BUDGET: $150,000 PROJECT FUNDING MANAGER: SPENCER THOMPSON SOURCES: Utility Revenue Bonds TxDOT project to make adjustments to this intersection. Additional ROW acquisition would allow for a better, ultimate design. However, the redesign of the intersection involving ROW acquisition will result in the need to relocate and/ or adjust existing utilites FISCAL YEAR LAND ENG. CONSTR. MISC. PROJECT TOTAL Prior Years $0 2004-05 25,000 $25,000 2005-06 125,000 $125,000 2006-07 $0 2007-08 $0 2008-09 $0 2009-10 $0 2010-11 $0 TOTAL $0 $25,000 $125,000 $0 $0 $150,000 Total Personnel $0 Supplies $0 Service $0 Capital $0 TOTAL $0$0 $0 PROJECT DESCRIPTION/STATUS PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR OPERATING COSTS First Fiscal Year Annually 234 WORK ORDER #: WF0379021 PROJECT: SOUTHSIDE WATER REHAB A PROJECT #: WTWOC FUND: WATER CAPITAL PROJECTS PROJECT BUDGET: $115,208 PROJECT FUNDING MANAGER: TBD SOURCES: Utility Revenue Bonds Replacement of sewer in conjunction with the Southside Drainage System A Project SD-0300 bounded by Welsh, Guernsey, Fairview, and Luther. PROJECT COMPLETE FISCAL YEAR LAND ENG. CONSTR. MISC. PROJECT TOTAL Prior Years 8,067 107,141 $115,208 2004-05 $0 2005-06 $0 2006-07 $0 2007-08 $0 2008-09 $0 2009-10 $0 TOTAL $0 $8,067 $107,141 $0 $115,208 Total Personnel $0 Supplies $0 Service $0 Capital $0 TOTAL $0 PROJECT DESCRIPTION/STATUS PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR OPERATING COSTS First Fiscal Year Annually $0 $0 235 WORK ORDER #: WF0427233 PROJECT: WESTPARK WATER REHAB PROJECT #: WTWOC FUND: WATER CAPITAL PROJECTS PROJECT BUDGET: $1,250,000 PROJECT FUNDING MANAGER: TBD SOURCES: Utility Revenue Bonds Replacement of water lines in area bounded by George Bush Drive, Luther Street, Wellborn Road, and Fairview Avenue. These lines were identified by the Freese & Nichols Southside Water Study (July 2003). April 2005 Status: In Design Council Award of Construction Contract: Summer 2005 FISCAL YEAR LAND ENG. CONSTR. MISC. PROJECT TOTAL Prior Years 16,158 $16,158 2004-05 88,247 300,000 $388,247 2005-06 5,000 840,595 $845,595 2006-07 $0 2007-08 $0 2008-09 $0 2009-10 $0 2010-11 $0 TOTAL $0 $109,405 $1,140,595 $0 $1,250,000 Total Personnel $0 Supplies $0 Service $0 Capital $0 TOTAL $0$0 $0 PROJECT DESCRIPTION/STATUS PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR OPERATING COSTS First Fiscal Year Annually 236 WORK ORDER #: WF0595915 PROJECT: COLLEGE PARK/BREEZY HEIGHTS PROJECT #: WTWOC FUND: WATER CAPITAL PROJECTS PROJECT BUDGET: $1,640,000 PROJECT FUNDING MANAGER: TBD SOURCES: Utility Revenue Bonds Replacement of water lines in area bounded by George Bush, Fairview, Eleanor, Holleman, and Dexter. These lines were identified by the Freese & Nichols Southside Water Study (July 2003). April 2005 Status: In Design Council Award of Construction Contract: Spring 2006 FISCAL YEAR LAND ENG. CONSTR. MISC. PROJECT TOTAL Prior Years $0 2004-05 81,500 $81,500 2005-06 27,250 $27,250 2006-07 1,531,250 $1,531,250 2007-08 $0 2008-09 $0 2009-10 $0 2010-11 $0 TOTAL $0 $108,750 $1,531,250 $0 $1,640,000 Total Personnel $0 Supplies $0 Service $0 Capital $0 TOTAL $0 PROJECT DESCRIPTION/STATUS PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR OPERATING COSTS First Fiscal Year Annually $0 $0 237 WORK ORDER #: TBD PROJECT: SOUTH KNOLL/THE GLADE REHAB. PROJECT #: WTWOC FUND: WATER CAPITAL PROJECTS PROJECT BUDGET: $1,355,000 PROJECT FUNDING MANAGER: TBD SOURCES: Utility Revenue Bonds Replacement of water lines in area bounded by Haines, Southwest Parkway, Glade, and Langford. These lines were identified by the Freese & Nichols Southside Water Study (July 2003). Council Award of Engineering Contract: Fall 2006 Council Award of Construction Contract: Spring 2007 FISCAL YEAR LAND ENG. CONSTR. MISC. PROJECT TOTAL Prior Years $0 2004-05 $0 2005-06 $0 2006-07 100,000 615,000 $715,000 2007-08 25,000 615,000 $640,000 2008-09 $0 2009-10 $0 2010-11 $0 TOTAL $0 $125,000 $1,230,000 $0 $1,355,000 Total Personnel $0 Supplies $0 Service $0 Capital $0 TOTAL $0 PROJECT DESCRIPTION/STATUS PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR OPERATING COSTS First Fiscal Year Annually $0 $0 238 WORK ORDER #: TBD PROJECT: SOUTHWOOD 5-7 WATER REHAB PROJECT #: WTWOC FUND: WATER CAPITAL PROJECTS PROJECT BUDGET: $1,185,000 PROJECT FUNDING MANAGER: TBD SOURCES: Utility Revenue Bonds Replacement of water lines in area bounded by Southwest Parkway, Harvey Mitchell, Welsh, and Shadowood. These lines were identified by the Freese & Nichols Southside Water Study (July 2003). Council Award of Engineering Contract: Fall 2007 Council Award of Construction Contract: Spring 2008 FISCAL YEAR LAND ENG. CONSTR. MISC. PROJECT TOTAL Prior Years $0 2004-05 $0 2005-06 $0 2006-07 $0 2007-08 88,000 537,000 $625,000 2008-09 22,000 538,000 $560,000 2009-10 $0 2010-11 $0 TOTAL $0 $110,000 $1,075,000 $0 $1,185,000 Total Personnel $0 Supplies $0 Service $0 Capital $0 TOTAL $0 PROJECT DESCRIPTION/STATUS PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR OPERATING COSTS First Fiscal Year Annually $0 $0 239 WORK ORDER #: TBD PROJECT: McCULLOCH WATER REHAB PROJECT #: WTWOC FUND: WATER CAPITAL PROJECTS PROJECT BUDGET: $1,400,000 PROJECT FUNDING MANAGER: TBD SOURCES: Utility Revenue Bonds Replacement of water lines in area bounded by Holleman, Wellborn, Nevada, and Welsh. These lines were identified by the Freese & Nichols Southside Water Study (July 2003). Council Award of Engineering Contract: Fall 2008 Council Award of Construction Contract: Spring 2009 FISCAL YEAR LAND ENG. CONSTR. MISC. PROJECT TOTAL Prior Years $0 2004-05 $0 2005-06 $0 2006-07 $0 2007-08 $0 2008-09 100,000 637,000 $737,000 2009-10 25,000 638,000 $663,000 2010-11 $0 TOTAL $0 $125,000 $1,275,000 $0 $1,400,000 Total Personnel $0 Supplies $0 Service $0 Capital $0 TOTAL $0$0 $0 PROJECT DESCRIPTION/STATUS PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR OPERATING COSTS First Fiscal Year Annually 240 WORK ORDER #: TBD PROJECT: THE KNOLL PROJECT #: WTWOC FUND: WATER CAPITAL PROJECTS PROJECT BUDGET: $1,170,000 PROJECT FUNDING MANAGER: TBD SOURCES: Utility Revenue Bonds Replacement of water lines in area bounded by Haines, Glade, Holleman, and Taurus. These lines were identified by the Freese & Nichols Southside Water Study (July 2003). Council Award of Engineering Contract: Fall 2009 Council Award of Construction Contract: Spring 2010 FISCAL YEAR LAND ENG. CONSTR. MISC. PROJECT TOTAL Prior Years $0 2004-05 $0 2005-06 $0 2006-07 $0 2007-08 $0 2008-09 $0 2009-10 85,000 532,000 $617,000 2010-11 21,000 532,000 $553,000 TOTAL $0 $106,000 $1,064,000 $0 $1,170,000 Total Personnel $0 Supplies $0 Service $0 Capital $0 TOTAL $0 PROJECT DESCRIPTION/STATUS PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR OPERATING COSTS First Fiscal Year Annually $0 $0 241 HEART OF THE RESEARCH VALLEY 242 WWAASSTTEEWWAATTEERR SSEERRVVIICCEE CCAAPPIITTAALL IIMMPPRROOVVEEMMEENNTT PPRROOJJEECCTTSS FFIISSCCAALL YYEEAARR 22000055--22000066 TTHHRROOUUGGHH FFIISSCCAALL YYEEAARR 22001100--22001111 243 WASTEWATER SERVICE CAPITAL IMPROVEMENT PROJECTS FISCAL YEAR 2005-2006 THROUGH FISCAL YEAR 2010-2011 REVISED PROJECT REVISED TOTAL PROJECT WORK REQUEST BUDGET ACTUAL FY 04-05 BUDGET ESTIMATE NUMBER NUMBER AMOUNT FY 03-04 APPROPRIATIONS FY 04-05 BEGINNING FUND BALANCE:4,666,907$ 6,894,736$ 6,894,736$ ADDITIONAL RESOURCES: UTILITY REVENUE BONDS 4,000,000$ 0$ 0$ INTEREST ON INVESTMENTS 178,001 85,000 85,000 INTRAGOVERNMENTAL TRANSFERS 0 2,000,000 2,000,000 INTERGOVERNMENTAL TRANSFERS 0 200,000 0 OTHER 000 SUBTOTAL ADDITIONAL RESOURCES 4,178,001$ 2,285,000$ 2,085,000$ TOTAL RESOURCES AVAILABLE 8,844,908$ 9,179,736$ 8,979,736$ COLLECTION PROJECTS COLLECTION PLANT - SCWOC OVERSIZE PARTICIPATION & PLANNING - WF0464783 ANNUAL $0 $250,000 $245,000 EDELWEISS GARTENS PH 5 - WF0473056 35,481 35,481 0 0 REATTA SUBDIVISION SEWER OP - WF0473164 207,676 207,676 0 0 SOUTHERN TRACE OP - WF0578968 4,459 0 0 4,460 WESTSIDE SEWER SERVICE SS9702 TBD 678,835 0 0 0 NORTHEAST TRUNK EXPAN. PHASE I SS9805 WF0351744 715,500 5,859 0 0 DARTMOUTH PHII - WF0350773 50,000 0 0 0 JONES-BUTLER WASTEWATER EXTENSION - TBD 33,000 0 0 0 GEORGE BUSH DR EAST WIDENING ST9804 WF0390568 16,879 12,868 0 0 NANTUCKET SEWER - TBD 111,000 0 0 111,000 STEEPLECHASE IMPACT FEE - WF0354517 1,005,540 91,082 0 462,000 LIFT STATION #1 GRAVITY LINE - WF0401835 372,581 18,081 0 354,500 LICK CREEK IMPACT FEE LINE - TBD 1,144,000 0 0 0 LICK CREEK PARALLEL TRUNK LINE - TBD 3,000,000 0 0 0 RAYMOND STOTZER WEST - TBD 1,978,000 0 0 0 SPRING CREEK CORPORATE CAMPUS - WF0622503 1,100,000 0 50,000 100,000 WESTMINSTER - TBD 225,000 0 0 0 ANNEXATION PROJECTS GREENS PR. W. OF ARRINGTON (AREA 2) - WF0395480 363,666 24,666 0 112,000 NANTUCKET E. OF HARPER'S FERRY (AREA 3) - WF0395488 518,205 24,666 0 213,539 ROCK P RD S OF CARTER LAKE (AREA 5) - TBD 207,000 0 0 0 GREENS PR. RD CORRIDOR EAST (AREA 6) - TBD 438,000 0 0 0 SUBTOTAL 420,379$ 300,000$ 1,602,499$ REHABILITATION PROJECTS: COLLECTION SYSTEM REHAB - WF0464772 ANNUAL 0$ 235,000$ 115,000$ EMERALD PKWY / BENT OAK - WF0626151 150,000 0 0 20,000 LIFT STATION #3 REHAB - WF0383012 116,180 16,180 0 100,000 WOLF PEN CREEK ICE RINK - WF0579999 119,580 119,580 0 0 UNIVERSITY DRIVE (NEAR LINCOLN) - WF0459136 81,576 78,914 0 0 BARRON ROAD REHAB - WF0654332 250,000 0 0 0 CARTERS CREEK SCREW LIFT SYSTEM - WF0376687 1,391,410 318,876 333,960 550,000 CHURCH STREET REHAB - PHASE II - WF0632257 85,000 0 0 0 FIRST & MAPLE STREETS REHAB SS0212 WF0351778 127,814 121,881 0 240 HENSEL PARK LIFT STATION SS0203 WF0354063 374,740 182 0 0 244 WASTEWATER SERVICE CAPITAL IMPROVEMENT PROJECTS FISCAL YEAR 2005-2006 THROUGH FISCAL YEAR 2010-2011 APPROVED FY 05-06 BUDGET PROJECTED PROJECTED PROJECTED PROJECTED PROJECTED PROJECTED APPROPRIATIONS FY 05-06 FY 06-07 FY 07-08 FY 08-09 FY 09-10 FY 10-11 3,127,332$ 3,127,332$ 710,704$ 650,454$ 563,954$ 688,279$ 880,279$ 3,000,000$ 3,000,000$ 6,800,000$ 3,150,000$ 750,000$ 500,000$ 0$ 38,000 38,000 14,000 13,000 14,000 17,000 16,000 2,000,000 2,000,000 1,500,000 1,500,000 1,500,000 1,500,000 1,500,000 0 0 0 0 0 500,000 0 0000000 5,038,000$ 5,038,000$ 8,314,000$ 4,663,000$ 2,264,000$ 2,517,000$ 1,516,000$ 8,165,332$ 8,165,332$ 9,024,704$ 5,313,454$ 2,827,954$ 3,205,279$ 2,396,279$ $250,000 $250,000 $250,000 $250,000 $250,000 $250,000 $250,000 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 468,000 0 0 0 0 0 0 50,000 0 0 0 0 0 500 33,000 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 445,000 0 0 0 0 0 0 0 0 0 0 0 0 144,000 144,000 1,000,000 0 0 0 0 250,000 250,000 1,000,000 1,750,000 0 0 0 398,000 398,000 1,580,000 0 0 0 0 117,000 117,000 0 883,000 0 0 0 75,000 75,000 150,000 0 0 0 0 3,666 227,000 0 0 0 0 0 280,000 280,000 0 0 0 0 0 21,000 21,000 186,000 0 0 0 0 38,000 38,000 400,000 0 0 0 0 1,577,166$ 2,796,000$ 4,566,000$ 2,883,000$ 250,000$ 250,000$ 250,000$ 235,000$ 235,000$ 235,000$ 235,000$ 235,000$ 235,000$ 235,000$ 130,000 130,000 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100,000 100,000 75,000 75,000 0 0 0 103,530 500,000 0 0 0 0 0 10,000 10,000 75,000 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 245 WASTEWATER SERVICE CAPITAL IMPROVEMENT PROJECTS FISCAL YEAR 2005-2006 THROUGH FISCAL YEAR 2010-2011 REVISED PROJECT REVISED TOTAL PROJECT WORK REQUEST BUDGET ACTUAL FY 04-05 BUDGET ESTIMATE NUMBER NUMBER AMOUNT FY 03-04 APPROPRIATIONS FY 04-05 LIFT STATION #2 FORCEMAIN REALIGNMENT -WF0467634 380,979 44,479 0 156,500 TEXAS AVE. RELOCATION SOUTH SS0003 WF0351341 1,300,000 20,246 54,000 940,000 TAUBER & STASNEY REHAB - WF0625893 120,000 0 0 5,000 SOUTHSIDE SEWER UPGRADE A - WF0379010 138,184 127,492 0 4,633 WEST PARK - WF0427245 1,500,000 19,394 0 386,606 COLLEGE PARK/BREEZY HEIGHTS - WF0595926 1,305,000 0 0 81,500 SOUTH KNOLL / THE GLADE - TBD 955,000 0 0 0 SOUTHWOOD 5-7 - TBD 1,410,000 0 0 0 McCULLOCH - TBD 1,160,000 0 0 0 THE KNOLL TBD 1,300,000 0 0 0 SUBTOTAL 867,224$ 622,960$ 2,359,479$ TREATMENT & DISPOSAL PROJECTS TREATMENT & DISPOSAL/PUMPING PLANT - SPWOC LICK CREEK PLANT EXPANSION SS9806 WF0355780 10,861,994$ 23,739 0$ 5,000$ CARTERS CREEK PLANT #1 DEMO - WF0450931 53,084 52,706 0 0 ODOR CONTROL SS9810 WF0354125 1,584,486 12,016 0 12,000 2005 ODOR CONTROL IMPROVEMENTS - WF0620950 800,000 0 0 250,000 CARTERS CREEK UV IMPROVEMENTS - WF0585450 715,000 0 0 165,000 EMERGENCY ELECTRIC POWER - WF0499611 471,926 16,251 0 150,500 WWTP EQUIPMENT REHABILITATION - TBD ANNUAL 0 50,000 120,000 SLUDGE TREATMENT & DISPOSAL/PUMPING PLANT - SSWOC SLUDGE PROCESSING IMPROVEMENTS SS9803 WF0363214 1,921,393 24,374 570,700 339,700 COLLEGE STATION SLUDGE FACILITY - TBD 1,350,000 0 0 0 SEWER GENERAL PLANT - SGWOC MATERIAL STAGING STORAGE AREA - USC - WF0518324 57,883 3,983 0 53,900 WASTEWATER PLANT SECURITY - WF0466416 247,259 71,431 0 127,000 CCWWTP PAVEMENT/REPAIRS IMP - WF0567890 585,778 5,778 227,000 580,000 CARTERS CREEK MAINTENANCE BLDG - TBD 200,000 0 0 0 SCADA REPLACEMENT - TBD 291,500 0 0 0 SUBTOTAL 210,278$ 847,700$ 1,803,100$ CLOSED PROJECTS 0 GENERAL AND ADMINISTRATIVE 87,326 87,326 DEBT ISSUANCE COST 0 0 TOTAL EXPENDITURES 30,688,430$ 1,497,881$ 1,857,986$ 5,852,404$ GAAP ADJUSTMENT (452,291)$ ENDING FUND BALANCE:6,894,736$ 7,321,750$ 3,127,332$ 246 WASTEWATER SERVICE CAPITAL IMPROVEMENT PROJECTS FISCAL YEAR 2005-2006 THROUGH FISCAL YEAR 2010-2011 APPROVED FY 05-06 BUDGET PROJECTED PROJECTED PROJECTED PROJECTED PROJECTED PROJECTED APPROPRIATIONS FY 05-06 FY 06-07 FY 07-08 FY 08-09 FY 09-10 FY 10-11 80,979 180,000 0 0 0 0 0 0 268,948 0 0 0 0 0 65,000 65,000 50,000 0 0 0 0 0 0 0 0 0 0 0 0 1,094,000 0 0 0 0 0 27,250 27,250 1,196,250 0 0 0 0 0 0 504,000 451,000 0 0 0 0 0 0 744,000 666,000 0 0 0 0 0 0 611,000 549,000 0 0 0 0 0 0 686,000 614,000 751,759$ 2,610,198$ 2,135,250$ 1,505,000$ 1,512,000$ 1,470,000$ 849,000$ 0$ 0$ 0$ 0$ 0$ 0$ 0$ 0 0 0 0 0 0 0 0 0 0 0 0 0 0 450,000 450,000 100,000 0 0 0 0 450,000 450,000 100,000 0 0 0 0 11,751 60,000 0 0 245,175 0 0 100,000 100,000 50,000 50,000 50,000 50,000 50,000 0 652,000 820,000 0 0 0 0 50,000 50,000 150,000 150,000 0 500,000 500,000 0 0 0 0 0 0 0 32,000 32,000 0 0 0 0 0 0 0 0 0 0 0 0 0 25,000 175,000 0 0 0 0 126,500 126,500 110,000 55,000 0 0 0 1,220,251$ 1,945,500$ 1,505,000$ 255,000$ 295,175$ 550,000$ 550,000$ 0 0 0 0 0 0 0 72,930 72,930 100,000 75,000 75,000 50,000 50,000 30,000 30,000 68,000 31,500 7,500 5,000 0 3,652,106$ 7,454,628$ 8,374,250$ 4,749,500$ 2,139,675$ 2,325,000$ 1,699,000$ 4,513,226$ 710,704$ 650,454$ 563,954$ 688,279$ 880,279$ 697,279$ 247 CCOOLLLLEECCTTIIOONN PPRROOJJEECCTTSS 248 WORK ORDER #: WF0464783 PROJECT: OVERSIZE WASTEWATER LINES PROJECT #: SCWOC FUND: WASTEWATER CAPITAL PROJECTS PROJECT BUDGET:ANNUAL PROJECT FUNDING MANAGER: ED SAVAGE SOURCES: Utility Revenue Bonds These funds are available for oversize participation with developers in the construction of sewer lines above the minimum size needed to serve the development. This allows lines to be built large enough to meet future development without having to go back and install larger lines. Projects are identified based on development activity. Total OP annual funding $250,000. Projects funded from OP FY 04-05: Year to date remaining balance available: $245,540.00 Southern Trace OP $4,460.00 WF0578968 Total OP annual funding $250,000. Projects funded from OP FY 03-04: Edelweiss Gartens Phase 5 $33,199.50 WF0473056 Reatta Subdivision (Spring Creek Line Ext) $194,090.00 WF0473164 FISCAL YEAR LAND ENG. CONSTR. MISC. PROJECT TOTAL Prior Years 105,000 430,000 15,000 $550,000 2004-05 50,000 195,000 5,000 $250,000 2005-06 50,000 195,000 5,000 $250,000 2006-07 50,000 195,000 5,000 $250,000 2007-08 50,000 195,000 5,000 $250,000 2008-09 50,000 195,000 5,000 $250,000 2009-10 50,000 195,000 5,000 $250,000 2010-11 50,000 195,000 5,000 $250,000 TOTAL $0 $455,000 $1,795,000 $50,000 $2,300,000 Total Personnel $0 Supplies $0 Service $0 Capital $0 TOTAL $0$0 $0 PROJECT DESCRIPTION PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR OPERATING COSTS First Fiscal Year Annually 249 PROJECT: WESTSIDE SEWER SERVICE PROJECT #: SS9702 FUND: WASTEWATER CAPITAL PROJECTS PROJECT BUDGET: $678,835 PROJECT FUNDING MANAGER:ED SAVAGE SOURCES: Utility Revenue Bonds Due to annexation, development, and expected future development, wastewater services were necessary. They did not exist west of FM 2818. Phase I - includes the construction of the Luther Street Lift Station completed in 2002. Phase II - new Raymond Stotzer West Project. PROJECT COMPLETE FY 2004 EXPENSES = $0 FISCAL YEAR LAND ENG. CONSTR. MISC. PROJECT TOTAL Prior Years $66,835 $593,000 $19,000 $678,835 2004-05 $0 2005-06 $0 2006-07 $0 2007-08 $0 2008-09 $0 2009-10 $0 2010-11 $0 TOTAL $0 $66,835 $593,000 $19,000 $678,835 Total Personnel $0 Supplies $0 Service $0 Capital $0 TOTAL $0$0 $0 PROJECT DESCRIPTION PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR OPERATING COSTS First Fiscal Year Annually 250 WORK ORDER #: WF0351744 PROJECT: NORTHEAST TRUNK EXPANSION PROJECT #: SS9805 FUND: WASTEWATER CAPITAL PROJECTS PROJECT BUDGET: $715,500 PROJECT FUNDING Utility Revenue Bonds MANAGER:EDWARD McDONALD SOURCES: Replacement of sewer section crossing SH 6 near FM 60 interchange. FISCAL YEAR LAND ENG. CONSTR. MISC. PROJECT TOTAL Prior Years 19,137 49,062 168,897 10,404 $247,500 2004-05 $0 2005-06 468,000 $468,000 2006-07 $0 2007-08 $0 2008-09 $0 2009-10 $0 2010-11 $0 TOTAL $19,137 $49,062 $636,897 $10,404 $715,500 Total Personnel $0 Supplies $0 Service $0 Capital $0 TOTAL $0$0 $0 PROJECT DESCRIPTION PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR OPERATING COSTS First Fiscal Year Annually 251 WORK ORDER #: WF0350773 PROJECT: DARTMOUTH DR. WW EXT. PH II PROJECT #: SCWOC FUND: WASTEWATER CAPITAL PROJECTS PROJECT BUDGET: $50,000 PROJECT FUNDING MANAGER:DONALD E. HARMON JR.SOURCES: Utility Revenue Bonds Dartmouth Drive will be extended from Krenek Tap Road to Harvey Mitchell Parkway (FM 2818). It will be necessary to replace three 100 linear feet crossings along Dartmouth Drive. (one 15", one 24", and one 30" crossings) This project will be coordinated with Streets Project ST0211. FISCAL YEAR LAND ENG. CONSTR. MISC. PROJECT TOTAL Prior Years $0 2004-05 $0 2005-06 5,000 45,000 $50,000 2006-07 $0 2007-08 $0 2008-09 $0 2009-10 $0 2010-11 $0 TOTAL $0 $5,000 $45,000 $0 $50,000 Total Personnel $0 Supplies $0 Service $0 Capital $0 TOTAL $0 PROJECT DESCRIPTION PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR OPERATING COSTS First Fiscal Year Annually $0 $0 252 WORK ORDER #: TBD PROJECT: JONES-BUTLER RD. WW EXT. PH. II PROJECT #: SCWOC FUND: WASTEWATER CAPITAL PROJECTS PROJECT BUDGET: $33,000 PROJECT FUNDING MANAGER:DANIELLE CHARBONNET SOURCES: Utility Revenue Bonds Jones-Butler Road would be extended from Holleman Drive to intersect with FM 2818. It will be necessary to replace three 100 linear feet crossings along Jones-Butler Road. (two 8" crossings and one 15" crossing) This project will be coordinated with Streets Project ST0005 which is needed to provide a north-south route paralleling Wellborn Road. FISCAL YEAR LAND ENG. CONSTR. MISC. PROJECT TOTAL Prior Years $0 2004-05 $0 2005-06 3,000 30,000 $33,000 2006-07 $0 2007-08 $0 2008-09 $0 2009-10 $0 2010-11 $0 TOTAL $0 $3,000 $30,000 $0 $33,000 Total Personnel $0 Supplies $0 Service $0 Capital $0 TOTAL $0 PROJECT DESCRIPTION PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR OPERATING COSTS First Fiscal Year Annually $0 $0 253 WORK ORDER #: WF0390568 PROJECT: GEORGE BUSH E. WASTEWATER PROJECT #: ST9804 FUND: WASTEWATER CAPITAL PROJECTS PROJECT BUDGET: $16,879 PROJECT FUNDING MANAGER:DONALD E. HARMON JR.SOURCES: Utility Revenue Bonds George Bush Drive East was widened from Texas Avenue to Dominik Drive. Adjust sewer manholes to grade and new service leads. Coordinated with Streets Project ST9804. PROJECT COMPLETED IN FY 2004 FISCAL YEAR LAND ENG. CONSTR. MISC. PROJECT TOTAL Prior Years 3,241 0 13,638 0 $16,879 2004-05 $0 2005-06 $0 2006-07 $0 2007-08 $0 2008-09 $0 2009-10 $0 2010-11 $0 TOTAL $3,241 $0 $13,638 $0 $16,879 Total Personnel $0 Supplies $0 Service $0 Capital $0 TOTAL $0$0 $0 PROJECT DESCRIPTION PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR OPERATING COSTS First Fiscal Year Annually 254 WORK ORDER #: TBD PROJECT: NANTUCKET SEWER PROJECT #: SCWOC FUND: WASTEWATER CAPITAL PROJECTS PROJECT BUDGET: $111,000 PROJECT FUNDING MANAGER:KARL GOLDAPP SOURCES: Utility Revenue Bonds The Nantucket Wastewater Treatment Plant service area was annexed in 2002. The City needs to purchase the collection system, lift station, and potentially the package plant in order to serve the individual households presently connected to the treatment plant. FISCAL YEAR LAND ENG. CONSTR. MISC. PROJECT TOTAL Prior Years $0 2004-05 111,000 $111,000 2005-06 $0 2006-07 $0 2007-08 $0 2008-09 $0 2009-10 $0 2010-11 $0 TOTAL $0 $0 $111,000 $0 $111,000 Total Personnel $0 Supplies $0 Service $0 Capital $0 TOTAL $0 PROJECT DESCRIPTION PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR OPERATING COSTS First Fiscal Year Annually $0 $0 255 WORK ORDER #: WF0354517 PROJECT: STEEPLECHASE IMPACT FEE PROJECT #: SCWOC FUND: WASTEWATER CAPITAL PROJECTS PROJECT BUDGET: $1,005,540 PROJECT FUNDING MANAGER: SPENCER THOMPSON SOURCES: Utility Revenue Bonds Installation of gravity wastewater line across Wellborn Road and along Old Wellborn Road to serve Rock Prairie Road West and Jones-Butler areas. FY04-05 transferred $230,000 to Texas Avenue Relocation - WF0351341. FISCAL YEAR LAND ENG. CONSTR. MISC. PROJECT TOTAL Prior Years 98,540 $98,540 2004-05 50,000 30,000 382,000 $462,000 2005-06 20,000 25,000 400,000 $445,000 2006-07 $0 2007-08 $0 2008-09 $0 2009-10 $0 2010-11 $0 TOTAL $70,000 $153,540 $782,000 $0 $1,005,540 Total Personnel $0 Supplies $0 Service $0 Capital $0 TOTAL $0 PROJECT DESCRIPTION PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR OPERATING COSTS First Fiscal Year Annually $0 $0 256 WORK ORDER #: WF0401835 PROJECT: LIFT STATION #1 GRAVITY LINE PROJECT #: SCWOC FUND: WASTEWATER CAPITAL PROJECTS PROJECT BUDGET: $372,581 PROJECT FUNDING MANAGER:SPENCER THOMPSON SOURCES: Utility Revenue Bonds Installation of 18" gravity sewer line from Lift Station #1 to Spring Creek Sewer in order to take Lift Station #1 out of service. In conjuction with Lift Station #2. FISCAL YEAR LAND ENG. CONSTR. MISC. PROJECT TOTAL Prior Years 14,258 17 3,806 $18,081 2004-05 26,500 40,000 288,000 $354,500 2005-06 $0 2006-07 $0 2007-08 $0 2008-09 $0 2009-10 $0 2010-11 $0 TOTAL $40,758 $40,017 $291,806 $0 $372,581 Total Personnel $0 Supplies $0 Service $0 Capital $0 TOTAL $0$0 $0 PROJECT DESCRIPTION PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR OPERATING COSTS First Fiscal Year Annually 257 WORK ORDER #: TBD PROJECT: LICK CREEK IMPACT FEE LINE PROJECT #: SCWOC FUND: WASTEWATER CAPITAL PROJECTS PROJECT BUDGET: $1,144,000 PROJECT FUNDING MANAGER: SPENCER THOMPSON SOURCES: Utility Revenue Bonds Installation of wastewater lines in area bounded by Rock Prairie Road, Greens Prairie Road, and SH 6. The Lick Creek Corporate Campus is also slated for funds for this line. FISCAL YEAR LAND ENG. CONSTR. MISC. PROJECT TOTAL Prior Years $0 2004-05 $0 2005-06 144,000 $144,000 2006-07 1,000,000 $1,000,000 2007-08 $0 2008-09 $0 2009-10 $0 2010-11 $0 TOTAL $0 $144,000 $1,000,000 $0 $0 $1,144,000 Total Personnel $0 Supplies $0 Service $0 Capital $0 TOTAL $0 PROJECT DESCRIPTION/STATUS PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR OPERATING COSTS First Fiscal Year Annually $0 $0 258 WORK ORDER #: TBD PROJECT: LICK CREEK PARALLEL TRUNKLINE PROJECT #: SCWOC FUND: WASTEWATER CAPITAL PROJECTS PROJECT BUDGET: $3,000,000 PROJECT FUNDING MANAGER:SPENCER THOMPSON SOURCES: Utility Revenue Bonds Installation of parallel trunkline from Greens Prairie Road to Lick Creek Wastewater Treatment Plant. Possible design to increase pipe size from 18" up to 27". FISCAL YEAR LAND ENG. CONSTR. MISC. PROJECT TOTAL Prior Years $0 2004-05 $0 2005-06 250,000 $250,000 2006-07 1,000,000 $1,000,000 2007-08 1,750,000 $1,750,000 2008-09 $0 2009-10 $0 2010-11 $0 TOTAL $0 $250,000 $2,750,000 $0 $3,000,000 Total Personnel $0 Supplies $0 Service $0 Capital $0 TOTAL $0 PROJECT DESCRIPTION PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR OPERATING COSTS First Fiscal Year Annually $0 $0 259 WORK ORDER #: TBD PROJECT: RAYMOND STOTZER WEST SERVICE PROJECT #: SCWOC FUND: WASTEWATER CAPITAL PROJECTS PROJECT BUDGET: $1,978,000 PROJECT FUNDING MANAGER:ED SAVAGE SOURCES: Utility Revenue Bonds This project is designated for a future lift station near the airport. Due to annexation, development, and expected future development, wastewater services are necessary. They do not currently exist west of FM 2818. "Westside Sewer Service", Project SS9702 was Phase I, which included the construction of the Luther Street Lift Station, completed in 2002. FISCAL YEAR LAND ENG. CONSTR. MISC. PROJECT TOTAL Prior Years $0 2004-05 $0 2005-06 183,000 215,000 $398,000 2006-07 1,580,000 $1,580,000 2007-08 $0 2008-09 $0 2009-10 $0 2010-11 $0 TOTAL $183,000 $215,000 $1,580,000 $0 $1,978,000 Total Personnel $0 Supplies $0 Service $0 Capital $0 TOTAL $0 PROJECT DESCRIPTION PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR OPERATING COSTS First Fiscal Year Annually $0 $0 260 WORK ORDER #: WF0622503 PROJECT: SPRING CREEK CORPORATE CAMPUS PROJECT #: SCWOC FUND: WASTEWATER CAPITAL PROJECTS PROJECT BUDGET: $1,100,000 PROJECT FUNDING MANAGER:DONALD E. HARMON JR.SOURCES: Utility Revenue Bonds Installation of a 30" sanitary sewer line along Pebble Creek Parkway from Greens Prairie Road to Hwy 6. Installation of a 12" collection line for the Spring Creek Corporate Campus. FISCAL YEAR LAND ENG. CONSTR. MISC. PROJECT TOTAL Prior Years $0 2004-05 100,000 $100,000 2005-06 115,000 2,000 $117,000 2006-07 $0 2007-08 881,000 2,000 $883,000 2008-09 $0 2009-10 $0 2010-11 $0 TOTAL $0 $100,000 $996,000 $4,000 $1,100,000 Total Personnel $0 Supplies $0 Service $0 Capital $0 TOTAL $0$0 $0 PROJECT DESCRIPTION PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR OPERATING COSTS First Fiscal Year Annually 261 WORK ORDER #: TBD PROJECT: WESTMINSTER SEWER PROJECT #: SCWOC FUND: WASTEWATER CAPITAL PROJECTS PROJECT $225,000 BUDGET: PROJECT FUNDING MANAGER:SPENCER THOMPSON SOURCES: Utility Revenue Bonds TxDOT will be widening Wellborn Road from FM 2818 down to near Barron Road. A gravity sewer line will be designed to serve properties along Wellborn Road and Barron Road. FISCAL YEAR LAND ENG. CONSTR. MISC. PROJECT TOTAL Prior Years $0 2004-05 $0 2005-06 50,000 25,000 $75,000 2006-07 150,000 $150,000 2007-08 $0 2008-09 $0 2009-10 $0 2010-11 $0 TOTAL $0 $50,000 $175,000 $0 $0 $225,000 Total Personnel $0 Supplies $0 Service $0 Capital $0 TOTAL $0 PROJECT DESCRIPTION/STATUS PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR OPERATING COSTS First Fiscal Year Annually $0 $0 262 WORK ORDER #: WF0395480 PROJECT: GREENS PRAIRIE RD W. OF ARRINGTON PROJECT #: SCWOC FUND: WASTEWATER CAPITAL PROJECTS PROJECT BUDGET: $363,666 PROJECT FUNDING MANAGER:SPENCER THOMPSON SOURCES: Utility Revenue Bonds Installation of wastewater lines to serve residents annexed in 2002. Installation of wastewater line from Arrington Road to Nantucket Drive. FISCAL YEAR LAND ENG. CONSTR. MISC. PROJECT TOTAL Prior Years 24,666 $24,666 2004-05 12,000 100,000 $112,000 2005-06 227,000 $227,000 2006-07 $0 2007-08 $0 2008-09 $0 2009-10 $0 2010-11 $0 TOTAL $0 $36,666 $327,000 $0 $363,666 Total Personnel $0 Supplies $0 Service $0 Capital $0 TOTAL $0 PROJECT DESCRIPTION PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR OPERATING COSTS First Fiscal Year Annually $0 $0 263 WORK NANTUCKET EAST OF ORDER #: WF0395488 PROJECT: HARPER'S FERRY PROJECT #: SCWOC FUND: WASTEWATER CAPITAL PROJECTS PROJECT BUDGET: $518,205 PROJECT FUNDING MANAGER:SPENCER THOMPSON SOURCES: Utility Revenue Bonds Installation of wastewater lines to serve residents annexed in 2002. Installation of 12" wastewater line along Nantucket Drive from SH 6 to Harper's Ferry. FISCAL YEAR LAND ENG. CONSTR. MISC. PROJECT TOTAL Prior Years 24,666 $24,666 2004-05 46,000 167,539 $213,539 2005-06 280,000 $280,000 2006-07 $0 2007-08 $0 2008-09 $0 2009-10 $0 2010-11 $0 TOTAL $0 $70,666 $447,539 $0 $518,205 Total Personnel $0 Supplies $0 Service $0 Capital $0 TOTAL $0$0 $0 PROJECT DESCRIPTION PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR OPERATING COSTS First Fiscal Year Annually 264 WORK ORDER #: TBD PROJECT: ROCK PRAIRIE S. OF CARTER LAKE PROJECT #: SCWOC FUND: WASTEWATER CAPITAL PROJECTS PROJECT BUDGET: $207,000 PROJECT FUNDING MANAGER:SPENCER THOMPSON SOURCES: Utility Revenue Bonds Installation of wastewater lines to serve residents annexed in 2002. Installation of 8" gravity line along Greens Prairie Road to Rock Prairie. FISCAL YEAR LAND ENG. CONSTR. MISC. PROJECT TOTAL Prior Years $0 2004-05 $0 2005-06 21,000 $21,000 2006-07 186,000 $186,000 2007-08 $0 2008-09 $0 2009-10 $0 2010-11 $0 TOTAL $0 $21,000 $186,000 $0 $207,000 Total Personnel $0 Supplies $0 Service $0 Capital $0 TOTAL $0 PROJECT DESCRIPTION PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR OPERATING COSTS First Fiscal Year Annually $0 $0 265 WORK ORDER #: TBD PROJECT: GREENS PRAIRIE RD. CORRIDOR E. PROJECT #: SCWOC FUND: WASTEWATER CAPITAL PROJECTS PROJECT BUDGET: $438,000 PROJECT FUNDING MANAGER:SPENCER THOMPSON SOURCES: Utility Revenue Bonds Installation of wastewater lines to serve residents annexed in 2002. Installation of lift station and 6" force main along Greens Prairie Road East. FISCAL YEAR LAND ENG. CONSTR. MISC. PROJECT TOTAL Prior Years $0 2004-05 $0 2005-06 38,000 $38,000 2006-07 400,000 $400,000 2007-08 $0 2008-09 $0 2009-10 $0 2010-11 $0 TOTAL $0 $38,000 $400,000 $0 $438,000 Total Personnel $0 Supplies $0 Service $0 Capital $0 TOTAL $0$0 $0 PROJECT DESCRIPTION PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR OPERATING COSTS First Fiscal Year Annually 266 RREEHHAABBIILLIITTAATTIIOONN PPRROOJJEECCTTSS 267 WORK ORDER #: WF0464772 PROJECT: COLLECTION SYSTEM REHABILITATION PROJECT #: SCWOC FUND: WASTEWATER CAPITAL PROJECTS PROJECT BUDGET:ANNUAL PROJECT FUNDING MANAGER: ED SAVAGE SOURCES: Utility Revenue Bonds These funds are for general rehabilitation of the wastewater collection system. Projects are identified on an annual basis. **Total CRS annual funding $285,000: Projects funded from CSR FY04-05 - WF0 Lift Station #3 Rehab $100,000 WF0383012 Bent Oak / Emerald Pkwy $20,000 WF0626151 Year to date remaining balance available: $115,000 **Total CRS annual funding $285,000: Projects funded from CSR FY03-04 - WF0464772: Wolf Pen Creek Ice Rink $150,000 WF0579999 Lift Station #3 Rehab $16,180 WF0383012 **Total CRS annual funding $285,000: Projects funded from CSR FY02-03 - WF0464115: University Drive (near Lincoln) $150,000 WF0459136 FISCAL YEAR LAND ENG. CONSTR. MISC. PROJECT TOTAL Prior Years 69,000 596,000 75,000 $740,000 2004-05 115,000 $115,000 2005-06 20,000 205,000 10,000 $235,000 2006-07 20,000 205,000 10,000 $235,000 2007-08 20,000 205,000 10,000 $235,000 2008-09 20,000 205,000 10,000 $235,000 2009-10 20,000 205,000 10,000 $235,000 2010-11 20,000 205,000 10,000 $235,000 TOTAL $0 $189,000 $1,941,000 $135,000 $2,265,000 Total Personnel $0 Supplies $0 Service $0 Capital $0 TOTAL $0 PROJECT DESCRIPTION PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR OPERATING COSTS First Fiscal Year Annually $0 $0 268 WORK ORDER #: WF0626151 PROJECT: EMERALD PARKWAY / BENT OAK PROJECT #: SCWOC FUND: WASTEWATER CAPITAL PROJECTS PROJECT BUDGET: $150,000 PROJECT FUNDING MANAGER:ED SAVAGE SOURCES: Utility Revenue Bonds New alignment of approximately 1,000' of 24" wastewater collection line will be installed to provide better flow hydraulics and will have sealed and bolted manholes. This construction will correct poor flow conveyance through the particular sewer segment and high levels of infiltration and inflow in the sewer basin upstream of the area. FY04-05 Funded $20,000 from Collection System Rehab FISCAL YEAR LAND ENG. CONSTR. MISC. PROJECT TOTAL Prior Years $0 2004-05 10,000 10,000 $20,000 2005-06 130,000 $130,000 2006-07 $0 2007-08 $0 2008-09 $0 2009-10 $0 2010-11 $0 TOTAL $10,000 $10,000 $130,000 $0 $0 $150,000 Total Personnel $0 Supplies $0 Service $0 Capital $0 TOTAL $0$0 $0 PROJECT DESCRIPTION/STATUS PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR OPERATING COSTS First Fiscal Year Annually 269 WORK ORDER #: WF0383012 PROJECT: LIFT STATION #3 REHAB PROJECT #: SCWOC FUND: WASTEWATER CAPITAL PROJECTS PROJECT BUDGET: $116,180 PROJECT FUNDING MANAGER:FRED SUROVIK SOURCES: Utility Revenue Bonds This project will rehabilitate deteriorated infrastructure and increase capacity to service a developing sewershed. FY04-05 funded $100,000 from Collection Rehab. FISCAL YEAR LAND ENG. CONSTR. MISC. PROJECT TOTAL Prior Years 16,180 $16,180 2004-05 100,000 $100,000 2005-06 $0 2006-07 $0 2007-08 $0 2008-09 $0 2009-10 $0 2010-11 $0 TOTAL $0 $0 $116,180 $0 $116,180 Total Personnel $0 Supplies $0 Service $0 Capital $0 TOTAL $0$0 $0 PROJECT DESCRIPTION PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR OPERATING COSTS First Fiscal Year Annually 270 WORK ORDER #: WF0579999 PROJECT: WOLF PEN ICE RINK PROJECT #: SCWOC FUND: WASTEWATER CAPITAL PROJECTS PROJECT BUDGET: $119,580 PROJECT ED SAVAGE FUNDING MANAGER:SOURCES: Utility Revenue Bonds Relocation of existing wastewater line located under the proposed ice rink. This project reimbursed developer for relocation of line as a result of Economic Development Agreement, approved by Council February 5, 2004. FY03-04 funded $150,000 from Collection System Rehab - WF0464772 PROJECT COMPLETE FISCAL YEAR LAND ENG. CONSTR. MISC. PROJECT TOTAL Prior Years 245 16,312 103,023 $119,580 2004-05 $0 2005-06 $0 2006-07 $0 2007-08 $0 2008-09 $0 2009-10 $0 2010-11 $0 TOTAL $245 $16,312 $103,023 $0 $0 $119,580 Total Personnel $0 Supplies $0 Service $0 Capital $0 TOTAL $0 PROJECT DESCRIPTION/STATUS PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR OPERATING COSTS First Fiscal Year Annually $0 $0 271 WORK ORDER #: WF0459136 PROJECT: UNIVERSITY DRIVE (NEAR LINCOLN)PROJECT #: WTWOC FUND: WASTEWATER CAPITAL PROJECTS PROJECT BUDGET: $81,576 PROJECT ED SAVAGE FUNDING MANAGER:SOURCES: Utility Revenue Bonds Upgraded two existing 8" wastewater lines to a 12" line to increase capacity. This project was authorized by Council on July 24, 2003 as an Ecomonic Development Project to support proposed University Village development. An impact study, conducted in 1998, has shown that there was inadequate sewer capacity in the system to support the new development as proposed. FY02-03 funded $150,000 from Collection System Rehab - WF0464115 FISCAL YEAR LAND ENG. CONSTR. MISC. PROJECT TOTAL Prior Years 2,902 78,674 $81,576 2004-05 $0 2005-06 $0 2006-07 $0 2007-08 $0 2008-09 $0 2009-10 $0 2010-11 $0 TOTAL $0 $2,902 $78,674 $0 $0 $81,576 Total Personnel $0 Supplies $0 Service $0 Capital $0 TOTAL $0$0 $0 PROJECT DESCRIPTION/STATUS PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR OPERATING COSTS First Fiscal Year Annually 272 WORK ORDER #: WF0654332 PROJECT: BARRON ROAD WASTEWATER REHAB PROJECT #: SCWOC FUND: WASTEWATER CAPITAL PROJECTS PROJECT BUDGET: $250,000 PROJECT FUNDING MANAGER:DONALD E. HARMON JR.SOURCES: Utility Revenue Bonds Barron Road will be upgraded from a two lane rural highway to a minor arterial road as reflected on the Thorough Plan. Wastewater lines and manholes will be relocated. This project will be coordinated with Streets Project #ST0409. FISCAL YEAR LAND ENG. CONSTR. MISC. PROJECT TOTAL Prior Years $0 2004-05 $0 2005-06 25,000 75,000 $100,000 2006-07 75,000 $75,000 2007-08 75,000 $75,000 2008-09 $0 2009-10 $0 2010-11 $0 TOTAL $0 $25,000 $225,000 $0 $250,000 Total Personnel $0 Supplies $0 Service $0 Capital $0 TOTAL $0 PROJECT DESCRIPTION/STATUS PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR OPERATING COSTS First Fiscal Year Annually $0 $0 273 WORK ORDER #: WF0376687 PROJECT: CARTERS CREEK SCREW LIFT SYSTEM PROJECT #: SCWOC FUND: WASTEWATER CAPITAL PROJECTS PROJECT BUDGET: $1,391,410 PROJECT FUNDING MANAGER:FRED SUROVIK SOURCES: Utility Revenue Bonds Provide funds for the replacement of Internaliff Screw Lift Pumps which have exceeded their economical life-cycle located before the Headworks of Carters Creek Wastewater Treatment Plant. Estimates for FY02-03 provide for the replacement of one (1) Screw Lift Pump. Two (2) pumps will be replaced in FY03-04 and FY04-05, and the final one (1) will be replaced in FY05-06. FISCAL YEAR LAND ENG. CONSTR. MISC. PROJECT TOTAL Prior Years 341,410 $341,410 2004-05 550,000 $550,000 2005-06 500,000 $500,000 2006-07 $0 2007-08 $0 2008-09 $0 2009-10 $0 2010-11 $0 TOTAL $0 $0 $1,391,410 $0 $1,391,410 Total Personnel $0 Supplies $0 Service $0 Capital $0 TOTAL $0 PROJECT DESCRIPTION PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR OPERATING COSTS First Fiscal Year Annually $0 $0 274 WORK CHURCH AVENUE REHABILITATION ORDER #: WF0632257 PROJECT: PHASE II PROJECT #: WTWOC FUND: WASTEWATER CAPITAL PROJECTS PROJECT BUDGET: $85,000 PROJECT FUNDING MANAGER:DONALD E. HARMON JR.SOURCES: Utility Revenue Bonds Wastewater lines along Church Avenue will be rehabilitated between College Main and Nagle. This project will be coordinated with Steets Project ST0523. FISCAL YEAR LAND ENG. CONSTR. MISC. PROJECT TOTAL Prior Years $0 2004-05 10,000 $10,000 2005-06 5,000 70,000 $75,000 2006-07 $0 2007-08 $0 2008-09 $0 2009-10 $0 2010-11 $0 TOTAL $0 $15,000 $70,000 $0 $0 $85,000 Total Personnel $0 Supplies $0 Service $0 Capital $0 TOTAL $0 PROJECT DESCRIPTION/STATUS PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR OPERATING COSTS First Fiscal Year Annually $0 $0 275 WORK ORDER #: WF0351778 PROJECT: FIRST AND MAPLE WASTEWATER LINES PROJECT #: SS0212 FUND: WASTEWATER CAPITAL PROJECTS PROJECT BUDGET: $127,814 PROJECT FUNDING MANAGER:LAURA HARRIS SOURCES: Utility Revenue Bonds Rehabilitation of wastewater lines for First and Maple Street due to the extreme deterioration of the collection lines. Also, included wastewater lines in Louise Street. This project was coordinated with Streets Project ST0201. PROJECT COMPLETE FISCAL YEAR LAND ENG. CONSTR. MISC. PROJECT TOTAL Prior Years 0 6,235 121,339 0 $127,574 2004-05 240 $240 2005-06 $0 2006-07 $0 2007-08 $0 2008-09 $0 2009-10 $0 2010-11 $0 TOTAL $0 $6,475 $121,339 $0 $127,814 Total Personnel $0 Supplies $0 Service $0 Capital $0 TOTAL $0 PROJECT DESCRIPTION PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR OPERATING COSTS First Fiscal Year Annually $0 $0 276 WORK ORDER #: WF0354063 PROJECT: HENSEL PARK LIFT STATION PROJECT #: SS0203 FUND: WASTEWATER CAPITAL PROJECTS PROJECT BUDGET: $374,740 PROJECT FUNDING MANAGER:FRED SUROVIK SOURCES: Utility Revenue Bonds Conversion of the existing lift station to submersible pumps. The lift station had exceeded its useful life and presented numerous maintenance and safety problems. PROJECT COMPLETE FISCAL YEAR LAND ENG. CONSTR. MISC. PROJECT TOTAL Prior Years 77,111 297,629 $374,740 2004-05 $0 2005-06 $0 2006-07 $0 2007-08 $0 2008-09 $0 2009-10 $0 2010-11 $0 TOTAL $0 $77,111 $297,629 $0 $374,740 Total Personnel $0 Supplies $0 Service $0 Capital $0 TOTAL $0 PROJECT DESCRIPTION PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR OPERATING COSTS First Fiscal Year Annually $0 $0 277 WORK ORDER #: WF0467634 PROJECT: LIFT STATION #2 FORCEMAIN PROJECT #: SCWOC FUND: WASTEWATER CAPITAL PROJECTS PROJECT BUDGET: $380,979 PROJECT FUNDING MANAGER:SPENCER THOMPSON SOURCES: Utility Revenue Bonds Installation of force main along SH 6 South Right of Way to Lift Station #1 gravity line. This redirect effort will divert flow to Lick Creek Wastewater Treatment Plant and provide capacity relief to Carters Creek Wastewater Treatment Plant. In conjuction with Lift Station #1 Project. FISCAL YEAR LAND ENG. CONSTR. MISC. PROJECT TOTAL Prior Years 44,479 0 $44,479 2004-05 6,500 150,000 $156,500 2005-06 180,000 $180,000 2006-07 $0 2007-08 $0 2008-09 $0 2009-10 $0 2010-11 $0 TOTAL $0 $50,979 $330,000 $0 $380,979 Total Personnel $0 Supplies $0 Service $0 Capital $0 TOTAL $0 PROJECT DESCRIPTION PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR OPERATING COSTS First Fiscal Year Annually $0 $0 278 WORK ORDER #: WF0351341 PROJECT: TX AVE. RELOCATION SOUTH PH II PROJECT #: SS0003 FUND: WASTEWATER CAPITAL PROJECTS PROJECT BUDGET: $1,300,000 PROJECT FUNDING MANAGER:DONALD E. HARMON JR.SOURCES: Utility Revenue Bonds Texas Avenue will be widened from Dominik to Harvey Mitchell Parkway. Sewer lines will need to be relocated into an easement outside of the right-of-way. Coordinated with Water Project WF0351282 (WT1012) FY04-05 Transferred $230,000 from Steeplechase Impact Fee Project - WF0354517. FISCAL YEAR LAND ENG. CONSTR. MISC. PROJECT TOTAL Prior Years 88,016 3,036 $91,052 2004-05 50,000 890,000 $940,000 2005-06 5,000 263,948 $268,948 2006-07 $0 2007-08 $0 2008-09 $0 2009-10 $0 2010-11 $0 TOTAL $0 $143,016 $1,156,984 $0 $1,300,000 Total Personnel $0 Supplies $0 Service $0 Capital $0 TOTAL $0$0 $0 PROJECT DESCRIPTION PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR OPERATING COSTS First Fiscal Year Annually 279 WORK ORDER #: WF0625893 PROJECT: TAUBER & STASNEY REHAB PROJECT #: SCWOC FUND: WASTEWATER CAPITAL PROJECTS PROJECT BUDGET: $120,000 PROJECT FUNDING MANAGER:EDWARD McDONALD SOURCES: Utility Revenue Bonds Wastewater line rehabilitation on Tauber and Stasney Streets from University Drive to Cherry Street. Replacement of existing wastewater lines with new 6" lines. FISCAL YEAR LAND ENG. CONSTR. MISC. PROJECT TOTAL Prior Years $0 2004-05 5,000 $5,000 2005-06 15,000 50,000 $65,000 2006-07 50,000 $50,000 2007-08 $0 2008-09 $0 2009-10 $0 2010-11 $0 TOTAL $0 $20,000 $100,000 $0 $0 $120,000 Total Personnel $0 Supplies $0 Service $0 Capital $0 TOTAL $0 PROJECT DESCRIPTION/STATUS PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR OPERATING COSTS First Fiscal Year Annually $0 $0 280 WORK ORDER #: WF0379010 PROJECT: SOUTHSIDE SEWER REHABILITATION A PROJECT #: SCWOC FUND: WASTEWATER CAPITAL PROJECTS PROJECT BUDGET: $138,184 PROJECT FUNDING MANAGER:LAURA HARRIS SOURCES: Utility Revenue Bonds Replacement of sewer in conjunction with the Southside Drainage System A Project bounded by Welsh, Guernsey, Fairview, and Luther. PROJECT COMPLETE FISCAL YEAR LAND ENG. CONSTR. MISC. PROJECT TOTAL Prior Years 6,163 127,388 $133,551 2004-05 59 4,574 $4,633 2005-06 $0 2006-07 $0 2007-08 $0 2008-09 $0 2009-10 $0 2010-11 $0 TOTAL $0 $6,222 $131,962 $0 $138,184 Total Personnel $0 Supplies $0 Service $0 Capital $0 TOTAL $0 PROJECT DESCRIPTION PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR OPERATING COSTS First Fiscal Year Annually $0 $0 281 WORK ORDER #: WF0427245 PROJECT: WEST PARK WASTEWATER REHAB.PROJECT #: SCWOC FUND: WASTEWATER CAPITAL PROJECTS PROJECT BUDGET: $1,500,000 PROJECT FUNDING MANAGER:TBD SOURCES: Utility Revenue Bonds Replacement of wastewater lines in area bounded by George Bush Drive, Luther Street, Wellborn Road, and Fairview Avenue. These lines were identified by the CDM Capacity/Infiltration/Inflow Management Project 2002-2003 Sanitary Sewer Evaluations (February 2004). April 2005 Status: In Design Council Award of Construction Contract: Summer 2005 FISCAL YEAR LAND ENG. CONSTR. MISC. PROJECT TOTAL Prior Years 19,394 $19,394 2004-05 86,606 300,000 $386,606 2005-06 5,000 1,089,000 $1,094,000 2006-07 $0 2007-08 $0 2008-09 $0 2009-10 $0 2010-11 $0 TOTAL $0 $111,000 $1,389,000 $0 $1,500,000 Total Personnel $0 Supplies $0 Service $0 Capital $0 TOTAL $0 PROJECT DESCRIPTION PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR OPERATING COSTS First Fiscal Year Annually $0 $0 282 WORK ORDER #: WF0595926 PROJECT: COLLEGE PARK/BREEZY HEIGHTS PROJECT #: SCWOC FUND: WASTEWATER CAPITAL PROJECTS PROJECT BUDGET: $1,305,000 PROJECT FUNDING MANAGER:TBD SOURCES: Utility Revenue Bonds Replacement of wastewater lines in area bounded by George Bush, Fairview, Eleanor, Holleman, and West Dexter. These lines were identified by the CDM Capacity/Infiltration/Inflow Management Project 2002-2003 Sanitary Sewer Evaluations (February 2004). April 2005 Status: In Design Council Award of Construction Contract: Spring 2006 FISCAL YEAR LAND ENG. CONSTR. MISC. PROJECT TOTAL Prior Years $0 2004-05 81,500 $81,500 2005-06 27,250 $27,250 2006-07 1,196,250 $1,196,250 2007-08 $0 2008-09 $0 2009-10 $0 2010-11 $0 TOTAL $0 $108,750 $1,196,250 $0 $1,305,000 Total Personnel $0 Supplies $0 Service $0 Capital $0 TOTAL $0$0 $0 PROJECT DESCRIPTION PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR OPERATING COSTS First Fiscal Year Annually 283 WORK ORDER #: TBD PROJECT: SOUTH KNOLL/THE GLADE REHAB.PROJECT #: SCWOC FUND: WASTEWATER CAPITAL PROJECTS PROJECT BUDGET: $955,000 PROJECT FUNDING MANAGER:TBD SOURCES: Utility Revenue Bonds Replacement of wastewater lines in area bounded by Haines, Southwest Parkway, Glade, and Langford. This is a section of the Southside area identified by the CDM Capacity/Infiltration/Inflow Management Project 2002-2003 Sanitary Sewer Evaluations. Council Award of Engineering Contract: Fall 2006 Council Award of Construction Contract: Spring 2007 FISCAL YEAR LAND ENG. CONSTR. MISC. PROJECT TOTAL Prior Years $0 2004-05 $0 2005-06 $0 2006-07 70,000 434,000 $504,000 2007-08 17,000 434,000 $451,000 2008-09 $0 2009-10 $0 2010-11 $0 TOTAL $0 $87,000 $868,000 $0 $955,000 Total Personnel $0 Supplies $0 Service $0 Capital $0 TOTAL $0$0 $0 PROJECT DESCRIPTION PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR OPERATING COSTS First Fiscal Year Annually 284 WORK ORDER #: TBD PROJECT: SOUTHWOOD 5-7 WASTEWATER REHAB PROJECT #: SCWOC FUND: WASTEWATER CAPITAL PROJECTS PROJECT BUDGET: $1,410,000 PROJECT FUNDING MANAGER: TBD SOURCES: Utility Revenue Bonds Replacement of wastewater lines in area bounded by Southwest Parkway, Harvey Mitchell, Welsh, and Shadowood. This is a section of the Southside area identified by the CDM Capacity/Infiltration/Inflow Management Project 2002-2003 Sanitary Sewer Evaluations. Council Award of Engineering Contract: Fall 2007 Council Award of Construction Contract: Spring 2008 FISCAL YEAR LAND ENG. CONSTR. MISC.PROJECT TOTAL Prior Years $0 2004-05 $0 2005-06 $0 2006-07 $0 2007-08 104,000 640,000 $744,000 2008-09 26,000 640,000 $666,000 2009-10 $0 2010-11 $0 TOTAL $0 $130,000 $1,280,000 $0 $1,410,000 Total Personnel $0 Supplies $0 Service $0 Capital $0 TOTAL $0$0 $0 PROJECT DESCRIPTION PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR OPERATING COSTS First Fiscal Year Annually 285 WORK ORDER #: TBD PROJECT: MCCULLOCH WASTEWATER REHAB.PROJECT #: SCWOC FUND: WASTEWATER CAPITAL PROJECTS PROJECT BUDGET: $1,160,000 PROJECT FUNDING MANAGER:TBD SOURCES: Utility Revenue Bonds Replacement of wastewater lines in area bounded by Holleman, Wellborn, Nevada, and Welsh. This is a section of the Southside area identified by the CDM Capacity/Infiltration/Inflow Management Project 2002-2003 Sanitary Sewer Evaluations. Council Award of Engineering Contract: Fall 2008 Council Award of Construction Contract: Fall 2009 FISCAL YEAR LAND ENG. CONSTR. MISC. PROJECT TOTAL Prior Years $0 2004-05 $0 2005-06 $0 2006-07 $0 2007-08 $0 2008-09 84,000 527,000 $611,000 2009-10 21,000 528,000 $549,000 2010-11 $0 TOTAL $0 $105,000 $1,055,000 $0 $1,160,000 Total Personnel $0 Supplies $0 Service $0 Capital $0 TOTAL $0$0 $0 PROJECT DESCRIPTION PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR OPERATING COSTS First Fiscal Year Annually 286 WORK ORDER #: TBD PROJECT: THE KNOLL PROJECT #: SCWOC FUND: WASTEWATER CAPITAL PROJECTS PROJECT BUDGET: $1,300,000 PROJECT FUNDING MANAGER:TBD SOURCES: Utility Revenue Bonds Replacement of wastewater lines in area bounded by Haines, Glade, Holleman, and Taurus. This is a section of the Southside area identified by RDII Phase II Sewer Study. Council Award of Engineering Contract: Fall 2009 Council Award of Construction Contract: Fall 2010 FISCAL YEAR LAND ENG. CONSTR. MISC. PROJECT TOTAL Prior Years $0 2004-05 $0 2005-06 $0 2006-07 $0 2007-08 $0 2008-09 $0 2009-10 95,000 591,000 $686,000 2010-11 23,000 591,000 $614,000 TOTAL $0 $118,000 $1,182,000 $0 $1,300,000 Total Personnel $0 Supplies $0 Service $0 Capital $0 TOTAL $0$0 $0 PROJECT DESCRIPTION PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR OPERATING COSTS First Fiscal Year Annually 287 TTRREEAATTMMEENNTT PPRROOJJEECCTTSS 288 WORK ORDER #: WF0355780 PROJECT: LICK CREEK WWTP EXPANSION PROJECT #: SS9806 FUND: WASTEWATER CAPITAL PROJECTS PROJECT BUDGET: $10,861,994 PROJECT FUNDING MANAGER: FRED SUROVIK SOURCES: Utility Revenue Bonds Expansion of the .5 MGD Lick Creek Wastewater Treatment Plant to a 2 MGD was necessary to meet State Federal requirements for treating flow. PROJECT COMPLETE FISCAL YEAR LAND ENG. CONSTR. MISC.PROJECT TOTAL Prior Years $626 $1,729,146 $9,108,357 $18,865 $10,856,994 2004-05 2,000 3,000 $5,000 2005-06 $0 2006-07 $0 2007-08 $0 2008-09 $0 2009-2010 $0 2010-11 $0 TOTAL $626 $1,731,146 $9,111,357 $18,865 $10,861,994 Total Personnel $0 Supplies $0 Service $0 Capital $0 TOTAL $0 PROJECT DESCRIPTION PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR OPERATING COSTS First Fiscal Year Annually $0 $0 289 WORK ORDER #: WF0450931 PROJECT: CCWWTP PLANT #1 DEMO PROJECT #: SPWOC FUND: WASTEWATER CAPITAL PROJECTS PROJECT BUDGET: $53,084 PROJECT FUNDING MANAGER:FRED SUROVIK SOURCES: Utility Revenue Bonds Demolition of abandoned treatment plant. Plant #1 was taken out of service in 1985 and had become an unattractive nuisance, deteriorated beyond repair, and poor land use. PROJECT COMPLETE FISCAL YEAR LAND ENG. CONSTR. MISC. PROJECT TOTAL Prior Years $53,084 $53,084 2004-05 $0 2005-06 $0 2006-07 $0 2007-08 $0 2008-09 $0 2009-10 $0 2010-11 $0 TOTAL $0 $0 $53,084 $0 $53,084 Total Personnel $0 Supplies $0 Service $0 Capital $0 TOTAL $0 PROJECT DESCRIPTION PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR OPERATING COSTS First Fiscal Year Annually $0 $0 290 WORK ORDER #: WF0354125 PROJECT: ODOR CONTROL PROJECT #: SS9810 FUND: WASTEWATER CAPITAL PROJECTS PROJECT BUDGET: $1,584,486 PROJECT FUNDING MANAGER:FRED SUROVIK SOURCES: Utility Revenue Bonds Engineering, design, and construction involving grounds and pavements improvements and installation of piping, odor-mitigating biofilter, electrical, instrumentation, and all appurtenant odor control equipment and systems. Project is justified on the need to mitigate wastewater treatment process odors offending residential neighborhoods near the Carters Creek Wastewater Treatment Plant. Construction of improvements to mitigate odors from 3 of 4 plant processes generating odors were completed in May 2001. Current construction contract provides improvements necessary to mitigate odors from the fourth and final plant process. PROJECT COMPLETE FISCAL YEAR LAND ENG. CONSTR. MISC. PROJECT TOTAL Prior Years 388,321 1,180,677 3,488 $1,572,486 2004-05 12,000 $12,000 2005-06 $0 2006-07 $0 2007-08 $0 2008-09 $0 2009-10 $0 2010-11 $0 TOTAL 0 400,321 1,180,677 3,488 $1,584,486 Total Personnel $0 Supplies $0 Service $0 Capital $0 TOTAL $0 PROJECT DESCRIPTION PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR OPERATING COSTS First Fiscal Year Annually $0 $0 291 WORK ORDER #: WF0620950 PROJECT: 2005 ODOR CONTROL PROJECT #: SSWOC FUND: WASTEWATER CAPITAL PROJECTS PROJECT BUDGET: $800,000 PROJECT FUNDING MANAGER:FRED SUROVIK SOURCES: Utility Revenue Bonds This project will reduce emissions from the most likely sources of off site odors. 1) Install upgraded aeration systems and covers on Digested Sludge Holding Tanks #1 and #2. 2) Address corrosion at the Thickner Building and Plant #3 blowers with improved exhaust treatments. 3) These improvements will be constructed concurrently with the Sludge Processing Improvements to reduce costs. This project is justified on the need to mitigate wastewater treatment process odors offending residential neighborhoods near the Carters Creek Wastewater Treatment Plant. FISCAL YEAR LAND ENG. CONSTR. MISC. PROJECT TOTAL Prior Years $0 2004-05 50,000 200,000 $250,000 2005-06 450,000 $450,000 2006-07 100,000 $100,000 2007-08 $0 2008-09 $0 2009-10 $0 2010-11 $0 TOTAL 0 50,000 750,000 0 $800,000 Total Personnel $0 Supplies $0 Service $0 Capital $0 TOTAL $0$0 $0 PROJECT DESCRIPTION PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR OPERATING COSTS First Fiscal Year Annually 292 WORK ORDER #: WF0585450 PROJECT: CARTERS CREEK UV IMPROVEMENTS PROJECT #: SPWOC FUND: WASTEWATER CAPITAL PROJECTS PROJECT BUDGET: $715,000 PROJECT FUNDING MANAGER:FRED SUROVIK SOURCES: Utility Revenue Bonds This project will determine the most effective improvements to replace the existing UV system and/or controls and install the selected improvements. This system has reached its service life and no longer meets TCEQ requirements. Ultra-violet lights are used for disinfecting the effluent from the wastewater treatment plant before being released into the waterways. FISCAL YEAR LAND ENG. CONSTR. MISC. PROJECT TOTAL Prior Years $0 2004-05 65,000 100,000 $165,000 2005-06 450,000 $450,000 2006-07 100,000 $100,000 2007-08 $0 2008-09 $0 2009-10 $0 2010-11 $0 TOTAL $0 $65,000 $650,000 $0 $0 $715,000 Total Personnel $0 Supplies $0 Service $0 Capital $0 TOTAL $0 PROJECT DESCRIPTION/STATUS PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR OPERATING COSTS First Fiscal Year Annually $0 $0 293 WORK ORDER #: WF0499611 PROJECT: EMERGENCY ELECTRIC POWER PROJECT #: SPWOC FUND: WASTEWATER CAPITAL PROJECTS PROJECT BUDGET: $471,926 PROJECT FUNDING MANAGER:FRED SUROVIK SOURCES: Utility Revenue Bonds Provide emergency electric power production equipment to ensure minimum essential wastewater collection and treatment services can be maintained in the event of a primary electric service blackout. Emergency electric power production capability will serve: Carters Creek Wastewater Treatment Plant (Interchangeable with Water Production emergency equipment for Dowling Road and Sandy Point Pump Stations). City currently unable to satisfy community's wastewater collection and treatment demand during periods of electric system blackout. February 26, 2004 Engineering Contract #04-062 approved by Council, Item #11.7 FISCAL YEAR LAND ENG. CONSTR. MISC. PROJECT TOTAL Prior Years 16,153 98 $16,251 2004-05 50,000 100,500 $150,500 2005-06 60,000 $60,000 2006-07 $0 2007-08 $0 2008-09 245,175 $245,175 2009-10 $0 2010-11 $0 TOTAL $0 $66,153 $405,773 $0 $471,926 Total Personnel $0 Supplies $0 Service $0 Capital $0 TOTAL $0$0 $0 PROJECT DESCRIPTION PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR OPERATING COSTS First Fiscal Year Annually 294 WORK ORDER #: TBD PROJECT: WWTP Equipment Rehab PROJECT #: SPWOC FUND: WASTEWATER CAPITAL PROJECTS PROJECT BUDGET:ANNUAL PROJECT FUNDING MANAGER: Fred Surovik SOURCES: Utility Revenue Bonds Rehabiitation or replacement of major plant equipment items or structures that have exceeded their service life. Annual funding will allow the prioritization of items nearing the end of their service life. It has been identified that these types of needs will exist through at least the next ten years. Clarifier 3A Drive is near failure and has been prioritized for FY04-05 funds. FY04-05 ATAD Spiral Aerators & Foam Cutter Blades $45,286.90 - WF0613063 FY04-05 Clarifier 3A Drive FY05-06 Clarifier 2A Drive and Gravity Thickener main bearing FISCAL YEAR LAND ENG. CONSTR. MISC. PROJECT TOTAL Prior Years $0 2004-05 120,000 $120,000 2005-06 100,000 $100,000 2006-07 50,000 $50,000 2007-08 50,000 $50,000 2008-09 50,000 $50,000 2009-10 50,000 $50,000 2010-11 50,000 $50,000 TOTAL $0 $0 $470,000 $0 $470,000 Total Personnel $0 Supplies $0 Service $0 Capital $0 TOTAL $0$0 $0 PROJECT DESCRIPTION PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR OPERATING COSTS First Fiscal Year Annually 295 WORK ORDER #: WF0363214 PROJECT: SLUDGE PROCESSING IMPROVEMENTS PROJECT #: SS9803 FUND: WASTEWATER CAPITAL PROJECTS PROJECT BUDGET: $1,921,393 PROJECT FUNDING MANAGER:FRED SUROVIK SOURCES: Utility Revenue Bonds Project provides for the design and construction of infrastructure required to satisfy increasing demands for wastewater sludge processing services. Digesters and related infrastructure will be designed and constructed to increase the efficiency and cost-effectiveness of sludge handling, processing, conditioning, and other functions required to produce an end product meeting Federal and State statutes and rules. FISCAL YEAR LAND ENG. CONSTR. MISC. PROJECT TOTAL Prior Years 96,920 3,615 9,158 $109,693 2004-05 79,700 260,000 $339,700 2005-06 70,000 582,000 $652,000 2006-07 70,000 750,000 $820,000 2007-08 $0 2008-09 $0 2009-10 $0 2010-11 $0 TOTAL $0 $316,620 $1,595,615 $9,158 $1,921,393 Total Personnel $0 Supplies $0 Service $0 Capital $0 TOTAL $0$0 $0 PROJECT DESCRIPTION PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR OPERATING COSTS First Fiscal Year Annually 296 WORK ORDER #: TBD PROJECT: COLLEGE STATION SLUDGE FACILITY PROJECT #: SPWOC FUND: WASTEWATER CAPITAL PROJECTS PROJECT BUDGET: $1,350,000 PROJECT FUNDING MANAGER:FRED SUROVIK SOURCES: Utility Revenue Bonds Future sludge handling facilities for Carters Creek and Lick Creek Plants will be relocated to an area that is unlikely to have residential development immediately adjacent to it. This project will: 1) Establish the criteria for moving and consolidating Carters Creek and Lick Creek sludge processing activities. 2) Develop a plan for timely replacement of existing facilities as they approach their service life. 3) Plan for those facilities to operate econimically with a minimum of public impact. 4) Construct facilities that minimize the potential for offending neighboring residents. This project expands past the 5 Year CIP window. FISCAL YEAR LAND ENG. CONSTR. MISC. PROJECT TOTAL Prior Years $0 2004-05 $0 2005-06 50,000 $50,000 2006-07 150,000 $150,000 2007-08 150,000 $150,000 2008-09 $0 2009-10 500,000 $500,000 2010-11 500,000 $500,000 TOTAL $0 $350,000 $1,000,000 $0 $0 $1,350,000 Total Personnel $0 Supplies $0 Service $0 Capital $0 TOTAL $0$0 $0 PROJECT DESCRIPTION/STATUS PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR OPERATING COSTS First Fiscal Year Annually 297 WORK ORDER #: WF0518324 PROJECT: MATERIAL STAGING STORAGE AREA PROJECT #: SGWOC FUND: WASTEWATER CAPITAL PROJECTS PROJECT BUDGET: $57,883 PROJECT FUNDING MANAGER:ED SAVAGE SOURCES: Utility Revenue Bonds This project is for engineering and construction of bulk material (sand, gravel, fill sand, topsoil, and road base) handling/staging facility. Currently storing bulk materials in vacant areas of Utilities Service Center which are not readily accessible in wet weather and result in considerable waste. A storage facility will allow easier access in inclement weather, keep materials drier, and improve efficiency and reduce waste. PROJECT COMPLETE FISCAL YEAR LAND ENG. CONSTR. MISC. PROJECT TOTAL Prior Years 3,902 81 $3,983 2004-05 3,900 50,000 $53,900 2005-06 $0 2006-07 $0 2007-08 $0 2008-09 $0 2009-10 $0 2010-11 $0 TOTAL $0 $7,802 $50,081 $0 $57,883 Total Personnel $0 Supplies $0 Service $0 Capital $0 TOTAL $0 PROJECT DESCRIPTION PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR OPERATING COSTS First Fiscal Year Annually $0 $0 298 WORK ORDER #: WF0466416 PROJECT: WASTEWATER PLANT SECURITY PROJECT #: SGWOC FUND: WASTEWATER CAPITAL PROJECTS PROJECT BUDGET: $247,259 PROJECT FUNDING MANAGER:MICHAEL KELLOGG SOURCES: Utility Revenue Bonds Design, construct, and install equipment and systems to strengthen security and minimize risks of potential terrorists activities and other threats to City's Wastewater Treatment Plant infrastructures. Staff will import concepts developed by Vulnerability Assessment consultant contract 03-66 (approved by City Council 03-13-03, Agenda Item #10.4, to enhance wastewater infrastructure security. February 26, 2004 Engineering Contract #04-062 approved by Council, Item #11.7. FISCAL YEAR LAND ENG. CONSTR. MISC. PROJECT TOTAL Prior Years 26,458 61,801 $88,259 2004-05 32,000 90,000 5,000 $127,000 2005-06 32,000 $32,000 2006-07 $0 2007-08 $0 2008-09 $0 2009-10 $0 2010-11 $0 TOTAL $0 $58,458 $183,801 $5,000 $247,259 Total Personnel $0 Supplies $0 Service $0 Capital $0 TOTAL $0$0 $0 PROJECT DESCRIPTION PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR OPERATING COSTS First Fiscal Year Annually 299 WORK ORDER #: WF0567890 PROJECT: CCWWTP PAVEMENT REPAIRS/IMPR.PROJECT #: SGWOC FUND: WASTEWATER CAPITAL PROJECTS PROJECT BUDGET: $585,778 PROJECT FUNDING MANAGER:FRED SUROVIK SOURCES: Utility Revenue Bonds Provide funds for design and construction of new and replacement street and parking lot pavements at the Carters Creek Wastewater Treatment Plant. Scope of work involves removal of 7,700 square yards of 37 year old failed asphaltic concrete street pavement and replacement with portland cement concrete pavement design to carry current traffic loads. Scope also includes addition of 1,400 square yards of new vehicle parking infrastructure. FISCAL YEAR LAND ENG. CONSTR. MISC. PROJECT TOTAL Prior Years 5,778 $5,778 2004-05 55,000 500,000 25,000 $580,000 2005-06 $0 2006-07 $0 2007-08 $0 2008-09 $0 2009-10 $0 2010-11 $0 TOTAL $0 $60,778 $500,000 $25,000 $585,778 Total Personnel $0 Supplies $0 Service $0 Capital $0 TOTAL $0$0 $0 PROJECT DESCRIPTION PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR OPERATING COSTS First Fiscal Year Annually 300 WORK ORDER #: TBD PROJECT: CCWWTP MAINTENANCE BLDG. PROJECT #: SGWOC FUND: WASTEWATER CAPITAL PROJECTS PROJECT BUDGET: $200,000 PROJECT FUNDING MANAGER:FRED SUROVIK SOURCES: Utility Revenue Bonds The construction of a dedicated maintenance building needed for parts storage, pump, motor, and gearbox repairs. FISCAL YEAR LAND ENG. CONSTR. MISC. PROJECT TOTAL Prior Years $0 2004-05 $0 2005-06 25,000 $25,000 2006-07 175,000 $175,000 2007-08 $0 2008-09 $0 2009-10 $0 2010-11 $0 TOTAL $0 $25,000 $175,000 $0 $200,000 Total Personnel $0 Supplies $0 Service $0 Capital $0 TOTAL $0$0 $0 PROJECT DESCRIPTION PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR OPERATING COSTS First Fiscal Year Annually 301 WORK ORDER #: TBD PROJECT: SCADA REPLACEMENT PROJECT #: SGWOC FUND: WASTEWATER CAPITAL PROJECTS PROJECT BUDGET: $291,500 PROJECT FUNDING MANAGER:MIKE KELLOGG SOURCES: Utility Revenue Services This project will facilitate the replacement of control based equipment that has exceeded its useful service life. It will upgrade the control of the plants into a more integrated architecture that will: 1. Reduce development time and cost by the re-use of engineering practices. 2. Maximize returns from existing assets, through greatly improved control and monitoring. 3. Reduce future installation cost by utilizing standard bus technologies. 4. Provide a means of being proactive in maintaining equipment with available diagnostic tools. FISCAL YEAR LAND ENG. CONSTR. MISC. PROJECT TOTAL Prior Years $0 2004-05 $0 2005-06 50,000 76,500 $126,500 2006-07 30,000 80,000 $110,000 2007-08 25,000 30,000 $55,000 2008-09 $0 2009-10 $0 2010-11 $0 TOTAL $0 $0 $105,000 $186,500 $0 $291,500 Total Personnel $0 Supplies $0 Service $0 Capital $0 TOTAL $0 PROJECT DESCRIPTION/STATUS PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR OPERATING COSTS First Fiscal Year Annually $0 $0 302 DDRRAAIINNAAGGEE UUTTIILLIITTYY CCAAPPIITTAALL IIMMPPRROOVVEEMMEENNTT PPRROOJJEECCTTSS FFIISSCCAALL YYEEAARR 22000055--22000066 TTHHRROOUUGGHH FFIISSCCAALL YYEEAARR 22001100--22001111 303 DRAINAGE UTILITY CAPITAL IMPROVEMENT PROJECTS FISCAL YEAR 2005-2006 THROUGH FISCAL YEAR 2010-2011 PROJECT REVISED PROJECT BUDGET ACTUAL FY 04-05 BUDGET ESTIMATE NUMBER AMOUNT FY 03-04 APPROPRIATION FY 04-05 BEGINNING FUND BALANCE:7,769,522$ 7,712,168$ 7,712,168$ ADDITIONAL RESOURCES: UTILITY REVENUES 1,062,179$ 1,093,900$ 1,104,287$ INTEREST ON INVESTMENTS 127,543 125,000 196,856 BOND PROCEEDS 855,000 0 0 INTERGOVERNMENTAL TRANSFERS 0 0 0 INTRAGOVERNMENTAL TRANSFERS 224,045 0 0 TRANSFERS OUT (72,330) 0 0 OTHER 4,523 0 1,827 SUBTOTAL ADDITIONAL RESOURCES 2,200,960$ 1,218,900$ 1,302,970$ TOTAL RESOURCES AVAILABLE 9,970,482$ 8,931,068$ 9,015,138$ BEE CREEK (COMBINED)SD9802 2,500,000$ 65,885 0 57,197 BEE CREEK PH. IV & V.SD0001 1,400,000$ 48 0 52,000 WPC - TEXAS TO BYPASS SD9901 1,200,000$ 44,301 0 650,000 GREENWAYS PROJECTS SD9903 3,640,000$ 2,904 882,057 1,266,427 CITY CENTER GG0002 0$ 1,194,124 0 0 MINOR DRAINAGE IMPROVEMENTS SD0002 ANNUAL 0 0 0 SOUTHSIDE DRAINAGE IMPROVEMENTS SD0300 260,000$ 239,830 0 0 WEST PARK DRAINAGE IMP SD0524 560,000$ 0 150,000 100,000 COLLEGE PARK/BREEZY HEIGHTS SD0601 485,000$ 0 0 0 BEE CREEK (LANCELOT TO GUADALUPE) SD0301 200,000$ 0 0 0 WPC (REDMOND TERRACE)SD0520 680,000$ 0 680,000 0 SCHAEFER ROAD DRAINAGE SD0401 135,000$ 12,180 0 122,820 STORMWATER MAPPING SD0523 200,000$ 0 50,000 0 DRAINAGE/STORMWATER MASTERPLAN SD0204 71,000$ 0 50,000 0 STONE FOREST STORM SEWER EXT SD0525 55,000$ 0 0 55,000 SOUTHWEST PKWY CULVERT IMPR SD0527 115,000$ 0 0 115,000 DRAINAGE DETENTION - UNIVERSITY DR SD0602 210,000$ 0 0 0 CLOSED PROJECTS 5,252 300,000 0 OTHER COSTS 5,949 0 DRAINAGE MAINTENANCE ANNUAL 396,992 518,350 661,536 DRAINAGE MAINTENANCE SLA's ANNUAL 0 192,153 0 GENERAL & ADMIN. 282,797 179,579 179,579 DEBT ISSUANCE COSTS 8,052 2,500 0 TOTAL EXPENDITURES 2,258,314$ 3,004,639$ 3,259,559$ GAAP ADJUSTMENT 0$ ENDING FUND BALANCE:7,712,168$ 5,926,429$ 5,755,579$ 304 DRAINAGE UTILITY CAPITAL IMPROVEMENT PROJECTS FISCAL YEAR 2005-2006 THROUGH FISCAL YEAR 2010-2011 APPROVED FY 05-06 BUDGET PROJECTED PROJECTED PROJECTED PROJECT PROJECT PROJECT APPROPRIATION FY 05-06 FY 06-07 FY 07-08 FY 08-09 FY 09-10 FY 10-11 5,755,579$ 5,755,579$ 2,413,366$ 180,667$ 7,123$ 118,923$ 268,023$ 1,137,400$ 1,137,400$ 1,160,500$ 1,171,500$ 1,195,300$ 1,206,600$ 1,231,200$ 121,000 121,000 75,000 7,000 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1,258,400$ 1,258,400$ 1,235,500$ 1,178,500$ 1,195,300$ 1,206,600$ 1,231,200$ 7,013,979$ 7,013,979$ 3,648,866$ 1,359,167$ 1,202,423$ 1,325,523$ 1,499,223$ 0 1,959,898 100,000 0 0 0 0 0 0 999,093 200,000 0 0 0 0 201,683 0 0 0 0 0 0 228,800 300,100 91,844 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 410,000 460,000 0 0 0 0 0 33,600 33,600 451,400 0 0 0 0 0 188,000 0 0 0 0 0 0 100,000 580,000 0 0 0 0 0 0 0 0 0 0 0 0 50,000 50,000 50,000 50,000 0 0 21,000 28,500 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 210,000 210,000 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 731,208 731,208 753,100 775,700 799,000 823,000 847,700 151,250 151,250 54,506 54,500 54,500 54,500 54,500 257,674 257,674 180,000 180,000 180,000 180,000 180,000 0 0 0 0 0 0 0 1,814,732$ 4,600,613$ 3,468,199$ 1,352,044$ 1,083,500$ 1,057,500$ 1,082,200$ 5,199,247$ 2,413,366$ 180,667$ 7,123$ 118,923$ 268,023$ 417,023$ 305 DDRRAAIINNAAGGEE CCAAPPIITTAALL PPRROOJJEECCTTSS 306 PROJECT: BEE CREEK CHANNELIZATION PROJECT #: SD9802 COMBINED PROJECT FUND: 912 - DRAINAGE FUND BUDGET: $2,500,000 PROJECT FUNDING MANAGER: TBD SOURCES: DRAINAGE UTILITY This project will widen the existing drainage channel of Bee Creek Main Channel from Texas Avenue upstream to Southwest Parkway and Bee Creek Tributary B from its confluence with the Main Channel upstream to Harvey Mitchell Parkway. Has CLOMR from FEMA and Individual 404 Permit from USACE. FISCAL YEAR LAND ENG. CONSTR. MISC. PROJECT TOTAL Prior Years $111,171 $271,732 $0 $2 $382,905 2004-05 36,713 20,484 $57,197 2005-06 20,950 1,925,000 13,948 $1,959,898 2006-07 100,000 $100,000 2007-08 $0 2008-09 $0 2009-10 $0 2010-11 $0 TOTAL $147,884 $313,166 $2,025,000 $13,950 $2,500,000 Total Personnel $0 Supplies $0 Service $0 Capital $0 TOTAL $0$0 $0 PROJECT DESCRIPTION/STATUS PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR OPERATING COSTS First Fiscal Year Annually 307 PROJECT: BEE CREEK PHASES IV AND V PROJECT #: SD0001 FUND: 912 - DRAINAGE FUND PROJECT BUDGET: $1,400,000 PROJECT FUNDING MANAGER: DANIELLE CHARBONNET SOURCES: DRAINAGE UTILITY Storm drainage improvements to the flow capacity of Bee Creek Tributary "A" including bank stabilization from where Phase I improvements ended at Brothers Boulevard to Longmire Drive and continuing to Texas Ave. Project in design. Needs rewrite for US Army Corps of Engineering Individual Permit. FISCAL YEAR LAND ENG. CONSTR. MISC.PROJECT TOTAL Prior Years 147,463 1,444 $148,907 2004-05 50,000 2,000 $52,000 2005-06 $0 2006-07 999,093 $999,093 2007-08 200,000 $200,000 2008-09 $0 2009-10 $0 2010-11 $0 TOTAL $0 $197,463 $1,199,093 $3,444 $1,400,000 Total Personnel $0 Supplies $0 Service $0 Capital $0 TOTAL $0 PROJECT DESCRIPTION/STATUS PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR OPERATING COSTS First Fiscal Year Annually $0 $0 308 PROJECT: WPC - TX to Bypass PROJECT #: SD9901 FUND: DRAINAGE FUND PROJECT BUDGET: $1,200,000 PROJECT FUNDING MANAGER: Edward McDonald SOURCES: DRAINAGE UTILITY Drainage Improvements associated with the Wolf Pen Creek Upper and Lower Trails Projects. FISCAL YEAR LAND ENG. CONSTR. MISC. PROJECT TOTAL Prior Years 321,832 26,484 $348,317 2004-05 650,000 $650,000 2005-06 201,683 $201,683 2006-07 $0 2007-08 $0 2008-09 $0 2009-10 $0 2010-11 $0 TOTAL $0 $321,832 $851,683 $26,484 $1,200,000 Total Personnel $0 Supplies $0 Service $0 Capital $0 TOTAL $0$0 $0 PROJECT DESCRIPTION/STATUS PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR OPERATING COSTS First Fiscal Year Annually 309 PROJECT: GREENWAYS PROJECTS PROJECT #: SD9903 FUND: 912 - DRAINAGE UTILITY FUND PROJECT BUDGET: $3,640,000 PROJECT FUNDING MANAGER: KRISTAN WEAVER SOURCES: DRAINAGE This project serves to hold funds for new greenways projects. Original budget was $3,640,000. $1,194,124 of Greenways funds were spent on the City Center land purchase. FISCAL YEAR LAND ENG. CONSTR. MISC.PROJECT TOTAL Prior Years $1,752,829 $1,752,829 2004-05 1,266,427 $1,266,427 2005-06 228,800 $228,800 2006-07 300,100 $300,100 2007-08 91,844 $91,844 2008-09 $0 2009-10 $0 2010-11 $0 TOTAL $3,640,000 $0 $0 $0 $0 $3,640,000 Total Personnel $0 Supplies $0 Service $0 Capital $0 TOTAL $0 PROJECT DESCRIPTION/STATUS PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR OPERATING COSTS First Fiscal Year Annually $0 $0 310 PROJECT:PROJECT #: GG0002 FUND: PROJECT Secondary Funding - 912 - DRAINAGE FUND BUDGET: $1,560,000 PROJECT FUNDING MANAGER: SOURCES: GENERAL GOVERNMENT CIP & DRAINAGE FUND SD9903 - Greenways Projects. $1,698,758 add'l expenditures from General Government CIP fund (137). FISCAL YEAR LAND ENG. CONSTR. MISC. PROJECT TOTAL Prior Years $1,194,125 $0 $0 $0 $1,194,125 2004-05 $0 2005-06 $0 2006-07 $0 2007-08 $0 2008-09 $0 2009-10 $0 2010-11 $0 TOTAL $1,194,125 $0 $0 $0 $0 $1,194,125 Total Personnel $0 Supplies $0 Service $0 Capital $0 TOTAL $0 CITY CENTER LAND ACQUISITION Primary Funding - 137-GENERAL GOV'T CIP MARK MCAULIFFE PROJECT DESCRIPTION/STATUS Funding for future City Center site. This is for land acquisition costs only. Drainage portion funding source - PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR OPERATING COSTS First Fiscal Year Annually 311 PROJECT: MINOR DRAINAGE PROJECT #: SD0002 IMPROVEMENTS PROJECT FUND: 912 - DRAINAGE FUND BUDGET:ANNUAL PROJECT FUNDING MANAGER: CHARLES MCLEMORE SOURCES: DRAINAGE UTILITY FUND Funds budgeted on an annual basis as available for minor drainage improvements throughout the City. FISCAL YEAR LAND ENG. CONSTR. MISC. PROJECT TOTAL Prior Years $0 $0 $225,108 $225,108 2004-05 $0 2005-06 $0 2006-07 $0 2007-08 $0 2008-09 $0 2009-10 $0 2010-11 $0 TOTAL $0 $0 $225,108 $0 $0 $225,108 Total Personnel $0 Supplies $0 Service $0 Capital $0 TOTAL $0$0 $0 PROJECT DESCRIPTION/STATUS PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR OPERATING COSTS First Fiscal Year Annually 312 PROJECT: SOUTHSIDE DRAINAGE IMPROVEMENTS PROJECT #: SD0300 FUND: DRAINAGE FUND PROJECT BUDGET: $260,000 PROJECT FUNDING DRAINAGE UTILITY MANAGER: MARK SMITH SOURCES: FUND First Project: Southside System A Drainage Improvements in the amount of $260,000.00 to be reimbursed by Community Development Funds. Includes improvements in the area of Southside bounded by Welsh Ave., Luther Street, Fairview Ave., and Guernsey Street. Improvements include drainage flume in alley between Welsh and Fairview, ditch section along Welsh from just south of Guernsey to Park Place, rebuilding the street section of Welsh between Luther and Park Place, installation of storm sewer system along Park Place through Luther Jones Park, and valley gutter across Welsh just north of Guernsey. Additional Southside Drainage Improvements will be incorporated into both the West Park Rehabilitation Project and the Breezy Heights/College Park Rehabilitation Project in the Southside Area in future fiscal years. Original project budget = $550,000; $150,000 transferred to SD0524; $140,000 in new appropriations for SD0524 in FY06. FISCAL YEAR LAND ENG. CONSTR. MISC.PROJECT TOTAL Prior Years 271,580 5,119 $276,699 2004-05 $0 2005-06 $0 2006-07 $0 2007-08 $0 2008-09 $0 2009-10 $0 2010-11 $0 TOTAL $0 $271,580 $0 $5,119 $0 $276,699 Total Personnel $0 Supplies $0 Service $0 Capital $0 TOTAL $0$0 $0 PROJECT DESCRIPTION/STATUS PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR OPERATING COSTS First Fiscal Year Annually 313 PROJECT: WEST PARK DRAINAGE PROJECT #: SD0524 IMPROVEMENTS FUND: 912 - DRAINAGE FUND PROJECT BUDGET: $560,000 PROJECT FUNDING MANAGER: TBD SOURCES: DRAINAGE UTILITY (SD0300) Drainage improvements in area bounded by George Bush Drive, Luther Street, Wellborn Road, and Fairview Avenue. These improvements were identified by the Mitchell & Morgan Southside Drainage Master Plan (July 2003). April 2005 Status: In Design Council Award of Construction Contract: Summer 2005 FISCAL YEAR LAND ENG. CONSTR. MISC. PROJECT TOTAL Prior Years $0 $0 $0 $0 $0 2004-05 100,000 $100,000 2005-06 460,000 $460,000 2006-07 $0 2007-08 $0 2008-09 $0 2009-10 $0 2010-11 $0 TOTAL $0 $0 $560,000 $0 $0 $560,000 Total Personnel $0 Supplies $0 Service $0 Capital $0 TOTAL $0$0 $0 PROJECT DESCRIPTION/STATUS PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR OPERATING COSTS First Fiscal Year Annually 314 PROJECT: COLLEGE PARK/BREEZY HEIGHTS PROJECT #: SD0601 DRAINAGE IMPROVEMENTS FUND: 912 - DRAINAGE FUND PROJECT BUDGET: $485,000 PROJECT FUNDING MANAGER: TBD SOURCES: DRAINAGE UTILITY Drainage improvements in area bounded by George Bush Drive, Luther Street, Wellborn Road, and Fairview Avenue. These improvements were identified by the Mitchell & Morgan Southside Drainage Master Plan (July 2003). April 2005 Status: In Design Council Award of Construction Contract: Spring 2006 FISCAL YEAR LAND ENG. CONSTR. MISC. PROJECT TOTAL Prior Years 0 0 0 0 $0 2004-05 $0 2005-06 33,600 $33,600 2006-07 451,400 $451,400 2007-08 $0 2008-09 $0 2009-10 $0 2010-11 $0 TOTAL $0 $33,600 $451,400 $0 $485,000 Total Personnel $0 Supplies $0 Service $0 Capital $0 TOTAL $0$0 $0 PROJECT DESCRIPTION/STATUS PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR OPERATING COSTS First Fiscal Year Annually 315 PROJECT: BEE CREEK (LANCELOT TO GUADALUPE)PROJECT #: SD0301 FUND: 912 - DRAINAGE FUND PROJECT BUDGET: $200,000 PROJECT FUNDING MANAGER: MARK SMITH SOURCES: DRAINAGE UTILITY FUND Erosion repairs and stream restoration. FISCAL YEAR LAND ENG. CONSTR. MISC. PROJECT TOTAL Prior Years $0 $12,000 $0 $0 $12,000 2004-05 $0 2005-06 188,000 $188,000 2006-07 $0 2007-08 $0 2008-09 $0 2009-10 $0 2010-11 $0 TOTAL $0 $12,000 $188,000 $0 $200,000 Total Personnel $0 Supplies $0 Service $0 Capital $0 TOTAL $0 PROJECT DESCRIPTION/STATUS PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR aka : Camelot Drainage improvements OPERATING COSTS First Fiscal Year Annually $0 $0 316 PROJECT: WOLF PEN CREEK REDMOND PROJECT #: SD0520 TERRACE FUND: 912 - DRAINAGE FUND PROJECT BUDGET: $680,000 PROJECT FUNDING MANAGER: CRAIG JORDAN SOURCES: DRAINAGE UTILITY FUND Stream restoration to Wolf Pen Creek between George Bush and Texas Avenue. The improvements will reduce flooding and erosion and will improve water quality. FISCAL YEAR LAND ENG. CONSTR. MISC. PROJECT TOTAL Prior Years $0 $0 $0 $0 $0 2004-05 $0 2005-06 100,000 $100,000 2006-07 580,000 $580,000 2007-08 $0 2008-09 $0 2009-10 $0 2010-11 $0 TOTAL $0 $0 $680,000 $0 $680,000 Total Personnel $0 Supplies $0 Service $0 Capital $0 TOTAL $0$0 $0 PROJECT DESCRIPTION/STATUS PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR OPERATING COSTS First Fiscal Year Annually 317 PROJECT: OLD SCHAFFER ROAD DRAINAGE PROJECT #: SD0401 FUND: 912 - DRAINAGE FUND PROJECT BUDGET: $135,000 PROJECT FUNDING MANAGER: GARY BALMAIN SOURCES: DRAINAGE UTILITY FUNDS DRAINAGE OPERATIONS ($15k) Rehabilitation of the Drainage Ditch along Old Schaffer Road from Arnold Bike Path to Creek Crossing. FISCAL YEAR LAND ENG. CONSTR. MISC. PROJECT TOTAL Prior Years $0 $11,951 $0 $229 $12,180 2004-05 3,820 119,000 $122,820 2005-06 $0 2006-07 $0 2007-08 $0 2008-09 $0 2009-10 $0 2010-11 $0 TOTAL $0 $15,771 $119,000 $229 $135,000 Total Personnel $0 Supplies $0 Service $0 Capital $0 TOTAL $0 PROJECT DESCRIPTION/STATUS PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR OPERATING COSTS First Fiscal Year Annually $0 $0 318 PROJECT: STORMWATER MAPPING PROJECT #: SD0523 FUND: 912 - DRAINAGE FUND PROJECT BUDGET: $200,000 PROJECT FUNDING MANAGER: MARK SMITH SOURCES: DRAINAGE UTILITY FUND Mapping of College Station stormwater infrastructure. FISCAL YEAR LAND ENG. CONSTR. MISC. PROJECT TOTAL Prior Years $0 $0 $0 $0 $0 2004-05 $0 2005-06 50,000 $50,000 2006-07 50,000 $50,000 2007-08 50,000 $50,000 2008-09 50,000 $50,000 2009-10 $0 2010-11 $0 TOTAL $0 $200,000 $0 $0 $200,000 Total Personnel $0 Supplies $0 Service $0 Capital $0 TOTAL $0 PROJECT DESCRIPTION/STATUS PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR OPERATING COSTS First Fiscal Year Annually $0 $0 319 PROJECT: DRAINAGE/STORMWATER PROJECT #: SD0204 MASTER PLAN PROJECT FUND: 912 - DRAINAGE FUND BUDGET: $71,000 PROJECT FUNDING MANAGER: MARK SMITH SOURCES: DRAINAGE UTILITY FUND Development of drainage plans for rehabilitation projects in Southside and Northgate. FISCAL YEAR LAND ENG. CONSTR. MISC. PROJECT TOTAL Prior Years $0 $0 $0 $42,500 $42,500 2004-05 $0 2005-06 28,500 $28,500 2006-07 $0 2007-08 $0 2008-09 $0 2009-10 $0 2010-11 $0 TOTAL $0 $28,500 $0 $42,500 $0 $71,000 Total Personnel $0 Supplies $0 Service $0 Capital $0 TOTAL $0 PROJECT DESCRIPTION/STATUS PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR OPERATING COSTS First Fiscal Year Annually $0 $0 320 PROJECT: Stone Forest Storm Sewer Extension PROJECT #: SD0525 FUND: 912 - Drainage Fund PROJECT BUDGET: $55,000 PROJECT FUNDING MANAGER: Gary Balmain SOURCES: Drainage Utility $55,000 transferred from SD0302. Project complete. FISCAL YEAR LAND ENG. CONSTR. MISC. PROJECT TOTAL Prior Years $0 2004-05 $4,250 $50,750 $55,000 2005-06 $0 2006-07 $0 2007-08 $0 2008-09 $0 2009-10 $0 2010-11 $0 TOTAL $0 $4,250 $50,750 $0 $55,000 Total Personnel $0 Supplies $0 Service $0 Capital $0 TOTAL $0$0 $0 PROJECT DESCRIPTION/STATUS PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR To correct a pre-existing drainage problem by capturing storm runoff. The project will consist of preparing construction plans and contract documents to extend an existing storm sewer system approximately 260 linear feet. OPERATING COSTS First Fiscal Year Annually 321 PROJECT:PROJECT #: SD0527 (culvert replacement) PROJECT FUND: 912 - Drainage Fund BUDGET: $115,000 PROJECT FUNDING MANAGER:SOURCES: Drainage Utility Fund FISCAL YEAR LAND ENG. CONSTR. MISC.PROJECT TOTAL Prior Years $0 2004-05 25,000 90,000 $115,000 2005-06 $0 2006-07 $0 2007-08 $0 2008-09 $0 2009-10 $0 2010-11 $0 TOTAL $0 $25,000 $90,000 $0 $0 $115,000 Total Personnel $0 Supplies $0 Service $0 Capital $0 TOTAL $0 Southwest Parkway drainage project Gary Balmain Replace culvert pipes running under Southwest Parkway. PROJECT DESCRIPTION/STATUS PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR OPERATING COSTS First Fiscal Year Annually $0 $0 322 PROJECT: Drainage Detention - University Dr PROJECT #: SD0602 FUND: 912 - Drainage Fund PROJECT BUDGET: $210,000 PROJECT FUNDING MANAGER:TBD SOURCES: DRAINAGE UTILITY FUND Development of a drainange detention pond along University Drive in conjunction with upcoming business development. FISCAL YEAR LAND ENG. CONSTR. MISC. PROJECT TOTAL Prior Years $0 $0 $0 $0 $0 2004-05 $0 2005-06 210,000 $210,000 2006-07 $0 2007-08 $0 2008-09 $0 2009-10 $0 2010-11 $0 TOTAL $0 $0 $0 $210,000 $210,000 Total Personnel $0 Supplies $0 Service $0 Capital $0 TOTAL $0$0 $0 PROJECT DESCRIPTION/STATUS PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR OPERATING COSTS First Fiscal Year Annually 323 HEART OF THE RESEARCH VALLEY 324 City of College Station  Office of Budget and Strategic Planning  1101 Texas  Avenue   College Station, Texas  77842  www.cstx.gov