Loading...
HomeMy WebLinkAboutFY 2007-2008 Capital Improvements Program Budget - r CITY OF COLLEGE STATION 2007.2008 Capita mprovements rogram 3udget ‘• .•.. . . • �° .1 �s ai ,>1S, � t _ IiiiNN�iIiNINl111411111pN `i8�1 •is�'. WWW.CStx.gov , • , • . ' , ,t , . . . . • • • • • • • _ - • • City of College Station CAPITAL IMPROVEMENTS PROGRAM BUDGET FOR FISCAL YEAR 2008 OCTOBER 1, 2007 to SEPTEMBER 30, 2008 www.cstx.gov • • • • \ . • > y« � � . . �` « ® x ?2\Q 2 \\ / CITY OF COLLEGE STATION 2 HEART OF THE RESEARCH VALLEY • • • • • - � - - - - - ----- - -- - ------------ -- - - - - - -- ----- ---- -- - TABLE OF CONTENTS Executive Summary 1 General Government Capital Improvement Projects Streets, Traffic, Sidewalks and Trails 11 Street Rehabilitation Projects 17 Street Extension Projects 29 Street TxDOT Projects 49 Traffic Projects 52 Sidewalks and Trails 65 Parks Projects 79 General Government Facilities and Technology 109 Public Facilities 112 Technology Projects 124 Drainage Utility 141 Special Revenue Capital Improvement Projects Parkland Dedication 155 Convention Center 183 Enterprise Funds Capital Improvement Projects Electric Service 189 Water Service 193 Production Projects 198 Distribution 213 Rehabilitation Projects 229 TABLE OF CONTENTS Wastewater Service 235 Collection 240 Rehabilitation Projects 250 Treatment 256 Brazos Valley Solid Waste Management Agency 269 Estimated Operations and Maintenance Costs General Government Capital Improvement Projects 0 & M Costs. 283 Special Revenue Capital Improvement Projects 0 & M Costs 284 Enterprise Funds Capital Improvement Projects 0 & M Costs 285 • Index by Project/Work Order Name 287 Index by Project/Work Order Number 289 ------------- -- --- ---- ----- FISCAL YEAR 2007-2008 APITAL IMPROVEMENTS EXECUTIVE SUMMARY The following is the annual City of College Station CAPITAL PROJECT FUNDING Capital Improvements Program(CIP)Budget The City operates under the laws of the State of document.The CIP budget provides the framework for capital improvement projects to be conducted in Texas and the City of College Station's Home Rule the 2008 fiscal year that begins October 1,2007 and Charter.On an annual basis,the City of College ends on September 30,2008. Station prepares a five-year Capital Improvements Program(CIP).The CIP is presented for City The City of College Station develops and adopts a Council review as part of the annual budget process. five-year Capital Improvement Projects list. The list The program consolidates all anticipated capital is updated annually and is presented for City Council needs for which funding authorization exists. The review as a part of the annual budget process. The program is divided into several sections depending list consolidates all anticipated capital needs for on the services provided and the funding source. which funding authorization exists,while separating the projects into several sections depending on the Two categories of capital expenditures are defined by services provided and the respective funding source. the City. The first category of capital expenditure is Once the budget is approved by the City Council,the for major capital projects.Major capital projects are assigned project managers manage their respective projects that cost more than$50,000 and provide a projects with budgetary oversight from the Office of fixed asset or equipment that has a useful life of three Budget and Strategic Planning and the Finance years or more.The second category of capital Department. expenditure is for minor capital projects. Minor capital projects are projects that cost more than While summary capital project schedules have been $5,000 and less than$50,000 and provide a fixed included in the annual College Station Approved asset or equipment that has a useful life of three years Budget,this CIP budget document permits greater or more. communication among City staff,administration, Council and citizens regarding capital projects.Areas The City only has legal authority to issue General • of enhanced information conveyed within this Obligation(GO)debt after a successful citizen document include individual project detail pages and referendum. GO debt is debt that obligates the City to corresponding maps,where applicable. The project repay the issue with ad valorem tax revenues. The sheets detail the project number,project manager, City uses GO debt for the acquisition and funding source(s), description of purpose and need, development of parks and recreation facilities,rights- funding per year and category, and the impact, if any, of-way acquisition,construction of arterial streets, on future operating budgets. The maps provide reconstruction of major arterial streets,and for public citizens and officials a greater understanding of the buildings such as City offices,libraries,swimming scope and the impact of the specific projects through pools and other general use facilities. the illustration of the planned action. The most recent 5-year General Obligation bond The projects presented in this document are grouped election was held in November of 2003.The 2003 according to major funding source.For example, November election granted the City authority to issue projects for which the major funding source is the $38,405,000 in General Obligation debt.The Streets Capital Improvement Projects Fund are proceeds from this debt issuance will fund the included in the Streets,Traffic, Sidewalks and Trails relocation of Fire Station 3,renovations to the police section of the document.A number of projects station, the development of Veterans Park Phase II, included in this document have multiple funding traffic enhancements, street improvements and sources.The project sheets for these projects include improvements to various parks throughout the City. an expenditure summary for each funding source as well as a combined expenditure summary that In FY07,the City issued$3,930,000 in GO debt for . reflects the total projected expenditures for the various General Government capital projects. Of this, project.The project sheets for projects with multiple $730,000 was issued for the construction of a new funding sources are included in the section of the CIP Forestry Shop.An additional$500,000 was issued document that reflects the project's primary funding for the final construction on Phase II of Veterans source. Park. These funds will be used to construct a road 1 • ' leading to a second entrance/exit to the park. • The purchase of land and development of land • $2,000,000 will be used for continued street for economic development uses. rehabilitation in the Northgate area,including the • Church Street and the Tauber and Stasney Street In FY07,the City issued$3,960,000 in CO debt for a rehabilitation projects.$600,000 will be used for new variety of General Government Capital projects. traffic signal and safety improvement projects. These $625,000 was issued for the design of and initial include signals at the intersections of Harvey construction costs for the new City cemetery. . • • Mitchell Parkway and Luther and Harvey Mitchell $991,000 was included for additional construction Parkway and Holleman.Finally,$100,000 will be costs related to the relocation of Fire Station#3. used for various sidewalk improvements throughout Funds in the amount of$1,750,000 were issued for the City. the completion of the second floor of the Municipal Court Building.Also included was$100,000 for an . The FY08 Approved Budget includes the issuance of updated EMS Reporting System.Parks projects for $5,494,000 in GO's. Included is$1,304,000 for street which CO's were issued included$90,000 for the rehabilitation projects in the Northgate area, design of the Adamson Pool Bath House and including the Tauber and Stasney Street $315,000 for the design and construction of a rehabilitation project. $540,000 has been included for neighborhood park adjacent to the Woodland Hills street oversize participation projects.These funds development.Finally,$89,000 was issued to cover will be used toward building increased capacity into debt issuance costs. .' the streets that are being constructed by developers. An additional$100,000 has been included for The FY08 Approved Budget includes the issue of sidewalk improvements and$400,000 for hike and $9,690,000 in CO debt. This amount includes bike trails throughout the City,some of which will be $5,525,000 for costs related to the continued • ••• used toward completion of the Bike Loop project. construction of the new City cemetery. Also included $500,000 is included for new traffic signal projects is$2,490,000 for the replacement of the City's 800 • and$100,000 is included for traffic system safety MHz radio system.The current total budget for this improvements. $1,000,000 is included to be issued project is$4,885,000. The additional funds for the for the Barron Road Rehabilitation project. In project will come from funds set aside in the addition,$1,000,000 is included for design and land Equipment Replacement Fund for the replacement of • acquisition costs associated with Rock Prairie Road the radio system.The City, along with a number of Widening.Additional funds from a future bond issue other local entities,is currently pursuing a grant that will be needed for the construction of the widening would provide funding toward this project if the of Rock Prairie Road. In addition,$510,000 is grant is received.Funds in the amount of$100,000 ' included for the design of the William D.Fitch are included for a Wireless Infrastructure project that • Widening project. Construction on this project is would establish wireless networking for City anticipated in future fiscal years.Finally, $40,000 is employees at various locations throughout the City. ' • included for renovations at the Central Park Shop. $250,000 has been included for rehabilitation projects at the existing municipal facilities that will The City has statutory authority,and City Council be vacated upon the completion of the second floor policy allows for the use of non-voter authorized debt of the Municipal Court Building. The facilities will instruments such as certificates of obligation and be rehabilitated to meet the needs of the new contract obligations (generally referred to as CO's). occupants. $150,000 is included for beautification City Council policy allows the City to use such projects throughout the City. It is estimated that instruments for capital items such as the following: $900,000 will be issued for the construction of the • Adamson Pool Bath House.Funds for the design of . The purchase and replacement of major the Bath House were issued in FY07. In addition, • computer systems and other technology-based funds in the amount of$30,000 are included for the items that have useful lives of not more than ten design of the Thomas Pool Bath House. Construction • .• years. of the Bath House is proposed for FY09.Finally, The purchase and replacement of major $245,000 has been included in the CO issue for the ® equipment items such as fire fighting installation of replacement lights on the Southwood • equipment. The City has,however,developed Valley Athletic Complex little league fields. policies and procedures to provide almost all of this equipment without issuing debt. 2 The City will continue those remaining authorized extended from Krenek Tap Road to Harvey Mitchell projects in accordance with the five-year CIP plan Parkway. Construction on this project began in FY07 presented to the City Council. and is expected to be completed in FY08. Funds in the amount of$540,000 are included for oversized ' Revenue bonds are authorized to be issued any time participation(OP)projects throughout the City. there is a need for financing capital construction or Included in this amount is$27,004 for the OP of acquisition and where the asset will reside in one or Manuel Drive. In addition,funds in the amount of more of the City's enterprise funds.The City's $131,605 have been included for Victoria OP enterprise funds include Electric,Water,Wastewater projects. OP funds are used to help meet future and Solid Waste Collection. Generally,revenue capacity needs by oversizing streets above the bonds do not require voter approval. The bonds are minimum size required to serve a development. . repaid from revenues generated by the utilities. $2,671,164 is included for the Arrington/Decatur street extension project. This project will extend Revenue bonds in the amount of$15,100,000 are Arrington Road and Decatur Drive will improve estimated to be issued for the water capital north-south traffic flow on the west side of State improvement projects and revenue bonds in the Highway 6 by providing local streets that will make a amount of$3,200,000 are estimated to be issued for connection from State Highway 40 to Barron Road. wastewater capital improvement projects in FY08. $140,000 is included in the budget for future street extension projects. Also included is$1,118,700 for GOVERNMENTAL CAPITAL PROJECTS the Rock Prairie Road Widening project.These funds Below are descriptions of the governmental capital will be used for design and right-of-way acquisition projects included in the FY08 Approved Budget. The costs related to the future widening of Rock Prairie funds expended on these projects are considered Road. Construction funds are not included in the significant and nonroutine. project budget. Funds are also included for projects on Barron Road. $130,119 is included for the remaining right-of-way acquisition related to the STREETS,TRAFFIC,SIDEWALKS AND TRAILS future widening of Barron Road. In addition, CAPITAL PROJECTS $2,320,656 is included for the design and initial Street Rehabilitation Projects construction costs associated with the rehabilitation In FY08,funds in the amount of$2,090,719 are of Barron Road. Additional funds from a future bond estimated to be spent for street rehabilitation in the issue will be needed for the completion of the College Park/Breezy Heights area in Southside widening of Barron Road.Finally,$508,500 has been College Station.This is the area bounded by George included for the design of the William D.Fitch Bush Drive,West Dexter Drive,Hereford Street, Parkway widening project.This project will widen Holleman Drive,Eleanor Street and Fairview William D.Fitch Parkway between Pebble Creek Avenue.This project is part of a multi-year effort to Parkway and Rock Prairie Road. Construction on this rehabilitate the infrastructure in older parts of project is scheduled to begin in FY09. College Station.Funds are also projected in FY08 for rehabilitation projects in the Northgate area. Street TxDOT Projects Specifically,it is anticipated that$736,670 will be $672,000 has been included in FY08 for street- expended for the rehabilitation of Church Avenue scaping along Texas Avenue.The streetscaping will between College Main and Nagle Street.Funds in the be in conjunction with the TxDOT Texas Avenue amount of$1,678,424 are estimated for the Widening project. It is anticipated that the street- rehabilitation of Tauber Street and Stasney Street scaping will occur when the widening phases are from University Drive to Cherry Street.Also completed. included in this project is the construction of sidewalks on College Main.The construction funds Traffic Projects for the Northgate Street rehabilitation projects were The F08 Approved Budget includes funds for traffic authorized part of the 2003 GO bond election. management improvements,traffic system safety improvements and new traffic signal projects.Funds Street Extension Projects are included for the installation of new traffic signals . $8,585,789 is projected in FY08 for various street at the intersection of Rio Grande and Rock Prairie extension and widening projects.An estimated and at the intersection of Welsh and Holleman. $1,025,045 is included for phase II of the Dartmouth $173,471 is included in the budget for the installation Drive extension project.Dartmouth Drive will be of these signals. $87,395 is included in the budget for 3 traffic signal communication projects. This will include the replacement fiber optic cable along Texas Funds in the amount of$399,896 have been included Avenue which will support traffic signal connectivity for the New Forestry Shop construction. These funds as well as other City data and voice services.The will be used for the construction of a new Forestry City was required to remove aerial copper and fiber Shop that will be adjacent to the future community • optic cables on Texas Avenue between Harvey and park near the landfill on Rock Prairie Road. $40,000 FM 2818 to accommodate lanes added as part of the is included in the budget for renovations to the • Texas Avenue Widening project. existing Central Park Shop. This shop,located at • Central Park,is used by Parks Operations and the • Sidewalks and Trails Projects funds will be used for minor renovations. The City of College Station has worked over the years to ensure adequate transportation infrastructure Funding in the amount of$315,000 has been • for pedestrians and bicyclists. $118,273 is included included in FY08 Approved Budget for the in the budget for phase IA of pedestrian development of Woodland Hills Park.The Woodland improvements along University Drive. The FY08 Hills Park will be adjacent to the Woodland Hills funds will be used for the design of this project.This development and will include features such as a • phase of the project includes the modification of the playground,walks area lights and other amenities. ramps at the University Drive and Wellborn Road Funds in the amount of$915,000 are estimated for interchange,median and pedestrian improvements the construction of a new bath house at Adamson . . from Wellborn Road to Boyett and the installation of Pool. The design of the bath house began in FY07 a signal on University Drive at Boyett. Construction and funding for the construction portion of the • . on this phase of the project is scheduled to begin in project has been appropriated in FY08. $30,000 is • FY09. included for the design of a new bath house at Thomas Pool. It is anticipated that construction of The City has an adopted sidewalk and bike loop plan. this bath house will occur in FY09. $400,000 has $1,010,826 has been included in the budget for hike been included in the approved budget for the and bike trail projects. It is anticipated that a portion installation of replacement lights on the little league of these funds will be used for the completion of the fields at the Southwood Valley Athletic Complex. City's bike loop.This project will consist of signed bike routes,on-street bike lanes,and off-street bike $30,000 of Community Development Block Grant paths to link the Texas A&M campus,City of (CDBG) funds are anticipated to be used on eligible College Station parks and local housing areas.As projects throughout the City.These include the new development occurs, sidewalks are an important replacement of the current sidewalk entry to the aspect that must be considered.In FY08,$107,000 is Lincoln Center which extends from the south • • estimated for sidewalk improvements along entrance to the parking lot and the addition of a Southwest Parkway and Appomatox Drive. Also swing set at Lion's Park. The funds will initially be • included is an estimated$259,320 for City of College expended out of the Parks C1P Fund but will be Station Beautification Improvements.This may reimbursed with CDBG funds. • include enhancements at entrance points into the City such as the Rock Prairie Road overpass at Highway Finally,funds in the amount of$30,000 are included 6. for Field Redevelopment projects.The funds for these projects are collected from the fees paid by PARKS CAPITAL PROJECTS players and teams from both City leagues and outside In FY08,funds in the amount of$395,018 are user groups.The funds are used to pay for included in the budget for the development of replacement items and facility upgrades at City • University Park. University Park will be a athletic facilities.FY08 projects include the neighborhood park that will include a fenced"Bark renovations of infields, shade structures and support • Park"for unleashed dogs. The park will also include facilities at the Central Park softball fields. amenities typical of the City's neighborhood parks, • . such as walks,benches,and tables and lighting. An GENERAL GOVERNMENT AND CAPITAL estimated$810,000 will be spent on Veterans Park EQUIPMENT CAPITAL PROJECTS Phase II. The construction of this phase of the park is General government and capital equipment projects • primarily complete and the project came in under are planned assets that have value to more than one budget. The balance of the funds will be used to specific area of City operations.The two main • create a second entrance/exit on University Drive. divisions within this category are public facilities and 4 ------- ------- technology projects.In FY08,it is projected that for this project will be transferred from the Utility $10,477,877 will be spent on public facilities. Customer Service Fund. Included in this amount is $5,783,066 for the construction of a new City cemetery. The new A projection of$16,720 is included in the FY08 _ cemetery will be located on the northwest corner of Approved Budget for the replacement of the FM 2818 and FM60,and will have an area Uninterruptible Power Supply(UPS) units and designated for students,faculty,staff,family and battery cabinets supporting the City's telephone, friends of Texas A&M University. Completion of the computer network and radio systems. An estimated construction on this project is estimated for late expenditure of$35,141 has been included for the FY08.It is anticipated that sufficient revenue will be final phase of the PBX(Phone System)Replacement. ' generated by the sale of cemetery lots to ultimately The final component of the phone system support the debt service payment and associated costs replacement will be for the Police Department. This of this project. $1,058,200 is the estimated will be coordinated with the Police Station expenditure for the relocation of Fire Station#3. The Improvements project.Funds for the UPS and Phone station will be moved from its current location on the System Replacement project will come from the Highway 6 frontage road,which is now one-way,to Equipment Replacement Fund where they have been Barron Road. Funds in the amount of$1,683,963 set aside for this purpose.An estimated expenditure have been included for renovations to the existing of$4,784,791 has been included for the replacement Police Station. The project provides for the of the City's 800 MHz radio system. A portion of the expansion of the Police Department into the space funds for this project($2,310,000)will come from vacated by Municipal Court and for renovations of the Equipment Replacement Fund where they have the existing space. The improvements will provide been set aside for this purpose.The remainder will the Police Department with much needed additional come from CO's.The City,along with a number of space. $61,487 is the estimated expenditure for the local entities,is applying for a federal grant that New City Hall.This project is still in the initial would fund a County-wide radio system.If planning stages and the funds will be used for this successful,the funds received for this project would planning. $621,161 is included for improvements in be used for the City's portion of the system.Finally the Northgate area. It is estimated that$1,000,000 $100,000 is included in the budget for the installation will be spent on the completion of the second floor of of equipment that will allow wireless access by City the Municipal Court Building. This space is currently employees at various locations throughout the City. unfinished and it is expected that this area will be occupied by the Finance Department upon DRAINAGE PROJECTS completion. $250,000 is estimated for the Drainage capital projects are funded by revenue rehabilitation and remodel of the various existing generated through a drainage utility fee that is municipal office areas that will be restructured collected from residential and commercial utility following the move of Finance to the Municipal users. The FY08 drainage capital projects budget Court Building.Finally,$20,000 is included for the includes a projected expenditure of$1,580,286 for purchase of library books. The funds for the purchase improvements to the City's drainage system. of these books come from donations collected for this Significant projects include a projected$750,658 for ' purpose. storm drainage improvements to the flow capacity of Bee Creek Tributary"A."These improvements The FY08 Approved Budget also includes a include bank stabilization from Brothers Boulevard projected expenditure of$5,028,815 for technology to Longmire Drive. $300,000 is projected for projects. $54,398 is included for the Police Greenways land acquisition throughout the City.The Department's Automated Citations project. This City's Greenways Master Plan calls for future trail project will allow officers in the field to use a device development in urban and suburban greenways. to enter citation information which can be $200,000 is included for Minor Drainage downloaded into the Municipal Court Case System. Improvement projects. These funds are used for Also included in the budget is$37,765 for the minor unscheduled drainage projects that arise Automated Customer Service project.This portion of throughout the fiscal year. $247,628 is included for . the project is for upgrades in Utility Customer drainage improvements occurring in the College Service. Upgrades will allow customers to update Park/Breezy Heights area in conjunction with the mailing addresses,phone numbers and email Street Rehabilitation project.In addition,$32,000 is addresses online. The upgrades will also allow for included for a Bee Creek Letter of Map Revision recurring credit cards payments. $9,000 of the funds (LOMR). The LOMR must be obtained from FEMA 5 for the Bee Creek Combined Channel Improvements No funds have been appropriated in FY08 for the project. Convention Center Fund. UTILITY CAPITAL PROJECTS SPECIAL REVENUE CAPITAL PROJECTS Below are descriptions of the utility capital projects Below are descriptions of the special revenue capital included in the FY08 Approved Budget.The funds projects included in the FY08 Approved Budget.The expended on these projects are considered significant funds expended on these projects are considered and nonroutine. significant and nonroutine. Electric Capital Projects Parkland Dedication Capital Improvement $12,268,757 is the budgeted appropriation for Projects electric capital projects in FY08.As the electric The Parkland Dedication Funds account for the capital projects are considered competitive matter, •. receipt and expenditure of funds received by the City details of these projects cannot be outlined in this from residential land developers who dedicate land, summary,but will be provided to the City Council. or money in lieu of land, for use in the development of neighborhood parks in residential areas. The Water Capital Projects projects in the Parkland Dedication Capital In FY08, $12,725,339 is the budgeted appropriation Improvement Projects Funds are funded using the for water capital projects. Water production projects dedicated parkland funds. include an estimated$2,500,000 for the construction of Water Well#7.These funds will be used for land Parkland dedication funds must be used for the acquisition,engineering and construction of a four development of parks within the zone to which the million gallon per day water well. The budget also funds are dedicated. In FY08,appropriations in the includes funds for security,electrical, SCADA and amount of$710,963 are included in the budget.Total drainage infrastructure. $3,381,448 is projected in expenditures are estimated at$1,075,398 for projects FY08 for the Well#7 collection line.This line will that are anticipated to be completed in the various progress from Water Well#7 to a connection point in park zones.Funds in the amount of$115,837 are the existing wellfield.Construction of Water Well#7 estimated for the development of University Park and and the collection line is anticipated to be complete $34,000 for the Woodland Hills Park. The primary in time for the peak demand in the summer of FY08. source of funding for these parks is through the Parks The additional capacity is required to meet TCEQ • C1P Fund,but Parkland Dedication funds will also be regulations for pumping capacity to match projected used. $61,000 is included for improvements at population. Also included in the budget is • Central Park.This includes trail improvements to the $4,016,435 for the construction of a water line that • pond and the addition of an 18-hole disc golf course. will run parallel to the existing water line.The $202,761 is projected in Zone 6 for the development existing line is currently operating at maximum of Southwest Park. This park will have amenities capacity. The parallel line will increase system • found in typical neighborhood parks such as a capacity. Another water production project for which playground,walks and picnic tables. funds are included is the parallel water transmission • line that will run along FM 2818 from Highway 21 An expenditure of$364,435 is projected for the south to Villa Maria. The additional system capacity development of Edelweiss Gartens Park.Amenities required to support Northgate area and provide water anticipated to be included at this park are a service to annexed area west of FM2818 along playground,basketball court,walks and lights. FM60. $5,500,000 is estimated for this project in Additional funds are projected in a number of Park FY08.A projected$2,500,000 is included for land zones but have not yet been obligated to specific acquisition for future well sites. As capacity needs projects.These funds will be obligated to specific grow,the City is preparing for the construction of projects within these zones throughout the fiscal year new wells.A component of this is the land as the projects arise.Funds not used in the fiscal year acquisition for new future wells. will carry over to future fiscal years. A projected$232,305 is included for the completion Convention Center Capital Projects of water plant security upgrades that will help to • The Convention Center Fund accounts for the receipt minimize risks and threats to the water production and expenditure of funds received by the City for the infrastructure.A projected$500,000 is included for operation and maintenance of a convention center. the Sandy Point Pump Station Fiber Optic Line.This • line will provide communications between Dowling • 6 • ----- ------ --- Road Pump Station and Sandy Point Pump Station Wastewater Capital Projects which will result in more effective communications The FY08 Approved Budget includes$3,627,058 in in the utility. Additional Water Production projects appropriations for numerous wastewater capital include$250,000 for well site drainage,$75,000 for projects. Collection projects include$100,000 for electrical upgrades at the Greens Prairie Elevated oversize participation and planning. These funds are Storage Tank and$150,000 for replacement of the available to meet future anticipated capacity in the SCADA system. construction of wastewater lines above the minimum size needed to serve the development. $978,000 is Distribution projects projected for FY08 include the estimated expenditure for the construction of $100,000 of general oversize participation(OP) wastewater lines in annexed areas along Raymond funds and$30,000 for Victoria Street OP. These Stotzer West. Due to annexation,development and funds are used to help meet future capacity needs by expected future development wastewater services are oversizing water lines above the minimum size necessary. $150,000 is projected for the completion required to serve a development. $390,000 is of wastewater improvements in the annexed William included for the completion of the Barron Road water D.Fitch area.These include the installation of a lift line extension. This project is for the installation of station,gravity line and force main. water lines along Barron Road,Barron Road Cut Off and Wellborn Road. $411,056 is projected for the Rehabilitation projects included in the FY08 installation of a water line to serve the annexed Approved Budget include$130,000 for the alignment William D.Fitch area. of a wastewater collection line in the Emerald Parkway/Bent Oak area that will correct poor flow Rehabilitation projects included in the FY08 conveyance. $100,000 has been included for the Approved Budget include$75,000 for relocation of rehabilitation of lift station#3.This project will water lines along Barron Road that need to be replace deteriorated infrastructure and the relocated in conjunction with the upgrade of Barron rehabilitated lift station will increase the lift station's Road from a two lane rural highway to a minor capacity to service a developing sewershed. In arterial road. $120,000 is projected for the addition,funds in the amount of$100,000 have been adjustments to water lines that will occur as part of projected for the rehabilitation of the Foxfire lift the Bee Creek IV and V drainage project which will station.These funds will be used to upgrade the provide storm drainage improvements to the flow electrical service,replace deteriorated piping and capacity of Bee Creek Tributary"A."An estimate of recoat the interior of the wet well. These $50,000 is included for the replacement of water improvements are expected to improve the efficiency lines along Tauber Street and Stasney Street and of the lift station. $75,000 has been estimated for the $991,366 is included for the replacement of water relocation of wastewater lines along Barron Road . lines in the College Park/Breezy Heights area. These that need to be moved in conjunction with the last two projects are being completed in connection upgrade of Barron Road from a two lane rural with the Streets rehabilitation projects. The existing highway to a minor arterial road. $300,000 is infrastructure is being replaced in conjunction with projected for the adjustments to wastewater lines that this project and capacity should increase as a result. will occur as part of the Bee Creek IV and V Finally,$900,000 is projected for the replacement of drainage project which will provide storm drainage water lines in the area bounded by Haines, Southwest improvements to the flow capacity of Bee Creek Parkway,Glade and Langford.These aging lines Tributary"A." were identified in a 2003 water study as in need of replacement.Finally,contingency in the amount of Funds in the amount of$299,784 have been $150,000 has been included in the FY08 Approved projected for the replacement of the final screw lift Budget. These funds will be available for use on pump at the Carters Creek Wastewater Treatment unanticipated projects as well as to offset project Plant.Three pumps were replaced in prior fiscal overruns. years.These improvements are expected to improve the efficiency of the screw lift system. Funds in the The FY08 Approved Budget includes$1,000,000 in amount of$36,626 are estimated for the current revenues that will be transferred from rehabilitation of wastewater lines in connection with , operations to fund water capital projects. the Church Street Rehab project and$26,321 is Additionally,a debt issue of$15,100,000 is projected estimated for replacement of wastewater lines along in FY08 for water capital projects. Tauber Street and Stasney Street. An estimate of $658,328 is included for the replacement of 7 • wastewater lines in the College Park/Breezy Heights improvements that will allow for improved access at area.Funds totaling$634,200 are projected for the the new landfill. Funds in the amount of$1,266,710 replacement of wastewater lines in the area bounded are projected for buildings and infrastructure by Haines, Southwest Parkway,Glade and Langford. improvements at the new landfill. These include a These aging lines were identified in a 2003 scale house and scale,a maintenance facility,waste . wastewater study as in need of replacement. screening area and service facility. In addition • $1,092,822 has been included for design services at • Treatment and disposal projects include an estimated the new landfill. These include the design and $1,324,333 for ultraviolet upgrades at the Carters engineering of disposal cells,access infrastructure Creek Wastewater Treatment Plant(CCWWTP). and utilities infrastructure. Ultra-violet lights are used for disinfecting the ' effluent from the wastewater treatment plant before it ADDITIONAL O&M COSTS is released into the waterways.The current system The FY08 Approved Budget includes a number of • has reached the end of its service life. The new capital projects that have been recently completed system will meet all Texas Commission on and have added operations and maintenance(O&M) Environmental Quality and EPA requirements. expense.In particular,the City's general fund has $30,000 is projected for clarifier improvements at the been and will continue to be impacted by capital CCWTP which should improve the effectiveness of projects as they come online. In some situations,the the clarifiers.Also included is$125,000 for O&M cost of a project is minimal and can be headworks improvements at the Plant. These absorbed by the City department that is benefiting the improvements should improve the efficiency of the most from the project. In other situations,the O&M headworks. $150,000 is included for improvements cost is more significant and funding for these additional expenses is addressed through the Service to the Carters Creek service water system. This will Level Adjustment(SLA)process. In these situations, include the installation of a complete bleach injection SLAs are submitted for the O&M needs of the capital system with a bulk liquid bleach tank,an above projects and funding is considered as part of the ground level PVC injection point,an improved budget process. • • bleach pump,a cover for the entire system,and a • ' paved drive for the bulk delivery of bleach.In Governmental Projects O&M ' addition,$60,000 is projected for CCWWTP blower The FY08 Approved Budget includes funding for a overhauls and$50,000 is estimated for centrifuge number of capital projects that were either recently ' improvements at the Lick Creek Wastewater put into operation or are anticipated to go-live in Treatment Plant. These improvements should FY08.Additional O&M funds are included in the • increase efficiency at the Plant. Funds in the amount FY08 Approved Budget for a number of of$20,000 are projected to complete security governmental capital projects. Funds in the amount upgrades at the Plant and$163,000 is projected for of$151,490 were included in the FY08 budget for the SCADA replacement project. Finally, O&M expenditures related to the new Municipal contingency in the amount of$150,000 has been Cemetery. This includes funds for a full time administrative support position. The incumbent in included in the FY08 Approved Budget. These funds this position will be responsible for paperwork and will be available for use on unanticipated projects as related administrative duties.Also included are funds well as to offset project overruns. for a Crew Leader position and a Groundsworker position. These positions will be funded for one A total of$2,200,000 in current revenues from quarter of FY08 and will be funded for a full year in operations is estimated to be used to fund wastewater FY09 to coincide with the cemetery becoming fully capital projects.Additionally,a debt issue of operational. Funds were also included for the • $3,200,000 is projected in FY08 for wastewater purchase of equipment such as a truck, tractor,trailer capital projects. and mower. BVSWMA O&M funds have been included in the FY08 Appropriations in the amount of$2,838,321 are Approved Budget for the Veterans Park and Athletic • included in BVSWMA for capital project Complex.Funding for this project was phased in expenditures. These expenditures are related over a two year period(FY07 and FY08)to coincide • primarily to design,permitting,access and with the progress of the project.Funds in the amount infrastructure for the Highway 30 Landfill. $305,100 of$257,286 have been included in the FY08 Approved Budget for O&M costs associated with . is projected for permit application and legal fees at this project. Included are funds for three positions: ' the new landfill. $1,168,330 is estimated for one Crew Leader,one Groundsworker and one 8 • Irrigation Specialist.Also included are funds for for the annual landscaping service costs that will be equipment such as a truck,cargo van and field required for the site. marking equipment,as well as funds for the increase in electric utility costs due to the additional lights. Funds have also been included in the FY08 Approved Budget for costs associated with the Funds were also included in the Parks O&M budget BVSWMA Rock Prairie Road Landfill gas recovery for the costs associated with the opening of several and final cover project. $7,000 has been included in new parks in FY08.These include University Park the department's budget for O&M costs related to and Woodland Hills Park.Funds were included for this project.These funds will be used for the mowing contracts at each of these parks,supplies and utility costs.Finally,funds were added to the Parks maintenance and periodic replacement of the O&M budget for costs associated with the opening of equipment that is part of the landfill's gas system. the new forestry shop. Funds were included for the purchase of tables,desks,chairs and an ice machine, More detailed sheets that reflect the estimated O&M as well as for utility costs associated with the costs associated with the capital projects have been building. Several other Parks capital projects will included in the final section of the CIP document. have O&M costs,but these will be absorbed within the existing Parks budget. UNFUNDED PROJECTS The City has identified a number of unfunded Other governmental projects for which O&M funds projects that have not been presented in the current are included in the FY08 Approved Budget include Capital Improvements Program. Some of these the additional funds for information technology projects may be presented for consideration as part of projects.The O&M costs associated with several a future bond issue. information technology projects were included in the Information Technology department's budget. Included funds were for software maintenance and upgrades.The O&M costs for the information technology software products are evaluated on an annual basis. Special Revenue Projects O&M Funds were also included in the Parks O&M budget for the costs associated with the opening of several new parks in FY08. These include Edelweiss Park and Cove of Nantucket Park. Funds were included for mowing contracts at each of these parks,supplies and utility costs. Several other Parks capital projects will have O&M costs,but these will be absorbed within the existing Parks budget. Utility Projects O&M The City of College Station strives to provide superior electric,water,and wastewater services to its citizens. Part of this effort includes investment in the capital that makes up the infrastructure.These investments take place in the form of capital improvement projects. Some of these improvements require additional operating and maintenance(O&M) costs. These costs are identified and ultimately become part of the cost of providing these utility services. The FY08 Approved Budget includes funds in the amount of$152,000 for the O&M costs related to the operation of Well#7. Included in this amount is $150,000 for the annual electric utility costs associated with the operation of the well and$2,000 9 • • CITY OF COLLEGE STATION HEART OF THE RESEARCH VALLEY • • • 10 GENERAL GOVERNMENT- STREET, TRAFFIC, SIDEWALK AND TRAIL CAPITAL IMPROVEMENT PROJECTS FISCAL YEAR 2007-2008 THROUGH FISCAL YEAR 2012-2013 11 GENERAL GOVERNMENT STREETS,TRAFFIC, SIDEWALKS, AND TRAILS CAPITAL IMPROVEMENT PROJECTS FISCAL YEAR 2007-2008 THROUGH FISCAL YEAR 2012-2013 PROJECT REVISED PROJECT BUDGET ACTUAL FY06-07 ESTIMATE NUMBER AMOUNT FY 05-06 APPROPRIATIONS FY 06-07 BEGINNING FUND BALANCE: 18,184,996 24,049,456 24,049,456 ADDITIONAL RESOURCES: ' GENERAL OBLIGATION BONDS 1,540,000 3,440,000 2,700,000 CERTIFICATES OF OBLIGATIONS 6,294,512 489,000 - INTERGOVERNMENTAL TRANSFERS 15,620 - - INTRAGOVERNMENTALTRANSFERS 91,728 - 365,091 • INVESTMENT EARNINGS 878,743 363,000 571,000 OTHER 9,183 25,000 25,000 • SUBTOTAL ADDITIONAL RESOURCES $ 8,829,786 $ 4,317,000 $ 3,661,091 • TOTAL RESOURCES AVAILABLE $ 27,014,782 $ 28,366,456 $ 27,710,547 STREET REHABILITATION PROJECTS WEST PARK(SOUTHSIDE) ST0400 1,200,000 117,510 - 986,627 COLLEGE PARK/BREEZY HEIGHTS(SOUTHSIDE) ST0507 2,500,000 82,303 - 248,864 2 NORTHGATE STREET REHAB ST0518 0 - - 2 CHURCH AVE REHAB PHASE II ST0523 1,687,063 46,857 - 887,063 895,002 1/2 TAUBER AND STASNEY REHAB/NG SIDEWALKS ST0505 2,252,110 69,519 2,000,000 472,654 CLOSED PROJECTS 6,835 - - ' SUBTOTAL $ 323,024 $ 2,887,063 $ 2,603,147 STREET EXTENSION PROJECTS * JONES-BUTLER RD SOUTH-PH II ST0005 1,467,042 118,709 100,000 1,270,788 • * VICTORIA OP ST9928 345,639 - - - DARTMOUTH EXTENSION PHASE 11 ST0211 3,600,000 50,499 - 2,387,500 • 2 OVERSIZE PARTICIPATION ST0519 2,320,565 - - - CORSAIR(AMS)STREET EXTENSION ST0612 329,000 2,031 - 326,969 WATER WOOD OP ST0613 23,431 - - 23,431 MANUELDRIVEOP ST0802 27,004 - - - ARRINGTON/DECATUREXTENSION ST0606 4,110,000 290,981 3,686,009 1,147,855 FUTURE STREET EXTENSION PROJECTS ST0701 140,000 - 890,000 - • . . • SOUTHERN BREEZE DRIVE ST0704 25,000 - 25,000 25,000 ' , . ROCK PRAIRIE ROAD PROJECTS 2 ROCK PRAIRIE RD WIDENING ST0417 2,969,000 271,645 - 270,317 BARRON ROAD PROJECTS • * BARRON ROAD RIGHT OF WAY ST0006 431,000 7,386 - 150,000 BARRON ROAD INTERCHANGE DESIGN ST0212 735,220 152,403 - 357,033 2 BARRON ROAD REHABILITATION ST0409 3,000,000 90,795 - 458,396 GREENS PRAIRIE ROAD PROJECTS . 2 WILLIAM D.FITCH PKWY WIDENING PH 11 ST0520 3,300,000 - - - CLOSED PROJECTS 315,003 - 3.837 SUBTOTAL 1,299,452 4,701,009 6,421,126 STREET TXDOT PROJECTS TX AVE STREETSCAPE PH II ST9915 999,552 315,733 - 11,819 • . TXDOT ROW PAYMENT TBD 484,957 - 484,957 484,957 SUBTOTAL 315,733 484,957 496,776 ' 12 GENERAL GOVERNMENT STREETS,TRAFFIC, SIDEWALKS, AND TRAILS CAPITAL IMPROVEMENT PROJECTS FISCAL YEAR 2007-2008 THROUGH FISCAL YEAR 2012-2013 APPROVED FY 07-08 PROJECTED PROJECTED PROJECTED PROJECTED PROJECTED PROJECTED APPROPRIATIONS FY 07-08 FY 08-09 FY 09-10 FY 10-11 FY 11-12 FY 12-13 14,839,816 14,839,816 3,683,117 1,336,227 972,721 715,752 607,125 5,454,000 5,454,000 3,661,000 1,935,000 540,000 - - • 150,000 150,000 - - - 257,000 257,000 73,000 35,000 26,000 21,000 19,000 $ 5,861,000 $ 5,861,000 $ 3,734,000 $ 1,970,000 $ 566,000 $ 21,000 $ 19,000 $ 20,700,816 $ 20,700,816 $ 7,417,117 $ 3,306,227 $ 1,538,721 $ 736,752 $ 626,125 2,090,719 - - - - - 416,937 - - - - - - 736,670 - - - - - - 1,678,424 $ 416,937 $ 4,505,813 $ - $ - $ - $ - $ - - 131,605 131,605 - - - - • - 1,025,045 - - - - - - 512,996 540,000 540,000 727,569 - - - 27,004 - - - - - - 2,671,164 - - - - - - 140,000 - - - - - • . 421,490 1,118,700 1,047,510 - - - - - 130,119 - - - • - - 1,000,000 2,320,656 - - - - - 508,500 508,500 1,395,750 1,395,750 - - - 1,929,990 8,585,789 3,114,865 1,935,750 727,569 - - - 672,000 - - - - - 0 672,000 0 0 0 0 0 13 GENERAL GOVERNMENT STREETS, TRAFFIC, SIDEWALKS, AND TRAILS CAPITAL IMPROVEMENT PROJECTS FISCAL YEAR 2007-2008 THROUGH FISCAL YEAR 2012-2013 PROJECT REVISED PROJECT BUDGET ACTUAL FY 06-07 ESTIMATE NUMBER AMOUNT FY 05-06 APPROPRIATIONS FY 06-07 • TRAFFIC PROJECTS * TRAFFIC MGMT.IMPROVE, ST0011 134,290 67,145 67,145 2 TRAFFIC SYSTEM SAFETY IMPR. ST0511 233,186 (16,129) - 33,186 • SOUTHWEST PKWY MEDIANS ST0602 128,000 26,729 100,000 101,271 • CLOSED TRAFFIC SYSTEM SAFETY IMP PROJECTS 77,444 28,955 - - . 2 NEW TRAFFIC SIGNAL PROJECTS ST0512 844,551 (21,039) (80,200) 174,551 • 2 VEHICLE DETECTION ST0302 50,000 - - 11,161 2 TRAFFIC SIGNAL @ROCK PRAIRIE/RIO GRANDE ST0414 120,000 - _ - • 2 TRAFFIC SIGNAL @WELSH/HOLLEMAN ST0415 120,000 9,900 2 TRAFFIC SIGNAL @ HM PKWY AND LUTHER ST0607 359,000 16,983 290,000 228,000 2 TRAFFIC SIGNAL @ HM PKWY AND 1-IOLLEMAN ST0608 359,000 19,108 290,000 259,000 2 TRAFFIC SIGNAL @ 2818/F&B ST0610 241,300 160,246 - 81,054 CLOSED NEW TRAFFIC SIGNAL PROJECTS 90,949 23,627 - - TRAFFIC SIGNAL @ GB DRIVE EAST&DOMINIK ST0205 133,000 _ _ _ 2 TRAFFIC SIGNAL COMMUNICATIONS ST0411 140,000 3,418 - 30,000 CLOSED TRAFFIC SIGNAL COMMUNICATIONS PROJECTS - 10,000 _ - 10,000 . CLOSED PROJECTS (10,517) - - SUBTOTAL $ 241,281 $ 666,945 $ 995,368 • SIDEWALKS& TRAILS • BIKE LOOP-2005 ST0530 327,202 - -. 2,000 MISC.BIKE TRAILS ST9803 169,000 _ - - 2 HIKE AND BIKE TRAILS ST0521 981,624 4,699 200,000 - CLOSED HIKE AND BIKE TRAIL PROJECTS 18,376 3,200 - - NEIGI-IBORI-IOOD CIP(TRAFFIC CALMING) ST0012 ANNUAL - - - 2 PEDESTRIAN IMP ON UNIVERSITY DR-PHASE IA ST0416 2,387,025 47,504 118,274 • COCS BEAUTIFICATION IMPROVEMENTS ST0515 300,000 - 150,000 40,680 PEDESTRIAN IMPROVEMENTS ON FM 2818 ST0516 1,069,900 1,703 250,200 1,067,007 2 SIDEWALK IMPROVEMENTS ST0517 158,735 - 44,780 44,623 • UNIV DR SIDEWALK IMPROVEMENTS ST0529 140,958 71,877 2,500 58,481 SIDEWALK IMP ON SOUTI-IWEST PKWY ST0702 31,300 - 2,720 - SIDEWALK IMP ON APPOMATTOX ST0803 75,700 - - - • CLOSED SIDEWALK IMPROVEMENT PROJECTS - 43,271 43,271 - - CLOSED PROJECTS (210,000) - ' SUBTOTAL $ 172,255 $ 440,200 $ 1,331,065 CAPITAL PROJECTS SUBTOTAL $ 2,351,745 $ 9,180,174 $ 11,847,483 OTIIER (64,645) - - LEGISLATIVE CONSULTING 108,629 162,000 162,000 DEBT ISSUANCE COSTS 102,347 39,000 20,000 GENERAL&ADMIN.CHARGES 467,250 841,248 841,248 TOTAL EXPENDITURES $ 2,965,326 $ 10,222,422 $ 12,870,731 ENDING FUND BALANCE: $ 24,049,456 $ 18,144,034 $ 14,839,816 *-Indicates projects funded through November 1998 G.O.Bond Authorization . . 1-Funded through CDBG Funds. 2- Indicates projects funded through 2003 G.O.Bond Authorization 14 GENERAL GOVERNMENT STREETS,TRAFFIC, SIDEWALKS, AND TRAILS CAPITAL IMPROVEMENT PROJECTS FISCAL YEAR 2007-2008 THROUGH FISCAL YEAR 2012-2013 APPROVED FY 07-08 PROJECTED PROJECTED PROJECTED PROJECTED PROJECTED PROJECTED APPROPRIATIONS FY 07-08 FY 08-09 FY 09-10 FY 10-11 FY 11-12 FY 12-13 67,145 67,145 - - - - - 100,000 100,000 100,000 - - - - 500,000 500,000 170,000 - - - - - 94,949 •- - - - - . - 78,522 - - - - - - - - - - 99,627 - 87,395 - - - - - $ 667,145 $ 928,011 $ 270,000 $ - $ - $ 99,627 $ - - 325,202 - - - - - - 169,000 - - - - - - 516,624 230,000 228,756 - - - - 118,273 1,980,025 - - - - - 259,320 - - - - - 100,000 - 100,000 - - • - - - 31,300 - - - - - - 75,700 - - - - - $ 100,000 $ 1,495,419 $ 2,310,025 $ 228,756 $ - $ - $ - $ 3,114,072 $ 16,187,032 $ 5,694,890 $ 2,164,506 $ 727,569 $ 99,627 $ - 25,000 25,000 36,000 19,000 5,400 - - 805,667 805,667 350,000 150,000 90,000 30,000 30,000 $ 3,944,739 $ 17,017,699 $ 6,080,890 $ 2,333,506 $ 822,969 $ 129,627 $ 30,000 $ 16,756,077 $ 3,683,117 $ 1,336,227 $ 972,721 $ 715,752 $ 607,125 $ 596,125 15 • • • • • • • • u ''r • CITY OF COLLEGE STATION HEART OF THE RESEARCH VALLEY • • • • • 16 STREET REHABILITATION PROJECTS 17 • PROJECT: West Park(Southside) • FUND(S): PROJECT NUMBERS&BUDGET: • 139-Streets Capital Fund Streets: ST0400 $1,200,000 238-Water Capital Fund Water: WF0427233 $1,250,000 • 239-Wastewater Capital Fund Wastewater: WF0427245 $1,500,000 •• 912-Drainage Utility Fund Drainage: SD0524 $560,000 Total Project Budget: $4,510,000 PROJECT MANAGER: Edward McDonald FUNDING PROJECT SOURCES: Streets-CO's CLIENT: Public Works W/WW-URB Drainage-Drainage Utility PROJECT DESCRIPTION/STATUS . This project includes the rehabilitation of the streets and drainage infrastructure in the West Park area of Southside bounded by George Bush Drive, Luther Street,Wellborn Road and Fairview Avenue.As part of this project,the water lines will be replaced. These lines were identified by the Freese&Nichols Southside Water Study(July 2003). In addition the wastewater lines will be replaced.These lines were identified by the CDM Capacity/Infiltration/Inflow Management Project 2002-2003 Sanitary Sewer Evaluations(February 2004). April 2006 Status: In Construction • . Award of Construction Contract: February 2006 • PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR Project Total 3,208 ....$.. FISCAL YEAR LAND I ENG $ CONSTR. $ MISC. OVERHEAD PROJECT TOTAL 1 Prior Years $ I $ 282,517 $ 1,447,404 2006-07 0 61,8751 2,847,813 0 152,908 3,062,595 2007-08 0 0 0 0 0 - 2008-09 0 0 0 0 0 - 2009-10 0 0 0 0 0 - • 2010-11 001 0 0I0 0 0 - 2011-12 0 0 0 - 2012-13 01 0 0 0 0 PROJECT TOTAL $0I $344,392 $4,009,492 $3,208 $152,908 $4,510,000 ��' w spa �. •'9 ' aii'''• ' �13 hF 0`i� `�.` s'y! JJ •�"�" V,♦ 'Nhzt ParF iSouthz�0>I� Q`"O • o y" �_s 2`9 h any rr?.w., ..$ J i 4 -j .• � s �Ica � - cry Q° f\., 1,, . \\„/„Nsi -1 ,/\__1 \ v 4,, .,„,,rev, .c•- is -n.. cl1••tn3. ;.�\ i id:ins;:r`.'.,. *�d;:n: 18 -41 PROJECT: West Park(Southside) PROJECT CALENDAR OF EXPENDITURES BY FUND Streets Portion FISCAL YEAR LAND ENG. CONSTR. MISC. OVERHEAD PROJECT TOTAL Prior Years $0 $115,819 $94,346 $3,208 $0 $213,373 2006-07 25,973 943,685 16,969 $986,627 - 2007-08 $0 2008-09 $0 2009-10 $0 2010-11 $0 2011-12 2012-13 $0 - Streets Total $0 $141,792 $1,038,031 $3,208 $16,969 $1,200,000 Water Portion FISCAL YEAR LAND ENG. CONSTR. MISC. OVERHEAD PROJECT TOTAL Prior Years $0 $82,650 $505,071 $0 $0 $587,721 2006-07 17,950 591,042 53,287 $662,279 2007-08 $0 2008-09 $0 2009-10 $0 2010-11 $0 2011-12 $0 2012-13 $0 Water Total $0 $100,600 $1,096,113 $0 $53,287 $1,250,000 a Wastewater Portion FISCAL YEAR LAND ENG. CONSTR. MISC. OVERHEAD PROJECT TOTAL 1 Prior Years $0 $84,048 $493,771 $0 $577,819 2006-07 17,952 830,031 74,198 $922,181 2007-08 $0 2008-09 2009-10 $0 2010-11 $0 2011-12 $0 2012-13 $0 Wastewater Total $0 $102,000 $1,323,802 $0 $74,198 $1,500,000a Drainage Portion FISCAL YEAR LAND ENG. CONSTR. MISC. OVERHEAD PROJECT TOTAL Prior Years $0 $0 $68,491 $0 $0 $68,491 2006-07 483,055 8,453 $491,508 2007-08 $0 2008-09 $0 2009-10 2010-11 $0 2011-12 $0 2012-13 $0 Drainage Total $0 $0, ......... . $551,546........ .... ....... .... .$0.. $8,453 $560,000 PROJECT TOTAL I $OI $344,3921 $4,009,4921 $3,208I $152,9081 $4,510,000 OPERATING COSTS • First Fiscal Year Annually I Total Personnel $0 Supplies $0 Service $0 Capital $0 TOTAL $0 I $0 $0 19 • PROJECT: College Park/Breezy Heights Street Improvements FUND(S): PROJECT NUMBERS&BUDGET: 139-Streets Capital Fund Streets: ST0507 $2,500,000 238-Water Capital Fund Water: WF0595915 $1,640,000 239-Wastewater Capital Fund Wastewater: WF0595926 $1,305,000 912-Drainage Utility Fund Drainage: SD0601 $485,000 • Total Project Budget: $5,930,000 . PROJECT MANAGER: Edward McDonald FUNDING PROJECT SOURCES: Streets-CO's CLIENT: Public Works W/WW-URB Drainage-Drainage Utility PROJECT DESCRIPTION/STATUS This project includes street improvements in the area bounded by George Bush Drive,West Dexter Drive, Hereford Street, Holleman Drive, Eleanor Street and Fairview Avenue.As part of this project,the water and wastewater lines will be replaced. • PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR Project Total _._._... FISCAL YEARaS , $ LAND , $ ENG. $ CONS�TR.OU I MISC. OVERHEAD PROJECT TOTAL Prior i $313,651 2006-07 $ $ 121,911.00 $ 1,400,000.00 $ 5,000.00 $ 101,395.54 $1,628,307 2007-08 $ - $ - $3,815,090.75 $ - $ 172,951.32 $3,988,042 2008-09 0 0 0 0 $0 2009-10 0 0 0 $0 • 2010-11 0 0 001 01 I $0 2011-12 0 0 01 01 I $0 2012-13 1 01 0 01 01 I $0 PROJECT TOTAL 1 $01 $433,600 $5,217,0531 $5,000I $274,3471 $5,930,000 .�yx A `ryo','� �Ooy`o 'S C 'ar <b b'ollege,Par4 Breezy Helgals ora�nage 1, (,.� '�`• , • r�C+ ��,�Ql`�e N ;'m„`lt?(� "-0; Sea` .,01' �` • , Q r a C s,„e. s P$p '9bN ,.L 5. N oe¢ _ Tna^'e `m01:. arry �S� loa�Lv 4- 46 f/✓ a +f4i,�\ \ y �F, `�° opt h, \ 3 a "i• ' a y ! 4 �t 4` lei .. `.A7 a. '1 6. ° 691,�.� Gas yda o a 9 .."Ni\--/ 20 • PROJECT: College Park/Breezy Heights Street ImprovementsI PROJECT CALENDAR OF EXPENDITURES TURES BY FUND Streets Portion FISCAL YEAR LAND ENG. CONSTR. MISC. OVERHEAD PROJECT TOTAL Prior Years $ - $ 160,416.42 $ - $ - $160,416 2006-07 $ 39,5.8.4.00 $ 200,000.00 $ 5,000.00 $ 4,280.22 $248,864 2007-08 $ 2,054,761.00 $ 35,958.32 $2,090,719 2008-09 $0 2009-10 $0 2010-11 $0 2011-12 $0 2012-13 Streets Total $0 $200,000 $2,254,761 $5,000 $40,239 $2,500,000 Water Portion FISCAL YEAR LAND ENG. CONSTR. MISC. OVERHEAD PROJECT TOTAL Prior Years $ - $ 66,610.00 $ 1,962.00 $ - $68,572 2006-07 $ 33,390.00 $ 500,000.00 $ 46,671.63 $580,062 2007-08 $ 911,601.00 $ 79,765.09 $991,366 2008-09 $0 2009-10 $0 2010-11 $0 2011-12 $0 2012-13 $0 Water Total $0 $100,000 $1,413,563 $0 $126,437 $1,640,000 Wastewater Portion FISCAL YEAR LAND ENG. CONSTR. MISC. OVERHEAD PROJECT TOTAL Prior Years $ - $ 66,610.00 $ - $ - $66,610 2006-07 $ 33,390.00 $ 500,000.00 $ 46,671.63 $580,062 2007-08 $ 605,359.50 $ 52,968.96 $658,328 2008-09 $0 2009-10 $0 2010-11 $0 2011-12 $0 2012-13 $0 Wastewater Total $0 $100,000 $1,105,360 $0 $99,641 $1,305,000 . Drainage Portion FISCAL YEAR LAND ENG. CONSTR. MISC. OH PROJECT TOTAL Prior Years $ - $ 18,053.00 $ - $ - $18,053 2006-07 $ 15,547.00 $ 200,000.00 $ 3,772.07 $219,319 2007-08 $ 243,369.25 $ 4,258.96 $247,628 2008-09 $0 2009-10 $0 2010-11 $0 2011-12 $0 2012-13 $0 , Drainage Total $0 $33,600 $443,369 $0 $8,031 $485,000 'PROJECT TOTAL I $OI $433,6001 $5,217,0531 $5,0001 $274,3471 $5,930,0001 , OPERATING COSTS First Fiscal Year I Annually Total Personnel $0 Supplies $0 Service $0 Capital I $0 TOTAL $0 ( $0 $0 21 . PROJECT: NORTHGATE STREET REHAB PROJECT#: ST0518 • FUND: 139-STREETS CAPITAL PROJECTS PROJECT BUDGET: $0 PROJECT • MANAGER: TBD FUNDING • • SOURCES: 2003 Bond Authorization (GOB's) PROJECT CLIENT: Public Works • PROJECT DESCRIPTION/STATUS Rehabilitation of Streets in the Northgate Area of the Cityportions of Church to •include Street, Boyett, Cross, Lodge, Nagle, Patricia, Stasney, Tauber, and Spruce. This project is a funding source for smaller projects that are being completed in the Northgate area.The funds have been used as follows: Original project budget=$4,104,000 $800,000 transferred to ST0523 (Church Street Rehab)in FY05. $2,000,000 transferred to ST0505(Tauber and Stasney Rehab)in FY07. $887,063 transferred to ST0523 (Church Street Rehab)in FY07. $416,937 to be transferred to ST0416(Univ Dr Pedestrian Improvements)in FY08. PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR FISCAL YEAR LAND ENG. CONSTR. MISC. I PROJECT TOTAL Prior Years 0 0 0 0 $0 2006-07 $0 2007-08 $0 2008-09 $0 2009-10 $0 2010-11 $0 • , . 2011-12 $0 2012-13 $0 • TOTAL $0 $0 $0 $0 $0 OPERATING COSTS First Fiscal Year I Annually Total Personnel $0 Supplies $0 Service $0 Capital $0 TOTAL $0 $0 $0 qr7'f ! i • I� A L „\� . 1 !Northgata Stroet Rehabilitation /v .. Qo�o n`vj �' � , ��� i� oem°-s, `"emsqj`N J, \s•4 �q�,�:� rzos„ 62 /Nr"..•* -.X . f %,, .k.7 ,$ ,,,, i.,, \ • 47\N/N,Ni\,..,"\.=j � s �g6 � tr. 22 • / ! < „ •CITY OF COLLEGE STATION HEART Of THE RESEARCH VALLEY 23 e PROJECT: Church Avenue Rehab-Phase II FUND(S): PROJECT NUMBERS&BUDGET: . 139-Streets Capital Fund Streets: ST0523 $1,687,063 238-Water Capital Fund Water: WF0632256 $51,000 " 239-Wastewater Capital Fund Wastewater: WF0632257 $103,313 Total Project Budget: $1,841,376 PROJECT • MANAGER: Donald Harmon • • FUNDING PROJECT SOURCES: Streets-03 GOB Funds CLIENT: Public Works W/WW-URB .s PROJECT DESCRIPTION/STATUS Church Avenue will be rehabilitated between College Main and Nagle.As part of this project water lines and meters as well as wastewater lines will be rehabilitated. Streets Funding: $800,000 transferred from ST0518 in FY05 for Streets portion of budget-FY05. $887,063 included on FY07 BA#2-transferred from NG Street Rehab (ST0518)-FY07. PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR Project Total FISCAL YEAR LAND ENG. CONSTR. j MISC. OVERHEAD PROJECT TOTAL Prior Years 0 73,879 0 0 0 $73,879 • 2006-07 350,000 14,609 591,321 15,000 23,271 $994,201 • ' 2007-08 0 14,000 733,679 10,000 15,617 $773,296 2008-09 0 0 0 0 0 $0 • 2009-10 0 0 0 0 0 $0 ' 2010-11 0 0 0 0 0 $0 • 2011-12 0 0 0 0 01 $0 2012-13 0 01 01 0 01 $0 PROJECT TOTAL $350,000 $102,4881 $1,325,0001 $25,000 $38,8881 $1,841,376 / \ 9 f `� / �p \N. • f \ f 1 9b I\ 4 .N '$ • , �'1 f Sid j' 0, +� � I Gheroh Avenue RehsbitlW4on-Phaaetli (o .- \ P� CAP�' `�� 9/ S ,, 1 j aq `,,,/ ys 24 PROJECT Church Avenue Rehab Phase II PROJECT CALENDAR OF EXPENDITURES BY FUND Streets Portion FISCAL YEAR LAND ENG. CONSTR. MISC. OVERHEAD PROJECT TOTAL Prior Years $0 $55,391 $0 $0 $0 $55,391 2006-07 $350,000 $14,609 $500,000 $15,000 $15,3931 $895,002 ' 2007-08 $0 $14,000 $700,000 $10,000 $12,670 $736,670 2008-09 $0 $0 $0 2009-10 $0 $0 $0 $0 $0 $0 2010-11 $0 $0 $0 $0 $0 $0 • 2011-12 - -- - $0 -- -- -- $0- -- ---$0 $0 2012-13 $0 $0 $0 $0 $0 $0 Streets Total $350,0001 $84,000 $1,200,000 $25,000 $28,0631 $1,687,063 Water Portion FISCAL YEAR LA ND ENG. CONSTR. MISC. OVERHEAD PROJECT TOTAL Prior Years $0 $2,175 $0 $0 $0 $2,175 2006-07 $0 $0 $45,000 $0 $3,825 $48,825 2007-08 $0 $0 $0 $0 $0 $0 2008-09 $0 $0 $0 2009-10 $0 $0 $0 $0 $0 $0 2010-11 $0 $0 $0 $0 $0 $0 2011-12 $0 $0 $01 $0 $0 $0 2012-13 I $0 $0 $01 $0 $0 $0 Water Total 1 $01 $2,175 $45,0001 $0 $3,825 $51,000 Wastewater Portion FISCAL YEAR LAND ENG. CONSTR. MISC. OVERHEAD PROJECT TOTAL Prior Years $0 $16,313 $0 $0 $0 $16,313 2006-07 $0 $0 $46,321 $0 $4,053 $50,374 2007-08 $0 $0 $33,679 $0 $2,947 $36,626 2008-09 $0 $0 $0 $0 $0 $0 2009-10 $0 $0 $0 $0 $0 $0 2010-11 $0 $0 $0 $0 $0 $0 2011-12 $0 $0 $0 $0 $0 $0 2012-13 $0 $0 $0 $0 $0 $0 Wastewater Total $0 $16,313 $80,000 $01 $7,000 $103,313 (PROJECT TOTAL $350,0001 $102,4881 $1,325,0001 $25,0001 $38,8881 $1,841,3761 OPE RATING COSTS,,.,..,..,.. ..... ...... First Fiscal Year I Annually Total Personnel $0 Supplies I $0 Service I I I $0 Capital I I $0 TOTAL $0 $0 I I $0 25 PROJECT: Tauber/Stasney Rehab and Northgate Sidewalks FUND(S): PROJECT NUMBERS&BUDGET: 139-Streets Capital Fund Streets: ST0505 $2,252,110 238-Water Capital Fund Water: WF0625888 $120,000 • • 239-Wastewater Capital Fund Wastewater: WF0625893 $120,000 Total Project Budget: $2,492,110 PROJECT MANAGER: Edward McDonald FUNDING • PROJECT SOURCES: Streets-CDBG, GOB's ' CLIENT: Public Works W/WW-URB • • .. PROJECT DESCRIPTION/STATUS • • Design for rehabilitation of Tauber and Stasney Street from University Drive to Cherry Street.Design and construction of new sidewalks on College Main.The project also includes the water and wastewater line rehabilitation on Tauber and Stasney streets from University Drive to Cherry Street.The water lines will be replaced with 8"lines and the wastewater lines replaced with 6" lines. .. March 2007 Status: Sidewalk Design Complete and Land Agent working on obtaining needed easements. Tauber and Stasney Street Rehab Design expected to be complete in April 2007. Anticpate all easements identified and • possibly two needs resolutions, one for each street dependent on when the Engineer and Surveyor get all the information to the •• Project Manager, beginning in late March early April 2007. Construction to begin in late summer early fall 2007. •• Streets Funding Break Down: $252,110 from CDBG funding&$2,000,000 transferred from ST0518 in FY07. PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR ' Project Total FIISCA YEARears LAND 0 ENG141 �4�I 0 182 CONSTR. I MISC. OVERHEAD 'PROJECT TOTAL 01 $141,924 2006-07 0 10,511 j 566,397 534 17,999 $595,442 2007-08 0 9,150 1,710,587 0 35,008 $1,754,745. 2008-09 0 0 0 0 0 $0 2009-10 0 0 0 0 0 $0. 2010-11 0 0 0 0 0 $0 2011-12 0 0 0 0 0 $0 • 2012-13 01 0 0 0 0 $0. • • PROJECT TOTAL $01 $161,403 $2,276,984 $716 $53,0071 $2,492,110 y, /� • --- - , S -c! !Tauber/Stasney Street Rehabilitation i °n Avo `°i. ' �.cs` '\ p raj J "le 1 and Northgate Sltlewalke dtb, -1,. 7.=<: :-' \ ,.0°,,,,,, y 'N ,e 44. � y t_em�"✓ � \.. h p° s " .. \ °. ` 6 /"'s/ ,✓ f/ \to \i,$‘ �.'' tT, ,daD �� N . 1\7\v-•-) '''.;„',.'3,-.•.: 4%\ a r � \ QD 26 PROJECT: Tauber/Stasney Rehab and Northgate Sidewalks PROJECT CALENDAR OF EXPENDITURES BY FUND Streets Portion FISCAL YEAR 1 LAND ENG. CONSTR. 1 MISC. 1 OVERHEAD PROJECT TOTAL Prior Years $ - $ 100,849.73 $ - $ 182.00 1 $101,032 2006-07 $ 10,000.00 $ 454,000.00 $ 534.00 $ 8,120.00 $472,654 2007-08 $ 9,150.00 $ 1,640,407.00 $ 28,867.25 $1,678,424 2008-09 2009-10 $0 2010-11 $0 2011-12 2012-13 $0 Streets Total ± $0 $120,0001 $2,094,4071 $7161 $36,987 $2,252,110 Water Portion FISCAL YEAR LAND ENG. CONSTR. MISC. OVERHEAD PROJECT TOTAL Prior Years $ - $ 21,402.92 $ - $ - $21,403 2006-07 $—_ 44,687.00 $ 3,910.11 $48,597 2007-08 $ 45,977.00 $ 4,022.99 $50,000 2008-09 I I I I $0 2009-10 I ! $0 2010-11 2011-12 ------ --- ----- --- --- ------- $0 2012-13 Water Total $0 $21,403 $90,664 $0 $7,933 $120,000 . Wastewater Portion FISCAL YEAR ! LAND ENG. CONSTR. 1 MISC. ! OVERHEAD 1 PROJECT TOTAL Prior Years I $ - , $ 19,488.89 $ - I $ - I $19,489 2006-07 $ 511.11 $ 67,710.00 $ 5,969.35 $74,190 2007-08 $ 24,203.00 $ 2,117.76 $26,321 2008-09 $0 2009-10 $0 2010-11 2011-12 $0 2012-13 $0 . Wastewater Total $01 $20,000 $91,9131 $0 $8,087 $120,000 'PROJECT TOTAL $01 $161,4031 $2,276,9841 $7161 $53,0071 $2,492,1101 OPERATING COSTS First Fiscal Year Annually ) Total Personnel j $0 Supplies i $0 Service $0 Capital $0 TOTAL $0 $0 $0 27 . . • • • . . . • • . . . . . • . • • • •• • „ ..„. • •.•. • •• , - •„:7 . • „.„ ,„,„„, CI TY OF COLLEGE STATION HEART OF THE RESEARCH VALLEY • • ' - • • . , • • 28 STREET EXTENSION PROJECTS 29 PROJECT: Jones Butler Phase II FUND(S): PROJECT NUMBERS&BUDGET: • 139-Streets Capital Fund Streets: ST0005 $1,467,042 • • 238-Water Capital Fund Water: WF0680235 $40,000 • 239-Wastewater Capital Fund Wastewater: WF0680144 $44,000 Total Project Budget: $1,551,042 • PROJECT MANAGER: Danielle Charbonnet ' FUNDING PROJECT SOURCES: Streets-Nov 98 G.O.B. CLIENT: Public Works W/WW-URB • PROJECT DESCRIPTION/STATUS Jones Butler Road will be extended southward from Holleman Drive to intersect with FM 2818 and align with Marion Pugh. This project is needed to provide a north-south route paralleling Wellborn Road.The length of the roadway will be approximately 2,600 feet with a 90 foot wide right-of-way.The project will include drainage facilities,sidewalks and street lighting. It will also be necessary to replace three 100 linear feet wastewater crossings(two 8"and one 15"crossing)along Jones Butler Road and to • extend the 8"and 16"dead-end water lines 100 feet across Jones Butler for future development. • • Status:Construction to be completed early summer 2007. Project expected to be completed under budget$636,000. • $6,000 of WW funds transferred to Bee Creek Combined in FY07 to decrease WW budget from$50,000 to$44,000 . Streets:Original project budget$2,136,000; reduced by$100,000 in FY08 to reflect reduction in debt issue.$100,000 in CO's • were planned to be issued and included in the budget but were not issued as the project came in considerably under budget. • $325,933 transferred to ST0516-FY07. $210,000 transferred for TxDOT ROW purchase($41,887 to ST9820;$53,928 to ST0009 and$114,185 to ST0510)-FY07 • $33,025 transferred to ST0212-FY07 PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR Project Total ' FISCAL YEAR LAND ( EN 24,808 CONSTR. MISC. OVERHEAD PROJECT TOTAL Prior Years I„ 69,921i 3,702 $200,210 2006-07 0 20,200 1,304,1721 10,000 16,460 $1,350,832 • 2007-08 0 0 0 0 $0 . , 2008-09 0 0 0 0 $0 • 2009-10 0 0 0 0 1 $0 2010-11 0 0 01 01 1 $0 • 2011-12 01 0 01 01 1 $0 2012-13 01 01 01 01 1 $0 PROJECT TOTAL $69,9211 $145,0081 $1,305,9511 $13,7021 $16,4601 $1,551,042: .N^VY` , car' v• `` .., }:.`.;,.:: } ', lfi fin. 't. Grp :z:� lg :14) t •,. ! „' 1. S4\v o _ •,. 4� a, a ttr *Jy c o �# ` <.$ IL. r • aieo,w '�000s enE s.temio Pn�e ii`za tilt, s +7, �,� .. . !3° ' Harvey Mitchell Pkwy 5 • fr P 'Nr\Njl\V\--i 6 6, 0 0 30 PROJECT: Jones Butler Phase II PROJECT CALENDAR OF EXPENDITURES BY FUND Streets Portion FISCAL YEAR LAND ENG. CONSTR. MISC. OVERHEAD PROJECT TOTAL Prior Years $69,921 $122,631 $0 $3,702 $196,254 2006-07 15,000 1,235,788 10,000 10,000 $1,270,788 2007-08 ------ ---- 2008-09 $0 $0 2009-10 $0 • ----- -- - - --- 2010-11 2011-12 2012-13 $0 Streets Total $69,9211 $137,6311 $1,235,788 $13,702 $10,0001 $1,467,042 Water Portion FISCAL YEAR LAND ENG. 1 CONSTR. 1 MISC. !OVERHEAD 1 PROJECT TOTAL Prior Years $0 $2,177 $1,779 $01 $3,956 2006-07 2,500 30,644 2,900 $36,044 2007-08 $0 2008-09 2009-10 1 1 I $0 • 2010-11 1 $0 2011-12 $0 2012-13 $0 Water Total $01 $4,677 $32,423 $01 $2,9001 $40,000 Wastewater Portion FISCAL YEAR LAND ENG. CONSTR. MISC. OVERHEAD PROJECT TOTAL Prior Years $0 $0 $0 $0 $0 2006-07 2,700 37,740 3,560 $44,000 2007-08 ( I I I $0 2008-09 1 I $0 2009-10 $0 2010-11 $0 2011-12 $0 2012-13 - $0 Wastewater Total $0 $2,700 $37,740 $0 $3,560 $44,000 1PROJECT TOTAL $69,9211 $145,0081 $1,305,9511 $13,7021 $16,4601 $1,551,0421 OPERATING COSTS • First Fiscal Year Annually Total Personnel 1 $0 . Supplies I $0 Service I $0 Capital I 1 $0 TOTAL I $0 31 PROJECT: Victoria Oversize Participation PROJECT#: ST9928 FUND: 139 -Streets CIP Fund PROJECT BUDGET: $345,639 . PROJECT MANAGER: Mark Smith FUNDING SOURCES: 1998 GO Bonds PROJECT • :CLIENT: Public Works PROJECT DESCRIPTION/STATUS This project will extend Victoria Street from its current termination at Graham Road south. The street will be a major thoroughfare with a 54 foot width in a 70 foot right-of-way and an approximate length of 4,200 feet. A significant drainage structure will be required. Developer participation is anticipated • for right-of-way donation with City oversize participation with street width in excess of 39 feet. The street will provide north-south access to a future CSISD school. Original budget= $894,000 .Projects include: ST0407 -Victoria Ave OP; ST0419 -Victoria OP Westfield Ph 3; and ST0420-Victoria OP Reatta Meadows Ph I. .$268,000 transferred to ST0001 - FY02. $280,361 transferred to ST0516 2/06. PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR FISCAL AYearsR LAND$38,880 ENG. CONSTR. MISC. OVERHEAD PROJECT TOTAL $362 43,188 $0I $82,430 2006-07 $0 $0 $0 $01 $0 $0 2007-08 $0 $11,620 $116,200 $1,585 $2,200 $131,605 • ` . 2008-09 $11,620 $116,200 $1,585 $2,200 $131,605 2009-10 $0 $0 2010-11 $0 $0 2011-12 $0 $0 • 2012-13 $0 $0 • : TOTAL $38,880 $23,602 $275,588 $3,170 $4,400 $345,639 . • OPERATING COSTS First Fiscal Year. j........... Annu• ally Total Personnel $0,• Supplies $0 Service $0 Capital $0 ' 'TOTAL $0 $0 $0 v: A,,,,,, �yZ?' d':- i'iyt h��»fir �p',y q"q t S ft y O . VQ'1j ✓"2;.; 477iI RJR ••.* .I., p��4Qt - 6x<O1 fYilWtlOdR4K pKN'f vrl7n, '�} V ( ! , F tlAa�M�ftAV Vanc xn� tt 1 1 *fi`. :: ;` ;,:;i..• 'l , li e . ''V,\.//JRlI # 1Y� Na41 ! `"a[rq tcgh, 32 \~^ \ : . 41 AM` � f CITY OF COLLEGE STATION HEART OF THE RESEARCH VALLEY 33 • PROJECT: Dartmouth Extension • FUND(S): PROJECT NUMBERS &BUDGET: 139-Streets Capital Fund Streets: ST0211 $3,600,000 • •. 238-Water Capital Fund Water: WF0350795 $220,000 • 239-Wastewater Capital Fund Wastewater: WF0350733 $254,000 Total Project Budget: $4,074,000 PROJECT • MANAGER: Donald Harmon FUNDING , • PROJECT SOURCES: Streets-CO's • -CLIENT: Public Works W/WW- URB PROJECT DESCRIPTION/STATUS Dartmouth Drive will be extended from Krenek Tap Road of Harvey Mitchell Parkway.As part of this project, it will be necessary to replace three 100 linear feet wastewater crossings(one 15", one 24"and one 30"crossing)and extend 2,300 linear feet of 12" . water line. PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR Project Total FISCAL YEAR LAND 1 ENG. CONSTR. I MISC. OVERHEAD PROJECT TOTAL Prior Years $7,8921 $179,404 $01 $159 $0 $187,455 2006-07 $0 $40,596 $2,616,3001 $124,841 $79,762 $2,861,499 2007-08 $0 $20,000 $912,4151 $75,000 $17,630 $1,025,045 2008-09 $0 $0 $0 $0 $0 $0 2009-10 $0 $0 $0 $0 $0 $0 2010-11 $0 $0 $0 $0 $0 $0 2011-12 $0 $0 $0 $0 $0 $0 2012-13 $0 $0 $0 $0, $0 $0 • PROJECT TOTAL $7,892 $240,000 $3,528,715 $200,000 $97,392 $4,074,000 . • ' \V 47)N, Z.Vi:',;,‘ Ag,i4Ve ‘, '': it s.-. .. .t 1 k ' 'D. '��; sa do .Y.: i ,�{y < DaMio�(h ERtenzbn Ph>se Ii , 4 N. /�!!'I V' ..�.�.—was ,pQ °6�; Q. • ,f �kJ �t••� 09 .. °4 iitt s � � 4� 1� ,, c� �a,aoYMitchel�n 'c• 34 ---- --------- • PROJECT: Dartmouth Extension PROJECT CALENDAR OF EXPENDITURES BY FUNC Streets Portion FISCAL YEAR LAND ENG. CONSTR. MISC. OVERHEAD PROJECT TOTAL Prior Years $7,892 $179,404 $0 $159 $0 $187,455 2006-07 $0 $21,596 $2,200,000 $124,841 $41,063 $2,387,500 - 2007-08 $0 $20,000 $912,415 $75,000 $17,630 $1,025,045 2008-09 $0 $0 $0 $0 $0 $0 2009-10 $0 $0 $0 $0 $0 $0 2010-11 $0 $0 $0 $0 $0 $0 2011-12 $0 $0 $0 $0 $0 $0 2012-13 $0 $0 $0 $0 $0 $0 Streets Total $7,892 $221,000 $3,112,4151 $200,000 $58,692 $3,600,000 Water Portion FISCAL YEAR LAND ENG. CONSTR. MISC. OVERHEAD PROJECT TOTAL Prior Years $0 $0 $0 $0 $0 $0 2006-07 $0 $12,000 $190,300 $0 $17,700 $220,000 2007-08 $0 $0 $0 $0 $0 $0 2008-09 $0 $0 $0 $0 $0 $0 2009-10 $0 $0 $0 $0 $0 $0 2010-11 $0 $0 $0 $0 $0 $0 2011-12 $0 $0 $0 $0 $0 $0 2012-13 $0 $0 $0 $0 $0 $0 Water Total $0 $12,000 $190,300 $0 $17,700 $220,000. Wastewater Portion FISCAL YEAR LAND ENG. CONSTR. MISC. OVERHEAD PROJECT TOTAL Prior Years $0 $0 $0 $0 $0 $0 2006-07 $0 $7,000 $226,000 $0 $21,000 $254,000 2007-08 $0 $0 $0 $0 $0 $0 2008-09 $0 $0 $0 $0 $0 $0 2009-10 $0 $0 $0 $0 $0 $0 2010-11 $0 $0 $0 $0 $0 $0 2011-12 $0 $0 $0 $0 $0 $0 . 2012-13 $0 $0 $0 $0 $0 $0 Wastewater Total $0 $7,000 $226,000 $0 $21,000 $254,000 • . 'PROJECT TOTAL $7,892 $240,0001 $3,528,7151 $200,0001 $97,3921 $4,074,0001 OPERATING COSTS First Fiscal Year Annually Total Personnel $0 Supplies $0 Service $0 Capital $0 TOTAL $0 $0 $0 35 _ - PROJECT: Oversize Participation PROJECT#: ST0519 FUND: 139 -Streets CIP Fund PROJECT BUDGET: $2,320,565 • PROJECT MANAGER: Alan Gibbs FUNDING SOURCES: 2003 GO Bonds • PROJECT CLIENT: Public Works . • PROJECT DESCRIPTION/STATUS . . Parent Project Funds provided for City-wide oversize participation projects. .4. Original project budget= $2,700,000. • $516,569 transferred to Corsair/AMS Street Extension (ST0612)in FY06. • $23,431 transferred to Waterwood OP in FY06. $187,569 transferred back from ST0612 in FY07, $27,004 transferred to ST0802 - FY08. - - • PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR _ FISCAL YEAR LAND ENG. CONSTR. MISC. PROJECT TOTAL . Prior Years $0 $0 0 $0 2006-07 $0 . 2007-08 512,996 $512,996 2008-09 540,000 $540,000 2009-10 540,000 $540,000 2010-11 727,569 $727,569 2011-12 $0 • . 2012-13 0 $0 TOTAL $0 $0 $2,320,565 $0 $2,320,565 OPERATING COSTS First Fiscal Year Annually Total Personnel $0 Supplies $0 Service $0 • Capital $0 TOTAL $0 $0 $0 • ' • i P : 1...'+ tek 11111, '4‘1, • 0. , xi • C O' 4:‘ MAP NOT .,_AVA ILABL 14, ,.. ,.. t 36 ,,4 PROJECT: Corsair(AMS) Street Extension PROJECT#: ST0612 FUND: 139 -Streets CIP PROJECT BUDGET: $329,000 PROJECT MANAGER: Chad Mallett FUNDING SOURCES: 2003 GO Bonds PROJECT transferred from ST0519 CLIENT: Public Works PROJECT DESCRIPTION/STATUS This project is for the land acquisition and deisgn of the extension of AMS road from its terminus in th e he Century Hill Subdivision to intersect with Emerald Parkway. Construction will be completed as area is developed. $516,569 transferred from ST0519 in FY06 $187,569 transferred back to ST0519 - FY07 PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR FISCAL YEAR LAND ENG. CONSTR. MISC. 1 PROJECT TOTAL Prior Years $0 $2,031 $0 $0 $2,031 2006-07 250,000 74,969 0 2,000 $326,969 2007-08 $0 2008-09 $0 2009-10 $0 2010-11 $0 2011-12 1 I $0 2012-13 I I I $0 • TOTAL ' $250,000 $329,000 $77,000 $0� 2,000� OPERATING First Fiscal Year Annually a COSTS Total Personnel ' $0 Supplies j $0 Service $0 Capital $0 TOTAL $0 $0 $0 .. , ,,. .; ..�.` i fm.: Kati � , t. nano Piz'`( � ) '15ree V im a { l. f y �'S°• '�� `'S ��'� x( *-,, s is r : S FC':i ' , o° :.�,.:,•`, 37 . _ „ „... . • PROJECT: Waterwood OP PROJECT#: ST0613 FUND: 139 -Streets CIP PROJECT BUDGET: $23,431 • PROJECT MANAGER: Alan Gibbs FUNDING . SOURCES: 2003 GO Bonds PROJECT transferred from ST0519 :CLIENT: Public Works . .. PROJECT DESCRIPTION/STATUS This project is to fund Street oversize participation. Funds were included in the 2003 bond authorization , .. for street oversize participation projects throughout the City. • $23,241 transferred from ST0519 -Oversize Participation - FY06 PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR FISCAL YEAR LAND ENG. CONSTR. MISC. OVERHEAD PROJECT TOTAL: . Prior Years $0 $0 $0 $0 $0 2006-07 $23,431 $23,431 2007-08 $0 2008-09 $0 • 2009-10 $0 2010-11 $0 , . 2011-12 $0 . • 2012-13 $0 TOTAL $0 $0 $23,431 $0 $23,431 OPERATING COSTS . „„.. . First Fiscal Year Annually I Total - Personnel $0, • . Supplies $0 Service $0 Capital $0. _ • TOTAL $0 $0 $0 • . . •),,,,--.--r---) 1:,),;, ',:•'.,-,`"'i',N. `‘ / . ' . '" ., '-`!,‘,•- ,t<,;• ':q,4' -`,''''' 'At-.- - ‘, IY..,: •.*'-,>N.-'-',-:,.-r'AA'''',V.,, • =<'., ;A.,ri,; V'.id/ ,.'",t.4°S1/2„1,,,,, ,,,,t 1,i,• ‘..1,,,c•.-0:,....„.... /,.;,,.?..-k% ,m; „,--- ",,,, ....,;., ,,./) 4,- ‘-,,,;;_ „ ,N.,/,--.?? %/ 2:, ,. ., , -,,,4• 0., &•• ',•/•,, :,/•(,,.; ' / ..,4' `.•',,,., ), ,•, "•;,' °P . • *I,t. 1:- ei ...7: .6.) w'jjr„,''', e/.0',),-j<.—'.- -:_,,,,tx'' .2,--06',. '', • , - A,, . : ' ,, -4, .1, • 7 A I '','\; ' 4c,,.. .:0 /44 , '•,>^')z•,,N,1,-,V- k4<' •, /'••),4,•V "A 4 '•2•- •‘,A, ..,, •Z:1-r. ''',,j,,'--",'",/'‘<1, '',/ ;Pr',,,,4Z-:,,, e,› 0 • '.-4v9sV2/`:A\ NI.' >' ca- ;'%\''' 4,e';',A - • ',1'• \ Acq.>;,t,,;,L•11'''• -••< 'c- 7..... N. „ , 5, ..K.vzo _ 1..r \- -,?,'• '> ‘•?:',`"4,0------- .*',;-... *."' 7---- -r) -r---:".(,!'-'-',-!?' •;,. ,..<\‘',1/4, ,,,Ni\te,,, ,,c`,>\,..,- , '!?-,,,,' ',.\ z ,,?,., v7(.1,,i \ ,,\ , i 1 \'-`t-. ',,''i. ,p.--,,,--'<,--\.ftr,,,N.'),.‘,A c _,-,:, ,,c,,,e/ ,, , „•, ' ,--' - )--2,,,, • 7::: --;•, ,,`, ,::,-•-',e,,,'",x87#/--}',3,',. ''', , ,-,:• ,,,:s'/ :<, ,„,,R, ,4,:' ,. . ,,,,,, ,,,,<\,,,..k 4.\".:;,,4, iT-4, -^-•-*,„ ?4 (,:,?,- J,.'- ,44(,,---lw,j , .,,,,;- \ ,,, , x ,„,,,-:, ,t,•!,?,,,,, i /•,-•:,.---.7:--c ••/, ,.:& 'g, \>'::'''''' 38 PROJECT: Manuel Drive OP PROJECT#: ST0802 FUND: 139 -Streets CIP PROJECT BUDGET: $27,004 PROJECT MANAGER: Alan Gibbs FUNDING SOURCES: 2003 GO Bonds PROJECT transferred from ST0519 CLIENT: Public Works PROJECT DESCRIPTION/STATUS This project is to fund Street oversize participation. Funds were included in the 2003 bond authorization for street oversize participation projects throughout the City. These funds will be used to upsize Manuel Drive extension from a local to a minor collector. $27,004 transferred from ST0519 -Oversize Participation - FY08 PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR FISCAL YEAR LAND ENG. CONSTR. MISC. OVERHEAD PROJECT TOTAL Prior Years $0 $0 $0 $0 $0 2006-07 $0 2007-08 $4,991 $22,014 $27,004 2008-09 $0 2009-10 $0 2010-11 $0 2011-12 $0 2012-13 $0 TOTAL $4,991 $0 $22,014 $0 $27,004 OPERATING COSTS Personnel First Fiscal Year Annually $0 I Total Supplies I $0 Service I I $0 Capital $0 TOTAL $0 $0 $0 .+. /\t / Via. \, ?h mow' \g`' ! „ 0'i\ '''‘ eqe, •'`�' t ,,nr�:�• t � v'"'` `fin \ k fir' .\ z°' � �'' o'� �n 'i` ' l`\ T 39 ` ______ - . 'PROJECT: Arhngton/0ecoturEmtmnoimn PROJECT#\ STOGOG � . .FUND: 139 -Streets CIP PROJECT . . BUDGET: $4,110,000 ` ' PROJECT MANAGER: Craig Jordan FUNDING . ' SOURCES: Certificates ofObligation PROJECT � CLIENT: Public Works ' ---------- -PROJECT DESCRIPTION/STATUS The extension of Arrington and Decatur will improve north-south traffic flow on the west' ' side nfSH0 by" -' -'- - � providing local streets that will make a connection from the future SH40to Barron Road. _ Original project budget=$4.0000O0 ' |D110.O00 transferred from STO701 - FYO7. ' '---------PROJFCT EXPENDITURES BY FISCAL YEAR' FISCAL YEAR '-- ' LAND -ENG. CONSTR. misc. OVERHEAD | PROJECT TOTAL. Prior Years $0 $290.867 $O $114 $290.081 2000-07 $133.124 $1.000.000 $14.7311 $1.147.855 ~ ' 2007'08 $2.830.500 $34,684 $2.671.184 20U8-08 $0. / 2008'10 $8 2010'11 $O, 2011-12 $O. 2012-13 $0. TOTAL $0 $423.A01 $3.03G.5O0^ $114 $40,305|�^ $4.110.000 . ' . ----- ...................... ' ' ' ' OPERATING COSTS ` --------------Fiooa -----' ' Annually' -- --. -- ----- ' --- Total �0 . . Personnel | *" | SuSupplies . $U -Service $O. Capital $0. TOTAL $0 $O $0 ' ' ` ' 40 ' ' PROJECT: Future Street Extension Projects PROJECT#: ST0701 FUND: 139 -Streets CIP PROJECT BUDGET: $140,000 PROJECT MANAGER: TBD FUNDING SOURCES: Certificates of Obligation PROJECT CLIENT: Public Works PROJECT DESCRIPTION/STATUS These funds are available for future street extension projects throughout the City. Original budget= $1,000,000 $110,000 transferred to ST0606 - FY07. $750,000 to be transferred to ST0416 - FY08. PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR FISCAL YEAR LAND ENG. CONSTR. MISC. PROJECT TOTAL Prior Years 0 0 0 0 $0 2006-07 $0 2007-08 140,000 $140,000 2008-09 $0 2009-10 $0 2010-11 $0 2011-12 $0 2012-13 $0 TOTAL $0 $0 $140,000 $0 $140,000 OPERATING COSTS First Fiscal Year Annually Total Personnel $0 Supplies $0 Service $0 Capital $0 TOTAL $0 $0 $0 e jj�� wry NL*T�1 NOT AVAILA L . 41 . _ PROJECT: Southern Breeze Drive PROJECT#: ST0704 FUND: 139 -Streets CIP PROJECT • BUDGET: $25,000 PROJECT MANAGER: TBD FUNDING SOURCES: Letter of Credit •PROJECT • .. CLIENT: Public Works PROJECT DESCRIPTION/STATUS The private developer defaulted on the construction of Southern Trace Phase one, so a Letter of Credit in the amount of$25,000 was drawn. The remaining work is the construction of Southern Breeze Drive from Station . 7+00 to 10+00. The City is utilizing the funds to finish construction. PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR ,. • FISCAL YEAR LAND ENG. CONSTR. MISC. PROJECT TOTAL Prior Years $0 $0 $0 $0 $0 2006-07 25,000 $25,000 2007-08 $0 2008-09 $0 . . • 2009-10 $0 2010-11 $0 .• 2011-12 $0 .. . 2012-13 $0: I.: TOTAL $0 $0 $25,000 $0 $25,000. OPERATING COSTS First Fiscal Year Annually Total Personnel $0. • Supplies $0 Service $0 . . Capital $0 TOTAL $0 $0 $0 . . . ' . e ' o'''' , e'' `%. ' -,0- -4,s• ''.,;," ,,,e . • ' 5.7`/S, c„Atb' A044' " k 4 i''•,2-''' '* ',}' '• .44 ,tti, A) *0,„ Ig,. '(.F.• ,0 N. 11 1 .,•• _, . . 42 PROJECT: Rock Prairie Road East Widening & PROJECT#: ST0417 Design& ROW FUND: 139-Street Capital Projects PROJECT BUDGET: $2,969,000 PROJECT Craig Jordan MANAGER: FUNDING SOURCES: 2003 GOB's PROJECT CLIENT: Public Works PROJECT DESCRIPTION/STATUS All design services for the widening of Rock Prairie East to a minor arterial section as shown on the Thoroughfare Plan from SH 6 Frontage Road to Greens Prairie Road. This includes design for the minor arterial section, sidewalks, storm drain facilities, lighting plan, etc. This budget also includes monies for all Right of Way Acquisition for the full minor arterial section. This is design and ROW • money only. No money for construction. Bleyl&Associates was awarded the engineering design by the City Council on February 10, 2005 for $795,000. This is a professional services contract for the engineering design for the proposed widening of Rock Prairie Road to a minor arterial from Highway 6 to Greens Prairie Road. The conceptual design will include topographic and utility surveys and provide an assessment of the interrelationship between rights-of-way, utilities, existing easements and drainage. The contract includes development of plans, specifications and final cost estimates. It will also provide survey work and legal descriptions for purchase of right-of-way. PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR ' FISCAL YEAR LAND ENG. CONSTR. MISC. OVERHEAD PROJECT TOTAL Prior Years $0 $532,237 $236 $532,473 2006-07 262,763 $7,554 $270,317 2007-08 1,100,000 $18,700 $1,118,700 2008-09 1,030,000 $17,510 $1,047,510 2009-10 $0 2010-11 $0 2011-12 $0 2012-13 $0 TOTAL $2,130,000 $795,000 $0 $236 $43,764 $2,969,000 OPERATING COSTS First Fiscal Year Annually Total Personnel $0 Supplies $0 Service $0 Capital $0 TOTAL $0 $0 $0 r� ,�J^. (�" it t Hook Prairie Road" [J' l A4� �. I,. L// t wwan4 g ROW,,d Design: cC Y f ; b 4 a'w-� ,.� I y o h "'"v . \\,,,, i/j/s- \v/\-% * e. •,-„,...,,, t.1% !-.V- r\r") 4 _ �Y .'b�6 Q l✓ ``Z No; o�/,. y�f' O 5 Anne 4 / `,\Yl, � ��., '�F.��� Our , 'Oi WO 09, il 43 _ . . • PROJECT: BARRON ROAD RIGHT OF WAN PROJECT#: ST0006 FUND: 139 -Street Capital Projects PROJECT • BUDGET: $431,000 • . PROJECT • MANAGER: CHAD MALLETT FUNDING SOURCES: 1998 General Obligation PROJECT Bond Funds CLIENT: Public Works , • PROJECT DESCRIPTION/STATUS Barron Road would be upgraded from a two lane rural highway to a minor arterial road as reflected on the Thoroughfare Plan. This project would establish an alignment and acquire the necessary right-of-way. Original budget= $316,000 2003 budget amendment added $115,000 for land purchase PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR FISCAL YEAR LAND ENG. CONSTR. MISC. PROJECT TOTAL • Prior Years $129,303 $21,578 $0 $0 $150,881 • 2006-07 $150,000 $150,000 • 2007-08 $130,119 $130,119 2008-09 $0 2009-10 $0 . , 2010-11 $0 2011-12 $0 . • 2012-13 $0 , • TOTAL $409,422 $21,578 $0 $0 $431,000 . OPERATING COSTS ......... .... First Fiscal Year Annually Total Personnel $0 . . Supplies $0 Service $0 . s. Capital $0. TOTAL $0 $0 $0 ye, ,e) oothork,c''' ik4.., `),,,,4,. / °A, 4.43. oe I , )'• 44 4.,,,,t, .9 * 44 / Si, 4.4 .: 'Bairon Road Right of Way 4' / " t..i'' 2/4,•>,..,t4,...4) .1'1, • i' /741,,,,, _J '',5•,,, 1.-- . .i.^. 1 *ck , , • 44 PROJECT: BARRON ROAD INTERCHANGE PROJECT#: ST0212 DESIGN FUND: 139 -Street Capital Projects PROJECT $735,220 BUDGET: PROJECT MANAGER: Craig Jordan FUNDING SOURCES: Certificates of Obligation PROJECT CLIENT: Public Works PROJECT DESCRIPTION/STATUS • The Project is for an outside private consultant to design a TxDot Highway Interchange at the intersection of Highway 6 and Barron Road. This interchange will move traffic east to west with no off ramps. The City of College Station is providing a 100% design plans of this Interchange as per TxDOT specifications. Epsilon Engineering, Inc. was awarded the design of Barron Road Interchange for$699,973.00 by City Council onFebruary 12, 2003. Original budget= $675,000 $10,000 transferred from ST0214- FY05 $17,195 transferred from ST0214- FY07 $33,025 transferred from ST0005- FY07 PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR FISCAL YEAR LAND ENG. CONSTR. MISC. OVERHEAD PROJECT TOTAL Prior Years 0 $378,187 0 $378,187 2006-07 $344,743 $12,290 $357,033 2007-08 $0 2008-09 $0 2009-10 $0 2010-11 $0 2011-12 $0 2012-13 $0 TOTAL $0 $722,930 $0 $0 $12,290 $735,220 OPERATING COSTS First Fiscal Year Annually Total Personnel $0 Supplies $0 Service $0 Capital $0 TOTAL $0 $0 I $0 'bt \s) "`�1 °•t' �' 4'eF.i,;Bayon Roatl lntPrsharge Beslgn� A/ { '> S-4E) 1\7.\\,,_ e , r do a \ 1 °T 45 PROJECT: Barron Road Rehabilitation FUND(S): PROJECT NUMBERS &BUDGET: • 139-Streets Capital Fund Streets: ST0409 $3,000,000 238-Water Capital Fund Water: WF0654325 $100,000 • 239-Wastewater Capital Fund Wastewater: WF0654332 $100,000 Total Project Budget: $3,200,000 PROJECT MANAGER: Chad Mallett .. • FUNDING • PROJECT SOURCES: Streets-03 G.O.B.: $3,000,000 • CLIENT: Public Works W/WW- URB PROJECT DESCRIPTION/STATUS • This project includes the upgrade of Barron Road from a two lane rural highway to a minor arterial road as reflecting on the Thoroughfare Plan. The Streets portion provides design services for the entire project and the first phase of construction.Water lines and meters as well as wastewater lines and manholes will be relocated. PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR Project Total t • FISCAL YEAR LAND ENG. CONSTR. MISC. OVERHEAD PROJECT TOTAL Prior Years 0 220,604 0 344 0 $220,9481 • 2006-07 0 503,125 0 2,000 3,272 $508,3961 2007-08 0 23,000 2,435,842 2,000 9,814 $2,470,6561 2008-09 0 0 0 0 0 $01 • 2009-10 0 0 0 0 0 $01 2010-11 0 0 0 0 0 $0 2011-12 0 0 0 0 0 $0 ,. 2012-13 0 0 0 0 0 $01 PROJECT TOTAL $0 $746,729 $2,435,842 $4,344 $13,086 $3,200,000 F 'r' s ;•k ?1..=•,-, :,\ , •eew Point O q • �erg � y �48U : by Vc / o- .ya c`OS aFr4 ,z 'y .W,05 . -0,/ +.• ' • ddc \A �a ff. • N� -1„s 'A' hyo om \ •.- .,�`•'"' .Q' ; 4 ''3 . > 1 5V5 tom `�� r Sy d ply f -..Norton Ln- 6 4, 41*.„ 1\, 1 1 ✓A_. 46 --------- • --------- - • 'PROJECT: Barron Road Rehabilitation J • PROJECT CALENDAR OF EXPENDITURES BY FUND Streets Portion FISCAL YEAR LAND ENG. CONSTR. MISC. OVERHEAD PROJECT TOTAL Prior Years $0 $220,604, 0 $344 $0, $220,948 2006-07 456,396 2,000 $458,396 2007-08 23,000 2,295,656 2,000 $2,320,656 2008-09 2009-10 $0 $0 2010-11 $0 2011-12 - ---- ------ 2012-13 $0 ' Streets Total $0 $700,000 $2,295,656 $4,344 $Oj $3,000,000 Water Portion FISCAL YEAR LAND ENG. CONSTR. MISC. OVERHEAD PROJECT TOTAL Prior Years $0 $0 0 2006-07 23,364 1636 $25,000 2007-08 70093 4907 $75,000 ---- - -- -------- --- ---------------- --- ------ ----- 2008-09 - ----- ---- ------ ------ --------- ----------- --- 2009-10 $0 $0 ---- ---- ---------- --- 2010-11 2011-12 $0 $0 2012-13 $0 Water Total $0 $23,364 $70,093 $01 $6,543 $100,000 • Wastewater Portion FISCAL YEAR LAND ENG. CONSTR. MISC. OVERHEAD PROJECT TOTAL ----- ---- ---- Prior Years $0 $0 0 $0 $0 I 2006-07 23,364 $1,636 $25,000 2007-08 70093 4907 $75,000 2008-09 $0 2009-10 ---- - ------- 2010-11 2011-12 2012-13 $0 Wastewater Total $0 $23,364 $70,093 $0 $6,543 $100,000 LPROJECT TOTAL $0 $746,7291 $2,435,842 $4,344 $13,086 $3,200,000 OPERATING COSTS First Fiscal Year Annually Total Personnel $O Supplies $0 Service $0 Capital $0 TOTAL $0 $0 $0 47 PROJECT: William D. Fitch Pkwy Widening PHII PROJECT#: ST0520 • FUND: 139 -Street Capital Projects PROJECT BUDGET: $3,300,000 • • PROJECT MANAGER: Craig Jordan FUNDING SOURCES: 2003 Bond Authorization PROJECT CLIENT: Public Works . • PROJECT DESCRIPTION/STATUS • Widening of Greens Prairie Road between Pebble Creek Parkway and Rock Prairie Road to a minor • . arterial. PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR FISCAL YEAR LAND ENG. CONSTR. MISC. OVERHEAD PROJECT TOTAL Prior Years $0 $0 $0 $0 $0 $0 2006-07 $0 • 2007-08 $500,000 $0 $8,500 $508,500 2008-09 $1,372,419 $23,331 $1,395,750 2009-10 $1,372,419 $23,331 $1,395,750 2010-11 $0 . . 2011-12 $0 . , 2012-13 $0• TOTAL $0 $500,000 $2,744,838 $0 $55,162 $3,300,000 ._...... , OPERATING COSTS First Fiscal Year Annually Total Personnel $0 Supplies $0 • Service $0 Capital $0 TOTAL $0 $0 $0 . ___......... . -------#, , • °cog,, b.. ,s,• r"... Phase II * 4 e „/ —71 ) , 1 3 \ ''''' " ----1 slA„„, , . 48 STREET TXDOT PROJECTS 49 • PROJECT: TEXAS AVENUE STREETSCAPE PROJECT#: ST9915 PHASE II FUND: 139 -Streets Capital Projects PROJECT BUDGET: $999,552 PROJECT MANAGER: TROY BOTHER FUNDING . SOURCES: STREETS CIP PROJECT • CLIENT: Public Works PROJECT DESCRIPTION/STATUS This is a part of the Texas Avenue Widening Phase II project. This is for the cost of streetscape improvements such as raised medians and streetscape light poles. Project combined with George Bush Drive Median project in FY06. Budget of$499,552.00 transferred from • ST0102. • PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR FISCAL YEAR LAND ENG. CONSTR. MISC. OVERHEAD PROJECT TOTAL Prior Years $0 $0 $315,733 $0 $315,733 2006-07 10,000 1,819 11,819 2007-08 672,000 672,000 2008-09 0 • :• • 2009-10 0 2010-11 0 2011-12 I 0 2012-13 0 TOTAL $0 $10,000 $987,7331 $0 $1,819 $999,552 OPERATING COSTS ' First Fiscal Year Annually Total Personnel $0 Supplies $0 Service I $0 Capital $0 TOTAL $0 $0 $0 Z? oo Q,a o / 't ao ? � c , : 1/\j/S f 4. G .r/ s � ,, , ' \ f.h,,� 9 \ , 6 e-k ! '' _fi6 7 r9C4 as ,J „` O� 6 / (~� h} {r,�s Avenue so-oei:oapz Phase I, ea aQ' � .f 23 S„ _ ) .6vhe ck on '�j Cif •t' - `?i:; ' \ :�o `f� /. /` 'l+� 'ti;'o c,- s,Ridge o„ ` a a r:,4, ,�"1,."! '�,�"gc7n / vF .cod 7'�v 1 ¢ o < o0 o`ary I'„ �,Arigersoc S!_.._ �a ♦o ��ecw. / \ c;`` ems " :3 t yy ,:':, - 1 &ST- M aa,, ��P4,�.+?:t`:•..,• 50 PROJECT: TxDOT ROW Acquisition Reconciliation PROJECT#: *see below FUND: 139 -Streets Capital Projects PROJECT BUDGET: $484,957 PROJECT MANAGER: Mark Smith FUNDING SOURCES: STREETS CIP PROJECT CLIENT: Public Works PROJECT DESCRIPTION/STATUS This project is for ROW cost owed to TxDOT for three projects.The City previously paid 10% of the estimated ROW acquisition costs on these three projects. These additional amounts reflect the difference between the amount paid previously by the City and the 10%of actual ROW costs incurred by TxDOT. *ST9820-TX Ave Widening-$96,715 *ST0009-SH40 ROW-$124,562 *ST0510-Wellborn Rd Widening-$263,680 PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR FISCAL YEAR LAND ENG. CONSTR. MISC. I OVERHEAD PROJECT TOTAL Prior Years $0 $0 $0 $01 $0 2006-07 484,957 I 484,957 2007-08 0 2008-09 0 2009-10 0 2010-11 I I I 0 2011-12 I I I I 0 2012-13 I I 0 TOTAL I $484,957 $0 $0 $0 $01 $484,957 OPERATING COSTS First Fiscal Year Annually I Total Personnel i $0 Supplies i $0 Service $0 Capital I $0 TOTAL $0 $01 $0 • '�+ l "4•f yea Ayz"E MAP NOT AV ILABL Hi 51 TRAFFIC PROJECTS 52 PROJECT: Traffic Management Improvements PROJECT#: ST0011 FUND: 139 -Streets Capital Projects PROJECT BUDGET: $134,290 PROJECT Holding Account MANAGER: Lee Robinson FUNDING SOURCES: 1998 GOB PROJECT CLIENT: Public Works PROJECT DESCRIPTION/STATUS....... This to serves ec rojt hold funds for new traffic management projects. As new are project projectscreated, funds will be allocated to those projects and this project balance will be reduced. Original project budget-$728,000 $140,000 used for ST9810 $30,000 used for ST0015 $12,000 used for ST9921 $402,000 transferred to ST9804 $9,710 transferred to ST0403 PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR FISCAL YEAR' LAND CONSTR. MISC. PROJECT CT TOTAL Prior Years $0 $0 0 $0 $0 2006-07 67,145 $67,145 2007-08 67,145 $67,145 2008-09 $0 2009-10 $0 2010-11 $0 2011-12 $0 2012-13 $0 TOTAL...... $0 $0 $134,290 $0 $134,290 OPERATING COSTS First Fiscal Year Annually Total Personnel $0 Supplies $0 Service $0 Capital $0 TOTAL.... $�R .......... J ') i.7: ).,i-2 th' e . 4....., iR- .n 53 .. PROJECT: Traffic System Safety Improvements PROUECTM ST0511 . FUND: 13S'Streets C!PFund PROJECT � BUDGET: *233186 PROJECT Holding Account MANAGER: Lee Robinson FUNDING ' SOURCES: 3003 GOB '*5OO,O0O PROJECT CLIENT: Public Works . ' k - ' PROJECT DESCRIPTION/STATUS - ---�--- This project -- ' vu vmv�o m hold funds for new traffic signal projects. Original budget was$5O0.O08. Annow -- ' signal projects are created, funds will be allocated to those projects and this projectbalance will boreduced. Projects on which these funds are currently used include: ` ' Original project budget=$500.00O $81.37O transferred huST051O- FY06 $34.20U transferred hoSTO525' FY85 $28.0O0 transferred toSTU802- FY0G $27.500 transferred hoSTO527-FYO5 $100.800hubobanfonod(oST0002' FY07 $7.50O transferred toST0528' FY05 $O.827 transferred(oST0525- FY07 � $845 transferred toST0OO5'FYOO $382 transferred toST0528-FY07 ' PROJECT CALENDAR C)F EXPENDITURES BY FISCAL YEAR . FISCAL YEAR � | 'LAND ENC. CONSTR. MISC. PROJECT TOTAL Prior Years ! *0 $0 0 $0 $0 2088'07 33.188 $33.186 . .'� 2007-08 1 100.000 $100.000 2008-09 100.000 | $10O.000 2UUQ-10 � _ / ( W 2010'11 � $8 ` 2011-12 � / ' | $0 2O12-13 | ` $0 TOTAL | $01 $O` $2331881 $Oi_ $233180 OPERATING COSTS ' ' --' -- - -Personnel 'l�,mmou F� - '- |---- An' on Year | . Annually i Total | $O .Supplies $0 ` Sam�o | $0 Capital � / $O JOTAL _ _ $0 $01 $0 ' ' ^ � � ' �� 7�r�-�'�~ l[ �� �vu�-�'� ��x-� JL i-�`�.���JL~�-�����» �, . ~w 54 ' PROJECT: Southwest Parkway Medians PROJECT#: ST0602 FUND: 139 Streets Capital Fund PROJECT BUDGET: $128,000 PROJECT MANAGER: Troy Rother FUNDING • SOURCES: 2003 GOB PROJECT (transferred from ST0511) CLIENT: Public Works PROJECT DESCRI PTION%STATUS This project will involve conduc ting a P u lic b meet rig gatherpublicinput, analyzing . ... and developing design plans to address the safety issues onSouthwest Parkway between Dartmouthdata, crash Street and Anderson Street. Improvements at the Texas Avenue intersection will be constructed by TxDOT as part of their project to widen Texas Avenue. $128,000 transferred from ST0511 PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR FISCAL YEAR LAND ENG. CONSTR. MISC. PROJECT TOTAL Prior Years $0 $26,038 0 $691 $26,729 2006-07 1,271 100,000 $101,271 2007-08 $0 2008-09 $0 2009-10 $0 2010-11 $0 2011-12 $0 2012-13 $0 TOTAL, $0 $27,309 $100,000 $691 $128,000 OPERATING COSTS First Fiscal Year Annually Total Personnel $0 Supplies $0 Service $0 Capital $0 TOTAL $0 $0 „ e , ‘F‘..:0, ii f 'b ( r 9^ y t7.\,,,,, �o o, °a A''' zC; ASP \c; ,,(t, a /��{� ' rya +`,,,,, /`^t 4Y` Southwest Parkway Medians i > f--) ;ono Ridge D� �f r ,. o° / y ,, 55 PROJECT: New Traffic Signal Projects PROJECT#: ST0512 FUND: 139-Streets Capital Projects PROJECT • BUDGET: $844,551 • PROJECT MANAGER: Lee Robinson FUNDING SOURCES: 2003 GOB PROJECT CLIENT: Public Works , PROJECT DESCRIPTION/STATUS This project serves to hold funds for new traffic signal projects. Original budget was$2,250,000. As new • signal projects are created, funds will be allocated to those projects and this project balance will be reduced. •4. Projects on which these funds are currently used include: Original project budget=$2,250,000 • ST0415-$120,000 FY04 ST0604-$14,100 FY06 ST0607 -$190,000 FY07 ST0414-$120,000 FY04 ST0608-$19,000 FY06 ST0608-$190,000 FY07 ST0421 -$7,322 FY04 ST0607-$19,000 FY06 ST0516-$200,200 FY07 ST0302-$25,000 FY05 ST0610-$241,300 FY06 ST0416-$190,000 to be transferred FY08 ST0603-$9,527 FY06 ST0614-$60,000 FY06 • PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR FISCAL YEAR LAND ENG. I CONSTR. MISC. PROJECT TOTAL Prior Years $0 $0 $0 $0 $0 2006-07 174,551 $174,551 2007-08 500,000 $500,000 2008-09 170,000 $170,000 2009-10 $0 2010-11 $0 2011-12 $0 2012-13 $0 TOTAL $0 $0 $844,551 $01 $844,551 OPERATING COSTS First Fiscal Year Annually Total Personnel $0 Supplies $0 Service $0 Capital 1 $0 TOTAL $0 $01 $0 • jell/S. . t NI ) A. . +4. Q z" MAP NOT AVAILABL E 56 ------ --- -- --- -- -------- PROJECT: Vehicle Detection Upgrade PROJECT#: ST0302 FUND: 139-Streets CIP Fund PROJECT BUDGET: $50,000 PROJECT MANAGER: Lee Robinson FUNDING SOURCES: 2003 GOB ($25,000) PROJECT CLIENT: Public Works PROJECT DESCRIPTION/STATUS This project has enable the Traffic Division to upgrade vehicle detection from in-ground inductance loops to over head cameras. The cameras allows for easy installation without the extra materials conduit, pull boxes and sealant. The cameras and video processor also allow the technician to draw and move around detection zones unlike a fixed sawed-in loop in the roadway. This will be the final purchase for this project. PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR FISCAL YEAR LAND ENG. CONSTR. MISC. PROJECT TOTAL Prior Years $0 $0 38,839 $0 $38,839 2006-07 11,161 $11,161 2007-08 $0 2008-09 $0 2009-10 $0 2010-11 $0 2011-12 $0 2012-13 $0 TOTAL $0 $0 $38,839 $11,161 $50,000 OPERATING COSTS First Fiscal Year Annually Total Personnel $0 Supplies $0 Service $0 Capital $0 ' TOTAL $0 $0 $0 4 MAP NOT A AILABL 57 PROJECT: Traffic Signal Rock Prairie/ PROJECT#: ST0414 Rio Grande • PROJECT :FUND: 139 -Streets CIP Fund BUDGET: $120,000 PROJECT FUNDING MANAGER: Lee Robinson SOURCES: 2003 GOB (transferred from ST0512) PROJECT • CLIENT: Public Works PROJECT DESCRIPTION/STATUS Signal design is complete, signal poles are in stock, construction fu ding was shifted to fund the signals on .. Harvey Mitchell Pkwy due to increased severe accidents at Luther Street and Holleman. The plan is to get these signals installed FY' 08. $120,000 transferred from ST0512. PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR '- FISCAL LAN ENG. R. � _..,_,.,......... PROJECT TOTAL ' Years $0 $ 53 2 $25,051 2006-07 $0 2007-08 75,000 19,949 $94,949 2008-09 $0 2009-10 I $0 2010-11 I $0 2011-12 I I $0 2012-13 I I $0 298 TAL 0 $2 $ 753 $97,, I $19,949 $120,000 OPERATING COSTS First Fiscal Year Annually Total Personnel $0 Supplies $0 -Service $1,100 I $1,100' Capital I $0 TOTAL $0 $1,1001 $1,100 N,am �``, 3 :, - { y^. rA� � fl y oh o •• -P' o ,,` , o Nf .q. .lido yi' o VC +" I/,,+rsr4. Zei le V R (3 d Rock..... -Signal-4,,,,,,,c,,,,, ,„,,,,,,;;;;,,,,4,„,,,,,,,, 1, �` \ . cF `GP �".R n`C z''.�"�+E'ip"'w`>z;`,aea F�a 1\ 11 • `� VS;',/ ems/ 9 ,p 0 C� Q'� 's fRr RA \ Cg, r / 58 PROJECT: Traffic Signal atVVm|sh/Hp||ennan PROJECT#: ST0415 - ^ FUND: 139 -Strmets Capital Projects PROJECT BUDGET: $120.000 PROJECT MANAGER: Lee Robinson FUNDING SOURCES: 2003 GOB PROJECT (transferred from GT0512) CLIENT: Public Works ` ' ---------- ''' ----- - ------PROjE-TDE-CR|pTiON' TATL}S--------'-' '----'--- -'---' ---- ' S -/H-----'--)-mcnm---- - �--------- ',---- ---- - - - - '/u/ design peze. signal poles are mstock, construction funding was shifted to fund the signals on­ Harvey Mitchell Pkwy due to increased severe accidents at Luther Street and Holleman. The plan is to get these signals installed FY' 08. $120.00O �mnafenodfnzmST0512� PROJECT 'CALENDAR OF EXPENDITURES BY FISCAL YEAR------------- FISCAL YEAR LAND ENG. CONSTR. misc. PROJECT TOTAL Prior Years $O $9.745 31.733 $U $41.478 30O0-O7 $D 2007-08 85.000 13.522 $78.522 20O8-UQ $O / 20O0-1O $0 2O1011 | / ' / $0 2011 12 | ( - ' , $0 2012-13 | | | | � | $0 TOTAL | S01_ _S9.7451 _ _$96.7331 $13.5221 | $120.000 � '-' --------- ------ - --- -OPERATING Cc]GTG ---'' -'- ----- -''' '--- First Fiscal Year Annually Total Personnel $0 Supplies $0 � Service $1.100 $1.100 Capital TOTAL $O/ G1,1D0/ $1,_100 AwmO iad \ ~^ �� _ ^ � 59 � ` �__________� _______-_-_- __ __�-_^�~�~��-___^_______--____- PROJECT: Traffic Signal Harvey 08atLuther PROJECT#: ST0607 � FUND: Traffic Signal Capital Project PROJECT ! / BUDGET: $359,000 ' PROJECT MANAGER: Lee Robinson FUNDING . ' SOURCES: 2003 GOB~ PROJECT (transferred from ST0512) �CLIENT: Public Works ` ------------ -' - PROJECT DESCRIPT\QNISTAJljS oono�uodunkaootto ed d Mh �ookof�aroh12 %O07 Theoontnadorhan'�V '-'m-' ----� ' .Roadway g un onmay e . � days �. complete the pr�eoLThis po�onof the pr�e�viUadd ahgh�tunn |anoand �otaUdnainugeou�a�s� Upon or near completion of the road work the signal contractor will get started installing fiber optics cables � ` and traffic signals. This signal work is tentative schedule for mid May2UU7 Proiect Budoet °$10.0OO transferred from ST0512 in FY08 � . 100.0O0 transferred from ST0512in FY06 � $58.0OO transferred from ST0411inFY80 . .$100,000ofCO'S ' This project is in under budget. - <�F EXPENDITURES BY YEAR ' PROJECT TOTAL FISCAL YEAR --------[ANn I EN8. MISC. / *� Years- ----- — O ----- U �16.983 rior 9,137 2000-07 158.000 78.000 $228.000 2007-08 $O � ' 2008'00 $0 2009-10 $o ' $0 � 2018'1i � 2011-12 $0 � 2012'13 $0 TOTAL �O �Q.i37 �157.840 $78.000 | �244.Q83 °^. --- --- ~------ ---� - OPERATING COSTS -- F�oa| ---'- Aonue|h/ Total s0 ' Personnel ' $1 28O $12O0 ' Supplies . Service $1,200 $1,200 :Capital . . .TOTAL $0 $2,400 $2,400 . `r- ` . � .� ^1- �' /7 � , ' *` \ \ \ / 60 ' ' PROJECT: Traffic Signal at Harvey M at Holleman PROJECT#: ST0608 FUND: Traffic Signal Capital Project PROJECT BUDGET: $359,000 PROJECT MANAGER: Lee Robinson FUNDING SOURCES: 2003 GOB* PROJECT (transferred from ST0512) . CLIENT: Public Works PROJECT DESCRIPTION/STATUS Roa07. dway the ptruction is set to get underway the roject This portion of the project will add a right-turn laneek of March 12, Oe in ctall drainage and install draina e culverts. to has 60 completeproject. g erts. Upon or near completion of the road work the signal contractor will get started installing fiber optics cables and traffic signals. This signal work is tentative schedule for mid May 2007 Project Budget *$19,000 transferred from ST0512 in FY06 *$190,000 transferred from ST0512 in FY06 $50,000 transferred from ST0411 in FY06 $100,000 of CO's **This project is projected to come in under budget. PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR FISCAL YEAR LAND ENG. " CONSTR. MISC. PROJECT TOTAL Prior Years 0 11,262 7,846 0 $19,108 2006-07 175,000 84,000 $259,000 2007-08 $0 2008-09 $0 2009-10 $0 2010-11 $0 2011-12 $0 2012-13 $0 TOTAL $11,262 $182,846 $84,000 $278,108 ** OPERATING COSTS Personnel First Fis cal Year... . . . Ann ually Total $0 Supplies $1,200 $1,200 Service $1,200 $1,200 Capital $0 TOTAL $o $2,400 $2,400 �q ' Q7 t7u ky Ry0 �C' oy' I ? 3 Ne s z` t 1� A: a s p 0/''8 .S''� jK 40 George Bush East g Hollman' V % A \',/L.�t„y � P9tµteoo 4° aoc® ,\ v li\7\ 1 Pq L d' P PS .jl\lags 8 3' A Nc 61 PROJECT: Traffic Signal at 28181F&B Road PROJECT#: ST0610 FUND: Streets Capital Fund -139 PROJECT BUDGET: $241,300 PROJECT • MANAGER: Troy Rother FUNDING SOURCES: 2003 GOB • PROJECT (transferred from ST0512) :CLIENT: Public Works PROJECT DESCRIPTION/STATUS g by new facilities construction near the intersection of The need for this signal is caused Agronomy Rd and F&B Road on the TAMU campus. Increased traffic flow is expected at the FM2818 • and F&B Rd intersection once the new building is occupied. The signal will be owned and maintained by the City of College Station. $241,300 transferred from ST0512 in FY06 PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR FISCAL YEAR _.._.. . _.....LAND ENG CONSTR. MISC. . .................,..,..PROJECT TOTAL Prior Years $0 $0 160,246 $0 $160,246 2006-07 $81,054 $81,054 2007-08 $0 . 2008-09 $0 2009-10 $0 2010-11 I $0 • 2011-12 I $0 ,3001 $0 $241,30 2012-13 $0 TOTAL $0 $0 $241 0 - OPERATING COSTS First Fiscal Year I Annually Total Personnel I $0 • . Supplies $0 Service $0 Capital $0 • TOTAL $0 $0 $0 • G gnnTno 6�t r CI/: - eb `�" 1 �c• •� y _I289B�t=&B Road-Signal27/—`,.14ei , 4 - Ni / te` r ~J I r � o T� . A� \\,.,, ,,, N.,,,,,, 7/\-- ///\\,' , ,,,,- , ,,),.,„,„;„4, - „ , - 11 l',/" ' \\<\ ' Ati ,•,.,) / , %, • • 62 ----------- PROJECT: TRAFFIC SIGNAL @ GEORGE BUSH/ PROJECT#: ST0205 DOMINIK FUND: 139 -Streets Capital Projects PROJECT BUDGET: $133,000 PROJECT . . MANAGER: LEE ROBINSON FUNDING SOURCES: 1998 G.O. BONDS PROJECT CIP FUNDS CLIENT: Public Works PROJECT DESCRIPTION/STATUS Installation of a new fully actuated traffic signal, Dominik and G. Bush East is presently in' a four-waystop. Increased traffic through this intersection especially during peak periods of the day warrants a traffic signal. Due to the widening of G Bush East the construction phase of this signal will be delayed until completion of the widening project. Update since the widening of G. Bush East the latest warrant study did not warrant a traffic signal,we will continue to monitor the intersection for increase traffic. It's not clear how soon the signal will be installed. Intersection has not met traffic signal warrants as of March 2007 PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR FISCAL YEAR LAND ENG. CONSTR. MISC. PROJECT TOTAL Prior Years $0 $5,309 20,032 $8,033 $33,373 2006-07 $0 2007-08 $0 2008-09 $0 2009-10 $0 2010-11 $0 2011-12 99,627 $99,627 2012-13 $0 TOTAL.... $0 $5,309 $119,659 $8,033 $133,000 OPERATING COSTS First Fiscal Year Annually Total Personnel $0 Supplies $0 Service 1,800 Utilities $1,800 Capital $0 TOTAL $0 $1,800.. $1,800 ... o ro o ., a � / t c°.� �bt c7 �o': `lo ,;21 F : . „kg' `p''' +,, os n /. ors �.t 3 t yrV �. �' mil' @ '1�/• `" , ,Geor9e Bush East Q Dominik j "a, J`qo .,./N- % As,. 175' '''N----, / / - '''',v,;1: P oA 1 I NiN\ 1 ��,94 N. oa0 c ._ 4�, P 'r .i taodn.0ng4 63 . PROJECT: Traffic Signal Communications PROJECT#: ST0411 FUND: 139 -Streets Capital Projects PROJECT BUDGET: $140,000 • PROJECT Holding Account MANAGER: Lee Robinson FUNDING • SOURCES: 2003 GOB -$250,000 • PROJECT -' :CLIENT: Public Works PROJECT DESCRIPTION/STATUS This project will consist of installing fiber optics to interconnect traffic signals and in some cases we will utilize wireless technology. Presently we have 15 signals that are not interconnected. Communications provides instant upload and download of data, ability to monitor the system and possible make repairs from " the signal shop,Installed wireless radios on Texas, installed conduit for fiber optics at Holleman & G Bush. Will continue to to udgrade from copper cables to fiber optics and add communications to signals without. Original project budget= $250,000 $50,000 transferred to ST0607 in FY06 $50,000 transferred to ST0608 in FY06 $10,000 transferred to ST0703 in FY07 PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR FISCAL YEAR LAND I ENG. CONSTR. MISC. I PROJ ECT JEGT TOTAL Prior Years $01 $0 22,605 $0 I $22,605 2006-07 30,000 $30,000 2007-08 87,395 $87,395 • . 2008-09 $0 • 2009-10 $0. 2010-11 I $0 2011-12 I $0 2012-13 $0 TOTAL $0 $0 $140,000 $0 $1 40,000 • OPERATING COSTS First Fiscal Year. Annually Total Personnel $0 Supplies $0 Service $0 Capital $0 TOTAL $0 $0 $0' len.IfilS\...,4201r,„Int . _,.... . i='4. MAP NOT AVAILA L 1�', o Lts S 64 SIDEWALKS AND TRAILS 65 • PROJECT: BIKE LOOP -2005 PROJECT#: ST0530 • FUND: 139 -Streets Capital Projects PROJECT BUDGET: $327,202 . . PROJECT MANAGER: Danielle Charbonnet FUNDING SOURCES: 1989 GOB , . •• PROJECT • CLIENT: Public Works .• PROJECT DESCRIPTION/STATUS Construction of a bike loop system consisting of signed bike routes, on-street bike lanes, and off-street bike paths to link the Texas A&M University (TAMU) Campus, City of College Station Parks, and local housing • areas. Loop may cross under Texas Avenue at Bee Creek. Phases I & II complete This project is to complete Phase III of the ST9409 project. • Funds from ST9803 and ST0521 are expected to be spent in conjunction with this project's funds to complete the bike loop project. PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR FISCAL YEAR LAND ENG. CONSTR. MISC. OVERHEAD PROJECT TOTAL • Prior Years $0 $0 0 $0 $0 2006-07 1,000 1,000 $2,000 .. . 2007-08 75,000 227,202 4,000 19,000 $325,202 . •'• , 2008-09 $0. 2009-10 $0 2010-11 $0 2011-12 $0 • 2012-13 $0 TOTAL $0 $75,000 $227,202 $5,000 $20,000 $327,202 OPERATING COSTS First Fiscal Year 1 Annually Total • Personnel $0 :Supplies $0 . . Service $0 Capital $0 TOTAL $0 $0 $0 e : ••••`'' ' 4. C , 4.., ••• ,.'4 C4/ . * .. t'tt.. .,,L ,--•\--, -k- / 'e-Z2 , .• Bixe Loop 4.i Ns, . ,e> „" 7, ,../ \PN l V 1 )100`14021V2iStWtti a' •Zz' .. 0304- efnlPlii, " ,- , 1, f,t444,7MAI' ,,i 1 ' ''N:' ,M4;!,, • )',,,,, '4i.• e,' — i . 'N AV ' ' • ; '''4 . 66 PROJECT: MISC BIKE TRAILS PROJECT#: ST9803 FUND: 139 -Streets CIP Fund PROJECT BUDGET: $169,000 PROJECT MANAGER: Danielle Charbonnet FUNDING SOURCES: 98 GOB PROJECT CLIENT: Public Works PROJECT DESCRIPTION/STATUS ...... .. This trail l projectsject s created, funds will ll trail allocated toOriginal budget is and this project balance will be funds for projects. g' As new bikeca those projects reduced. Projects on which these funds have been used include: ST0203-Anderson Street Sidewalks NOTE : These funds are expected to be spent upon completion of the Bee Creek drainage improvement project in conjunction with the 2005 Bike Loop Project, ST0530.They will provide a bike trail along one side of the improved channel. PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR FISCAL YEAR LAND ENG. CONSTR. MISC. PROJECT TOTAL Prior Years $0 $0 0 $0 $0 2006-07 $0 2007-08 169,000 $169,000 2008-09 $0 2009-10 $0 2010-11 $0 2011-12 $0 2012-13 $0 TOTAL $0 $0 $169,000 $0 $169,000 OPERATING COSTS First Fiscal Year Annually Total Personnel $0 Supplies $0 Service $0 Capital $0 TOTAL... . ...... $0 $0..... .. $0 ,46 .44 M P NOT A AILABL F, 67 — .-------- - PROJECT: Hike & Bike Trails PROJECT#: ST0521 FUND: 139 -Streets CIP Fund PROJECT BUDGET: $981,624 • PROJECT . . MANAGER: Danielle Charbonnet FUNDING SOURCES: 2003 GOB • PROJECT CLIENT: Public Works . . PROJECT DESCRIPTION/STATUS --- _ .6 $75,000 transferred in FY2004-05 to Brison Park Bike & Ped Path ST0524. $2625 was approved for as a match for a grant for a Safe Routes to School course at the 2-24-05 Council meeting. $56,624 transferred from ST0524 in FY07 - project completed under budget. , NOTE: A portion of these funds are expected to be spent in conjunction with the 2005 Bike Loop Project, ST0530. ° • PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR • • FISCAL YEAR LAND ENG. CONSTR. MISC. 1 PROJECT TOTAL • Prior Years $0 $0 6,244 $0 $6,244 2006-07 $0 . 2007-08 516,624 $516,624 . • 2008-09 I 230,000 $230,000 2009-10 I I I 228,756 $228,756 2010-11 I I I $0 2011-12 I I I $0 . _ 2012-13 I I I I $0 TOTAL I $01 $01 $981,624 $01 I $981,624 ,—, OPERATING COSTS First Fiscal Year I Annually Total Personnel $0 Supplies $0 • • Service $0 Capital I $0 TOTAL $0 $01 $0 . . • a • V r/S1 ir rk. ,•.)' . eP .•,:.-. • , ....r Lk.. 'N 44 e,:•Li` NOT AVAILABL Fi', %--... .;., 68 PROJECT: NEIGHBORHOOD CIP PROJECT#: ST0012 FUND: STREETS CAPITAL PROJECTS PROJECT BUDGET: ANNUAL PROJECT FUNDING MANAGER: TROY ROTHER SOURCES: GENERAL FUND PROJECT CLIENT: Public Works PROJECT DESCRIPTION/STATUS , Neighborhood CIP is one means of addressing infrastructure needs identified through small area plans and through the neighborhood traffic calming program. Improvements may include traffic calming measures such as speed cushions and landscaped medians. PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR FISCAL YEAR LAND ENG. CONSTR. MISC. OVERHEAD PROJECT TOTAL Prior Years 0 4,077 64,224 19,910 $88,211 2006-07 $0 2007-08 $0 2008-09 $0 1 2009-10 $0 2010-11 $0 2011-12 $0 2012-13 $0 TOTAL $0 $4,077 $64,2241 $19,910 $0 $88,211 OPERATING COSTS First Fiscal Year Annually Total Personnel $0 Supplies $0 Service $0 Capital $0 TOTAL $0 $0 $0 • • MAP NOT AV1- ILABLh 69 PROJECT: PEDESTRIAN IMPROVEMENTS PROJECT#: ST0416 ON UNIVERSITY DRIVE-Ph 1A FUND: 139-Streets CIP Fund PROJECT • BUDGET: $2,387,025 PROJECT • • MANAGER: TROY ROTHER FUNDING SOURCES: see below* • PROJECT CLIENT: Public Works PROJECT DESCRIPTION/STATUS The project consists of developing and implementing a plan to improve pedestrian travel in the Northgate area of College Station; specifically to facilitate pedestrian movement across and along University Drive between College Avenue and Wellborn Road. A consultant was hired (for$217,715)to collect input from multiple stake holders, study the area, and develop a phased construction plan. The construction costs of all of the projects within Phase 1 was estimated to be$3.4 Million;therefore the projects included in Phase 1 have been reduced to the following and the • construction cost is estimated to be$1,942,000: 1. Modify ramps of Univ. @ Wellborn Rd interchange;2.Wellborn Rd.to Boyett median improvements; 3.Wellborn Rd to Boyett pedestrian improvements; and, 4. Signalize University Drive at Boyett. *Funding: $50,000 debt issued in 04 (03 GOB) 357,000 debt issued in 05(03 GOB) $750,000 to be transferred from ST0701 $416,937 to be transferred from ST0518 $190,000 to be transferred from ST0512 $623,088 from fund balance($427,000 from ST0213 and remainder to be appropriated in FY09) FISCAL YEAR LAND ENG. 1 CONSTR. MISC. OVERHEAD I PROJECT TOTAL • Prior Years $0 $170,211 0 $242 $0 $170,453 2006-07 0 118,274 0 0 0 $118,274 2007-08 0 118,273 0 0 0 $118,273 2008-09 0 0 1,946,000 0 34,025 $1,980,025. • 2009-10 I I I $0 • 2010-11 I I $0 2011-12 I I ! I $0 • 2012-13 I I $0 TOTAL $01 $406,7581 $1,946,0001 $242 $34,0251 $2,387,025 'ERATING COSTS First Fiscal Year Annually I I Total Personnel $0 Supplies i i I $0 • Service I $0 • Capital I I $0 I TOTAL $01 $0 f ea mpe / �✓t - sz.• - \ � Wtm ', I• y y � in rl S, A \ -,,;/ S } ' S s � ,4 y , + ° /6i 4 s n , s ' ri I\7,\____I ' , I O `� Gor ? `n oo/k 70 PROJECT: COCS BEAUTIFICATION IMPROVEMENTS PROJECT#: ST0515 FUND: 139 -Streets CIP Fund PROJECT BUDGET: $300,000 PROJECT . MANAGER: Craig Jordan FUNDING SOURCES: Certificates of Obligation PROJECT , CLIENT: Public Works PROJECT DESCRIPTIO N/STATUS This project is to design construct t facilities just south of the Rock Pr airie Bridge at Highway 6. These facilities ' include retaining walls, landscaping, beautification of the existing bridge railing and bridge siding texture. These new facilities will occur on the side slopes of Highway 6 in the TxDOT right-of-way and on the existing bridge at Rock Prairie Road and Highway 6. PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR FISCAL YEAR I LAND ENG. CONSTR. MISC. Overhead PROJECT TOTAL Prior Years $0 $0 0 $0 $0 2006-07 40,000 $680 $40,680 2007-08 254,985 $4,335 $259,320 2008-09 I $0 2009-10 I I I I $0 2010-11 I I I I I I I $0 2011-12 I I I I I I I $0 2012-13 I $0I I I I $0 $294,985 $300,000 TOTAL I $0 I $5,015 . � I I I $0 OPERATING COSTS First Fiscal Year 1 Annually I Total Personnel I $0 Supplies I $0 Service $0 Capital 1 $0 TOTAL I$0I $01 I co L. A.-, \ 1\e/IAP NOT _AVAILABLE 71 • a PROJECT: Pedestrian n Improvements on FM2818 • FUND(S): PROJECT NUMBERS&BUDGET: 139-Streets Capital Fund Streets: ST0516 $1,069,900 238-Water Capital Fund Water: WF0614950 $150,025 239-Wastewater Capital Fund Wastewater: TBD $72,000 • Total Project Budget: $1,291,925 PROJECT MANAGER: Chad Mallett FUNDING • PROJECT SOURCES: Streets-GOB,CO's and CLIENT: Public Works Streets CIP* W/WW-URB • PROJECT DESCRIPTION/STATUS Pedestrian improvements will be installed at the intersection of FM 2818 and Welsh as well as the approaches to the intersection. TxDOT will design the project and the City of College Station will construct the project.The redesign of the instersection involving ROW acquisition will result in the need to relocate and/or adjust the existing utilities. • Streets Funding ST0517* Sidewalk Improvements $50,036 FY06 (2003 GOB) ST0511* Traffic Safety Improvements $61,370 FY06 (2003 GOB) • .. ST0512* New Traffic Signal Projects $200,200 FY07 (2003 GOB) Dean Intl $102,000 FY06 • ST0516* Ped Imp on 2818 $50,000 FY06 ($50,000-FY05 CO Issue) ' ST9928* Victoria OP $280,361 FY06 (1998 GOB) • ST0005* Jones Butler St Ext $325,933 FY07 $1,069,900 $72,000 wastewater portion of budget transferred from Oversize Participation. • • PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR • . Project Total FISCAL YEAR LAND ENG. CONSTR. 1 MISC. OVERHEAD PROJECT TOTAL Prior Years 0 2,918 0 0 0 $2,918 2006-07 40,000 47,000 1,135,000 2,007 11,300 $1,224,007 2007-08 0 0 0 0 0 $0: 2008-09 0 0 0 0 0 $0 • 2009-10 0 0 0 0 0 $0 2010-11 0 0 0 0 0 $0 2011-12 0 0 0 0 0 $0 2012-13 0 0 0 0 0 $0 PROJECT TOTAL $40,000 $49,918 $1,135,0001 $2,007 $11,300 $1,238,225 . j o c 00 ," 4. gi�pp>,, .,`ter 6 g `(-Vk i. `•ram °,',D= 0. `� a C ¢ �C y, t . c h71 'may^\\� 'j'J �l ,,,, 0. S� / g4 72 PROJECT: Pedestrian Improvements on FM28181 PROJECT CALENDAR OF EXPEN DITURES BY FUND Streets Portion — FISCAL YEAR ......... . ... LAND....... ENG.. CONSTR........._ MISC........... ...,,... . PROJECT TOTAL Prior Years $0 $2,893 0 $0 $2,893 2006-07 $40,000 $25,000 $1,000,000 $2,007 $1,067,007 2007-08 $0 2008-09 $0 2009-10 $0 2010-11 $0 2011-12 $0 2012-13 $0 Streets Total $40,000 $27,893 $1,000,000 $2,007 $1,069,900 Water Portion FISCAL YEAR LAND ENG. CONSTR. MISC. OVERHEAD PROJECT TOTAL Prior Years $0 $25 0 $0 $25 2006-07 15,000 75,000 6,300 $96,300 2007-08 $0 2008-09 $0 2009-10 $0 2010-11 $0 2011-12 $0 2012-13 $0 Water Total $0 $15,025 $75,000 $0 $6,300 $96,325 Wastewater Portion FISCAL YEAR LAND ENG. CONSTR. MISC. OVERHEAD PROJECT TOTAL • Prior Years $0 $0 0 $0 $0 2006-07 7,000 60,000 5,000 $72,000 2007-08 $0 2008-09 $0 2009-10 $0 2010-11 $0 2011-12 $0 2012-13 $0 Wastewater Total $0 $7,000 $60,000 $0 $5,000 $72,000 PROJECT TOTAL $40,0001 $49,9181 $1,135,0001 $2,0071 $11,3001 $1,238,2251 OPERATING COSTS I First Fiscal Year I Annually I Total Personnel I $0 Supplies $0 Service I $0 Capital $0 TOTAL $01 I $0 $0 73 PROJECT: Sidewalk Improvements PROJECT#: 8T0517 � . . ` FUND: 13S 'Streets C|PFund PROJECT ` BUDGET: $158J35 / PROJECT MANAGER: ChodeoMoLennuno FUNDING SOURCES: 3UO3GO Bonds '$5OO,0OO PROJECT ' � �CLIENT: Public Works � PR@JECTDESCFUPT|��N/�T�TU8 Fundssidewalk provided ' k|m � � /ovueouxmoe�a/ provemanzpn�oo�t�roug�ou���eC�� P�ntobui|doidawa|koa|ong � ` thoroughfares and collectors and to retrofit older neighborhoods. ' Original Budget=$50O.O00; $2.50U transferred toSTO520FY07 � � $88.400 transferred to8T0520FYO5 $2'728 transferred toST872FYU7 ' $36.000 transferred toSTOS00FYO6 $4.078 transferred back toSTU517 from ST080O- $5O.U30 transferred toST0516FY08 balance ofpnoj - FYO7 .$11.34A transferred toVVPAQ05FYU8 $28.580 transferred tnST07O2- FY08 . .$50.00O transferred toSTO518inFY07 $75.70O transferred toST0803 - FYO8 ' � $2.058 transferred toGTU52Q - FY07 � --''-'--- ---'' PROJECT CALENDAR OF EXPENDITURES BYFISCAL YEAR --- -----'--- --- -' . . F|SCAL—FAR -- - ---' 'LAND ENQ. CONSTR. PW|SC. RHEAn --pR---CTTOTxL Prior Years $0 $512 $13.600 $8 $14'112' 2008-07 _ 3.500 30.777 $506 $750 $44.023 2007'08 0 0 $O $0 $0 2008-08 10.000 87.600 $730 $1.870 $100.000 / �00Q'10 $O $O ` 2U10'11 | ' . $O $0, 2011'12 | | | $O W ' 2012'13 | | | $8 W . TOTAL 1______ $0.__$14.o12|__$140.077|_ $1.326 _ $2.419�____ $158.735 OPERATING CQ8T5---- ------- -------- ' — First Fiscal Yea' r' ' - --- - ' AnnuaU------- -----Toea| -- - :Personnel - �0 ' Supplies ` $0 . . $0 Capital $0 TOTAL____ $0 $0' �O ` ^---_-_____-__ ' ` ` ' ^� ~ ' ' , ' ' �� 7�T�-�°�` ��l[ K� ��]_���� �`wv�� -� �����^���JL~��^��x-.« ' � ` 74 PROJECT: University Dr Sidewalk Improvements PROJECT#: ST0529 FUND: 139 -Streets Capital Fund PROJECT BUDGET: $140,958 PROJECT MANAGER: Chad Mallett FUNDING SOURCES: GOB and Certificates of PROJECT Obligation CLIENT: Public Works PROJECT DESCRIPTION/STATUS The design an d the construction of an 8' sidewalk on the north side of University from Texas Avenue to College Avenue $86,400 transferred from ST0517 - FY05 $50,000 transferred from ST0516 - FY06 $4,558 transferred from ST0517 - FY07 PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR FISCAL YEAR LAND ENG. CONSTR. MISC. PROJECT TOTAL Prior Years $0 $27,141 $54,686 $651 $82,477 2006-07 1,756 54,561 2,164 $58,481 2007-08 $0 2008-09 $0 2009-10 $0 • 2010-11 $0 2011-12 $0 2012-13 $0 TOTAL $0 $28,896 $109,247 $2,815 $140,958 Year... OPERATING COSTS First FiscalAnnually Total Personnel $0 Supplies $0 Service $0 Capital $0 TOTAL $0 $0 $0 lee '' 7' ram' N i l /:: ?4x\ r r ,r. •N` \ q„.. L / Nam, . 'af + ^'\ +K. j 'yd,,• \ r'4';!- N e- N ; ),,t N<-,:,,,,, m %l :i .,;, 'gym sw, `\ 75 PROJECT: Sidewalk Improvements on PROJECT#: ST0702 Southwest Parkway FUND: 139 -Streets Capital Fund PROJECT BUDGET: $31,300 . . PROJECT • MANAGER: Chad Mallett FUNDING SOURCES: ST0517 -03 GOB's PROJECT :CLIENT: Public Works . • • : : PROJECT DESCRIPTION/STATUS • The project consists of the survey and construction of a 4-foot sidewalk on the south side • of Southwest Parkway from Anderson to Texas Avenue. The project will be designed in-house. ..• $2,720 transferred fro ST0517 in FY07 . . $28,580 transferred from ST0517 in FY08. PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR : FISCAL YEAR LAND ENG. CONSTR. MISC. PROJECT TOTAL Prior Years $0 $0 $0 $0 $0 - 2006-07 $0 • - 2007-08 3,000 27,300 1,000 $31,300' 2008-09 $0 2009-10 $0 2010-11 1 I $0 2011-12 1 I I I $0 2012-13 I I I I 1 $0 TOTAL I I $01 $3,000 $27,3001 $1,000 $31,300 •_ OPERATING COSTS First Fiscal Year I 1 Annually 1Total Personnel $0 ' Supplies 1I $0, Service I $0 Capital • $0, TOTAL $01 $0 I $0 • : - , ' .-- ;w%--•'-4-' •.;•. .- ., y' ..,,,o,:,,,,,,,, • • 6' ----' T-1,4 V ', ...-- ien'r 7-- , / .'', --, 0.1, Z2* , 6$'- 1 „ N , '.•''',,, t Ni g- < / %,-- ..,9. ,,,,,r,,, S '94:)\.c?'• / „ ., , ,- .,- -,,-7,--,/ ,•,-,,i, 7"--, ,,,,' /, '-,,,,,,,,,-- . • , 4, ..4, t‘• N',9 `, ,,,7 ,,, ,. > _. ", N / ?...> QP / „,., — —-• e:,',,,,,, 1,,s,,,,--I e 2,,e • ';.= ‘<4. 4, '‘1' , N ,;' • • l'''''. '''*- \< t , N ,/ -7; -.,, -. -- --- ,,., ,.. '"?.. 'Y '''''N _,-,-- • ' 76 PROJECT: Sidewalk Improvements on Appomattox PROJECT#: ST0803 Drive FUND: 139 -Streets Capital Fund PROJECT BUDGET: $75,700 PROJECT MANAGER: Gary Balmain FUNDING SOURCES: ST0517 -03 GOB's PROJECT CLIENT: Public Works • PROJECT DESCRIPTION/STATUS This project will consist of sidewalk improvements on Appomattox matto x Drive. $75,500 transferred from ST0517- FY08. PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR FISCAL YEAR LAND ENG. CONSTR. MISC. PROJECT TOTAL Prior Years $0 $0 $0 $0 $0 2006-07 $0 2007-08 75,700 $75,700 2008-09 $0 2009-10 I $0 2010-11 i 1 $0 2011-12 I I I I $0 • 2012-13 I I $0 TOTAL $0 $01 $75,7001 $0 $75,700 OPERATING COSTS First Fiscal YearAnnually Fi I Total Personnel $0 Supplies I $0 Service I I $0 Capital $0 TOTAL .. ., $0, 0 $0 tt'` .�. A ferdIS''',.k: "'4. ,,,„,: ,..x.--,0, ,,,,,,,,,,, -,,',/ 1u N. .Fry ''§q c F '� 'd" �z. i��-- I f ,'( .:*/ .,,:' li it r j 1"1(v.;"41J• qa 44 -•,,±fie / \'. , , ;, r e'// i /' ?dam "� a% < " .,, ^ i 0Gs �./ ,j get" r�!a,i:vs 'Z.•a�v3%,,, t•.,ZE�y'' .'�F'ci \ ,i•^,<',+- ./'r� o \.-: :y\•, :'y.K .�K-" i .ti yam/ ...,:,,k 77 • . • . • • • . , . . • •. . .„„.„ • , • CITY OF COLLEGE STATION HEART OF THE RESEARCH VALLEY • • • • . . • 78 GENERAL GOVERNMENT- PARKS PROJECTS CAPITAL IMPROVEMENT PROJECTS FISCAL YEAR 2007-2008 THROUGH FISCAL YEAR 2012-2013 79 GENERAL GOVERNMENT PARKS PROJECTS . CAPITAL IMPROVEMENT PROJECTS FISCAL YEAR 2007-2008 THROUGH FISCAL YEAR 2012-2013 PROJECT REVISED PROJECT BUDGET ACTUAL FY 06-07 ESTIMATE NUMBER AMOUNT FY 05-06 APPROPRIATIONS FY 06-07 BEGINNING FUND BALANCE: 1,043,007 3,329,533 3,329,533 . ADDITIONAL RESOURCES: GENERAL OBLIGATION BONDS 5,835,000 1,070,000 1,230,000 CERTIFICATES OF OBLIGATIONS 406,098 405,000 405,000 INTERGOVERNMENTAL TRANSFERS • INTRAGOVERNMENTAL TRANSFERS 626,388 667,000 698,184 INVESTMENT EARNINGS 77,642 63,000 68,000 • OTHER 78,076 71,100 71,100 SUBTOTAL ADDITIONAL RESOURCES $ 7,023,204 $ 2,276,100 $ 2,472,284 TOTAL RESOURCES AVAILABLE $ 8,066,211 $ 5,605,633 $ 5,801,817 PARK PROJECTS RAINTREE PARK IMPR. PK0068 44,000 - - 13,765 FIELD REDEVELOPMENT PK0300 ANNUAL - 4,496 57,000 UNIVERSITY PARK DEVELOPMENT PK0410 400,000 4,162 - - # VETERANS PARK PHASE II PK0501 6,925,000 3,691,337 - 2,174,063 # NEW FORESTRY SHOP CONSTRUCTION PK0520 830,000 104 730,000 430,000 • # CENTRAL PARK SHOP RENOVATION PK0521 40,000 - - - WOODLAND HILLS DEVELOPMENT PK0523 315,000 - 315,000 - • ADAMSON POOL BATH HOUSE REPLACEMENT PK0701 990,000 - 90,000 75,000 • SOUTHWOOD VALLEY LITTLE LEAGUE LIGHTS _ PK0801 400,000 - _ THOMAS POOL BATH HOUSE REPLACEMENT PK0802 330,000 _ - WOLF PEN CREEK AMPHITHEATER ADDITIONS WP0501 168,581 - 168,581 * LINCOLN CENTER BLDG TO PARKING COVER PK0602 60,500 - - 60,500 • * LINCOLN CENTER ADDITONAL PARKING PK0702 99,000 - 99,000 99,000 ' * LINCOLN CENTER RECEPTION DESK IN FOYER PK0703 18,670 - 15,000 18,670 * GABBARD PARK IMPROVEMENTS PK0704 140,000 - 140,000 140,000 * OAKS PARK IMPROVEMENTS PK0705 96,000 - 96,000 96,000 * OAKS PARK BASKETBALL PAVILLION PK0706 277,000 - 277,000 277,000 * CENTRAL PARK LIFE TRAIL EXERCISE EQUIPMENT PK0707 40,000 - 40,000 40,000 * LINCOLN CENTER ENTRY SIDEWALK PK0803. 15,000 _ . - * LIONS PARK SWING SET PK0804 15,000 - - - CLOSED PROJECTS 1,013,742 57,369 73,781 CAPITAL PROJECTS SUBTOTAL 4,709,345 1,863,865 3,723,360 • MISCELLANEOUS 7,121 • DEBT ISSUANCE COST 12,339 10,000 10,000 GENERAL&ADMIN.CHARGES 7,873 15,057 15,057 TOTAL EXPENDITURES $ 4,736,678 $ 1,888,922 $ 3,748,417 ' ENDING FUND BALANCE: $ 3,329,533 $ 3,716,711 $ 2,053,400 • *-FUNDED THROUGH COMMUNITY DEVELOPMENT BLOCK GRANT #-Indicates projects funded through November 2003 G.O.Bond Authorization 80 GENERAL GOVERNMENT PARKS PROJECTS CAPITAL IMPROVEMENT PROJECTS FISCAL YEAR 2007-2008 THROUGH FISCAL YEAR 2012-2013 APPROVED FY 07-08 PROJECTED PROJECTED PROJECTED PROJECTED PROJECTED PROJECTED APPROPRIATIONS FY 07-08 FY 08-09 FY 09-10 FY 10-11 FY 11-12 FY 12-13 . 2,053,400 2,053,400 189,066 188,066 217,066 248,566 281,066 40,000 40,000 - - - - 1,175,000 1,175,000 300,000 - - - - 225,000 225,000 - - - 21,000 21,000 5,000 5,000 6,000 7,000 8,000 72,500 72,500 74,000 74,000 75,500 75,500 77,000 $ 1,533,500 $ 1,533,500 $ 379,000 $ 79,000 $ 81,500 $ 82,500 $ 85,000 $ 3,586,900 $ 3,586,900 $ 568,066 $ 267,066 $ 298,566 $ 331,066 $ 366,066 30,000 30,000 75,000 50,000 50,000 50,000 50,000 395,018 - - - - - - 810,000 - - - 399,896 - - - 40,000 40,000 - - - - 315,000 - - 900,000 915,000 - - - - ' 400,000 400,000 - - - - 30,000 30,000 300,000 - - - - 15,000 15,000 - - - 15,000 15,000 - - - - 1,430,000 3,364,914 375,000 50,000 50,000 50,000 50,000 1 1,500 11,500 - - - - 21,420 21,420 5,000 - - - $ 1,462,920 $ 3,397,834 $ 380,000 $ 50,000 $ 50,000 $ 50,000 $ 50,000 $ 2,123,980 $ 189,066 $ 188,066 $ 217,066 $ 248,566 $ 281,066 $ 316,066 81 Parkland Dedication 1 -16 • • • CIA?' .. a A L ::r; ywY '> a: • $; .tom:: ,, -; ;a:.x... .a;:_'y°x��.�;r'"�-`:'- .fie" ,A•`. -, . ..F::x .' .> ::> 1".r' g ;s 'l xa. �rwv sl'xF;>i;':'m.:'" r" / t�,r 7 1 \ N� 0t . _ ."„^Wavy. ..,.......,<'<.: 1..a.,d,K ii�,�..:i.,3. m:t';E'?}:ilc*i''"C�t:i(i*; ., ..... , ,... :;:x. .rya 82 PROJECT: RAINTREE PARK IMPROVEMENTS PROJECT#: PK0068 FUND: 138 - Parks CIP Fund PROJECT BUDGET: $44,000 PROJECT MANAGER: DAVID WOOD FUNDING SOURCES: General Obligation Bonds 99 PROJECT CLIENT: Parks and Recreation PROJECT DES CRIPTlON/STATUS These remaining funds will replace six (6)existing area lights, install new signs, and install a bench. PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR FISCALo Years i LA ND J ENG. CONSTR. MISC. PROJECT TOTAL P rs $0 $906 $28,178 $1,150 $30,235 2006-07 13,765 $13,765 2007-08 $0 2008-09 $0 2009-10 $0 2010-11 $0 • 2011-12 I I $0 TOTAL2012I I1 I � $0 3 � $906 $41,943 $1,1501 I $44,000 , $0 OPERATING COSTS First Fiscal Year y Annuall Total Personnel $0 Supplies $0 .• Service $0 Capital $0 TOTAL $0 $0 $0 , # N ,4 ;i,: ,;: 4 :t .,_ <f: Raihtree Park ,�. t='si4 '4,th Improvements ACI i � " p, a&:i' F '1k } 61.c k 9 r N a g+F v ell0 r `�A' m _U W a / Nc e-, a .Mhxs� AJ tir yy ; " 410) 'S. ' ,/ ; . d iW 1 � ' k, .; 4; ra4a1m� 4� { z : a 't=� ',:F'fi.�= ;:• i}e'; ' iiii;iS:r MOW q "; i t'At'i ';`''?):L:l�.C� 'l�:c:.!st., z:3:;.rv�,y.: ,y�` m�,�. :fit :3� ,:C �.-' ,"'IU �..i 3GYq:'{: 4 'si R, yAy T" e£t'tr ..-?a4hRttlr:? s'y.:sti"'�' �°� %, '14.1y5�yfdt .,,A�•�pv g3atr`2e:�S ti �. 41 83 PROJECT: FIELD REDEVELOPMENT PROJECT#: PK0300 • FUND: 138-Parks CIP Fund PROJECT BUDGET: Annual PROJECT MANAGER: PETER LAMONT FUNDING SOURCES: Field Redevelopment Fees PROJECT CLIENT: Parks and Recreation PROJECT DESCRIPTION/STATUS This project will fund various projects from the Field Redevelopment Fee fund. This fee is collected from players and teams from both city leagues and outside user groups to pay for replacement items and facility upgrades at city athletic facilities. FY 2008 projects include renovation of the infields, shade structures, and support facilities at Central Park softball fields. PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR • FISCAL YEAR LAND ENG. CONSTR. I MISC. PROJECT TOTAL' • m Prior Years $0 $33,705 2006 07 $50,434 $84,139 57,000 $57,000 . 2007-08 30,000 $30,000 2008-09 75,000 $75,000' 2009-10 I 50,000 • 2010 11 I I I 50,000 $50,000 $50,000 2011-12 I I I I 50,000 $50,000 2012-13 I I 50,000 $50,000 • TOTAL $01 $33,705 $01 $412,4341 $446,139 OPERATING COSTS First Fiscal Year 1 Annually Total . Personnel $0 • Supplies I $0 Service I I • Capital I I $0 $0 TOTAL $01 $01 $0 Q. ir e 0` 1r'LT'" NOT r1 ?AILA 13L i-4' AP 84 �� ��` .� �� �/ . CITY OF COLLEGE STATION HEART O£THE RESEARCH VALLEY • 85 • • PROJECT: University Park Development • ' FUND(S): PROJECT NUMBERS&BUDGET: 138-Parks Capital Fund Parks: PK0410 $400,000 172-Zone 2 Parkland Dedication Fund Parkland Ded: TBD $115,837 Total Project Budget: $515,837 • • PROJECT MANAGER: David Wood ' FUNDING PROJECT SOURCES: 138-Certificates of Obligation CLIENT: Parks and Recreation 172-Zone 2 Parkland Dedication PROJECT DESCRIPTION/STATUS Neighborhood park development to include a fenced"Bark Park"for unleashed dogs. Other amenities will be typical of Neighborhood Parks, including walks, benches,drinking fountains,tables, lights and small shelter. In addition,a small parking lot and restrooms would be required. The location is the 10-acre undeveloped neighborhood park site in Park Zone 2. This site is adjacent to Burton Creek in the University Park Subdivision. •. _ PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR Project Total FISC Pr oA Years LAND 0 ENG. CONSTR. MISC. PROJECT TOTAL 0 4,872 110 $4,982 • • 2006-07 0 0 0 0 I $0 • 2007-08 0 0 510,855 0 I $510,855 2008-09 0 0 0 0 I $0 • • 2009-10 0 0 0 0 I $0 2010-11 0 0 0 0 $0 2011-12 0 0 0 0 $0 2012-13 0 0 0 0 $0 • PROJECT TOTAL $0 $0 $515,727 $110 $515,837: • ;` /N .„ yF f :k r?",,, university Park Development 411,41016., • ..t .'-'lh :3•;,, fit( .� { " ' • i... 'liitt3'N':t€F7;'f;'s.„g;,tE=,:5i;;i>-`,.�_,` m" t' '�6 • -: #r.<.ti,�.,z.ti:, `:r.;' `,`'11X�31}i< p:;;�., e:;,z,.. _ } o. \ 'Y'..., i`,��. ..i`+:yiiVIIr.4i';; Poe c' ll ':i,;.s'�s ,aq':;}"�E,'?�i 3..."'.'::;.4`fiI�iC^ :'`0: '` I `';u{i`c�`y t`t-.: :t43V'zr�i`:;;4i ^k:•' 1i kiPiNntaAn;o,+x "'�3ei' 1 __ "5Vh1'g 86 PROJECT: University Park Development PROJECT CALENDAR OF EXPENDITURES BY FUND Parks Portion FISCAL YEAR LAND... ENG. CONSTR... MISC. PROJECT TOTAL Prior Years 0 0 4,872 110 $4,982 2006-07 ------ - ------- 2007-08 - - 395,018 0 2008-09 $395, $08 2009-10 $0 • 2010-11 - -- -- $0 2011-12 2012-13 - - - $0 $0 Water Total $0 $0 $399,890 $110 $400,000 Parkland Dedication Portion FISCAL YEAR I LAND I ENG. CONSTR. I MISC. PROJECT TOTAL Prior Years 0 0 0 0 $0 2006-07 $0 2007-08 115,837 --- -- - $115,837 2008-09 $0 2009-10 $0 2010-11 I $0 2011-12 $0 2012-13 $0 Wastewater Total I $01 $0 $115,8371 $0 $115,837 PROJECT TOTAL I $0f $01 $515,7271 $1101 ( $515,8371 • . OPERATING COSTS First Fiscal Year Annually Total Personnel $0 Supplies 2,295 4,590 I $6,885 Service 8,925 18,340 $27,265 • Capital $0 TOTAL $11,220 $22,930 $34,150 87 ' ` PROJECT: VETERANS PARK &ATHLETIC PROJECThh9KO501 / COMPLEX, PHASE U PROJECT FUND: 138 'Parks C|9Fund BUDGET: $6,925008 ' PROJECT � MANAGER: ERKC PLOEGER FUNDING 3003 General ' SOURCES: Obligation Bonds . ' ' �PROJECT � CLIENT: Parks and Recreation ` ' -' - ----- -- '-' PROJECT DESCRIPTION/STATUS -- -' __--__-- _.......... __-___ Phase 11 of Veterans Park&Athletic Complex to include parking, utilities, shop addition, Veterans � Parkway extension, three (3) soccer fields, throe (3)softball fields, large group navUkm, and a softball concession utand/n*ahoum building. Project design began in January 2O05and construction began in March . ^ 2008. The oo ed of Veterans_Parkway ha. eoeanadded because of available funds. . ------------ PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR ' ---- ' ' ��\S� - ' - PROJECT TOTAL F|8�A�YEAR LAND ENG� CONSTR. � ' _______- - '_ ' Prior Years'"'' $0 $439.336 $3.501.325 $276 $3.940.93/ � 2008-07 20,080 2.154,063 $2.174.063 2007'08 10.000 808�00 $810`000 $0 2008-09 2009'10 $0 �0� ' ' ^ 2 -i1 01O 2011-12 $0 � 2012-13 $O- TOTAL $8 $40O.330 $8�55 388 $276 $8.925.008 _---~=~�~�_~____' ' _____'- _______'- ' . OPERATING COSTSFirst Fiscal Year Annually Total -- ' -- - --- -- '' --- ' 'Parunnnu| $58`731 $182`370 $239.101 ' Supplies28 21'850 .350 $48.200� ` 'Seninn 117.380 170.880 $288.240 ' Capital 78.900 $78.000 TOTAL $274.881 _ ____$37A,580_____ __ $854.441� ---_�_ __-___��� �� ' `r ^` . ` , ` ' , . 88 ` • PROJECT: NEW FORESTRY SHOP PROJECT#: PK0520 CONSTRUCTION FUND: 138 - Parks CIP Fund PROJECT BUDGET: $830,000 PROJECT MANAGER: ERIC PLOEGER FUNDING FY 2003 General • SOURCES: Obligation Bonds PROJECT CLIENT: Parks and Recreation PROJECT DESCRIPTION/STATUS Construction of a ne w Forestry Shop with equipment and supply storage. The shop will be built adjacent to the new Community Park located adjacent to the Landfill on Rock Prairie Rd. Original budget= $670,000 $160,000 transferred from PK0521; included on FY07 budget amendment#2. PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR FISCAL YEAR LAND ENG. CONSTR. MISC. PROJECT TOTAL Prior Years $0 $104 $0 $0 $104 2006-07 30,000 400,000 $430,000 • 2007-08 10,000 389,896 $399,896 2008-09 $0 2009-10 $0 2010-11 $0 2011-12 $0 2012-13 $0 TOTAL $0 $40,104 $789,896 $0 $830,000 OPERATING COSTS • First Fiscal Year Annually Total Personnel $0 Supplies 21,000 2,000 $23,000 . Service 5,000 $5,000 Capital $0 TOTAL $21,000, ,.. 28, 0 $7,000 .... . $ 00 r>- - d::. xrt';°r;fi''iii•yA7ii :^;PC34 =.M:cl rt=,_"xIY sus.'c'Q A'.4.�,�:'.�yt`:._ 4:�� ,�{j��1 ..,tip\.�:..1,.5 •;:z�:. Air:..,., .a4:, F'kx- ,,,;, . ;,.,:. .. Lai.€.«:..,.,. '..,... � ,,.3s e`bt....k:, '^-.. _ti:.•:,:iinr'.:....m,'eul{:�n��,;:,......y5ikitslEYt,.;'.;.�j .. ,... :t:,iv.+,.: yr "',:k.„,, t:tlYi,6„ SuS N:�,.,a 4i�f: :;: �;i,.:.. J� .,r3,::I::.: [^:ug.tiry: �'�.tj�:;:c ..'•�kl.t S:tt:e �i{',f:i,i2i:�..ii; �✓M?::3:'?:::€€:€'.{:'�'y}... . '.1;.�'.�:<..�{:ix.. i'Y`s ii vol s�,` ,r,F,,i.;'�;� +" ?�. `.5.:;:.:`e":, :i:Yx � � ..tCHs;{iYtir,v •f'-.{��,'j+'i� ')'i+ ::::{{}=i'' N,i1:,'q: i=.., �nch,pu,.i- :Z7,:,!%_ 'ii5,...., tyi,4_...;r; : �:.s*y�;t:i's.::rryy ...�.��;�����':_�� ralrl:is{ .: `,:4� ,..:•,��e.,...':.. ' ,:Y+b,7'' �q.z eXU+ah:3r<3iT}7 `r:i{;'' (' + e;::;.. ;,,;s <:1s # `Sir 1 G op Forestry ��7 1 � hop Construction f.: .>• ry';ijci;:iiiii: :$''.'�,"i;4 ::,:t. x,[l:ar fi', ;3 r ''''''rim;. :;� .�.\ rz" ;t• .'Jfigr ��``.`'`�,`+3,,, ge'('�at,:.�"'s',piti4 ,`.t 'i,£u 4 " �'li`fiS;,;a'�Riteg. '4''�'h.s}i.}i;:EA�i9rx:6,; ZvY;?fl}iFz';y»"� ^'5'p •r :��,:::r: t1:yl:,y53n:?:;..i :51., ,i'$/:i ar..,s ;{1 �' :Y..t. f ':i�l'0hy...l'�\. n';€v;t:to r�b3}lx,+j3�,R.�.f' �Yd'3^;s)Z�`Rt4:���,�i"` 89 • •- . •• . . . . . . . . . PROJECT: CENTRAL PARK SHOP PROJECT#: PK0521 • RENOVATION • „ FUND: 138 -Parks CIP Fund PROJECT .. . • BUDGET: $40,000 • • PROJECT . MANAGER: ERIC PLOEGER FUNDING FY 2003 General Obligation ... . • SOURCES: Bonds "• PROJECT .. . • CLIENT: Parks and Recreation ' PROJECT DESCRIPTION/STATUS .. .. . . . ' . Renovation of the Central Park Shop following the Forestry Division's move to a new shop. This will •-••". • .: increase restroom size and modify the building for use by Parks Operations. A portion of this original budget will be transferred to the Forestry Shop Project. Original budget=$200,000 $160,000 to be transferred to PK0520;to be included on FY07 budget amendment. . . . . ... • PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR ....... • FISCAL YEAR LAND ENG. CONSTR. MISC. PROJECT TOTAL . . • Prior Years $0 $0 $0 $0 $• 0 .. . 2006-07 $0 .• . 2007-08 4,000 36,000 $40,000 •..- .,. 2008-09 $0 . . • • . 2009-10 $0 . . 2010-11 $0 • 2011-12 $0 2012-13 $0 , . TOTAL $0 $4,000 $36,000 $0 $40,000 • - " „ . . OPERATING COSTS . ......„ . - , First Fiscal Year Annually Total • . Personnel $0 •'• .Supplies $0 . . • . . Service $0 • - . Capital $0 • • • $0 $0 TOTAL $0 . . .. . ..4,4'':;:•- 4.,.,„=•444 5 -,,,. \ ',.:,,,,,,,44,,,i;,i,,-,,,,,,,,,,,,,,z,,,,,,,,,,e:::! . ..„,- /1,4i;,4:7‘...'i;a1,•;, ,.. ••-.. ''1,;!;,i,1: ::f,15iiJ;,i-,-,,;;ii,;i;,i:;R;ig,:,'i 1., leA'''04A0474"), ,! .,:f01!,,..'"' 4$11444,000.111iit'''4t. •ii"t,'ItAi,Wi,WIgh! NA"KV*Vi*., ' ''i•ItNiblA e'Y4•41iikNieggaileftit.0;9010eiiii, '• r4;', '':TIP: i"iip'E'.,!:!;!!IE 6:': 4,$;;'.ititiStahQ4140•44,8410,00,4440,th \ q-,',,'lf!t-.44';::.:,"'i;;,, .,. . *k, 'M 1,, k;••' , .iW::•:::.,::!7z, Al' '44G44111,i,:.Noomatimio 0::**3-4140biwtio,,,,,,-!, ... ,,:a.*,,,,,,,,•:,,;;,5,Zk, „4,,A, iirkit•%#:•4:1% !i;4'111,141'i',,,,,• °V AtilittSialivwwwittiliAliptclfrvoi'4,04, -,, ,y,;• ;:!:FN'•-oelrl ANKOMAIWUN;444,14446 VitViyc.e%ogow.4,. -• ::.;,,,s:,;?,e;:.0,.,:, Atg7 Av 0 tV40'toVoiggr,,w6:„ 4, ...... .r 41 Nt4.44., .dralt,',.1 it i V r i I.1.14.,i,e .44.4,06;,1 ,44,CP* 4411"—''''ti'.ileAtifinignitOgiVeataN,14,44„0 \ li:!;si'0,i- .14KM,!;iiiINITNI11;11AAIRgoii,t3xiigii,k,e„,.q...,:.. 4,14,,,,RIttorobiem*Agolitegittifolverk • ON i,41;;''- g• '444mtiOrotaugg10.41yomioltsittax, '.., '' W!!:;f iik.K.iVir.qp, • - -tf,.7W44014i4104,MOINKAt' ,i c ":3.:; :l tiff.4040,00.44- s, liY:.!g I;,:i,i;iii,!:,:ii'afih:Ifyr•"'"-Wpigq:Mgi:3;iA. 444,ifi central Park " 44:070k!illil iltOlgiv%64111 ',04 Shop Renovation' . ... 'Ik;74111 '‘IentiVir litiqi!:1 - MstAilir vosttilr .. • ,,,,,;4 . -. 1.. 90 . . z �/ » « \ . m > ? » a ƒ : \ =a . :� ��` ' ƒ . y \ z « ` z CITY F COLLEGE STATIONHEART . o£THE SE ARCH VALLEY 91 • • • PROJECT: Woodland Hills Park Development FUND(S): PROJECT NUMBERS&BUDGET: 138-Parks Capital Fund Parks: PK0523 $315,000 . 179-Zone 9 Parkland Dedication Fund Parkland Ded: PK0714 $34,000 Total Project Budget: $349,000 • • PROJECT MANAGER: Pete Vanecek • • FUNDING • PROJECT SOURCES: 138-Certificates of Obligation CLIENT: Parks and Recreation 179-Zone 9 Parkland Dedication PROJECT DESCRIPTION/STATUS Typical neighborhood park development to include a playground, bridges,basketball court,shelter, walks, area lights,etc. The first public hearing for development was held on March 7,2007. • • • PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR Project Total — .......... FISCAL YEAR LAND ENG. CONSTR. MISC. PROJECT TOTAL Prior Years 0 0 0 0 $0 • + 2006-07 0 0 0 0 $0. 2007-08 0 0 349,000 0 $349,000 • 2008-09 0 0 0 0 $0 2009-10 0 0 0 0 $0 - 2010-11 0 0 0 0 $0 2011-12 0 0 0 0 $0 • 2012-13 0 0 0 0 $0 • PROJECT TOTAL $0 $0 $349,000 $0 $349,000 • • WooaanaHMs e r�" a y rl� _; ": ....2, -c,. Park Deve opnten; * `i�t:�' ;:a����?i z:,•�':i:.�=i`n ,�ii:s� Ty";;z�;:�i:=> F'�+t;< `�:'j 'y o`�'� �c # .;..;e `3: '3 � r! f`` c7ff ' as °Q.y K e= .it`" e ;:c: �t${� ;, :.4 nt E.i�k'' b 4n • • ail :=::r{gk&� • ,.lx SQc� e i 42'• r: ': 92 - ------- ---- Park• Development PROJECT: Woodland HillsHPROJE ......... ...... ... . . .... .... CT CALENDAR OF EXPENDITURES BY FUND Parks Portion FISCAL YEAR LAND ENG. CONSTR. MISC. PROJECT TOTAL Prior Years 0 0 0 0 $0 2006-07 2007-08 315,000 $315,000 2008-09 $0 2009-10 $0 2010-11 $0 2011-12 2012-13 ---- ------- $0 Water Total $0 $0 $315,000 $0 $315,000 Parkland Dedication Portion FISCAL YEAR LAND ENG. CONSTR. 1 MISC. 1 PROJECT TOTAL Prior Years 0 0 0 0 $0 2006-07 $0 2007-08 34,000 $34,000 -- ---- -------- ---- ---- ----- 2008-09 - - - - -- --- -- - $0 2009-10 $0 2010-11 $0 2011-12 $0 2012-13 - — _- -- ------- --------- --- $0 Wastewater Total $0 $01 $34,000I $0 I $34,000 • • !PROJECT TOTAL ( $01 $01 $349,0001 $01 $349,0001 • OPERATING COSTS First Fiscal Year Annually Total Personnel $0 Supplies 610 1,120 $1,730 Service 6,825 13,650 $20,475 Capital $0 TOTAL $7,435 $14,770 $22,205 93 ' ' ' . PROJECT ADAMGDN POOL BATH HOUSE PROJECT#: PK0701 ` REPLACEMENT , PROJECT ` FUND: 13O 'Parks CNPFund BUDGET: $890,000 PROJECT FUNDING MANAGER/ ER|CPU]E0ER SOURCES: Certificates mfObligation ' PROJECT ` CLIENT: PorkoondReoreoUon ' - PRQJECTDESCFUPT)QN/STATUS ------ ` Replacement of the bath house at Adamson Lagoon pool due to its poor condition -leaking/rotten roof and . structural problems. The bath house was constructed in1OT6. The facility needs tobe larger ho handle current .crowds and meet current Americans With Disabilities Act(AOA)Standards. The replacement structure needs tobe approximately 5.000SF. Asbestos abatement will bo required in the existing structure. � �� ���....... ` PROJECT CALENDAR OF EXPENDITURES BYFISCAL YEAR '-------- FISCAL YEAR - - LAND ' ENG. CONSTR. misc. --- ' - PROJECT TOTAL ' Prior Years $0 $0 $0 $O $O 2008'07 75.000 $75,000 2007-08 15.000 900,000 $015,000 ' 2008'09 $0 2000'10 $0 2010-11 $0. 2O11'12 $O ` 2012'13 W TOTAL $U $90,000 $000,000 $0 $090,000 ` OPERATING C(]STS---- '---- - ---- � -- F�e --'' — -- --Annually ' -- —Total Personnel $0 Supplies $0 Service $O. ` Capita $O TOTAL �0 $8 $0 _ CY iV Adams&i bath home ` . , r ° ` `r , . VIV MP� ===" � 94 PROJECT: Southwood Valley Little League Lights PROJECT#: PK0801 PROJECT FUND: 138 -Parks CIP Fund BUDGET: $400,000 PROJECT FUNDING MANAGER: TBD SOURCES: $155,000-General Fund $245,000 -Certificates of PROJECT Obligation CLIENT: Parks and Recreation PROJECT DESCRIPTION/STATUS This project is for the installation/replacement of lights on the little league fields at the Southwood Valley Athletic Complex. , Orginal project budget= $180,000 for Eastgate Park(CO's)-funds redirected by Council during FY08 budget process to PK0801 Southwood Valley Little League Lights. Add'I $100,000 from Gen'I Fund balance, $55,000 from Gen'I Fund contingency and $65,000 in add! CO's- added by Council to approved budget during FY08 budget process. PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR FISCAL YEAR LAND ENG. CONSTR. MISC. PROJECT TOTAL Prior Years $0 $0 $0 $0 $0 2006-07 $0 2007-08 400,000 $400,000 2008-09 $0 2009-10 $0 2010-11 $0 2011-12 $0 2012-13 $0 TOTAL $0 $0 $400,000 $0 $400,000 OPERATING COSTS First Fiscal Year Annually Total Personnel $0 Supplies $0 Service $0 Capital $0 TOTAL $0 $0 $0 / c < r ` am: ' -'`ir? tii � i' c 4�/v,s \ > 1\ ,-,,,;%e s\ `F1: _ 1 �, ef,' r ; � �u' t; " ' 8€i � ; p� fF: <.�,Yl,W� . .l' . �/\�' �i �K .f, i„ A M { ,: , < 9a ` i'"�;:• " •', :r:t':<s`t`t's`>i:';�:`.' ' moo`'_ C. ",,., : :xx,,," v,, ` X'.,n` �-iik;•-tic. G �`��;',,•,n-0:k..<v�:y.��'-z�iy�!;;z�i�rs:;<+7:� - �.iti.� '�✓�,���•� �, „�''"'�`�.g` rtv`c/ �/' 'r/,-��j �',C,� : -:u.,. •��;,:>yi ;? bili,li'.:-3..,,riz. ,'�'u .x.', ,,.rtM1 ,,, \s ,�,`J,`w ise.d?li�...: £, 3\,'..ti.'',`..yt'ylA;ik�$:a{, '" t,,; / \ ��7 :,"x,,. .` / `( m.7' (.,.. � ,4l- .. �,�':,: ,, ','t..,m. 4 �+ T.- Garr , ' `�% \% '� ' r ;',.,,i :�:>i_...,i;;.,if:{is;;,;. .:r/ :��__ �� <.�»`'. /.i .`� �/ a9iV�,'.y (,`,,�\ev P�yhj��'�F� i:,: .�.'�5`v§'@{Ev:��;�`.i��::'vf� x/ .' /�� � j:\�hn<°<,:a /ay;� ���� Ag�, �ye :a::i }' Sri' Q /\ ''�,r // �.'Z`iW •`r�('f/?- `} ,.�' ''"�. '"'v ... �*:'o 'a' 1, a`Y' ,< l /,, 95 .PROJECT: TH[)MAS POOL BATH HOUSE pROJECT#h TBO . . ' REPLACEMENT ` PROJECT FUND: 13D 'Parks CKzFund BUDGET: $330000 ' ` PROJECT FUNDING � 'MANAGER: ER]CPL0EGER SOURCES: Certificates wfObligation ' . PROJECT � CLIENT: Parks and Raormotion � -- - - PROJECT|DESCRIPTION/STATUS -' -- --- Replacement the Thomas Pool Bath House. Thomas Pool was ' --constructed in1080. The bath house ------- ioin poor condition and does not adequately serve the needs of the pool patrons. The structure -is open air and does not meet current Americans With Disabilities Act(A]A)Standardu. . :The building ia small (080 SF)and needs hu double insize. . - ' _. _. ������� ` � � -����EC7��LENO���F ����������F� BYF��z\i����------- - F|SCALvFAR --- - -[AN5- ENG. /CON C. PROJECT TOTAL Prior Years $0 $0 $O $0 $0- 2U0G-07 $0 2007-08 30.000 $30.000 2008-00 300,008 $300.000: ' ^ � 2009-10 $8. 2010-11 - $0 . 2011'12 $O 2012'13 � W TOTAL $O $30.000 $300000 $O__ _______��___ $330.880 OPERATING COSTS ` ----' -- -- --;��aF��a|-----' ' ' ' -- -- --Year nua||y------- --------'Tnta| -- . . � Personnel $0 ' Supplies $0' 'Samioe $O . Capital $0 � �0 �0| $0' TOTAL ______~-' _____--__� ` --_----_- _ ` ` � ' `� rn1offlaS Pool Bath HOUS / ` . 1,AR .m� 96 .„. • 2 . . \maws • • y \ . CITY OF COLLEGE STATION HEART OF THE RESEARCH VALLEY 97 PROJECT: Wolf Pen Creek Amphitheater Additions • FUND(S): PROJECT NUMBERS&BUDGET: 138-Parks Capital Fund Parks: WP0501 $168,581 . 127-Wolf Pen Creek TIF Fund WPC TIF: WP0501 $1,000,000 Total Project Budget: $1,168,581 PROJECT MANAGER: Ric Ploeger FUNDING ' PROJECT SOURCES: 138-Certificates of Obligation CLIENT: Parks and Recreation 127-TIF Fund Proceeds • PROJECT DESCRIPTION/STATUS • Addition of office, performer dressing rooms, storage,ticket window,concession area for the WPC • amphitheater. This would also include funds to terrace the steep slope between the amphitheater and the original restroom building for safety reasons and to control erosion. This project is being funded primarily out of the WPC TIF($1,000,000).Add'I funds in the amount of$168,581 transferred as follows: • • $107,798 from Veterans Pk Soccer Field Light project(PK0511)&$48,901 from Central Pk Soccer Field • Lights project(PK0406).$5,272 transferred from PK0513-FY07; $6,610 transferred from • PK0406-FY07. Total Budget including TIF Funds-$1,168,581. • • • •. PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR Project Total — — ..._........... FISCAL YEAR LAND ENG. CONSTR. MISC. PROJECT TOTAL - • Prior Years 0 76,350 232,537 920 $309,807 2006-07 0 13,513 845,261 0 $858,773 • 2007-08 0 0 0 0 $0 2008-09 0 0 0 0 $0 2009-10 0 0 0 0 $0 • 2010-11 0 0 0 0 $0 2011-12 0 0 0 0 $0 • 2012-13 0 0 0 0 $0 PROJECT TOTAL $0 $89,863 $1,077,797 $920 $1,168,581 • h? q .a «c.hLLAIt a -$.-.01.-*514,--: , 'ddmidiv&drod,t,edid,doi, 3 i 11R-4 4 i0:0,1:$j,;ill:,' `.R. WPC AMPHITHEATER ADDITIONS . A1. , :r::;`.v,:. ,,; ;;4ii igip^ ' ~'s?:: a: x fi: '4 {.i.`r `Aao gk i.irir _is"-ti.71�? "`�,`s iu•:s':• ..'z'7:� ATI;t i4fi4 ...� 42:i{tn — :•'tti? 0'.-' ~CL . .. ,fHi��.i, 'ts • 98 PROJECT: Wolf Pen Creek Amphitheater Additions PROJECT CALENDAR OF EXPENDITURES BY FUND ......... . Parks Portion FISCAL YEAR LAND ... ...... ENG. .. ..... CONSTR...,. MISC,.. PROJECT TOTAL Prior Years 0 0 0 0 $0 2006-07 168,581 $168,581 2007-08 2008-09 $0 2009-10 $0 2010-11 $0 2011-12 2012-13 $0 • Water Total $0 $0 $168,581 $0 $168,581 WPC TIF Portion FISCAL YEAR LAND ENG. I CONSTR. I MISC. I PROJECT TOTAL Prior Years 0 76,350 232,537 920 $309,807 2006-07 13,513 676,680 $690,192 2007-08 $0 -------- --- - 2008-09 $0 2009-10 I I I $0 2010-11 I $0 2011-12 2012-13 - - - -- -- $0 Wastewater Total $0 $89,863 $909,216 $920 $1,000,000 (PROJECT TOTAL I $OI $89,8631 $1,077,7971 $9201 I $1,168,5811 OPERATING COSTS First Fiscal Year Annually Total Personnel 4,800 $4,800 Supplies 2,300 $2,300 Service 13,100 $13,100 Capital $0 TOTAL $0 $20,200 $20,200 99 .. . ......._ . , . PROJECT: Lincoln Center Building to Parking PROJECT#: PK0602 Cover PROJECT , . . . FUND: 138 -Parks CIP Fund BUDGET: $60,500 . . . PROJECT FUNDING • ... MANAGER: Pete Vanecek SOURCES: CDBG Funds . . . . - PROJECT CLIENT: Parks and Recreation • PROJECT DESCRIPTION/STATUS . . . . .. . . • ••- This project will include a cover over the walkway from Lincoln Center to the parking lot. This will provide -weather protection and improve the appearance of the north entrance. . . Original budget= $45,000• $9,250 transferred from PK0603- FY07; $6,250 transferred from PK0604- FY07 .. ......... ......... ..„, , , . - • PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR . . • • FISCAL YEAR LAND ENG. CONSTR. MISC. PROJECT TOTAL. - • ' Prior Years $0 $0 $0 $0 $0 . . - 2006-07 4,000 56,500 $60,500 . . 2007-08 $0 •• .. 2008-09 $0- . ,.. ..., ' - 2009-10 $0 • . - 2010-11 $0 2011-12 $0. 2012-13 $0. . , TOTAL $0 $4,000 $56,500 $0 $60,500 , - OPERATING COSTS First Fiscal Year Annually Total .• •. 'Personnel $0 • - $0- . • .Supplies •. . -Service $0 • .- Capital $0 TOTAL $0 $0 0 $0: . . , „.. ,„,-/•:::';,.,„-' .......,„,, ,,,,,......„...„ --- ..- AttlIttPrtiotedortiVo,'•,:.-.•-,', ••-• ---4,- •- ,-,..1„-... -,..... ,.°3--, - ..-•,T,N,,,,, •;!,:,.:-• •-,,,,,,.:01.,..0..gi•-„,..4.....1.- --,-- JShqp Old Office 04' All'illV;rll,lil,r ::;174.11 ,.,,,,,410 s 1 ,„..,`• -14, '-, , %.'N-Vn,i;,-Iii:W.::!liN Wili-Nrahkikkiack-:•iippliiripke tir 'illi'l'-'ldilli•l:llil•llilllil3lllirrill'l,,,,,,,i, .4101141.10,,,44,4iltllli&k, Coln ,%nt-- Shop • . ilt.l7'444Pq-lAtAlitN,lillFil-',, 4'. °l'Al•Ol'llillellilidllialierrillitifiliklio4 ,ii.rlio"l lll.'ll-,-.-•!":X.:.finietelti•,.,..-Zer:ll:'.rirli,,,i'l• '-' ll, , iiik 1. ei, . ‹,:l•,,' -ll-l.41liill4,;4-illnl•li-l•:iil'on liiiii,i4roiiiiiiorrklikir-,;,,,Alilirioriiiikim.-r-e-kkiciiirrii.roikeiii,Ne„ ri4„,. ''"'"ilklil'alFr'l0:,:r7;,,, li -riei•-ili-,iiiirevirii.riiiiriikritriJo•iiideliii-Pkintil-elllriliiionioilk,o, o IFIll'llOillilliligirilligiellPlillkeriftlikkleritiliiiinilizik-i-rilkrik,or.,„..,,,.. .-, .. .i, 'qikillill,Will'illcall-ll ,-ly •lAVORMilliilitillig,inVellleillill*Minlrati011M*.tlK,, . ""l''''''l",•iillall:ilr,---, 4 LI .411,40aliPil '''''''''''-UlltArtillilltAlrilliN'ilkiilh,o, .`, . ,iiiikkiikeirei P rarking Cover i-rldielkilielkiiiirertionk - ",,riiiiink.: •-•,,,. kkeildinirskinnia• .... . •. 'iLrt:.'--6'I' A''','/'l'...,,4:j 1.k''.,',,.'4-c,.y1,'.t1i.,ti..'e,'u`',''.'L.,.',,,.,';:y'.0'','',,,,,,m,5'.iV.,t;;1;g,,.'",:4.r,„U4:,.'i.h-T,.lii.-l:'l:..'`i-4:4.k,*i:.4-,,,.l.':-:;,i:*'',,;.,l11,i*,:lq4=i,'iA,:,q,,,3!i,,'iiiig,-itev,,'',-,,,,r,A{V,r,,.,f't'''i.c.,,.',;,s:';:,,Nir;c"-,,i..D,.'6,.C,i..T.r..,ii.l,,1„'!..,',e,',.''.‘,I"',e)K',.!;;,t.i,,,:,,4,4Nlgi,tVii.A1.,:T.,:.....t,,,.,,g,bT:,.i.V;,;q4:,:.A,l.14q 4jfi:.A,,,cAefr;fi!.iA,t',l.h,,,.'.,;4T.l0f';:.,.it4.,.,.,'iA,'-:,l',',,1'.':p.,,h:0;r',:i.,'.l,i't.#.p,1,iZg%4.,,;.Ki Cl.Z,•,i'/4;':,.P.4,'1/'10i,1; 1.4-i,.;,1,,kV:'Y,-,t,2-,,,,i J,g 4:,•,,..r;,::.,,;,:1Q.„,,..2- -1" V,'4i„t4.t':+,ii,fii:VE,A,.:4,r'At,1$1,:A.f1.l.44o:M4,l'T,0ib1i:lVtMxV0it1e4tA,tN.O,I1ll1Fa.4FO,1M,1OOf4t0is,l,lN,OP 0iAMt,riin,'l.iAPl1tlaiVt4ti'M't:ie,1I.it.,1PNiV rltl.lt.4AamLie10,..t,i,Lla.:n1,PV1l,mA4,P*a.s,TV*.;1Ai'tO,r,Az.Me.4o0;lV,i:,t,4itW‘tT.6k,4 ,.s,ivi4Nl,a.UO1,,4.ov0-S?.0'N c , v lU0.i7N..,n4,72-,A..,4•'.,r`-,,0.,,1".,t,.g-t,di'"ptr l,,'rit1.,k'n:,f itic. e.Pi,,,'-t nlI,'::ei•1',1te ?,'4'.,'4,-..,4i.t.',,".tZ e,t'..,0e'7''Ae.-a.',-1"-4t'fCO't.,,4.-.'‘4.lOei4 rym,'-''-,'a,;40',','1s,'.1'A,ta:11,i,.0,k•:,,.,1,,,,i'Vl',,hv',lt f-*..tq0lr.r,1,#,.ii t feioiI,lili1,lWl,,aR t,4Wi,.iV‘:iitpi.,,,tb.t,,k•ARe,g4,l..,Afi,i-rp.„lr ,loit4,a*',w 49W: . i .- 4,., -''f,--',"N"'s,;-.42 .,-,N'IP,-..lili:,,k,,,g-,:,.,,,m,,b --hog,-,,,,,,m•ploYmi,.1,1v.,:e.,:iteate, !:,4,,4::,:v.,--v-th,v-:::::!k>,..., <, .. ,,,....,•..1,',WA t'lliAlithral) k VP>ki,r44i ge.444,td.hi,,,,ii,,A, ‘'i;,40:417.,iigii:410:Vial.W1.4rligi,Riiia. ',,V.;,;;*:..$,''..,• e 12 . ,s, ,A,4:iiw?..,,,. 4iAltift-1401.!•,,,.,4441.0%.' 'ail4:33,, N,,,,,ViZ!qa,ttP410:ir,:`-zanf 4rif,,1-,11:44141.. .Ktwo4 1 00 . . • PROJECT: LINCOLN CENTER ADDITIONAL PROJECT#: PK0702 PARKING PROJECT $99,000 FUND: 138 - Parks CIP Fund BUDGET: PROJECT FUNDING MANAGER: PETE VANECEK SOURCES: CDBG Funds PROJECT CLIENT: Parks and Recreation PROJECT DESCRIPTION/STATUS This would add thirty (30) parking spaces to the north parking lot adjacent to the multi-purpose pavilion. This follows the Tarrow Park Mater Plan that calls for additional parking in this area. This includes an additional driveway, island, and lighting. PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR FISCAL YEAR 1 LAND ENG. CONSTR. MISC. PROJECT TOTAL Prior Years $0 $0 $0 $0 $0 2006-07 11,000 88,000 $99,000 2007-08 $0 2008-09 $0 . 2009-10 $0 2010-11 I I I I I $0 2011-12 I I I I I $0 2012-13 I I I I $0 TOTAL.. $01 $11,000 $88,0001 $01 $99,000 OPERATING COSTS First Fiscal Year Annually Total Personnel $0 Supplies 2,000 $2,000 • Service 4,000 $4,000 Capital $0 TOTAL $0 $6,000 0 $6,000 .y,k+ _+ ;,•`S Shop Old Office q.+tee sVi :.<�'��" r'xC„',n.`., ,,,,,,. �l0. s-' Shop Iiii4 OMNA a.„ �X'Tjx3 b� y'tk+i;< i, ,,,3n, ,,,, f '' `'sr. y z.�Pl < <`1`i,i';ti.l f _ a _ �} tip€ i ,i::=: 4 ,•ii: aA A ...Jx��:,:e"Y ,:,„,,",,4,S r` .„'u }j{,T#,Ij':}€,` - `�1'�=a ,.+i,„ a„S,.< ca �.,.5�1'' . ;•,c;va= iiff;fi Ci,..n Ce', , �N �,:pir, ,-.,,I `ci*,cis <.a, °'x,10i,,m$X,,p''n r:: ='f, ia�'. I�CAI^:, ht . 9 i'T".,,=.`.i:. �';:i:: ' .3,:, A. ,2S tY,.':i' - ;ti;j a}ii>,. l� .t_„•2t,.. ...i;?�'' i,s:'4.:: ,:.:�ir'sii'4 i;i`+�{: ", ilt `r` '�';;,;::?r's::�z;;ircaa.,`;i;; rr;fit: "te> ,:a,::f5 s .:;,'.;, z&'i.s``''f" s'tii�s ;:t,ll3n':;;`-.n,''alz"te .,� `�a :::::::,!.::::;,i,,,::.., isi, wt 1':, J/ .,, oht 101 ... . . . , --,.... . , .. _.... ,,•PROJECT: LINCOLN CENTER RECEPTION DESK PROJECT#: PK0703 IN FOYER PROJECT $18,670 : . . FUND: 138 - Parks CIP Fund BUDGET: . . PROJECTFUNDING .... . .• • • MANAGER: PETE VANECEK SOURCES: CDBG Funds .. - . • PROJECT ., .. CLIENT: Parks and Recreation , . . . . . PROJECT DESCRIPTION/STATUS •. . . . . . . .... This would install a reception desk/counter in the new Lincoln Center foyer and provide a doorway and with access into the adjacent office, to allow for better control and customer service for the facility. . . . . PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR . . . . CONSTR ENG. MISC. FISCAL YEAR LAND . PROJECT TOTAL • .• - Prior Years $0 $0 $0 $0 $0 • 2006-07 1,500 17,170 $18,670 ... _•• - 2007-08 - $0 .. , . . ..., 2008-09 $0 ....." - 2009-10 $0 . . 2010-11 1 $0 $0 .. ... ' 2011-12 , . . 2012-13 $0 I , TOTAL 1 $0 $1,500 $17,170 $0 $186701 •• . .. • OPERATING COSTS • . First Fiscal Year Annually Total , .. . -• 'Personnel $0 ... Supplies $0 'Service $0 . ... , .• Capital $0 TOTAL $0 $0 0 $0: . . . , , A,%awe' ,,„•,,ftweR,Awat..,.4,- ,m.: _. old office .,.. illeqUitOtifilr,,,,.1n e J,1 bh0e„ ,,,,,,tUfalltratiliAtakt:IF4', '".-4,,,,... ' •• • P4:411',i,,:,9k-VF: , , . •,..24,•:‘,,,,,i'lif.fWAIOT*W''- e% ,,.,.:,,,,,i,,,,,,,,,..3.0.4.,,Ammot-3,,,,t,5 otn ,,,,,41,4,„ShOp ,'. N-.-qteemtf-sm•:,40.4::,,,gtotopowei,,,,,„....1...:„..,,,,,,,„„ ••„ velreivroppAilliv.,04014bmiim.tikoo,..„ -0,, . . . <:. , ,., ,...0.„:,a,,„:„.4,X4.-Um kii ORItaiviamtv•i•RECEPTION DESK:,,,A.p,,,,,,-,.,,,':',',1,1,.. -" . . 4"-0'' •f'•:• ..,"i,IC.Itilii,t4,-,,,,,,,,,cii;,,,,4.'-',,,,,',, .„;•,,,,,,,,itirr6,rne.r.A.rA,,zie4.'.:i";..4.,,,,,,,,..-,,..... •'•-••• ...,, f.,:`''..e.Aii4 iZta. '.. , l'g'''''.''1,111.0k0.444,01at7NK., p,..,4,....,I cat °ewe r,..,,A,),o,,,,,,,,,,,...,,,,fti,. N. • • . ''' 1p0A4:0,4;V•;,;!;ik-,Naitgi!:;*FAF,,,*,,,;4,fmg4g.m,;T:,-, Ao,-,43,1,,,,,,,,,,,,,"4-4,-,...,....„!,,,,,,,,,.. .„,.:... ..„.,,.„:„„..„,,,,„„.„,m,,,,,,,,,,..,„4„,.,,,,,,,,,,„,, ,t ::;!f4:17,71t1::-.':'.::!'.:-:',.:!'".".'2:-;,-,-,:.-::::,, ,...,;,:,:,•„,i?.:-,.ii•,. .-4,,A;titi,,,,,,,.,,rot.,,,„,i::, t -,,1%,,,-,v-,,,4,.,§,,,s,wv,,,,g,,k,,Q,-,:',4,0,,,.;,..p, ''''444"44•41,NAKE,ili WOlcdtiiiiig Tr 'il;111104%p ht*.k,,, ' $ ;'.0,,i,'0,-"Z>ji',1,,.-r-r-,/ 'lig''iiitIALiit'; 4,,,,wa4.16,1„...,*0"..11,,,hiv,p0;•,,t,,,:tm... , ItiatNnina:iiirovnikikamo 7 ' . . 4iglikr,4r?'d ,44,0' 41,44.4pgregm,,%glik.`44:EddieR4V` Attibt1110.*Ignly,,:niailqm , ,qt / ''';.-•N`igil.g 4N0i144160,4,PatfWVV` Nii,*,-,' 1040041004vitiNW / „ . 1 02 . . �__.. PROJECT: GABBARD PARK IMPROVEMENTS PROJECT PK0704 PROJECT $140,000 FUND: 13Q 'Parks C|PFund BUDGET: ` PROJECT FUNDING MANAGER: PETEVANECEK SOURCES: CDBGFundo PROJECT CLIENT: Parks and R|mcreat|mn --- --- - --- - ' PROJECT DESCRIPTION/STATUS ' Additional sidewalk loop on ot �side cf Gabbard Park; five (S) additional area lights for security purposes; nne (1) additional picnic unit; four (4) additional benches; and a playground shade cover. Public hearings are complete. - PROJECT CALENDAR' OF EXPENDITURES B`y FISCAL YEAR FISCAL YEAR LAND FNG. CONSTR. K4(SC. PROJECT TOTAL Prior Years $0 $0 $O $O $0 2008-07 140,000 Q140.000 2007'08 $0 . 20O8-O0 $0 2000-10 $0 ' 2O10-11 � 2811 12 | | ' / / $U 2012-13 | | TOTAL $01 $O| $140.080 ` $U' . $140.000 --- - ' --------- -- --- --- OPERATING COSTS- F/na F mcm Year Annually Total Personnel 8 � Supplies 1.000 $1.000 Sonooe 3.000 $3.000 Capital $0 TOTAL __________$0 ___��__�_�___ $4,0000m4!o00 \` � di ' ` n' -' \ 103 � PROJECT: OAKS PARK IMPROVEMENTS PROJECT#: PK0705 • FUND: 138 -Parks CIP Fund PROJECT $96,000 • • • BUDGET: • PROJECT :MANAGER: DAVID WOOD FUNDING SOURCES: CDBG Funds • PROJECT -CLIENT: Parks and Recreation PROJECT DESCRIPTION/STATUS . .......................................... - Improvements to Oaks Park to include a one-half(1/2) mile sidewalk, fifteen (15) area lights; and, four(4) benches to improve the appearance of this heavily used neighborhood park. Original budget = $143,000; $47,000 transferred to PK0706 - FY07. • T C A ® R OF XPERSBYFISCAL YEAR FISCAL• YEAR LAND I ENGCONSR. MISC. PROJECT TOTAL • Prior Years $0 $0 $0 $0 $9 $0 2006 07 96,000 6,000 • 2007-08 $0 • 2008-09 I $0 • • • 2009-10 I I $0 2010-11 I I I I I $0 2011-12 I I I I $0 2012-13 I I I I $0 TOTAL I I $0 $01 $96,000 $01 $96,000 • OPERATING COSTS First Fiscal Year I Annually Personnel Total $0 • Supplies 1,000! $1,000 • Service I 4,000! $4,000 Capital ! $0 TOTAL 5,0001 $5,000 , `,j" / drys;::,"' a :itoptsommottAM tn: :s::(i:.. .3.,fit.' eiii'.'' a1 . :`iiKli,i ,fe61.` :r.'', x�i3.i3 i i`,I„p "�;! r ,'E^ 2,,;`ict.l 1 ',i, {?,y� t= _ OAKS PARK IMPROVEMENTS :iii;.B,,: i-,{a• ;EiYxul=,y..L,t: :ig:!i!:'r;3i#':t '.xccs:' :;:t.` ;tj J <,:1!:.�,ir?E I`3 y`7 ';»' ,. . 1,0''' :'htc.r ::,,," ,.t i"v :`,' j1v,-, k.tart",.aE'^:vj:"i;'�'„�t i::: x'�:R'Y�Yc�'i'Y:WI�:.,st:!Fs+is {. �1¢i': ✓,4 t` �^F,�, s. .. :< ?:..3=. „z4i, :.'y. .44 ��t A•A A 5 ;,:::0l''3,ii,.i S'iaQ,=,:4„,i. Sst+• �t# dim!.,,.„Sal, '! iati3r':='„ r�'„? t���:_ i.i1:i„' fi sE.3s; `^n'tlka t. =itHi'� '`.::'.i.:i':'..t,..1, :'3 .;'i Ls.s?xx:•it^.�V ,,,,b ::Y7:4.,2.iE:::e'•^;ts:Eq:<' 'v E • '` '�;!�:":;F::i: .cf�;r,�.Y,;;`: t .�j:{; Pi::;i.;.;h;'.4.$ t' �f�;ti�!:i;' a.:�iE."Sr:, ,':,`,.:'r:'',_....:: a„...tf:i, .i.. IR.Y:;:l:l,.., i'.t3�:_X.:.., ,ey:t.:Yft,..!.el'!f;.�.. , ,. i., .......>.,TSY':,..,!_.<' -x::i,,....,:e.i:,t'e",:::':.::,t,::.%1.:...:::_, n Ii..:'.„v,€ i":tUyi::: 1 '' ..,.,..,,d.•„...'%-,i„u„i 4:;" .... 3..isa r#Rhl,4. ,t ' s31:Bt.#!=.!#:-,-,;ii,,.� tl�a;iE:i!tytji ,..t..,, ..tr -lL,,k�.`- '>:"' �.a,,,.,,IN": a .,:,�1I'1:; :.ag;f,':u=;t, A'r'lir` ,,�, ���...�.v,.,.,y.5...:s::s.^.r:::;s^l f � Q'. '� '�. ,!., :!,rfi�*#.:x ._.......«,.i!.,i„r.. Ks...ii'i:,..,. .....s.t.. .. �_ .;;i;; ;,.t," i:`:if:,^Y'�. L1" c,:.,,;p;t:�' :�> 0;:i'-vity .0,,,+f r4l. ,.,Is i. ...1,.:. ..i �"iT ei...„�. tV ,�.:: ;:::t. Cl 3: ts.4:F���i't!;;i;n!`i'.:;L':G :11.40::F'::G,i:) .7"ktr,�,"x;'t,:.i m�,!7,,,,its•ItE-c!#:y ;ii ii':'up. t l,41:11„i:s.iimi;:in.ii#=t: n:4Y.; :::°n—:'r.:`s'"s... ;..�3,.: .,.11.! '-�.jzxls,i •T`(;„..:'3.iNj'�3=8:.,t�ii:.,i�s'hsl2v a:.Yf;°s��??;:ri.,l.ztlr+:33^t�t:y: vt i4t S'an �.�x' �.V:'1'3..Y:,:a}..,: 10::!:V,d;Ty.;:,i,,'; ('{!.;ili, �i::f:„„,„;,iRi:y4, citi;{'t: t:s;aikk�,i: .al,!e;L<. ,��b�{;3:: .,�.g. :i,&.,:.a V.� ;.:rgt;,e.l�.' .!..{?i�Ait"+, .+,r,:':.. .iiii"r.:,� ,:e .':: ;:,7::i^ih r '.•.;i,,.�f!,.:5'.t:7 i;1• :;:r�:: ¢,h"+,3i;< �;r ti'� ..�:..s;���rE:i:s�;::ani,'x r....a:::l'. ::.#frt,,;�;., ,;' • "''• 4;?A' #'(!Ii: !''- "'f i„V„!,:E,.:.�Il.:st „+'pliIiF:'itA::.,.i�l it4 ii3j ,=: ti., :�:d.Yl.�. #':^"���' `,;��.,yC;:tty:;='3:34s!.,T=7; ,3 �,'#'i,:':'.:„:i;%ijl+;�: :S' ' qi ' i:'r',?w.:;;N;:.,",:' .,,'I##s ,ix�xt,\�£:3#LI,;,oz s:i,,,glg„�,;? ry • S:;:"_ .,,r`�c;t(;.`;'iltii;�7. ';' ;:,ti'j[v.,..:i.„ttrtt +. ; i jf tl C.,..: t{{:(;i;0 :,2ttf'1\::%:t'�1, iii¢:isN�:�4i:5�,:i+l:s: �„i of t*o .�'•e:��::.,:.:.,.., , .,'�Eifii,:>. .?;4't;;,C'':i,`�d'Tti;"�K'3i���'i Y�lri"2 i!'��",..i.`A 104 PROJECT: OAKS PARK BASKETBALL PAVILION PROJECT#: PK0706 FUND: 138 - Parks CIP Fund PROJECT $277,000 BUDGET: PROJECT MANAGER: DAVID WOOD FUNDING SOURCES: CDBG Funds PROJECT CLIENT: Parks and Recreation PROJECT DESCRIPTION/STATUS This project will replace the existing basketball court with a new court with a pavilion for all-weather play. The court at Oaks Park is heavily used and adding the pavilion would greatly enhance its use. Original budget= $230,000; $47,000 transferred from PK0705 - FY07. PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR FISCAL YEAR LAND ENG. CONSTR. MISC. PROJECT TOTAL Prior Years $0 $0 $0 $0 $0 2006-07 23,000 254,000 $277,000 2007-08 $0 2008-09 $0 2009-10 $0 2010-11 I $0 2011-12 I I I I $0 2012-13 I I I I I I $0 TOTAL $01 $23,0001 $254,0001 $01 I $277,000 OPERATING COSTS PersonnelFirst Fiscal Year I Annua lly � Total $0 Supplies I 1,000 $1,000 • Service 4,000 $4,000 Capital $0 TOTAL $0 $5,0001 0 $5,000 >., /4",,,* t ' e / E.;:, ::ti; ': Qq .. .. .... .tea.'i''.!;ii{:3%:;£G;i;3.. '�;. yr_� a ,;;, ��i =i1 •OAKS PARK BASKETBALL�PAVILION 1[-46 y E�`i ii;;.""y;� vu J Feat',,x:' ii:'`;:.\`�.:�:: •'g„so;lr�v=y„r,:,i' ;':a:.', ;.:�p:f:';;zY,i.: z<ta .�;.: ,�.'t ..r:E•;,`�irf,i.,s`i�,'itzi�::�:: i j + �. afi.. E fr ?Ery,;av' fir.,.,_:;'�"� �,;: r::u4;:..9,,,.u...:,.....yt,l;.i'.' `' N°.��?.,3i..,_1f 1 i..s,, 1.:{: d%%:�;:x:'p°"' ,wi.,r'•.1::7}s": 1`�r^�Sy���;z;'`:; :*st�,,�li,. :3;k�:l`% _ �':h.;. • ^Q'£:4i;�� ,.c;" ..A.. .:t�i":?fi?i;E'., _,.;;' =Y 6I�1'::'`'i=.r?^i,i:iu��::,=�'r;'.�EP"4'1r:' i .s..sL'-' .«.sat� �,o'' `i!:;i3E,y:�, zi;� ` is feu�.„Y�,,{,a,!,n,. 4.01;'se'sa'tt.ia::. -,k,1— A ft' i'0 .�va411, .......u,.r.,, }�,::ie: -.tat,:?.+ Fri? ..j ll<y.,,z u:{;cr}l ,:i ;:t�l,4;k ,�,,.n�.1e.{".;,di?5�..�. ..,R,t. �.$I' :t"LL�1ti:'� iril±ttu'� ,:t�>. 3:e�.1.{ 1�:`:Y�..Y"r,:3.�,=.:� 4s;�c fi ::ke'r,.;,, ;"E J�:,r,�.�'"��4.,,:..� �� `I''ktut .,.. .., .I:' J::l.,3 Irli,i't- ?:t.:i'F�2:i \ aFW'�F:.;Ei:.�•':. E is>�,`.,'�,`R...�:.�li\:. :.:;Si�Y.'+:\ 5}� ...i'y Yip _ �.uR' >:'•.>„€;.a:�a'r;�',u` Q-M-r gi �::la.c s ii;ii?:,;3;,:a;8:::;" ''�t':`t;:, .,.:, l.x„ HIs:i tE.. m`.t:•;7q„yeses ...t,Ek,'� ..1;:::�'.,,. w,;,y.. :::1 ).-=3r ,•,#.•.:.., ,:i,.:, ,e; ' s]a .,ii,,;pi i is i:il':; i'q:,4"�:;:;z•45.C+;a :.Y", i.," .i:�t};ji(;i,,�x.v a�`�;..r ;:tIS't,N.��i x >.F eti:�h�. 5 �i - {.;,,. .t,.. :y,s,t ik'il`U;i 'rekn;Gi'-: .::'t:':�" :,;;.�l:i� IIg :''4'.; ?hFh. .f z;;7,,.a,L ."3vd,•rV`Ii6::i,t:x�:r} �::`Pvi;._''r::Ylr - ^,: i'ir;;rlai, „h$1;: 3t:l:iiK1 :'.S\::.i:*1': ;i�i,.."'f::'"+` ""`;s;ids ?s`. j...�,. :a1�:: y.,c'�•x'u�"u;`s�fiu;#?#�u�•;,��iE;,a;s'?i,t,,a ,�.;x:.!; :;ti;f?;!!:.\.sty, iv M1i�t] ,C�3.. ?!; '.:ri:! t .�i: v:,y ftfi,`.iff`:i u,:t".: ie..:..i:;3 .,'£1��:�G': vt.!Su z?r'.:s¢Sa ii'H�n.,e.A,., `ip`4vi{ Tiin:i:.}i.:J',':'t'a, i'1 •fe, i:E: . .,¢! !=�'S sj:.ls,0 `.31,ry 11'�. �.;Ia`1 ;�':t,.,:::i'.} .rtzty,rb\:,, yEY+':ua;;.;�p. ,.,igf..:n�;i�,,;,,a:5 . �.,�.'>i''t'l a .'.F. ,i'':9...:.5'v'i 4;v4�{'�k,'' `'� ., •'ti(ig,!1 s�s.`.3:cZt�.3;di,�.il E; i E�j'}� t ^i}'1 ..,�l�ligfx ,U''aaii{:E;, ":t< ,pi::.,..,.,!' `15,. .'l:..:..l; r....,,.. ,I.'fV�:tAj;,Y1i.tl,n....• ti::.., Y, • 105 . . .. . . ..... .._ ... . - PROJECT: CENTRAL PARK LIFE TRAIL PROJECT#: PK0707 • EXERCISE EQUIPMENT •. ' • PROJECT $40,000- . FUND: 138 -Parks CIP Fund BUDGET: • .. . .. .. . . . . . PROJECT . • • • MANAGER: DAVID WOOD FUNDING . . • -- - - SOURCES: CDBG FUNDS . . . . . . 'PROJECT . . CLIENT: Parks and Recreation ..,_,. ... . . PROJECT DESCRIPTION/STATUS• - . .,. . . .. . . . . • . Installation of Life Trails Exercise Equipment along the trail in Central Park. This is exercise equipment specifically for senior citizens. - - . . . .• — ---------PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR . . . ' FISCAL YEAR.., , •• LAND ENG. CONSTR. MISC. PROJECT TOTAL . .. , .• , „ „ „ „ - ' • . Prior Years $0 $0 $0 $0 $0 .. . • . 2006-07 40,000 $40,000 . •-. . - 2007-08 $0 . • 2008-09 $0 . ..,. - 2009-10 $0 . - 2010-11 $0- . - 2011-12 $0 2012-13 $0- • . • $40,000 • TOTAL $0 $0 $40,000 $0 . - OPERATING COSTS • • . "' " " ' ' „ ,, ,, ' I First Fiscal Year • Annually Total .. • . • Personnel $0 • •. I - , • Supplies I $0 .• :Service $0 • - • Capital $0 TOTAL $0 $0 0 $0. .. • .„ ' • . . '10glagOAN4 ...4***501411100k. s.,,, ,loit,sv.iNIti.ii09INi-,1;i11 llgt:WON,401#4, .., '',:i1"ItrOlintig4'VF: 401046$10,4114.0104, , 4t ViONIOilablifirattge4 '''. '':!! :'!.' ,1.;;SO,RI;E'i, - ,1, ,..,)-A,,4, :,..;,,N,,,,, ...:,' A,:L 'A'a'k.Olifilk191,146411806010444411:At '-., lill.'7.NIMI,,,,,MO:',3:kii::! . 4,p, -7g,- -*f1 ,r,„itmwmmtitfgatgootat, 4q- 4'4611MROWKOWNSAIONVIONA, . -: 44-10-: "",th,:1•:',73.N,m if Atati*liggatetiMAN:4010016.PZ‘w`-: \ '!Ii4i;:,':Ig::::',i0xf, •?,',1 ,4300040041000141V1401nott,,m4 \ -14!-,.,,;,,,viilirgi:l''.,:., -6,IN*7,4t.,:. '`RiSigPfili:i1-4;z,,, , '`,i1 le1410 40tROMPANNOWAgligeiVkiiiViiiiram, ''. tt.!2,i;iliN:::;,,ip:rt,,;! • . 4,./i-V,,,b,i,g*?,Iiit..-,,K4it,i0,,,13:;,:,F,,:,, ,r.,,s1,1,3;!!0,::.. dmiemthq.twoogeratilikinkaitgettomommoitilitieptiol .-, ..ii4r,''i5!!i,1.•';':,), 'Iv", A1,,,,'„•!,..4.-)1,64::ii.W.j''N3;,IP:g1:0,11i4•;W:,4'.'. -ii•-,!3: •,'. . 421001&44fttqpIACIAMMAat441$NIROINNWIVONINAF -, '.4,441411.1104110011KaakoptiotharvpIteacgtoo- • ,•;:,,, 'it',•16',Pi;i112,414f.;;. !ii6-7,J•"'Vii :!R:ii;in404,,3'.ytntiMit--.:,. 'lit.„eifitrAglApiimittilittbmeillughokaitomi- '"Virkc-.ii;!:a'i•*,,,*ii,e.:•izifiiii;111, <A1,001N,N,1,1i ..4,4,-:..'4 -.A14•72$114101404100,11„A„,..i CENTRAL PARK LIFE TRAIL ,. ' 1.t''!". IIiNiI#.,'I',',,IIh:!''''".'q.,,V,,,,,0 0I,,,,.,riI,I,i,,,,,,,,I.,....4,„, . ",''c'R;'9'0iIIIIIIiE,..,'r't,,n.,.!;IINItiEgAiv -- NiiktIpAgt4TIOMILIIIVO EXERCISE EQUIPMENT _ . '. ., ' VrI!'Xik:.4131k.PCGTIIIiikg=IIIV, 'AVAII4,1441010AtiRIMAIIWalir ' ;-,L.'i.,Ifa, . ;M;',:,,,=0:';',!,,i',KI-ailhaiV:*;,EIIIMAI4j,- ,,,,,,,,'' '410.414401RIMINAPIIVERIIIIMIIIV7 ' TI.cqR' . N'ilifr,ikf,-,-,;MYCli*ViNP-NYbiP15iV,n,NtiVii'.1:'i, '''LNPROPIA,V,,,i,V:+,4441isi, ', P :,K 0;iiig,iiAlsoil 110100$110A ,, -,,,,moomi, , . • • ,miN:f 11 lel '--t''' ' liptin 14.7 •, • . . .;0y, ; r•i. 106 • . • _........ _~ ' ____ ______ � � ____-__ PROJECT: Lincoln Center Entry Sidewalk PROJECTA\ PK0803 FUND: 138 ' Parks C|PFund PROJECT BUDGET: $15'000 PROJECT FUNDING ` MANAGER: PmteVnnmomk SOURCES: CDBG Funds PROJECT CLIENT: Parks and Recreation ---------- ------ --'--- - PROJECTQESCR|PT|KjN/STATUS -' -- ------ ---- - - ' This project would replace the 'current sidewalk entry tuthe Lincoln Centor. This extends from the south -- - � entrance hn the parking lot. The new sidewalk would be larger, provide a better outdoor gathering area PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR FISCAL YEAR LAND ENG. CONSTR. yW|Sc. PROJECT TOTAL Prior Years $v 2006-0 ` 0 2007-08 15.000 $15.000 2008'00 $0 � 200Q-10 $8 2010-11 $0 2011-12 $U � 2012-13 $0 � TOTAL $0 $0 $i5.000 $0 $15'008 OPERATING COSTS - ' ' ------ - --Firs ' 'al Year- --' - Annually -- --- -- -- Total Personnel $0 Supplies $0 8onioe $O Capital $0 TOTAL $O $0 $0 SWp Old Office AID _- ` 107 , . . .• ..,,,, ...._.....,..._,„ . ... ....... • PROJECT: LIONS PARK SWING SET PROJECT#: PK0804. . . . • .FUND: 138 -Parks CIP Fund PROJECT .: . . ... BUDGET: $15,000 . . .. -PROJECT FUNDING MANAGER: David Wood SOURCES: CDBG Funds • . . PROJECT Parks and Recreation . . • CLIENT: . . PROJECT DESCRIPTION/STATUS ....„...„„ ... . ... .. . .......„. .. ,. •• , This project install a swing set in Lions Park on University Drive. • • • . • , . „ PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR „....„.... .... ,•. . FISCAL YEAR LAND r ffid."-------"e5Ki§tk.1 MISC. PROJECT TOTAL. • • • Prior Years I $0- • 2006-07 $0• 2007-08 15,000 $15,000 .-. .. .. . . 2008-09 $0 ... .,.... 2009-10 $0 . •••.:.-•,' 2010-11 $0: • 2011-12 $0 • , - 2012-13 I I $0 .• TOTAL I $0 $0 $15,0001 $0 $15,000. ........ „. OPERATING COSTS • First Fiscal Year I Annually Total .•• Personnel I $0 ..-:•• - Supplies $0: Service $0. .• . • Capital $0' . .. $0 TOTAL $0 $0 ,.. • "' .. -. ,,,ai:•.‘ ,-qa.ii.!j,.:,i1.:.',I'l:il,ilv--4.:- . . , .,•-q.,-,,t,'!•'2' V T RA' PAP,, -:'09i:1,,.r„k:, 7'''''' 4•!,'A,.,.,i'" /TI 444W PA '''''C::::P, •,e ..,:wiy ,±M!!,f-!:•,,,--'1Api!,,,,, ''''::V ,,,:',1fr.q?; •]1:1E!IIP,Iike4;a,,„ A'' BILLIE M EY_ AR1c '117k : w- ':‘ MIlitERP ) et,21V.1W);'1Nt,ligikoili,i:,-!:,,,,. .:1„..::. , ' '- ' . - -'.\hir.,':pkv;;;•.:.,::ib . . •.... • 4.4.i1i'4::,:,0' q..ti,'4n'if'''h 7,xik1,x'EC'!t%f2:g-9t;ia,*,,4Vigign.'ii;XZi,l4i4iC'g'!0E:47M.va(./4,c4k4iiertiNi21g4:S-4ITag1,Oe,0lRNM"ilMitAijkl9f4i i I, .:;i0i2kiiine;l%,-iTtliiait OkfjP iNiik"'r„i4.Wf..0 ,I,.z,.-t,:Y:,:,..',?i',l.:,>,,!`:;:,:T--.!:,'.!ir::',;''i'c:I:,:.,i,N,j;o:I.t,'4.4"'4„-,,`/,':-,.:,,.*,,'-e.`_,;'.-'':''",,7.-.-,.:-,_f.-e,'‘',/'t:'";..,/'"-<<'"I',r''',/•",,,,/,-7.,N_,-IVI'I.,/'•••,,,R>.4.9A.,--s-,7,•-,3 ItA4 ;L724V - ' ', f2PAFAY 'A6 ,;F,,s,,-...-:.,.4A"Thr:1,1Nc,H ,;I:•,'tcC'r,,7„, , ' 1.7I1I :-;.-.4.‘,----'/,'. lliNotiMiahrTtiOR' 2i!:!:.,.4' '. EA 7. P* Aggiii6159 < / - ':' .°., '''' N-.00,441041Nril!'6*,;;;A',i,: ' • `i'"'il*VOOnittiMit4tVgf. (,.:f4,!,,:i4 -......:, / PARK/ , !4 "I'' cl''r'''-':-;/° :Pi.i:litg'i!lqi:P:i0.0,i201 _-.. .. pk,tiotiroram ..,,,....,,,, -',R:AMiajlifil4 titir"' "0, ',/ .' "*.) _144°,,,it, <•04141r 'fi!O' -"1:',7:i_-'::,4410-10., 4100,40;;Iiikrill:, jill*,;:-V .. • .. • ''''',. ',' \,';'"\. wii.VIIA,ail.,:oN...:0411 :,461:tVx.011A4,..,,vgo..244,.:nit:6.1,„ . .. 1 08 • GENERAL GOVERNMENT- FACILITIES AND TECHNOLOGY CAPITAL IMPROVEMENT PROJECTS FISCAL YEAR 2007-2008 THROUGH FISCAL YEAR 2012-2013 • 109 GENERAL GOVERNMENT FACILITIES AND TECHNOLOGY CAPITAL IMPROVEMENT PROJECTS FISCAL YEAR 2007-2008 THROUGH FISCAL YEAR 2012-2013 PROJECT REVISED BUDGET ACTUAL FY 06-07 BUDGET PROJECTED AMOUNT FY 05-06 APPROPRIATIONS FY 06-07 BEGINNING FUND BALANCE: $ 8,283,185 S 7,842,561 $ 7,842,561 ADDITIONAL RESOURCES: GENERAL OBLIGATION BONDS $ $ $ • CERTIFICATES OF OBLIGATIONS 1,624,390 6,712,300 3,466,000 INTERGOVERNMENTAL TRANSFERS - - 65,000 INTRAGOVERNMENTAL TRANSFERS 354,528 2,446,892 2,446,892 INVESTMENT EARNINGS 334,895 113,000 330,000 OTHER 54,471 - - SUBTOTAL ADDITIONAL RESOURCES $ 2,368,284 S 9,272,192 $ 6,3(17,892 • TOTAL RESOURCES AVAILABLE $ 10,651,469 $ 17,114,753 S 14,150,453 PUBLIC FACILITIES LIBRARY BOOK DONATIONS GG9901 - 291,348 _ " 19,856. 20,000 ' NEW CEMETERY 009905 7,950,000 1,472,858 251,476 - 678,907 • FIRE STATION#5 ' . GG0201 1,795,000 81,838 69,018 I RELOCATION OF FIRE STATION 83 GG0401 2,701,1100 30,388 991,000 1,428,030 I POLICE STATION IMPROVEMENTS - 000402 3,610,080 - 11,2I8 - 966,625 1 NEW CITY HALL GG0408 4,300,000 - - 88,513 NORTHGATE IMPROVEMENTS TBD - 625,000 - "3,839 - ' • MUNICIPAL FACILITY IMPROVEMENTS GG0701 1,750,000 _ 1,750,000 75(1,000 k MUNICIPAL BUILDINGS REHAB&REMODEL G00801. 2511,000 DESIGN OF SENIOR CENTER GG0601 75,500 25,172 - 50,328 CLOSED PROJECTS - - . SUBTOTAL S 1,645,170 $ 2,992,476 $ 4,(IS I,421 TECHNOLOGY PROJECTS POLICE FIELD REPORTING-• - • - C00516 268,252 , " 118,876 . - .- 31,617- AUTOMATED CITATIONS C00503 332,652 134,769 140,11(1 POLICE BOOKING . CO0515 98,579 . 1,177- MDT SYSTEM REPLACEMENT CO0701 100,000 - 100,000 - EMS REPORTING SYSTEM C00702 120,000_ - 120,000 120,000 PD SCHEDULING SYSTEM C00703 71,300 - 71,3(l0 - AUTOMATED CUSTOMER SERVICE C00102 196,000 30 000, ._ PARD AUTOMATION C00402 133,00(1 - _ - 34,792 AS400 ENHANCEMENT, TBD 250,000 " UPS REPLACEMENT C00603 93,560 4,892 34,400 PBX(PHONE SYSTEM)REPLACEMENT C00400 990,328 62,449 - 36,498 RADIO SYSTEM REPLACEMENT C00601 4,885,000 209 4,785,000 100,000 WIDE AREA COMMUNICATIONS GRANT - ' C00706:. - " 78,871 " - . ' '78,871 78,871 ATM NETWORK REPLACEMENT CO0522 453,172 - - 453,172 WIRELESS INFRASTRUCTURE C00704 • • • 200,000 - " 200,000 . . CLOSED PROJECTS 289,905 I6,644 SUBTOTAL $ 607,384 $ 5,360,063 $ 1,076,104 CAPITAL PROJECTS SUBTOTAL $ 2,252,554 S 8,352,539 S 5,127,525 DEBT ISSUANCE COSTS $ 26,015 $ 66,000 $ 39,543 • TRANSFERS 353,059 32,000 85,212 OTHER 4,457 75,000 75,000 GENERAL&ADMIN.CHARGES 172,823 215,562 215,562 • TOTAL EXPENDITURES S 2,808,908 $ 8,741,101 $ 5,542,842 ENDING FUND BALANCE: $ 7,842,561 $ 8,373,652 $ 8,607,611 I-Indicates projects funded through 2003 G.O.Bond Authorization • 110 GENERAL GOVERNMENT FACILITIES AND TECHNOLOGY CAPITAL IMPROVEMENT PROJECTS FISCAL YEAR 2007-2008 THROUGH FISCAL YEAR 2012-2013 APPROVED FY07-08 PROJECTED PROJECTED PROJECTED PROJECTED PROJECTED PROJECTED APPROPRIATIONS FY 07-08 FY 08-09 FY 09-ID FY 10-11 FY 11-12 FY 12-13 S 8,007,611 $ 8,607,611 $ 1,406,824 S 570,497 S 2,096,368 $ 104,368 $ 89,868 . $ - $ - $ - $ 3,655,000 $ - S - $ 8,365,000 8,365,001) 421,300 - - - - 23,552 23,552 12,480 29,960 - - - . 154,000 154,00(1 35,000 45,000 38,000 8,000 8,000 $ 8,542,552 S 8,542,552 S 468,780 $ 3,729,960 $ 38,000 $ 8,000 S 8,000 $ 17,150,163 $ 17,150,163 $ 1,875,604 S 4,300,457 S 2,134,368 $ 112,368 $ 97,868 20,000 20,000 - - ' 20,000 -20,000. 20,000 ' 20,000 20,000 5,253,524 5,783,066 - - - - . - 1 - ,058,2110 - - - 1,683,963 742;127 • - - - - - 61,487 - 2,109,129 2,000,000 - - . - - _ 621,161 - - - - - - _ - I,00(1,000 - - - 250,000 . 250,000 - ' . - - - - S 5,523,524 S 10,477,877 $ 762,127 $ 2,129,129 $ 2,020,000 S 20,000 S 20,000 ' 54,398 - - - 100,000 - - _ - - . _ - 71,300 - - - 9,000 37,765 - -• " . - - . 14,552 16,720 12,480 29,960 - - 35,141 - , - - - - - - ' 4,784,791 - - - - - 100,000 100,000 - . . - - $ 23,552 S 5,028,815 S 533,780 $ 29,960 $ - $ - S - $ 5,547,076 $ 15,506,692 $ 1,295,907 $ 2,159,089 S 2,02)1,000 S 20,000 S 20,000 $ 66,000 $ 66,000 S 4,200 $ 35,000 $ - S - S - 170,647 170,647 5,000 10,000 10,000 2,500 2,500 S 5,783,723 $ 15,743,339 $ 1,305,107 S 2,204,089 5 2,030,000 $ 22,500 $ 22,500 S 11,366,440 $ 1,4(16,824 $ 570,497 S 2,096,368 S 104,368 $ 89,868 $ 75,368 111 PUBLIC FACILITIES 112 • PROJECT: LIBRARY BOOK DONATIONS PROJECT#:GG9901 • FUND: General Government,CIP PROJECT . BUDGET: $291,348 PROJECT MANAGER: David Gerling FUNDING SOURCES: Funds raised by donations . PROJECT for library materials CLIENT: Parks and Recreation PROJECT DESCRIPTION/STATUS This money was raised through donations for adding to the collection of books and other items in the Larry J. Ringer Library. Based on history we anticipate spending$20,000 per year until the funds are depleted. • PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR FISCAL YEAR HARDWARE SOFTWARE CONS/TRAIN OTHER PROJECT TOTAL Prior Years $0 $0 $0 $126,014 $126,014 2006-07 $20,000 $20,000 2007-08 $20,000 $20,000 2008-09 $20,000 $20,000 2009-10 $20,000 $20,000 ' 2010-11 $20,000 $20,000 2011-12 $20,000 $20,000 2012-13 $20,000 $20,000 future years $25,334 $25,334 TOTAL $0 $0 $0 $291,348 $291,348 OPERATING COSTS First Fiscal Year Annually Total Personnel $0 Supplies $0 Service $0 Capital $0 TOTAL $0 $0 $0 li? 1"=,it`'' ,- 2s ar lltM,,i;: ' p AR?c {.iYi'{ .,.8. v,pA}'tKt;�1 ,<'1f j;i; clN:S lkiflilL..z,ial:IPc-,�:;}f`'z+:».4.0; �> .. ";.1�-9�4I±1�1IT3.::r,:E ry:\4 „4;h�' ol P,,�'ari• nh,^'•:4 f�q;,''t�= t11 �,'•, ; .s a'n.t'!+:v +' �`t 'tP �.11�E W"'s,S!Il 4. i..1Y::,<, '',F�S,(��', .,. ,,�1 ,g}YJ''� .,.P,:rit}y2.^t``:,.y0 i&` �;�"�'f �(y7'#,n} .',?.�k:x�:h i�t��` �s'���` !;�!F�jF'}n['v.I�oayY:-1,'.�:;���'i ai:`If.;3Y' .�_ :Sy— 3`YI ��•',� E,� y6H:l:'�.,� A,f ''a ;;41, i' .:n3 ';E.Kplp. n Li `mac, ycs w.f�lj,i>i;i(li°'"I' '�;:'. ,t� .��a ,t; 1" .i, Larry J.Ringer brary I-m �{" ,�.�c ,r"�i:F :' 'F:s�d4�;�" if't':1.,2.„'�^i ,45$,�..._.:.�\® 9 i \Yoh �t.�q�..; �.v:tu y�;�:.fy�:i�r�;J (): d.8, ''.S:, .�".'xi:1�,�''�,dh�l�:. �':'�:� :i•Y��.y;�}e\ t:"� ✓ �b�a /�+ Q� <Rl'a M F a o;d':3 : x j,..";;t`. 'vFi Xi{:;I,,:i�r�t+;,Y.„ saneI, T �'.p'X: '\. `" v ,60 .�'�:"' ..Y;;,;{:;,_.�'° �::i; ;;>sC,;'1' :�.iti;$:6=:,;F :iJ �l."'�,..{,EEPLE A5E PA :'S:- ;Q�Ti>i 1 j.6�y,:?i�s\�za::� =='}IF,,.*::, %.`te. ? . a "fit, ::-, �.q l = : �u �.<. iEs3T�:n�:i.-i%�`.'".,' \ �p \�6•T� ,2 F�<: 1 s4 U LETI;P �� : 4y 't.:.�'N-s n &:.. 3r0��, .y ;?llib' ;:„ ` ..:. R�. : "?Y yizt + �#t kzE€ � :' irCeaO 16 8 POR 111ER PARK, ° a a4,ti:GGi:'; k i� ?1a : `y t; kf4,.L Ia i� i�t, 4 '',5 Ci"fyE`f,:sF ;`` ;{ ; P � ;ii0! iIiYt�v L hkk 's, '''.ra:z�:pIor '# 1,.R'i.l'�1s W} mp: t4po <'1; •' i:. ,, 1iti,�.' vW.:'v�:;iS 4,D 'z1 fn�i V1!.� Aas \ ,' l . "^Y�� . r . . �ELt � A .M 113 • PROJECT: NEW CEMETERY PROJECT#: GG9905 FUND: 137 -General Government CIP PROJECT BUDGET: $7,950,000 • PROJECT MANAGER: Ross Albrecht FUNDING SOURCES: Certificates of Obligation PROJECT CLIENT: Parks and Recreation PROJECT DESCRIPTION/STATUS Development of a new municipal cemetery that will include at least 20 acres designated for the Aggie Field of Honor. $275,000 debt issued in 1999 (CO's) ° $600,000 debt issued in 2005 (CO's) $1,000,000 debt issued in 06 (CO's) $625,000 debt issued in FY07 (CO's) $5,525,000 projected FY08 debt issue (CO's) (includes debt issuance costs) Construction cost includes $200,000 to move overhead electrical lines underground. PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR • FISCAL YEAR LAND.... ENG. CONSTR. MISC. PROJECT TOTAL_ Prior Years $1,479,524 $8,299 $0 $204 $1,488,027 2006-07 $678,907 $678,907 2007-08 $5,783,066 $5,783,066 2008-09 $0 2009-10 $0 2010-11 $0 2011-12 $0 • 2012-13 $0 TOTAL $1,479,524 $687,206 $5,783,066 $204 $7,950,000 OPERATING COSTS First Fiscal Year 11 Total y Personnel'� $50,383 � $103,300 $153,683 Supplies 5,660 4,660 $10,320 Service 9,947 35,738 $45,685: • 'Capital 85,500 $85,500 TOTAL $151,490 $143,698 $295,188 l o.F(��' "\) sue,._�, i` f.'/ 114 PROJECT: FIRE STATION No. 5 PROJECT#: GG0201 FUND: 137-GENERAL GOVERNMENT CIP PROJECT BUDGET: $1,795,000 PROJECT FUNDING MANAGER: DONALD HARMON SOURCES: GENERAL OBLIGATION BONDS 1998 ($1,567,000) PROJECT SERVICE LEVEL ADJUSTMENT CLIENT: Fire Department FIRE($176,000) GENERAL FUND ($52,000) PROJECT DESCRIPTION Fire Station No. 5 will be located at 601 Greens Prairie Road to provide services to a high growth area of the City. The facility is expected to have two equipment bays of 2,300 square feet with an additional estimated 7,100 square feet for living quarters, training, kitchen, storage, exercise and decontamination areas. The operating costs include additional engine company to operate the aerial apparatus on a 24 hour 7 day per week schedule. PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR FISCAL YEAR LAND ENG. CONSTR. MISC. PROJECT TOTAL Prior Years $181,270 $202,510 $1,247,844 $94,358 $1,725,982 2006-07 $2,500 $54,018 $12,500 $69,018 2007-08 $0 2008-09 $0 2009-10 $0 2010-11 $0 2011-12 $0 2012-13 $0 TOTAL $181,270 $205,010 $1,301,862 $106,858 $1,795,000 OPERATING COSTS First Fiscal Year Annually I Total II Personnel $529,638 $545,527 $1,075,165 • Supplies $7,250 $7,250 $14,500 Service $15,000 $15,000 $30,000 Capital $0 TOTAL $551,888 $567,777 I $1,119,665 't No 1o,crrnk Pkvi ` ` `y) lr lore Stattan No S 14 may, ,..". / +. l 6ci'S:`' p SprInV M.. ._ "' • i1 �d-� i.F'=fy('' �f i _-v 1,� �c4yy�O'�y n �'4 coionini,, 1` \+' rty o q.O • 4i { VgllayDroak Clt Jam,! '�"/4� :7, I; �v i "`O _ SV Pndro Ws pr ` Rr� P. ' 9 Oaf•pia peq a.. d 115 PROJECT: Relocation of Fire Station#3 FUND(S): PROJECT NUMBERS&BUDGET: 137-General Government Capital Projects Fund Facilities: GG0401 $2,701,000 238-Water Capital Projects Fund Water: WF0632255 $28,000 • Total Project Budget: $2,729,000 PROJECT ' MANAGER: Donald Harmon FUNDING PROJECT SOURCES: 2003 GOB:$1,710,000 CLIENT: Fire Department CO's:$991,000 • W/WW-URB: $28,000 • ° PROJECT DESCRIPTION/STATUS Fire Station No. 3 will be located at 1900 Barron Road to provide services to a high growth area of the City.The facility is expected to have two equipment bays of 2,300 square feet with an additional estimated 7,100 square feet for living quarters,training, kitchen, storage, exercise and decontamination areas.The project includes the extension of water service. • • . PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR Project Total ' • FISCAL YEAR LAND ENG. CONSTR. MISC. OVERHEAD PROJECT TOTAL Prior Years $154,339 $62,221 $0 $580 $0 $217,140 2006-07 $0 $30,149 $1,342,335 $54,000 $27,175 $1,453,659 • 2007-08 $0 $10,000 $1,000,000 $30,000 $18,200 $1,058,200 • 2008-09 $0 $0 $0 $0 $0 $0 • 2009-10 $0 $0 $0 $0 $0 $0 • 2010-11 $0 $0 $0 $0 $0 $0 2011-12 $0 $0 $0 $0 $0 $0 • • 2012-13 $0 $0 $0 $0 $0 $0 PROJECT TOTAL $154,339 $102,370 $2,342,335 $84,580 $45,375 $2,729,000 J -. a6 Spa' i \ 'V, C hu,Z'hi4. '' ' ``h~ /`o off A°S —E"0�' .4 <'1 f5 >�.,� �C" `P�- <h' `°c rya ^_ O` ' Firx Station Nn 3 `4 J/ • rp. � .pa: `<A \7 1 -11 '+\ N E, " - a``9.fi. 's�. .,per • 4 c o\o�v�,rnatr ...,r 0r` 9,,, a- •,,lh, ;y`:' 41w., W,i 116 • • PROJECT: Relocation of Fire Station#3 PROJECT CALENDAR OF EXPENDITURES BY FUND Facilities Portion FISCAL YEAR m LAND ENG. CONSTR. MISC. OVERHEAD PROJECT TOTAL Prior Years $154,339 $59,851 $0 $580 - - - - -- - $0 $214,770 2006-07 $0 $30,149 $1,319,335 $54,000 $24,546 $1,428,030 2007-08 $01 $10,000 $1,000,0001 $30,0001 $18,200 $1,058,200 ,- 2008-09 $0 $0 $0 $0 $0 $0 2009-10 $0 $0 $0 $0 $0 $0 2010-11 $0 $0 $0 $0 $0 $0 2011-12 $0 $0 $0 $0 $0 $0 2012-13 $0 $0 $0 $0 $0 $0 12 Facilities Total $154,339 $100,000 $2,319,335 $84,580 $42,746 $2,701,000 Water Portion FISCAL YEAR LAND ENG. CONSTR. MISC. OVERHEAD PROJECT TOTAL Prior Years $0 $2,371 $0 $0 $0 $2,371 2006-07 $0 $0 $23,000 $0 $2,630 $25,630 2007-08 $0 $0 $0 $0 $0 $0 2008-09 $0 $0 $0 $0 2009-10 $0 $0 $0 $0 $0 $0 2010-11 $0 $0 $0 $0 $0 $0 2011-12 $0 $0 $0 $0 $0 $0 2012-13 $0 $0 $0 $0 $0 $0 Water Total $0 $2,371 $23,000 $0 $2,630 $28,000 'PROJECT TOTAL I $154,3391 $102,3701 $2,342,3351 $84,5801 $45,3751 $2,729,0001 OPERATING COSTS First Fiscal Year Annually Total Personnel $0 Supplies 10,000 10,000 $20,000 Service 10,000 10,000 $20,000 Capital $0 TOTAL $20,000 $20,000 $40,000 117 • PROJECT: POLICE STATION IMPROVEMENTS PROJECT#: GG0402 FUND: 137 -GENERAL GOVERNMENT CIP PROJECT •. BUDGET: $3,610,000 .. . PROJECT • MANAGER: ED MCDONALD FUNDING 2003 GENERAL OBLIGATION - SOURCES: BOND FUNDS ($3,310,000) • • PROJECT 2006 CERTIFICATES CLIENT: Police Department OF OBLIGATION ($300,000) •• : : : , PROJECT DESCRIPTION/STATUS cm= - ' -This project provides for the expansion of the Police Department into the space vacated by Municipal Court and renovation of the existing facility. PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR FISCAL YEAR LAND ENG. CONSTR. MISC. OVERHEAD PROJECT TOTAL • Prior Years $0 $212,550 $0 $998 $3,737 $217,285 • 2006-07 $0 $150,000 $750,000 $50,000 $16,625 $966,625 . • , 2007-08 $0 $55,000 $1,400,000 $200,000 $28,963 $1,683,963' • . • 2008-09 $0 $32,450 $500,000 $196,913 $12,764 $742,127 • 2009-10 $0 $0 $0 $0 $0 $0 ,. • .• 2010-11 $0 $0 $0 $0 $0 $0 2011-12 $0 $0 $0 $0 $0 $0 2012-13 $0 $0 $0 $0 $0 $0 TOTAL $0 $450,000 $2,650,000 $447,911 $62,088 $3,610,000 • , • OPERATING COSTS . ' First Fiscal Year Annually Total Personnel .. . Supplies Service • • Capital iTOTAL • ', . . ,,,,'VA,,;., -\\>• ••;i•'-i, ''t'''. '`,/' 7,. '-- . , ,,I-K --',;-,- t-,,, 4, \,,;- ,k,: ,• -k-' -,,„ .. ,,,,; . N 0...b- ,, ..\,?: ,,•:<,,,,,,„44. ,„,.5;\ ,,„,- ,,,,,,, // / 4.---;\1-- e.:./ , ;•,./ ,.,...‘,.- ,,,.."':,z.,,,--‘;',k‘, ' 7';‘: ,',Q,,, /,-',",',,\ '1,, -./ \•,.. 1 \ 6t 16 -- 9, ,, ,4'''''1: - --'-------'-,/,,,r('&'-',:,,,\-,,4V-%> '<-\ _ \c) ,`/-<N,:',,•K' -- /V . °A 4/1/'-. 4,. S7 "" ,,„:>‘'4"< ,,' )' /- ck '/ CV,,,, •--,,,.` -•5K-7 :7/ ' ,: /` -/A:3' • ,X--, • <'" -,• :,, • -•• •,,/,_•3;' -,I., '‘,4'k;•9',/,>', .---- , rr-,1 • , - /.-. t h -41 (A ''' <\\. //'/''A\\\,..(‘ • 'SS!".N f -3 • CV/ 1 Asa‘ /<,'6:4.-t e: ,:`'Zie"-Cli';:->1') ' ??:4 ,,,; ' , ---*-..<:',:47 '`4.-" `:.'642'''t,*.. ,4v " ,' 9, -I ,- `',47-1,.',, 0 • .-..\\, .... N....„.",„__ ' N>S/ \-,'•<.(As"•- ,,Nc ‘,•'/ :Jz; \ .,,,,e'', ( ,s' , 1 ', .\ s5.-., ,.<•.‘,: .,,,,,,,---,.,7 .„ t t\,Ey, \,..r.;--,', ,v„-Y , 1 ,, ,.. ,f \f\s.,,,, ,,,,t, \-,•.±, -N,c7„,s ' ),,/,.•,--‘.;•'' 'el, ' ) •k, ,,....!-\- \. •aS.'---?.'ivi.) ,-=t:''n N•* \/ ,,,,r-- ) e,'''- 1 ,.f- ( :'›,c',, 'v/ --SX ;',4‘\ ..--/ ,/2 0.) • 118 - -_ - .... -_........ PROJECT New City Hall PRQJECT#: GG0408 FUND: 137'General Government CUP PROJECT 4`300.000 BUDGET: PROJECT MANAGER: Mark Smith FUNDING 3VU3 General Obligation SOURCES: Bonds PROJECT CLIENT: CK8D -----' - '- ---------PROJECTnFSCp|PT|ON/STATVS T -- - -- --- - - '-'--- --'- P�ae� of�'�w� �h�[_ ---- ' ----'--- -- -''--- ' -- -' -- --- '--- --- -- - --- ''---' O30807'Site plan and cost estimating services contract awarded ho Randall Scott Associates($88.513) � ' PROJECTCALENDAR��FEXPENO�URES BY FISCAL YEAR FISCAL YEAR LAND ENG. CONSTR. K80C. PROJECT TOTAL Prior Years $10.737 $20'000 $O $2'134 $40'071 2006'07 88.513 $08.513 2007-08 01.487 $01.487 2OU8-08 $0 200910 2.109.129 $2.109.129 2010-11 2,000,000 $2,000,000 2O11'12 2012'13 $0 TOTAL $10.737 $178,000 $4.109,129 $2,134 $4.300000 OPERATING COSTS � First Fiscal Year Annually Total � Personnel Supplies $0 Oomica Capital $O |V|xL TBD TBD T8D ' Al �r , / . ' . � =' ���l ~ ' A"+� . 119 ` PROJECT: Northgate Improvements PROJECT#: TBD •FUND: 137 -General Government CIP PROJECT BUDGET: $625,000 PROJECT MANAGER: David Gwin FUNDING • SOURCES: 2005 Certificates PROJECT of Obligation . • CLIENT: Economic Development PROJECT DESCRIPTION/STATUS • Construction of entry features in the Northgate area. • 1.$150,000 appropriated in 05 to GG0520 2. $175,000 appropriated in 05 to GG0521 3. $300,000 appropriated in 05 to GG0522 '•• 4. Projects combined for FY07 budget • PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR FISCAL YEAR LAND ENG. CONSTR. MISC. PROJECT TOTAL • Prior Years $0 $0 $0 $3,839 $3,839 • •• 2006-07 $0•• 2007-08 $621,161 $621,161 2008-09 $0 • • ' 2009-10 $0 • 2010-11 I $0 2011-12 $0 2012-13 $0 • TOTAL $0 $0 $621,161 $3,839 $625,000 OPERATING COSTS • First Fiscal Year Annually Total Personnel $0 Supplies $0 Service 35,000 35,000 $70,000 Capital $0 • TOTAL $35,000 $35,000 $70,000 • \44.? 4,11. • MAP NOT _,,NVAILABL • • 120 PROJECT: Municipal Facility Improvements PROJECT#: GG0701 FUND: 137-General Government CIP PROJECT 1,750,000 BUDGET: PROJECT MANAGER: Mark Smith FUNDING • SOURCES: Certificates of Obligation PROJECT CLIENT: City Manager's Office PROJECT DESCRIPTION/STATUS This project is for the completion of the second floor of the Municipal Court building which will be used for City office space. Also included are funds for renovations to existing facilities. PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR FISCAL YEAR LAND ENG. CONSTR. MISC. PROJECT TOTAL Prior Years $0 $0 $0 $0 $0 2006-07 $87,290 $662,710 $750,000 2007-08 $1,000,000 $1,000,000 2008-09 $0 2009-10 $0 2010-11 $0 2011-12 $0 2012-13 $0 TOTAL $0 $87,290 $1,662,710 $0 $1,750,000 OPERATING COSTS First Fiscal Year Annually Total Personnel $0 Supplies $17,000 $17,000 $34,000 Service $15,000 $15,000 $30,000 Capital $0 TOTAL $32,000 $32,000 $64,000 }� . 5 /// Koh ,,., \6:. 1^',./ $`� �c/ :s: po$ / ~�"�� s• ��i yY .r::� /�,^/ ✓ to Cir. QV .z t,'��>$s,'«..ter 5! F.+' it c"� \ 'O 1(hyf}j;! t:'-; iTt `i,,, .,.,eob e aQ 4,v°..1 ''IN. y�-yrjyP f/ j f/e/ Q� —27 r' '' t i MUnroipat Facility Improvements 0 i 7II "' i,cam ,pkwy 3 'ems-/En-Y,W„ VNx..-404;au4-4;�M;=,�_� 121 '.... _ PROJECT: Municipal Buildings rehabilitation&remodel PROJECT#\ $G0801 . . FUND: 1�r-�one,�Gnvommoou�|P PROJECT ' BUDGET: $250.000 PROJECT ' FUNDING MANAGER: TaO SOURCES: Certificates ufObligation PROJECT ' CLIENT: Public Works -� - -- ' ' -- '- PROJECT -- - - --- DESCRIPT ` ' As new office spaces are added to the city's space inventory the need arises to rehabilitate and refurbish the vacated space for other uses. 1. Rehabilitate the space made available after the move of the Public Works Engineering Division .� � (Engineering Technician's)to new space in City Hall.The rehabilitated space will be used by the Traffic Signs Division. - 2. Rohobi|date the space made available after the move of the Public Works Engineering Division (Engineers)to new space in City Hall.The rehabilitated space will be used as a meeting/training area. � 3.Rehabilitate the space made available by contracting out of Print Services , ' -- -- CALENDAR OF EXPENDITURES BrF�CALYEAR - ---------- ' -��CALYEAR ' LAND ffi�. ._- / CONSTR. | MISC. PROJECT TOTAL Prior Years $O $Ol *U) $O $O 2000-07 *O 2007-00 $20,000 $200,000 $30,000 $250,000. ' 2008-09 $0 20U91O $0 2010'11 $0, ' 2011-12 *O ' 2012'13 $U � T0TAL _ $0 $20,000_ _ $200.000 $30000 _ *250000: OPERATING=°""'" ' --- ---- - ' Total First Fiscal Year Annually Personnel $O � 'Supplies $0 Service $0 Capital $0 TOTAL T8D T8D TBD _ _ - -____- - / ` ' ' ' ' V, ' 122 - ' __ - PROJECT: Design of Senior Center PROJECT#: GG0601 FUND: 137'General Government CIP PROJECT $75.500 BUDGET: PROJECT MANAGER: StavmBmmohy FUNDING SOURCES: General Fund Contingency PROJECT Tnonofmr-FYOG CLIENT: Parks and Recreation -------------- -- - ----------pROjECT'DESCR|PTxON/STATVS--------- ------------------ This project ia for the conceptual design ofa future City Senior Center, ---- --------------------- � - - - - PROJECTCALENDARQFEXPEND[TURESBYFtGCALYEAR FISCAL YEAR - - LAND EN8. I CONSTR. MISC. PROJECT TOTAL Prior Years $O $25.1721 $O $0 $25,172 � 2006-07 $50.328 $58.328 20O7-O8 2008'0Q $O 20OQ'10 2010-11 � $U 2011 12 | - . $0 2012'13 | � � | $0 � TOTAL $U %75.5001 $01 $01 | $75.500 � - ' -- ' - - - - OPERATING COSTS --- ' First Fiscal Year ' Annually Total ' Personnel $0 Supplies $0 Service ) $0 Capital � $0 i ,TOTAL . $O __$01____,____ _ $O ' � ti iq PARK � ��. �r , 123 TECHNOLOGY PROJECTS 124 PROJECT: POLICE FIELD REPORTING PROJECT tiC00516 FUND: 137-GENERAL GOVERNMENT CIP PROJECT BUDGET: $268,252 PROJECT FUNDING MANAGER: TIM CLARK SOURCES: Certificates of Obligation PROJECT CLIENT: Police Department PROJECT DESCRIPTION/STATUS This project will allow police officers to fill out report forms electronically as the data is collected. This will mean less time spent in the Police offices filling out reports. The Police Department decided to use Geac's Field Reporting Application. The application required upgraded computer hardware in the vehicles,therefore prior to implementation,the MDT Replacement project required completion. The Scope of Work,to be incorporated into an addendum to the Master agreement,with Geac was approved and the contract was approved by Council on August 8,2005. Implementation of the application began in 1st Qtr FY 06. The Message Switch and Field Reporting part of this project are complete.The only outstanding item is the conversion of the TLETS connection to the State to a TCP/IP(Internet based)connnection.This item has a vendor cost of$4,800 and is incuded in the project budget as an encumbered amount.Completion of this item is dependent on the State conversion schedule. Original project budget=$229,000($129,000 from C00404-Add'I Technology Improvements) $21,500 transferred from C00022 in FY05 • $29,729 transferred from C00401 in FY05. $11,977 transferred to C00503-FY08 PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR FISCAL YEAR HARDWARE SOFTWARE CONS/TRAIN OTHER PROJECT TOTAL Prior Years $5,060 $147,106 $41,600 $42,869 $236,635 2006-07 8,794 18,023 4,800 $31,617 2007-08 $0 2008-09 $0 2009-10 $0 2010-11 $0 2011-12 $0 2012-13 $0 TOTAL $13,854 $165,129 $41,600 $47,669 $268,252 OPERATING COSTS First Fiscal Year Annually Total Personnel $0 Supplies $0 Service 0 23,000 $23,000 Capital $0 TOTAL $0 $23,000 $23,000 u MAP NOT AVAILABL Fi, 125 • • PROJECT: Automated Citations PROJECT#: CO0503 FUND: 137-General Government CIP PROJECT BUDGET: $332,652 • PROJECT FUNDING " . • MANAGER: Don Davis SOURCES: General Government Court Technology PROJECT CLIENT: Police Department& Municipal Court PROJECT DESCRIPTION/STATUS This will allow officers in the field to use a device to enter citation information which will • be downloaded into the Municipal Court Case System. This will save data entry time at Courts and PD Records and imporve uniformity for citations. PD Records will be able to acces the database for reporting purposes. Contract was awarded to Advanced Public Safety in December 2005. Completion of this project is expected in Spring/Summer 2007. $20,254 transferred from CO0022- FY07 . $42,421 transferred from CO0515- FY08 $11,977 transferred from CO0516- FY08 PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR FISCAL YEAR HARDWARE SOFTWARE CONS/TRAIN OTHER PROJECT TOTAL Prior Years $93,095 $33,883 $2,972 $8,194 $138,144 • 2006-07 61,197 66,371 3,161 9,381 $140,110 • 2007-08 54,398 $54,398 2008-09 $0 2009-10 $0 2010-11 $0 • • 2011-12 $0 . • 2012-13 $0 TOTAL $154,292 $154,652 $6,133 $17,575 $332,652 OPERATING COSTS First Fiscal Year Annually Total Personnel $0 Supplies $0 Service $15,120 $15,120 • • Capital $0 TOTAL $0 $15,120 $15,120 • • .100 k � � MAP NOT AVAIL BLK • 126 PROJECT: POLICE BOOKING PROJECT#C00515 FUND: 137 -GENERAL GOVERNMENT CIP PROJECT BUDGET: $98,579 PROJECT FUNDING MANAGER: TIM CLARK SOURCES: Certificates of Obligation PROJECT CLIENT: Police Department PROJECT DESCRIPTION/STATUS This will automate the booking of detainees in the City's jail facility. It will include live scan of fingerprints, thus making it possible to immediately compare detainee fingerprints to those on file. This should speed up the booking process, allowing officers to return to patrol duty quicker. The fingerprint and mugshot part of this project was completed in FY 05. Remaining funds are projected to be used for the Electronic Booking application. Original budget=$141,000 $42,421 transferred to C00503-FY07 PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR FISCAL YEAR HARDWARE SOFTWARE CONS/TRAIN OTHER PROJECT TOTAL Prior Years $47,343 $38,745 $10,966 $1,526 $98,579 2006-07 $0 2007-08 $0 2008-09 $0 2009-10 $0 2010-11 $0 2011-12 $0 2012-13 $0 TOTAL $47,343 $38,745 $10,966 $1,526 I $98,579 OPERATING COSTS • First Fiscal Year I Annually ( Total • Personnel $0 Supplies $0 Service 18,000 $18,000 Capital $0 TOTAL $0 $18,000 $18,000 fib.+steS MAP NOT .AVAIL.ABL na '6n 127 • PROJECT: MDT SYSTEM REPLACEMENT PROJECT#: C00701 FUND: 225-EQUIPMENT PROJECT REPLACEMENT FUND BUDGET: $100,000 PROJECT FUNDING MANAGER: TBD SOURCES: EQUIPMENT REPLACEMENT FUND PROJECT CLIENT: Information Services PROJECT DESCRIPTION/STATUS This project replaces the electronic equipment that provides the interface.between radio frequency system (800 MHz radio system)and the Internet Protocol system (Computer Aided Dispatch). This equipment is . -. • located at the Radio Tower and is anticipated to be upgraded in conjunction with the Radio System • Replacement. Current funding is estimated as sufficient to replace existing infrastructure, not enhance or upgrade.To a lesser extent, the data system is experiencing the same coverage limitations as the voice system. addressed by project C00601. If the data side requires expansion to a multisite system to support current and projected City growth, costs will likely exceed$100,000 PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR FISCAL YEAR Hardware Software Cons/Trainingl Other PROJECT TOTAL . • - Prior Years $0 $0 $0 $0 $0 2006-07 $0 2007-08 $0 .• 2008-09 70,000 20,000 5,000 5,000 $100,000 " ' 2009-10 $0 ' 2010-11 $0 • 2011-12 $0 2012-13 $0 TOTAL $70,000 $20,000 $5,000 $5,000 . $100,000 • . ' • , OPERATING COSTS First Fiscal Year Annually Total • Personnel $0 Supplies $0 • • Service $0 Capital $0 TOTAL $0 $0 $0 f - Val' . ., ,,.,/C"' , *Q. ''..-, GT: .t14,V •.•-`,.,,t, '0,4 . 0- .,•0 .,... er •0), ' MAP NOT AVAILABLF . ,-.3. ,...-., , 1 128 PROJECT: EMS Reporting System PROJECT#: C00702 FUND: 137 -General Gov't CIP PROJECT $120,000 BUDGET: PROJECT MANAGER: Don Davis FUNDING Certificates of Obligation • SOURCES: PROJECT CLIENT: Fire Department PROJECT DESCRIPTION/STATUS The Fire Department needs to update the EMS reporting system. It takes staff 1.5 to 2 hours to complete a EMS report with the current system. In order to provide better reports in a quicker time frame the current system needs to be replaced with one of the newer more efficient EMS reporting systems. City representatives from Fire, IS and Finance researched various system and developed requirements and drafted the RFP. RFP 07-60 was released in Feb 2007. System implementation is expected to be complete by the end of CY 2007. Original Budget=$100,000; $20,000 added through FY07 budget amendment#3 - 9/27/07 FISCAL YEAR Hardware Software Cons/Training Other PROJECT TOTAL Prior Years $0 $0 $0 $0 $0 2006-07 25,000 70,000 10,000 15,000 $120,000 2007-08 I $0 2008-09 $0 2009-10 $0 2010-11 $0 2011-12 $0 2012-13 $0 TOTAL 25,000 50,000 10,000 15,000 $120,000 OPERATING COSTS First... Fiscal Year AnnuallyTotal Personnel $0 $0 Supplies 0 $0 Service 20,000 $20,000 Capital 0 $0 TOTAL . $20,000 $20,000 1.0116.0111M110> r MA_P N it AVL ILABL Fp Ste, 129 • PROJECT: PD Scheduling System PROJECT#: C00703 FUND: 137 -General Gov't CIP PROJECT $71,300 ' • BUDGET: • PROJECT . • MANAGER: Tim Clark FUNDING Certificates of Obligation SOURCES: PROJECT , • CLIENT: Police Department . . • PROJECT DESCRIPTION/STATUS • • This will provide the Police Department the same type of scheduling used in the Fire Department. This system will expedite the creation of work schedules, rosters, back-fill for absentees and entry of work hours in the payroll A. • system. This project is not expected to be implemented until FY 08. • • • PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR • • FISCAL YEAR Hardware Software Cons/Training Other PROJECT TOTAL Prior Years $0 $0 $0 $0 $0 . . . ' 2006-07 $0 . , 2007-08 $0 . • 2008-09 10,000 50,000 10,000 1,300 $71,300 . ' 2009-10 $0 2010-11 $0 •.- .... 2011-12 $0 • 2012-13 $0 TOTAL $10,000 $50,000 $10,000 $1,300 $71,300 OPERATING COSTS First Fiscal Year Annually Total Personnel $0 $0 • Supplies 0 $0 • Service 9,300 $9,300 • . Capital 0 $0 TOTAL $0 $9,300 $9,300. • - • ?...,•4 cleS•\* . . 1 '''•• 1.•;' ,... .., • • lAt• '44'0„, /.-- , -N4 . .. .• .. . ..0? 4,,,, •4,, cc': .9 •%, 10, 'N. ,rivk . . .c.:P MAP NOT AVAILABL F, .,... $ l•i., .0, • • 130 PROJECT: Automated Customer Service PROJECT#: C00102 FUND: 137 -General Government CIP PROJECT BUDGET: $196,000 PROJECT MANAGER: Erin Provazek FUNDING SOURCES: Electric Fund PROJECT CLIENT: Information Services PROJECT DESCRIPTION/STATUS This project is to place interactive processes on the City's website so that citizens can do business with the City over the Internet and the telephone 24 hours a day. Payments can be taken online by Utility Customer Service and Municipal Court and charged to credit cards. PARD will implement the capability to accept reservations and payment for activities and facilities reservation . via the internet and phone by the end of FY 06 $20,000 transferred to C00402- FY07 This project will be use to upgrade the current server for Utilities/Court and then closed. $9,000 transferred from Utility Customer Service Fund for FY08 Click2Gov Customer Information System SLA- funds will be combined with the balance of this project for completion of this automated system. PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR FISCAL YEAR HARDWARE SOFTWARE CONS/TRAIN OTHER PROJECT TOTAL Prior Years $93,607 $34,628 $0 $0 $128,235 2006-07 7,000 20,000 3,000 0 $30,000 2007-08 5,000 18,000 7,000 7,765 $37,765 2008-09 $0 2009-10 $0 2010-11 $0 2011-12 $0 2012-13 $0 TOTAL $105,607 $72,628 $10,000 $7,765 $196,000 OPERATING COSTS First Fiscal Year Annually Total Personnel $0 Supplies $0 Service 35,000 $35,000 Capital $0 TOTAL $0 $35,000 $35,000 itek /1\1,,,12.erp.a.p te MAP NOT AVAILABLE 131 PROJECT: PARD AUTOMATION PROJECT#:C00402 FUND: 137-GENERAL GOVERNMENT CIP PROJECT BUDGET: $133,000 . " PROJECT MANAGER: KEVIN JOYNER FUNDING • PROJECT SOURCES: General Government CIP CLIENT: Parks and Recreation • PROJECT DESCRIPTION/STATUS This project will provide for the automation of many processes in the Parks and Recreation Department, such as registrations, scheduling of facilities,team scheduling and pass management. These processes must be automated prior to integrating them with the Automated Customer Service system through the internet and phone. PARD software began integration with the City's financial system in March of 2005. The system will begin the planning process of integrating it with the Automated Customer Service system in the second quarter of FY06. Negotiations with the vendor are in progress to determine if this project can be best accomplished using Teleworks or RecWare Internet and Phone based registration systems. Project completion is estimated at the end of the forth quarter of FY06. Original budget=$171,000 $58,000 transferred to C00503 in 2005 $20,000 transferred from C00102-FY07 • PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR • FISCAL YEAR HARDWARE SOFTWARE CONS/TRAIN OTHER PROJECT TOTAL Prior Years $12,934 $83,774 $0 $1,500 $98,208 . . 2006-07 5,000 20,687 9,105 $34,792 2007-08 $0 2008-09 $0 • 2009-10 I $0 2010-11 $0 2011-12 $0. • • 2012-13 I $0 TOTAL $17,934 $104,461 $0 $10,6051 $133,000 OPERATING COSTS First Fiscal Year Annually I I Total Personnel $0 • Supplies $0 . Service 12,000 $12,000 Capital $0 • TOTAL $0 I $12,000 I $12,000 i�i }' ce'S ize'' ..e' IVL.L.Iter..„5 w� 3 132 PROJECT: AS400 ENHANCEMENT PROJECT#:CO0504 FUND: 137-GENERAL GOVERNMENT CIP PROJECT BUDGET: $250,000 PROJECT MANAGER: ROGER EARWOOD FUNDING PROJECT SOURCES: Future Certificates • CLIENT: Information Services of Obligation ($250,000) PROJECT DESCRIPTION/STATUS The AS400 is the computer system that runs several of the City's key operational databases and software. Some of these include Utility Customer Service, Finance, Budget, Fleet Management, and Development Services. An upgrade to the hardware is anticipated every three to four years to ensure that the system is performing at the level of efficiency required for its daily use. The project will provide for the funding to make such changes which will be determined for the particular year of implementation. The current hardware is now referred to as an IBM i5. The old AS/400 was replaced in January of 2005 with 2 IBM i5s. Additional software was also purchased to enable replication of data from one i5 to the other. This ensures data access on the primary machine 24/7 and provides business continuity and disaster recovery for this system in the event that the city needs such. The next upgrade is scheduled for FY 08-09 PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR FISCAL YEAR HARDWARE SOFTWARE CONS/TRAIN OTHER PROJECT TOTAL Prior Years $0 $0 $0 $0 $0 2006-07 $0 2007-08 $0 2008-09 150,000 80,000 10,000 10,000 $250,000 2009-10 $0 2010-11 $0 2011-12 $0 2012-13 $0 TOTAL $150,000 $80,000 $10,000 $10,000 $250,000 OPERATING COSTS First Fiscal Year Annually* Total Personnel $0 Supplies $0 Service FY09 28,000 $28,000 Capital $0 T*T TAL $0 e annual operating cost will increase to$28,000 when the next upgrade is i plemenOted in FY09. $28,000` 42 1"6,, N1111 R.-��{{ the �p 133 • PROJECT: UPS Replacment PROJECT#: C00603 FUND: 137 -General Gov't CIP PROJECT BUDGET: $93,560 PROJECT MANAGER: Jon Schlandt FUNDING PROJECT SOURCES: Equipment Replacement Fund CLIENT: Information Services PROJECT DESCRIPTION/STATUS Replacement of Uninterruptible Power Supply (UPS) units and associated Battery Cabinets supporting the City's telephone, computer network, and radio systems. Recommended replacement schedule of 9 years for UPS units and every 3 years for associated Battery Cabinets. Attached spreadsheet details UPS inventory and replacement schedule. PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR • FISCAL YEAR HardwareO $ Software 0 $ Cons/Training 0 $0 Other . .. PROJECT TOTAL Years. Prior 2006-07 $34,400 $34,400 2007-08 $16,720 $16,720 2008-09 $12,480 $12,480 • 2009-10 $29,960 $29,960 2010-11 $0 2011-12 $0 2012-13 $0 TOTAL . , ...... . $93,560 $0 ., , .. $0 $0 $93,560 OPERATING COSTS . ... First FiscalYear Annually Total • Personnel I $0 Supplies $0 Service $0 Capital $0 TOTAL $0 $0 $0 • *I'KA1 1134) • MAP NOT AVAILABL• 1-{e •'sae 134 ----- --- --- -- - ------- --- PROJECT: PBX(PHONE SYSTEM) REPLACEMENT PROJECT#C00400 FUND: GENERAL GOVERNMENT PROJECT PROJECTS BUDGET: $990,328 PROJECT FUNDING MANAGER: Jon Schlandt SOURCES: General Government CIP/ Equip Replacement Fund PROJECT CLIENT: City-wide PROJECT DESCRIPTION/STATUS This project provides for the scheduled replacement of the city's PBX phone system. As of FY04,the system was 10 years old and had reached the end of its expected service life. In August 2005, a contract was awarded to eLinear Solutions of Houston to implement the new phone system. Cut over to the new system occurred on April 21, 2006. Implementation of the phone project through out the City is complete, with the exception of the PD building. Remaining funds are held in reserve to fund conversion of the old PD phones (analog system)to the new phone system (digital, Voice Over Internet Protocol) Original project budget= $917,000 $46,828 transferred from C00522 in 2005 $26,500 transferred from C00523 in 2005 PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR FISCAL YEAR HARDWARE SOFTWARE CONS/TRAIN OTHER PROJECT TOTAL Prior Years $68,670 $606,826 $69,314 $173,877 $918,689 2006-07 22,108 2,200 12,190 $36,498 2007-08 30,000 5,141 $35,141 2008-09 $0 2009-10 $0 2010-11 $0 2011-12 $0 2012-13 $0 TOTAL $120,778 $609,026 $81,504 $179,0181 $990,328 First Fiscal Year Annually Total Personnel i $0 Supplies $0 Service $34,000 $34,000 Capital $0 TOTAL $0 $34,000 1 $34,000 22> AP NOT AVAILABL 1- , 135 PROJECT: RADIO SYSTEM REPLACEMENT PROJECT#: C00601 FUND: 137-GENERAL GOVERNMENT CIP PROJECT BUDGET: $4,885,000 PROJECT • • MANAGER: Mike Hare • FUNDING PROJECT SOURCES: Equipment Replacement Fund CLIENT: Information Services Certificates of Obligation D PRO -- .... .. .. . . • ... ECT DESCRIPTION/STATUS • The City's 800 MHz radio system was installed in 1996. It was scheduled to begin its replacement in FY07. Project costs are • based on replacing the existing radio system with equivalent features. Public Safety Staff have raised the issue of upgrading the current radio system with a more robust, dynamic system which would improve the current, inadequate coverage in south • • College Station. A RFQ was issued on 9/18/2006 for a consultant to assist in analysis and recommendations for a replacement system.The budget contanis$100,000 for this consultant. Negotiations with the most qualified firm are ongong. The implementation phase of this project cannot begin until the Federally mandated 800 MHz radio rebanding is complete. • $15,000 transferred to Area Wide Communications System(CO 0706)in FY 07 �...._...—_. PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAF FISCAL YEAR HARDWARE SOFTWARE CONS/TRAIN I OTHER PROJECT TOTAL YearsPrior $0 $0 $01 $209 $209 2006-07 100,000 $100,000 • • 2007-08 2,500,000 500,000 1,485,000 299,791 $4,784,791 2008-09 $0 2009-10 $0 2010-11 $0 2011-12 $0 2012-13 $0 TOTAL $2,500,000 $500,000 $1,600,000 $300,000 $4,885,000• • OPERATING COSTS • • First Fiscal Year Annually I Total • Personnel $0 Supplies $0 Service 150000 $150,000. Capital $0 TOTAL $0 $150,000 1 $150,000• 0. • MAP NOT AVA.ILABL h • 136 PROJECT: Wide Area Communications Grant PROJECT#: C00706 FUND: 137-GENERAL GOVERNMENT CIP PROJECT • BUDGET: $78,871 PROJECT • MANAGER: Ben Roper FUNDING PROJECT SOURCES: Certificates of Obligation CLIENT: Information Services PROJECT DESCRIPTION/STATUS These funds will be used for consultant services to develop a conceptual design and apply for a Federal Public Safety grant designed to install a Wide Area Communications System.This project is part of an ILA with City of Bryan, Brazos County, Texas A&M, City of Brenham and Washington County. Each entity will contribute toward the consultant fee and the City of College Station's portion will be$15,000. $15,000 transferred from Radio System Replacement(C00601)in FY07. $63,871 added through FY07 budget amendment. These funds will be reimbursed by the other entities participating . in the grant. PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAF FISCAL YEAR HARDWARE SOFTWARE CONS/TRAIN OTHER PROJECT TOTAL Prior Years $0 $0 $0 $0 $0 2006-07 78,871 $78,871 2007-08 $0 2008-09 $0 • 2009-10 $0 2010-11 $0 2011-12 $0 2012-13 $0 TOTAL $0 $0 $78,8711 $0 $78,871 OPERATING COSTS First Fiscal Year Annually I Total Personnel + $0 Supplies I $0 Service I $0 Capital $p TOTAL $0 $01 $0 49 cis4:" AP NOT AVAILABLF 137 PROJECT: ATM NETWORK REPLACEMENT* PROJECT#: C00522 . "Asynchronous transmission mode FUND: 137 -GENERAL GOVERNMENT CIP PROJECT BUDGET: $453,172 PROJECT . MANAGER: Jon Schlandt FUNDING • SOURCES: Certificates of Obligation PROJECT CLIENT: Information Services PROJECT DESCRIPTION/STATUS The City began construction of a high speed network in 1996 that supports data, communication, and traffic systems. The network system's backbone Asynchronous Transmission Mode (ATM)switching equipment will need to be replaced in FY06. It is anticipated that a faster and more cost effective Gigabit Ethernet switching network will be • installed in FY06 to support existing services as well as provide greater capability to support future communications. Although approved for FY 05 start, project was placed on hold pending completion of the telephone replacement • project. Project is expected to start in 3rd Qtr FY 07 In April 2005, $46,828 was moved from this project to project CO0400 (Phone System)to fund network related upgrades.This transfer reduced the original project budget from$500,000 to$453,172. Original project budget=$500,000 • $46,828 transferred to CO0400 in 2005 PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR . FISCAL YEAR HARDWARE SOFTWARE CONS/TRAIN OTHER PROJECT TOTAL Prior Years $0 $0 $0 $0 $0 2006-07 233,172 70,000 50,000 100,000 $453,172 2007-08 $0 2008-09 $0 2009-10 $0 2010-11 $0 2011-12 $0 2012-13 $0 . TOTAL $233,172 $70,000 $50,000 $100,000 $453,172 OPERATING COSTS First Fiscal Year Annually Total • Personnel $0 • . • Supplies $0 • Service $0 Capital $0 . TOTAL $0 $0 1 $0 � Y Alp . 9-I, Pi t r --.0), \ If' MAP NOT A AIL.ABL , c 3 138 PROJECT: Wireless Infrastructure PROJECT#: C00704 FUND: 137 -General Gov't CIP PROJECT $200,000 BUDGET: PROJECT MANAGER: Jon Schlandt FUNDING Certificates of Obligation SOURCES: PROJECT CLIENT: Information Services PROJECT DESCRIPTION/STAY US This project will allow the use of Wireless Fidelity (WiFi), by city employees in most areas of the city. Antennas of this type were placed on one of three major towers as a part of the Fiber Loop project The other two antennas. In order to adequately cover major areas of the city antennas and repeating devices must be strategically placed throughout the city. This will allow the use of personal digital assistants (PDAs such as Palm Pilots)and notebook PCs by city staff to receive information and enter data in the field. PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR FISCAL YEAR Hardware Software Cons/Training Other PROJECT TOTAL Prior Years $0 $0 $0 $0 $0 2006-07 $0 2007-08 60,000 20,000 15,000 5,000 $100,000 2008-09 60,000 20,000 15,000 5,000 $100,000 2009-10 $0 2010-11 $0 2011-12 $0 2012-13 $0 TOTAL $120,000 $40,000 $30,000 $10,000 $200,000 OPERATING COSTS First Fiscal Year Annually Total Personnel $0 Supplies 5,000 $5,000 Service 5,000 $5,000 Capital 10,000 $10,000 TOTAL $0 $20,000 $20,000 p'Sy 4.- )4 NI R" , L P NOT AVAILA L H, L. 139 S � • • • • • • CITY OF COLLEGE STATION • HEART OF THE RESEARCH VALLEY 140 GENERAL GOVERNMENT- DRAINAGE CAPITAL IMPROVEMENT PROJECTS FISCAL YEAR 2007-2008 THROUGH FISCAL YEAR 2012-2013 141 DRAINAGE UTILITY CAPITAL IMPROVEMENT PROJECTS FISCAL YEAR 2007-2008 THROUGH FISCAL YEAR 2012-2013 PROJECT REVISED PROJECT BUDGET ACTUAL FY06-07 ESTIMATE NUMBER AMOUNT FY 05-06 APPROPRIATIONS FY 06-07 BEGINNING FUND BALANCE: $ 6,628,296 $ 5,409,427 $ 5,409,427 . ADDITIONAL RESOURCES: • UTILITY REVENUES $ 1,159,112 $ 1,186,500 $ 1,200,821 .a INTEREST ON INVESTMENTS 258,976 86,000 200,000 BOND PROCEEDS - - - INTERGOVERNMENTALTRANSFERS - - - INTRAGOVERNMENTALTRANSFERS - - - TRANSFERS OUT - - - OTHER 15,009 - - • SUBTOTAL ADDITIONAL RESOURCES $ 1,433,097 $ 1,272,500 $ 1,400,821 TOTAL RESOURCES AVAILABLE $ 8,061,393 $ 6,681,927 $ 6,810,248 • BEE CREEK(COMBINED) SD9802 $ 3,105,000 966,861 - 1,701,693 BEE CREEK PH.IV&V. SD0001 $ 1,400,000 17,244 - 53,500 • GREENWAYS PROJECTS SD9903 $ 3,640,000 13,457 - 6,554 MINOR DRAINAGE IMPROVEMENTS SD0801 ANNUAL - 100,000 100,000 PEEBLE CREEK DRAINAGE IMP SD0702 $ 50,000 - 50,000 50,000 SC WEST PARK DRAINAGE IMP SD0524 $ 560,000 68,491 - 491,508 SC COLLEGE PARK/BREEZY HEIGHTS SD0601 $ 485,000 18,053 451,400 219,319 WPC(REDMOND TERRACE) SD0520 $ 680,000 1,431 - - STORMWATER MAPPING SD0523 $ 150,000 - - - BEE CREEK-Letter of Map Revision SD0703 $ 82,000 - - 50,000 • WPC DRAINAGE RESTORATION SD0704 $ 210,000 - 100,000 210,000 CLOSED PROJECTS 530,630 CAPITAL PROJECTS SUBTOTAL 1,616,167 701,400 2,882,574 OTHER COSTS 17,757 7,200 7,200 DRAINAGE MAINTENANCE ANNUAL 711,241 834,388 763,380 DRAINAGE SLA's ANNUAL - - - TRANSFERS OUT 49,127 - - GENERAL&ADMIN. 257,674 404,346 404,346 DEBT ISSUANCE COSTS - - - , • TOTAL EXPENDITURES $ 2,651,966 $ 1,947,334 $ 4,057,500 ENDING FUND BALANCE: $ 5,409,427 $ 4,734,593 $ 2,752,748 SC= Project funded through combination of sources. Project sheet reflected in Streets section of CIP document. 142 . DRAINAGE UTILITY CAPITAL IMPROVEMENT PROJECTS FISCAL YEAR 2007-2008 THROUGH FISCAL YEAR 2012-2013 APPROVED FY07-08 PROJECTED PROJECTED PROJECTED PROJECTED PROJECTED PROJECTED ' APPROPRIATIONS FY 07-08 FY 08-09 FY 09-10 FY 10-11 FY 11-12 FY 12-13 $ 2,752,748 $ 2,752,748 $ 1,259,523 $ 556,021 $ 436,821 $ 17,421 $ 38,652 $ 1,236,800 $ 1,236,800 $ 1,273,900 $ 1,312,100 $ 1,351,500 $ 1,392,000 $ 1,433,800 60,000 60,000 29,000 19,000 6,700 1,000 7,000 $ 1,296,800 $ 1,296,800 $ 1,302,900 $ 1,331,100 $ 1,358,200 $ 1,393,000 $ 1,440,800 $ 4,049,548 $ 4,049,548 $ 2,562,423 $ 1,887,121 $ 1,795,021 $ 1,410,421 $ 1,479,452 605,000 750,658 429,000 - - - - - 300,000 300,000 300,000 413,700 - - 200,000 200,000 150,000 - - - - - 247,628 - - - - - - - - - 340,000 338,569 - 50,000 50,000 50,000 50,000 - - - 32,000 - - - - - 855,000 1,580,286 929,000 350,000 753,700 338,569 - 31,325 7,200 7,200 7,200 7,200 7,200 7,200 833,124 740,479 762,700 785,600 809,200 833,500 858,500 - 69,525 32,502 32,500 32,500 32,500 32,500 345,290 392,535 275,000 275,000 175,000 160,000 160,000 $ 2,064,739 $ 2,790,025 $ 2,006,402 $ 1,450,300 $ 1,777,600 $ 1,371,769 $ 1,058,200 $ 1,984,809 $ 1,259,523 $ 556,021 $ 436,821 $ 17,421 $ 38,652 $ 421,252 143 PROJECT: Bee Creek Combined Drainage FUND(S): PROJECT NUMBERS&BUDGET: 239-Wastewater Wastewater: WF0738214 $164,500 912-Drainage Drainage: SD9802 $3,105,000 Total Project Budget: $3,269,500 PROJECT MANAGER: Danielle Charbonnet FUNDING • PROJECT SOURCES: W/WW-URB CLIENT: Public Works Drainage-Drainage Utility • PROJECT DESCRIPTION/STATUS • This project will widen the existing drainage channel of Bee Creek Main Channel from Texas Avenue upstream to Southwest Parkway and Bee Creek Tributary B from its confluence with the Main Channel upstream to Harvey Mitchell Parkway. Sanitary sewer line crossings will be lowered as part of the project. • Construction began April 2006. $605,000 transferred from SD0001 following FY06 Budget Amendment#1 increasing Drainage budget from$2,500,000 to$3,105,000. $8,500 transferred from WW Collection System Rehab in FY07 and$6,000 transferred from Jones Butler Extension in FY07 increasing WW budget from$150,000 to$164,500. • PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR • Project Total FISCAL YEAR LAND ENG. I CONSTR. MISC. OVERHEAD PROJECT TOTAL Prior Years 98,603 161,-i 33 1,191,4 77 1,926 $1,453,139 2006-07 0 10,000 1,784,635. 2,500 19,226 $1,816,361 . 2007-08 0 0 0 0 $0 2008-09 01 0 0 0 $0 2009-10 01 0 0 0 $0 2010-11 0 0 0 0 $0 ' • 2011-12 0 0 0 0 $0 2012-13 0 0 0 0 $0 PROJECT TOTAL $98,6031 $171,133 $2,976,1121 $4,426 $19,226 $3,269,500 J a o,,s �� o• i• '* 1 41 < / a„ z` y,.s°,,' Nam, r�S r2, to ,i,fM y==�=:.: of 4.. ' ° vP. � t —» ' = 7ff ` =. h ;fix � , n 1,- ,< , 4 _' c .r. °^nmiro q�. ��� • NNI'Nj:44)—\e"7\--I \'',:;,'1%4:7,reA''.„,,,, a G3 \ yy4,q C! '�, \ ' >\ 144 --- ---- ---------- PROJECT: Bee Creek Combined Drainage PROJECT CALENDAR OF EXPENDITURES BY FUND Drainage Portion FISCAL YEAR LAND ENG. CONSTR. MISC. OVERHEAD PROJECT TOTAL Prior Years $98,603 $161,133 $1,141,645 $1,926 $1,403,307 2006-07 10,000 1,679,193 2,500 10,000 $1,701,693 • 2007-08 $0 2008-09 $0 2009-10 $0 2010-11 $0 2011-12 $0 2012-13 $0 Drainage Total $98,603 $171,133 $2,820,838 $4,426 $10,000 $3,105,000 Wastewater Portion FISCAL YEAR LAND ENG. CONSTR. MISC. OVERHEAD PROJECT TOTAL Prior Years $0 $0 $49,832 $0 $49,832 2006-07 105,442 9,226 $114,668 2007-08 2008-09 $0 2009-10 $0 2010-11 $0 2011-12 $0 2012-13 _ _ $0 Wastewater Total $0 $0 $155,274 $0 $9,226 $164,500. 'PROJECT TOTAL $98,6031 $171,1331 $2,976,1121 $4,4261 $19,2261 $3,269,5001 OPERATING COSTS First Fiscal Year Annually Total Personnel $0 Supplies $0 Service $0 Capital $0 • TOTAL $0 $0 $0• • 145 I ' PROJECT: Bee Creek IV and V • FUND(S): PROJECT NUMBERS&BUDGET: 238-Water Capital Fund Water: TBD $120,000 • 239-Wastewater Capital Fund Wastewater: TBD $300,000 912-Drainage Utility Fund Drainage: SD0001 $1,400,000 • Total Project Budget: $1,820,000 PROJECT MANAGER: Danielle Charbonnet FUNDING • PROJECT SOURCES: W/WW- URB CLIENT: Public Works Drainage-Drainage Utility PROJECT DESCRIPTION/STATUS Strom drainage improvements to the flow capacity of Bee Creek Tributary"A"including bank stabilization from where Phase improvements ended at Brothers Boulevard to Longmire Drive and continuing to Texas Avenue.Adjustments to sewer and water lines will be made as part of this project. • Project in permitting with the US Army Corps of Engineers. PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR Project Total • FISCAL YEAR LAND ENG. l CONSTR. MISC. I OVERHEAD PROJECT TOTAL • Prior Years 0 165,387 0 1,4551 0 $166,842 2006-07 0 51,500 0 1,000 1,000 $53,500 2007-08 0 33,500 1,086,100 13,858 37,200 $1,170,658 2008-09 0 0 422,000 0 7,000 $429,000 2009-10 0 0 0 0 0 $0 2010-11 0 0 0 0 0 $0 2011-12 0 01 0 0 0 $0. 2012-13 0 01 0 0 0 $0 PROJECT TOTAL $0 $250,3871 $1,508,100 $16,3131 $45,200 $1,820,000 asp.--------.,_ Or 41k, Y �`'—co,nn, 6,3Vie /AI \ W:f ; 90. f��..., �O "�A _ (.j .{lawk Tr.Or" t1J 3'� uJJ��C f r' lI /A\ 2 BeeCre¢kG anneiP asezO dV� 'y ar I i u.,gko y1 4 I 146 ----- ------------- ------- PROJECT: Bee Creek IV and V PROJECT CALENDAR OF EXPENDITURES BY FUND Water Portion FISCAL YEAR LAND ENG. CONSTR. MISC. OVERHEAD PROJECT TOTAL Prior Years $0 $0 $0 $0 $0 2006-07 2007-08 110,300 9,700 $120,000 2008-09 $0 2009-10 $0 2010-11 $0 2011-12 $0 2012-13 Water Total $0 $0 $110,300 $9,700 $0 $120,000 Wastewater Portion FISCAL YEAR LAND ENG. CONSTR. MISC. OVERHEAD PROJECT TOTAL Prior Years $0 $0 $0 $0 $0 2006-07 $0 2007-08 275,800 24200 $300,000 2008-09 2009-10 $0 2010-11 $0 2011-12 $0 2012-13 Wastewater Total $0 $0 $275,800 $0 $24,200 $300,000 a Drainage Portion FISCAL YEAR LAND ENG. CONSTR. MISC. OVERHEAD PROJECT TOTAL Prior Years $0 $165,387 $0 $1,455 $166,842 2006-07 51,500 1,000 1,000 $53,500 2007-08 33,500 700,000 4,158 13,000 $750,658 2008-09 422,000 7,000 $429,000 2009-10 $0 2010-11 $0 2011-12 $0 2012-13 Dr ainage Drama9 e Total $0 $250,387 $1,122,000 $6,613 $21,000 $1,400,000 (PROJECT TOTAL I $01 $250,3871 $1,508,1001 $16,3131 $45,2001 $1,820,0001 OPERATING COSTS First Fiscal Year Annually Total Personnel $0 Supplies I $0 Service i $0 Capital $0 TOTAL $0 $0 1 $0 147 PROJECT: GREENWAYS PROJECTS PROJECT#: SD9903 FUND: 912 - DRAINAGE UTILITY FUND PROJECT BUDGET: $3,640,000 • PROJECT FUNDING MANAGER: Greenways Coordinator SOURCES: General Obligation Bonds • PROJECT • CLIENT: Parks and Recreation PROJECT DESCRIPTION/STATUS This project serves to hold funds for new greenways projects.• Original budget was$3,640,000.,000. ' $1,194,124 of Greenways funds were spent on the City Center land purchase. Greenways program administration transferred to the Parks & Recreation Department. PARD will submit project sheet. PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR FISCAL YEAR LAND I ENG. CONSTR. MISC. ( PROJECT TOTAL : Prior Years $2,263,051 $55,957 0 $737 $2,319,746: 2006-07 6,554 $6,554 • • 2007-08 300,000 $300,000 2008-09 300,000 I I $300,000 2009-10 300,000 I I I $300,000: 2010-11 413,700 I $413,700. 2011-12 I I $0 2012-13 I I I $0. TOTAL $3,576,751 $55,957 $01 $7,2921 $3,640,000 OPERATING COSTS First Fiscal I Year ....... .. .... . Annually I .. Total Personnel $0 Supplies I Service ' $0 $0 • • Capital 1 $0 TOTAL $01 $0 $0.......... .....I ......... ......._ ... __......... ..,...... ,.... ,,. ..,. , • • �d v tip; ~ 44. cf tf }� MAP NOT ANT`.a ILABL K L4. 14o PROJECT: FY08 MINOR DRAINAGE PROJECT#: SD0801 IMPROVEMENTS PROJECT FUND: 912 - DRAINAGE FUND BUDGET: ANNUAL PROJECT FUNDING MANAGER: Gary Balmain SOURCES: DRAINAGE UTILITY FUND PROJECT CLIENT: Public Works PROJECT DESCRIPTION/STATUS.... Funds budgeted on an annual bas is as available for minor drainage improvements throughout the City. In FY07, $50,000 was transferred from the original FY07 appropriation of$250,000 to fund SD0702- Pebble Creek Drainage Improvements. $100,000 was then transferred to SD0704 -WPC Restoration, leaving a FY07 balance of$100,000. PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR FISCAL YEAR LAND . ENG. CONSTR. MISC. PROJECT TOTAL Prior Years $0 $0 $0 $0 $0 2006-07 100,000 $100,000 2007-08 200,000 $200,000 2008-09 150,000 $150,000 ' 2009-10 $0 2010-11 $0 2011-12 $0 2012-13 $0 TOTAL $0 $0 $450,000 $0 $450,000 OPERATING COSTS First Fiscal Year Annually Total Personnel $0 Supplies $0 Service $0 ' Capital $0 TOTAL $0 $0 , ._ iev,c4i: .i. .4 ,tCV, I de IIAP TOT AVAILABLK ,� c 149 PROJECT: PEBBLE CREEK DRAINAGE IMPR PROJECT#: SD0702 FUND: 912 -DRAINAGE FUND PROJECT BUDGET: $50,000 PROJECT FUNDING MANAGER: Mark Smith SOURCES: DRAINAGE UTILITY • FUND PROJECT CLIENT: PARD & CSISD PROJECT DESCRIPTION/STATUS On 1/11/07, Council approved an ILA the Cityof College Station and the College g 9... . : � . betweene Station Independent School District for the construction of drainage improvements to Pebble Creek Park. The cost of the project is anticipated to be $89,000 and will be shared equally between the two entities. The City of College Station's portion of the project is not to exceed $50,000. $50,000 transferred from SD0701 - FY07 PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR.,..,.......... ,,..,...,. • • FISCAL YEAR LAND ENG. CONSTR. MISC. PROJECT TOTAL Prior Years $0 $0 $0 $0 $0 2006-07 50,000 $50,000 2007-08 $0 2008-09 $0 2009-10 $0 • 2010-11 $0. 2011-12 $0 • 2012-13 I $0 TOTAL ..... ...... $0 $0 $50,000 $0 ... $50,000 ._.__._.._.. .•...• OPERATING COSTS • First Fiscal Year Annually Total • Personnel $0 • Supplies $0 Service $0 • I _.. l $0 p $0 $$0. TOTAL $0 6.+ "NLAT"`LA. NOT T AV IL.ABL h. 150 - - -- - --- PROJECT: WOLF PEN CREEK REDMOND PROJECT#: SD0520 TERRACE FUND: 912 - DRAINAGE FUND PROJECT BUDGET: $680,000 PROJECT FUNDING MANAGER: CRAIG JORDAN SOURCES: DRAINAGE UTILITY FUND PROJECT CLIENT: Public Works PROJECT DESCRIPTION/STATUS Stream restoration to Wolf Pen Creek between George Bush and Texas Avenue. The improvements will reduce flooding and erosion and will improve water quality. This project was put on hold March of 2006 until further notice. PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR FISCAL YEAR LAND ENG. CONSTR. MISC. OVERHEAD PROJECT TOTAL Prior Years $0 $1,431 $0 $0 $0 $1,431 2006-07 $0 2007-08 $0 2008-09 $0 2009-10 $0 2010-11 $334,500 $5,500 $340,000 2011-12 $333,000 $5,569 $338,569 2012-13 $0 TOTAL $0 $668,932 $0 $0 $11,069 $680,000 OP=RATING COSTS.... First Fiscal Year Annually Total Personnel $0 Supplies $0 Service $0 Capital I $0 TOTAL, . ....... 1 _ T •c- "tw' e*Oe �y e�Jy f DLO 0 ' c' 6 'q e �� Lam.} b 0®� 4\ L�n s }- a. s A a ° �di6 "f o c t� °sue '4/ < ......v.", \C"A,,,,. 0 j? yy y° No1f R in \ ,,..-. J 46 .Pats ��� 0 os'F 9�/ ate. .y4g9 �/ N• o\low St 151 • PROJECT: STORMWATER MAPPING PROJECT#: SD0523 FUND: 912 - DRAINAGE FUND PROJECT BUDGET: $150,000 PROJECT FUNDING • MANAGER: MARK SMITH SOURCES: DRAINAGE UTILITY FUND PROJECT Public Works • . CLIENT: .4 PROJECT DESCRIPTION/STATUS Parent Project Mapping of College Station stormwater infrastructure. $50,000 transfer to SD0703 Bee Creek- LOMR in March 2007 Original Budget 200,000 PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR • FISCAL YEAR LAND ENG. CONSTR. MISC. PROJECT TOTAL Prior Years $0 $0 $0 $0 $0 2006-07 0 $0 • 2007-08 50,000 $50,000 2008-09 50,000 $50,000 2009-10 I I 50,000 $50,000 2010-11 I I I $0.•.- 2011-12 j I I $0 2012-13 I I I $0. • TOTAL $01 $150,000 $0 $01 $150,000 OPERATING COSTS • First Fiscal Year I Annually Total Personnel I $0 Supplies $0. Service $0 Capital $0 TOTAL $0 $0 $0 •. . • 6' if" 4 1 • '''' 1, za• .', ' ' ' . °' , 's-4`,„ :z- • kF: 9 • ,„,,,jr.p..., .... MAP NOT AVAILABLF ,.. • 1.7 .;.. . . 152 PROJECT: BEE CREEK - Letter of Map Revision PROJECT#: SD0703 (LOMR) FUND: 912 -DRAINAGE FUND PROJECT BUDGET: $82,000 PROJECT FUNDING MANAGER: DANIELLE CHARBONNET SOURCES: DRAINAGE UTILITY FUND PROJECT CLIENT: Public Works PROJECT DESCRIPTION/STATUS To obtain a Letter of Map Revision (LOMR)from FEMA for the Bee Creek Combined Channel Improvements Project area and extending downstream to its confluence with Carter's Creek. $50,000 transferred from SD0523 - FY07 $21,000 transferred from SD0204- FY07 $11,000 transferred from SD0301 - FY07 PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR FISCAL YEAR LAND ENG. CONSTR. MISC. OVERHEAD PROJECT TOTAL Prior Years $0 $0 0 $0 $0 2006-07 40,000 5,000 5,000 $50,000 2007-08 27,000 3,000 2,000 $32,000 2008-09 $0 2009-10 $0 2010-11 $0 2011-12 $0 2012-13 $0 TOTAL $0 $67,000 $0 $8,000 $7,000 $82,000 OPERATING COSTS First Fiscal Year Annually Total Personnel $0 Supplies $0 Service $0 Capital $0 TOTAL $0 $0 $0 E4 r1 153 _ ...._......_ ...._ _ PROJECT: WPC Drainage Restoration PROJECT#: SD0704 ' FUND: Fund 912 - Drainage PROJECT BUDGET: $210,000 • PROJECT FUNDING MANAGER: Gary Balmain SOURCES: Drainage Fund PROJECT CLIENT: PARD PROJECT DESCRIPTION/STATUS — -- $110,000 transferred from SD0301 to fund repair to city infrastructure due to storm damage. $100,000 additional transferred from SD0701 - Minor Drainage Improvments PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR FISCAL YEAR LAND ENG. CONSTR. MISC. PROJECT TOTAL Prior Years $0. 2006-07 210,000 $210,000 • 2007-08 $0 . . 2008-09 $0 2009-10 $0 2010-11 $0 2011-12 $0 2012-13 $0 TOTAL $0 $0 $210,000 $0 $210,000 OPERATING COSTS First Fiscal Year Annually Total Personnel $0 Supplies $0 Service $0 Capital $0 TOTAL $0 $0 1 $0 , c--;,' ,',< \ •.f.. "" q- •..„://,,, ,:',•..7'..,!-„, '.4\ ;,• / ''- ty .-- , .,,, 2 • ‘:g..‘,- ,,,- ,,'\*. ';' //,- nik, • ,.... '41";8• *4... ,I.?'" ' `. —Cs-st. - .sY linv ' / .... \\'':!';:' ..X‘ S o, 1 ,,It"'c -A, • /'--c;,, \ ,,-. \''‘'''''',1•,- N,., ,,-----/ „ Ls' • ....`;" .g".4:- 5Z.' rs,,,\';`,..\';1?,-,r,..2,,, / . ';.. '‘ft'''''•• 'S>.' •'%''t.''' N:"// i4''''' ''‹ *.. ,,,e '\---- , fi,,,->;7f:<,4-9 ,( , ' Y •"' '-',-, '''''' ''` <"'"''''''</ • 154 SPECIAL REVENUE - PARKLAND DEDICATION CAPITAL IMPROVEMENT PROJECTS FISCAL YEAR 2007-2008 THROUGH FISCAL YEAR 2012-2013 155 GENERAL GOVERNMENT PARKLAND DEDICATION CAPITAL IMPROVEMENT PROJECTS FISCAL YEAR 2007-2008 THROUGH FISCAL YEAR 2012-2013 PROJECT REVISED FY 06-07 PROJECT BUDGET ACTUAL FY 06-07 BUDGET YEAR-END NUMBER AMOUNT FY 05-06 APPROPRIATIONS ESTIMATE • BEGINNING FUND BALANCE: $ 1,165,401 S 1,465,681 $ 1,465,681 ADDITIONAL RESOURCES: . CONTRIBUTIONS S 367,383 S 290,000 S 290,000 INVESTMENT EARNINGS 57,947 29,000 37,000 • INTRAGOVERNMENTAL TRANSFERS _ OTIIER . SUBTOTAL ADDITIONAL RESOURCES $ 425,330 S 319,000 $ 327,000 TOTAL RESOURCES AVAILABLE $ 1,590,731 $ 1,784,681 $ 1,792,681 PARKLAND DEDICATION FUND ZONE 1 PARK PK0051 3,947 _ - NG(SPRUCE ST)LAND PURCHASE PK0727 261,107 - 261,107 261,107 ZONE 2 PARK PK0052 (I8,975) 87,552 PC UNIVERSITY PARK PK04I0 115,837 , ZONE 3 PARK PK0053 1,390 (2,020) 82,290 WPC DISC GOLF COURSE PK0617 7,000 • - 1,000 7,000 CENTRAL PARK POND IMP/DISC GOLF PK0805 61,000 _ - - . . , ZONE 4 PARK PK0054 32,033 - ZONE 5 PARK PK0055 2,522 ' ' ZONE 6 PARK PK0056 1,878 - 95,000 SOUTHWEST PARK DEVELOPMENT PK0806 202,761 - - • ' ZONE 7 PARK PK0057 8,980 - - JO1IN CROMPTON PARK PHASE II PK0712 263,000 263,000 263,000 - ZONE 8 PARK PK0058 - - 1,000 • • EMERALD FOREST PARK IMP. PK0713 45,699 41,000 45,699 ZONE 9 PARK PK0059 2,766 - - PC WOODLAND HILLS PARK DEV. . PK0714 34,000 - 34,000 ZONE 10 PARK PK0060 125,574 - _ - EDELWEISS GARTENS PK0613 366,000 1,565 364,000 ZONE 11 PARK PK0061 2,819 _ - - • ZONE I2PARK TBD ' COVE OF NANTUCKET PARK PK0716 47,500 - 47,500 47,500 ZONE 131'ARK PK0807 617 - _ _ • ZONE 14 PARK PK07I7 74,510 - 47,000 ZONE 15 PARK PK0808 18,909 - ZONE 16PARK TBD - _ - CLOSED PROJECTS 144,480 82,927 124,403 • CAPITAL PROJECTS SUBTOTAL $ 125,050 $ 1,407,376 $ 748,709 TRANSFER PROJECT • GENERAL&ADMIN.CI IARGES - 7,220 7,220 TOTAL EXPENDITURES S 125,050 S 1,414,596 S 755,929 ENDING FUND BALANCE: S 1,465,681 S 370,085 S 1,036,752 PC= Project funded through combination of sources.Project sheet reflected in Parks section of CI document. 156 GENERAL GOVERNMENT PARKLAND DEDICATION CAPITAL IMPROVEMENT PROJECTS FISCAL YEAR 2007-2008 THROUGH FISCAL YEAR 2012-2013 APPROVED FY 07-08 PROJECTED PROJECTED PROJECTED PROJECTED PROJECTED PROJECTED • APPROPRIATIONS FY 07-08 FY 08-09 FY 09-10 FY 10-11 FY 11-12 FY 12-13 $ 1,036,752 S 1,036,752 S 271,354 $ 575,354 S 593,354 $ 612,354 $ 631,354 $ 290,000 $ 290,000 $ 290,000 S - $ - $ - S - 20,000 20,000 14,000 18,000 19,000 19,000 20,000 . S 310,000 $ 310,000 $ 304,000 S I8,000 $ I9,000 $ 19,000 $ 20,000 S 1,346,752 $ 1,346,752 $ 575,354 $ 593,354 S 612,354 $ 631,354 $ 651,354 3,947 3,947, - - - - 115,837 115,837 __,- -_ - - - 1,390 1,390 _ - 61,000 . 61,000. - - - - - 32,033 32,033 - - _ _ _ - 2,522 2,522" . 1,878 1,878 - - - - 202,761 202,761 - 8,980 8,980 - - - 2,766 2,766 - - - " 34,000 34,000 125,574 125,574 - - - - -• 364,435_. 2,819 2,819 - - - - - ' 617 . . 617 - • - - - 74,510 74,510 - - - - - 18,909 18,909 S 689,543 S 1,053,978 $ - S - $ - $ - S - ' 21,420 2I,420 - - - - $ 710,963 S 1,075,398 $ - $ - $ - $ - $ - $ 635,789 S 271,354 $ 575,354 S 593,354 $ 612,354 S 631,354 $ 651,354 157 • • Parkland Dedication Zones 1 -• • • • 16 • J,t 'vk»ti, -�ya • ., * ^, • s:Y'Y T F 4) {` a :'....:/ Qa .;(� �t,3`aA IY'v` P. 8' +�� ;,C E \v �.E!, S >�:titE , ..its' €1 .ems.. ..�.. ...t:,, ;ER 1f4 Y.�S;;}}`:). :;i{t r €a,.�•'' :� '�t'! „,fE,3t•=€teat , .,., .... .... .t YJ:•:.,;. °&€::?�,s:.,i'";a:.€;r.x.t ty.,n£;. s:isizsrkl�i:'�,E,..,.:�:��Ir;c,,;\>j.". ,..:. • . T. .„ ... .,..<.,..:,. ,., �j...a It;„lt.,;;€i iiya,3ii'a�� ,a�,a�' � „, is t:?i:^d=..,'! '.'r' z .. 158 PROJECT: ZONE 1 PARK PROJECT#: PK0051 FUND: 171 -Zone 1 Parkland PROJECT BUDGET: $3,947 ' PROJECT , MANAGER: RIC PLOEGER FUNDING SOURCES: Zone 1 Parkland Dedication PROJECT Funds CLIENT: Parks and Recreation PROJECT DESCRIPTION/STATUS In accordance with the Parkland Dedication Ordinance, these funds have been set aside for park improvement and renovation projects as identified in Park Zone 1. These Park Land Dedication funds are intended for a Northgate Park and will be used for land acquisition of property on Spruce Street. PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR FISCAL YEAR LAND ENG. CONSTR. MISC. PROJECT TOTAL Prior Years $0 $0 $0 $0 $0 2006-07 $0 2007-08 3,947 $3,947 2008-09 • $0 2009-10 $0 . 2010-11 $0 2011-12 I I. $0 2012-13 I $0 TOTAL.... $3,947 $0 $0 $01 I $3,947 OPERATING COSTS First Fiscal Year Annually I Total Personnel $0 Supplies $0 Service I • $0 Capital I $0 TOTAL $0 $01 $0 <r:„x;' �I%,:<<Sr'f yyt:�;:rt e V z'v�i' 'kx§'s ; u:'t::., ,F rz�}2,,r 0' .. \ 1, ,_„ 4 ' a^!:',, Y1 tir L':',�„niFts, :i"y",;i; or,t. ,,,; ` ''7` ? \ • l„i!; `«^.;;f a ;lfii ,3`.i�8,\ s•:al.;r;;t!Ei",.�1:if ;,''ji s`: ,,tr "�,' '40 \c l ktv-w ,.'VM:4'1:_.:.C:.;'ti g },:.-W f Wiii 1�,'"�':,ji;�!!&i:s41.::`v!:a ,P ',, l`, 'm, Lit:l�;.;`;:a;'st>`;;iii: .,�;3„`},y;r�:-4t;�. „73;.�':€•:.=;,3i:,{ : �� �� ,fie, rF�" c0`4 '=;lil�Y;i:.t:,:"i" .i3S°.l r�.'�,`y;,."i9::V f;7;1,?.:,..�.Yyl�.,.:,,, 'aoo • u o g,t �%a�i:' 'I'_.'' ?1 1 1 F: :,2 �34.^;ei'' y % 3 \1 /�'- j' \l 159 ' ' PROJECT: NmdhQoto (Spruce Street) Land Purchase PROJECT PK0727 ' ` FUND: 1T1 -Zone 1Parkland PROJECT . BUDGET: $261.107 ' . pR0JECT � MANAGER: RICPL0EGER FUNDING SOURCES: Zone poMb|and Dedication ' PROJECT Funds � . ` -CLIENT: Parks and Recreation PR�JF��[���CR|PT���STATUG with-- the Parkland Dedication Ordinance, these funds have been set aside for park improvement and renovation projects as identified in Park Zone 1. These Park Land Dedication funds are intended for a Northgate Park and will be used for land acquisition of property on Spruce Street. '------ - PROJECT CALENDAR OF EXPENDITURES BY FISCAL ' -------------- ' FISCAL ' - YEAR - ' ------ LAND ENG. - CONSTR. KA|SC- - - '--- PROJECT TOTAL Prior Years $O $U $O $O $0� 2008'07 261.187 0 0 0 $261.107 2007'08 $0 2008'00 $0 _ ~ � 2000'10 � $0 2010'11 $0- ' 2Ol1'12 $0 ` 2012'13 $0- ' TOTAL $261.107 $O $8 $O $201'107 ------~---.----^ -- --- ' __-________- '' .-- OPERATING COSTS -------------First - Fiscal Year - Annually Total . :Personnel ' �OW ' Su�d�o . 500 750 750 �1 Service . ` Capital $0 ' TOTAL $750____ $750 _ $1,500: ' ' ' 4L A MR 4 ` / / -� ` . . qu 160 ' PROJECT: ZONE 2 PARK PROJECT#: PK0052 ' FUND: 172 -Zone 2 Parkland PROJECT • BUDGET: $0 PROJECT MANAGER: RIC PLOEGER FUNDING SOURCES: Zone 2 Parkland Dedication PROJECT Funds CLIENT: Parks and Recreation PROJECT DESCRIPTION/STATUS In accordance with the Parkland Dedication Ordinance,these funds have been set aside for park . improvement and renovation projects as identified in Park Zone 2. PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR FISCAL YEAR LAND ENG. CONSTR. MISC. , PROJECT TOTAL Prior Years $0 $0 $0 $0 $0 2006-07 $0 2007-08 $0 2008-09 $0 2009-10 $0 • 2010-11 I I I I $0 2011-12 I I I I I $0 2012-13 I I I I I I $0 TOTAL I $0I $01 $0I $0I I $0 OPERATING COSTS First Fiscal Year I Annually I Total Personnel $0 Supplies $0 Service $0 Capital $0 TOTAL $01 $oI $0 VE RA "F? K:&+Ali.. flit,5 gg t�tt�:t3�.a� `L +:f!ii ky E',!,'—,,M�:v: r�ris er t;,,,,fh i ,1 yg0 r^�3i: uy:aW `<.',' it�ts=,, ;":f ?7 BILLIE M lY VARK ./ 'ri;g:,•'1,,,i rz, • Art:'� ,iDe �...,;11`t:,cw`�. .,,,,uy, M i�::e,;s ;,X;.� ,:,;�`�. 7.lON +sr .r.. ,f I,,�i``+�2 ".�., ,.3. ;;�;i;+is'� ''3[1,�,�ti;.il44'rp'k.:::.�r F�3:,:• :1`� �'P�' �, •AAER -`'S'°_,}.�; '; ;:n i i:ttk'i.5;[:':e ts,"t:i,;'?:`:W:*a„;t+I:.I._ S',;: >i t�; y.PqR c4 �` `,�y��'c'� �$1' /'S: �'G,I.z. :.e: a a,.� :F4s�i. ..1, r�"-`. „r<:`L' _. ON`'���,,_;,; .:�#;,,!'ii;Y= ,.+ pqR V�!{Y P� K. ,�fw;t:. ��:t•x12t;�t ;;5i'`'=&:1°' M!bin�'h"r: ?rues,c-r4";f;i: f 4�y. '\ h> WI :.'tiF:.,, ,:,�4,..rav, gis."..`M.�r'�t�3a�=,'&sE�. ..t i`. 2�t� FA . '"o, '��_ �,9 r:,,,�,,::.. +``l;"`.i:ti%,,, :.v3:Sli.,.ls;!;r;'at'Z' .s;t' ,w s,.�"v:=,ra..?,;iij-.1! -'d E.,. ;:�;`'x;-.;$ f+�� ;Y=#3a;.,r i1.t;,:+$ °s}, c �c a,,, �,� l :�i:,,���=?@`y' i':E;;;.5`�` „�^s:,�.:,,:!''Ttiu. ;��.�a'. ��., '� ,�:`;.,. ;ry�:is�,tlt1+� .A. ; I .•ter a?�,s.r`R;>:t,:: - 'e�» EA I A au:•"''.k,:.,:-;; ,tit;i .�,,',ac:z#.::,., +; ,.,.,t;:lf• :ti::P;r,'.'.::rfi>' :.c n SPA / ,;.t ^t.-;;!i y,i E�,r, 155�.,.x.F,r:�'."r 4.,ix ��i"' 'ti ,� p � t:•iiiii;3'!%�.+- ;;,t_.�:;,; F / tµ.., _,{�t , t... tY� o �1�4'I 4'iY f � / +,i";,I ki,a$ram;` 'l' F,' >:,.. `�'' 4 ' ac" `� �'fi:: `:;t<`n:ii';v. ., =�%.x:i'..r';,Ii i ".',,cs':•R.r c��i�:.:,::='Y ,;.; a �;r`:<;A;:.:: 2.-" , ,,r:,x,,;uu.:£ak64''.i '��,+<i* :::,..::tS:ztY.. ',;kk: . ,''�^t . ,.,:. 161 • . .. • . . . • ' • . . PROJECT: ZONE 3 PARK PROJECT#: PK0053 •. . FUND: 173 -Zone 3 Parkland PROJECT BUDGET: $1,390 PROJECT • • MANAGER: RIC PLOEGER FUNDING SOURCES: Zone 3 Parkland Dedication • " ..... .• : .,. • •, PROJECT Funds . • .CLIENT: Parks and Recreation . .... • PROJECT DESCRIPTION/STATUS . • In accordance with the Parkland Dedication Ordinance, these funds have been set SetaSiele for park . . . • •. . . , . improvement and renovation projects as identified in Park Zone 3. • - . . ...... ..... ... . ...... •. • . .....: . • . . . . PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR ENG. CONSTR. MISC. • . •.. . • - FISCAL YEAR LAND PROJECT'TOTAL $0 . , Prior Years $0 $0 $0 $0 . . . • • 2006-07 $0 $1,390 2008-09 ..., .J: .... 1,390 2007-08 $0 ... ., .\.:. ' $0 2009-10 I .., , 2010-11 I I I I I $0 2011-12 I I I I $0 2012-13 $0 • I I I TOTAL 1 $0 $0 $1,3901 $01 $1,390 .....'. . OPERATING COSTS • First Fiscal Year Total Annually 1 • ...,. : - • $0 Personnel I . . . .• • Supplies I I so I $0 . . $ • • Service I 0 •• . • ' Capital I J____ . . - .TOTAL I $01 $o' $o . ,. . .....„..,.,...,,,„ ' ' Ri<Ng•-•,;:ai:;.,i7•••,.n*4-!,,ig •-,•-•-:',..,-.••• ••:••!;•i.!:','.;:4'i:•.!ilil- W.1--•••,1•' -, -4,r.,:•-,:.,,,,!••••!•-•,•%,,,,:,-,•., . . . . . . ...„... ,. „k........, 4 4 ';'h;,;„, "!1?. '‘:''''''';: '''le:'''i:97'7':\/.. .\ e‹. '• tgefiRik,fki-::,?gil4gillibiiiii!14 • - • • 4':PA'' * i5't'liks';:•:',..,,7,,,,, .°t10:3,41.-.. Tc- '.'4411,11'. \.''')44i'AZ,V-11•Mi0.4g-t''' • • • 4124N ' Wiall'1;:1,0,, V • A.0' NNO-A5PIA . lilei.tAi4g,i .1.M.,q ,,:e PINgAntit:.N4L/4'''''•y/ .4tr ' PAX , . . . . ,f,(0'. ,,,=0,4.47.44i&WIE.;144g Ailf.4;:i6''' i.,!A'i4i•f4Ai.,;?0Pe / '" ,,> -;" ' -..1,?'Jy, 5\WOR-::::4i-;'!?tW.1!:,Z;:' "‘"/-.. • . • tIrglItit4agggeitIOVAN i'• :N1.>'1,4111.'4''''''''''''''-'-"':-.f: ,," •- • l'i:ntallAilaligitr'.4' !!!!!!i';':=,•,:;;!":i';i!iJi!p :-i-`.%,..T,,.. ,44tE PARK • i! ''''k&PE.1-IDA-/ • . . . . ',1i1N3t1.0}1W1.:QreicA-1,.;g!i0'ili!ia ',;:„:•844;),,f .,....'1,4i'4..4>N4611V1;:::,;?.'iMit:406i2;„': ,,, ,', ;IN70 ;',$ • • • ,•',4iI . 443ili:,•'40 . .. '''''':ZMi*OZI °(4.0';•'' ' WAlfdt;•!'%,.RM16104'.' •to:VT,:,Wf•!::•'.'ir' ' MIRE P •'04Vt'".:'!''''ii,40 "'''''''''''4•. !:'1,;',i * l'§'''.4W4,10,0ZrtnV,i,V., ;ii,:=,:,g'.4.,,:c.,W,ti.::;,,,,,:i., ;,,,. ,1,-; 1?,,p,,,,,,:,,,,,i i,,y,,, • • 162 . .• . • - PROJECT: WOLF PEN CREEK DISC GOLF COURSE PROJECT#: PK0617 FUND: 173 -Zone 3 Parkland PROJECT BUDGET: $7,000 PROJECT MANAGER: PETE VANECEK FUNDING ' SOURCES: Zone 3 Parkland Dedication PROJECT Funds CLIENT: Parks and Recreation PROJECT DESCRIPTION/STATUS The project is for the design of a 9-hole disc golf course, purchase of equipment and signage to be installed. The design is complete and the equipment has been purchased. Installation will be completed in the spring of 2007. PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR . FISCAL YEAR LAND ENG. CONSTR. MISC. PROJECT TOTAL Prior Years $0 $0 $0 $0 $0 • 2006-07 2,000 5,000 $7,000 2007-08 $0 2008-09 $0 2009-10 $0 2010-11 $0 2011-12 $0 2012-13 $0 TOTAL $0 $2,000 $5,000 $0 $7,000 ' OPERATING COSTS First Fiscal Year Annually Total Personnel $0 Supplies $0 Service $0 Capital $0 TOTAL $0 $0 $0 a. ;;^ ,°! eah :^�riiAlil". ,:y is o�1i�'?' :"\.r.L"'%Xf;�,�l+e.e. "'``ti'.s y +' ??i'` O'^, t;:I.;,;s:".Ft.c;":1'i t:tr•^:.�5•,", �5;�..; �%F;ge3`w\;� /' Y,.?.: <�;t,,is :<. ` r fs �„?<t:?:.` - Wier :ss "t`..`°'. iP.<:fie;i '=g3s;r;�=0 �.. 'LWc... .,,fib, o=tiy.."tt.A.. T,;. C:y. ;;x ^I :i:::.''J Via,.:;'' �.'.�.,=uii.� .;,l;�ti'3,'� r:z � task, .,..-, \ s. n h' .::j�:;" R��= 4 Hoy k6ii,i': ? !,;::%'?';:,:�, ::; .&�` 1 '„Ni,:s:.:;;,; Vie',',,:,.r, .,=,t�.�..,., `"`" "in r:�. ,inti?: 'e'� �'`� F P P RK };t"16i��:"S``,e; ,.,..t„'.e.::'";itj;> t.�ir>'''''ir:' ;t ,.��?;r',= '=: ;-i, - / c. ,,�yJ�av y°',-t`-.t,..4 1 �:v;?.'. n,":�'=itt +/ C€€� Wig ?br� .O S�T.'4„:...:.;4' >,;+.i;;'�'=\'.'t,:` ✓v6 u'i •.^' ,t: ids;�.+ .;^�.;:,laia'�'. J^ ::5��.:...,,.fS.. .z,}�i�i,�a�. . "' ,z..ro-z,., tt +x.r.,.,« ,:E;N;�v.'s:. 4t, ..i..�:�.i .t. - ky n"j b�tti Y:i`?'.`YJ;` .,M.t�'.i.,Y."r r�:.,;... ,�:h�;.:.. ,441,e. _ ;rr}.,E.6 ,r ;"A,:l:.iF ct.�t=, "`i_t '�. s-7 3'� ,ifik i i,::=tt�=';o.. , 4 ,A e..2. � .aF x s. "CE, :a::: ':,G:. 4 x.16,.'rv ..:,..,�•..,.,.t..,sb�:.,.fi'.•=:s-..�. .<i?+ � 9.'3"t�iki�`�i =sa.., '/ �Ob `�; _�, ..: e.. , .,>;:.,t..,nv.,'„t,.':n,`s..:t.;i' ,'a':.„=:F k=r..l''' ;;?�.iti,� ?•3: 'S;udt��9ts'`.r'.`"1„':j;:, �... :4.sa.�,.e.,?..._, ;.,:>;4...b:vs.,s .€:,{. \�ett `.g\ ...�rt.n �:;w�;,,o ?...,,:��..,.. ...,., �,,,..,n,.:,,r,..:,'.x::�..,.:.: _...x+�.,,t..�..r .,e.L's 4 i[��sr 6s�:::.+5 hs' — i3�vss//�x .,:.j .;. 2•= ,{� t r�a v. , , ..;,r_,:eh v.s..:f.,t,=.,.,-�n:' �v$;i;-...t:v'+•'..-� '✓Y2:+;J.::»T:i.. ''-'4,a •=;Sr'.'. - ;l.h <;„t '::+ -;;;,';5,,•, dentlat°ncDa :.,a,..,�-,.,Ui�i�?o;,;=',F.if.:is: ':ti" ;::3'�" ,.'c°,t,: ''it. PARK �y /{y,t,I C,.;.+:i:,'�:lit :f``}+.hi t .}s+?t:'.`'.�2y^.:;:,;,?;Y'ti:IT i`it: ,:iiilN tat:'1 .,)Q 4, ,a , .3 ,R K c �RE7Ut�t' -''r `t; to T::i<:.:: r,w .::'� �rs�=.' if`. �x},t€€, ��;; .ne,,, E.,:hiia�i.... ,' i,.a\\,: RF� v}i>J�`..s.'t:'u=�s7" iaf.;;,s::��=-'¢,t.., )3 �':$':;'�'s,;'.iiiY;:':.�'�':r y,� g.g:'t,a^z:a, ...t4t�0 'rf':l.,:a'7{:��..J.-.3.t yt,:;:?.:i v ,,„���3.9/�'t,.'• �t.�:�....,}�f;`;:f+��\..it<S� n t ?:'.tiii ��i,�t„?.�;.jEi:tt..tO li .41M', rc{t- _ a it+`fs�v R''t+ti;?.,`fr?,., °G: t;kiirit}.,.,.t O yid'.\:?'r`n:i�,';4:U?," .µl in z,� j,'4,i',' F )� .N 'S::,iV`?3,.:,.�;i".� ,;,'v L`t�tn.',+ :.1���;f�c�.) .;�Y.":. t4'. '��:;..�{.". '' �i;v.2:{.h..P t" �,'� v1i.i x??,�:t,t�' ° ,;1.,6 :tea+ .l ?':,.,E;.,,,;.,'po,,,.,:,,t< "i+:` ti'�':y' 'o�-�l::g i"„?j+:y`G+. ...4S Iv `'ff`"Si:�.Ei<::�k j,t,'V' ,.,..Y it.s '.i, (t.P '.n,a t:f.Yi?:a,,.t,f=';i:i:°OAe M,":ti" .£3J rEP t.":;:;i ii'''!': �'" ai T2°'ti? x,(:,tr,,;tf:'.+,r,4�t.:.::a1.:,3 �s 0,., x:5,: b =::5.�' ?t3:3;e=;.:znPm ;;✓k,.f:iRzat= �<! ;;-. %..,..; "t "Jpnce 1t'ti?;ii.� ag,?hi rb;,l` 6"s^•:a.,.E..:;. ,.y, re3;'.:��d, o,�?„Y...� :Eat'` ''f.L:._,i i'..yc.,, a,.�s",�;`:i:tit`�, ;r, r r .....t........t:.,,..t.a,.,,..:.,.n..F. ,��� �' ,,.,�t:r'i ^}.;3i,--._�,,..,3„ ���.,.:...x:L..ab:^:i,-..4,.:.� 163 ~ PROJECT: Central Park Pond Improvements/ PROJECT#: PN0805 ' Disc Golf FUND: 173 -Zone 3Parkland PROJECT � PROJECT BUDGET: �Gi'OUO ' MANAGER: David Wood FUNDING , SOURCES: Zone 3 Parkland Dedication ' PROJECT, Funds 'CLIENT: Parks and Recreation � - -- - _ PROJECT DESCRIPTION/STATUS --- - --- ' -' � ThisviUmakotraUimprovamantotodhapondondheChy - ' rhootodjaoanttothapondatCunbn| Park - - - An 18-hole disc golf course will also be built along the floodplain area of Bee Creek. PROJECT CALENDAR 0F EXPENDITURES BY ---~- '�� ^ - ' - FISCAL YEAR - � LANO ENG� CONSTR. �»�C� — .' Prior Years | $0 $O $O $O ' '`°^�^' /«/�� $0 _ 2006-07 ( — - 2O87O8 �O ' / / 81O0O.� 2008'09 / j �81'O00 2U0Q'1O $0 / 2010'11 ) / $0 ' 2U11 12 ' �8 ] | ` �012-13 ' $0 ' | TOTAL - _|_ ___�8 �0 �61.00O _ �8` �81. $O .......... 0P�R�TU���C�gTg- | First F���-- T--- - . , ,�ar . Annually ) ' ' Personnel � / | . / total . ' Supplies �O � / | | � $0 Service ' | � - ' | ( $0 Capital / | | ` ' | / ' TOTAL �v $0 MY FA ` v 44 � - ~r ' 104 -_'... _-_........... _ --___ --_- -- . PROJECT: ZONE 4PARK PROJECT#: PK0064 FUND: 174-Zone 4Parkland PROJECT BUDGET: $33'033 PROJECT MANAGER: R|CPLDEGER FUNDING SOURCES: Zone 4 Parkland Dedication PROJECT Funds CLIENT: Pnrheand Rmonendon - ' PRDJECTDESCR|PT|ON/SBAJ'US in accordance with the Parkland Dedication Ordinance, these funds have been set aside for park ' improvement and renovation projects uo identified in Park Zone 4. PROJECT CALENDAR QF EXPENDITURES BY FISCAL YEAR FISCAL YEAR LAND ENG. CONSTR. K4\SC. PROJECT TOTAL Prior Years $8 $O $0 $O $0 2008'07 $O 2007-08 32.033 $32.033 / 2O88-OA $0 $O � 2OOU'10 ! 2010'11 $O 2011'12 $0 201243 0 0 8 $O TOTAL mO $0 $32.033 $0 $32.033 � OPERATING COSTS ' -- -- --- 'First Fiscal Year -- -- Annually - -'- ---'— -- ' ' Total ' | �O Personnel Supplies SeService $O �O Capital TOTAL $0 $0 _ $U SNI NP REEK � _ 165 • . •. - . . . , • . ,. . . PROJECT: ZONE 5 PARK LAND PROJECT#: PK0055 . •. .. . - " FUND: 175 -Zone 5 Parkland PROJECT . • BUDGET: $2,522 PROJECT . ....: . :MANAGER: RIC PLOEGER FUNDING . .. ..: . . .. SOURCES: Zone 5 Parkland Dedication • • .. - . , . PROJECT Funds . • • •. . • . -CLIENT: Parks and Recreation , • PROJECT DESCRIPTION/STATUS • -. . .. . , • • • . In accordance with the Parkland Dedication Ordinance, these funds have been set aside for park improvements . . . . , .. and renovation projects identified in Zone 5. •. . • . • • - •. . PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR . , • • -FISCAL YEAR LAND ENG. CONSTR. MISC. 1 PROJECT TOTAL • ''. . Prior Years $0 $0 $0 $01 $0- . ...• 2006-07 $0 ••• 2007-08 2,522 1 $2,522 ‘,......-.:. • . . - 2008-09 1 $0. .._.... ' 2009-10 J I I $0 2010-11 I1 I 1 I $0 . .•• 2011-12 1 I 1 $0 • • - . • _ 2012-13 1 I 1 1 $0• - TOTAL 1 • $01 $0 $2,522 $01 $2,522. • • . . OPERATING COSTS . . . . • First Fiscal Year Annually Total • ' Personnel $0 . • • . ., .. .Supplies 1 $0, . . Service 1 $0 . ... .• .. Capital 1 I $0 ' . .TOTAL 1 $01 $01 $0 .. . , . . 45.1:-.•;- • • mkotii.:!: :-Foigt:)" :—.,"A11 y odTmv 4 1':!•M3egigO,WrOgiff;:.„,,,„ ' • . 4:'i.:;!g,, :i,„ •'•7'7'v''',:f•cY•r• 44A1::--Vig•ik' ''''''::,?'-.Xli-!•';'41II iq:;':441 :1e3:4;-:M. ,-, ,-4.1tN,:;„„:1'''lli'''' „.;,4!,•41:::',,it,'•ii >epi, 11,..vi4:ss,!:!K,„,\ __,./;Nqw::iii 5;ANWiLIV';.::ffr.reciiii . 4f-ii'!: -!!!ittijOi!!4 ;44110;:i:4:41011104dPN.:"1.79 1 G:f.4,t-5 i'Mi ;illiVilaillAtKr,1!!!;!:!;,: ,:t!.!Fi'::,i,i'ik;-.-.4..:7\Zii '1 - !.,' , .;,\2,,KiAi, ;,1p,;:,:.,i, ',4 1 '::11-1- ''' -,--- . ' ,,.„,"'.. .-.-, ii.,:;;:.:::Niloiv-d-,,..et,-,-,- . . ic\31 1-1'1 :71,,:, . -41nptil.42:41-,;.•.: . • ,,,,:4, 0.„Kinitignap- tigwriA,,,k,r , . • , --le.,.,,!,,,,,,,,,,,,,.-,,••;-,v.-plik4„ t, t7glit,!5•:,- \<,e,i,,P,14„ iiiiri:.;„;<;-,,,;„:„:2,\ \,I01;t1,0,,,!frl ' . • .' 6A'.1'' ,f;41'tOittili';.PO4!` ' 1 . Al li .*!;# PLIi#A*E PA K. '.-‘4'j':•,.6,-;rT,.'4)0':''',,...''‘,-F‘;-M',,,:,4,.:i.'-",e',..:°toN'\..,V'"e'gli•ciii4,!ItF;;!V!;!k NtiiiijiterAri4141 i.',;!:lifle, '' ''''''',''':',N'N,''' 'f?'''.' --.-\t 4:iil,:lfti•Oi:',A1, ,,,,,,,..,..„, , ,4°„- ,,,..?, " UnIW00 st,:,•LETIC • "'''' *.„.„. 4 4''' 41i#45-40VARNORAIWI \igii!igiAit4V1:,,t., - '/Artp4r!, 'ililii:Y.1 ,,'-',Nn'-5 :'U4'../)'-'-': '.- 'k''.•:1:i1:,• 1.3.61,'1:rialitTiAll,igili!fric -.i eVi,t,,,.' , ::4,AP.< ',,„,,,!'4'y!gAN.!.M.i;ii.•`7L,I '4:'':;ilt•49.41.4108ailkt:';'.1:iplEit'Tiii'' t1:13$,POZ•j;• ;-A \.1.f4iN4-10,4*P 1344'!%, n7V%Olit4iii,NA A\E'D''E"L:'.. :' ' :Vti:teigiiRMIPINNX „„PK,,AY:;:i:,,,,,1 ii,-,A0-•t•*-1 4t4IffiZ44 ,,,ii4iaiVIN . . . • Nqa11A0141g5i 3,--V,''''" ' 1'' e VIIWAIDELV ri4:'-„ , , ,,PAOOVAVM. it; . , q-,,, 41C;i:4.'4ge""':iii .41.4 • 166 , . ....... __.. _ ' ........ .� PROJECT: ZONE GPARK PROJECT#: PK0056 FUND: 176-Zone GParkland PROJECT BUDGET: $1'878 PROJECT MANAGER: R|CPLOEGER FUNDING SOURCES: Zone G Parkland Dedication PROJECT Funds CLIENT: PnrbnondReonomdon PROJFCTDESCR\PT|ON/STATUS In accordance with the Parkland Dedication Ordinance,these funds have been set aside for park improvement and renovation projects ao identified in Park ZonaO. PROJECT CALENDAR OF EXPENDITURES 8Y FISCAL YEAR FISCAL YEAR' LAND I ENG. CONSTR. misc. | PROJECT TOTAL Prior Years $0 $0 $0 $0 $o 2O08-07 $, 2007-08 1.878 $1.878 � 2008'08 $O ` 2000'10 \ $8 | 2010-11 ' $0 � 2811'12 *, 2O12'13 *v TOTAL $0 $O $1.878 $O $1.878 OPERATING COSTS ' -- -- First Fiscal ' - - - Annually Total �O ! Personnel _ Supplies . . Service $O Capital $O TOTAL ___ $0 $0 $0 fl di iip BRI LE WN \ � ` PARKTA 411 ON PARK 167 / ' PROJECT Southwest Park Development PRQJECTtt PK0806 FUND: 178'Zone GParkland PROJECT ' BUDGET: $202,761 PROJECT MANAGER: P*tnVanoueh FUNDING � SOURCES: Zone G Parkland Dedication ` PROJECT Funds CLIENT: Parks and ' ------' - ---� PR�JBCTDE�u��PTu�����TUS ----- ` Southwest;Park will 'be developed ona typical neighborhood with features that may include items such aoa playground,walks, picnic units, basketball court, etc. ' . ' PROJECT CALENDAR OFEXPEND|TURES8YF)QCALY���- -- ' - - -' '- � F(SCALYFAR---' misc.' ENS. CONSTR. �SC� -- -' PROJECT TOTAL ' Prior Years $0 $O $O $81 $0 2006-07 QO � 2007'08 202.761 $202.761 2008'09 $O 2009' O $o, 2010-11 � $O 2011-12 $O ` 2012-13 $0 ' TOTAL $0 $O $2U2.7G1 $O/ $202.781 - ' ` � ` ------- ---- -' -- OPERATING COSTS - ----- ' ' First Fiscal Year - - Annually Tots - ' ` Personnel $20.000 $20.000 Supplies 800 $800 .Service 7.000 $7.000 ` Capita 750 $750 TOTAL $O $28.550 $28.550 -11051 XW- 611 41 ' . � ` iM [ ` \ ` mfiNA ` 108 ' PROJECT: Zone 7 Parkland PROJECT#: PK0057 FUND: 177 -Zone 7 Parkland PROJECT - BUDGET: $8,980 PROJECT MANAGER: RIC PLOEGER FUNDING SOURCES: Zone 7 Parkland Dedication PROJECT Funds CLIENT: Parks and Recreation • PROJECT DESCRIPTION/STATUS In accordance with the Parkland Dedication Ordinance, these funds have been set aside for park improvement , projects in John Crompton Park in Park Zone 7. Features such as walks, lights, gazebo, pond improvements, and signage may be included. • . PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR FISCAL YEAR LAND ENG. CONSTR. MISC. PROJECT TOTAL Prior Years $0 $0 $0 $0 $0 2006-07 $0 2007-08 8,980 $8,980 2008-09 $0 2009-10 $0 ' 2010-11 I I I $0 , 2011-12 I I I I I $0 2012-13 I I I $0 TOTAL $ol $o( $8,9801 $0 $8,980 OPERATING COSTS First Fiscal Year Annually Total Personnel $0 Supplies I $0 Service $0 Capital $0 TOTAL $0 I $0 _ ,! . x : .A:.,•,,,.`- ii�'fu5}t+R.P''�,:`:(:..'`;.'I t a..,<x,f fl , o ji ijie t.Q,�'r•," „at. a •f4 em,.b + m o7 �':. ..-� -,! v m ,l.,0,. A u f '" an.E " v . y '% A fi1t RfE .a.x' �k x ' L:":3+:A: Y; " p � b1-VR - q i ' l`t..MQ iV i"y T;.ry. � * `; .✓6 \ s' f` p 'pi « „{.:` tit ,,T '„ j'(k: �f \3nf ( ' .'b<P:"' 0q" Nt'. 'cY, ;g`: r4 0 71PtiferiPegtiNitOtin*, ' .F n. 1: ^ii4 xiT )y I ♦A ,'",.4„:. ' 4� „..o .,,,g,, ,,f , ,,tv, rfw ix =e" sx /� ( Ic01v ,th'iN :;rs + � ,:Rio> t't'�, .,.s,.,x,a,>. ,�, ry� },x.; ; " ,. uT N c p •N�Fl 4 ? ,x.,. �.,h, : "? '�, lw ;: `,nr' Axgl ;ixYy :�(uni'4MMl:U 1\ r S •sii z4ri;; 'C " , J4 g L gji; 3: 5Y $, *t ` 4 1 FaeYMtGI SI l� G , PINV t *$ ? vg.;Iw^ "r ` ie ` . t ..._.-.. ; .o : rt, �:«, , , :d...� ' ` .2Yf;iyEt$Yq i3cv >i+ � jpa .kJ., < :}. %!Cx":lr^ : MC : A� `:J... ;," + .? eN g '� �: Rfir,.',- � : " ' :. ,, . . : ' iF1';;3 s ' `k 'id :�:i �r e A„?`,5- isa, k(; d;, � x a`r '; . 'k 1 "'c, .� .B , iKvt a rie} ,�� Y .i:0^r. j 5iii )5,,,V .,`'4 x IY I," 1 .Liq; a j tgr , . \ 169 • . . . . •. , . . _........„„ .. .... ........„„„,„...„, .. ... .. ... . :PROJECT: John Crompton Park, Phase II PROJECT#: PK0712 . , . . . . . . FUND: 177 -Zone 7 Parkland PROJECT • • BUDGET: $263,000 •- • PROJECT . . . MANAGER: Pete Vanecek FUNDING . . • -• -. SOURCES: Zone 7 Parkland Dedication . . . . • PROJECT Funds • . • . 'CLIENT: Parks and Recreation PROJECT DESCRIPTION/STATUS . ,Phase II development of Crompton Park. This may include items such as trees, walks, pond improvements, signage, and disc golf. •' • PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR . . . . „ . . .. . . •FISCAL YEAR LAND ENG. CONSTR. MISC. PROJECT TOTAL '•• • : Prior Years $0 $0 $0 $0 $0 • • . • • 2006-07 263,000 $263,000 . . :.. . 2007-08 $0 • 2008-09 $0 " • 2009-10 $0 2010-11 $0' • . - 2011-12 $0, -, - 2012-13 $0 • - TOTAL $0 $0 $0 $263,000 $263,000 • OPERATING COSTS . • - First Fiscal Year Annually - ' - Total- Personnel $0 . . Supplies 2,000 $2,000 . . ' • Service 1,000 $1,000 . . . • , .Capital 1,000 $1,000- . TOTAL $0 $4,000 $4,000 . . . . r No,,?..,•:,••,,,I,I.,:l \ lil*PW % 4 RiAT,.. ., .‘?. .,,,,.. - Sitaleaig, , . .~.6,4 , 46Watent. -- . 4110 , ,... . A., John Crompton Path,Phase II . jekigliW4littWL') i 1'1 ' ,,,,, cP,SSISMelfah.t4Meitekm • e.4.0.1k0MIANASSMC,Jjkere. e, eght0650114iMint .,.4' g''' 4A ', "41bibeet3AeRre-04$,!, . • . NOIY -,MMTONOMIE1019 , . ii -: ( 0111,1 CRO lte..600044,111, i. .. . < ? . ''V6'gi;VZIP16.404.40"Nv ' '',1614INIMItiP N946PI44AWMANA01W$A G-,,,, , , -$044.61400", • , 60, . litogimAgiiiikasi, . • -. ' 1.P.:Palip4KORM#145114i*.3 ,Wi woodway Or 1 4 -/N,,`"VPINIRCIO ' • \104:4*AMIOV.NitfiteMiMigi,:g4W'. , . ,InAlitimezit,,I, -. ',,cotRogoviita1/4 . *'"illiVPIC00041100043 \ '8 VOgN0001451WIROWN1 \ % SNIINfeak . WARMAIOW\'''WOMORI •,.., \ .Alma, . • ''''P ,,.. \ 170 _ . PROJECT ZONE DPARK PROJECT PK0058 FUND: i7D 'Zone BParkland PROJECT ' BUDGET: $0 PROJECT MANAGER- RICPLQEGE0 FUNDING SOURCES: Zone G Parkland Dedication PROJECT Funds CLIENT: porkmondRmcnomtion ' -- PROJECTnESCR|PT|ON/8TATUS In accordance with the Parkland Dedication Ordinance, these funds have been set aside for park improvement and renovation projects ao identified in Park Zone O. PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR FISCAL YEAR LAND ENG. CONSTR. misc. ( PROJECT TOTAL Prior Years $0 $0 $U $0 $0 2OUS-U7 $0 200708 ' $O . 2OO8-OQ | 2009-10 \ ( $ 2010'11 $O 2011 12 ' $0 2012'13 $0 TOTAL $0 $01 _ $01 $01 ) $0 ' OPERATING COSTS ' --- '-- --Firat Fiscal- - Yoor ' --- Annually Total Personnel $O ' Supplies $O Service $O Capital TOTAL_ _______ $O $O. _____ | ' EST PARK - 171 . . • • . . . .. . .. .PROJECT: EMERALD FOREST PARK PROJECT#: PK0713 '• IMPROVEMENTS .. .. .. FUND: 178-Zone 8 Parkland PROJECT .,.. BUDGET: $45,699 PROJECT . .. • MANAGER: David Wood FUNDING . . . , . • . . • SOURCES: Zone 8 Parkland Dedication •' • PROJECT Funds ' - CLIENT: Parks and Recreation .• .4 . PROJECT DESCRIPTION/STATUS Improvements to Emerald Forest Park may include a swingset, concrete fencing, new sign, and benches. . . . . . . . . . ... . . • . . . . . • PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR . . . .._. .. • -. .• •FISCAL YEAR LAND ENG. CONSTR. MISC. 1 1 PROJECT TOTAL - .• • Prior Years $0 $0 $0 $0 $0 2006-07 45,699 I $45,699 . .• . . .. 2007-08 I $0 .. . :•.-.-.. 2008-09 $0 . . 2009-10 $0 , ... ' 2010-11 $0 . . . . 2011-12 $0 2012-13 $0 . TOTAL $0 $0 $45,699 $0 $45,699 . . .. . OPERATING COSTS • • First Fiscal Year Annually I Total • Personnel I $0 • . .. .Supplies 1 $0 .. .. .. • Service 1 $0 • . • Capital . $0 • TOTAL $0 1 $01 $0. . . • . ..,....„. -'• i . .4,,,PiT,;•'" I , ,., ::;,,!,,••••• ..Argii:543A- I . 5:ipia,1•5iTitift, . I • NvVMWA$0446, . . 41.,• : •..,i,,,04.,z,Nlilif„;., .A., ..etatrtio 1 . . . : e•f:‘,,, -,' .,,,..*,,,,,s4,444,-fe,,,,i•• " 0 - • 0.104FRIKAirl,"" , - --1 fq ,,!131:86.4104144p841 0. • „ .1, igi'iMe=1.k.10,,F.': A , 0 vokiWkeiSipOttkimewv4 ,,a, • . ',4 ,04,4,,rpoporit,votv,,A,p4Imivp - '474414';'W40441:011-9oNmg m * • ,..lit'' .„4ttiapkw,h,i,-A ,. ;,-,:i' ,6fib.:,',. ,Ii? „01:11104,L4MANtayikobtita g . . ,041PIWAZPOIMA,„, fr 44,10041P ' • '-''''''''''''''''''4i''`,..igiagovommot ..•.. ''-01,,,,iiwAlt01031,,..Yatio:1415mAini,,,,,, :Emerald Forest Park Improvements AbfrOriMpArtifigt . Wf.3frAttgAA'V.V4*P*Nriik011igp" ,40,,A lit l''' '11011.0.1.11, w li,i,,,v,, . . . / vigstivo;liprpiorrqfpnotii,,,,,,,<,,, . . • 'tiftiplikt,R.MitatI4.9 . . . .. .. ' p1,1101.0110A .-.,:31400 VIVI • 14iagii",,i,cet, T..1.0,j;s, v..., • • 14,0g. _ChipPOndslo 81 . . 172 . ,_.. . . PROJECT: ZONE 9 PARK PROJECT#: PK0059 FUND: 179-Zone 9 Parkland PROJECT BUDGET: $2,766 ' PROJECT MANAGER: RIC PLOEGER FUNDING SOURCES: Zone 9 Parkland Dedication PROJECT Funds • CLIENT: Parks and Recreation PROJECT DESCRIPTION/STATUS In accordance with the Parkland Dedication Ordinance,these funds have been set aside for park improvement projects at Woodland Hills Park in Park Zone 9. PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR FISCAL YEAR LAND ENG. CONSTR. MISC. PROJECT TOTAL Prior Years $0 $0 $0 $0 $0 2006-07 $0 2007-08 2,766 $2,766 . 2008-09 $0 2009-10 $0 2010-11 $0 2011-12 $0 2012-13 $0 TOTAL $0 $0 $2,766 $0 $2,766 ' OPERATING COSTS First Fiscal Year Annually Total Personnel $0 Supplies $0 Service $0 Capital $0 TOTAL $0 $0 $0 • ±;s`r,:.., f}T' .7,' ..3C,,.' ^;�'€i ;.; :Y •t„iti4,4`<iq:N,,,s{Fi!+?;�`li':rl ,(� ,;,,,i+r:x:, ^w::•:: :';i:`�` it h:.t ...- .R':'l'a,'.:rY^rxt�` kii,:if, .;uf,: ,,t,.,.i:3:... �i-�`Tui`:` -,,, i fi�a1:011;r=,;.0iii s7z`)/C `s v°,`,;:ri';"'g•t.,,,; ,ems ;'" „ :€.:,tom•,.. �,6,;_r:. .,;Ihii:t;�:>`'�. i�:JoC,_ :iAili € :3it';..�:tl:it' i' FP'S�r,,,., : .:;p,..;. h.E.; - 1;",<",s... ,t:I�: YI`4 ,;:f,.GiSsi:€_, f qD, 'i.�'�4�'',',:::; 'fr'YiiY;v - :.t..,-'' ...f,, „EOill!#:ir:':,a a.,g— ,, .: Ser i:. ,.t^illp^i€.c ihto- �t,�,t;,•�.:> ,.r t:{ '={:;}ii'.,: :.S✓ p� .o.��=...r��« 0:i,1'.tt.�., iat�.Ri: :t:•, '¢ ;}£� ..•K.:rvt`'„ :::is,. .m�:;:Dui: ';�,....J � .s{n"t:;:r�`;�t..cf3'.:';...a;..z...rwv::h, i,.�m:...r..„T,€% fiiz„ .:,;it. ;, F`o , y«,:i�.< ..c ..,::if<� �la t �, r t rx:•' €,i;e ,q' dx:,3 is ..�', 'p::' �sc;,. "?'i;,l:r ,t..L `,a4�i;itit3`^ lieuii:' ,'F iz`:,o-�€"1t..,�:;}a...,,,.;�;5,,,oi1?, �>i'�..;'� ryry,:.:,.�+ ,.....t:; ,�'" 'it:; q;{Fzt• t��i; 2t k r�,-tt k.i .y�.i:.>l" 1''Nrv:.1.:, .V `Iti}t,:ZVili0";:illii;N-, 1;,✓ 4.i` :tai ",:.'"^-d:.'jxtt.;,,,4,,,,,,�4'.; .:3`C,."3{,:, ,--,-4,, . ��.,"�'�.��.��.� ;Jiazv,.�� .,f 4... ,.,2. Roch,Pi ';'�+��tyl;:lY'.t„ •� ,v� .d:.;,. w ;�`'i,:�ht+w.t„i.'!=..�.� €/,. �4e - ei2q'$�,u h:+ii€i�� i�i,,�•°u ell ' fiy {r,,:'`e.`.ivti:'p' 3i t'' t{G.,r``y 'jrr" :i �• ROCK' PARK .>i?r�ak.,ivyp„t, r'''`f :i`E""x �£�,'.ef,�,i. :'{,:r.....k,:rsk::,;k��' _ cFv�;f3�„`. .. �F� Y G"�;5�1,�� i' {i': i'3V t�. ��;'..`ti? A , , l fie,,, :'riA 'z ,+' , has a 9� 3,i ro ..i.•i .:g:r: �'ii:s#�:'a;'i;i:t' eli': ,"4 .,�Fii F�ii:i:4yTi:;'t;. ,,"i'.!$`Vt'ai,ti\;A:i : .i�El :t n :1i3¢:t f'.�,,,i''E';•.�,. � ;;;F;...-+ „Y,':.� g,�ss:; '�:;r isF;� `.�xt•y;�-r:�:;:i,::.,,.,t.w�':+ s 1r. .�i;�':�:a�\� .r:it, ::iii1„1t,176W:;j;u. -`,ig` ''''' 'A d;�t. `,:r;a ;rhi445 v t�+�i.;;"A t,. xi+;,.'�k r•,�xY`r .:'si;'i axw•'s`'if y:�ae;:'i•~:?p,.t.vi'.t+,;yi':�{s�: P I n;:. ;r�,ti�, 4 t t i z;",:Nfi isi?;"til:e':i::>rt ',.ti1<.. 5i0.,;:._ie,y�,: / �+ _ '�'c s+su:.y'ti.,,..�; .:?. <*v�;":.;,•oZ.f=i'r:;. s, �;q:tiat`r'� r, .'aB :,:,-'" ;ir,#`"F?$',r ',,^kti v' S„? ,sa`i��':,EaS'."e7' s::,oN"#v'.il:ili:::. .('� ,',,�t' YS;;s':.,..4�:` ,•�,,., .4`.o s!u:;t'i;.,if`E:�s. .:t#;;{ <<:,s' «j1, i,;h €r4_ UGO�IA LSPA12 l•.,,. �'`2,w: ,t.'�rti�"m'.;,: >t.;; �,k i�ts,t #.t.,,v�?ta: "'�i"?'�;4_�:' r.'�.Ct?: 3'" '��';u�g'` �t�i• s 01:',::ael',�,el ,ti3.., ,:e,ii= " `a 7,1441!iii, . '�iYt # .a::f. a 9, :iiu � ,.,i,.:,r:til,...' a •4i e t �'Oil;', a azu+.?ao.,� G ,s'=' Yis' .,.,m:sr= y �t'q[��'Y�t{�_�,"' �j� ii' 'r,+;=.. 1 t..,....:.�'=t�t'<,+�''� A s;,•:::`�st nn'a:4g':�;i:i�'� at z ..SII: a.::,;� L'zG? ,� ?',?T}t',t•:fS::y.=\,..*.,:::"z1i.P. j'''.f:. ,6,1"1 �4::n',1°.;� . ,�, is ii ++ .fit.:,`ei:{'`�.*" i�''-,S:S,;,s:,; �;;Ety, aa�a :{„ti j,i 7�°0�`;:-`,�:.�.,..�f:��:i,.. , , <• '..,,i.,, .;.4^.z:.x.ivzz6'G;. .?t., 'i{P.y„iS• ,,�:.^ .P.•i...,,: •;0 o .':iN, O�'?kOt`, is<:`i: L:>;r', s�j':,.`t:,n .ni:![ic„�l•,'s•'�t.d'>W. i�:iF `�.;d;`$A "o- ig rinor r1 l=sc,•,, '1;E .�XF ��1;v4-c;iffe ,:4'SPAa y 3 0,,,ii ` ;:g:G,�;til� ii.3vn`;?cb„ .`ga::ve:;"'ili:ii?::1(E£;.-iEps`�':... ...�.,irP .. ...,,...,T0v44422 173 •PROJECT: ZONE 10 PARK PROJECT#: PK0060 FUND: 180 -Zone 10 Parkland PROJECT BUDGET: $125,574 PROJECT ' • :MANAGER: TBD FUNDING : • SOURCES: Zone 10 Parkland Dedication . PROJECT Funds • CLIENT: Parks and Recreation PROJECT DESCRIPTION/STATUS In accordance with the Parkland rk d Dedication Ordinance' •. , these funds have been set aside for park -improvement and renovation projects as identified in Park Zone 10. PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR FISCAL YEAR LAND ENG. CONSTR. MISC. PROJECT TOTAL- • I Prior Years $0 $0 $0 $0 I $0- • 2006-07 I $0- 2007-08 125,574 $125,574 2008-09 $0 2009-10 $0. 2010-11 I I $0 2011-12 I I $0. . • . I I $0 $0I $01 $125,574 $0 $125,574' • TOTAL ,,„ • OP ERATING COSTS I IAnnually I , . . .$o' • Personn First Fiscal Year I Total el •Supplies I $0. . Service : Capital . I I $0 TOTAL $01 �I $0. ..::�. =i. `..`.; . ill� F # :ii'E ii? , :�i ii:?a ;a P }5-; . ^. a::s_i. i.Nt+u,m3, a1:! i:., . "yti �3�i :: a L,; jI h ` t!i; t„ " av3. { ' _+ i . ..... r :a. 4.. S ,,g i')' : t,tF :0. ? � .Ls ..:. P992 x, c '�„',a 3 a,ni. {,p� i;t�iti .,a: .;; 4< € .. . ,.,:,.:� S-, • ;.}:. y :,t6tJ,cd. Y 1r :xpx: t } : K, ,3t.3.,,, :.., ..ti .. , Y`, ::.1 ...y ,.: r � w ,y ,, y ' 0 > ai ... : ..a .A ..f �: A��y.e,..;ice.'.:.pi , r6aI .,E .0.'t ... ., .. � jl[i ., , , ..,0 . ...,,,, .` .,..}_,., e 7: Jv- � a O . Lh '`,yi3Pm , : :: ar. ''?i, :;,.a.:,._.ra. t f.t - tr, =<:r. S ,tiA e'0 " k .e`; i::f. L:�;}, t 3 ; .. sN, ._,. :es _. } A'istop;t.,,,5aa„V . a ♦ '°a�'4,� x:, °;h:,;,: . ;;ii'i)4,,r!: S;�y.::_ Y" jVBr i11xg ,: , - _ . 3,=. • r.... ,p,... >: ltK q,>d n„tR' z }, d - : A b i :eii ,:^�Ia .r.,;,;,,....:::,:.xr...t.,;,..,..�.:,..r....tr tt=:a^t..� _......,,,,,� f. ,,, f.+ .�.r;m,::..:::. ,,, =;;<teya::Ir ;A, #:>• TfyO PARK' '� 4 �i nY,: r 'is:az',::' t;,p,' i;$l::e.f '?a"" r�N e. '•S*.:3::"� s,,:<.a. :iiifES:, �.eS�ii'.., ,.'tt'l>, /- ,/' :^x.,,il a11' 4`.',> .e'Y...:::1i,.?':��"",:.: ::,:{:�r q:�"?' t�.,..,i,.n �:=..� V� :cJ •.h:��:y�f.fFl ....',u'..,.;,,,,.�;r,'.,:.;.,.., � iI .., � �{ zL? EIS NS PA .,,,, .... �.^, ,a'?, a„„1�;{.%i E3%st'#�..._a f'..�tf�'�,,.q'$.iw.;:i':2 �. ; .,{i�i;(iz '�; ' t:i rat, ;'#1 t.: *=.iE„ .S, .'c. 0. .� u..::, :!i tiSF.: !35? T�, �?Q"i�'':#:1.; uf<:y - '.P y,.,..,:;1;.,.:.x USI{-i «t:" u�' .ti:,'i:. ��\'� .� � .7 :S:it4.lu ,.'_'•,.>'Y.,•,. 6",�y��itl'-'A=s:' }}:!^` :i,}.,.k '� ,SOUTf-1E ��f<S'PARK � . '2�°,.;.{ -�i.'%fit K:IJ:t� £:�'.�l,t;�i� ..Y... .,4 y l� - <\ '� 'OJ.1'� f' ,>,ys�k ZG:..2':;:zi,.:::3�,,;,;M;,.tp4yV�tg:• ;'1\ �}., , ey S.h'Y'.I si c. 1 ""l;'�}t1';;l;:x Pp=ii=�.t. „�j REATTA'f4'3EADOWS ,��::. • ty,.. / ,i i(;g::i:iii}�tsk,.:.. \x.:,,t,.,,Ee�t { :_,'i >r.;4{,'V�.. �F; 1,A.;,a;=�9[t it:, $[? s':}.,.'�',,,, CASTLE CKPARK ail:}:!:li.! ..#.{,t.: ii y,�it�i�� €'tt{`•'.<�"3:3��'tj'n I.'4:i'. .*44..:.113::,=.•:t £irit,:^:' s}:::l1 'ii1•r: i:wi �4ralitl: `"+,„v}:. F„ ?,i','3' ' rya. ;i3i'r:.,..3.(. 3=!ii 4;.,»g!,iiif, t, O,<.,.;ii''; ;:i :1ht".:��; '"�} 1���'t"r�� ' �`c,i""S{€.,�:.3.�:` taS�S.�P y \',-i:; 46, ,i ``'�'l;i, " „ u.',;,i:^,*.:k,. ',a,t.t.:µ'':,':.:" "r William D FitcV,Pkw S H oi.i;>,.,,-,er;:t : - 7i?r1, y'ti:::tt;; d'7i>D;^",''.'� c�aistt[a:S`N 40��s,#,= <:::=,E}.�,:3:=fir' iz',-;� ''io-f=SI;1 �•a:2�'.,iii' .�':. ^;:i i"Y-: uiiiN t�1, _:;:�.�t� R1+�":,:'.,s.i.:�z ;i�� ,t � , ' i..a „},,.,nit [, ,;..,,•,„a' '+ y it, k ;,.,�3's:�;li:xtl; sv:'i:.'.y `^V�'APP..._.:?�P^ �.3..,. .. • „_...!.k:v., .,;... t:::i:.n•ge5''_`_v:..":4??IY;;;;•3:r.�.<....,r.�?:..::''."aSz-s<. 174 PROJECT: Edelweiss Gartens Park PROJECT#:PK0613 FUND: 180 -Zone 10 Parkland PROJECT BUDGET: $366,000 PROJECT , MANAGER: Pete Vanecek FUNDING SOURCES: Zone 10 Parkland Dedication PROJECT Funds • CLIENT: Parks and Recreation PROJECT DESCRIPTION/STATUS These funds are for the development of an Edelweiss Gartens Park. The park will include a playground, basketball court, walks, bridge and lights. Public hearings and design work are complete. PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR FISCAL YEAR LAND ENG. I CONSTR. MISC. PROJECT TOTAL • Prior Years 0 959 173 432 $1,565 2006-07 $0 2007-08 364,435 $364,435 2008-09 $0 . 2009-10 $0 2010-11 $0 2011-12 $0 2012-13 I $0 TOTAL $0 $9591 $364,608 $432 $366,000 OPERATING COSTS First FiscalYear $15,441 I Annually 882 Total Personnel $46,323 • Supplies $637 $1,275 $1,912 Service $8,700 $17,350 $26,050 Capital $0 TOTAL $24,778 $49,507 $74,285 <;W r,.r ., +; S'P ,. ,� 4VESTFIELD P 40Wil,% i2k;ti3'�:''mil f�O z l .S4 9+-..�93"�'Wj �ilLjL{!tit£_ �4 '(Q111. 2i • 6 ' j 4 t § t a�1 EDE `Er,iy,.s'Gartens Park Development f � i r ti[;, 't w ��iiv''; ':s"i3k,:,gkigi;'t;s ii.W?: < P� ;0 o ....e'p:^ "{i'iuy..,�.§0 i:;sft?' ;:,'r i''i:' `s}a{:>'pWk,;�i ;I ,P N.�" ,42, e„o °=" ;,'3.E;• .`XH"'s�'.;;..5�,"i�4:yf;:t f;_fat;:�;�° �7(�,,,.,,,,;y :3 ;F, c.3a4 �t- ; .N, _.;' t Apyw,.,,i L3"s$, :;,37, 3:5'::4 y ,,���++ sr' dTgilt. ac 'r' �y�`is i ;14:sR'? ii'.i1yu`✓�53.:;°�,;,n „itt "<";`Sig>:: .w..a < i �A�1�y7 gi .a.: ".li;:, y`t :3.:,a}'{C',' '""1,40,L'`,, ` S ,, ,?:::` iu s• ` ;t`3`�,3•,.: , der �" 3 r"'� 4 a `XX �x y L't`�}sY j',;>;.`';:; , Q' �4 , o "-'?::,:. iy 4:�vx YtyY4St i mow:: 6l� i v <„ i i�1'i . t 3;a.r a S •i;k.jh�'s��tw r,�', ig,jj1'u ' ` `�i 1 k:.. 175 . . .. •. . . .. . . PROJECT: ZONE 11 PARK PROJECT#: PK0061 • •. , . .. FUND: 181 -Zone 11 Parkland PROJECT . BUDGET: $2,819 • . PROJECT •:.. . MANAGER: RIC PLOEGER FUNDING .. . . • • SOURCES: Zone 11 Parkland Dedication ... . PROJECT Funds • . ..:. . CLIENT: Parks and Recreation PROJECT DESCRIPTION/STATUS In accordance with the Parkland Dedication Ordinance, these funds have been set aside for park . . . . improvement and renovation projects as identified in Park Zone 11. • • • . . . . . .. . .. •. • PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR -. ...- •FISCAL YEAR LAND ENG. CONSTR. MISC. PROJECT TOTAL • . Prior Years $0 $0 $0 $0 $0 ... 2006-07 $0 •, .. -.....• 2007-08 2,819 $2,819 — • , •••- 2008-09 $0 2009-10 $0 . .•• . 2010-11 $0 • . , . 2011-12 $0 . . • • 2012-13 $0 • . TOTAL $0 $0 $2,819 $0 $2,819 . . . .• OPERATING COSTS . . „ •. .• First Fiscal Year Annually Total • Personnel $0 . . . •. ,Supplies $0. . . • .. Service $0 . • Capital . $0 . ... .TOTAL $0 I $01 $0 . . . 4.....,,. r it 00;0440440z .,. . '<k4--SMILL'4441• itit511: ,A,:„ ,?,:,leiks,:::', z AigtV:i''' .,....4,,j2i.i.,,,:i!,F,pilT.,ii:!:;:dr„i win:glzwii. i '' ;. 14!„';•:5:iligA41;,.. LAND.. 1 ,. v> . , , - ...laliteigOalli . .„ ,A,450-4,igit ,t. Vgl.ngq:-.;: 571["7, ARK .- ''," `, 444.11‘11111/413t1'4', 44'.:::':' N.Vatf.10iiiV,',„AglideiiPtgAiVA, , id 4; PE 8%5\4EK PARKs:,...''.', . . 791i!!4;140riiitiM411-0T , WPAiifittioggqmtp4 ,,:s:iip4i -;•,, • -,,,,..... -4,topio,4:12iigiwers14001.46,mmiiro::,,„,, ,41, ,2,!:,,,,, • PARK tftik<4011%.44!**11FAPIVV6 M.4iNelgriiIiiViMAI,gii!:lii/ . e*Aatifikil :41, ''',41.011,.1400:11%!; 4 •,i. 4.i'iA!,!':-:, •,,,,,,,4.0,,„ , , ,,,,,,, a ROA.„,',,,,„11)%1'' •!6••J , 1,,,k,•;i;i i, ,- -,•:. ,:•„ 1 1 . vliollii,!: li! ,,:ta ,, . -• ,. 0-,A10,,,,:„, „„___ oil„„i1 ' • ,04-1,;Ks. ...-- . -31,,-4,401, • , • ,,,k$,,,r, prm -'•• co\$(syliu,,,, ,Kp`KARK • • ,,,,,-,' kid .. • 176 PROJECT: ZONE 12 PARK PROJECT#: TBD FUND: 182 -Zone 12 Parkland PROJECT BUDGET: $0 PROJECT MANAGER: RIC PLOEGER FUNDING • SOURCES: Zone 12 Parkland Dedication PROJECT Funds CLIENT: Parks and Recreation PROJECT,DESCRIPTION/STATUS. • In accordance with the Parkland Dedication Ordinance, these funds have been set aside for park improvement and renovation projects as identified in Park Zone 12. '' PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR FISCAL YEAR LAND ENG. CONSTR. MISC. 'PROJECT TOTAL ' Prior Years $0 $0 $0 $0 $0 2006-07 $0 2007-08 $0 2008-09 $0 2009-10 $0 2010-11 $0 2011-12 ' $0 2012-13 $0 TOTAL... $0 $0 $0 $0 $0 OPERATING COSTS.„ First Fiscal Year Annually Total Personnel $0 Supplies $0 r Service $0 Capital $0 TOTAL $0 ..‘ ...... . $� ..... .,.... ,,...... . :..>' >/ iJmERK ::RKNPE • i i fi.r.: i l.:• iiiiv st, =xd4a ? � �y .9 ui4i F., J uh wC & , ;, ,,,4 .. q. : J".g.lPk.w�'+ ;-! M* :,1;�1,..,, ,i .I,:+' ._ti.t , ,'� _�"-�..�''S3£i + . >, ', es ,!i "off'1% „:: s = v '� s40,, v 1itt ,> _ z 2 �� , � a�' +„yp„ i rvg&yag ,v , {i:¢ : ,ti� x *Dq i n 4i{ i £Gi,* K ;.yt"r�Ik;.£' 4,'1 'Aa6>4::: `�„ st}i:a:\ N42 ,. ;�r iOa t4f _tov�? °; ,,y ��" �j3: . :Y' i . jwer: ' 7Bi,o�rt : ]0 .t „✓ h a ",,„1 ;: ,4rc.],,, ii-:• , a .w : ...Ira4t : �� r-4ij ,rz ; E iy.ti,,�,?s' Y,bv :41v,,?., :"{ , ( , " ; - ; „ [ 4�� , t£�,1.:r:::t,� � ° �r�r�*< �sri. '.�1Z. Kt`t:' <:,. �:�:�< .,y.;;aac .� ::'�s=B :4scs R.::r::. ` Yv d #" 0i �l'fi ,1?1y ' t '0I,:ii i�,t 4 ''% "*� 1;�, ��1gv E� v " Jx £iy ��lr 10 i � 0 IE: i :I f fi—G2„£.,;"r' „gal 44,0 1 2 177 . . • •- . . PROJECT: Cove of Nantucket Park PROJECT#: PK0716 -•. . . . •• FUND: 182 -Zone 12 Parkland PROJECT . • BUDGET: $47,500 . . , • PROJECT MANAGER: Pete Vanecek FUNDING • . . . • ' SOURCES: Zone 12 Parkland Dedication . ., PROJECT Funds . . 'CLIENT: Parks and Recreation • •. • . PROJECT DESCRIPTION/STATUS .... Initial development of the Cove of Nantucket to include a sidewalk and area lighting. -- .,.. •, Original Budget= $34,000; $13,500 added through FY07 budget amendment#3-9/27/07. • •. .. . • PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR .• • - ,FISCAL YEAR LAND I ENG. CONSTR. MISC. 1 PROJECT TOTAL: . , . ... i Prior Years $01 $0 $0 $0 $0 • . . - ' . ,. . . - 2006-07 47,500 $47,500 . . . . . . , . 2007-08 $0 . . • i • 2008-09 $0 . ... ' 2009-10 I I $0. . -..: 2010-11 I $0 .. ,• - 2011-12 I $0.. 2012-13 I $0- . . •. . TOTAL $0 $0 $47,500 $0 $47,500 . . •• , . . . . • • , OPERATING COSTS • . . •• • First Fiscal Year Annually Total •• • Personnel $0, . .. . -Supplies I $0: .. . . . . Service 2,5001 5,0001 $7,500- . .. . - • Capital I I $0 •. TOTAL $2,5001 $5,0001 $7,500 . ... , ' • . ' , s-,,,, '",.0,i§il!ii0oFkiiiiiiii2Nyi,,;$21gi.:,;:;1:-•,SifVOCki;,,tAiiiiiIIIIIT.:,--., , .„,,„,„,„.,..,„...!,,,,,,,,,,,„.„,„,,,,,„w,,, ,,4.•iii„.v." ,ePi•li,!;,,m41;,,ihm ,' 41-447-,;,' ',„ ,- Q.1,:;,*,..,mo,,,,i•,i, ,i.A,.thi,,,,,Fii.,p,,,ii ,,,,k4.;,,,,, ,,*,i;::,..,..,p,,,,,,,,ii: '. ''.1')EWAImBii',NNPNAliivr,•.n•Vgf.,..,-.. .4i.x,-..,,..2- *-. .6',$..',.fti*,Ter' '','cA '4,r,dwg0F.011CAIPAF,UN4,AgMwE :-,', . . , / '''t',, f.i%'_,;i1g,:4•4a,iiii!ii-',WiMiaX;:[,i1,;•Iggioi::;:;:;!,i dr .-• z - •-.%.,, Ni.4cf,4611,gliViiil,i',,,golit!::,,1:44-k'ggiolii-i' . :',404,11.:1,0,iliNtlik., A 'P '''''4-'-'411,•:Aglillg.4"' ;•3110i-Mgvt-•,:, .. - AMlitt=1,M;ii2F,,,,, 4' .k. .., , .,,QN,Igin!,M.•??.4 -ZA•!0:;1'w.:iq:-. • . , — . , . . 4 itg„i0 Vg"-Aini •JVii0;k1h4F,A,,,, . i:,, : ' - ' '''NiAll:nliiiNfitellEiPaiiiiieill:! -12 •-. '' Vft,MbtiotiThift:!ui: 144a*-Daillig,e4161-wp,p4-4 h - „COVE OF fl CK ''.R4t;','OiMi.ii!gf,:0iii2g.-:;;,:k:!'l • ,,k-, <11;!iitV:IP!..!sig;!iiiV,0,4*-51i-Wti,c,,,,, , ,, w!grio-tio,:,,,,viip . . • '''1V IWQ'iNtarAqiiiii6011141.4g1c4g4 , -M!'lMe'&1M,i, • • VRV,i.itkagOtka0V;IiiiiiiMar' 4...,, ' ''. '':' ,Wlilli..11,;i!!i'. NT41;PAIAPOONIQC5440;t0 ... . % ,,,‘ •;c41,46 %:1.40.4441104P'ViligNi'l,W,'AR0-:1' 06,, \ . "- . . , . . . . . 178 • . . PROJECT: ZONE 13 PARK PROJECT#: PK0807 FUND: 183 -Zone 13 Parkland PROJECT BUDGET: $617 PROJECT MANAGER: Ric Ploeger FUNDING SOURCES: Zone 13 Parkland Dedication PROJECT Funds CLIENT: Parks and Recreation PROJECT DESCRIPTION/STATUS In accordance with the Parkland Dedication Ordinance, these funds have been set aside for park improvements and renovation projects as identified in Park Zone 13. PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR FISCAL YEAR LAND ENG. CONSTR. MISC. PROJECT TOTAL Prior Years $0 $0 $0 $0 $0 2006-07 $0 2007-08 617 $617 2008-09 $0 2009-10 $0 2010-11 $0 2011-12 $0 2012-13 $0 TOTAL $0 $0 $617 $0 $617 • • OPERATING COSTS ' ' ' First Fiscal Year Annually Total i. Personnel $0 Supplies $0 Service $0 Capital $0 TOTAL $0 $0 $0 • • : � = c�tt, �iy ' ' ` ``� ?y '.° X"<^ \:y;`t , a :nSL: � „:i}?': d "s^�•�^.:i :roeiG,r° Qt-I •�ie? .a;:;�N g aa0 , ``4•0 ,, <'<,I it�614. ir:x a f,,, -.1 J . S. . i:.5. 1 , t� krrttlu1,, , uflK ,g` f i pp , ti ` .Es :P9 , � 't 11� �w' �tft;4 A^" � is;itik ,v y • „e-a.-4-, l 4g } " ; ` rk `c}: .n CIM1 S i3 -0, '-o"ine soA*0.0T al -';:? kx'm:ine„, 0 Y• 1 i A4wurP ::4017iiii!,,aigp.votiw 4-4 .e; T .PA :aik;:t. v 'l � al { Cx\ r :,�,: _ .t: :z:*_ • �5,,1 « y . A: 1 E 13 e. ,;...., v .,_-1f ` - . i kir ,.N ; t ; gitttti °iri \ PARK ' «a.; 3 tt 1 3 ..:+�,� '.lieu" .o'� .1,:<: £,Prjxs^iE}`:;; 179 pRO,ECS $14,51° ®�E 1�PPP( gVOC'El 1�park\and Oed`cat+o pRO,EC-�: ohel4pavk\and p04DICES, Zon�ds 1g4.Z SOUR F F UN)' ark ECEK TUS side{or P pRO3EC,�R: PE'CEVAN SGR,p�,O14sSa e-beeoseta N\P�PGE ecKeation pF2o,EG^C®e these cued dR ao oo pROJ 14. ECS Parks ar` ed\Gabor,ordin d ir•pa - rk ' 0-011' e?as ects as i•d • W\th th tio+�PrO\ tr vo aCCordaents and rer°\Ia LYEPR pRp�EC��oT $0. \rriPro�em g' F�SCP g,0 XpEND`�VRES $7q 5�0 E • row GPLEN� R OOs�� $0 � $0 E � o ' $o PRONE f"� $° $0 t $o $0 ,��p,R ' $ q,510 \SCP Years �"� o� "� w pr20o6- Oo7'oa $0 • �Op8.09 _ �._ iota\ $0 20 10.11 $0 cqS ' $o 2so 2�11.12 Wip $0 OpERA��tJ PooUa\\ so 2012 13 ' ' so •�o1Pk a\ Year 00 First p\so $o 1 _ perso 011 7/ . , / 1 • ! ',,f,,,, 1,4 Y ' �''�;s;,its; c""q:-4* -,�-,;PI t t A��,Y:.u^.,• 7;\ ///i fir-. / 4 "rtf "t :;•hU ,Si607 t ..� J 1 x;;at;�"'\'S,;is, .,:rit;.;�•,*�'�x�'��;.,��," .:4 .,. - .s.;:�US, �?�__'. ,.;ary3*.;:,�r:.. fit, '�j,�#:=:z';n.�k„.,�'�,:, `Tr;„YE;`,g. };is. ..?2 ,x.. ,v x.. ..�,:nth` s�=�'.:r.<�x •..cv.'.,t....-�,',''�-i��}n.�.,�.���•��`,'�xt..,-..,;��^s 7.. R. si#.u�=ta,.t'.•;,tf,o �.,��r„i:":,.4•.,c„_}al,,,v.�i,.,,.;a,<. ,�,u:. "�t�" u.,n _aY,:7v,.,. �,,,}„<�.,-�„�,:, � z, >��•%it=:e- .x�?., _:,�„�°yam ,�„'•i=r'�.H. a�u:.s�'�.y.. mew ��s':`,,,�„ �s�„�-�.<.r�:i•:t. 't:�!t��;e�t.�a„*, t. 'c��i•;,:...k.�w-�, *:;:a� `la,.,:i4�"':=�:.�.ua �av:�,-::,€ ,:���' 'ti` '?T.,. "'��;'h:>,rY..,.;.,,,.,•��t';�".i.<:,,�,-:. .3+.. �i. - .�,..�..:' ;;; � s'P;:= ":ifi-^J ai";�i;:,,5rk°3 sn. ;�;Fr.�... '.r'�-,.,a.- }� '-,Ys? iW},: '�:{.. - - �k�4=-1v 5 t."«�:::4:y �:'F ':�•..:k,4;.,,i,.4.� Y:.�i,.,..,.�5„,i,v >'.xe.nt`,5,$�, :-.t:.; .w.:!`4;•.,N.:� :.s .�n,.�,�:r.L:;'dr'eitwf:�'' d.z';',,g.ju ,.};>x.,..,.R",.•;..v_.Jv.k„,car. .�., '`'t"���<.�v'.,...�:<,,;;,u���-<Y.;,?�3`�,, ,`ht_.,r�.,-Z.•� -i`��T=,3% t.�.,9•,?,�r;;.:;c,..:p:>K:r:<, �r-' _�y4')33�=y-•..L ,.�?a1:'b_�:„vk, ,,.gv��.:d,.aiY., '�;: >;,�'r }:' ..�.^:'S'�,1,.�:1 i,.1•��;:. �u .,s y4'`tA'`=''" ..dn, ,n..k,, ..T;a,:u'3:� ; , ; aa7..r,�.�g,. '<'�:,'.0 4:x�.^4?'"�° f}."°.c.`P`'•,se5:t:?;f."„ ,,,:4,'m.`s", ..id,.�i „�';....�s1,Wt. '^' SL•`S.r };�tiH,�iY". *.3.••',7-fin.,.v.N.. PROJECT: ZONE 15 PARK PROJECT#: PK0808 FUND: 185-Zone 15 Parkland PROJECT BUDGET: $18,909 PROJECT MANAGER: Ric Ploeger FUNDING SOURCES: Zone 15 Parkland Dedication PROJECT Funds CLIENT: Parks and Recreation PROJECT DESCRIPTION/STATUS . In accordance with the Parkland Dedication Ordinance,these funds have been set aside for park improvements and renovation projects as identified in Park Zone 15. PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR FISCAL YEAR LAND ENG. CONSTR. MISC. PROJECT TOTAL . Prior Years $0 $0 $0 $0 $0 • 2006-07 $0 2007-08 18,909 $18,909 2008-09 $0 2009-10 $0 2010-11 $0 2011-12 $0 2012-13 $0 TOTAL $0 $0 $18,909 $0 I $18,909 OPERATING COSTS First Fiscal Year Annually Total Personnel $0 Supplies $0 . Service $0 Capital $0 TOTAL $0 $0 $0 t ,;. ;,:.;,`-'i,rS=::ite:'31��'{r�:pr.�t•.a, ,},; :�;�..},,r �^: ci�1}:`1`"i�� "}:):v ��t,lr�,t�,,:f viYr. ri�:.lr`,,...N' ^.,r „^.r�..,'z.r o,{:::SS`} ",,A,,ti;Q,z,d,- :�;,pit;;.,,h1,:tt..,may' -, �..:tv,....,,, ,.f}. .N' f.; ';:.j:i?i',:; .Y�'3:::: :,;,V?i �..�.1,,��6.p�.L1P.":^,j'�,".: ,'Y:*.. ,pep, 'z;;;;';s:�'sz ti'i:.:S .,,:,,... „'r ry „„4,:. „, °r%i`.:t£,,.tp. +.»fi�jrp,,il .'r-r:t:,.. ,t �, .a�i.. a: >,r.I':?.r,{ ��}`n:;iti, .... ^� ",>''�.' sf:::�„."zYa,�n y T 4 Z�, �`�`�.1 ;[:i?ill... .d.,},.. ..t;:;. m,,..iii MrtchctFPRvry ,,,,.11fy,:»>.t:�et,'�;:�iti,�.,,}te�"as ,,y.<:.r �",:+;��t�i^.' sEr:fi»;:; .., \`J,s\ Y Y,�t;},�n.sgii�r`iy.�`r:t; 'i9a5=Jpa,.p,,4�,, ‹, ` '.a+; 4; .: ",A v e° STE d ,y X.,1 ` ' „Alt e j jitt.:1 .,/ / \ oYtt AaK O 'r --, ,::i ' ; n a ?� ati.1- 3gic ,p�I ?t^ n 31 � . '' 4� aP4Friy . fit. �•3p ? 4- ; , c , . , \ L„,. , ,- ` � � @'":;. ACK&DGRGTi v ,i k:�jr ;... �> ; y s .zikaiii Y \0v`� �l^'sh1.{tia�"Tu �irii i" N"ry:.1,7 a4;: .,";,.}:(iv., f"'''1fig ;.':jr'f` iyyti..%�t�°.iiuSF:,,')Pf;f:Y!'t` �4� aa1;;n '.ggt Yi.,::i' v *' y.,:Sv..t1.,,z ai :. \/ No�" p1...�i.z 4;'�iii'ti :C;aR1„t i-dxi;!F41tiY+'1'sc;:a::j:. �y' �" f,; il 181 • • • PROJECT: ZONE 16 PARK PROJECT#: TBD FUND: 186-Zone 16 Parkland PROJECT • BUDGET: $0 PROJECT • MANAGER: Ric Ploeger FUNDING • SOURCES: Zone 16 Parkland Dedication • PROJECT Funds CLIENT: Parks and Recreation PROJECT DESCRIPTION/STATUS • In accordance with the Parkland Dedication Ordinance,these funds have been set aside for park • improvements and renovation projects as identified in Park Zone 16. • PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR FISCAL YEAR LAND ENG. CONSTR. MISC. PROJECT TOTAL • Prior Years $0 $0 $0 $0 $0 2006-07 $0 • ' . 2007-08 $0 • 2008-09 $0 2009-10 $0. 2010-11 $0 • 2011-12 $0 • 2012-13 I $0 TOTAL $0 $0 $0 $0 I $0 OPERATING COSTS First Fiscal Year Annually Total Personnel $0 Supplies $0" Service $0 Capital $0 TOTAL $0 $0 $0 '4h sirft i;qf.P .e2'-:�:';x',.s<., pi('}, y.-::�tz'r,Y�li�i `'A,..,;;i A,.I�S't '� {.+' J .�" �i�.;.:F .:'a:�.i`',ti;`#`,hyt?,ti:'.` }:�✓t,1t':2•1:: L;.. .y-.a d;..x • • qi�r�'"'.`` i�i—#J:a:ty�' rtN;�'v"i rxf..�f �`-3rk..N �:;' �'�?`cltgnRt:;� ^ti�t':� ::Ex s'I`t" .y..$4?'a. 1� `sl'�;hrrAY,'.'.•..: ai ..�� :.'Z`.��1:R :F it r "'.5 � l 182 SPECIAL REVENUE- CONVENTION CENTER CAPITAL IMPROVEMENT PROJECTS FISCAL YEAR 2007-2008 THROUGH FISCAL YEAR 2012-2013 183 GENERAL GOVERNMENT CONVENTION CENTER CAPITAL IMPROVEMENT PROJECTS FISCAL YEAR 2007-2008 THROUGH FISCAL YEAR 2012-2013 PROJECT REVISED FY 06-07 • PROJECT BUDGET ACTUAL FY 06-07 BUDGET YEAR-END NUMBER AMOUNT FY 05-06 APPROPRIATIONS ESTIMATE .a • BEGINNING FUND BALANCE: $ 880,028 $ 588,842 $ 588,842 ADDITIONAL RESOURCES: CERTIFICATES OF OBLIGATION $ - $ 4,040,000 $ - INTERGOVERNMENTAL • INTRAGOVERNMENTAL TRANSFERS INVESTMENT EARNINGS 32,728 10,000 25,000 OTHER 5,237 SUBTOTAL ADDITIONAL RESOURCES $ 37,965 $ 4,050,000 $ 25,000 TOTAL RESOURCES AVAILABLE $ 917,993 $ 4,638,842 $ 613,842 PUBLIC FACILITIES CONVENTION CNTR GG0523 $ 38,380,000 $ $ 3,000,000 $ PRIOR PROJECT INFRASTRUCTURE * HWY30/60INFRASTRUCTURE GG0105 $ 4,850,000 $. 304,151 $ . - $ 416,369 CLOSED PROJECTS • CAPITAL PROJECTS SUBTOTAL $ 304,151 $ 3,000,000 $ 416,369 OTHER DEBT ISSUANCE COSTS - 40,000 - GENERAL&ADMIN CHARGES 25,000 4,785 4,785 • TOTAL EXPENDITURES $ 329,151 $ 3,044,785 $ 421,154 ENDING FUND BALANCE: $ 588,842 $ 1,594',057 $ 192,688 *Hwy 30/60 Corridor development costs funded through$1,560,000 Electric Fund,$1,690,000 Water Fund,$400,000 Wastewater Fund,and$1,200,000 from DE0002. 184 GENERAL GOVERNMENT CONVENTION CENTER CAPITAL IMPROVEMENT PROJECTS FISCAL YEAR 2007-2008 THROUGH FISCAL YEAR 2012-2013 APPROVED FY07-08 PROJECTED PROJECTED PROJECTED PROJECTED PROJECTED PROJECTED APPROPRIATIONS FY 07-08 FY 08-09 FY 09-10 FY 10-11 FY 11-12 FY 12-13 $ 192,688 $ 192,688 $ 198,688 $ 252,688 $ 235,188 $ 217,188 $ 144,688 $ - $ - $ 7,070,000 $ 9,387,950 $ 13,902,650 $ 8,401,000 $ - 6,000 6,000 7,000 7,000 7,000 5,000 4,000 $ 6,000 $ 6,000 $ 7,077,000 $ 9,394,950 $ 13,909,650 $ 8,406,000 $ 4,000 $ 198,688 $ 198,688 $ 7,275,688 $ 9,647,638 $ 14,144,838 $ 8,623,188 $ 148,688 $ - . $ - $ , 6,938,000 $ 9,294,500 $ 13,765,000 $ 8,382,500 $ - $ - $ - $ - $ $ - $ - $ - $ - $ - $ 6,938,000 $ 9,294,500 $ 13,765,000 $ 8,382,500 $ - - - 70,000 92,950 137,650 81,000 - - - 15,000 25,000 25,000 15,000 - $ - $ - $ 7,023,000 $ 9,412,450 $ 13,927,650 $ 8,478,500 $ - $ 198,688 $ 198,688 $ 252,688 $ 235,188 $ 217,188 $ 144,688 $ 148,688 185 PROJECT: Convention Center Ph III PROJECT#: GG0523 PROJECT FUND: 128 -Convention Center Fund BUDGET: $38,380,000 • - PROJECT FUNDING MANAGER: Terry Childers SOURCES: Certificates of Obligation • PROJECT CLIENT: CMO • PROJECT DESCRIPTION/STATUS Design and constructuion of Convention Center/ Hotel. PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR FISCAL YEAR LAND ENG. CONSTR. MISC. PROJECT TOTAL Prior Years 0 0 0 0 $0 2006-07 $0 2007-08 $0 . . 2008-09 5,200,000 1,738,000 $6,938,000 2009-10 I 2,412,000 6,882,500 I $9,294,500 2010-11 I 13,765,000 $13,765,000. 2011-12 I 6,882,500 1,500,000 $8,382,500 2012-13 I I I $0 TOTAL 1 $5,200,0001 $4,150,000 $27,530,0001 $1,500,000 $38,380,000 OPERATING COSTS First Fiscal Year 1 Annually Total Personnel I TBD , • Supplies TBD Service I TBD Capital I I TBD TOTAL TBD TBD1 I TBD . . b.* • -.6-, Ilw'0 :.i.`.6' -, '•4 '-r") ...v. 9 .q ,.... •,.„ 1, 'N MAP NOT AVAILABL 14, . N.:. ... L., .;.. 186 PROJECT: HIGHWAY 30/60 INFRASTRUCTURE PROJECT#: GG0105 FUND: 128-CONVENTION CENTER FUND PROJECT BUDGET: $4,850,000 PROJECT FUNDING MANAGER: Craig Jordan SOURCES: Electric Fund,Water Fund, Wastewater Fund PROJECT CLIENT: Public Works . PROJECT DESCRIPTION This project includes the design and construction of a new roadway(Copperfield Parkway)between Hwy 60 and Hwy 30 connecting Copperfield Drive in Bryan to Linda Lane in College Station. Also included is a water main extension. Sewer and other utilities will also be constructed for availability to the future development. Copperfield Parkway and the water main extension are a 100%completed and constructed. For the purposes of this project sheet,the remaining project is Highway 30/60 Infrastructure Phase II which will be to construct a looped road within a 137-acre tract with a cul-de-sac at the end. It will extend sewer, water and storm drain for its entire length of approximately 3400 feet. The proposed road will be 38 feet wide with curb,gutter and sidewalk on both sides. Highway 30/60 Infrastructure Phase II final construction bid was awarded to Dudley Construction in the amount of $1,404,004.52. P.O. No. 070446 for$255,304.92 for Landscaping Copperfield Parkway to Riverside Landscape, inc was awarded Feb. 2007. PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR FISCAL YEAR LAND ENG. CONSTR. MISC. OVERHEAD PROJECT TOTAL Prior Years $10,341 $1,269,094 $3,135,013 $19,183 $0 $4,433,631 2006-07 0 0 409,623 0 6,745 $416,369 2007-08 $0 2008-09 $0 2009-10 $0 2010-11 $0 2011-12 $0 2012-13 $0 TOTAL $10,341 $1,269,094 $3,544,636 $19,183 $6,745 $4,850,000 OPERATING COSTS First Fiscal Year Annually Total Personnel $0 Supplies $0 Service $0 Capital $0 TOTAL $0 I $0 $0- 0 y� A tea ' / %,' 6,4. e. ,- ,( / '4`NlpMvaY 301601nftastructhie. ?'41„k ,A.‘,>,/A` .p. 1\7\,.._11 ; ,, IUIIIIf 187 • • • • . CITY OF COLLEGE STATIriN HEART OF THE RESEARCH VALLEY • • • • 188 ELECTRIC CAPITAL IMPROVEMENT PROJECTS FISCAL YEAR 2007-2008 THROUGH FISCAL YEAR 2011-2012 189 • ELECTRIC SERVICE CAPITAL IMPROVEMENT PROJECTS FISCAL YEAR 2007-2008 THROUGH FISCAL YEAR 2011-2012 APPROVED • ACTUAL BUDGET FY 06-07 ESTIMATE FY 05-06 APPROPRIATION FY06-07 • ADDITIONAL RESOURCES $ 8,114,030 $ 3,365,000 $ 4,515,000 TOTAL RESOURCES AVAILABLE $ 18,332,316 $ 9,775,352 $ 10,925,352 • TOTAL EXPENDITURES,MODIFIED • ACCRUAL BASIS OF ACCOUNTING $ 11,958,156 $ 10,537,765 $ 10,039,435 • MEASUREMENT FOCUS ADJUSTMENT $ 36,192 BEGINNING WORKING CAPITAL • BALANCE,ACCRUAL BASIS OF ACCOUNTING: $ 10,218,286 $ 6,410,352 $ 6,410,352 ENDING WORKING CAPITAL BALANCE, ACCRUAL BASIS OF ACCOUNTING: $ 6,410,352 $ (762,413) $ 885,917 • • • • • • • 190 ELECTRIC SERVICE CAPITAL IMPROVEMENT PROJECTS FISCAL YEAR 2007-2008 THROUGH FISCAL YEAR 2011-2012 PROJECTED PROJECTED PROJECTED PROJECTED PROJECTED FY 07-08 FY08-09 FY09-10 FY10-11 FY11-12 $ 11,962,000 $ 10,187,400 $ 6,187,300 $ 8,862,300 $ 8,862,300 $ 12,847,917 $ 10,766,560 $ 6,203,860 $ 8,876,160 $ 9,176,460 $ 12,268,757 $ 10,750,000 $ 6,190,000 $ 8,562,000 $ 8,637,000 $ 885,917 $ 579,160 $ 16,560 $ 13,860 $ 314,160 $ 579,160 $ 16,560 $ 13,860 $ 314,160 $ 539,460 • 191 • • • Agy • • CITY OF COLLEGE STATION • • HEART OF THE RESEARCH VALLEY • • • 192 WATER CAPITAL IMPROVEMENT PROJECTS FISCAL YEAR 2007-2008 THROUGH FISCAL YEAR 2012-2013 193 WATER SERVICE CAPITAL IMPROVEMENT PROJECTS FISCAL YEAR 2007-2008 THROUGH FISCAL YEAR 2012-2013 " FY08 PROJECT REVISED •. PROJECT WORK REQUEST BUDGET ACTUAL FY 06-07 ESTIMATE NUMBER NUMBER AMOUNT FY05.06 APPROPRIATIONS FY06-07 • ADDITIONAL RESOURCES: UTILITY REVENUE BONDS $ 6,000,000 $ 14,750,000 $ 10,750,000 INTEREST ON INVESTMENTS 2,035 76,000 97,000 TRANSFERS FROM OPERATIONS 6,000,000 2,500,000 600,000 OTHER - 75,000 75,000 • SUBTOTAL ADDITIONAL RESOURCES $ 12,002,035 $ 17,401,000 $ 11,522,000 .a . TOTAL RESOURCES AVAILABLE $ 16,657,444 $ 23,275,694 $ 17,396,694 PRODUCTION PROJECTS SOURCE AND SUPPLY PLANT-WSWOC WELL#7 WT0106 WF0353607 2,962,875 589 2,570,000 189,263 WELL#7 COLLECTION LINE' WT0203 'WF0353621 ' • 3,719,876 - - - 186,952 • PARALLEL WELLFIELD COLL LINE PH I - WF0352553 4,260,191 - - 226,065 PARALLEL WATER TRANS LINE-SH21-VILLA MARIA WT0116 WF0352317 . 7,838,793 339,451 4,625,864 267,229 ' LAND ACQUISITION-WELLS WT0206 WF0377324 3,522,614 - - 500,000 WELL SITE DRAINAGE" WPWOC TBD 250,000 " - - WATER PUMPING AND TREATMENT PLANT-WPWOC DOWLING ROAD 10MG GST-LAND PURCHASE WT0117 -" WF0353631 .209,890 19 - 70,000. DOWLING ROAD PUMP/CHEMICAL SYSTEM - WF0499740 3,519,780 2,818,437 800,000 180,000 COOLING TOWER UPGRADE "" ' WTWOC TBD 115,000 ' - 115,000 - 115,000 SANDY POINT PUMP STATION&WELLFIELD EROSION - WF0461924 255,901 20,147 - 135,000 GREENS PRAIRIE ELEVATED STORAGE ELECTRIC UPGRAC WTWOC TBD ' "._.75,000' - " • WATER GENERAL PLANT-WGWOC SCADA REPLACEMENT ' - _ - . WF0742940 351,751- 18,751 108,751 105,000' • WATER PLANT SECURITY - WF0466439 1,492,969 767,696 572,937 350,000 SPPS FIBER OPTIC LINE - - TBD 500,000 _ - - CLOSED PROJECTS 3,254,616 649,685 95,235 SUBTOTAL $ 7,219,707 $ 9,442,237 $ 2,419,744 • DISTRIBUTION PROJECTS • TRANSMISSION AND DISTRIBUTION PLANT-WTWOC OVERSIZED PARTICIPATION - WF0742715 ANNUAL - - . _ 32,950 32,950" • CENTRAL PARK LANE EXTENSION OP FY04-05 WF0592456 3,670 - - 3,670 • - DOVE CROSSING SUBDIVISION,PHI OP FY04.05 WF0592456 14,336 39,021 - 14,303 • SHENANDOAH PH 12&13 FY03-04 WF0579115 7,524 - - 7,524 - SONOMA PHASE 2-24"WATER LINE WF0934457 167,050 - - 167,050 167,050 • VICTORIA WATER OP - WF0537425 100,000 - - 12,000 B/CS PUMP INTERCONNECT - WF0751883 208,392 2,358 58,392 206,034 .. WATER RECLAIM/IRRIGATION WT0110 TBD 2,715,730 - 75,730 84,000 'SC DARTMOUTH WATER EXTENSION PII • - - WF0350795 220,000 - 220,000 FC FIRE STATION#3-BARRON ROAD WF0632255 28,000 (12,129) 3,000 25,630 'SC JONES-BUTLER WATER EXT PHII - _ WF0680235 - 40,000 " 3,956 - 23,000 36,044 WELLBORN WIDENING - WF0613546 4,250,000 826,151 3,510,000 3,358,775 • ROCK PRAIRIE WATER SERVICE EXT WT0102 WF0352094 . 1,531,098 . -1,272,702 90,948 11,110 . ARRINGTON RD WATER SERVICE EXT - WF0379145 745,056 3,706 255,293 697,136 BARRON ROAD WATER SERVICE EXT - - WF0379197 2,383,253 950,043 - - 656,328 LICK CREEK/ROCK PRAIRIE SERVICE EXT - WF0379226 187,534 121,274 - 22,025' 194 WATER SERVICE CAPITAL IMPROVEMENT PROJECTS FISCAL YEAR 2007-2008 THROUGH FISCAL YEAR 2012-2013 APPROVED FY07-08 PROJECTED PROJECTED PROJECTED PROJECTED PROJECTED PROJECTED , APPROPRIATIONS FY 07-08 FY 08-09 FY 09-10 FY 10-11 FY 11-12 FY 12-13 $ 15,100,000 $ 15,100,000 $ 3,050,000 $ 750,000 $ 550,000 $ - $ 250,000 16,000 16,000 14,700 14,000 15,700 16,000 8,000 1,000,000 1,000,000 1,400,000 - - - - . 3,593,000 - - - - $ 16,116,000 $ 16,116,000 $ 8,057,700 $ 764,000 $ 565,700 $ 16,000 $ 258,000 $ 22,815,896 $ 22,815,896 $ 8,120,407 $ 4,399,725 $ 4,515,425 $ 4,101,425 $ 3,994,425 . - 2,500,000 - - .- 2,911,028 2,905,191 4,016,435 - - - - - 1,907,929 5,500,000 _ - - - - .. - • 2,422,614 2,500,000 500,000 - - - - 250,000 250,000 - - .. - - " ' , ' 75,000 ' 75,000 - - - - -- 228,000 150,000 78,000 _ - - - _ . - 232,305 - - - - - $ 10,699,760 $ 19,105,188 $ 578,000 $ - $ - $ $ - 100,000 , ' ' ' 100,000 '_ 100,000 - - - 100,000 - 100,000 ,'100,000 - -100,000. - 30,000 39,939 - - - -- - - - 2,590,000 - - - _ - - - - 390,000 - - " 195 WATER SERVICE CAPITAL IMPROVEMENT PROJECTS • FISCAL YEAR 2007-2008 THROUGH FISCAL YEAR 2012-2013 FY08 PROJECT REVISED PROJECT WORK REQUEST BUDGET ACTUAL FY 06-07 ESTIMATE NUMBER NUMBER AMOUNT FY 05-06 APPROPRIATIONS FY 06.07 2002 ANNEXATION PROJECTS ROCK P RD S OF CARTER LAKE(AREA 5) - WF0805789 178,811 3,811 300,000 175,000 WILLIAM 0 FITCH EAST(AREA 6) - WF0805807 672,000. 2,944 274,800 258,000 DONATED WATER NA 0 19,669 - -CLOSED PROJECTS .29,410 .1.000,500 SUBTOTAL $ 3,262,916 $ 5,791,663 $ 6,187,579 REHABILITATION PROJECTS: SC BARRON ROAD REHAB - WF0654325 $ 100,000 - - 25,000 • DC BEE CREEK PHASES IV&V TBD 120,000 - SC CHURCH AVENUE REHAB-PHASE II - WF0632256 51,000 - 39,000 48,825 SC TAUBER&STASNEY WF0625888 120,000 15,689 - 48,597 TEXAS AVE.RELOCATION SOUTH WT1012 WF0351282 $ 1,991,406 395,702 - 6,743 SC . PEDESTRIAN IMP ON 2818ANELSH - WF0614950 150,025 - 25 96,300 SC WEST PARK - WF0427233 $ 1,250,000 508,759 - 662,279 "SC COLLEGE PARK/BREEZY HEIGHTS WF0595915 1,640,000. 34,464 .. 1,531,250 - 580,062 SOUTH KNOLL/THE GLADE - TBD $ 1,725,000 - - - CLOSED PROJECTS - 37,691 - - 487 SUBTOTAL $ 992,306 $ 1,570,275 $ 1,466,293 • CAPITAL PROJECTS CONTINGENCY . - WF0608079 ANNUAL . - 243,000 243,000 CAPITAL PROJECTS SUBTOTAL $ 11,474,929 $ 17,047,175 $ 10,318,616 GENERAL AND ADMINISTRATIVE 156,762 215,681 215,681 DEBT ISSUANCE COST 3,883 162,500 162,500 TOTAL EXPENDITURES,MODIFIED ACC RAL BASIS OF ACCOUNTING $ 11,635,574 $ 17,425,356 $ 10,696,797 BEGINNING WORKING CAPITAL BALANCE,ACCRUAL BASIS OF ACCOUNTING: $ 4,655,409 $ 5,874,694 $ 5,874,694 MEASUREMENT FOCUS ADJUSTMENT 852,823 • ENDING WORKING CAPITAL BALANCE,ACCRUAL BASIS OF ACCOUNTING: $ 5,974,694 $ 5,850,338 $ 6,699,896 SC = Project funded through combination of sources.Project sheet reflected in Streets section of CIP document. FC = Project funded through combination of sources.Project sheet reflected in Facilties section of CIP document. • DC = Project funded through combination of sources.Project sheet reflected in Drainage section of CIP document. • • 196 WATER SERVICE CAPITAL IMPROVEMENT PROJECTS FISCAL YEAR 2007-2008 THROUGH FISCAL YEAR 2012-2013 APPROVED FY07.08 PROJECTED PROJECTED PROJECTED PROJECTED PROJECTED PROJECTED . APPROPRIATIONS FY 07-08 FY 08-09 FY 09-10 FY 10-11 _ FY 11-12 FY 12-13 275,000 411,056 . - . - - - - . . - • $ 375,000 $ 931,056 $ 2,729,939 $ 100,000 $ 100,000 $ 100,000 $ 100,000 - 75,000 - - - - - 120,000 120,000 - - - - - . - 50,000 50,000 - - .. . - _ -- 6,743 6,743 6,743 - - - - 991,366 - - - - - 900,000 900,000 825,000 - - - - $ 1,076,743 $ 2,143,109 $ 831,743 $ - $ - $ - $ - ' . 150,000 ,150,000 150,000 150,000 - _150,000 _ - 150,000 150,000 . $ 12,301,503 $ 22,329,353 $ 4,289,682 $ 250,000 $ 250,000 $ 250,000 $ 250,000 309,836 309,836 100,000 100,000 100,000 100,000 100,000 114,000 114,000 95,000 100,000 80,000 15,000 15,000 $ 12,725,339 $ 22,753,189 $ 4,484,682 $ 450,000 $ 430,000 $ 365,000 $ 365,000 $ 6,699,896 $ 6,699,896 $ 62,707 $ 3,635,725 $ 3,949,725 $ 4,085,425 $ 3,736,425 $ 10,090,557 $ 62,707 $ 3,635,725 $ 3,949,725 $ 4,085,425 $ 3,736,425 $ 3,629,425 197 . PRODUCTION PROJECTS 198 WORK ORDER#: WF0353607 PROJECT: WELL#7 PROJECT#: WT0106 FUND: WATER CAPITAL PROJECTS PROJECT BUDGET: $2,962,875 PROJECT MANAGER: FRED SUROVIK FUNDING SOURCES: Utility Revenue Bonds PROJECT CLIENT: Water Services PROJECT DESCRIPTION/STATUS. Purchase land, conduct engineering design, and construction of additional 4 MGD water well. This will also include security, electrical, SCADA, and drainage infrastructure. The additional capacity is required to meet TCEQ regulations for pumping capacity to match projected population. PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR FISCAL YEAR LAND ENG. CONSTR. MISC. PROJECT TOTAL Prior Years 24,836 248,776 0 0 $273,612 2006-07 5,000 184,263 $189,263 2007-08 2,500,000 $2,500,000 2008-09 $0 2009-10 $0 2010-11 $0 2011-12 $0 2012-13 $0 TOT AL $29,836 $433, 039 $2,500,000 $0 $2,962,875 . .. OPERATING COSTS First Fiscal Year Annually...... .. • Total Personnel 0 0 $0 Supplies 0 $0 Service 152,000 $152,000 Capital $0 TOTAL $0 $152,000 ........ ��,.... ........_... .............. ._.... ..,$152,000 CITY OF COLLEGE STATION 199 WORK ORDER#: WF0353621 • PROJECT: WELL#7 COLLECTION LINE PROJECT#: WT0203 FUND: WATER CAPITAL PROJECTS PROJECT BUDGET: $3,719,876 PROJECT • MANAGER: FRED SUROVIK FUNDING • SOURCES: Utility Revenue Bonds PROJECT • CLIENT: Water Services PROJECT DESCRIPTION/STATUS providesline col lection of construction for land purchase, engineering design, and ne Project progressing from Water Well#7 approximately 10,400 linear feet to a connection point in the existing wellfield collection line. The additional capacity is required to meet TCEQ regulations for pumping capacity to match projected population. : ,. .... . . .. PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR LAND• ENG. CONSTR. MISC. PROJECT TOTAL Prior Years 9,613 141,863 0 0 $151,476 2006-07 186,952 $186,952 2007-08 249,448 3,132,000 $3,381,448 2008-09 $0 2009-10 $0 2010-11 $0 2011-12 $0 • 2012-13 $0 .... ........TOTAL... $196,565 $391,311 $3,132,0 00 $0 $3,719,876 OPERATING COSTS • First Fiscal Year ...... Annually ... Total Personnel $0 Supplies $0 Service $0 Capital $0 TOTAL $0 $0 $0 r CITY OF COLLEGE STATION 200 ------ ------ --- --- --- --- --- WORK ORDER#: WF0352553 PROJECT: PARALLEL WELLFIELD COLLECTION PROJECT#: WSWOC LINE PHASE I FUND: WATER CAPITAL PROJECTS PROJECT BUDGET: $4,260,191 PROJECT MANAGER: ED SAVAGE FUNDING SOURCES: Utility Revenue Bonds PROJECT CLIENT: Water Services PROJECT DESCRIPTION/STATUS.. Construction of a collection line for the water wells parallel to the existing line. The existing line is operating at maximum design capacity with the input of six wells. The construction of Well#7 will require this additional pipeline to deliver water to Sandy Point Pump Station. PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR FISCAL YEAR LAND ENG. CONSTR. MISC. PROJECT TOTAL Prior Years 6,308 11,384 0 0 $17,691 2006-07 127,500 98,565 $226,065 2007-08 127,500 365,935 3,523,000 $4,016,435 2008-09 $0 2009-10 $0 2010-11 $0 2011-12 $0 2012-13 $0 TOTAL ., $261,308 $475,884 $3,523,000 $0 $4,260,191 OPERATING COSTS First Fiscal Year Annually Total. Personnel $0 Supplies $0 Service $0 Capital $0 TOTAL $0 $0 $0 • CITY OF COLLEGE STATION 201 WORK ORDER#: WF0352317 PROJECT: PARALLEL WATER TRANSMISSION SH 21 PROJECT#: WT0116 VILLA MARIA FUND: WATER CAPITAL PROJECTS PROJECT BUDGET: $7,838,793 PROJECT MANAGER: ED SAVAGE FUNDING SOURCES: Utility Revenue Bonds PROJECT CLIENT: Water Services PROJECT DESCRIPTION/STATUS Construct parallel water transmission line along FM2818 from Hwy 21 south to Villa Maria Road; approximately 21,000 LF of 36" diameter pipe. The additional system capacity required to support Northgate area and provide water service to annexed area west of FM2818 along FM60. Project supports additional water distribution interconnection with TAMU. Project has been deferred 4 years due to land acquisition. PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR FISCAL YEAR LAND ENG. CONSTR. 1 MISC. I PROJECT TOTAL Prior Years 1,634,185 425,493 11,8861 0 $2,071,564 2006-07 141,229 126,000 01 $267,229 2007-08 23,771 5,476,2291 $5,500,000 2008-09 $0 2009-10 $0 2010-11 $0 2011-12 ( $0 2012-13 $0 TOTAL $1,775,414 $575,264 $5,488,115 $01 $7,838,793 OPERATING COSTS First Fiscal Year Annually Total Personnel $0 • Supplies $0 Service $0 Capital $0 TOTAL $0 $0 1 $0 $p 3 CITY OF COLLEGE STATION • 202 ---- --------------------------------- - �.. .�.-.....W...._.............. WORK ORDER#: WF0377324 PROJECT: LAND ACQUISITION -WELLS PROJECT#: WSWOC FUND: WATER CAPITAL PROJECTS PROJECT BUDGET: $3,522,614 PROJECT MANAGER: FRED SUROVIK FUNDING SOURCES: Utility Revenue Bonds PROJECT CLIENT: Water Services PROJECT DESCRIPTION/STATUS Land to be purchased for future Well Site#8. PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR FISCAL YEAR LAND ENG. CONSTR. MISC. PROJECT TOTAL Prior Years 22,614 0 0 0 $22,614 2006-07 500,000 $500,000 2007-08 2,500,000 $2,500,000 2008-09 500,000 $500,000 2009-10 $0 2010-11 $0 2011-12 $0 2012-13 $0 TOTAL $3,522,614 $0 $0 $0 $3,522,614 OPERATING COSTS First Fiscal Year Annually Total Personnel $0 Supplies $0 Service $0 Capital $0 TOTAL $0 $0 $0 • � E CITY OF COLLEGE STATION 203 WORK ORDER#: PROJECT: WELL SITE DRAINAGE PROJECT#: TBD 'FUND: WATER CAPITAL PROJECTS PROJECT • . BUDGET: $250,000 - ' PROJECT MANAGER: TBD FUNDING SOURCES: Utility Revenue Bonds • • PROJECT CLIENT: Water Services PROJECT DESCRIPTION/STATUS .a On occasion, significant amounts of water must be discharged at each well head, for both water quality control and to comply with drainage regulations. This project will provide flow controls that will mitigate the impacts to adjoining properties of well site drainage and well blow off. PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR • FISCAL YEAR LAND ENG. CONSTR. MISC. PROJECT TOTAL Prior Years 0 0 0 0 $0 2006-07 $0 2007-08 250,000 $250,000. 2008-09 $0. 2009-10 $0 2010-11 $0. 2011-12 $0 • 2012-13 $0 TOTAL $0 $0 $250,000 $0 $250,000 OPERATING COSTS First Fiscal Year Annually Total Personnel $0 $0 $0 • Supplies $0 Service $0 Capital $0 TOTAL $0 $0 $0 CITY OF COLLEGE STATION 204 WORK ORDER#: WF0353631 PROJECT: Dowling Road Ten MG Tank- PROJECT#: WT0117 Land Purchase FUND: WATER CAPITAL PROJECTS PROJECT BUDGET: $209,890 PROJECT MANAGER: FRED SUROVIK FUNDING SOURCES: Utility Revenue Bonds PROJECT CLIENT: Water Services PROJECT DESCRIPTION/STATUS.. This project is for the purcahse of land associated with the future construction of a new Ground Storage g Tank of 10 MG capacity at the Dowling Road Pump Station. PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR FISCAL YEAR LAND ENG. CONSTR. MISC. PROJECT TOTAL Prior Years 139,890 0 0 $139,890 2006-07 70,000 $70,000 2007-08 $0 2008-09 $0 2009-10 $0 2010-11 $0 2011-12 $0 2012-13 $0 TOTAL $209,890 $0 $0 $0 $209,890 .. „ . . OPERATING RATIN COSTS.. Personnel First Fiscal Year AnnuallyAnnual) , .. y �O I Total $0 Supplies $0 Service $0 Capital $0 TOTAL $0 $0 $0 t � � S CITY OF COLLEGE STATION 205 WORK ORDER#: WF0499740 PROJECT: DOWLING ROAD PUMP STATION PROJECT#: WPWOC CHEMICAL FEED & STORAGE SYSTEM FUND: WATER CAPITAL PROJECTS PROJECT • BUDGET: $3,519,780 PROJECT MANAGER: FRED SUROVIK FUNDING • SOURCES: Utility Revenue Bonds PROJECT CLIENT: Water Services PROJECT DESCRI PTI®N/STATUS The Chemical Feed and Storag e facilities at Dowling Road Pump Station require upgrading to accommodate current expansion of its Water Production infrastructure and to be in compliance with current fire codes. Engineering investigations supporting the expansion effort have identified the need to replace the existing Chlorine Disinfection System to improve personnel safety and operating realibility and cost efficiency. February 26, 2004, Engineering Contract#04-062 approved by Council, Item#11.7. PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR FISCAL YEAR LAND ENG. CONSTR. .......I,,,,,,,,,,,,,,,,MISC. PROJECT TOTAL Prior Years 0 416,585 2,923,1951 0 $3,339,780• 2006-07 180,000 $180,000 • • 2007-08 $0 2008-09 $0 2009-10 $0 2010-11 $0 2011-12 $0 2012-13 $0 TOTAL $0 $416,585 $3,103,195 $0 $3,519,780 OPERATING COSTS . . . . First Fiscal Year Annually Total. Personnel $0 Supplies $0 Service $0" Capital $0 TOTAL„ ...,,. . . ..,. $0 $0 ... .. .. ..,. .. . .„ . .. .._.... $0 S 4 3 CITY OF COLLEGE STATION • 206 • WORK ORDER#: PROJECT: COOLING TOWER UPGRADE PROJECT#: WF0857892 FUND: WATER CAPITAL PROJECTS PROJECT BUDGET: $115,000 PROJECT MANAGER: FRED SUROVIK FUNDING SOURCES: Utility Revenue Bonds PROJECT CLIENT: Water Services PROJECT DESCRIPTION/STATUS This project replaces the existing cooling tower fans, which have begun to fail, and replaces the associated gearboxes, which have exceeded the rated service life for their seals and bearings. PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR ' FISCAL YEAR LAND ENG. CONSTR. MISC. PROJECT TOTAL Prior Years 0 0 0 0 $0 2006-07 115,000 $115,000 2007-08 $0 2008-09 $0 2009-10 $0 2010-11 $0 2011-12 $0 2012-13 $0 ....TOTAL............. . . . $0 „.. . $0 $115,000 $0 $115,000 OPERATING COSTS..... Annually Total Personnel First Fiscal Year $0 P nel Supplies I $0 Service $0 Capital $0 TOTAL $0 $0 $0, CITY OF COLLEGE STATION 207 WORK SANDY POINT PUMP STATION ORDER#: WF0461924 • PROJECT: EROSION IMPROVEMENTS PROJECT#: WPWOC FUND: WATER CAPITAL PROJECTS PROJECT BUDGET: $255,901 PROJECT MANAGER: FRED SUROVIK FUNDING SOURCES: Utility Revenue Bonds PROJECT CLIENT: Water Services PROJECT DESCRIPTION/STATUS This project will remediate erosion damage to downstream property as well as provide infrastructure g to control discharges and thereby limit the potential for future damage. PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEA R FISCAL YEARears LAND 0 . .. .1 N7 . CONSTR.4 MIS 3 064 PROJECT TOTAL $120,901, Prior 2006-07 26,000 109,000 $135,000 2007-08 $0 . , ' • 2008-09 $0 2009-10 $0 2010-11 2011-12 1 $0• . $0 2012-13 I $0 TOTAL I .. .$143,523 $109,314 $3,0641 $255,901 $0...... OPERATING COSTS First Fiscal Year Annually Total. Personnel $0 • Supplies $0 Service I $0 Capital I $0 TOTAL $0 $0 1 $0 , S 4i CITY OF COLLEGE STATION 208 • WORK ORDER#: PROJECT: Greens Prairie Elevated Storage PROJECT#: TBD Electric Upgrade FUND: WATER CAPITAL PROJECTS PROJECT BUDGET: $75,000 PROJECT MANAGER: TBD FUNDING SOURCES: Utility Revenue Bonds PROJECT CLIENT: Water Services PROJECT DESCRIPTION/STATUS The city has conducted a vu lnerability assesment of its water production facilities as manadated under the homeland security act. The recommended improvements include security upgades at Greens Prairie Elevated Storage Tank and Park Place Elevated Storage Tank. The existing electrical system a Greens Prairie is inadequate and must be upgraded to support these security features. PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR FISCAL YEAR LAND ENG. CONSTR. MISC. PROJECT TOTAL Prior Years 0 0 0 0 $0 2006-07 $0 2007-08 75,000 $75,000 2008-09 $0 2009-10 $0 2010-11 $0 2011-12 $0 2012-13 $0 TOTAL $75,000 $0 $75,000 OPERATING COSTS First FiscalYear r Annually Total .... . Personnel $0 Supplies $0 Service $0 Capital $0 TOTAL $0 $0 $0 t J CITY OF COLLEGE STATION 209 WORK ORDER#: WF0742940 • PROJECT: SCADA REPLACEMENT PROJECT#: WGWOC • FUND: WATER CAPITAL PROJECTS PROJECT BUDGET: $351,751 PROJECT MANAGER: MIKE KELLOGG FUNDING SOURCES: Utility Revenue Bonds PROJECT CLIENT: Water Services PROJECT DESCRIPTION/STATUS This project will facilitate the replacement of control based equipment that has exceeded its useful service life. It will upgrade the control of the plants into a more integrated architecture that will: 1. Reduce development time and cost by the re-use of engineering practices. 2. Maximize returns from existing assets, through greatly improved control and monitoring. 3. Reduce future installation cost by utilizing standard bus technologies. 4. Provide a means of being proactive in maintaining equipment with available diagnostic tools. PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR FISCAL YEAR LAND ENG.® CONSTR. MISC. PROJECT TOTAL Prior Years 0 0 18,751 0 $18,751 • 2006-07 105,000 $105,000 2007-08 150,000 $150,000 2008-09 78,000 $78,000 2009-10 $0 2010-11 $0 2011-12 $0 2012-13 $0 TOTAL $0 $0. $351,751 $0 $351,751 OPERATING COSTS Fiscal YearAnnually First Total Personnel $0 Supplies $0 Service $0. Capital $0 TOTAL $0 $0 $0 1a aim 1 CITY OF COLLEGE STATION 210 . . ... _ .�.. WORK m �, ORDER#: WF0466439 PROJECT: WATER PLANT SECURITY PROJECT#: WGWOC FUND: WATER CAPITAL PROJECTS PROJECT BUDGET: $1,492,969 PROJECT MANAGER: MICHAEL KELLOGG FUNDING SOURCES: Utility Revenue Bonds PROJECT CLIENT: Water Services PROJECT DESCRIPTION/STATUS Design, construct, and install equipment and systems to strengthen security and minimize risks of potential terrorists activities and other threats to City's Water Production infrastructure including geographically isolated water wells, pumping stations, and storage reservoirs. Vulnerability Assessment consultant contract 03-66 mandated by the U.S. Department of Homeland Security, the Centers for Disease Control and Prevention (CDC), and Environmental Protection Agency (EPA)approved by City Council 03-13-03. February 26, 2004 Engineering Contract#04-062 approved by Council, Item#11.7 PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR FISCAL YEAR LAND ENG. CONSTR. MISC. PROJECT TOTAL Prior Years 0 181,075 712,713 16,875 $910,664 2006-07 48,000 300,000 2,000 $350,000 2007-08 30,720 93,585 108,000 $232,305 2008-09 $0 2009-10 $0 2010-11 $0 2011-12 I I $0 2012-13 I I I I I $0 TOTAL 6, $1 26 � .$01 $259,7951 $1,106,298 ,8751 , $1,492,969 OE P RATING COSTS First Fiscal Year Annually ... � .. Total„ Personnel $0 Supplies $0 Service $0 Capital ' $0 TOTAL $0 $01 $0 r CITY OF COLLEGE STATION 211 ASINIESSIMIMS .008011=1.111.61.04 WORK ORDER#: TBD PROJECT: SANDY POINT PUMP STATION (SPPS) PROJECT#: WGWOC FIBER OPTIC LINE FUND: WATER CAPITAL PROJECTS PROJECT BUDGET: $500,000 • PROJECT MANAGER: MICHAEL KELLOGG FUNDING SOURCES: Utility Revenue Bonds PROJECT CLIENT: Water Services PROJECT DESCRIPTION/STATUS Design, procure, and install fiber optic cornmunications between Dowling Road Pump Station and • Sandy Point Pump Station. This link will allow for data communications for Plant Control, Security and Computer Workstations. The approximate length of fiber is 17 miles and allows for 24 fibers minimum. This project is to be coordinated with the Water Transmission -SH21 to Villa Maria completion. • • • PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR FISCAL YEAR LAND ENG. CONSTR. MISC. PROJECT TOTAL Prior Years 0 0 0 0 $0 2006-07 $0 2007-08 I 100,000 400,000 $500,000 2008-09 $0 2009-10 $0 • 2010-11 $0 2011-12 $0 • 2012-13 $0 TOTAL $0 $100,000 $400,000 $0 $500,000 OPERATING COSTS First Fiscal Year Annually Total Personnel $0 • Supplies $0 Service $0 • Capital $0 TOTAL $0 $0 • $0 CITY OF COLLEGE STATION • 212 DISTRIBUTION PROJECTS 213 WORK ORDER#: WF0742715 PROJECT: OVERSIZE WATER LINES PROJECT#: WTWOC FUND: WATER CAPITAL PROJECTS PROJECT BUDGET: Annual • PROJECT MANAGER: ED SAVAGE FUNDING • SOURCES: Utility Revenue Bonds PROJECT CLIENT: Water Services • PROJECT DESCRIPTION/STATUS These funds are available for oversize TOCiPation with developers in the construction of water lines above th e minimum size needed to serve the development. This allows lines to be built large enough to meet future • development without having to go back and install larger lines. Projects are identified based on • development activity. • Projects funded for FY 06-07: $167,050 transferred to Sonoma Phase II-24"water line Projects funded for FY 05-06-WF0763380: Valley Park $102,050.00 WF0763380/001 CANCELLED • Projects funded for FY 04-05-WF0592456: Quality Inn Ponderosa $30,067.00 WF0592456/001 Waterwood-Central Park Lane Extension $3,670.00 WF0592456/002 • Cotton-Dartmouth Dr Extension $6,174.55 WF0592456/003 CANCELLED Dove Crossing Subdivision,Phase I $14,336.00 WF0592456/004 Castlegate-Section 6 $5,784.00 WF0592456/005 Projects funded for FY 03-04-WF0472461: Shenandoah Phase 9 $16,142.82 WF0472465 Westfield Village Phase 6 $8,324.60 WF0472458 Shenandoah Phase 8A $8,957.20 WF0477949 Shenandoah Phase 12& 13 $7,524.25 WF0579115 PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR FISCAL YEAR LAND ENG. CONSTR. MISC. PROJECT TOTAL Prior Years 0 0 0 0 $0 • 2006-07 32,950 $32,950 2007-08 100,000 $100,000 2008-09 100,000 $100,000 2009-10 100,000 $100,000 2010-11 100,000 $100,000 2011-12 100,000 $100,000 2012-13 100,000 $100,000 TOTAL $0 $0 $632,950 $0 $632,950 OPERATING COSTS —....._ __._ ....® First FiscalAnnually Year 1 Total Personnel $0 • Supplies $0 • Service $0 Capital $0 • TOTAL $0 f $0 0 • • ,,, CITY OF COLLEGE STATION 214 WORK ORDER#: WF0934457 PROJECT: Sonoma Phase II Water Line PROJECT#: WTWOC FUND: WATER CAPITAL PROJECTS PROJECT BUDGET: $167,050 PROJECT MANAGER: Spencer Thompson FUNDING SOURCES: Utility Revenue Bonds PROJECT CLIENT: Water Services PROJECT DESCRIPTION/STATUS This project is associated with th e development of Sonoma Subdivision, Phase 2. The City required the construction of a 24 inch water line for the larger City system. Subsequently, the developer's engineer demonstrated that an 8 inch water line was adequate for the developer's specific development. This oversized participation request is the construction cost difference for upsizing an 8 inch water line to a 24 inch water line for a 1,229 linear feet section along William D. Fitch Pkwy. PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR FISCAL YEAR LAND ENG. CONSTR. MISC. PROJECT TOTAL Prior Years 0 0 0 0 $0 2006-07 167,050 $167,050 2007-08 $0 2008-09 $0 2009-10 $0 2010-11 $0 2011-12 $0 2012-13 $0 TOTAL $0 $0 $167,050 $0 $167,050 .. ..... ... .. .. .. ... .. OPERATING COSTS .. ..... ..... ... ... ... First Fiscal Year ........ . .... Annually L........ . . ....Total....... Personnel I $0 Supplies $0 Service I $0 Capital I $0 TOTAL $01 $01 ...... $0. vE CITY OF COLLEGE STATION 215 WORK ORDER#: WF0537425 PROJECT: VICTORIA STREET OP PROJECT#: WTWOC FUND: WATER CAPITAL PROJECTS PROJECT BUDGET: $100,000 PROJECT MANAGER: SPENCER THOMPSON FUNDING SOURCES: Utility Revenue Bonds PROJECT CLIENT: Water Services d PROJECT DESCRIPTION/STATUS This project will extend Victoria Street water line from Barron Road to SH40. It will be necessary to extend oversized 12"water approximately 3,000 linear feet. This project will be coordinated with Streets Project ST9928, which is needed to provide a . north-south access to a future CSISD school. • Projects funded from this Victoria Street Water OP Project: •. FY 03-04: Westfield Village Phases 2 & 3 $18,061.20 WF0537425/001 FY04-05-Westfield Village Phases 4 & 5 $11,895.08 WF0537425/002 PROJECT CALENDAREXPENDITURES BY FISCAL YEAR OF FISCAL AYearsR LAND 0 ENG. 0 CONSTR. 8,061 MISC.., 0 PROJECT TOTAL $18,061 2006-07 I 12,000 $12,000 2007-08 30,000 $30,000 2008-09 39,939 $39,939 2009-10 $0 • 2010-11 $0 2011-12 $0 2012-13 $0 ..._ .. ,.� OPERATING CO TS ._. . ... TOTAL..... $0 $0 $100,000 $0 $100,000• First Fiscal Year Annually Total Personnel $0 • Supplies $0 Service $0 Capital $0 TOTAL $0 $0 $0 CITY OF COLLEGE STATION 216 WORK ORDER#: WF0751883 PROJECT: B/CS PUMP INTERCONNECT PROJECT#: WTWOC FUND: WATER CAPITAL PROJECTS PROJECT BUDGET: $208,392 PROJECT MANAGER: ED SAVAGE FUNDING SOURCES: Utility Revenue Bonds PROJECT CLIENT: Water Services PROJECT DESCRIPTION/STATUS Joint project with City of Bryan to construct an interconnect to supply water to either City in emergency situations. i.e.: Water transmission line outage, storage tank problems, distribution line problems, well or well field problems. This interconnect would be located in the vicinity of 29th Street, Tarrow, and the joining City limit line. PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR FISCAL YEAR LAND ENG. CONSTR. MISC. PROJECT TOTAL Prior Years 0 0 2,358 0 $2,358 2006-07 206,034 $206,034 2007-08 $0 2008-09 $0 2009-10 $0 2010-11 $0 2011-12 $0 2012-13 I $0 TOTAL $0 $0 $208,392 $01 $208,392 OPERATING COSTS First Fiscal Year y Annual! Total Personnel $0 Supplies i $0 Service i $0 Capital I $0 TOTAL $0 $01 $0 • CITY OF COLLEGE STATION 217 • atemo: •LI WORK ORDER#: TBD PROJECT: WATER RECLAIMED - IRRIGATION PROJECT#: WT0110 'FUND: WATER CAPITAL PROJECTS PROJECT • BUDGET: $2,715,730 PROJECT MANAGER: JENNIFER NATIONS FUNDING SOURCES: Utility Revenue Bonds PROJECT CLIENT: Water Services • PROJECT DESCRIPTION/STATUS Engineering, design, and construction of the Irrigation Water System from Carters Creek Wastewater Treatment Plant to Veterans Park. This will be a multi-phase project to deliver irrigation water to major users throughout College Station. Study Phase has been completed. This project will be coordinated with Parks & Recreation Department. PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR FISCAL YEAR LAND ENG. CONSTR. MISC. PROJECT TOTAL • ' Prior Years 0 41,730 0 0 $41,730 . , 2006-07 84,000 $84,000 2007-08 $0 2008-09 200,000 2,390,000 $2,590,000 2009-10 $0 2010-11 $0 • 2011-12 $0 2012-13 $0 TOTAL $84,000 $241,730 $2,390,000 $0 $2,715,730 OPERATING COSTS First Fiscal Year Annually Total Personnel 20,000 $20,000 • Supplies 26,000 $26,000. • Service 30,000 $30,000 Capital $0 TOTAL $0 I $76,000 $76,000 dr • , CITY OF COLLEGE STATION 218 WORK ORDER#: WF0613546 PROJECT: WELLBORN WIDENING PROJECT#: WTWOC FUND: WATER CAPITAL PROJECTS PROJECT BUDGET: $4,250,000 PROJECT MANAGER: SPENCER THOMPSON FUNDING SOURCES: Utility Revenue Bonds PROJECT CLIENT: Water Services PROJECT DESCRIPTI ON/STATUS TXDOT will be widening Wellborn Road. Water lines from FM 2818 to SH 40 must be relocated outside future pavement areas. It is expected that partial reimbursement will be forthcoming from TxDOT on this utility project. PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR FISCAL YEAR LAND ENG. CONSTR. MISC. PROJECT TOTAL Prior Years 0 189,650 701,575 0 $891,225 2006-07 10,000 50,350 3,298,425 $3,358,775 2007-08 $0 2008-09 $0 2009-10 $0 2010-11 $0 2011-12 $0 2012-13 $0 .......TOTAL...... ... $10,000, $240,000, $4,000,000 $0 $4,250,000 OPERATING COSTS First Fiscal Year. ... Annually Total Personnel $0 Supplies $0 Service $0 Capital $0 TOTAL ............ .. .......... .... .. $0 1.... ...... $0 $0 ......... ..,. . .. ...... ..... .. . - s £ CITY OF COLLEGE STATION 219 WORK ORDER#: WF0352094 • PROJECT: ROCK PRAIRIE WATER SERVICE EXT PROJECT#: WT0102 • (BIRD POND) • FUND: WATER CAPITAL PROJECTS PROJECT BUDGET: $1,531,098 PROJECT MANAGER: SPENCER THOMPSON FUNDING • SOURCES: Utility Revenue Bonds PROJECT • CLIENT: Water Services PROJECT DESCRIPTION/STATUS Extend 18"water line along Rock Prairie from Stonebrook to the intersection of Rock Prairie Road and Greens Prairie Road. Then along Greens Prairie near Pebble Creek Development. • . , PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR FISCAL YEAR LAND ENG. CONSTR. MISC. PROJECT TOTAL • Prior Years 16,172 90,931 1,412,885 0 $1,519,988 2006-07 11,000 110 $11,110 2007-08 $0 • 2008-09 $0 • 2009-10 $0 2010-11 $0 2011-12 $0 2012-13 $0 TOTAL $16,172 $101,931 $1,412,995 $01 $1,531,098 • OPERATING COSTS First Fiscal Year Annually • Total Personnel $0 Supplies $0 Service $0. • Capital $0, TOTAL $0 $0 $0 . - • • • - •,. • • CITY OF COLLEGE STATION 220 WORK ORDER#: WF0379145 PROJECT: ARRINGTON RD WATER SERVICE EXT PROJECT#: WTWOC FUND: WATER CAPITAL PROJECTS PROJECT BUDGET: $745,056 PROJECT MANAGER: SPENCER THOMPSON FUNDING SOURCES: Utility Revenue Bonds PROJECT CLIENT: Water Services PROJECT DESCRIPTION/STATUS This project will install a 12"water line along Arrington Road and Hwy 6. This project provides water service to properties along SH 6 that are currently served by Wellborn Special Utility District. PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR FISCAL YEAR LAND ENG. CONSTR. MISC. PROJECT TOTAL Prior Years 0 47,920 0 0 $47,920 2006-07 121,920 575,216 $697,136 2007-08 $0 2008-09 $0 2009-10 $0 2010-11 $0 2011-12 $0 2012-13 $0 TOTAL $0 $169,840 $575,216 $0 $745,056 OPERATING COSTS First Fiscal Year Annually Total Personnel $0 Supplies $0 Service $0 Capital $0 TOTAL $0 $0 $0 zytgaE r � 4 CITY OF COLLEGE STATION 221 WORK ORDER#: WF0379197 PROJECT: BARRON ROAD WATER SERVICE PROJECT#: WTWOC EXTENSION FUND: WATER CAPITAL PROJECTS PROJECT BUDGET: $2,383,253 • PROJECT MANAGER: SPENCER THOMPSON FUNDING • SOURCES: Utility Revenue Bonds PROJECT CLIENT: Water Services 1 PROJECT DESCRIPTION/STATUS This project will install a 18"water line along Barron Road, a 12"water along Barron Cut Off, and an 8" water line along Wellborn Road. This project provides water service to residents within College Station's Water CCN who are currently served by Wellborn Special Utility District. PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR FISCAL YEAR LAND ENG. CONSTR. MISC. PROJECT TOTAL Prior Years 0 200,837 936,088 0 $1,136,925 • 2006-07 82,776 773,552 $856,328 • 2007-08 390,000 $390,000 2008-09 $0 2009-10 $0 2010-11 $0 2011-12 $0 • 2012-13 $0 TOTAL $0 $283,613 $2,099,640 $0 $2,383,253 • . 11=111.61116.1110. OPERATING COSTS First Fiscal Year Annually Total • Personnel I $0 Supplies i $0 • Service $0 Capital $0 TOTAL $0 $0 $0 . , • r ' CITY OF COLLEGE STATION 222 WORK .. . . ORDER#: WF0379226 PROJECT: LICK CREEK/ROCK PRAIRIE PROJECT#: WTWOC SERVICE EXTENSION FUND: WATER CAPITAL PROJECTS PROJECT BUDGET: $187,534 PROJECT MANAGER: SPENCER THOMPSON FUNDING SOURCES: Utility Revenue Bonds PROJECT • CLIENT: Water Services PROJECT DESCRIPTION/STATUS This project will install an 8"water line from the Lick Creek Wastewater Treatment Plant to Rock Prairie Road. This project provides water service to residents within College Station's Water CCN who are currently served by Wellborn Special Utility District. PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR FISCAL YEAR LAND ENG. CONSTR. MISC. PROJECT TOTAL Prior Years 0 48,455 117,054 0 $165,509 2006-07 11,225 10,800 $22,025 2007-08 $0 2008-09 $0 2009-10 $0 2010-11 $0 2011-12 $0 2012-13 I $0 TOTAL..... $0 $59,680 $127,854 $0 J $187,534 OPERATING COSTS............... Personnel First Fiscal Year Annually I Total $0 Supplies $0 Service $0 Capital $0 TOTAL $0 $0 $0 CITY OF COLLEGE STATION 223 PROJECT: ROCK PRAIRIE ROAD SOUTH OF CARTER LAKE(AREA 5) FUND(S): WATER CAPITAL PROJECTS PROJECT NUMBERS&BUDGET: WASTEWATER CAPITAL PROJECTS Water: WF0805789 $178,811 Wastewater: WF0805744 $221,000 Total Project Budget: $399,811 PROJECT MANAGER: SPENCER THOMPSON FUNDING PROJECT SOURCES: Utility Revenue Bonds CLIENT: Water Services PROJECT DESCRIPTION/STATUS Installation of waterline,lift station,force main, and gravity line to serve Area 5(2003). Lift station costs are being shared with Area 6. • PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR Project Total FISCAL YEAR LAND ENG. I CONSTR. MISC. I PROJECT TOTAL • Prior Years 0 6,756 0 0 $6,756 2006-07 0 43,056 350,000 0 $393,056 2007-08 0 0 01 0 $0 2008-09 0 0 0 0 $0. 2009-10 0 0 0 0 $0 2010-11 0 0 0 0 $0 2011-12 0 0 0 0 $0. 2012-13 0 0 0 0 $0 PROJECT TOTAL $0 $49,812 $350,000 $0 $399,812 CITY OF COLLEGE STATION 224 PROJECT: ROCK PRAIRIE ROAD SOUTH OF CARTER LAKE(AREA 5) PROJECT CALENDAR OF EXPENDITURES BY FUND Water Portion FISCAL YEAR LAND......... .. ...®....ENG..,..... CONSTR. ........ MISC. PROJECT TOTAL Prior Years 0 3,811 0 0 $3,811 • 2006-07 25,000 150,000 $175,000 2007-08 $0 2008-09 $0 2009-10 $0 2010-11 $0 2011-12 $0 2012-13 Water Total $0 $28,811 $150,000 $0 $178,811 Wastewater Portion FISCAL YEAR LAND ENG. CONSTR. MISC. PROJECT TOTAL Prior Years 0 2,944 0 0 $2,944 2006-07 18,056 200,000 $218,056 2007-08 $0 2008-09 2009-10 $0 2010-11 $0 2011-12 $0 2012-13 Wastewater Total $0 $21,000 $200,000 $0 $221,000 PROJECT TOTAL I $0I $49,8121 $350,0001 $01 I $399,8121 OPERATING COSTS First Fiscal Year Annually Total Personnel $0 Supplies $0 Service $0 Capital $0 TOTAL $0 $0 $0 225 PROJECT: WILLIAM D FITCH EAST(AREA 6) FUND(S): WATER CAPITAL PROJECTS PROJECT NUMBERS&BUDGET: • WASTEWATER CAPITAL PROJECTS Water: WF0805807 $672,000 Wastewater: WF0805756 $638,000 •• Total Project Budget: $1,310,000 PROJECT MANAGER: SPENCER THOMPSON FUNDING PROJECT SOURCES: Utility Revenue Bonds CLIENT: Water Services PROJECT DESCRIPTION/STATUS 2003 .) Area of lift station,gravity line,and force main to serve Annexation Area 6( Installation of water line to serve Area 6 in City's CCN. In addition, possible 2007 annexation Area 2 to add to facility. This project formerly knows as"Greens Prairie Rd Corridor East(Area 6). • • • PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR Project Total FISCAL YEAR 1 LAND ENG. CONSTR. MISC. 1 PROJECT TOTAL Prior Years 0 3,488 0 0 $3,488 2006-07 0 95,456 650,000 0 $745,456. 2007-08 0 0 561,056 0 $561,056 • 2008-09 0 0 0 0 $0 2009-10 0 0 0 01 $0 2010-11 0 0 0 01 $0 2011-12 0 0 01 01 $0 2012-13 1 01 0 01 01 $0 PROJECT TOTAL I $OI $98,944 $1,211,0561 $0 $1,310,000. CITY OF COLLEGE STATION 226 PROJECT: WILLIAM D FITCH EAST(AREA 6) PROJECT CALENDAR OF EXPENDITURES BY FUND Water Portion FISCAL YEAR LAND.......... ENG........ CONSTR. . .......... MISC. PROJECT TOTAL Prior Years 0 2,944 0 0 $2,944 2006-07 58,000 200,000 $258,000 2007-08 411,056 $411,056 2008-09 $0 2009-10 $0 2010-11 $0 2011-12 $0 2012-13 $0 Water Total $0 $60,944 $611,056 $0 $672,000J . Wastewater Portion FISCAL YEAR LAND ENG. CONSTR. MISC. PROJECT TOTAL Prior Years 0 544 0 0 $544 2006-07 37,456 450,000 $487,456 2007-08 150,000 $150,000 2008-09 $0 2009-10 $0 2010-11 $0 2011-12 $0 2012-13 $0 Wastewater Total $0 $38,000 $600,000 $0 $638,000 PROJECT TOTAL I $0I $98,9441 $1,211,0561 $01 I $1,310,0001 OPERATING COSTS First Fiscal Year Annually Total Personnel $0 Supplies $0 Service $0 Capital $0 TOTAL $0 I $0 $0, 227 • • • • • . • Fes` .,« ,..;,•.•.:o`.:;:Y CITY OF COLLEGE STATION HEART OF THE RESEARCH VALLEY • • • • 228 REHABILITATION PROJECTS 229 PROJECT: Texas Avenue Relocation South FUND(S): PROJECT NUMBERS&BUDGET: 238-Water Capital Fund Water: WF0351282 $1,991,406 239-Wastewater Capital Fund Wastewater: WF0351341 $1,325,848 Total Project Budget: $3,317,254 PROJECT MANAGER: Donald Harmon FUNDING • PROJECT SOURCES: W/WW- URB CLIENT: Water Services Department PROJECT DESCRIPTION/STATUS Texas Avenue will be widened from Dominik to Harvey Mitchell Parkway.Water lines will need to be relocated into an easement under the proposed development. Sewer lines will need to be relocated into an easement outside of the right-of-way. • Water- FY05-$120,000 transferred from Rock Prairie/Bird Pond project-WF0352094. Wastewater-FY05-$230,000 transferred from Steeplechase Impact Fee Project-WF0354517. PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR Project Total • • FISCAL YEAR LAND ENG. CONSTR. 1 MISC. OVERHEAD PROJECT TOTAL Prior Years $38,555 $213,243 $3,019,6101 $5,391 $0 $3,276,799 2006-07 $0 $2,000 $10,0001 $400 $1,085 $13,485 2007-08 $0 $2,000 $10,000 $400 $1,085 $13,485 2008-09 $0 $2,000 $10,000 $400 $1,085 $13,485 2009-10 $0 $0 $0 $0 $0 $0 2010-11 $0 $0 $0 $0 $0 $0 2011-12 $0 $0 $0 $0 $0 $0 2012-13 $0 $0 $0 $0 $0 $0 PROJECT TOTAL $38,555 $219,243 $3,049,6101 $6,591 $3,255 $3,317,254 CITY OF COLLEGE STATION 230 PROJECT Texas Avenue Relocation South PROJECT CALENDAR OF EXPENDITURES BY FUND Water Portion • FISCAL YEAR LAND ENG. CONSTR. MISC. . .. OVERHEAD PROJECT TOTAL Prior Years $32,847 $112,765 $1,823,211 $2,355 $0 $1,971,178 2006-07 $0 $1,000 $5,000 $200 $543 $6,743 2007-08 $0 $1,000 --- - $5,000 $200-- $543- -- $6,743 2008-09 $0 $1,000 $5,000 $200 $543 $6,743 2009-10 $0 $0 $0 $0 $0 $0 2010-11 $0 $0 $0 $0 $0 $0 2011-12 $0 2012-13 $0 $0 $0 $0 $0 $0 Water Total $32,847 $115,765 $1,838,211 $2,955 $1,628 $1,991,406 Wastewater Portion FISCAL YEAR LAND ENG. CONSTR. MISC. OVERHEAD PROJECT TOTAL Ye ars ears $5,708 $100,478 __$1,196,399-- $3,036 _-- $0 $1,305,621 2006-07 $0 $1,000 $5,000 $200 $543 $6,743 2007-08 $0 $1,000 $5,000 $200 $543 $6,743 2008-09 $0 $1,000 $5,000 $200 $543 $6,743 2009-10 $0 $0 $0 $0 $0 $0 2010-11 $0 $0 $0 $0 $0 $0 2011-12 $0 $0 $0 $0 $0 $0 2012-13 $0 $0 $0 $0 $0 $0 Wastewater Total $5,708 $103,478 $1,211,399 $3,636 $1,628 $1,325,848 • (PROJECT TOTAL I $38,5551 $219,2431 $3,049,6101 $6,591 I $3,2551 $3,317,2541 OPERATING COSTS First Fiscal Year Annually Total Personnel $0 Supplies $0 Service $0 Capital $0 TOTAL $0 $0 $0 231 PROJECT: SOUTH KNOLL/THE GLADE REHAB FUND(S): WATER CAPITAL PROJECTS PROJECT NUMBERS&BUDGET: WASTEWATER CAPITAL PROJECTS Water: TBD $1,725,000 Wastewater: TBD $1,215,400 Total Project Budget: $2,940,400 PROJECT • MANAGER: ED SAVAGE • FUNDING PROJECT SOURCES: Utility Revenue Bonds CLIENT: Water Services PROJECT DESCRIPTION/STATUS • Replacement of water and wastewater lines in area bounded by Haines,Southwest Parkway,Glade,and Langford.These water lines were identified by the Freese&Nichols Southside Water Study(July 2003).The wastewater lines in the Southside area were identified by the CDM Capacity/Infiltration/Inflow Management Project 2002-2003 Sanitary Sewer Evaluations. Water Council Award of Engineering Contract: Fall 2007 Council Award of Construction Contract: Spring 2008 Wastewater Council Award of Engineering Contract: Fall 2007 Council Award of Construction Contract: Spring 2008 PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR • • . Project Total FISCAL YEAR LAND ENG. CONSTR. MISC. PROJECT TOTAL Prior Years 0 0 0 0 $0 2006-07 0 0 0 0 $0 2007-08 0 170,000 1,364,200 0 $1,534,200 2008-09 0 42,000 1,364,200 0 $1,406,200, 2009-10 0 0 0 0 $0 • 2010-11 0 0 0 0 $0 2011-12 0 0 0 0 $0. 2012-13 0 0 0 0 $0 PROJECT TOTAL $0 $212,000 $2,728,400 $0 $2,940,400 • CITY OF COLLEGE STATION 232 ---- ------ - --- - PROJECT: SOUTH KNOLL/THE GLADE REHAB PROJECT CALENDAR OF EXPENDITURES BY FUND Water Portion FISCAL YEAR. ..__.. .. .. ...LAND ......... ENG........ CONSTR. ........ .. ..MISC. ..... PROJECT TOTA L Prior Years 0 0 0 0 $0 ' 2006-07 $0 2007-08 100,000 800,000 $900,000 2008-09 25,000 800,000 $825,000 2009-10 $0 2010-11 2011-12 2012-13 Water Total $0 $125,000 $1,600,000 $0 $1,725,000 Wastewater Portion FISCAL YEAR LAND ENG. CONSTR. MISC. PROJECT TOTAL Prior Years 0 0 0 0 $0 2006-07 $0 2007-08 70,000 564,200 $634,200 2008-09 17,000 564,200 $581,200 2009-10 $0 2010-11 $0 2011-12 $0 2012-13 $0 Wastewater Total $0 $87,000 $1,128,400 $0 $1,215,400 PROJECT TOTAL I $OI $212,000I $2,728,400I $0I I $2,940,4001 OPERATING COSTS First Fiscal Year Annually I Total Personnel $0 Supplies $0 Service $0 . Capital $0 TOTAL $0 $0 $0 233 • • • CITY OF COLLEGE STATION HEART OF THE RESEARCH VALLEY • • • • • • 234 WASTEWATER CAPITAL IMPROVEMENT PROJECTS FISCAL YEAR 2007-2008 THROUGH FISCAL YEAR 2012-2013 235 WASTEWATER SERVICE CAPITAL IMPROVEMENT PROJECTS FISCAL YEAR 2007-2008 THROUGH FISCAL YEAR 2012-2013 FY08 PROJECT REVISED PROJECT WORK REQUEST BUDGET ACTUAL FY 06-07 ESTIMATE NUMBER NUMBER AMOUNT FY 05-06 APPROPRIATIONS FY 06-07 ADDITIONAL RESOURCES: UTILITY REVENUE BONDS $ 3,000,000 $ 7,100,000 $ 5,300,000 INTEREST ON INVESTMENTS 119,303 55,000 55,000 TRANSFERS FROM OPERATIONS 2,000,000 1,000,000 1,000,000 • INTERGOVERNMENTAL _ ' OTHER - - - .6 SUBTOTAL ADDITIONAL RESOURCES $ 5,119,303 $ 8,155,000 $ 6,355,000 • TOTAL RESOURCES AVAILABLE $ 9,552,296 $ 12,197,118 $ 10,397,118 COLLECTION PROJECTS COLLECTION PLANT-SCWOC OVERSIZE PARTICIPATION WF0464783 ANNUAL 41,989' - SONOMA WW DEVELOPMENT AGREEMENT - WF0954571 375,230 - 363,230 375,230 • • NORTHEAST TRUNK EXPAN.PHASE I SS9805 -WF0351744 663,517 369,985 - 40,000 SC DARTMOUTH PHII - WF0350773 254,000 - 204,000 254,000 SC JONES-BUTLER WASTEWATER EXTENSION - - WF0680144 44,000 - - 44,000 NANTUCKET SEWER - WF0700950 164,000 13,981 - 150,019 NANTUCKET LIFT STATION WF0954381- 23,450 - 23,450 . 23,450 STEEPLECHASE IMPACT FEE - WF0354517 1,156,211 972,267 - 56,000 RAYMOND STOTZER WEST . - - TBD 1,978,000 - - 1,580,000 - ANNEXATION PROJECTS ' GREENS PR.W.OF ARRINGTON(AREA 2) WF0395480 - 622,613 8,778 184,202 569,200" NANTUCKET E.OF HARPER'S FERRY(AREA 3) - WF0395488 552,525 6,664 - 505,000 INC ROCK P RD S OF CARTER LAKE(AREA 5) - WF0805744 221,000 • 2,944 - 200,000 218,056 WC WILLIAM D FITCH EAST(AREA 6) - WF0805756 638,000 544 450,000 487,456 CLOSED PROJECTS - 16,814 SUBTOTAL $ 1,433,966 $ 3,004,882 $ 2,722,411 REHABILITATION PROJECTS: • • EMERALD PKWY/BENT OAK WF0626151 141,094 1,538 6 6,250 LIFT STATION#3 REHAB" WF0383012 199,036 23,083- _ • 64,953 136,000 • LIFT STATION#2 REHAB SCWOC TBD 100,000 - _ - • FOXFIRE LIFT STATION REHAB SCWOC TBD 100,000 - - - SC BARRON ROAD REHAB - WF0654332 100,000 - - 25,000 DC BEE CREEK COMBINED WASTEWATER WF0738214 164,500 -- 49,382 - 8,500 114,668 DC BEE CREEK PH IV&V WASTEWATER TBD 300,000 - - - CARTERS CREEK SCREW LIFT SYSTEM WF0376687- 1,453,164 717 246,306 250,000 SC CHURCH AVENUE REHAB-PHASE II - WF0632257 103,313 - 46,687 50,374 WC TEXAS AVE.RELOCATION SOUTH- SS0003 WF0351341 1,325,848 256,798 6,743 SC TAUBER&STASNEY REHAB - WF0625893 120,000 13,775 50,000 74,190 SC PEDESTRIAN IMP ON 2818RNELSH - TBD 72,000 - 72,000 72,000 SC WEST PARK - WF0427245 1,500,000 497,336 448,581 922,181 ' SC COLLEGE PARK/BREEZY HEIGHTS - WF0595926 1,305,090 32,502 1,196,250 580,062 • WC SOUTH KNOLL/THE GLADE - TBD 1,215,400 - - - CLOSED PROJECTS 665,403 2,798 2 SUBTOTAL $ 1,560,534 $ 2,136,081 $ 2,237,470 236 WASTEWATER SERVICE CAPITAL IMPROVEMENT PROJECTS FISCAL YEAR 2007-2008 THROUGH FISCAL YEAR 2012-2013 APPROVED FY07-08 PROJECTED PROJECTED PROJECTED PROJECTED PROJECTED PROJECTED APPROPRIATIONS FY 07-08 FY 08-09 FY 09-10 FY 10-11 FY 11-12 FY 12-13 $ 3,200,000 $ 3,200,000 $ 2,000,000 $ 250,000 $ - $ - $ 150,000 11,100 11,100 10,100 2,000 5,400 9,700 9,700 2,200,000 2,200,000 1,000,000 - 500,000 250,000 100,000 740,000 - - - - $ 5,411,100 $ 5,411,100 $ 3,750,100 $ 252,000 $ 505,400 $ 259,700 $ 259,700 $ 6,103,402 $ 6,103,402 $ 3,836,749 $ 381,806 $ 579,706 $ 504,406 $ 459,106 ' 100,000 - 100,000 . 160,000,. 100,000 • . . 100,000 100,000 100,000. 978,000 1,000,000 _ - - - ' - - 150,000 150,000 - - - - . $ 250,000 $ 1,228,000 $ 1,100,000 $ 100,000 $ 100,000 $ 100,000 $ 100,000 - 130,000 - - 100,000 100,000 - - - - - . 100,000 - 100,000 ,. - - - - 75,000 - - - - 300,000 300,000 - - - - _ - - 299,784'- - - - - 36,626 36,626 - - • _ 6,743 - 6,743, - _ - - - - 26,321 - - - - 658,328 - - - - - 634,200 634,200 581,200 - - - _ $ 1,170,826 $ 2,367,002 $ 587,943 $ - $ - $ - $ _ 237 WASTEWATER SERVICE CAPITAL IMPROVEMENT PROJECTS FISCAL YEAR 2007-2008 THROUGH FISCAL YEAR 2012-2013 FY08 PROJECT REVISED PROJECT WORK REQUEST BUDGET ACTUAL FY 06-07 ESTIMATE NUMBER NUMBER AMOUNT FY05.06 APPROPRIATIONS FY06.07 TREATMENT&DISPOSAL PROJECTS TREATMENT&DISPOSAL/PUMPING PLANT-SPWOC 200.5 ODOR CONTROL IMPROVEMENTS - WF0620950 1,495,348 490,286 535,348 925,200 CARTERS CREEK WIMPROVEMENTS - - WF0585450" _ 1,900,000 41,393 - 261,000 500,000• . CARTERS CREEK CLARIFIER IMPROVEMENTS TBD 205,000 - 175,000 175,000 CARTERS CREEK HEADWORKS IMP TBD- 1,325,000 - - CARTERS CREEK SERVICE WATER IMP TBD 450,000 - 150,000 150,000 LICK CREEK CLARIFIER CATWALKS TBD - 200,000 - 200,000 200,000 SLUDGE TREATMENT&DISPOSAL/PUMPING PLANT-SSWOC - SLUDGE PROCESSING IMPROVEMENTS SS9803 WF0363214 3,001,873 . 833,993 _ .. 1,651,929 1,829,980 CARTERS CREEK BLOWER OVERHAULS TBD 140,000 - 80,000 80,000 LICK CREEK CENTRIFUGE IMPROVEMENTS TBD 400,000 - - - • SEWER GENERAL PLANT-SGWOC WASTEWATER PLANT SECURITY - - WF0466416. 419,167 293,868 - 7,400 CCWWTP PAVEMENT/REPAIRS IMP - WF0567890 585,778 13,017 550,106 556,089 SCADAREPLACEMENT - .WF0742950. 362,000 - 163,000 141,500 CLOSED PROJECTS 439,779 357,514 3,000 • SUBTOTAL. $ 2,112,335 $ 4,123,897 $ 4,568,169 . CAPITAL PROJECTS CONTINGENCY - WF0700774 ANNUAL _ - - CAPITAL PROJECTS SUBTOTAL $ 5,106,836 $ 9,264,860 $ 9,528,050 GENERAL AND ADMINISTRATIVE 72,930 98,765 98,765 DEBT ISSUANCE COST 1,691 78,000 78,000 TOTAL EXPENDITURES,MODIFIED ACCRUAL BASIS OF ACCOUNTING $ 5,181,457 $ 9,441,625 $ 9,704,815 BEGINING WORKING CAPITAL BALANCE,ACCRUAL BASIS OF ACCOUNTING: $ 4,432,993 $ 4,042,118 $ 4,042,118 MEASUREMENT FOCUS ADJUSTMENT (328,721) • • ENDING WORKING CAPITAL BALANCE,ACCRUAL BASIS OF ACCOUNTING: $ 4,042,118 $ 2,755,493 $ 692,302 SC = Project funded through combination of sources.Project sheet reflected in Streets section of CIP document. FC = Project funded through combination of sources.Project sheet reflected in Facilties section of CIP document. we = Project funded through combination of sources.Project sheet reflected in Water section of CIP document. • oc = Project funded through combination of sources.Project sheet reflected in Drainage section of CIP document. • 238 WASTEWATER SERVICE CAPITAL IMPROVEMENT PROJECTS FISCAL YEAR 2007-2008 THROUGH FISCAL YEAR 2012-2013 APPROVED FY07-08 PROJECTED PROJECTED PROJECTED PROJECTED PROJECTED PROJECTED APPROPRIATIONS FY 07-08 FY 08-09 FY 09-10 FY 10-11 FY 11-12 FY 12-13 1,069,314 1,324,333 - - - - - . - 30,000 30,000 - - - _ - - . . 125,000 125,000 1,200,000 - - - - • 300,000 150,000 150,000 - - - - 60,000 60,000 - - - - - 50,000 50,000 350,000 _ " . - . - - - 20,000 - - - - - •- . 72,500 163,000 - 57,500 - - - - - - $ 1,706,814 $ 1,922,333 $ 1,757,500 $ - $ - $ - $ - 150,000 '150,000 150.000 150,000 150,000 150.000 - 150,000, $ 3,277,640 $ 5,667,335 $ 3,595,443 $ 250,000 $ 250,000 $ 250,000 $ 250,000 290,418 290,418 75,000 50,000 50,000 50,000 50,000 59,000 59,000 36,500 7,500 35,000 5,000 5,000 $ 3,627,058 $ 6,016,753 $ 3,706,943 $ 307,500 $ 335,000 $ 305,000 $ 305,000 $ 692,302 $ 692,302 $ 86,649 $ 129,806 $ 74,306 $ 244,706 $ 199,406 $ 2,476,344 $ 86,649 $ 129,806 $ 74,306 $ 244,706 $ 199,406 $ 154,106_ 239 • • COLLECTION • 240 • WORK ORDER#: WF0464783 PROJECT: OVERSIZE PARTICIPATION PROJECT#: SCWOC WASTEWATER LINES FUND: WASTEWATER CAPITAL PROJECTS PROJECT BUDGET: ANNUAL PROJECT . MANAGER: ED SAVAGE FUNDING SOURCES: Utility Revenue Bonds PROJECT CLIENT: Water Services PROJECT DESCRIPTION These funds are available for oversize participation with developers in the construction of sewer lines above the minimum size needed to serve the development. This allows lines to be built large enough to meet future development without having to go back and install larger lines. Projects are identified based on development activity. Original FY07 appropriation-$295,000 $72,000 transferred to Pedestrian Imp on 2818-FY07 $223,000 transferred to Sonoma WW Development Agreement project WF0954571 -FY07 Total OP annual funding$250,000. Projects funded from OP FY 05-06: Valley Park-Pornada $102,500.00 WF0763380 Total OP annual funding$250,000. Projects funded from OP FY 04-05: Year to date remaining balance available: $245,540.00 Southern Trace OP $4,850.00 WF0578968 Total OP annual funding$250,000. Projects funded from OP FY 03-04: Edelweiss Gartens Phase 5 $39,749.00 WF0473056 Reatta Subdivision(Spring Creek Line Ext) $207,676.00 WF0473164 PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR FISCAL YEAR LAND ENG. CONSTR. MISC. PROJECT TOTAL Prior Years 0 0 17,120 0 $17,120 2006-07 0 $0 2007-08 100,000 $100,000 2008-09 100,000 $100,000 2009-10 100,000 $100,000 2010-11 100,000 $100,000 2011-12 100,000 $100,000 2012-13 100,000 $100,000 TOTAL $0 $0 $617,120 $0. $617,120 OPERATING COSTS First Fiscal Year I Annually Total Personnel $0 Supplies $0 Service $0 Capital $0 TOTAL $0 $0 $0. • F. CITY OF COLLEGE STATION 241 WORK ORDER#: PROJECT: Sonoma WW Development Agreement PROJECT#: WF0954571 FUND: WASTEWATER CAPITAL PROJECTS PROJECT BUDGET: $375,230 PROJECT MANAGER: Spencer Thompson FUNDING • SOURCES: Utility Revenue Bonds PROJECT • CLIENT: Water Services PROJECT DESCRIPTION/STATUS This project is for the construction of a gravitysewer trunk line that will connect the existing Spring Creek Impact Fee line to the Sonoma Development and extend across W.D. Fitch Parkway. • PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR FISCAL YEAR LAND ENG CONSTR. MISC. PROJECT TOTAL Prior Years 0 0 0 0 $0 2006-07 375,230 $375,230 2007-08 $0 2008-09 $0 2009-10 $0 2010-11 $0 2011-12 $0 2012-13 $0 TOTAL $0 $0 $375,230 $0 $375,230 OPERATING COSTS............. .... .. ......... ..,.... .. Annually ` Tot.. Year..... ...... First Fiscal Total Personnel $0 Supplies $0 Service $0 Capital $0 TOTAL $0 $0 $0 • • Avg S fs CITY OF COLLEGE STATION • 242 WORK ORDER#: WF0351744 PROJECT: NORTHEAST TRUNK EXPANSION PROJECT#: SS9805 FUND: WASTEWATER CAPITAL PROJECTS PROJECT BUDGET: $663,517 PROJECT MANAGER: CHAD MALLETT FUNDING SOURCES: Utility Revenue Bonds PROJECT CLIENT: Water Services PROJECT DESCRIPTION Replacement of sewer section crossing SH 6 near FM 60 interchange. PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR FISCAL YEAR LAND ENG. CONSTR. MISC. PROJECT TOTAL Prior Years 19,136 428,927 175,454 0 $623,517 2006-07 40,000 $40,000 2007-08 $0 2008-09 $0 2009-10 $0 2010-11 $0 2011-12 I $0 2012-13 f $0 TOTAL 1 $19,136 $468,927 $175,454( $01 $663,517 OPERATING COSTS First Fiscal Year Annually Total Personnel $0 Supplies J $0 Service $0 Capital $0 TOTAL $0 $0 $0 7 CITY OF COLLEGE STATION 243 WORK ORDER#: WF0700950 PROJECT: NANTUCKET SEWER PROJECT#: SCWOC FUND: WASTEWATER CAPITAL PROJECTS PROJECT BUDGET: $164,000 • PROJECT MANAGER: ED SAVAGE FUNDING SOURCES: Utility Revenue Bonds PROJECT • CLIENT: Water Services PROJECT DESCRIPTION The Nantucket Wastewater Treatment Plant service area was annexed in 2002. The City needs to purchase the collection system, lift station, and potentially the package plant in order to serve the individual households presently connected to the treatment plant. After purchase, package plant will be taken offline and connected to city's infrastructure. • PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR • FISCAL YEAR LAND ENG.... . CONSTR. MISC. PROJECT TOTAL Prior Years 13,981 0 0 0 $13,981 • 2006-07 150,019 $150,019 2007-08 $0 2008-09 $0 2009-10 $0 2010-11 $0 • 2011-12 $0 2012-13 $0 • ...... TOTAL $13,981 $0 $150,019 $0 $1 64,000 OPERATING COSTS.. .... . ... . ... . ....,... ....... .. Total, Personnel Fiscal Year Annually • $0 Supplies $0 Service $0 Capital $0 • TOTAL $0 I $0 $0 CITY OF COLLEGE STATION 244 WORK ORDER#: WF0954381 PROJECT: NANTUCKET LIFT STATION PROJECT#: SCWOC FUND: WASTEWATER CAPITAL PROJECTS PROJECT BUDGET: $23,450 PROJECT MANAGER: FRED SUROVIK FUNDING SOURCES: Utility Revenue Bonds PROJECT CLIENT: Water Services PROJECT DESCRIPTION This project provides for the design, easement acquisition, and construction of a gravity sewer line to eliminate the need for Nantucket Lift Sation. It also provides for the necssary temporary repairs to the lift station to maintain sewer service to the area until this line can be constructed. PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR FISCAL YEAR LAND ENG. CONSTR. MISC. PROJECT TOTAL Prior Years 0 0 0 0 $0 2006-07 23,450 $23,450 2007-08 $0 2008-09 $0 2009-10 $0 2010-11 $0 2011-12 $0 2012-13 $0 TOTAL $0 $0 $23,450 $0 $23,450 OPERATING COSTS First Fiscal Year Annually Total Personnel $0 Supplies $0 Service $0 Capital $0 TOTAL $0 $0 $0 CITY OF COLLEGE STATION 245 WORK ORDER#: WF0354517 PROJECT: STEEPLECHASE IMPACT FEE PROJECT#: SCWOC FUND: WASTEWATER CAPITAL PROJECTS PROJECT BUDGET: $1,156,211 PROJECT • MANAGER: SPENCER THOMPSON FUNDING SOURCES: Utility Revenue Bonds PROJECT CLIENT: Water Services PROJECT DESCRIPTION Installation of gravity wastewater line across Wellborn Road and along Old Wellborn Road to serve Rock Prairie Road West and Jones-Butler areas. PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR FISCAL YEAR__ LAND ENG. CONSTR. _ _ __ .......... MISC. PROJECT TOTAL Prior Years 61,717 159,495 878,999 0 $1,100,211 2006-07 34,000 22,000 $56,000 2007-08 $0 2008-09 $0 • 2009-10 $0 2010-11 $0 2011-12 $0 2012-13 $0 TOTAL $61,717 $193,495 $900,999 $0 $1,156,211 OPERATING COSTS First Fiscal Year ......_....._.__.._._ Annually• Total • Personnel $0 Supplies $0 Service $0 Capital $0 TOTAL $0 $0 $0 • • CITY OF COLLEGE STATION 246 WORK ORDER#: TBD PROJECT: RAYMOND STOTZER WEST PROJECT#: SCWOC FUND: WASTEWATER CAPITAL PROJECTS PROJECT BUDGET: $1,978,000 PROJECT MANAGER: SPENCER THOMPSON FUNDING SOURCES: Utility Revenue Bonds PROJECT CLIENT: Water Services PRO JECT DESCRIPTION Due to annexation, development and expected future development, wastewater services will be necessary. This project is also designated for a future lift station near the airport. PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR FISCAL YEAR LAND ENG. CONSTR. MISC. PROJECT TOTAL Prior Years 0 0 0 0 $0 2006-07 $0 2007-08 183,000 215,000 580,000 $978,000 2008-09 1,000,000 $1,000,000 2009-10 $0 2010-11 $0 2011-12 $0 2012-13 $0 TOTAL.... . $183,000 $215,000 $1,580,000 $0 $1,978,000 OPERATING COSTS First Fiscal Year Annually.....,. Total Personnel $0 Supplies $0 Service $0 Capital ....................W....-_............... -................_... .._.,..........w........,...,.............--........W.... .._........... ............-.....,$0 TOTAL $0 $0 $0 E a t '?� t � CITY OF COLLEGE STATION 247 WORK ORDER#: WF0395480 PROJECT: GREENS PRAIRIE RD W. OF ARRINGTON PROJECT#: SCWOC (AREA 2) FUND: WASTEWATER CAPITAL PROJECTS PROJECT BUDGET: $622,613 PROJECT MANAGER: SPENCER THOMPSON FUNDING SOURCES: Utility Revenue Bonds • PROJECT CLIENT: Water Services PROJECT DESCRIPTION Installation of wastewater lines to serve residents annexed in 2002. Installation of wastewater line from Arrington Road to Nantucket Drive. • • PROJECT CALENDAR OF EXPENDITURESYEAR BY FISCAL YEAR YEAR LAND... ENG. CONSTR. MISC. PROJECT T TOTAL Prior Years 0 53,100 312 0 $53,413 2006-07 200 569,000 $569,200 • 2007-08 $0 2008-09 $0 2009-10 $0 2010-11 $0 2011-12 $0 2012-13 $0 TOTAL $0 $53,300 $569,312 $0 ,........ $622,613 ... OPERATING COSTS Firsts Fiscal YearAnnually Total Personnel $0 Supplies $0 Service $0 Capital $0 TOTAL..... $0 $ soy t � r CITY OF COLLEGE STATION 248 WORK PROJECT: NANTUCKET EAST OF HARPERS FERRY ORDER#: WF0399488 (AREA 3) PROJECT#: SCWOC FUND: WASTEWATER CAPITAL PROJECTS PROJECT BUDGET: $552,525 PROJECT MANAGER: SPENCER THOMPSON FUNDING SOURCES: Utility Revenue Bonds PROJECT CLIENT: Water Services PROJECT DESCRIPTION Installation of wastewat er lines to serve residents annexed in 2002 in Area 3. PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR FISCAL YEAR LAND ENG. CONSTR. MISC. PROJECT TOTAL Prior Years 0 47,213 312 0 $47,525 2006-07 10,000 495,000 $505,000 2007-08 $0 2008-09 $0 2009-10 $0 2010-11 $0 2011-12 $0 2012-13 $0 TOTAL $0 $57,213 $495,312 $0 $552,525 OPERATING COSTS First Fiscal Year Annually Total Personnel $0 Supplies $0 Service $0 Capital $0 $0 $0 t TOTAL ......... ...... ....... ..... $0 • R s� CITY OF COLLEGE STATION 249 REHABILITATION PROJECTS 250 WORK ORDER#: WF0626151 PROJECT: EMERALD PARKWAY/BENT OAK PROJECT#: SCWOC FUND: WASTEWATER CAPITAL PROJECTS PROJECT BUDGET: $141,094 PROJECT MANAGER: ED SAVAGE FUNDING SOURCES: Utility Revenue Bonds PROJECT CLIENT: Water Services PROJECT DESCRIPTION/STATUS New alignment of approximately 1,000'of 24"wastewater collection line will be installed to provide better flow hydraulics and will have sealed and bolted manholes. This construction will correct poor flow conveyance through the particular sewer segment and high levels of infiltration and inflow in the sewer basin upstream of the area. PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR FISCAL YEAR LAND ENG. CONSTR. MISC. PROJECT TOTAL Prior Years 1,088 3,756 0 0 $4,844 2006-07 6,250 $6,250 2007-08 130,000 $130,000 2008-09 $0 2009-10 $0 2010-11 $0 2011-12 $0 2012-13 $0 TOTAL $1,088 $10,006 $130,000 $0 $141,094 OPERATING COSTS First Fiscal Year Annually Total Personnel $0 Supplies $0 Service $0 Capital $0 TOTAL... $0 .... $0 $0 js ts'x • I CITY OF COLLEGE STATION 251 WORK ORDER#: WF0383012 PROJECT: LIFT STATION#3 REHAB PROJECT#: SCWOC FUND: WASTEWATER CAPITAL PROJECTS PROJECT BUDGET: $199,036 PROJECT MANAGER: FRED SUROVIK FUNDING SOURCES: Utility Revenue Bonds PROJECT CLIENT: Water Services • PROJECT DESCRIPTION This project will rehabilitate deteriorated infrastructure and increase capacity to service a developing sewershed. PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR FISCAL YEAR LAND ENG. CONSTR. MISC. PROJECT TOTAL Prior Years 0 0 63,036 0 $63,036 • 2006-07 11,000 125,000 $136,000 2007-08 $0 • 2008-09 $0 2009-10 $0 2010-11 $0 • 2011-12 $0 2012-13 - $0 TOTAL $0 $11,000 $188,036 $0 $199,036 OPERATING COSTS First Fiscal Year Annually Total Personnel $0 • Supplies $0 Service $0 Capital $0 TOTAL $0 $01 $0 • ,.. CITY OF COLLEGE STATION 252 WORK ORDER#: TBD PROJECT: LIFT STATION #2 REHAB PROJECT#: SCWOC FUND: WASTEWATER CAPITAL PROJECTS PROJECT BUDGET: $100,000 PROJECT FUNDING MANAGER: FRED SUROVIK SOURCES: Utility Revenue Bonds PROJECT CLIENT: Water Services PROJECT DESCRIPTION/STATUS This project will upgrade the electrical service, replace deteriorated piping and recoat the interior of the wet well to upgrade the station and extend its service life. PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR FISCAL YEAR LAND ENG. CONSTR. MISC. PROJECT TOTAL Prior Years $0 2006-07 $0 2007-08 20,000 80,000 $100,000 2008-09 $0 2009-10 $0 2010-11 $0 2011-12 $0 2012-13 $0 TOTAL $0 $20,000 $80,000 $0 $100,000 OPERATING COSTS First Fiscal Year Annually Total Personnel $0 Supplies $0 Service $0 Capital $0 TOTAL $0 $0 $0 yt�� CITY OF COLLEGE STATION 253 WORK.. . ...... . ....._ . . .. .. .. ... ._.._._._..__. ORDER#: TBD PROJECT: FOXFIRE LIFT STATION REHAB PROJECT#: SCWOC FUND: WASTEWATER CAPITAL PROJECTS PROJECT • BUDGET: $100,000 PROJECT FUNDING MANAGER: FRED SUROVIK SOURCES: Utility Revenue Bonds • PROJECT CLIENT: Water Services PROJECT DESCRIPTION/STATUS This project will upgrade the electrical service, replace deteriorated piping and recoat the interior of the wet well to upgrade the station and extend its service life. PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR FISCAL YEAR LAND ENG. CONSTR. MISC. PROJECT TOTAL Prior Years $0 2006-07 $0 2007-08 20,000 80,000 $100,000 2008-09 $0 • 2009-10 $0 2010-11 $0 2011-12 $0 2012-13 $0 TOTAL $0 $20,000 $80,000 $0 $100,000 • OPERATING COSTS • • First Fiscal Year Annually Total Personnel. $0 Supplies $0 • Service $0 Capital $0 • TOTAL $0 $0 $0• • t�ri f CITY OF COLLEGE STATION • 254 ....� WORK ORDER#: WF0376687 PROJECT: CARTERS CREEK SCREW LIFT SYSTEM PROJECT#: SCWOC FUND: WASTEWATER CAPITAL PROJECTS PROJECT BUDGET: $1,453,164 PROJECT MANAGER: FRED SUROVIK FUNDING SOURCES: Utility Revenue Bonds PROJECT CLIENT: Water Services PROJECT DESCRIPTION • Provide funds for the replacement of Internaliff Screw Lift Pumps which have exceeded their economical life-cycle located before the Headworks of Carters Creek Wastewater Treatment Plant. Estimates for FY02-03 provide for the replacement of one (1) Screw Lift Pump. Two (2) pumps will be replaced in FY03-04 and FY04-05, and the final one(1)will be replaced in FY06-07. PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR FISCAL YEAR LAND ENG. CONSTR. MISC. PROJECT TOTAL Prior Years 0 0 903,380 0 $903,380 2006-07 250,000 $250,000 2007-08 299,784 $299,784 2008-09 $0 2009-10 $0 2010-11 $0 2011-12 $0 2012-13 $0 TOTAL $0 $0 $1,453,164 $0 $1,453,164 OPERATING COSTS First Fiscal Year Annually Total Personnel $0 Supplies $0 Service $0 Capital $0 TOTAL $0 $0 $0 r f � z � CITY OF COLLEGE STATION 255 TREATMENT 256 • WORK ORDER#: WF0620950 PROJECT: 2005 ODOR CONTROL PROJECT#: SSWOC FUND: WASTEWATER CAPITAL PROJECTS PROJECT BUDGET: $1,495,348 PROJECT MANAGER: FRED SUROVIK FUNDING SOURCES: Utility Revenue Bonds PROJECT CLIENT: Water Services PROJECT DE SCRIPTION This project will reduce emissions from the most likely sources of off site odors. 1) Install upgraded aeration systems. 2) Address corrosion at the Thickner Building and Plant#3 blowers with improved exhaust treatments. 3) These improvements will be constructed concurrently with the Sludge Processing Improvements. This project is justified on the need to mitigate wastewater treatment process odors offending residential neighborhoods near the Carters Creek Wastewater Treatment Plant. FY05-06-transfer$260,000 from Carters Creek Pavement Improvements-WF0567890 PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR FISCAL YEAR LAND ENG. CONSTR. MISC. PROJECT TOTAL Prior Years 84,490 111,295 374,362 0 $570,148 2006-07 500 9,700 915,000 $925,200 2007-08 $0 2008-09 $0 2009-10 $0 2010-11 $0 2011-12 $0 2012-13 $0 .....TOTAL....... $84,990 $120,995 $1, 289,362 $0 . .. $1,495,348 OPERATING COSTS First Fiscal Year Annually.. Total Personnel $0 Supplies $0 Service I $0 • Capital $0 TOTAL $0 $01 $0 ¢{ 4 lur CITY OF COLLEGE STATION • 257 WORK ORDER#: WF0585450 PROJECT: CARTERS CREEK UV IMPROVEMENTS PROJECT#: SPWOC FUND: WASTEWATER CAPITAL PROJECTS PROJECT BUDGET: $1,900,000 PROJECT MANAGER: FRED SUROVIK FUNDING SOURCES: Utility Revenue Bonds PROJECT CLIENT: Water Services PROJECT DESCRIPTION/STATUS _ ... This project will determine the most effective the ex isting to improvements replace p UV system and/or ........... , 6 controls and install the selected improvements. This system has reached its service life and no longer meets TCEQ requirements. Ultra-violet lights are used for disinfecting the effluent from the wastewater treatment plant before being released into the waterways. Updated 4/23/07. Construction estimate for the improvements selected via RFP is approximately twice the value of the May 2006 Prelimininary Engineering Report. • PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR• • FISCAL YEAR LAND ENG. CONSTR. MISC. PROJECT TOTAL) Prior Years 0 73,991 1,676 0 $75,667 ' . 2006-07 75,000 425,000 $500,000 • 2007-08 22,000 1,302,333 $1,324,333 2008-09 $0 2009-10 $0 2010-11 $0 • 2011-12 $0 2012-13 $0. TOTAL $0 $170,991 $1,729,009 $0 $1,900,000• OPERATING COSTS First Fiscal Year Annually Total Personnel $0 Supplies $0 Service $0 p ital $0 • TOTAL $0 $0 $0 ...... . .. ..... ...... ,,.,.,. .. . .... ,, . ... ..... • • b • � I CITY OF COLLEGE STATION 258 WORK ORDER#: TBD PROJECT: CARTERS CREEK CLARIFIER PROJECT#: SPWOC IMPROVEMENTS FUND: WASTEWATER CAPITAL PROJECTS PROJECT BUDGET: $205,000 PROJECT MANAGER: DOUG WALLACE FUNDING SOURCES: Utility Revenue Bonds PROJECT CLIENT: Water Services PROJECT DESCR IpTION/STATUS Provide funds for fier rake drives improvements on Clarifiers ers2B and 3B, replace ethe walkway surfaces rs Creek WWTP IonsClarifiers 0 2B and 3B, install an operating07 - replace the l platform, and raise the clarifier drain MOV to ground level. FY2007-08- install safety rails around Clarifiers 2B and 3B. PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR FISCAL YEAR LAND ENG. I CONSTR. MISC. I PROJECT TOTAL Prior Years 0 0 0 0 $0 2006-07 175,000 $175,000 2007-08 30,000 $30,000 2008-09 $0 2009-10 I I $0 2010-11 I I I I I $0 2011-12 I I I I I $0 2012-13 $01 $01 $2050001 $0 $0, TOTAL I � I $205,000 OPERATING COSTS First Fiscal Year I Annually Total Personnel ! $0 Supplies i $0 Service $0 Capital $0 TOTAL I $0 CITY OF COLLEGE STATION 259 ..,...., WORK ORDER#: TBD PROJECT: CARTERS CREEK HEADWORKS PROJECT#: SPWOC IMPROVEMENTS FUND: WASTEWATER CAPITAL PROJECTS PROJECT BUDGET: $1,325,000 PROJECT MANAGER: DOUG WALLACE FUNDING SOURCES: Utility Revenue Bonds • PROJECT CLIENT: Water Services • "PROJECT DESCRIPTION/STATUS Provide funds for Headworks. Replace the engineering motori motorized bar screens w make m the efficientst p screens. Design, construct,t, and install followingWWTP ore more efficient replacements for the current grit bridges. Overhaul the shaftless screw conveyor. Install mixers in the wells at the end of the grit bridges. PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR FISCAL YEAR LAND ENG. CONSTR. MISC. PROJECT TOTAL • Prior Years $0 $0 0 $0 $0 2006-07 $0 2007-08 125,0001 $125,000 2008-09 I 1,200,000 $1,200,000 • 2009-10 $0 • 2010-11 $0 2011-12 $0 2012-13 $0 TOTAL.... $0 $125 1 $1,200,000 $0 $1,325,000 OPERATING• COSTS Person• First Fiscal $• Year Annually Total ,Personnel I 0 Supplies $0 Service $0 Capital $0. TOTAL $0 $0 $0 • • CITY OF COLLEGE STATION 260 WORK ORDER#: TBD PROJECT: CARTERS CREEK SERVICE WATER PROJECT#: SPWOC IMPROVEMENTS FUND: WASTEWATER CAPITAL PROJECTS PROJECT BUDGET: $450,000 PROJECT MANAGER: DOUG WALLACE FUNDING SOURCES: Utility Revenue Bonds PROJECT CLIENT: Water Services PROJECT DESCRIPTION/STATUS Provicurrent e funds for urrrent serviceimprovements water screen with at self-cleaning model servicehe Carters Creek FY 2007 -2008 min tall complete e0 replace bleach injection system with a bulk liquid bleach tank, an above ground level PVC injection point, an improved bleach pump, a cover for the entire system, and a paved drive for the bulk delivery of bleach. FY 2008-09 replace the two service water pumps with more efficient models. PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR FISCAL YEAR LAND ENG. CONSTR. MISC. PROJECT TOTAL Prior Years $0 $0 0 $0 $0 2006-07 150,000 $150,000 2007-08 150,000 $150,000 2008-09 150,000 $150,000 2009-10 $0 2010-11 $0 2011-12 $0 2012-13 $0 TOTAL.... $0 $0 $450,000 $0 $450,000 OPERATING COSTS First Fiscal Year.. y Annual) Total Personnel $0 Supplies $0 Service $0 Capital $0 TOTAL $0 $0 $0 } v/I Y n CITY OF COLLEGE STATION 261 WORK ORDER#: TBD • PROJECT: LICK CREEK CLARIFIER CATWALKS PROJECT#: SPWOC FUND: WASTEWATER CAPITAL PROHECTS PROJECT • BUDGET: $200,000 PROJECT MANAGER: DOUG WALLACE FUNDING SOURCES: Utility Revenue Bonds PROJECT • CLIENT: Water Services PROJECT DESCRIPTIONS STATUS Provide funds for constructing catwalks around the Lick Creek clarifiers. The catwalks will provide safe access ess for the operators to operate and maintain the clarifiers. PROJECT CALENDAR OF EXPENDITURES BY- __.__.._,_-._... .... FISCAL YEAR FISCA L YEAR LAND ENG. CONSTR. MISC. PROJECT TOTAL • - Prior Years 0 0 0 0 $0 2006-07 200,000 $200,000 2007-08 $0 2008-09 $0 2009-10 $0 2010-11 $0 2011-12 $0 2012-13 $0 TOTAL $0 $0 $200,000 $0 $200,000 - - - OPERATING COSTS First Fiscal Year Annually...... Total Personnel $0 Supplies $0 • Service $0 Capital $0 TOTAL...... . ............ .... $0 $� $0 $0• • L �4 eat CITY OF COLLEGE STATION 262 ossafflawal. WORK .�. .. .. ORDER#: WF0363214 PROJECT: SLUDGE PROCESSING IMPROVEMENTS PROJECT#: SS9803 FUND: WASTEWATER CAPITAL PROJECTS PROJECT BUDGET: $3,001,873 PROJECT MANAGER: FRED SUROVIK FUNDING SOURCES: Utility Revenue Bonds PROJECT CLIENT: Water Services PROJECT DESCRIPTION n and construction of infrastructure required to satisfyincreasing N Project provides for the design q ' demands for wastewater sludge processing services. Digesters and related infrastructure will be designed and constructed to increase the efficiency and cost-effectiveness of sludge handling, processing, conditioning, and other functions required to produce an end product meeting Federal and State statutes and rules. $15,180 transferred to WF0954381 - Nantucket Lift Station- FY07. PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR FISCAL YEAR LAND ENG. CONSTR. MISC. I PROJECT TOTAL Prior Years 0 466,676 705,217 0 $1,171,893 2006-07 96,762 1,733,218 $1,829,980 2007-08 $0 2008-09 $0 2009-10 $0 2010-11 I $0 2011-12 I I I I I $0 2012-13 I I I I I 1 I $0 TOTAL $3,001,873 I .. 1, $�1, .,$563,438I $2,4 8, 3 435 $0 OPERATING COSTS First Fiscal Year Annually Total Personnel $0 Supplies $0 Service $0 Capital $0 TOTAL $0 ,,. �y S CITY OF COLLEGE STATION 263 WORK ORDER#: TBD PROJECT: CARTERS CREEK BLOWER OVERHAULS PROJECT#: SSWOC FUND: WASTEWATER CAPITAL PROJECTS PROJECT BUDGET: $140,000 PROJECT MANAGER: DOUG WALLACE FUNDING SOURCES: Utility Revenue Bonds PROJECT • CLIENT: Water Services PROJECT DESCRIPTION/STATUS Provide funds for the purchase of services to inspect and repair as necessary sev en en blowers at the Carters Creek WWTP. FY 2006-07 - overhaul Blowers#1, #4, #7, and #8. FY 2007-08 -overhaul Blowers#2, #6, and #9. PROJECT CALENDAR OF EX S_ AL Y _....... EXPENDITURES BY FISCAL YEAR FISCAL YEAR LAND ENG. CONSTR. MISC. PROJECT TOTAL' Prior Years $0 $0 0 $0 $0 2006-07 80,000 $80,000 • 2007-08 i 60,000 $60,000, 2008-09 • $0 2009-10 $0 2010-11 I $0 2011-12 I I I I $02012-13• $0. $140,000, 1 $0 $01 $140000I $01 TOTAL _........................................................... OPERATING COSTS First Fiscal Year Annua1. ....,..... al y Total Personnel $0 Supplies $0 Service I $0 Capital I $0 • ' TOTAL $0 $01 $0 • CITY OF COLLEGE STATION • 264 WORK ORDER#: TBD PROJECT: LICK CREEK CENTRIFUGE PROJECT#: SSWOC IMPROVEMENTS FUND: WASTEWATER CAPITAL PROJECTS PROJECT BUDGET: $400,000 PROJECT MANAGER: DOUG WALLACE FUNDING SOURCES: Utility Revenue Bonds PROJECT CLIENT: Water Services PROJECT DESCRIPTION/STATUS Provide funds for improvements to the Lick Creek WWTP Centrifuge. These include installing a larger sludge discharge hopper, a sludge conveyor replacing the current moyno pump, and a work platform around the centrifuge. PROJECT CALENDAR OF EXPENDITURES BY FISCAL FISCAL YEAR LAND ENG. CONSTR. MISC. PROJECT TOTAL Prior Years 0 0 0 0 $0 2006-07 $0 2007-08 50,000 $50,000 2008-09 350,000 $350,000 2009-10 $0 2010-11 $0 2011-12 $0 2012-13 $0 TOTAL $0 $50,000 $350,000 $0 $400,000 OPERATING COSTS First Fiscal Year y Annuall Total Personnel $0 Supplies $0 Service $0 Capital $0 TOTAL $0 $0 $0 a i CITY OF COLLEGE STATION 265 • WORK ORDER#: WF0466416 PROJECT: WASTEWATER PLANT SECURITY PROJECT#: SGWOC FUND: WASTEWATER CAPITAL PROJECTS PROJECT BUDGET: $419,167 PROJECT MANAGER: MICHAEL KELLOGG FUNDING SOURCES: Utility Revenue Bonds PROJECT CLIENT: Water Services PROJECT DESCRIPTION Design, construct, and nimize risks of * potential terrorists activities install and o he rsystemsto threats• to City's Wastewater Treatment Plantand 'infrastructures. Staff will import concepts developed by Vulnerability Assessment consultant contract 03-66 (approved by City Council 03-13-03, Agenda Item#10.4)to enhance wastewater infrastructure security. February 26, 2004 Engineering Contract#04-062 approved by Council, Item#11.7. • PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR • FISCAL YEARLAND ENG. ICONSTR. 0 MISC. PROJECT TOTA L' PriorYears 0 62,488 329,279 0 $391,767 2006-07 200 7,200 $7,400 2007-08 20,000 $20,000 2008-09 I $0 2009-10 I I $0 • 2010-11 I I I $0 2011-12 I I I $0 2012-13 $0 • 0 $419,167 TOTAL � ,.. $0 $62,688I $356,479 .. ., $ OPERATING COSTS First Fisc al YearI Annually y......................................,,.i,...,..,.,.....,......,,.........•............. . Total,.... Personnel $0 Supplies $0 Service I $0 Capital I I $0 • TOTAL • $OI .... $01 $0. • • • CITY OF COLLEGE STATION 266 WORK ORDER#: WF0567890 PROJECT: CCWWTP PAVEMENT REPAIRS/IMPR. PROJECT#: SGWOC FUND: WASTEWATER CAPITAL PROJECTS PROJECT BUDGET: $585,778 PROJECT MANAGER: FRED SUROVIK FUNDING SOURCES: Utility Revenue Bonds PROJECT CLIENT: Water Services PROJECT DESCRIPTION Provide funds for design and construction of new and replacement street and parking lot pavements at the Carters Creek Wastewater Treatment Plant. Scope of work involves removal of 7,700 square yards of 37 year old failed asphaltic concrete street pavement and replacement with portland cement concrete pavement design to carry current traffic loads. Scope also includes addition of 1,400 square yards of new vehicle parking infrastructure. PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR FISCAL YEAR LAND ENG. CONSTR. MISC. PROJECT TOTAL Prior Years 0 29,689 0 0 $29,689 • 2006-07 556,089 $556,089 2007-08 $0 2008-09 $0 2009-10 $0 2010-11 $0 2011-12 $0 2012-13 $0 TOTAL $0 $29,689 $556,089 $0 $585,778 OPERATING COSTS First Fiscal Year Annually Total Personnel $0 Supplies $0 Service $0 Capital $0 TOTAL $0 $0 $0 CITY OF COLLEGE STATION 267 WORK ORDER#: WF0742950 PROJECT: SCADA REPLACEMENT PROJECT#: SGWOC FUND: WASTEWATER CAPITAL PROJECTS PROJECT BUDGET: $362,000 PROJECT MANAGER: MIKE KELLOGG FUNDING SOURCES: Utility Revenue Services PROJECT • . CLIENT: Water Services PROJECT DESCRIPTION/STATUS .6 This project will facilitate the replacement of control based equipment that has exceeded its useful service life. It will upgrade the control of the plants into a more integrated architecture that will: 1. Reduce development time and cost by the re-use of engineering practices. 2. Maximize returns from existing assets, through greatly improved control and monitoring. 3. Reduce future installation cost by utilizing standard bus technologies. 4. Provide a means of being proactive in maintaining equipment with available diagnostic tools. • PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR FISCAL YEAR LAND ENG. CONSTR. MISC. PROJECT TOTAL • Prior Years 0 0 0 0 $0 2006-07 65,000 76,500 $141,500 2007-08 83,000 80,000 $163,000 2008-09 27,500 30,000 $57,500 2009-10 $0 • - _ 2010-11 $0 2011-12 $0 2012-13 $0 TOTAL $0 $0 $175,500 $186,500 $362,000 OPERATING COSTS • First Fiscal Year Annually Total Personnel I $0 Supplies $0. Service $0 Capital $0 TOTAL $0 $0 $0.. CITY OF COLLEGE STATION 268 BRAZOS VALLEY SOLID WASTE MANAGEMENT AGENCY (BVSWMA) CAPITAL IMPROVEMENT PROJECTS FISCAL YEAR 2007-2008 THROUGH FISCAL YEAR 2012-2013 269 CITY OF COLLEGE STATION BRAZOS VALLEY SOLID WASTE MANAGEMENT AGENCY(BVSWMA) PRO-FORMA FISCAL YEAR 2007-2008 THROUGH FISCAL YEAR 2012-2013 REVISED FY07 BUDGET FY06 APPROVED FY07 AMOUNT ACTUAL APPROPRIATIONS ESTIMATE • LANDFILL CHARGES $ 5,316,986 $ 5,947,000 $ 5,950,000 OTHER SALES-METHANE GAS INTEREST 366,087 178,000 375,000 OTHER 24,48R TOTAL REVENUES $ 5,707,561 $ 6,125,000 $ 6,325,000 • • _ EXPENDITURES AND TRANSFERS LANDFILL OPERATIONS $ 2,618,999 $ 3,112,262 $ 2,948,729 ADMINISTRATION 352,328 339,175 301,379 PROPOSED SLAs PAY PLAN ADJUSTMENTS - EXPEND&TRANSFERS SUBTOTAL $ 2,971,327 $ 3,451,437 $ 3,250,108 BVSWMA CIP BV0403-RPR Gas Recovery and final cover 8,000,000 4,iiik 125,350 E ms+ _ 41,842 BV0404-RPR Gas Collection System 109,900 33,971 BV0504-RPR Soil Deficit Management r�-' „' 1,086,500- 1,061,191 a - 23,000 BV0003-HWY 30 land purchase 2,608,500 234,128 191,500 405,140 BV0502-HWY 30 Permit Application/Legal Fees 1,996,136' 'i 99,734 : 1,240,136 1,291,459 BV0601-HWY 30 Access 2,609,660 721,000 121,000 BV0602-HWY 30 Buildings&Infrastructure .a' s 3,785,690; - ' ,• 25,000 25,000 BV0603-HWY 30 Design Services 2,112,000 207,178 247,000 447,000 �� �� i BV0701-HWY 30 Cell Construction 1. 8,704,154 - Diu. TBD-tI WY 30 Compost Facility Design and Construction 1,553,500 TBD-HWY 30 Petroleum Pipeline Relocation ss s ,"- 634,040 ' s - Closed Projects - 790,254 11,970 • $ 2,517,834 $ 2,424,636 $ 2,400,382 NON-DEPARTMENTAL CONTRIBUTIONS $ 50,500 $ 20,000 $ 70,000 • OTHER 12,485 667,000 • TRANSFERS OUT 52,905 GENERAL&ADMIN.TRANSFERS 278,149 338,761 338,761 BRYAN COMPOST FACILITY COSTS HOST FEES 127,176 155,000 135,175 CONTINGENCY 85,000 35,000 • NON-DEPARTMENTAL SUBTOTAL $ 521,215 $ 1,265,761 $ 578,936 TOTAL OPERATING EXPENDITURES . AND TRANSFERS $ 6,010,376 $ 7,141,834 $ 6,229,426 • • INCREASE(DECREASE)IN WORKING CAPITAL • FROM OPERATIONS,modified accrual budgetary basis $ (302,815) $ (1,016,834) $ 95,574 • BEGINNING WORKING CAPITAL,accrual basis of acccounting $ 9,175,854 $ 8,954,289 $ 8,954,289 • Measurement Focus Adjustment 81,250 ENDING WORKING CAPITAL,accrual basis ofacccounting $ 8,954,289 $ 7,937,455 $ 9,049,863 • • • • 270 CITY OF COLLEGE STATION BRAZOS VALLEY SOLID WASTE MANAGEMENT AGENCY(BVSWMA) PRO-FORMA FISCAL YEAR 2007-2008 THROUGH FISCAL YEAR 2012-2013 FY 08 APPROVED FY 08 FY 09 FY 10 FY 11 FY 12 FY 13 APPROPRIATIONS PROJECTED PROJECTED PROJECTED PROJECTED PROJECTED PROJECTED $ 6,125,000 $ 6,125,000 $ 6,305,000 $ 6,800,000 $ 7,000,000 $ 7,206,000 $ 7,418,000 TBD TBD TBD TBD TBD TBD TBD 208,000 208,000 130,000 64,000 39,000 26,000 49,000 $ 6,333,000 $ 6,333,000 $ 6,435,000 $ 6,864,000 $ 7,039,000 $ 7,232,000 $ 7,467,000 $ 3,170,925 $ 3,170,925 $ 3,270,000 $ 3,370,000 $ 3,480,000 $ 3,590,000 $ 3,700,000 307,932 307,932 320,000 330,000 340,000 360,000 380,000 $ 3,478,857 $ 3,478,857 $ 3,590,000 $ 3,700,000 $ 3,820,000 $ 3,950,000 $ 4,080,000 • - - - 4,000,000 - - 8,306 15,000 8,000 - - - - 94,975 305,100 71,985 74,518 76,522 - - 568,330 1,168,330 1,320,330 - - - - 1,266,710 1,266,710 2,368,980 125,000 - - - 900,000 1,092,822 250,000 15,000 50,000 50,000 - - - 2,452,537 2,452,537 - 1,899,540 1,899,540 $ 2,838,321 $ 3,847,962 $ 6,471,832 $ 2,667,055 $ 4,126,522 $ 1,949,540 $ 1,899,540 $ - $ - $ - $ - $ - $ - $ - - 1,000,000 - - - - 347,075 347,075 355,000 363,000 371,000 379,000 387,000 80,000 80,000 80,000 80,000 80,000 80,000 80,000 139,000 139,000 143,000 147,000 151,000 156,000 161,000 75,000 75,000 75,000 75,000 75,000 75,000 75,000 $ 641,075 $ 1,641,075 $ 653,000 $ 665,000 $ 677,000 $ 690,000 $ 703,000 , $ 6,958,253 $ 8,967,894 $ 10,714,832 $ 7,032,055 $ 8,623,522 $ 6,589,540 $ 6,682,540 $ (625,253) $ (2,634,894) $ (4,279,832) $ (168,055) $ (1,584,522) $ 642,460 $ 784,460 $ 9,049,863 $ 9,049,863 $ 6,414,969 $ 2,135,137 $ 1,967,082 $ 382,560 $ 1,025,020 $ 8,424,610 $ 6,414,969 $ 2,135,137 $ 1,967,082 $ 382,560 $ 1,025,020 $ 1,809,480 271 PROJECT: RPR Gas Recovery and Final Cover PROJECT#: BV0403 FUND: BVSWMA PROJECT BUDGET: $8,000,000 PROJECT FUNDING • MANAGER: Samantha Best SOURCES: BVSWMA PROJECT • CLIENT: BVSWMA PROJECT DESCRIPTION/STATUS This project is for the construction of approximately 98 acres of Subtitle D Final Cover. An Active Gas Collection and Control System (GCCS)was installed in conjunction with Phase I of the project. The project also includes professional services for project design, bid administration, and quality assurance/quality control during construction, and a global positioning satellite system for compaction and grading work. Phase I construction for 49 acres reached final completion in 2006. Phase II of the project will commence when the remaining landfill footprint reaches design capacity(projected FY 2010-2011). Phase I project will have annual operating costs of $7,000.00 • It is projected that this project will come in under budget. PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR FISCAL YEAR LAND ENG. CONSTR. MISC. PROJECT TOTAL Prior Years $0 $679,051 2,225,233 $302,652 $3,206,936 2006-07 30,000 11842 $41,842 2007-08 $0 2008-09 $0 2009-10 $0 2010-11 775,000 3,225,000 $4,000,000 2011-12 $0 2012-13 I $0 TOTAL $0 $1,484,0511 $5,462,075 $302,652 $7,248,778 OPERATING COSTS First Fiscal Year Annually Total Personnel I $0 Supplies 5,000 5,000 $10,000 Service 2,000 2,000 $4,000 . Capital $0 • TOTAL $7,000 $7,000 $14,000 l )t hlSlc•a, v ,' � i, ; 55(r"' ' 7,'1..2C��� _,_rs:.. 'Y '`t - _ - . • - . _ , "i.' ,rf:-.)'- ;" ' State Hwy 3� . " o,,,,.s. , ..,., _, • �. ,,..„ •,�,,;`� ,,,,.. }Iy�,v +� j�f` � � ..'State Hwy 6 �) '��=�===.,��� - One Mile Radius 1 i�, s1� 1 \• State Hwy A� \. -s;, , ., 4 30 Landfill is • K., ,NA'�� ` �-' .• _� _ 1,-\ r u • .. ;� ,;.s k !, z Y ' .iv. ,2%'' t;r<: Rock Prairie `-.�; i` . ! ' ..4. r,?, :L-k= .. _Fri_-. r.Rd Landfill • �..`;". .4 / F. r✓ 1 .�`, 4 :5,;,�c, c,� ";\�� y5'Sr"' ti 4; ,./. NC� � .,k;�, j r-= ;'-rf...��.!_.. I � Navasota �'' .._ ,. r, _ 4 River. tjEasterwood •Airport . : 4. k ,-' f`'` ` ,'.I ., , - , ,-, , ,� •,1 - - w;_: 'y "".;55-. ``' 'i � •-\-•\ ,tir '4',� ' ;1 ' /` 2. �11''-i}•' L. • _! -Jr _ / , ti r . r.�'•, -''''. f \.,3 - , 1^s). 1.' ,,' 1 ' - ',r—..�\.,-_I . ` S _ ,r 272 PROJECT: RPR Gas Collection System PROJECT#: BV0404 FUND: BVSWMA PROJECT BUDGET: $109,900 PROJECT FUNDING MANAGER: Samantha Best SOURCES: BVSWMA PROJECT CLIENT: BVSWMA PROJECT DESCRIPTION/STATUS This project encompasses the installation of seven horizontal gas collection trenches in the lateral expansion area. The project includes the installation and fusion welding of high density polyethelene (HDPE) pipe and rock backfill as the fill sequence progresses. This project will be constructed in-house utilizing BVSWMA . forces. The first two gas collection trenchs were installed in late 2004 and 2005. Two trenches are scheduled to be installed in FY2007 and again in FY2008. The remaining trench will be installed as design elevation 276 is reached in Fill Sector 19. These horizontal trenches will be tied into Phase I GCCS once Phase II commences. It is projected that this project will come in under budget. PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR FISCAL YEAR• • LAND • ENG. CONSTR. MISC. PROJECT TOTAL Prior Years $0 $0 15,531 $0 $15,531 • 2006-07 33,971 $33,971 • 2007-08 15,000 $15,000 2008-09 8,000 $8,000 2009-10 $0 2010-11 $0 2011-12 $0 2012-13 $0 TOTAL $0 $0 $72,502 $0 $72,502 OPERATING COSTS First Fiscal Year Annually Total Personnel $0 - Supplies $0 Service $0 Capital $0 TOTAL $0 $0 $0 ` , ,•A•, c'..,' ; ,/ �' . ~-/ State Hwy 30 I [One Mile Radius f ' n ,' '; wr% ,; ,t: State Hwy 6 t.j =r.,'� ,> _ ../. ..1). I • • l6 �� ' ',. � State Hwy VO ,,c. (x,FN a e • 4 , 4 Yr , � } ! , 30 Landfill I ^ `� ue' • . b, r', .{ • .r -,1 rti I -• ' ! " . Rock Prairie ; T;'. • � k I — - -Fri � � . . � __, • � � _ .` � Rd Lanill ^,•� _ 1...,_;� ,, , r ...- t t-,. -�.c" ', , . 1 :ti /. Navasota ,.,-,. // ,�// ` ,t :_ I i rr ' ',` h 1. ( .;1_'• i t ` River ,' ! t',lEasterwood Airport ] . J', y J' ./ -r ! , ,,' , I 4,_. > .it �� I 't� '1,,, yi _"1"\ '`e:„ I:"C\,/, -Iry/�-' ` l — , _ _I i ''r+ — 4 4 rY;. . , , 1.4 = , A'), zI - .,f— '.-L.,.-5 . S I. 273 . PROJECT: RPR Soil Deficit Management PROJECT#: BV0504 FUND: BVSWMA PROJECT • • BUDGET: $1,086,500 PROJECT Pete Caler FUNDING MANAGER: Samantha Best SOURCES: BVSWMA • PROJECT • • CLIENT: BVSWMA PROJECT DESCRIPTION/STATUS - --- --- - • This project is for the purchase of property needed for soil deficit management for the RPRLF. The 76 acre property was owned by Dolly Olden and is located adjacent to the landfill on Rock Prairie Road. The RPRLF is in need of approximately 1.2 million cubic yards of soil to use for daily cover operations as well as eventual closing of the facility. Once the needed soil has been excavated and the landfill closed,the property will be used as a lake to enhance the recreational attributes of the area. Professional Services for a master excavation and grading plan and an evaluation of groundwater conditions associated with the lake on the property are included. A fence to separate the property purchased will be constructed in house. Budget amendment for$1,057,200:$8,500 transferred from 999-4973-585-41-60 for achaeological assessment dig. PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR FISCAL YEAR LAND ENG. CONSTR. MISC. PROJECT TOTAL . Prior Years $1,050,249 $9,949 3,244 $0 $1,063,441 . 2006-07 23,000 $23,000 • 2007-08 $0 2008-09 $0 2009-10 $0 2010-11 $0 • 2011-12 $0 . 2012-13 $0 TOTAL $1,050,249 $32,949 $3,244 $0 $1,086,441 . • • OPERATING COSTS . - First Fiscal Year Annually i Total • Personnel I $0. .Supplies I $0 Service $0 Capital $0. • TOTAL $0 $0 1 $0 i. �. ; .Cr ( � :r'• i/ .FYI., j f l r—.}';`C�f.:.... y yap— l" FS'�- _ �� '. �� ','�� '`,.`r{ "' �.. ',= : - 'r. mil. State Hwy 30 LOne Mile Radius ) • �y,:.r 5 ; State Hwy 6 IJ =.— _ _ . }1 - •-�1G I '.\ i( ` - ioi ,.., ;''� % `• - f • JState Hwy `Y, r � . ' #a 4:.:•-•'; ' ' ''', " N''- , - '1 1' 30 Landfill ' • �•� J. • •``/'s`M.Y!�'' �-" `,40v: ,,m.'•,y-i i" 4' Rock Prairie ��i 1 ',. - i , . � . : ,:.�?-.;;J;..ki 5 ,;�=- �'-°, t�,t ,Sly—;.--.=Fr _-.. • Rd Landfill n,.`}J-;',. 1�. `,r",fir. •',�;) :^ ;.. s i ' / • • rY_'• `''. -'/4''t �,'N' i // ,'/''d:^/,K✓ .� ` ?'f/. • ry`• J`\^. !/. ' . _ .-,�"'r[' ,,yet�" '"^{,�r J- ")_ �1. k'- '` I'/ ',:`-- =y-'Z';."--`,'x)(- • . •rlr r .•'. > t/t\�'\ µ� �"�4 >S.'` ^.i >i r✓� "\'"(r? , `' Navasota r'; . !tti.1Easterwood •Airport ;. 'rk, may','" ' ,.-!. `i' �'' r' .._,p',. ; _� - River .; ty :1.... --r.�. .1 ' l. �, �, _ f �'•v( �1 �:� I� �C' ' "'—��' -i \4 .. Y;i}. .'—�: , .,\,,ifs ; ''�n1, k 1 ' - ..f— u-..-3 . ` 5 �\ ' 274 e PROJECT: HWY 30 Land Purchase PROJECT#: BV0003 PROJECT FUND: BVSWMA BUDGET: $2,608,500 PROJECT FUNDING MANAGER: Pete Caler SOURCES: BVSWMA PROJECT CLIENT: BVSWMA PROJECT DESCRIPTION/STATUS This project is for the purchase of approximately 610 acres in Grimes County for the future SH 30 Landfill site. Approximately 90% of the total acreage has been purchased as of March 2007. The remaining tracts of land are expected to be condemned in mid 2007. PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR FISCAL YEAR LAND I ENG. CONSTR. MISC. I PROJECT TOTAL ' Prior Years $2,195,027 $0 0 $8,333 $2,203,360 2006-07 382,971 22,169 $405,140 • 2007-08 $0 2008-09 $0 ' 2009-10 $0 2010-11 I $0 2011-12 1 1 I 1 $0 2012-13 I $0 TOTAL $2,577,998 $0 $0 $30,5021 $0 $2,608,500 OPERATING COSTS First Fiscal Year Annually 1 Total Personnel $0 • Supplies $0 . Service $0 Capital $0 TOTAL $0 $0 $0 a rs �r , ve. l',,�., z S f _ Y ,' _ • ,,�, .tir;_ r�. .'i.,.State Hwy 30 ' R- . </:,, f - .� ' '` State Hwy 6 h -- - l !On_e Mile Radius I I'1i ;4> r .; h ', •. /. .ct;l.t' \+',. . ' \' -.. , 1-- �l '- 2 '.,r __r— --- i ,�`,-.—,, ` t,� ,.� r� N' \ t State Hwy ege. s �` ' 4 30 Landfill - _ 1 •sod '• -•+. ) x' _} ,.a �• •ti 7r•. • �. _;_. t k'r- :}.. • ,- �<f•,� .'4r ±' /.r Rock Prairie l , i i. --�, .x, ;,�; __ -'4 .- , :: `.; ',4= -_-- •- • Rd Landfill .,,�,.� , .._� c k .�' / < t ems: � - k � ,✓ ..;', , ' Navasota ,�' • - o Airport ' ' f 1'> �,, - %'- 1 , — -' Riverr lEasterwo d it J, ,_.,". t.. •• • r'' i /I lt 5 _ r ' '� 'ti' f SG3. `;i/ /` x�`4, -.pr'- )— —r r .: r+ , . ,/ \/ - /,/ —h:.` J I t. f y l 275 PROJECT: HWY 30 Permit Application/Legal Fees) PROJECT#: BV0502 Mitigation PROJECT FUND: BVSWMA BUDGET: $1,996,136 PROJECT FUNDING • MANAGER: Pete Caler SOURCES: BVSWMA , -PROJECT CLIENT: BVSWMA PROJECT DESCRIPTION/STATUS This project is for the permitting process for the SH 30 Landfill site in Grimes County,Texas, This project includes off-site land acquisition and engineering fees for section 404 and other miscellaneous permits. The land acquisition will be for floodplain and NLT mitigation. This project also includes permit work for a driveway, on-site mitigation plan development, and a landfill permit modification for TMPA property. $603,000 transferred from BV0603 in FY07. „,,..,,. . PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR FISCAL YEAR LAND ENG. CONSTR. MISC. PROJECT TOTAL • •. ' . Prior Years 0 73,350 0 103,202 $176,552 2006-07 750,000 375,000 86,323 80,136 $1,291,459. 2007-08 224,000 81,100 $305,100 2008-09 71,985 $71,985 2009-10 74,518 $74,518 2010-11 76,522 $76,522 2011-12 $0 2012-13 $0 TOTAL...... $750,000 $448,350 $310,323 $487,463 $1,996,136 _._ __._............... . OPERATING COSTS y Personnel First Fiscal Year Annuall . Total• $0 . Supplies $0 • Service $0 . Capital $0 TOTAL $0 $0 __...,._ 0 .... �`� a a , t:ate/: : J, • "{� :. . x ;r: = .,�. State Hwy 30 \.'�y: Qn -0 r ' � . • State Hwy 6 I \_ = [One Mille Radius J -`, a V_ +' y •Y.• .-.., J •-.J. • { '\, , �' Y'. it r /'\ f } �t r ' _ ;�� i` . . • �,- L •= State Hwy 2",.��. j x "` , s °t eill k -,5.. N'';:,r �.,1 �; .."- 30 Landfill l�w• k� iy -<' r f.',5'�r= s5/'', Rock Prairie k� - --, `.'.�?r•;:•L, �;,{_—.�`'"°, r, `<• • , -Fr -. . Rd Landfill .;.,. , J ',rrx, I.'''.' ,,.,:;':.Z/ /�, •c;+J?��r'/ ,^` •`;`• -'^•7``"t_'_-- _�.r='..i" YL-„ \ ` .-',\,>• Y:.: `.. -,f '1 ,J` ' L ,//' F',.-,d.^ +siS'-`<*?'S'f .sc^"__ f 4\_., ., `.,. • !..•;.r' -r ,, '_ - C f1, v., 9,'. r ,1, _ ' ti"�. ,ti 1 f, ...ti'.e ' Navasota ram'.. yy ' T�. S' i i f ', nA `I rJ v i �.jEasterwood Airport 4.'Jy, ; ;_.!y Jam" f ,,,!. i't:;�, r' j �',r,-,,5, �- - ' River ,,, ' '' • t ! .:� --=-'•7, Y•,_a- (l,,`1ti ,ti `..• f I _ I..' r ,.7 I \ I!r r 4,�_ .- ,. - _ _ i 4• X:: '—'y—• f J\4 t.-= , 'd'YJ. f f '( ' - �,(_-,-\•--I . ' r. .5 _I. 276 -- ------ --- --- - -- - ------ -- ., PROJECT: HWY 30 Access Development PROJECT#: BV0601 PROJECT • FUND: BVSWMA BUDGET: $2,609,660 PROJECT FUNDING MANAGER: Pete Caler/Samantha Best SOURCES: BVSWMA PROJECT • CLIENT: BVSWMA PROJECT DESCRIPTION/STATUS This project is for access development and fencing for the SH 30 Landfill. This will include a perimeter fence and gates, paved and unpaved roadways, a bridge over Alum Creek parking areas, and State Highway 30 improvements. PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR FISCAL YEAR LAND ENG. CONSTR. I MISC. I PROJECT TOTAL . Prior Years $0 2006-07 121,000 $121,000 2007-08 1,168,330 $1,168,330 2008-09 1,320,330 $1,320,330 2009-10 $0 2010-11 I $0 2011-12 1 I I I $0 2012-13 1 I I I I $0 TOTAL I I $0 $01 $2,609,6601 $0 $01 $2,609,660 OPERATING COSTS First Fiscal Year Annually I Total Personnel $0 Supplies $0 Service I $0 Capital $0 TOTAL $0 $0 $0 .\ �`�"�j �.�.+x, . > J�`t,.!ij',.5t'.' i .F ' �,'S{C , _,•r'�` Y 'f - 'p:7--1,1 �y. „T.., \. ' `' .' •+ J t • `~' ,F �' State Hwy 3 k { ,,, ,,- . n :. w''' 1 .. �'. • State Hwy 6 f `'\;':._: =—� _ 0 One Mile `, ,� 1 ., - i e Radius , r,1/ 1Y ^:: l� - -. ,•Gcn L.\! `y''.l L/ ',\`, _-.1 `tt` f \t f . • • %;.;,-; . {n %- �` e 4 ' �. '` State Hwy ,N, t r , r 1 _ s,' 1 A 30 Landfill �,.-` , ,,}k y�J„ �cF '.... 4 �"'—. �•! 1.,�, ,)`�{/ /fig ,,111 I �•�".^ ���-'' ♦ h+ / 7 > t, .. � `•,, ' E, 5l , ;._� .''.,` , :, ~ ": 1 SiX Jar f', Rock Prairie �, x , ; ' °'! ;°` �? ,. ><; ', _Fri R LandfillJ L '� - d c;• .. 4 i,il.�y ,,J/ ", -`1.' 'd' ", Y�,..^'••'< • lC' a-= .ma ''�";` ��; - •�.-1-.. -. . • .I'_ if •`�",,e ,\ �c.-r Y!. I' ` ( yeti `•' Iv" /..-:....-,j.�y±_',Ar- \jr,^ !- - ( r ` ,. , 1. /:, 3. , , h -- .l, , Navasota �' 't•',jEasterwood Airport k' ' Jr, ,— r . i:' "•"n'' ' '' • ��. � rJ�� ,' �^� %. '��: � -r i r'r'%- River F I' it '% _ ri +a'•, f ,' . 277 • • PROJECT: HWY 30 Buildings & Infrastructure PROJECT#: BV0602 PROJECT FUND: BVSWMA BUDGET: $3,785,690 PROJECT FUNDING • MANAGER: Pete Caler/Samantha Best SOURCES: BVSWMA • • PROJECT • CLIENT: BVSWMA •• PROJECT DESCRIPTION/STATUS • • This project includes the construction of buildings and related infrastructure for the future SH 30 landfill facility • in Grimes County.These include a scale house and scales, maintenance facility,waste screening area, service facility for drivers, citizens convenience area, and a de-mudder. Related infrastructure includes landscaping,water and electric supply systems,and a waste-water management system. • PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR FISCAL YEAR LAND ENG. CONSTR. MISC. I PROJECT TOTAL • Prior Years $0 2006-07 25,000 $25,000 ,. . 2007-08 1,266,710 $1,266,710 2008-09 2,368,980 $2,368,980 - 2009-10 125,000 $125,000 • • 2010-11 I $0 2011-12 I $0 2012-13 $0 TOTAL $0 $01 $3,785,690 $01 _ $0 $3,785,690 OPERATING COSTS First Fiscal Y ,. ..... .........._-- -- -_... • Year I AnnuallyTotal Personnel I $0 'Supplies $0 Service I $0 • Capital $0 TOTAL $0 $01 $0 • f „ _ .. State Hwy 30 ✓ ;•� �'4 ,, 7—. `.. State Hwy 6 _== � _ 7 > �On_a Mlle Radius51•, • i �� • _ Hwy - State . I J ;s , tiT. 30 Landfill I 1-T \ her,/':``)tl f i'a;. `- ;'f Y x `r ' ,1J�,.y'Y ,r Rock Prairie i 5 • -�- i:,:�'! f .:� _i ^Yo-% J;M1t'I 1{ L_ 4r r iM1 •. 1 • �t:X: f; �-{= `' °`S"t'�" \, ', =Fri:.. Rd Landfill •N' =`:•T \ Imo. ..'• 1' i 'j'-�f/.:�;.'xl i; t•D'"r{ :,r < �( .,+__ „-r.. ;J:'.f�,_ --' • '! -4'�i f I' -4 f.` Y_-..t__l'`,Yj�•z'_.,4,���,^J,+ ;`_:, ,t ,' .''��,,: .- �' Y/ <_- t '�S -r' ., ., ▪/-` .- I _ ' Navasota ,..f' .,f Easterwood Airport .//r•,.... i. -,,;J ...'i r -.r I ,/,- ;; __ _ River I -,r ?' '{' Ili•`i .1, •1i / . +''. ,(�i r"-`C\,'�,4 —11.a/!'.l. \ ,l• "_)"•` ' Jr I r. . _ \i, fir;.; '�J``` �� y\� '�y�, �l I - '.,f� t-t-�.—I S -n, 278 PROJECT: HWY 30 Design Services PROJECT#: BV0603 PROJECT FUND: BVSWMA BUDGET: $2,112,000 • PROJECT FUNDING MANAGER: Pete Caler SOURCES: BVSWMA PROJECT CLIENT: BVSWMA PROJECT DESCRIPTION/STATUS This project is for design, engineering and architectural services for the SH 30 Landfill Facility. These services will include the design and engineering of disposal cells, access infrastructure, and utilities infrastructure. Architectural services will include the assorted facility buildings and landscaping located at the site. PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR FISCAL YEAR LAND ENG. CONSTR. MISC. PROJECT TOTAL Prior Years $0 $207,178 0 $0 $207,178 2006 07 447,000 $447,000 2007 08 1,092,822 $1,092,822 • 2008-09 250,000 $250,000 2009 10 15,000 $15,000 2010-11 50,000 $50,000 2011-12 50,000 $50,000 2012-13 $0 TOTAL $0 $2,112,000 $0 $0 $2,112,000 • OPERATING COSTS First Fiscal Year Annually Total • ' Personnel $0 Supplies $0 Service $0 Capital $0 TOTAL $0 $0 $0 1,-:;:. • x i • A \1? ',� 'S ti" \. ' t,' — ., -_• .'c •'Y }y f,.v` - - '- _?: •:::(1 .,:•;-........ ..F.6 ,''''''':::;<.--...1::";.0i:''..c.;-;- ,. . • `�=`' - `- . ''�,<-/• ;4'•�: ._r State Hwy 30.: _•fi ,,, '`,State Hwy 6 'r ----- One Mile Radius ir 1 �, 1^ r•" !It State Hwy z. ti. __.- t'.; r .. ;ram' 4 y . : r J2 .= ../ Rock Prairie �.�t ; �, '', '.,;:, r' = - 56`?'...• ',.. ;_ -=Fri_-. • Rd Landfill ;,. ..r. ,. /; I -(I _ r t %si ` ` '� ..-,, `, I Navasota �,� .. .,Easterwood Airport A \y, ' . X. '' V 11':•' .. ;' I ri' r' ( ' _,, River ,_r ' -1,,,• 5., `,"'' '`. ',.-'0 fu,C� . :I� 1I J fir'~ r�' .L. _ - ', ..r-...- \ f , �.. • of = - i r' '�y ti }. ,/', �o- \ jr i r` I _ > .•it •�'i�1 V �7 _ y! .� •>`[ mot.(� /��.! `lf y��"' \ J ).%. ' ...1 � i �1 279 ' ..... �PROJECT: HVVY3O Cell Construction PROJECT#: BV0701 . . ' PROJECT � FUND: BVSVVMA BUDGET: $8'704,154 ' ` ` PROJECT FUNDING � MANAGER: Pete Ca|or/SomonthoBest SOURCES: 8VSVVMA ' PROJECT ' , . CLIENT: BVSVVMA —' ......................................' PROJECT DESCR|PT|QN/gfKfG§ ---- -�----....... ..... —'--- - This project is for Fill Sector8 and 5Aat the ---- 3U landfill site in Grimes County. U sector will encompass an area of approximately 2Oacres. Construction will include the excavation, ,aoompaotedclay liner, HDPE composite liner and related |eoohabs collection structures. Construction io expected ho begin in 2008. Also included in this project are water and gas monitoring wells and quality control/quality assurance . costs. . —PROJECT CALENDAR OF EXPENDITURESBYFISCALrEAR - ''.... --------- ' � Fl S C A L Y EAR -- --- LAND -- - EN8.- -CONST R. - |SC. -- '| PR0JECT Prior � $0. 2UO0-07 . ` $O 20U7-08' $0 2008'00 2.452.5371 $2.452.537 2O0Q-10 | . 2,452,5371 $2,452.537: 2O1O'11 � �' ' 1 $0. 201142 1.890.5401 $1.800.540 2012'13 1, 899,5401 _ $1.899.540. . |U|8L $0 $O $0 $0 $8.704.154 OPERATING COSTS HrstFi—~` Year - | --' u,a|k/ - | Total ' Por�mna| | | ' / $0. . � Supplies � $0 Service $0' 'Capita| $0 TOTAL �0 $01 � $U State Hwy 6 One Mile Radius State Hwy ' r 30 Landfill Rock Prairie Rd Landfill ' ` ' ( Navasota ' `� ,~ y � ' ' �=�ox.�ou��o/po/� ^�� `^, '. River | �� '�/ 280 � � PROJECT: Compost Facility Design and PROJECT#: TBD Construction (Twin Oaks Landfill) PROJECT FUND: BVSWMA BUDGET: $1,553, 500 PROJECT FUNDING MANAGER: Pete Caler/Samantha Best SOURCES: BVSWMA PROJECT CLIENT: BVSWMA PROJECT DESCRIPTION/STATUS This project includes the construction of infrastructure for a composting facility at the Twin Oaks Landfill. The estimated start of design and construction is FY2014.The facility will be located on fill sector 1 of the landfill footprint. This project is anticipated to begin in FY14. PROJECT CALENDAR OF EXPENDITURES BY FISCAL YEAR FISCAL YEAR LAND ENG. CONSTR. MISC. PROJECT TOTAL Prior Years $0 2006-07 $0 2007-08 $0 2008-09 • $0 2009-10 $0 . 2010-11 $0 2011-12 $0 2012-13 $0 TOTAL $0 $0 $0 $0 $0 OPERATING COSTS Firs t Fiscal Year Annually Total Personnel $0 Supplies $0 Service $0 Capital $0 TOTAL $0 $0 $0 , '.,, u'- tli1 ' v 'TV--r.l� '.�.V:-,� . i I ,t,', I \ __r`- ,Yr .y� --- '-�. �•- t •'� 'J� `}' ;f '',_ti'A`:r . r{ ? ~ ' State Hwy 30 I k' x .,1 `` ,,. — / _ y One Mile Radius , f `? r State Hwy 6 • `. ;" 1 ' � ` State Hwy I r�¢' ; `! 30 Landfill t?,w x:.•'•./,v ,ó ' : ';( ''t` Y 6'/'' Rock Prairie `--; • ?''' ._�,.. .yR', },-.' I•I ` -•-.. • Rd Landfill •;;---). •.r ` � '-�t , s. t f r1 1. , .. Navasota ,, y ''jEasterwood Airport e(., ^. .-' . l'' .. r - r,-,,.,) _ <'I J., , ,. r; River • . -:.'..-.-71",;53_. `` II r;vv,.t-''I.P.14 ��-:+. �-/ I ./ `-,�'` ,2� L. -I---•'r ti / ; , 281 PROJECT: Petroleum Pipeline Relocation PROJECT#: TBD (Twin Oaks Landfill) PROJECT .FUND: BVSWMA BUDGET: $634,040 PROJECT FUNDING MANAGER: Pete Caler/Samantha Best SOURCES: BVSWMA PROJECT • CLIENT: BVSWMA PROJECT DESCRIPTION/STATUS This project the relocation of a petroleum pipeline atthe includes Twin Oaks Landfill. The estimated start of design and construction is FY2015.The pipeline is currently located within the landfill footprint and will be relocated outside the perimeter of the waste fill area. This project is anticipated to begin in FY15. --_-PROJECT CAL ENDAR OF EXPENDITURES BY FISCAL YEAR • FISCAL YEAR. LAND D ENG. CONSTR. MISC. I PROJECT TOTAL Prior Years $0 2006-07 1 $0 2007-08 $0 2008-09 $0 • • 2009-10 $0 ' 2010-11 $0 " 2011-12 $0 2012-13 $0 TOTAL $0 $0 $0 $0 $0 OPERATING CO STS . First Fiscal Year I Annually Total • Personnel $0 Supplies $0 Service M $0 $0 { Capital TOTAL $0 $0 $0 :\ it i ,z �r V 0, ; `''..\ \ ,;r.,—," y ,; ''- .lt-'�``' S �''J- 3-••, �, _ FA .= -`�.�ti\;-4-•:a-', I State Hwy 30 , -I ;.` �.-%. 7 ,:'! r State Hwy 6 " i" i>, iOne Mile Radius ' �rr-f�-v-je• � ter ..� )' ` iy . `-.��: -i ?/i,, ,. ' „ ,�' __-/ f 1,. ,Z' 1^r. ;; T. _ tate Hwy • r ,�. c.l ▪ i . •/ � '}. r Y. .j'. • �. 0 and • .�... ' � 4`' '\� 3 Landfill • = :t i <:' : .'II I� . Rock PrairieI -.-'_ • ‘.•'. ,.;,',— =F _- • Rd Landfill , I. ' • ;'•' '�• 1 4 ;-,- �4_,/.;'l'- k ^ra=f ... • _ : �,"r" .ri.- _ ---- .I'_:, _ ,,-. k 1'r t• ',,`1• :: = ✓ . ...`' - i Navasota r�•• % ,Easterwood Airport ,- a', I.s • �- ' / ; ,;"+.5, River ;_ • y -L,, ,r. 'I,•:','`'D IY':.'c.\ ?+/ i / 1�`';1),•'• ,L. _ry-_,r (. _ i, j I. 282 Governmental Funds Capital Improvement Projects Estimated Operations and Maintenance Costs Total Projected Projected Projected Projected Projected Estimated O&M FY08 FY09 FY10 FY11 FY12 Cost FY08-FY12 Street/Traffic Projects Traffic Signal Rio Grande and Rock Prairie - 1,100 1,100 1,100 1,100 4,400 Traffic Signal at Welsh and Holleman - 1,100 1,100 1,100 1,100 4,400 Traffic Signal Harvey M.at Luther 2,400 2,400 2,400 2,400 2,400 12,000 Traffic Signal Harvey M.at Holleman 2,400 2,400 2,400 2,400 2,400 12,000 Street/Traffic Project Totals $ 4,800 $ 7,000 $ 7,000 $ 7,000 $ 7,000 $ 32,800 Parks Projects University Park Development 11,220 22,930 23,618 24,326 25,056 107,151 Veteran's Park and Athletic Complex,Phase 379,580 385,051 390,686 390,491 402,206 1,948,014 Forestry Shop Construction 28,000 7,000 7,000 7,000 7,000 56,000 Woodland Hills Park Development 7,435 14,770 15,213 15,669 16,140 69,227 Lincoln Center Additional Parking 6,000 6,000 6,000 6,000 6,000 30,000 Gabbard Park Improvements 4,000 4,000 4,000 4,000 4,000 20,000 Oaks Park Improvements 5,000 5,000 5,000 5,000 5,000 25,000 . Oaks Park Basketball Pavilion 5,000 5,000 5,000 5,000 5,000 25,000 Parks Project Totals $ 446,235 $ 449,751 $ 456,517 $ 457,487 $ 470,402 $ 2,280,391 Facilities and Technology Projects New Cemetery $ 151,490 $ 143,698 $ 148,009 $ 152,449 $ 157,023 $ 752,669 . Relocation of Fire Station#3 - 20,000 20,000 20,000 20,000 80,000 New City Hall - - - - - TBD Northgate Improvements - 35,000 35,000 35,000 35,000 140,000 Municipal Facility Improvements - 32,000 32,000 32,000 32,000 128,000 Police Field Reporting - 23,000 23,000 23,000 23,000 92,000 Automated Citations 15,120 15,120 15,120 15,120 15,120 75,600 1 Police Booking 18,000 18,000 18,000 18,000 18,000 90,000 EMS Reporting System - 20,000 20,000 20,000 20,000 80,000 PD Scheduling System - - 9,300 9,300 9,300 27,900 Automated Customer Service - 35,000 35,000 35,000 35,000 140,000 PARD Automation 12,000 12,000 12,000 12,000 12,000 60,000 AS400 Enhancement - - 28,000 28,000 28,000 84,000 PBX Replacement 34,000 34,000 34,000 34,000 34,000 170,000 Radio System Replacement Enhancement - 150,000 150,000 150,000 150,000 600,000 Wireless Infrastructure - 20,000 20,000 20,000 20,000 80,000 • Facilities and Technology Project Totals $ 230,610 $ 557,818 $ 599,429 $ 603,869 $ 608,443 $ 2,600,169 Drainage Projects Capital Projects $ - $ - $ - $ - $ - Drainage Project Totals $ - $ - $ $ $ - $ - Total Estimated O&M Costs $ 681,645 $ 1,014,569 $ 1,062,946 $ 1,068,356 $ 1,085,844 $ 4,913,360 283 Special Revenue Funds Capital Improvement Projects Estimated Operations and Maintenance Costs • • Total Projected Projected Projected Projected Projected Estimated O&M • FY08 FY09 FY10 FY11 FY12 Cost FY08-FY12 Parkland Dedication Northgate Park(Spruce Street) 750 750 750 750 750 3,750.00 Southwest Park Development - 28,550 29,407 30,289 31,197 119,442.55 John Crompton Park Ph Il 4,000 4,000 4,000 4,000 4,000 20,000.00 Edelweiss Gartens Park 24,778 49,507 50,992 52,522 54,098 231,896.82 Cove of Nantucket Park 2,500 5,000 5,000 5,000 5,000 22,500.00 Parks Project Totals $ 31,278 $ 87,057 $ 89,399 $ 91,811 $ 94,295 $ 393,839 • • Convention Center Capital Projects $ - $ - $ - $ - $ - TBD Convention Center Project Totals $ - $ - $ $ $ $ Total Estimated O&M Costs $ 31,278 $ 87,057 $ 89,399 $ 91,811 $ 94,295 $ 393,839 • • • 284 Enterprise Funds Capital Improvement Projects Estimated Operations and Maintenance Costs Total Projected Projected Projected Projected Projected Estimated O&M FY08 FY09 FY10 FY11 FY12 Cost FY08-FY12 BVSWMA Projects RPR Gas Recovery and final cover $ 7,000 $ 7,000 $ 7,000 $ 7,000 $ 7,000 $ 35,000 BVSWMA Project Totals $ 7,000 $ 7,000 $ 7,000 $ 7,000 $ 7,000 $ 35,000 Water/Wastewater Projects • Well#7 $ 152,000 $ 152,000 $ 152,000 $ 152,000 $ 152,000 $ 760,000 Reclaimed Water-Irrigation - - 76,000 76,000 76,000 228,000.00 Water/Wastewater Project Totals $ 152,000 $ 152,000 $228,000 $228,000 $228,000 $ 988,000 Total Estimated O&M Costs $ 159,000 $ 159,000 $235,000 $235,000 $235,000 $ 1,023,000 285 • . , • , . . . . • „, • • . . • - • • CITY OF COLLEGE STATION • • HEART OF THE RESEARCH VALLEY ' • • • , • --• 286 Index by Project/Work Order Name Streets Projects Project# Page Facility Projects Project# Page ARRINGTON/DECATUR EXTENSION ST0606 40 DESIGN OF SENIOR CENTER GG0601 123 BARRON ROAD INTERCHANGE DESIGN ST0212 45 FIRE STATION#5 GG0201 115 BARRON ROAD REHABILITATION ST0409 46-47 LIBRARY BOOK DONATIONS GG9901 113 BARRON ROAD RIGHT OF WAY ST0006 44 MUNICIPAL BUILDINGS REHAB&REMODEL GG0801 122 BIKE LOOP-2005 ST0530 66 MUNICIPAL FACILITY IMPROVEMENTS GG0701 121 _ CHURCH AVE REHAB PHASE II ST0523 24-25 NEW CEMETERY GG9905 114 COCS BEAUTIFICATION IMPROVEMENTS ST0515 71 NEW CITY HALL GG0408 119 . COLLEGE PARK/BREEZY HEIGHTS(SOUTHSIDE) ST0507 20-21 NORTHGATE IMPROVEMENTS TBD 120 CORSAIR(AMS)STREET EXTENSION ST0612 37 POLICE STATION IMPROVEMENTS GG0402 118 DARTMOUTH EXTENSION PHASE II ST0211 34-35 RELOCATION OF FIRE STATION#3 GG0401 116-117 FUTURE STREET EXTENSION PROJECTS ST0701 41 . HIKE AND BIKE TRAILS ST0521 68 Technology Projects Project# Page JONES-BUTLER RD SOUTH-PH II ST0005 30-31 AS400 ENHANCEMENT TBD 133 MANUEL DRIVE OP ST0802 39 ATM NETWORK REPLACEMENT C00522 138 MISC.BIKE TRAILS ST9803 67 AUTOMATED CITATIONS C00503 126 NEIGHBORHOOD CIP(TRAFFIC CALMING) ST0012 69 AUTOMATED CUSTOMER SERVICE C00102 131 NEW TRAFFIC SIGNAL PROJECTS ST0512 56 EMS REPORTING SYSTEM C00702 129 , NORTHGATE STREET REHAB ST0518 22 MDT SYSTEM REPLACEMENT CO0701 128 OVERSIZE PARTICIPATION ST0519 36 PARD AUTOMATION C00402 132 PEDESTRIAN IMP ON UNIVERSITY DR-PHASE IA ST0416 70 PBX(PHONE SYSTEM)REPLACEMENT CO0400 135 PEDESTRIAN IMPROVEMENTS ON FM 2818 ST0516 72-73 PD SCHEDULING SYSTEM C00703 130 ROCK PRAIRIE RD WIDENING-DESIGN AND ROW ST0417 43 POLICE BOOKING C00515 127 SIDEWALK IMP ON APPOMATTOX ST0803 77 POLICE FIELD REPORTING C00516 125 SIDEWALK IMP ON SOUTHWEST PKWY ST0702 76 RADIO SYSTEM REPLACEMENT C00601 136 SIDEWALK IMPROVEMENTS ST0517 74 UPS REPLACEMENT C00603 134 SOUTHERN BREEZE DRIVE ST0704 42 WIDE AREA COMMUNICATIONS GRANT C00706 137 SOUTHWEST PKWY MEDIANS ST0602 55 WIRELESS INFRASTRUCTURE C00704 139 • TAUBER AND STASNEY REHAB/NG SIDEWALKS ST0505 26-27 TRAFFIC MGMT.IMPROVE. ST0011 53 Drainage Projects Project# Page TRAFFIC SIGNAL @ 2818/F&B ST0610 62 BEE CREEK-Letter of Map Revision SD0703 153 TRAFFIC SIGNAL @ GB DRIVE EAST&DOMINIK ST0205 63 BEE CREEK(COMBINED) SD9802 144-145 TRAFFIC SIGNAL @ HM PKWY AND HOLLEMAN ST0608 61 BEE CREEK PH.IV&V. SD0001 146-147 TRAFFIC SIGNAL @ HM PKWY AND LUTHER ST0607 60 COLLEGE PARK/BREEZY HEIGHTS SD0601 20-21 TRAFFIC SIGNAL @ ROCK PRAIRIE/RIO GRANDE ST0414 58 GREENWAYS PROJECTS SD9903 148 TRAFFIC SIGNAL @ WELSH/HOLLEMAN ST0415 59 MINOR DRAINAGE IMPROVEMENTS SD0801 149 TRAFFIC SIGNAL COMMUNICATIONS ST0411 64 PEEBLE CREEK DRAINAGE IMP SD0702 150 TRAFFIC SYSTEM SAFETY IMPR. ST0511 54 STORMWATER MAPPING SD0523 152 TX AVE STREETSCAPE PH II ST9915 50 WEST PARK DRAINAGE IMP SD0524 18-19 TXDOT ROW PAYMENT TBD 51 WPC(REDMOND TERRACE) SD0520 151 • UNIV DR SIDEWALK IMPROVEMENTS ST0529 75 WPC DRAINAGE RESTORATION SD0704 154 VEHICLE DETECTION ST0302 57 VICTORIA OP ST9928 32 Parkland Dedication Projects Project# Page ' WATERWOOD OP ST0613 38 CENTRAL PARK POND IMP/DISC GOLF PK0805 164 WEST PARK(SOUTHSIDE) ST0400 18-19 COVE OF NANTUCKET PARK PK0716 178 WILLIAM D.FITCH PKWY WIDENING PH II ST0520 48 EDELWEISS GARTENS PK0613 175 EMERALD FOREST PARK IMP. PK0713 172 Parks Projects Project# Page JOHN CROMPTON PARK PHASE II PK0712 170 ADAMSON POOL BATH HOUSE REPLACEMENT PK0701 94 NG(SPRUCE ST)LAND PURCHASE PK0727 160 CENTRAL PARK LIFE TRAIL EXERCISE EQUIPMENT PK0707 106 SOUTHWEST PARK DEVELOPMENT PK0806 168 CENTRAL PARK SHOP RENOVATION PK0521 90 UNIVERSITY PARK PK0410 86-87 FIELD REDEVELOPMENT PK0300 84 WOODLAND HILLS PARK DEV. PK0714 92-93 GABBARD PARK IMPROVEMENTS PK0704 103 WPC DISC GOLF COURSE PK0617 163 LINCOLN CENTER ADDITONAL PARKING PK0702 101 ZONE 1 PARK PK0051 159 LINCOLN CENTER BLDG TO PARKING COVER PK0602 100 ZONE 2 PARK PK0052 161 LINCOLN CENTER ENTRY SIDEWALK PK0803 107 ZONE 3 PARK PK0053 162 LINCOLN CENTER RECEPTION DESK IN FOYER PK0703 102 ZONE 4 PARK PK0054 165 LIONS PARK SWING SET PK0804 108 ZONE 5 PARK PK0055 166 NEW FORESTRY SHOP CONSTRUCTION PK0520 89 ZONE 6 PARK PK0056 167 OAKS PARK BASKETBALL PAVILLION PK0706 105 ZONE 7 PARK PK0057 169 • OAKS PARK IMPROVEMENTS PK0705 104 ZONE 8 PARK PK0058 171 RAINTREE PARK IMPR. PK0068 83 ZONE 9 PARK PK0059 173 SOUTHWOOD VALLEY LITTLE LEAGUE LIGHTS PK0801 95 ZONE 10 PARK ' PK0060 174 THOMAS POOL BATH HOUSE REPLACEMENT PK0802 96 ZONE 11 PARK PK0061 176 UNIVERSITY PARK DEVELOPMENT PK0410 86-87 ZONE 12 PARK TBD 177 VETERANS PARK PHASE II PK0501 88 ZONE 13 PARK PK0807 179 WOLF PEN CREEK AMPHITHEATER ADDITIONS WP0501 98-99 ZONE 14 PARK PK0717 180 WOODLAND HILLS DEVELOPMENT PK0523 92-93 ZONE 15 PARK PK0808 181 287 ZONE 16 PARK TBD 182 • Index by Project/Work Order Name Convention Center Projects Project# Page Wastewater Projects Work Order# Page CONVENTION CENTER GG0523 186 BARRON ROAD REHAB WF0654332 46-47 HWY 30/60 INFRASTRUCTURE GG0105 187 BEE CREEK COMBINED WASTEWATER WF0738214 144-145 BEE CREEK PH IV&V WASTEWATER TBD 146-147 Water Projects Work Order# Page CARTERS CREEK BLOWER OVERHAULS TBD 264 ARRINGTON RD WATER SERVICE EXT WF0379145 221 CARTERS CREEK CLARIFIER IMPROVEMENTS TBD 259 B/CS PUMP INTERCONNECT WF0751883 217 CARTERS CREEK HEADWORKS IMP TBD 260 BARRON ROAD WATER SERVICE EXT WF0379197 222 CARTERS CREEK SCREW LIFT SYSTEM WF0376687 255 • BARRON ROAD REHAB WF0654325 46-47 CARTERS CREEK SERVICE WATER IMP TBD 261 • ' BEE CREEK PHASES IV&V TBD 146-147 CARTERS CREEK UV IMPROVEMENTS WF0585450 258 CENTRAL PARK LANE EXTENSION OP WF0592456 214 CCWWTP PAVEMENT/REPAIRS IMP WF0567890 267 CHURCH AVENUE REHAB-PHASE II WF0632256 24-25 CHURCH AVENUE REHAB-PHASE II WF0632257 24-25 COLLEGE PARK/BREEZY HEIGHTS WF0595915 20-21 COLLEGE PARK/BREEZY HEIGHTS WF0595926 20-21 • COOLING TOWER UPGRADE WF0857892 207 DARTMOUTH PHII WF0350773 34-35 DARTMOUTH WATER EXTENSION PII WF0350795 34-35 EMERALD PKWY/BENT OAK WF0626151 251 ' DOVE CROSSING SUBDIVISION,PH I OP WF0592456 214 FOXFIRE LIFT STATION REHAB TBD 254 • DOWLING ROAD 10MG GST-LAND PURCHASE WF0353631 205 GREENS PR.W.OF ARRINGTON(AREA 2) WF0395480 248 DOWLING ROAD PUMP/CHEMICAL SYSTEM WF0499740 206 JONES-BUTLER WASTEWATER EXTENSION WF0680144 30-31 FIRE STATION#3-BARRON ROAD WF0632255 116-117 LICK CREEK CENTRIFUGE IMPROVEMENTS TBD 265 GREENS PRAIRIE ELEVATED STORAGE ELEC UPGRADE TBD 209 LICK CREEK CLARIFIER CATWALKS TBD 262 JONES-BUTLER WATER EXT PHII WF0680235 30-31 LIFT STATION#2 REHAB TBD 253 LAND ACQUISITION-WELLS WF0377324 203 LIFT STATION#3 REHAB WF0383012 252 LICK CREEK/ROCK PRAIRIE SERVICE EXT WF0379226 223 NANTUCKET E.OF HARPER'S FERRY(AREA 3) WF0395488 249 • OVERSIZED PARTICIPATION WF0742715 214 NANTUCKET LIFT STATION WF0954381 245 PARALLEL WATER TRANS LINE-SH21-VILLA MARIA WF0352317 202 NANTUCKET SEWER WF0700950 244 PARALLEL WELLFIELD COLL LINE PH I WF0352553 201 NORTHEAST TRUNK EXPAN.PHASE I WF0351744 243 • PEDESTRIAN IMP ON 2818/WELSH WF0614950 72-73 OVERSIZE PARTICIPATION WF0464783 241 . ROCK P RD S OF CARTER LAKE(AREA 5) WF0805789 224-225 PEDESTRIAN IMP ON 2818/WELSH TBD 72-73 ROCK PRAIRIE WATER SERVICE EXT WF0352094 220 RAYMOND STOTZER WEST TBD 247 ' SANDY POINT PUMP STATION&WELLFIELD EROSION WF0461924 208 ROCK P RD S OF CARTER LAKE(AREA 5) WF0805744 224-225 SCADA REPLACEMENT WF0742940 210 SCADA REPLACEMENT WF0742950 268 . SHENANDOAH PH 12&13 WF0579115 214 SLUDGE PROCESSING IMPROVEMENTS WF0363214 263 SONOMA PHASE 2-24"WATER LINE WF0934457 215 SONOMA WW DEVELOPMENT AGREEMENT WF0954571 242 SOUTH KNOLL/THE GLADE TBD 232-233 SOUTH KNOLL/THE GLADE TBD 232-233 . SPPS FIBER OPTIC LINE TBD 212 STEEPLECHASE IMPACT FEE WF0354517 246 . TAUBER&STASNEY WF0625888 26-27 TAUBER&STASNEY REHAB WF0625893 26-27 TEXAS AVE.RELOCATION SOUTH WF0351282 230-231 TEXAS AVE.RELOCATION SOUTH WF0351341 230-231 VICTORIA WATER OP WF0537425 216 WASTEWATER PLANT SECURITY WF0466416 266 WATER PLANT SECURITY WF0466439 211 WEST PARK WF0427245 18-19 WATER RECLAIM/IRRIGATION TBD 218 WILLIAM D FITCH EAST(AREA 6) WF0805756 226-227 WELL#7 WF0353607 199 2005 ODOR CONTROL IMPROVEMENTS WF0620950 257 WELL#7 COLLECTION LINE WF0353621 200 • WELL SITE DRAINAGE TBD 204 BVSWMA Projects Project# Page WELLBORN WIDENING WF0613546 219 HWY 30 Access BV0601 277 . WEST PARK WF0427233 18-19 HWY 30 Buildings&Infrastructure BV0602 278 WILLIAM D FITCH EAST(AREA 6) WF0805807 226-227 HWY 30 Cell Construction BV0701 280 • ' • HWY 30 Compost Facility Design and Construction TBD 281 HWY 30 Design Services BV0603 279 HWY 30 Land Purchase BV0003 275 HWY 30 Permit Application/Legal Fees BV0502 276 HWY 30 Petroleum Pipeline Relocation TBD 282 RPR Gas Collection System BV0404 273 RPR Gas Recovery and Final Cover BV0403 272 • RPR Soil Deficit Management BV0504 274 • 288 Index by Project/Work Order Number Project# Streets Projects Page Project# Facility Projects Page ST0005 JONES-BUTLER RD SOUTH-PH II 30-31 GG0201 FIRE STATION#5 115 ST0006 BARRON ROAD RIGHT OF WAY 44 GG0401 RELOCATION OF FIRE STATION#3 116-117 ST0011 TRAFFIC MGMT.IMPROVE. 53 GG0402 POLICE STATION IMPROVEMENTS 118 ST0012 NEIGHBORHOOD CIP(TRAFFIC CALMING) 69 GG0408 NEW CITY HALL 119 ST0205 TRAFFIC SIGNAL @ GB DRIVE EAST&DOMINIK 63 GG0601 DESIGN OF SENIOR CENTER 123 ST0211 DARTMOUTH EXTENSION PHASE II 34-35 GG0701 MUNICIPAL FACILITY IMPROVEMENTS 121 ST0212 BARRON ROAD INTERCHANGE DESIGN 45 GG0801 MUNICIPAL BUILDINGS REHAB&REMODEL 122 ST0302 VEHICLE DETECTION 57 GG9901 LIBRARY BOOK DONATIONS 113 ST0400 WEST PARK(SOUTHSIDE) 18-19 GG9905 NEW CEMETERY 114 ST0409 BARRON ROAD REHABILITATION 46-47 TBD NORTHGATE IMPROVEMENTS 120 ST0411 TRAFFIC SIGNAL COMMUNICATIONS 64 ST0414 TRAFFIC SIGNAL @ ROCK PRAIRIE/RIO GRANDE 58 Project# Technology Projects Page ST0415 TRAFFIC SIGNAL @ WELSH/HOLLEMAN 59 C00102 AUTOMATED CUSTOMER SERVICE 131 ST0416 PEDESTRIAN IMP ON UNIVERSITY DR-PHASE IA 70 C00400 PBX(PHONE SYSTEM)REPLACEMENT 135 ST0417 ROCK PRAIRIE RD WIDENING-DESIGN AND ROW 43 C00402 PARD AUTOMATION 132 ST0505 TAUBER AND STASNEY REHAB/NG SIDEWALKS 26-27 CO0503 AUTOMATED CITATIONS 126 ST0507 COLLEGE PARK/BREEZY HEIGHTS(SOUTHSIDE) 20-21 C00515 POLICE BOOKING 127 ST0511 TRAFFIC SYSTEM SAFETY IMPR. 54 C00516 POLICE FIELD REPORTING 125 ST0512 NEW TRAFFIC SIGNAL PROJECTS 56 C00522 ATM NETWORK REPLACEMENT 138 ST0515 COCS BEAUTIFICATION IMPROVEMENTS 71 CO0601 RADIO SYSTEM REPLACEMENT 136 ST0516 PEDESTRIAN IMPROVEMENTS ON FM 2818 72-73 C00603 UPS REPLACEMENT 134 ST0517 SIDEWALK IMPROVEMENTS 74 CO0701 MDT SYSTEM REPLACEMENT 128 ST0518 NORTHGATE STREET REHAB 22 C00702 EMS REPORTING SYSTEM 129 ST0519 OVERSIZE PARTICIPATION 36 C00703 PD SCHEDULING SYSTEM 130 ST0520 WILLIAM D.FITCH PKWY WIDENING PH II 48 C00704 WIRELESS INFRASTRUCTURE 139 ST0521 HIKE AND BIKE TRAILS 68 C00706 WIDE AREA COMMUNICATIONS GRANT 137 ST0523 CHURCH AVE REHAB PHASE II 24-25 TBD AS400 ENHANCEMENT 133 ST0529 UNIV DR SIDEWALK IMPROVEMENTS 75 ST0530 BIKE LOOP-2005 66 Project# Drainage Projects Page ST0602 SOUTHWEST PKWY MEDIANS 55 SD0001 BEE CREEK PH.IV&V. 146-147 ST0606 ARRINGTON/DECATUR EXTENSION 40 SD0520 WPC(REDMOND TERRACE) 151 ST0607 TRAFFIC SIGNAL @ HM PKWY AND LUTHER 60 SD0523 STORMWATER MAPPING 152 ST0608 TRAFFIC SIGNAL @ HM PKWY AND HOLLEMAN 61 SD0524 WEST PARK DRAINAGE IMP 18-19 ST0610 TRAFFIC SIGNAL @ 2818/F&B 62 SD0601 COLLEGE PARK/BREEZY HEIGHTS 20-21 ST0612 CORSAIR(AMS)STREET EXTENSION 37 SD0702 PEEBLE CREEK DRAINAGE IMP 150 ST0613 WATERWOOD OP 38 SD0703 BEE CREEK-Letter of Map Revision 153 ST0701 FUTURE STREET EXTENSION PROJECTS 41 SD0704 WPC DRAINAGE RESTORATION 154 ST0702 SIDEWALK IMP ON SOUTHWEST PKWY 76 SD0801 MINOR DRAINAGE IMPROVEMENTS 149 ST0704 SOUTHERN BREEZE DRIVE 42 SD9802 BEE CREEK(COMBINED) 144-145 ST0802 MANUEL DRIVE OP 39 SD9903 GREENWAYS PROJECTS 148 ST0803 SIDEWALK IMP ON APPOMATTOX 77 ST9803 MISC.BIKE TRAILS 67 Project# Parkland Dedication Projects Page ST9915 TX AVE STREETSCAPE PH II 50 PK0051 ZONE 1 PARK 159 ST9928 VICTORIA OP 32 PK0052 ZONE 2 PARK 161 TBD TXDOT ROW PAYMENT 51 PK0053 ZONE 3 PARK 162 PK0054 ZONE 4 PARK 165 Project# Parks Projects Page PK0055 ZONE 5 PARK 166 PK0068 RAINTREE PARK IMPR. 83 PK0056 ZONE 6 PARK 167 PK0300 FIELD REDEVELOPMENT 84 PK0057 ZONE 7 PARK 169 PK0410 UNIVERSITY PARK DEVELOPMENT 86-87 PK0058 ZONE 8 PARK 171 PK0501 VETERANS PARK PHASE II 88 PK0059 ZONE 9 PARK 173 PK0520 NEW FORESTRY SHOP CONSTRUCTION 89 PK0060 ZONE 10 PARK 174 PK0521 CENTRAL PARK SHOP RENOVATION 90 PK0061 ZONE 11 PARK 176 PK0523 WOODLAND HILLS DEVELOPMENT 92-93 PK0410 UNIVERSITY PARK 86-87 PK0602 LINCOLN CENTER BLDG TO PARKING COVER 100 PK0613 EDELWEISS GARTENS 175 PK0701 ADAMSON POOL BATH HOUSE REPLACEMENT 94 PK0617 WPC DISC GOLF COURSE 163 PK0702 LINCOLN CENTER ADDITONAL PARKING 101 PK0712 JOHN CROMPTON PARK PHASE II 170 PK0703 LINCOLN CENTER RECEPTION DESK IN FOYER 102 PK0713 EMERALD FOREST PARK IMP. 172 PK0704 GABBARD PARK IMPROVEMENTS 103 PK0714 WOODLAND HILLS PARK DEV. 92-93 . PK0705 OAKS PARK IMPROVEMENTS 104 PK0716 COVE OF NANTUCKET PARK 178 PK0706 OAKS PARK BASKETBALL PAVILLION 105 PK0717 ZONE 14 PARK 180 PK0707 CENTRAL PARK LIFE TRAIL EXERCISE EQUIPMENT 106 PK0727 NG(SPRUCE ST)LAND PURCHASE 160 PK0801 SOUTHWOOD VALLEY LITTLE LEAGUE LIGHTS 95 PK0805 CENTRAL PARK POND IMP/DISC GOLF 164 PK0802 THOMAS POOL BATH HOUSE REPLACEMENT 96 PK0806 SOUTHWEST PARK DEVELOPMENT 168 PK0803 LINCOLN CENTER ENTRY SIDEWALK 107 PK0807 ZONE 13 PARK 179 PK0804 LIONS PARK SWING SET 108 PK0808 ZONE 15 PARK 181 WP0501 WOLF PEN CREEK AMPHITHEATER ADDITIONS 98-99 TBD ZONE 12 PARK 177 TBD ZONE 16 PARK 182 289 Index by ProjectlWork Order Number Project# Convention Center Projects Page Work Order# Wastewater Projects Page GG0105 HWY 30/60 INFRASTRUCTURE 187 WF0350773 DARTMOUTH PHII 34-35 • GG0523 CONVENTION CENTER 186 WF0351341 TEXAS AVE.RELOCATION SOUTH 230-231, WF0351744 NORTHEAST TRUNK EXPAN.PHASE I 243 • Work Order# Water Projects Page WF0354517 STEEPLECHASE IMPACT FEE 246 WF0350795 DARTMOUTH WATER EXTENSION PII 34-35 WF0363214 SLUDGE PROCESSING IMPROVEMENTS 263 WF0351282 TEXAS AVE.RELOCATION SOUTH 230-231 WF0376687 CARTERS CREEK SCREW LIFT SYSTEM 255 • WF0352094 ROCK PRAIRIE WATER SERVICE EXT 220 WF0383012 LIFT STATION#3 REHAB 252 WF0352317 PARALLEL WATER TRANS LINE-SH21-VILLA MARIA 202 WF0395480 GREENS PR.W.OF ARRINGTON(AREA 2) 248 WF0352553 PARALLEL WELLFIELD COLL LINE PH I 201 WF0395488 NANTUCKET E.OF HARPER'S FERRY(AREA 3) 249 ... WF0353607 WELL#7 199 WF0427245 WEST PARK 18-19 WF0353621 WELL#7 COLLECTION LINE 200 WF0464783 OVERSIZE PARTICIPATION 241 WF0353631 DOWLING ROAD 10MG GST-LAND PURCHASE 205 WF0466416 WASTEWATER PLANT SECURITY 266 WF0377324 LAND ACQUISITION-WELLS 203 WF0567890 CCWWTP PAVEMENT/REPAIRS IMP 267 WF0379145 ARRINGTON RD WATER SERVICE EXT 221 WF0585450 CARTERS CREEK UV IMPROVEMENTS 258 WF0379197 BARRON ROAD WATER SERVICE EXT 222 WF0595926 COLLEGE PARK/BREEZY HEIGHTS 20-21 WF0379226 LICK CREEK/ROCK PRAIRIE SERVICE EXT 223 WF0620950 2005 ODOR CONTROL IMPROVEMENTS 257 WF0427233 WEST PARK 18-19 WF0625893 TAUBER&STASNEY REHAB 26-27 WF0461924 SANDY POINT PUMP STATION&WELLFIELD EROSION 208 WF0626151 EMERALD PKWY/BENT OAK 251 WF0466439 WATER PLANT SECURITY 211 WF0632257 CHURCH AVENUE REHAB-PHASE II 24-25 WF0499740 DOWLING ROAD PUMP/CHEMICAL SYSTEM 206 WF0654332 BARRON ROAD REHAB 46-47 WF0537425 VICTORIA WATER OP 216 WF0680144 JONES-BUTLER WASTEWATER EXTENSION 30-31 • WF0579115 SHENANDOAH PH 12&13 214 WF0700950 NANTUCKET SEWER 244 WF0592456 CENTRAL PARK LANE EXTENSION OP 214 WF0738214 BEE CREEK COMBINED WASTEWATER 144-145 - • WF0592456 DOVE CROSSING SUBDIVISION,PH I OP 214 WF0742950 SCADA REPLACEMENT 268 WF0595915 COLLEGE PARK/BREEZY HEIGHTS 20-21 WF0805744 ROCK P RD S OF CARTER LAKE(AREA 5) 224-225 , , WF0613546 WELLBORN WIDENING 219 WF0805756 WILLIAM D FITCH EAST(AREA 6) 226-227 WF0614950 PEDESTRIAN IMP ON 2818/WELSH 72-73 WF0954381 NANTUCKET LIFT STATION 245 WF0625888 TAUBER&STASNEY 26-27 WF0954571 SONOMA WW DEVELOPMENT AGREEMENT 242 WF0632255 FIRE STATION#3-BARRON ROAD 116-117 TBD BEE CREEK PH IV&V WASTEWATER 146-147 •• WF0632256 CHURCH AVENUE REHAB-PHASE II 24-25 TBD CARTERS CREEK BLOWER OVERHAULS 264 . WF0654325 BARRON ROAD REHAB 46-47 TBD CARTERS CREEK CLARIFIER IMPROVEMENTS 259 ' WF0680235 JONES-BUTLER WATER EXT PHII 30-31 TBD CARTERS CREEK HEADWORKS IMP 260 WF0742715 OVERSIZED PARTICIPATION 214 TBD CARTERS CREEK SERVICE WATER IMP 261 WF0742940 SCADA REPLACEMENT 210 TBD FOXFIRE LIFT STATION REHAB 254 WF0751883 B/CS PUMP INTERCONNECT 217 TBD LICK CREEK CENTRIFUGE IMPROVEMENTS 265 • WF0805789 ROCK P RD S OF CARTER LAKE(AREA 5) 224-225 TBD LICK CREEK CLARIFIER CATWALKS 262 ' WF0805807 WILLIAM D FITCH EAST(AREA 6) 226-227 TBD LIFT STATION#2 REHAB 253 • WF0857892 COOLING TOWER UPGRADE 207 TBD PEDESTRIAN IMP ON 2818N/ELSH 72-73 WF0934457 SONOMA PHASE 2-24"WATER LINE 215 TBD RAYMOND STOTZER WEST 247 ' TBD BEE CREEK PHASES IV&V 146-147 TBD SOUTH KNOLL/THE GLADE 232-233 • • TBD GREENS PRAIRIE ELEVATED STORAGE ELEC UPGRADE 209 TBD SOUTH KNOLL/THE GLADE 232-233 Project# BVSWMA Projects Page TBD SPPS FIBER OPTIC LINE 212 BV0003 HWY 30 Land Purchase 275 . TBD WATER RECLAIM/IRRIGATION 218 BV0403 RPR Gas Recovery and Final Cover 272 • TBD WELL SITE DRAINAGE 204 BV0404 RPR Gas Collection System 273 . BV0502 HWY 30 Permit Application/Legal Fees 276 BV0504 RPR Soil Deficit Management 274 BV0601 HWY 30 Access 277 BV0602 HWY 30 Buildings&Infrastructure 278 BV0603 HWY 30 Design Services 279 BV0701 HWY 30 Cell Construction 280 • TBD HWY 30 Compost Facility Design and Construction 281 TBD HWY 30 Petroleum Pipeline Relocation 282 • • 290 I f F 1 1 • • .•, 1 • • • •II ,..E . i , •!I ;I wilmwoommo f • j • • • CITY OF COLLEGE STATION • City Of College Station P.O. Box 9960 Col 979-764-3445 • www.cstx.gov