HomeMy WebLinkAbout1977 B-CS Urban Transportaion Annual Report420
280 -/50
'723
`.J
.L
7
MN IW
420
I I
6 /0
1
' ,///0
215/
,24/0
I//
CON
380 .5540
F ,. 11_w n.1
Lunt. SIgLI
«011141 NOM
3350 3420
2370
67104
2890
s
io3o
,�, y1 DENCE ` GVE.
2470 / 3330
4840'
//,140
0,070
,/980
893
1 LYINFR 51
1
//00
59/0
'‘520
1r
5'
El-
SCI ■0111 NN
6780
2660
MN
u.1s sr
- //,730
/7,/70
• 4 /
•
..t .. 'I'
• /630
20,00 /g
9770 247
27,E
A2/s0
245/
/5,730
4940
Vasa
22,040
/020
•13,090
1
a
23'
NO
51
1011.4 -
'w
3290
u.l.t Iir y ,• I1 t
uM
170 _
S1NO
Zvi y , .v AN.
wE 1
M
..r
070
NA .N1 s1
F LOR I N
� SI
/x/,730
/MIS N
011111111
IA 1 1 51
PLANTATION OW
t
3/50 800
'330
d ` 7/40' 630
� S
4 SI
SI Mr
4
r
SI
4230 ° '2 /50
moo
3780
N. 1
l
SANS •
tU1E4 SI
FF SI
c lice sr c.fo Si
8910
51.
.3iQ7Y)
I .540 .15155 51
820 I :
< /50
67so ^ �� ►:
WIN N
wt. 4
1=
5C
1977 TRAFFIC MAP
BRYAN - COLLEGE STATION
URBAN TRANSPORTATION STUDY AREA
LEGEND
3050-24 HOUR WEEKDAY TRAFFIC VOLUMES
DURING THE PERIOD APRIL 5, 1977
THROUGH MAY 13, 1977
1
CLOACA
L.NEL
MF.
ST
ST
ST
A
40
2 520 ,25
.ELLYIE ‘r
HAMS ST
11. nN !T
.i
379
�■ TRANSPORTATION IMPROVEMENT PROGRAM
ANNUAL ELEMENT - T S M
- - PLAN IMPLEMENTATION SINCE 1970
- - UNDER CONSTRUCTION
A
1
TRANSPORTATION PLAN
The State and local governments, working through
the cooperative, comprehensive, and continuing
planning process, have developed a recommended
transportation plan for the Bryan - College Station
Urban Area. The Recommended Transportation Plan
is closely integrated with and part of the total
conceptual community planning effort. The Recom-
mended Transportation Plan contains several ele-
ments, including
These are improvements which will be needed in
the transportation network during the long -range
planning period, a time span generally estimated
to be a 20 -year framework. The local governments
are working to implement this long -range trans-
portation plan in an orderly, systematic manner.
Since the total plan is so closely related to com-
munity planning as a whole, the overview of the
proposed future transportation system is shown
superimposed on the aerial photograph in the Neigh-
borhood Analysis section of this Annual Report.
TRANSPORTATION SYSTEMS
These are projects which, without major or exten-
sive construction or capital expenditure, will en-
courage more efficient use of the existing trans-
portation resources. The TSM is designed to ad-
dress the short -term needs of the community. The
complete TSM is on file in the Study Office, and
those projects which have been included on the
Annual Element are shown in the chart below.
PROJECT CHARACTER OF WORK
Railroad Study
Public Transit Study
Computerized Signal
System
Bikeway Demonstration
Project
City Ordinances
LONG RANGE ELEMENT
PROJECT CHARACTER OF WORK
Villa Widen to 64 -Ft.
Maria C&G section
Texas Widen to 84 -Ft.
Avenue C&G section
East Construct 48 -Ft.
25th St. C&G section
Nall- Construct 48 -Ft.
FM 158 C&G section
South Widen to 64 -Ft.
College C&G section
South Widen to 64 -Ft.
College C&G section
South Widen to 64 -Ft.
College C&G section
Dexter- Reconstruct inter -
Jersey section & appr.
East Widen to 64 -Ft.
29th C&G section
East Widen to 64 -Ft.
29th C&G section
East Widen to 64 -Ft.
29th C&G section
East Widen to 64 -Ft.
29th C&G section
East Widen to 64 -Ft.
29th C&G section
East Widen to 64 -Ft.
29th C&G section
South- Construct new
west 64 -Ft. C&G
Pkwy
Fin- Widen to 48 -Ft.
feather C&G section
Beck Widen to 48 -Ft.
C&G section
Beck Construct new
48 -Ft. C&G
Inner Construct 48 -Ft.
Loop C&G section
Inner Construct 48 -Ft.
Loop C&G section
Dominek Construct 64 -Ft.
C&G section
FM 2818 Undetermined
Easter- Phase I of capi-
wood tal improvement
Airport program
PROJECT CHARACTER OF WORK
Villa
Maria
Widen to 64 -Ft.
C&G on existing
right of way
Holleman Widen to 40 -Ft.
C &C sectiun
FM 158 Reconstruct to
rural 2 -lane
FM 2154 Widen to 4 -lane
C&G section
FM 2154 Widen to 4 -lane
C&G section
FM 60- Widen to 4-lare
FM 2818 & construct grade
separation str.
FM 60 Construct new
arterial street
Easter- Develop Master
wood Plan
Airport
MANAGEMENT
Study by consultant to evaluate
feasible alternates for the
railroad problems
Study by consultant to assess
the feasibility of a public tran-
sit system for Bryan- College Station
Install computerized signal system
on perimeter of Campus
Implement Bikeway Demonstration
Project
Review existing city ordinances
relating to transportation
TRANSPORTATION IMPROVEMENT
PROGRAM
The Transportation Improvement Program is a list
of improvements which will be needed in the trans-
portation network in the very near future. This
list is generally a three to five year program of
work which is extracted from the long -range ele-
ment and the TSM element. The TIP for the local
area is shown in the chart below and is also on
the map at the left, color -coded green.
ESTIMATED
TERMINI LENGTH COST
1.0 605,915
From E.29th
To FM 158
From Jersey 1.0
To University
From Texas
To Coulter
From Coulter
To SH 6
From Coulter
To Carson
From Carson
To Villa Maria
From Villa
Maria to North
N/A
From Texas
To Coulter
From Coulter
To Garden Ln.
From Beck
To Carson
445,250
0.8 572,652
0.7 481,998
0.8 496,566
0.8 496,566
0.6 270,830
0.1 71,900
0.6 411,113
0.6 417,368
From Garden Ln.
To Memorial 0.5 354,312
From Memorial 0.5 354,312
To Briarcrest
From Briarcrest
To Carter Cr. 0.8 375,162
From Carter 0.5 257,161
Cr. to Bryan
City Limit
From Texas to 1.1 672,500
SH 6 Express.
1.7 961,563
From Palasota 0.5 304,500
To Wood Lane
From Wood Lane
To FM 2818 0.6 348,000
From Cotton- 0.7 421,225
wood Creek
To Groesbeck
From Groes- 0.6 397,275
beck to Texas
From Puryear 0.3 317,000
To Texas at
Jersey
From Texas
To SH 6
N/A N/A 1,290,700
ANNUAL ELEMENT
1.0 1,755,000
From the Transportation Improvement Program, the
j list of transportation - related projects which are
- proposed for implementation during the upcoming
fiscal year has been prepared. These are the top
priority improvements, defined and agreed upon by
the local governments. The projects which are in-
cluded in the Annual Element for the 1978 fiscal
year are shown in the chart below and on the map
at the left, color -coded red.
ESTIMATED
TERMINI LENGTH COST
Fr. B:iar-
crest LO
Eat 29th St.
From SH 6
To FM 158
N/A
PLAN IMPLEMENTATION
0.6 296,125
From FM 2154 0.7 507,215
To Winding Rd.
From SH 6 3.1 712,950
To SH 30
From FM 2347 0.6 261,000
To Holleman
From Holleman 0.8 306,800
To FM 2818
From FM 2154 1.0 1,223,250
To FM 2818
1.7 1,140,000
N/A 42,000
Since 1970, when the Bryan - College Station Urban
Study was organized, major improvements have been
made in the transportation system. The projects
which have been constructed since 1970 are shown
in blue on the map. The improvements were funded
from various sources, including Federal, State,
city, county, and private developer funds. These
improvements indicate the desire of the community
to implement the planning process, insofar as the