Loading...
HomeMy WebLinkAbout1981-1279 - Ordinance - 03/26/1981ORDINANCE NO. 1279 AN ORDINANCE AMENDED CHAPTER 11 OF THE CODE OF ORDINANCES, CITY OF COLLEGE STATION, TEXAS. BE IT ORDAINED THAT THE CITY OF COLLEGE STATION: THAT CHAPTER 11 OF THE CODE OF ORDINANCES, CITY OF COLLEGE STATION, TEXAS IS HERBY AMENDED BY ADDING A SECTION TO BE NUMBERED SECTION 4A (8), WHICH SECTION SHOULD READ AS FOLLOWS: (8) Electric Rate - Schedule LP -4 (Texas Instruments, Inc.) (a) Applicable to electrical service furnished to Texas Instruments, Inc. for this College Station Manufacturing Plant. (b) Character of Service - A.C.; 60 cycles per second, single - phase, 120/ 140 volts; three - phase, 120/140, 120/208, 240/480, 2300/4160, 7200/12, 470 volts, as available at point of service. Three -phase service supplied via underground primary to pad- mounted transformers to be at 120/208 or 277/480 volts only. (c) Rate - Demand Charge - $2.08 per kw of billing demand. (d) Billing Demand - The billing demand shall be the maximum 15 minute measured kw in the month, but not less than 50% of the largest billing demand established during the twelve month period ending with the current month and in no case less than 301 kw. (e) Minimum Bill - $2.08 per kw for 300 of billing demand plus applicable fuel adjustment on the kwhrs used. (f) Fuel Adjustment Clause - The net energy charge per kwhr under the above rate shall be increased by an amount equal to the total fuel cost incurred by the City from its wholesale supplier on energy purchases made to serve this customer. (g) Power Factor - Should the power factor be lower than 0.85 lagging, the City may adjust the measured demand by multiplying by the ratio of 0.85 to the actual power factor for that month. (h) Primary Service - Where service is taken by the customer at the City's available primary voltage, a credit of 4% of the base rate charges will be allowed. Metering may be primary or secondary (corrected for transformer losses) at the City's option. This rate shall be effective on all invoices submitted by the City of College Station to Texas Instruments on or after April 1, 1981. PASSED and APPROVED this 26 ATTEST: CITY SECRETARY day of March 1981. s APPROVED• MAJOR l