Loading...
HomeMy WebLinkAboutWater Report WATER SYSTEM ANALYSIS FOR INDIAN LAKES SUBDIVISION PHASE IX COLLEGE STATION, TEXAS January 2006 MSS ( # 10b2--oOIZ 'l McCLURE & BROWNE ENGINEERING/SURVEYING, INC. ri 1008 Woodcreek Drive,Suite 103•College Station,Texas 77845 (979)693-3838•Fax:(979)693-2554•Email:McClureBrowne@Verizon.net WATER SYSTEM ANALYSIS FOR INDIAN LAKES, PHASE IX General Information Area encompassed by this phase: 15.4 acres Anticipated land use: Single family residential Anticipated number of lots: 44 lots Notes on surrounding development: The area surrounding the Phase 9 consists of previous phases of Indian Lakes. These are single-family residential lots that are generally 1 acre or larger in size. Water System Analysis Primary water supply line: Existing 12" line on Indian Lakes Drive Existing System Data: The hydraulic characteristics of the existing water system were determined during a fire flow test performed by Wellborn Water Special Utility District on January 18, 2006 at the intersection of Indian Lakes Drive and Arapaho Drive. Static Pressure: 67 psi . Residual Pressure: 37 psi ,-'g OF re" Residual Flow: 1040 gpm 5 �• ;�,," Software model: PIPE2000 (Kentucky Pipe Network Model) I* \ *', Average daily flow: 300 gpd (0.208 gpm)per residential lot / JEFFERY L.ROBERTSON Peaking factor: 4.0 1,13%. 94745 :re, Estimated peak domestic demand: 0.83 gpm per residential lot 14; •.tidSEp; Estimated fire demand: 1000 gpm EN hM�h ONA1.��� Pipe material: PVC(C909) Most Hydraulically Remote Point: Node#J-6 (See Exhibit A) Determined by calculating the lowest pressure under sta 'c conditions Regulated Items Designed ! Requirement Notes Min. Pressure(psi) 40.31 20 Fire flow conditions Max. Velocity(fps) 11.25 12 Fire flow conditions Conclusion: Indian Lakes Subdivision was vested prior to the requirement that subdivisions in the ETJ meet the requirements of the Cities of Bryan and College Station. However, the proposed water system exceeds the requirements of TCEQ and the Cities of Bryan and College Station. Applicable Exhibits: Exhibit A Schematic Water System Layout Exhibit B PIPE2000 Model Output for Indian Lakes Phase IX (static) Exhibit C PIPE2000 Model Output for Indian Lakes Phase IX (fire flow) Indian Lakes,Phase IX MBESI#1062-0012 \ \ \ \ \\ Z a \\y- • r o oo o . N // / N / / // / N. Pr / 'NN 1 4 t1,--6 SS :7/ // /I$ p / III � ,, � II /v N I -V10 . J I h% -- T I i � a ® ; / IS, W r p__, /I I / 1 W/� I/ I ® I1/1/,! I / I a 111 /<" A .., I I I \ II ill I I \ I / . / \ Ii / \ I LI / a 10) 1 4111111 tol \ / 1I N / .I . to 1 to „ k y / 0 gr: t 4,,, •, ci /I ��/ EXHIBIT B PIPE2000 Model Output for Indian Lakes Phase IX (static flow) * * * * * * * * * * KYPIPE * * * * * * * * * * * University of Kentucky Network Modeling Software * * Copyrighted by KPFS 1998 * * Version 1.200 - 01/26/2000 * *• * * * * * * * * * * * * * * * * * * * * * * * * * * * * Date & Time: Thu Jan 26 09:32:44 2006 INPUT DATA FILENAME C:\PROGRA-1\PIPE20-1\Projects\INDIAN-1\ILIXSTAT.DT2 TABULATED OUTPUT FILENAME C:\PROGRA-1\PIPE20-1\Projects\INDIAN-1\ILIXSTAT.OT2 POSTPROCESSOR RESULTS FILENAME C:\PROGRA-1\PIPE20-1\Projects\INDIAN-1\ILIXSTAT.RS2 ************************************************ SUMMARY OF O R I G I NAL DATA ************************************************ U NITS SPECIFIED FLOWRATE = gallons/minute HEAD (HGL) = feet PRESSURE = psig P IPELINE DATA STATUS CODE: XX -CLOSED PIPE CV -CHECK VALVE PIPE NODE NAMES LENGTH DIAMETER ROUGHNESS MINOR NAME #1 #2 (£t) (in) COEFF. LOSS COEFF. P-1 VP-i J-1 895.81 12.09 120.0000 0.00 P-2 2-2 2-8 339.05 6.07 120.0000 0.00 P-3 J-2 2-4 156.33 8.07 120.0000 0.00 P-4 J-4 J-5 179.74 3.07 120.0000 0.00 P-5 2-4 2-7 322.80 6.07 120.0000 0.00 P-6 2-1 J-2 313.77 8.07 120.0000 0.00 P-7 VP-2 2-1 2064.72 12.09 120.0000 0.00 P-8 J-7 J-6 341.84 3.07 120.0000 0.00 P-9 2-8 2-3 193.34 3.07 120.0000 0.00 P UMP/LOSS ELEMENT DATA THERE IS A DEVICE AT NODE VP-1 DESCRIBED BY THE FOLLOWING DATA: (ID= 1) HEAD FLOWRATE EFFICIENCY (ft) (gpm) (8) 161.54 0.00 1.00 141.92 520.00 1.00 83.08 1040.00 1.00 THERE IS A DEVICE AT NODE VP-2 DESCRIBED BY THE FOLLOWING DATA: (ID= 2) HEAD FLOWRATE EFFICIENCY (ft) (gpm) (6) 156.92 0.00 1.00 139.04 520.00 1.00 85.38 1040.00 1.00 E ND NODE DATA NODE NODE EXTERNAL JUNCTION EXTERNAL NAME TITLE DEMAND ELEVATION GRADE (gpm) (ft) (ft) J-1 0.00 282.00 J-2 5.00 272.00 J-3 5.83 263.00 J-4 4.17 270.00 J-5 4.16 278.00 J-6 8.33 290.00 J-7 5.00 280.00 J-8 5.83 267.00 VP-1 ---- 280.00 280.00 VP-2 ---- 282.00 282.00 OUTPUT OPTION DATA Indian Lakes,Phase IX Page 1 of 2 Static Flow Analysis OUTPUT SELECTION: ALL RESULTS ARE INCLUDED IN THE TABULATED OUTPUT S YSTEM CONFIGURATION NUMBER OF PIPES (p) = 9 NUMBER OF END NODES (j) = 8 NUMBER OF PRIMARY LOOPS (1) = 0 NUMBER OF SUPPLY NODES (£) = 2 NUMBER OF SUPPLY ZONES (z) = 1 Case: 0 RESULTS OBTAINED AFTER 6 TRIALS: ACCURACY = 0.00000 S IMULATION DESCRIPTION (LABEL) P IPELINE RESULTS STATUS CODE: XX -CLOSED PIPE CV -CHECK VALVE PIPE NODE NUMBERS FLOWRATE HEAD MINOR LINE HL/ NAME #1 #2 LOSS LOSS VELO. 1000 (gpm) (ft) (ft) (ft/s) (ft/ft) P-1 VP-1 3-1 38.32 0.01 0.00 0.11 0.01 8-2 J-2 3-8 11.66 0.01 0.00 0.13 0.02 P-3 3-2 J-4 21.66 0.00 0.00 0.14 0.02 P-4 3-4 3-5 4.16 0.02 0.00 0.18 0.09 P-5 3-4 3-7 13.33 0.01 0.00 0.15 0.03 P-6 3-1 3-2 38.32 0.02 0.00 0.24 0.05 P-7 VP-2 J-1 0.00 0.00 0.00 0.00 0.00 P-8 3-7 3-6 8.33 0.11 0.00 0.36 0.32 P-9 3-8 3-3 5.83 0.03 0.00 0.25 0.16 P UMP/L O S S ELEMENT RESULTS INLET OUTLET HEAD EFFIC- USEFUL INCREMTL TOTAL NAME FLOWRATE HEAD HEAD CHANGE ENCY POWER COST COST (gpm) (ft) (ft) (ft) (6) (Hp) ($) ($) VP-1 38.32 0.00 161.43 161.4 ---- --- ---- Device "VP-2" is closed E ND NODE RESULTS NODE NODE EXTERNAL HYDRAULIC NODE PRESSURE NODE NAME TITLE DEMAND GRADE ELEVATION HEAD PRESSURE (gpm) (ft) (ft) (ft) (psi) 3-1 0.00 441.43 282.00 159.43 69.08 3-2 5.00 441.41 272.00 169.41 73.41 3-3 5.83 441.37 263.00 178.37 77.29 3-4 4.17 441.41 270.00 171.41 74.28 3-5 4.16 441.39 278.00 163.39 70.80 J-6 8.33 441.29 290.00 151.29 65.56 E- Low Pressure J-7 5.00 441.40 280.00 161.40 69.94 J-8 5.83 441.40 267.00 174.40 75.57 VP-1 ---- 441.43 280.00 161.43 69.95 718-2 ---- 441.43 282.00 159.43 69.08 S UMMARY OF INFLOWS AND OUTFLOWS (+) INFLOWS INTO THE SYSTEM FROM SUPPLY NODES (-) OUTFLOWS FROM THE SYSTEM INTO SUPPLY NODES NODE FLOWRATE NODE NAME (gpm) TITLE VP-1 38.32 NET SYSTEM INFLOW = 38.32 NET SYSTEM OUTFLOW = 0.00 NET SYSTEM DEMAND = 38.32 ***** HYDRAULIC ANALYSIS COMPLETED ***** Indian Lakes,Phase IX Page 2 of 2 Static Flow Analysis EXHIBIT C PIPE2000 Model Output for Indian Lakes Phase IX(fire flow) * * * * . * * * * * KYPIPE * * * * * * * * * * University of Kentucky Network Modeling Software * * Copyrighted by KPFS 1998 * * Version 1.200 - 01/26/2000 *• * * * * * * * * * * * * * * * * * * * * * * * * * * * * Date & Time: Thu Jan 26 09:32:19 2006 INPUT DATA FILENAME C:\PROGRA-1\PIPE20-1\Projects\INDIAN-1\ILIXFIRE.DT2 TABULATED OUTPUT FILENAME C:\PROGRA-1\PIPE20-1\Projects\INDIAN-1\ILIXFIRE.OT2 POSTPROCESSOR RESULTS FILENAME C:\PROGRA-1\PIPE20-1\Projects\INDIAN-1\ILIXFIRE.RS2 *********.**********************.*************** SUMMARY OF O R I G I NAL DATA ************************************************ UNITS SPECIFIED FLOWRATE = gallons/minute HEAD (HGL) = feet PRESSURE = psig P IPELINE DATA STATUS CODE: XX -CLOSED PIPE CV -CHECK VALVE PIPE NODE NAMES LENGTH DIAMETER ROUGHNESS MINOR NAME #1 #2 (ft) (in) COEFF. LOSS COEFF. P-1 VP-1 2-1 895.81 12.09 120.0000 0.00 P-2 J-2 3-8 339.05 6.07 120.0000 0.00 P-3 J-2 J-4 156.33 8.07 120.0000 0.00 6-4 2-4 3-5 179.74 3.07 120.0000 0.00 6-5 3-4 3-7 322.80 6.07 120.0000 0.00 6-6 3-1 3-2 313.77 8.07 120.0000 0.00 P-7 VP-2 3-1 2064.72 12.09 120.0000 0.00 P-8 J-7 2-6 341.84 3.07 120.0000 0.00 P-9 3-8 3-3 193.34 3.07 120.0000 0.00 P UMP/LOSS ELEMENT DATA THERE IS A DEVICE AT NODE VP-1 DESCRIBED BY THE FOLLOWING DATA: (ID= 1) HEAD FLOWRATE EFFICIENCY (ft) (gpm) (8) 161.54 0.00 1.00 141.92 520.00 1.00 83.08 1040.00 1.00 THERE IS A DEVICE AT NODE VP-2 DESCRIBED BY THE FOLLOWING DATA: (ID= 2) HEAD FLOWRATE EFFICIENCY (ft) (gpm) (8) 156.92 0.00 1.00 139.04 520.00 1.00 85.38 1040.00 1.00 E ND NODE DATA NODE NODE EXTERNAL JUNCTION EXTERNAL NAME TITLE DEMAND ELEVATION GRADE (gpm) (ft) (ft) J-1 0.00 282.00 J-2 5.00 272.00 J-3 5.83 263.00 J-4 4.17 270.00 J-5 4.16 278.00 J-6 8.33 290.00 J-7 1005.00 280.00 J-6 5.83 267.00 VP-1 ---- 280.00 280.00 VP-2 ---- 282.00 262.00 O UTPUT OPTION DATA Indian Lakes,Phase IX Page 1 of 2 Fire Flow Analysis OUTPUT SELECTION: ALL RESULTS ARE INCLUDED IN THE TABULATED OUTPUT S YSTEM CONFIGURATION NUMBER OF PIPES (p) = 9 NUMBER OF END NODES (j) = 8 NUMBER OF PRIMARY LOOPS (1) = 0 NUMBER OF SUPPLY NODES (f) = 2 NUMBER OF SUPPLY ZONES (z) = 1 Case: 0 RESULTS OBTAINED AFTER 3 TRIALS: ACCURACY = 0.00000 S IMULATION DESCRIPTION (LAB E L) P IPELINE RESULTS STATUS CODE: XX -CLOSED PIPE CV -CHECK VALVE PIPE NODE NUMBERS FLOWRATE HEAD MINOR LINE HL/ NAME #1 #2 LOSS LOSS VELO. 1000 (gpm) (ft) (ft) (ft/s) (ft/£t) P-1 VP-1 3-1 531.42 0.79 0.00 1.49 0.88 P-2 2-2 3-8 11.66 0.01 0.00 0.13 0.02 P-3 2-2 J-4 1021.66 3.30 0.00 6.41 21.12 P-4 3-4 3-5 4.16 0.02 0.00 0.18 0.09 P-5 J-4 J-7 1013.33 27.00 0.00 11.25 83.63 P-6 J-1 2-2 1038.32 6.83 0.00 6.51 21.76 P-7 VP-2 3-1 506.90 1.66 0.00 1.42 0.81 P-8 3-7 J-6 8.33 0.11 0.00 0.36 0.32 P-9 J-8 3-3 5.83 0.03 0.00 0.25 0.16 P UMP/LOSS ELEMENT RESULTS INLET OUTLET HEAD EFFIC- USEFUL INCREMTL TOTAL NAME FLOWRATE HEAD HEAD CHANGE ENCY POWER COST COST (gpm) (ft) (ft) (ft) (8) (Hp) (8) (8) VP-1 531.42 0.00 141.05 141.1 ---- --- ---- VP-2 506.90 0.00 139.93 139.9 ---- ---EN D NODE RESULTS NODE NODE EXTERNAL HYDRAULIC NODE PRESSURE NODE NAME TITLE DEMAND GRADE ELEVATION HEAD PRESSURE (gpm) (ft) (ft) (ft) (psi) J-1 0.00 420.26 282.00 138.26 59.91 2-2 5.00 413.44 272.00 141.44 61.29 J-3 5.83 413.40 263.00 150.40 65.17 J-4 4.17 410.14 270.00 140.14 60.73 3-5 4.16 410.12 278.00 132.12 57.25 J-6 8.33 383.03 290.00 93.03 40.31 - Low Pressure J-7 1005.00 383.14 280.00 103.14 44.69 J-8 5.83 413.43 267.00 146.43 63.45 VP-1 ---- 421.05 280.00 141.05 61.12 VP-2 ---- 421.93 282.00 139.93 60.64 SUMMARY OF INFLOWS AND OUTFLOWS (+) INFLOWS INTO THE SYSTEM FROM SUPPLY NODES (-) OUTFLOWS FROM THE SYSTEM INTO SUPPLY NODES NODE FLOWRATE NODE NAME (gpm) TITLE VP-1 531.42 VP-2 506.90 NET SYSTEM INFLOW = 1038.32 NET SYSTEM OUTFLOW = 0.00 NET SYSTEM DEMAND = 1038.32 ***** HYDRAULIC ANALYSIS COMPLETED ***** Indian Lakes,Phase IX Page 2 of 2 Fire Flow Analysis