HomeMy WebLinkAboutStaff Comments CITY OF COLLEGE STATION
Planning&Development Services
1101 Texas Avenue, P.O. Box 9960
College Station, Texas 77842
Phone 979.764.3570 / Fax 979.764.3496
MEMORANDUM
December 27, 2005
TO: Travis Martinek, Clarke &Wyndham, via fax: 979.846.4161
FROM: Jennifer Prochazka, Senior Planner
SUBJECT: VILLAGES OF INDIAN LAKES PH IX (FP) - Final Plat
Staff received the above-mentioned final plat. The following page is a list of staff
comments detailing items that need to be addressed prior to the review of this replat.
Once all comments have been addressed, your project will be placed on the next
available Planning and Zoning Commission meeting.
If you have any questions or need additional information, please call me or Carol Cotter
at 979.764.3570.
Attachments: Staff review comments
cc: McClure & Browne, Inc., via fax: 979.693.2554 ✓
Case file#05-00500232
NOTE: Any changes made to the plans,that have not been requested by the City of College Station,must be explained
in your next transmittal letter and"bubbled"on your plans.Any additional changes on these plans that have not
been pointed out to the City,will constitute a completely new review. 1
STAFF REVIEW COMMENTS NO. 1
Project: VILLAGES OF INDIAN LAKES PH IX (FP) - 05-00500232
PLANNING
1. The Preliminary Plat has not been approved; therefore, the Final Plat cannot be
reviewed for compliance.
2. A Resolution for the City to provide wastewater collection / treatment outside of the
City Limits is scheduled for the January 12, 2006 City Council regular meeting. The
plat can not be considered complete as submitted until the Resolution is approved.
3. It is my understanding that you are currently working with College Station Utilities on
issues related to sanitary sewer service. The plat can not be considered complete
as submitted until these issues are resolved.
4. The construction documents and reports are still under review and may affect the
plat.
Reviewed by: Jennifer Prochazka & Carol Cotter Date: December 21,
2005
ELECTRICAL
1. ETJ
Reviewed by: Sam Weido Date: 12-21-
05
NOTE: Any changes made to the plans,that have not been requested by the City of College Station,must be explained
in your next transmittal letter and"bubbled"on your plans.Any additional changes on these plans that have not
been pointed out to the City,will constitute a completely new review. 2
( •
CITY OF COLLEGE STATION
DEVELOPMENT SERVICES
1101 Texas Avenue South, PO Box 9960
College Station, Texas 77842
Phone 979.764.3570 / Fax 979.764.3496
MEMORANDUM
January 12, 2006
TO: Travis Martinek, via fax 846.1461
FROM: Bridgette George, Development Coordinator
SUBJECT: Villages of Indian Lakes Final Plat— Engineering Comments
Staff reviewed the construction documents for the above-mentioned final plat. The
following page is a list of staff comments detailing items that need to be addressed.
Please address the comments and submit the following information for further staff
review and approval.
One (1) set of construction documents.
If you have any questions or need additional information, please call me or Carol Cotter
at 979.764.3570.
CC: McClure & Browne Engineering/Surveying, Inc., via fax 693.2554
Case file #05-00500232
Home of Texas A&M University
r
I
ENGINEERING
1. Both the lift station and force main are considered part of this project and approval of
both are required for the Final Plat.
2. Submit sanitary sewer report.
3. Submit water design/fire flow report.
4. FYI - If the proposed street had been public, you would not have been allowed to put
utilities under the pavement. However, since it is private I cannot require that the
water and sewer lines be located out from under the pavement, but I did want you to
consider that the placement of these lines and possibility of associated leaks from
these lines under the street will decrease the life of the street. And being that this is
street owned and maintained by the home owners, this should be considered
because they will have to bear the cost of repairs.
5. As previously discussed, OP will have to be approved by Council before construction
can begin on the off-site force/gravity main.
6. Are the PUE's that do not have volume and page numbers proposed? If so, these
will be required prior to construction plan approval, as well as the assignment of
rights for the existing easements.
7. Gravity sanitary sewer mains with less than 6' cover are required to be ductile iron.
8. Indicate TCEQ requirements for sewer lines crossing existing water lines.
9. Additional comments may arise from review of sewer and water reports.
10. CSU is reviewing the force main plans, the specified lift station equipment, and
needs the WW design report to comment fully.
Reviewed by: Carol Cotter Date: January 12, 2006
Home of Texas A&M University
A
filliiilli
41
CITY OF COLLEGE STATION
PLANNING &DEVELOPMENT SERVICES
1101 Texas Avenue,PO Box 9960
College Station,Texas 77842
Phone 979.764.3570 / Fax 979.764.3496
MEMORANDUM
February 10, 2006
TO: Travis Martinek, via fax 846.1461
FROM: Bridgette George, Development Coordinator
SUBJECT: Villages of Indian Lakes Final Plat— Engineering Comments
Staff reviewed the construction documents for the above-mentioned final plat. The
following page is a list of staff comments detailing items that need to be addressed.
Please address the comments and submit the following information for further staff
review and approval.
One (1) set of construction documents.
If you have any questions or need additional information, please call me or Carol Cotter
at 979.764.3570.
CC: McClure & Browne Engineering/Surveying, Inc., via fax 693.2554
Case file #05-00500232
ENGINEERING COMMENTS NO. 1
Project: INDIAN LAKES PH 9 (FP)—05-00500232
ENGINEERING
1. Your interpretation is incorrect. Gravity sewer mains with less than 6 feet of
cover are required to be ductile iron. Cement stabilized sand backfill is also
required if the cover is less than 3.5 feet.
2. As a reminder, construction plans cannot be approved until required easements
have been dedicated.
3. The lift station is still under review by CSU. Spencer will be contacting you to set
up a meeting with you and your Engineer to discuss those and the comments
listed below.
Reviewed by: Carol Cotter Date: February 2, 2006
Regarding OP request:
4. Most of the drainage area shown on Exhibit A to the west of the proposed line,
areas 2 and 4, will not be served by this line. The ravine on the adjacent
properties that parallels the proposed line prohibits connectivity except by way of
aerial crossing. This area will be served by the main trunkline in Nantucket.
Drainage Area 1 can connect as shown.
5. The 10-in line should be reduced to an 8-in line.
6. The 8-in line should be reduced to a 6-in line.
7. The pipe section between MH 1.5 and MH 1.6 will not meet the 0.8% minimum
slope for 6-in pipe. This will need to be adjusted. It appears all other sections
meet minimum pipe slope.
Reviewed by: Spencer Thompson Date: February 8, 2006
Grff11114111141
CITY OF COLLEGE STATION
Planning&Development Services
1101 Texas Avenue, P.O. Box 9960
College Station, Texas 77842
Phone 979.764.3570 / Fax 979.764.3496
MEMORANDUM
March 22, 2006
TO: Travis Martinek, via fax 846.1461
FROM: Bridgette George, Development Coordinator
SUBJECT: ZPDES- ngineering Documents
Staff reviewed the above-mentioned engineering documents as requested. The following
page is a list of staff review comments detailing items that need to be addressed.
Please address the comments and submit the following information for further staff
review and approval of the plans:
One (1) sets of revised construction documents.
If you have any questions or need additional information, please call Carol Cotter at
979.764.3570.
Attachments: Staff review comments
cc: McClure & Browne Engineering/Surveying, Inc., via fax 693.2554
Case file #05-232
V
r
ENGINEERING COMMENTS NO. 1
Project: PZPDES— PROJ
ENGINEERING
Comments for on-site utilities only, off-site and lift station still under review.
1. A minimum 2" blowoff is required on a 3" line.
2. Stationing of water service 15 (Sheet 11) appears to be incorrect.
Reviewed by: Carol Cotter Date: March 20, 2006