July 27, 2007
TO: Bill Scarmardo, via fax:979.779.3424
FROM: Jennifer Prochazka, Senior Planner
SUBJECT: STOP-N-STORE EXPANSION (SP)- Site Plan
Staff reviewed the above-mentioned site plan as requested. The following page is a list of staff
review comments detailing items that need to be addressed. Please address the comments
and submit the following information for further staff review:
One (1) revised site and landscaping plan
$200.00 Site Plan review fee (for next two reviews)
Please note that the Easement Dedication Sheet and the necessary documents are required
prior to the issuance of a building permit. If there are comments that you are not addressing with
the revised site plan, please attach a letter explaining the details. If you have any questions or
need additional information, please call me or Carol Cotter at 979.764.3570.
Attachments: Staff review comments
cc: Marek Brothers Construction, via fax: 979.696.3063
McClure & Browne Engineering, via fax: 979.693.2554
Case file #05-00500226
NOTE: Any changes made to the plans, that have not been requested by the City of College Station,must be explained in your next transmittal
letter and"bubbled"on your plans. Any additional changes on these plans that have not been pointed out to the City,will constitute a
completely new review. 1 of 2
STAFF REVIEW COMMENTS NO. 1
Project: STOP-N-STORE EXPANSION (SP)—05-00500226
PLANNING
1. The alteration to the front of the structure does not meet the Non-Residential Architectural
Standards. No more than 33% of the facade facing the right-of-way can be on the same
continuous geometric plane. In addition, the structure is now shown in areas previously
shown for landscape.
Reviewed by: Jennifer Prochazka Date: July 27, 2007
NOTE: Any changes made to the plans,that have not been requested by the City of College Station,must be explained in your next transmittal
letter and"bubbled"on your plans. Any additional changes on these plans that have not been pointed out to the City,will constitute a
completely new review. 2 of 2
CITY OF COLLEGE STATION
Planning&Development Services
1101 Texas Avenue, P.O. Box 9960
College Station, Texas 77842
Phone 979.764.3570 / Fax 979.764.3496
MEMORANDUM
August 2, 2006
TO: J.D.P. Holdings, Inc., Via fax: 979.696.3063
FROM: Jennifer Prochazka, Senior Planner
SUBJECT: STOP-N-STORE EXPANSION (SP)-Site Plan
Staff reviewed the above-mentioned site plan as requested. The following page is a list of staff
review comments detailing items that need to be addressed. Please address the comments
and submit the following information for further staff review:
One (1) revised site and landscaping plan
Please note that the Easement Dedication Sheet and the necessary documents are required
prior to the issuance of a building permit. If there are comments that you are not addressing with
the revised site plan, please attach a letter explaining the details. If you have any questions or
need additional information, please call me or Carol Cotter at 979.764.3570.
Attachments: Staff review comments
cc: McClure & Browne Engineering, Via fax: 979.693.2554
Case file #05-00500226
Home of Texas A&M University
STAFF REVIEW COMMENTS NO. 3
Project: STOP-N-STORE EXPANSION (SP) - 05-00500226
PLANNING
1. The line of the roof on the facade facing the right-of-way must vary by a minimum of two feet
up or down so that no more than 66% is at the same elevation (must be satisfied prior to
building permit).
2. The facade facing the right-of-way must have a minimum of 25% masonry (not split-faced
CMU). All other facades visible from the right-of-way must have 10% masonry (must be
satisfied prior to building permit).
3. The landscape plan does not match the site plan. The landscape plan shows vegetation
where the site plan shows drives. Please remove existing vegetation from the landscape
plan; show only new plantings.
4. Please state that the non-canopy tree measurement is for a single cane.
5. If you will be paving the end island where the bike rack is proposed, it must be stamped died
concrete.
Reviewed by: Jennifer Prochazka Date: July 31, 2006
ENGINEERING
No comments
Reviewed by: Carol Cotter Date: August 1, 2006
NOTE: Any changes made to the plans,that have not been requested by the City of College Station,must be explained in your next transmittal
letter and"bubbled"on your plans. Any additional changes on these plans that have not been pointed out to the City,will constitute a
completely new review. 2 of 2
CITY OF COLLEGE STATION
Planning&Development Services
1101 Texas Avenue, P.O. Box 9960
College Station, Texas 77842
Phone 979.764.3570/ Fax 979.764.3496
MEMORANDUM
December 19, 2005
TO: J.D.P. Holdings, Inc., Via fax: 979.696.3063
FROM: Jennifer Prochazka, Senior Planner
SUBJECT: STOP-N-STORE EXPANSION (SP)-Site Plan
Staff reviewed the above-mentioned site plan as requested. The following page is a list
of staff review comments detailing items that need to be addressed. Please address the
comments and submit the following information for further staff review:
One (1) revised site and landscaping plan
One (1) 11x17 grading and erosion control plan
Easement Dedication Sheet and required documents (please allow 4
weeks to process).
Please note that the Easement Dedication Sheet and the necessary documents are
required prior to the issuance of a building permit. If there are comments that you are not
addressing with the revised site plan, please attach a letter explaining the details. If you
have any questions or need additional information, please call me or Carol Cotter at
979.764.3570.
Attachments: Staff review comments
cc: McClure & Browne Engineering, Via fax: 979.693.2554
Case file #05-00500226
STAFF REVIEW COMMENTS NO. 1
Project: STOP-N-STORE EXPANSION (SP) — 05-00500226
PLANNING
1. Please see Engineering comment below regarding platting.
2. Please include the required information in the title block of the site plan, including
name, address, legal description, and total site area to be developed.
3. Please show current zoning of subject property and all abutting parcels on the site
plan.
4. FYI - a minimum separation of 15' is required between structures if additional fire
protection is not provided.
5. Please show all setbacks on the site plan.
6. Please provide topography, grading, and drainage information.
7. Detention facility will have to be screened from adjacent properties.
8. Please provide a curb and pavement detail on the site plan.—r\u - tikavto I CS
9. Please provide the right-of-way width for Harvey Road.
10. Please provide material for proposed retaining wall or show how it will be screened
from adjacent properties. L !1e scALe.4-).
11. Drive aisle does not have space to accommodate a fire lane and loading / unloading
spaces. If space is not provided for, loading and unloading may not be permitted in
this area.
12. Provide a general note that all roof and ground-mounted mechanical equipment shall
be screened from view or isolated so as not to be visible from any public right-of-way
or residential district within 150' of the subject lot, measured from a point five feet
above grade. Such screening shall be coordinated with the building architecture and
scale to maintain a unified appearance.
13. The following comment was received from TxDOT: "Appropriate data will be required
for any future work/permits in the ROW @ this site including drainage, etc."
Reviewed by: Jennifer Prochazka Date: December 19, 2005
NON-RESIDENTIAL ARCHITECTURAL STANDARDS
1. FYI - building materials, color samples, and all building elevations showing
locations of materials and design elements must be submitted for approval prior
to issuance of building permit. The front or main building facade is required to be
minimum of 25% masonry (not split faced CMU), and all other facades visible
from a right-of-way are also required to use masonry, but not at a prescribed
amount. Please see Section 7.9 of the Unified Development Ordinance.
2. A bicycle storage facility capable of storing a minimum of 4 bikes is required.
3. The combination of buildings in this project is greater than 50,000 square feet,
and therefore must meet the following additional standards:
*No more than 33% of the front or main building facade may be on the
same continuous geometric plane. Wall plane projections or recessions
must be a minimum of 4' in depth.
*Accent colors may be used on no greater than 10% of the facade
,-Required landscape points must be doubled, and the minimum caliper
tree is two inch.
rib
Tree wells are required along 15% of the building facade and shall
include canopy trees.
*A 10' sidewalk is required along the full frontage of the primary building
facade.
Reviewed by: Jennifer Prochazka Date: December 19, 2005
LANDSCAPING/STREETSCAPING/BUFFER
Yaupon is a non-canopy tree.
2. Please provide caliper of a single cane for all non-canopy trees.
. Half of the required points must be from canopy trees.
IA!-Please see landscape note above in Non-Residential Architectural Standards.
f Please see attached Planting List for approved plant species.
Provide a general note that 100% coverage of groundcover, decorative paving,
decorative rock, or a perennial grass is required in parking lot islands, swales and
drainage areas, the parking lot setback, rights-of-way, and adjacent property
disturbed during construction.
Reviewed by: Jennifer Prochazka Date: December 19, 2005
ENGINEERING
1. Submit Development Permit, associated fees and documents.
2. Property in Phase 2 (formerly La Selva) is not platted in current configuration.
Platting is required.
3. Identify all existing easements.
Reviewed by: Carol Cotter Date: December 15, 2005
FIRE
1. Additional fire hydrant required.
Reviewed by: Jerry Duffy Date: December 15, 2005
ELECTRICAL
1. Contact Weldon Davis at 764-5027 wdaviscstx.gov for any questions involving
electrical requirements.
Reviewed by: Weldon Davis Date: 12-13-05
MISCELLANEOUS
1. Irrigation system must be protected by either a Pressure Vacuum Breaker, a
Reduced Pressure Principle Back Flow Device, or a Double-Check Back Flow
Device, and installed as per City Ordinance 2394.
2. All BackFlow devices must be installed and tested upon installation as per City
Ordinance 2394.
0
Ckff111114
CITY OF COLLEGE STATION
Planning d'Development Services
1101 Texas Avenue,P.O. Box 9960
College Station, Texas 77842
Phone 979.764.3570/ Fax 979.764.3496
MEMORANDUM
June 6, 2006
TO: J.D.P. Holdings, Inc., Via fax: 979.696.3063
FROM: Jennifer Prochazka, Senior Planner
SUBJECT: STOP-N-STORE EXPANSION (SP)- Site Plan
Staff reviewed the above-mentioned site plan as requested. The following page is a list
of staff review comments detailing items that need to be addressed. The next submittal
will be the third and final review by staff for this round of reviews. If all items have not
been addressed on the next submittal, another $200 processing fee will need to be
submitted for the subsequent set of three (3) reviews. Please address the comments
and submit the following information for further staff review:
One (1) revised site and landscaping plan.
If there are comments that you are not addressing with the revised site plan, please
attach a letter explaining the details. If you have any questions or need additional
information, please call me at 764-3570.
Attachments: Staff review comments
cc: McClure & Browne Engineering, Via fax: 979.693.2554
Case file #05-00500226
STAFF REVIEW COMMENTS NO. 2
Project: STOP-N-STORE EXPANSION (SP) - 05-00500226
PLANNING
1. Thank you for providing the curb detail. The curb / pavement is required to be
monolithic. Please contact me if you need a standard detail.
2. For at-grade tree wells, a minimum 72 inch square tree grate with a 16 inch diameter
expandable tree opening is required. Raised planters should be a minimum of six
feet by six feet (6' x 6') and two feet (2') high. The maximum height is three feet (3').
The bottom of the bed must be kept open and planting soil should be cultivated into
the original soil to encourage roots to escape from the bed into surrounding soil
3. The proposed building square footage on the landscape plan does not match the site
plan.
4. Please provide caliper of a single cane for all non-canopy trees (repeat comment).
5. If the building will be sprinkled (because of size change) please provide location of
FDC.
6. Please provide building height on plan. See engineer comment below that relates to
building height.
Reviewed by: Jennifer Prochazka Date: June 5, 2006
ENGINEERING
1. Please locate fire hydrant closer to SH30 and the entrance, northwest of the modular
block retaining wall.
2. Now that it is two-story, will the building be sprinkled? If so, show fire suppression
line and provide design information.
3. If your building is greater than 30' in height, the required fire lane width is 26'.
4. Provide drainage report.
5. Provide fire flow report/letter.
Reviewed by: Carol Cotter Date: June 5, 2006
Tree wells are required along 15% of the building facade and shall
include canopy trees.
*A 10' sidewalk is required along the full frontage of the primary building
facade.
Reviewed by: Jennifer Prochazka Date: December 19, 2005
LANDSCAPING/STREETSCAPING/BUFFER
�. Yaupon is a non-canopy tree.
2� Please provide caliper of a single cane for all non-canopy trees.
Half of the required points must be from canopy trees.
.4 Please see landscape note above in Non-Residential Architectural Standards.
,Blease see attached Planting List for approved plant species.
Provide a general note that 100% coverage of groundcover, decorative paving,
decorative rock, or a perennial grass is required in parking lot islands, swales and
drainage areas, the parking lot setback, rights-of-way, and adjacent property
disturbed during construction.
Reviewed by: Jennifer Prochazka Date: December 19, 2005
ENGINEERING
1. Submit Development Permit, associated fees and documents.
2. Property in Phase 2 (formerly La Selva) is not platted in current configuration.
Platting is required.
3. Identify all existing easements.
Reviewed by: Carol Cotter Date: December 15, 2005
FIRE
1. Additional fire hydrant required.
Reviewed by: Jerry Duffy Date: December 15, 2005
ELECTRICAL
1. Contact Weldon Davis at 764-5027 wdavis@cstx.gov for any questions involving
electrical requirements.
Reviewed by: Weldon Davis Date: 12-13-05
MISCELLANEOUS
1. Irrigation system must be protected by either a Pressure Vacuum Breaker, a
Reduced Pressure Principle Back Flow Device, or a Double-Check Back Flow
Device, and installed as per City Ordinance 2394.
2. All BackFlow devices must be installed and tested upon installation as per City
Ordinance 2394.
(*,1111144
CITY OF CoM T.FGE STATION
Planning d Development Services
1101 Texas Avenue, P.O. Box 9960
College Station, Texas 77842
Phone 979.764.3570/ Fax 979.764.3496
MEMORANDUM
June 6, 2006
TO: J.D.P. Holdings, Inc., Via fax: 979.696.3063
FROM: Jennifer Prochazka, Senior Planner
SUBJECT: STOP-N-STORE EXPANSION (SP)- Site Plan
Staff reviewed the above-mentioned site plan as requested. The following page is a list
of staff review comments detailing items that need to be addressed. The next submittal
will be the third and final review by staff for this round of reviews. If all items have not
been addressed on the next submittal, another $200 processing fee will need to be
submitted for the subsequent set of three (3) reviews. Please address the comments
and submit the following information for further staff review:
One (1) revised site and landscaping plan.
If there are comments that you are not addressing with the revised site plan, please
attach a letter explaining the details. If you have any questions or need additional
information, please call me at 764-3570.
Attachments: Staff review comments
cc: McClure & Browne Engineering, Via fax: 979.693.2554
Case file #05-00500226
STAFF REVIEW COMMENTS NO. 2
Project: STOP-N-STORE EXPANSION (SP) - 05-00500226
PLANNING
1. Thank you for providing the curb detail. The curb / pavement is required to be
monolithic. Please contact me if you need a standard detail.
2. For at-grade tree wells, a minimum 72 inch square tree grate with a 16 inch diameter
expandable tree opening is required. Raised planters should be a minimum of six
feet by six feet (6' x 6') and two feet (2') high. The maximum height is three feet (3').
The bottom of the bed must be kept open and planting soil should be cultivated into
the original soil to encourage roots to escape from the bed into surrounding soil
3. The proposed building square footage on the landscape plan does not match the site
plan.
4. Please provide caliper of a single cane for all non-canopy trees (repeat comment).
5. If the building will be sprinkled (because of size change) please provide location of
FDC.
6. Please provide building height on plan. See engineer comment below that relates to
building height.
Reviewed by: Jennifer Prochazka Date: June 5, 2006
ENGINEERING
1. Please locate fire hydrant closer to SH30 and the entrance, northwest of the modular
block retaining wall.
2. Now that it is two-story, will the building be sprinkled? If so, show fire suppression
line and provide design information.
3. If your building is greater than 30' in height, the required fire lane width is 26'.
4. Provide drainage report.
5. Provide fire flow report/letter.
Reviewed by: Carol Cotter Date: June 5, 2006
9ZZ00900-90# all' eseO
1759Z'E69'6L6 :xel eln `6ulaaaul6u3 auMOJB g aan10oW
bZl'E'6LL'6L6 :xej eln `sloapyoay SOM :03
sluawwoo Malnaa gels :sluawgoelly
'OL9E179L'6L6 le ew Ileo
aseald `uollewaolul leuoll!PPe peau ao suogsenb Aue anal noAll sllelap all 6ululeldxa aallal
a yoelle aseald `ueld alts paslnaa all ypM 6ulssaappe lou aae nog( 'an sluewwoo aae wall ll
ueld ails paslnaa (L) euO
]enoidde.aol uogewaolu!
6ulnnollol all l!wgns aseald •passaappe aq of peau jell swap 6uylelep sluawwoo Me!AOJ
gels to lsll a sl abed 6u!mollol ay1 •palsenbaa se ueld alis pauoquaw-anoge eql pamalnaa gels
ueld alis - (dS) Z 3SVHd 32IO1S N dOIS :10318f1S
Jauueid aoluaS `d3IV `e)izeyooad aalluuel :WOHd
690£'969'6L6 :xel eln `){anew led :01
LOOZ `8 aagoloO
Wf10Nb2IOW3W
96ti£'179L'6L6 Xed /OLSE'b9L'6L6 euoyd u°��d�s3��z�o� _ `�
Zi79LL sexal `uollej5 a6alloO ��
0966 Xo8 'ad `anueny sexel LOLL `S.
LOOZ '8 aagoToo :alea e){zegoaad JeJluuar :Aq paMalnal
'Me!Aaa MaU Alalaldwoo a ainmsuoo IIIM 4o aaeMe
spew uaaq lou seq AT'O aye ley) sueld asegj uo sa6uega leuoglppe i(uy .sueld anon(
uo „palggnq„ pue canal Iepwsueal ixeu anon( ul pauleldxe aq isnw `uollelg abelloo jo c313
aye Aq palsanbai uaaq iou anal req `sueld aye oI spew sa6uego Aue iegi a ou aseaid .g
(aidwes
ap!noad) .6ul1elnw!s 1! sl auois ad/CI 1eLM pue 4o spew „auo1s paTelnuals„ aye sl leq .17
•Aldde aa6uol OU /Ca ll souls ti C seiou ails anouaaU .E
.ieej bi, sl aoueaeelo auel aalj wnualu! J 'euel aaiij e ul pasodoad
sae sivauaala aye souls ueld ails aye uo (eoueaeap ao) ig6laq 6ulume eqi apnloul aseaid 'Z
(ueld alis panoadde
AIsnolnaad eqi uo umogs se) }eel 01, sl 6ulpllnq ay} Jo Tuoaj Li! >{lemapls paalnbaa eql
ONINNV1d
9ZZ00500-90 - (dS) Z 3SVHd 32iO1S N dOIS :�oafoad
5 'ON SIN311111NO3 M31/01:I 33V1S