Loading...
HomeMy WebLinkAboutStaff Comments STAFF REVIEW COMMENTS #2 Project: CULPEPPER PLAZA (REZ) - 05-00500222 PLANNING 1. Interior island areas clustered in Pod 1 must have the majority of the area of each planted or treated with enhanced paving. 2. Show columns, or provide note to clarify that the colonnade area is not represented on the site plan. 3. Update elevations to reflect landscape plan plant selections. 4. Provide table to demonstrate compliance with Section 7.9.D Building Materials, particularly part 3 where a minimum of 25% of the first two stories of the front or main building(s) façade shall be brick, stone, marble or granite or a material fabricated to simulate brick or stone (not split face concrete masonry)... 5. Provide one additional architectural element every 45 feet on the Kohl's elevation (pilasters provided). The projection with the sign is only one architectural element, there needs to be another. The south end of the building nearest Harvey Road also lacks two architectural'elements every 45 feet. One is provided, being pilasters. 6. Provide note/label to indicate subject site and adjoining parcels are zoned C-1 General Commercial. 7. In Pod 2, per Sec. 7.2.C.2, the 18-foot parking spaces against the adjoining property line require 4 feet landscape strip. 8. Elevations of Existing Buildings A & C required for final site plan approval; add note to indicate that the elevations of these will be similar to Existing Building A and'satisfy NRA requirements. 9. Provide note or table regarding parking allocations. 10.Provide note, as shown for Dominik Drive, to indicate existing right-of-way on Harvey Road and Texas Avenue South. 11.Show existing drives off site. 12.Show building footprints for Lot 9, Lots 3&4, Lot 2, Lot 1 and Parcel III. 13.On final site plan provide curb and pavement details. 14.Include note to indicate intent to comply with Pedestrian / Bike Circulation & Facilities items within Section 7.9 15.Final site plan to show easements, utilities, etc. 16.Final Site plan to provide water and sanitary sewer legend. 17.Show fire lanes 18.Will the building(s) be sprinkled? 19.Label /show the loading dock areas / any retaining walls proposed. 20.Indicated proposed dumpster locations. 21.Per 7.4.M.7.b — the additional Kohl's sign may be installed by separate permit. 22.11 alterations proposed to the existing freestanding sign are such that a building permit is required, the sign must conform to Sec. 7.4 Signs. Reviewed by: Trey Fletcher Date: March 17, 2006 Engineering 1. The proposed site/building layout appears to encroach into the following, please address: • Public Utility Easement (PUE) • Floodway • Public Water Main • Public Sanitary Sewer Main • Drainage Infrastructure Reviewed by: Josh Norton Date: March 17, 2006 Grifful CITY OF COLLEGE STATION Planning er Development Services 1101 Texas Avenue, P.O. Box 9960 College Station, Texas 77842 Phone 979.764.3570 / Fax 979.764.3496 MEMORANDUM December 12, 2005 TO: Dan Muniza via fax 713-369-7056 FROM: Trey Fletcher, Project Manager SUBJECT: CULPEPPER PLAZA (REZ) Staff reviewed the above-mentioned site plan as requested. The following page is a list of staff review comments detailing items that need to be addressed. Please address the comments and submit the following information for further staff review and consideration by the Planning & Zoning Commission and City Council: Ten (10) revised site and landscaping plans. These materials must be received by Monday, December 19th to remain on schedule for the January 5th Planning & Zoning Commission meeting. If there are comments that you are not addressing with the revised site plan, please attach a letter explaining the details. If you have any questions or need additional information, please call me at 979.764.3570. Attachments: Staff review comments cc: Veronica Morgan via fax 260-3564 Case file #05-00500222 Home of Texas A&M University STAFF REVIEW COMMENTS Project: CULPEPPER PLAZA (REZ) - 05-00500222 PLANNING 1. One of the parallel parking spaces in Pod 2 does not meet requirements nor appear to be shown as an interior island, although it is not counted in the sum of parking spaces. 2. A confusing duplication of the rear building line appears to the right of Tables 1 & 2. 3. The throat depth for the main entry does not meet requirements of 130 feet. The inbound lane merges to the left allowing for the additional landscaping to the right. Staff recommends an alternative design to avoid driver confusion and improve safety where the median would continue and extend to the drive aisle adjacent to Pod 4. The "lost" landscaping area could be shifted to the median. The outbound drive aisle could be a minimum width of 12 feet with 45 degree angle parking. Some alternative should also be considered for the entry to the north to align with the drive aisle. 4. Landscape Plan: Table reflects 46 crepe myrtles; plan shows 52. 5. Landscape Plan: Table reflects 200 indian hawthorns; plan does not denote any. 6. Landscape Plan: Tree wells are shown on plan. What species of tree(s) are planned? 7. Is enhanced paving or sod planned for islands without landscaping? 8. Is this project pursuing any of the additional point credits referenced in Sec 7.5C7? 9. Provide documentation of the age of the shopping center. 10.No Facilitation Meeting has been arranged for this application, however, I am happy to meet with you discuss any questions you may have regarding these comments. Reviewed by: Trey Fletcher Date: December 12, 2005 NOTE: Any changes made to the plans, that have not been requested by the City of College Station, must be explained in your next transmittal letter and"bubbled"on your plans. Any additional changes on these plans that have not been pointed out to the City, will constitute a completely new review. 2 of 2 n. CITY OF COLLEGE STATION Planning cr Development Services 1101 Texas Avenue, P.O. Box 9960 College Station, Texas 77842 Phone 979.764.3570 / Fax 979.764.3496 MEMORANDUM March 17, 2006 TO: Dan Muniza via fax 713-369-7056 FROM: Trey Fletcher, Project Manager SUBJECT: CULPEPPER PLAZA (REZ) Staff reviewed the above-mentioned site plan as requested. The following page is a list of staff review comments detailing items that need to be addressed. Please address the comments and submit the following information for further staff review and consideration by the Planning & Zoning Commission and City Council: Ten 00) copies of the revised site and landscaping plans Ten;(10) copies of building elevations for the proposed structures Two (2) revised copies on 24"x36" paper showing the building elevations for the proposed structures. Two (2) revised of a fully dimensioned map (the site plan) on 24"x36" paper showing: • Land affected; • Legal description of area proposed for change • Present zoning, • Zoning classification of all abutting land • All public and private rights-of-way and easements bounding and intersecting subject land. These materials must be received by Wednesday, March 22nd at 10 a.m. to remain on schedule for the Thursday, April 6th Planning &Zoning Commission meeting. If there are comments that you are not addressing with the revised site plan, please attach a letter explaining the details. If you have any questions or need additional information, please call me at 979.764.3570. Attachments: Staff review comments cc: Veronica Morgan via fax 260-3564 Case file#05-00500222 CITY OF COLLEGE STATION Planning er Development Services 1101 Texas Avenue, P.O. Box 9960 College Station, Texas 77842 Phone 979.764.3570 / Fax 979.764.3496 MEMORANDUM December 12, 2005 TO: Dan Muniza via fax 713-369-7056 FROM: Trey Fletcher, Project Manager SUBJECT: CULPEPPER PLAZA (REZ) Staff reviewed the above-mentioned site plan as requested. The following page is a list of staff review comments detailing items that need to be addressed. Please address the comments and submit the following information for further staff review and consideration by the Planning & Zoning Commission and City Council: Ten (10) revised site and landscaping plans. These materials must be received by Monday, December 19th to remain on schedule for the January 5th Planning & Zoning Commission meeting. If there are comments that you are not addressing with the revised site plan, please attach a letter explaining the details. If you have any questions or need additional information, please call me at 979.764.3570. Attachments: Staff review comments cc: Veronica Morgan via fax 260-3564 Case file #05-00500222 Home of Texas A&M University STAFF REVIEW COMMENTS Project: CULPEPPER PLAZA (REZ) - 05-00500222 PLANNING 1. One of the parallel parking spaces in Pod 2 does not meet requirements nor appear to be shown as an interior island, although it is not counted in the sum of parking spaces. 2. A confusing duplication of the rear building line appears to the right of Tables 1 & 2. 3. The throat depth for the main entry does not meet requirements of 130 feet. The C.- inbound lane merges to the left allowing for the additional landscaping to the right. Staff recommends an alternative design to avoid driver confusion and improve safety where the median would continue and extend to the drive aisle adjacent to Pod 4. The "lost" landscaping area could be shifted to the median. The outbound drive aisle could be a minimum width of 12 feet with 45 degree angle parking. Some alternative should also be considered for the entry to the north to align with the drive aisle. \e 4. Landscape Plan: Table reflects 46 crepe myrtles; plan shows 52. 5. Landscape Plan: Table reflects 200 iridian hawthorns; plan does.not denote any. Landscape Plan: Tree wells are shown on ,plan. What species of tree(s) are planned? NI 7. Is enhanced paving or .•• tanned for islands without landscaping? A)v /lc- -, 8. Is this project pursuing any of the additional point credits referenced in Sec 7.5C7? 9. Provide documentation of the age of the shopping center. 10.Section 7.9 NRA requirements: Comments regarding this section will be forthcoming pending reconciliation of the scale issue. 11.No Facilitation Meeting has been arranged for this lication, however, I am happy to meet with you discuss any questions you may- a e regarding these comments. Reviewed by: Trey Fletcher Date: December 12, 2005 NOTE: Any changes made to the plans, that have not been requested by the City of College Station, must be explained in your next transmittal letter and "bubbled"on your plans. Any additional changes on these plans that have not been pointed out to the City, will constitute a completely new review. 2 of 2