Loading...
HomeMy WebLinkAboutCorrespondence Jennifer Reeves-Veterans Park Page 1 From: Jerry Duffey To: Jennifer Reeves Date: 11/14/2005 4:34:30 PM Subject: Veterans Park Howdy, I spoke with Eric Hurt and he had visited with the engineer and Ric Ploeger from Parks, and was happy with the layout s000 it is okay by Fire.. Jer tatoilos- Craig Kankel, P.E. Og: O'Malley Engineers, L.L.P. Robert C. Schmidt, P.E. Ed Addicks, P.E. December 9, 2005 Ms. Jennifer Reeves City of College Station P.O. Box 9960 College Station, Texas 77842-9960 Re: City of College Station VPAC Phase 2 Responses to Development Services Review Comments Project No. PK0501 Dev. Serv. Case No. 05-00500203 OE Job No. 675.02-RB Dear Ms. Reeves: We have completed the revisions to the above referenced plans in accordance with the comments received from your office dated November 15 and 22, 2005. Attached is a copy of the written comments we received, a revised site plan (2 sheets) and an 11 x 17 erosion control plan (2 sheets). Our responses are as follows: November 15 Comments: Planning 1. We have verified that the plans meet this requirement and a note has been added to the site plan. 2. We have attempted to show phasing lines on the site plan. Unfortunately, the first and second phase improvements intermingle and overlap such that we could not delineate them clearly. To depict the phases, we have shown "existing", "proposed" and "future" notes on the major features. 3. Parking lot security lights are proposed between parking spaces rather than in end islands to optimize light coverage and energy efficiency. Electrical 1. 2., and 3. These items are covered in the plans and specifications, which reference the City's standards. 4. and 5. An AutoCAD drawing with load data will be sent to Mr. Weido by Paul Swoboda, P.E. 5. No response required. K:\00675\675-02RB\Letter\College Station P&D Comment Responses 12-09-05.doc 203 S.Jackson P. 0. Box 1976 Brenham,Texas 77834-1976 (979) 836-7937 FAX(979) 836-7936 r Craig Kankel, P.E. Q [ O'Malley Engineers, L.L.P. \V' Robert C. Schmidt, P.E. Ed Addicks, P.E. January 5, 2005 Ms. Jennifer Reeves Development Services City of College Station P.O. Box 9960 College Station, Texas 77842-9960 REVIEWED FOR Re: City of College Station C4MPLIANCE VPAC Phase 2 Responses to Development Services Review ommentIAN 1 3 200. -' Project No. PK0501 COLLEGE STATIONDev. Serv. Case No. 05-00500203 OE Job No. 675.02-RB DEVELOPIENT SERVICES Dear Ms. Reeves: In accordance with your December 27, 2005 memorandum, attached are the following items: 1. December 27 memorandum and checklist, 2: Six (6) complete sets of project plans and specifications plus one (1) set to be returned for our records, 3. Two (2) copies of the revised site plan (Sheets C-2 and C-3), 4. One (1) copy of the landscaping plan, and 5.• One (1) 11 X 17 grading and erosion control plan. In response to the Decemb 27 comments, we otter the following: PLANNING 1. The plans call for a 6" curb along all edges of pavements that will be extended in the future and a note stating that has been added to the site plan. ENGINEERING 1. The landscape plans state that all areas disturbed by the contractor are to be seeded. Although none of the culverts or storm sewers will have velocities exceeding 6 feet per second, the landscape plans show sod to be placed at all culvert and storm sewer discharge points. To further minimize the potential for erosion at these outfalls, some are shown on the civil plans to have energy dissipaters and protective concrete pavement. The site plan shows the locations of proposed sod and energy dissipater installations. K:\00675\675-02RB\Letter\College Station P&D Comment Responses 12-27-05.doc 203 S.Jackson R. 0. Box 1976 Brenham,Texas 77834-1976 (979) 836-7937 FAX(979) 836-7936 2. The area between existing softball field 2 and Veterans Parkway will be graded to drain under this project. 3. The silting noted between Parking Lot "D" and Soccer Field 4 does not appear to be causing any damage at this time and is not anticipated to do so. The natural tendency for silt to drop out of runoff water in the flood plain has prevented the silt from reaching Carter Creek. This area has now stabilized and I recommend waiting until completion of this project before doing any maintenance in the subject area. Please let me know if you need anything else. Sincerely, 3114r tj9 .--f LI- Robert C. Schmidt, P.E. Project Manager RCS:kl Enclosures cc: Ric Ploeger, PARD K:\00675\675-02RB\Letter\College Station P&D Comment Responses 12-27-05.doc IccioS Craig Kankel, P.E. 0i-: O'Malley Engineers, L.L.P. Robert C. Schmidt, P.E. Ed Addicks, P.E. December 16, 2005 Ms. Jennifer Reeves City of College Station P.O. Box 9960 College Station, Texas 77842-9960 Re: City of College Station VPAC Phase 2 Responses to Development Services Review Comments Project No. PK0501 Dev. Serv. Case No. 05-00500203 OE Job No. 675.02-RB Dear Ms. Reeves: Per your request, we have prepared site plan drawings (2 sheets) delineating project phasing in color and have attached 11"x 17" and 24"x 36" copies. We included the larger drawings because the reduced sheets are not to scale, and because of the amount of information shown thereon may be hard to read. Also transmitted herewith is a complete set of the revised Civil sheets for Josh Norton's use. Please let me know if you need anything else. Sincerely, frtr6- Robert C. Schmidt, P.E. Project Manager RCS:kl Enclosures cc: Ric Ploeger, PARD K:\00675\675-02RB\Letter\College Station P&D Comment Responses 12-16-05.doc 203 S. Jackson P. 0. Box 1976 Brenham,Texas 77834-1976 (979) 836-7937 FAX(979) 836-7936