Loading...
HomeMy WebLinkAboutStaff Comments CITY OF COLLEGE STATION Planning dr Development Services 1101 Texas Avenue, P.O. Box 9960 College Station, Texas 77842 Phone 979.764.3570 / Fax 979.764.3496 MEMORANDUM October 24, 2005 TO: Steve Duncan via fax to 731-1500 FROM: Trey Fletcher, Project Manager SUBJECT: VALLEY PARK CENTER (FP) - Final Plat Staff reviewed the above-mentioned final plat as requested. The following page is a list of staff review comments detailing items that need to be addressed. If all comments have been addressed and the following information submitted by Monday, October 31st, 10:00 a.m., your project will be placed on the next available Planning and Zoning Commission meeting scheduled for Thursday, November 17, 2005, 7:00 p.m. in the City Hall Council Chambers, 1101 Texas Avenue. Two (2) 24"x36" copies of the revised final plat; Twelve (12) 11"x17" copies of the revised final plat; One (1) copy of the digital file of the final plat on diskette or e-mail to Sven Griffin at sgriffin@cstx.gov Upon receipt of the required documents for the Planning & Zoning meeting, your project will be considered formally filed with the City of College Station. Please note that if all comments have not been addressed your project will not be scheduled for a Planning & Zoning Commission meeting. Your project may be placed on a future agenda once all the revisions have been made and the appropriate fees paid. If you have any questions or need additional information, please call Alan Gibbs or me at 979.764.3570. Attachments: Staff review comments cc: David Hillman via fax 713-355-4275 Case file #05-00500191 Home of Texas A&M University STAFF REVIEW COMMENTS NO. 1 Project: VALLEY PARK CENTER (FP) - 05-00500191 PLANNING/ENGINEERING 1. Please remove building lines and associated General Note#2. 2. Remove ")" typos in subheadings of applicable certifications. 3. Complete Volume and Page info in Legal Description. 4. The construction documents and reports are still under review and may affect the plat. 5. Fire lines to sprinkle buildings must have PUE to within 5 feet of the building if the back flow preventer is within the building. Otherwise, a double check valve is needed to end the PUE further from the building. This will need to be dedicated accordingly on the Final Plat. Reviewed by: Trey Fletcher/Alan Gibbs Date: 10-24-05 ELECTRICAL 1. Easement as shown on plat is okay with electric. 2. To discuss any of the above electrical comments, please contact. Sam Weido at 979.764.6314. /Tony Michalsky at 979.764.3438. Reviewed by: Sam Weido /Tony Michalsky Date: 10-18-05 NOTE: Any changes made to the plans,that have not been requested by the City of College Station, must be explained in your next transmittal letter and"bubbled"on your plans.Any additional changes on these plans that have not been pointed out to the City,will constitute a completely new review. Page 2 of 2