HomeMy WebLinkAboutLetter of Completion i
(..D ----- Vq ,\.,
RPR 11 2007 12:15 FR ILL.'S. INTERESTS INC. 713 355 4275 TO 19795907152 P.03/03
£0"30bd ZSTL059646 Ls:rt Gdec =ou
LETTER OF COMPLETION
CITY ENGINEER DATE: 4/10/07
CITY OF COLLEGE STATION
COLLEGE STATION,TEXAS
RE: COMPLETION OF Valley Park Shell
Construction
Dear Sir:
The purpose of our letter is to request that the following listed improvements be
approved and accepted as being constructed under City inspection and completed
according to plans and specifications as approved and required by the City of College
Station,Texas. This approval and acceptance by the City is requested in order that we
may finalize any subcontracts and to affirm their warranty on the wort. This approval
and acceptance by the City of the improvements listed below does hereby void the letter
of guarantee for the listed improvements on the above referenced project.
The one-year warranty is hereby affirmed and agreed to by Elliott Construction LTD
and by their subcontractors as indicated by signatures below.
WORK COMPLETED WARRANTY DATE
4" Force Main 4/10/07
Lift Station 4/10/07
12" waterline4!10/07
Fire Hydrants & Valves 4/10/07
Owner
Titan-Mac 1, LP Contractor: Elliott Construction LTD
Phone Number: 505-8e9-3061 Phone Number:979-690-7071
Address€300 Riverside Plaza NW Address: P.O. sox 510 -.
Suite *200 Wellborn, TX 77881
Albuquerque, NM 87120
Signature: `d'/c------- Signature:_ L �Cf�..
Scott Elliott, President
ACCEP ,. APPROVAL
fill‘ik,
City Engineer
'wow 1r 1,07
02 39ad NCI10081SNO0 110I-173 L61L0096L1 0Z:tO L00L/0T/t0
:** TOTAL PAGE.03 .f,T
4
APR 11 2007 12:16 FR W.L.S. INTERESTS INC 713 355 4275 TO 19796907152 P.02,03
80'31Wd ESTL069666 9S:4T L602 0t Hdb
LETTER OF COMPLETION
CITY ENGINEER
DATE: 4/10/07
CITY OF COLLEGE STATION
COLLEGE STATION,TEXAS
RE: COMPLETION OF Valley Perk -
On Site Utilities
Dear Sir:
The purpose of our letter is to request that the following listed improvements
errtencomplstbbee
approved and accepted as being constructed under City inspection
according to plans and specifications as approved and required by the City of College
Station,Texas. This approval and acceptance by the City is requested in order that we
may finalizecceptany sthe City tsof and to affimt their improvements listed below doon es hereby void the work. This roval
and acceptance by the City of the imp
of guarantee for the listed improvements on the above referenced protect.
The one-year warranty is hereby affirmed and agreed to by Elliott Construction LTD
and by their subcontractors as indicated by signatures below.
WOIRC COMPLETED WARRANTY DATE
12" & 10" Waterlines 4/10/07
Fire Hydrants & Valves 4/10/07
6" Severlines 4/10/07
Manholes_ 4/10/07
Owner: Titan valley park. LP Contractor Elliott Construction LTD
Phone Number: 505-889-3061 Phone Number.97g-690-7071
Address: 6300 Riverside Address: p.0. Box 510
Plaza NW. Suite #200 Wellborn, TX 77881
Albugu?raue, NM 87120
Signature: Signature:
Scott T11iott, President
ACCE' ANC ROYAL
ra
Int*���.��„y eve
City Engineer
Revised OW
•
ra any..a NOILOnd15N00 1L02113 ZSTL0696L6 0Z:t0 LOU/et/be
JUL-24-2006 MON 02:51 PM FAX NO. P. 02/02
,_,,,,u
(#L / :-,F4 _ S f 7p JCS f 1 JL LL�1U 1 1 UL.q'I�I fSLJI�l iUl'!
rH,� r�i
-JUL 21 mit FR W.L.S, INTERESTS INC 713 X55 4245 TO i�?9r311 p.02
k3'/D1Pi�bt4Cv 21:22 9/983171,112
Ft t tpr{T p�gri PAGE a2
UM=Oki($616010344 ••" PgAleitIPW
MT Oar COURGE ISTATION , 7
cOLLIOOR oriirriflat.TEXAS /"/
f:01<IPi.N:7'tblM pF 2/1-/
�'�'
.--,�teeter min
The purpose of our letter la to request that the [ollOvring Wind
ttapkauiem nb be aPPlave.d and aCecplccl as being
, inspection
spection and combed according to plans a d spoelficatil 4etxt under etty
Approved and required b tite City at Celkge Stau Texas. This
apprreva) and nee ne % the City is retueattted in order that we rna
finalize any Kub,coittrtrets and tea tiro their warrantyon yy
approval and acceptance by the City ar the Im the nta listed
t ej at
noes hrxeby void the latter or Guarantee fee the listedimprovements tort
the above rt!Irrnewuf project,
The txia year warranty i5 hG c1 y affirmed and agreed to b
li Arte: na ltrea ow, and try their bub-contractara as
WORK cOrsPL rrf,
DATE
4 -
tVe lipleaile
•
_ tea,
hers "' y'--CLQ ' ..1.5g w ,c, 4
Address, 4ot 41(
S
--�-� Signature-
Contractor: j
llddress ,
/� �'..��.,SpX,��lei�,._
ç ;.
1taRepr : -ntettive(e) ),!t
`,� SAgr shire !rats
114 ,i 1 PR4vA L
r n nerd —,--
?Z 9- 3 y.
pok Tani_ P GE.e2 #