Loading...
HomeMy WebLinkAboutCorrespondence t From: "Steve Duncan" <sed@pkengineering.com> To: "Alan Gibbs" <Agibbs@cstx.gov> Date: 8/16/2006 1:53:41 PM Subject: RE: Valley Park my responses below. need to discuss these with you as soon as you can, specifically 1, 2, 5 and 10. shall i come by? ✓1 -will require a 10" line, policy does not make sense in that an 8" line could never be acceptable for commercial? i do not see anything here to change, the easement is shown on both the on-site plans and the site utility plan, please verify requirments plat in process t/ 4-done but still coordinating with txdot did not contact eric again, but believe the fire flow issues are correct V5 (1 fdc was removed, the other is in the same location, hydrant locations did not change, fire lanes did not change, bldg height did not change, sprinking did not change). did eric have any specific requirements? 6-yes have coordinated with the architect and building type and fire line size are correct. ✓7 -yes, in the building ('8f submitted on 8/10/06 IA C 9-i think the hydrant is close enough, but will add the blow off. the structural backfill note says typ but i will add an arrow to that area as well. 10-the easement edge i rom the building, the easement is 15'wide and C the pipe is sho at 5. from - - - ed•.= • e ea ement making it �,( 14.5'from th- •Id•. e building is only 100 wide an. as a road on the x other side so maintenance access should not be a problem. we discussed and �} agreed to the location of the line and the easement back in the plans that were stamped in october. i request that the line and easement remain as shown. / 11 -i have fullfilled all of lindsay's comments. <><><><><><><><><><><><><><><><><><>< Steve E. Duncan, P.E., V.P. Pledger Kalkomey, Inc. -Consulting Engineers 7020 Coyote Run, Bryan, Texas 77808 979-731-8000 (voice), 979-731-1500 (fax) sed@pkengineering.com <><><><><><><><><><><><><><><><><><>< Original Message From: Alan Gibbs[mailto:Agibbs@cstx.gov] Sent: Tuesday, August 08, 2006 5:29 PM To: Steve Duncan Cc: Eric Dotson; Lindsay Boyer Subject: Valley Park Steve, As we discussed briefly on the phone: 1. The fire flow report reflects velocities in excess of the maximum of 12 fps-please address. 2. Please incorporate the attached general draft guidelines for fire suppression line in the design. Likely, this will require a blowup plan detail depicting the infrastructure and limit of easement. 3. Please note the intent for the detention pond in that this lot will need to be platted to develop. 4. Please provide velocities associated with the pond's discharge orifice, 24" pipe, and ultimate outfall in relation to the Drainage Report and the associated TxDOT permit. 5. Have you visited with Eric Dotson of the Fire Department on the Site Plan revisions-specifically FDC-FH locations, fire lanes, building height, 50% reduction in fire flow requirement due to sprinkling, etc.? 6. Have you coordinated with the architect and fire sprinkler engineer on the building type(your latest submittal states IIB)and fire suppression line size(6"?)? 7. Please confirm the location of the backflow device for the fire suppression (in the building?). 8. What is the status of the letter of credit for filing the plat? Again, this is necessary for the development permit to be issued for the site plan. 9. The Baseline"D"wateline should end in a 2" blowoff, and note that structural compaction is required in the westernmost drive crossing near this waterline end as well. 10. The Baseline"D"waterline is preferably aligned such that the public easement is no closer than 15'to the building, and due to depth exceeding 6'the PUE should be a minimum of 20' in width. 11. Lindsay Boyer is the planner now assigned to this case, she may have additional comments regarding the site plan and landscaping plan in the next week or so. Alan Gibbs, P.E. City of College Station Sr. Asst. City Engineer, Public Works From: Mandi Alford To: Planners/ Engineers Date: 10/5/2005 11:46:49 AM Subject: Fwd: New Development-Week of 10/03/05 >>>Wally Urrutia 10/05/05 11:45 AM >>> Lakeview Acres (05-500171): Sanitation is ok with this project. Valley Park Center(05-500174): Both enclosures need to be turned 10 to 15 degrees clockwise. Sanitation needs to have a minimum of 45 feet turning radius infront of each enclosure. Auto Zone (05-500175): Sanitation is ok with this project. Spring Creek Commons (05-500176): Sanitation is ok with this project. Wally Urrutia Sanitation Superintendent (979) 764-3841 Fax(979) 764-3822