HomeMy WebLinkAboutStaff Comments CITY OF COLLEGE STATION
Planning Development Services
1101 Texas Avenue, P.O. Box 9960
College Station, Texas 77842
Phone 979.764.3570 / Fax 979.764.3496
MEMORANDUM
October 11, 2005
TO: Steve Duncan
FROM: Trey Fletcher, Project Manager
SUBJECT: VALLEY PARK CENTER (SP) - Site Plan
Staff reviewed the above-mentioned site plan as requested. The following page is a list of staff
review comments detailing items that need to be addressed. Please address the comments
and submit the following information for further staff review:
One (1) revised site and landscaping plan.
Please note that the Easement Dedication Sheet and the necessary documents are required
prior to the issuance of a building permit. If there are comments that you are not addressing
with the revised site plan, please attach a letter explaining the details. If you have any
questions or need additional information, please call me at 979.764.3570.
Attachments: Staff review comments
cc: David Hillman
Case file #05-00500174
Home of Texas A&M University
+r
STAFF REVIEW COMMENTS NO. 1
Project: VALLEY PARK CENTER (SP)—05-00500174
PLANNING
1. The Site Plan including the detention pond cannot be approved until the Final Plat and
public infrastructure is accepted.
2. Provide a general note that all roof and ground-mounted mechanical equipment shall be
screened from view or isolated so as not to be visible from any public right-of-way or
residential district within 150' of the subject lot, measured from a point five feet above
grade. Such screening shall be coordinated with the building architecture and scale to
maintain a unified appearance.
3. The detention pond shall be screened per Sec. 7.9.B to achieve a 3-foot high screen.
4. Prior to the issuance of a building permit, provide elevations, color samples, and materials
list for non-residential buildings. Indicate placement of materials on facades according to the
UDO, Section 7.9. Include a note with the following dimensions:
• Total vertical square footage minus openings (for each facade separately)
• Total vertical square footage of each building material (for each façade
separately)
• Total vertical square footage of color(for each façade separately)
5. Demonstrate compliance with Sec. 7.9.0 and 7.9.1 regarding building mass and design.
Some of the options may affect the site plan. Façade articulation (wall plane projections or
recessions) is required on the first two stories of the front or main building facades with a
minimum depth of 4 feet.
6. Sec. 7.9.1.4
• Provide detail
• Locate facility or facilities where no tenant entrance is further than 150' from a
bike facility and show on site plan to show 3' separation from buildings or other
structures including landscaping.
...: • Need 5' sidewalk between parking area and private drive, show 4'
c emonstrate compliance with parking lot provisions in Sec. 7.9.H.
. What is the purpose of the excessively deep parking spaces abutting the buildings? How do
the rear entry points function?Are stoops shown for each door?
9. how end island to replace parking space in the NW corner of the site.
i :how 2520 square feet of interior islands per Sec. 7.2.E. Provide table and calculate area of
k�° end and interior islands provided.
t'' 11. What is the architectural screening proposed for the transformers? Show detail.
1� • 12. Lots 1-4 are a Building Plot, thus the additional standards for 150,000 SF or greater set
vrit
forth in Sec. 7.9.J may apply as well and be integrated into the development.
13. Per Sanitation (Wally Urrutia 764-3841), both enclosures need to be turned 10 to 15
degrees clockwise. Sanitation needs to have a minimum of 45 feet turning radius in front of
each enclosure.
14. TxDOT comments forthcoming, pending clarification to City staff.
Reviewed by: Trey Fletcher Date: 10-11-2005
a
i LI
1 NOTE: Any changes made to the plans, that have not been requested by the City of College Station, must be explained in your
next transmittal letter and"bubbled"on your plans.Any additional changes on these plans that have not been pointed out
to the City,will constitute a completely new review.
Page 2 of 3
LANDSCAPING/STREETSCAPING/BUFFER
1. Provide a general note that 100% coverage of groundcover, decorative paving, decorative
rock, or a perennial grass is required in parking lot islands, swales and drainage areas, the
parking lot setback, rights-of-way, and adjacent property disturbed during construction.
Reviewed by: Trey Fletcher Date: 10-11-2005
ENGINEERING
1. Provide a fire flow analysis per the fire code to analyze if additional hydrants are necessary.
2. Provide a drainage report analyzing the detention design.
3. Provide a detailed grading plan and erosion control plan.
4. Provide applications for TxDOT driveways.
5. Clarify if fire lines are proposed to the buildings. If so, additional easements or back flow
prevention will be required.
Reviewed by: Alan Gibbs Date: 10-07-05
FIRE
1. No comments at this time.
Reviewed by: Date:
ELECTRICAL
1. Developer installs conduit per city specs and design.
2. Final routing of conduit per city specs.
3. City will furnish drawings for conduit routing and specifications.
4. Developer provides 30' of rigid conduit for riser poles.
5. Developer pours transformer pad(s) per city specs and design.
6. Developer installs pull boxes and junction boxes as per city specs and design.(pull boxes
and junction boxes provided by the city).
7. Developer provides digital AutoCAD 2000 or later version of plat and/or site plan email to
sweidoRcstx.gov
8. Developer provides load data for project.
9. Developer provides temporary blanket easement for construction purposes.
10. Developer provides easements for electric infrastructure as installed for electric lines.
11. To discuss any of the above electrical comments, please contact Sam Weido at
979.764.6314.
Reviewed by: Sam Weido Date: 10-05-05
MISCELLANEOUS
1. Irrigation system must be protected by a Pressure Vacuum Breaker, a Reduced Pressure
Principle Back Flow Device, or a Double-Check Back Flow Device, and installed as per City
Ordinance 2394.
2. All Back Flow devices must be installed and tested upon installation as per City Ordinance
2394.
NOTE: Any changes made to the plans,that have not been requested by the City of College Station, must be explained in your
next transmittal letter and"bubbled"on your plans.Any additional changes on these plans that have not been pointed out
to the City,will constitute a completely new review.
Page 3 of 3
4ffill11111111111
CITY OF COLLEGE STATION
Planning ei-Development Services
1101 Texas Avenue, P.O. Box 9960
College Station, Texas 77842
Phone 979.764.3570 / Fax 979.764.3496
MEMORANDUM
October 24, 2005
TO: Steve Duncan via fax 731-1500
FROM: Trey Fletcher, Project Manager
SUBJECT: VALLEY PARK CENTER (SP) -Site Plan
Staff reviewed the above-mentioned site plan as requested. The following page is a list of staff
review comments detailing items that need to be addressed. The next submittal will be the third
and final review by staff for this round of reviews. If all items have not been addressed on the
next submittal, another $200 processing fee will need to be submitted for the subsequent set of
three (3) reviews. Please address the comments and submit the following information for
further staff review:
One (1) revised site and landscaping plan.
If there are comments that you are not addressing with the revised site plan, please attach a
letter explaining the details. If you have any questions or need additional information, please
call me at 764-3570.
Attachments: Staff review comments
cc: David Hillman via fax 713-355-4275
Case file #05-00500174
Home of Texas A&M University
STAFF REVIEW COMMENTS NO. 2
Project: VALLEY PARK CENTER (SP) - 05-00500174
PLANNING
1. TxDOT comments are still forthcoming, pending clarification to City staff due this week.
2. Add note to indicate that detention on Lot 2 and private drive through development are
included in Phase I.
3. Where parking spaces greater than 20' are shown along west side, stripe them to be 20
feet.
4. Future landscaped area will need to have 100% groundcover per note 3 on landscaping
plan prior to CO.
5. Prior to the issuance of a building permit, provide elevations, color samples, and materials
list for non-residential buildings. Indicate placement of materials on facades according to the
UDO, Section 7.9. Include a note with the following dimensions:
• Total vertical square footage minus openings (for each façade separately)
• Total vertical square footage of each building material (for each façade
separately)
• Total vertical square footage of color (for each façade separately)
Reviewed by: Trey Fletcher Date: 10-24-2005
ENGINEERING
1. FYI, Fire lines to sprinkle buildings must have PUE to within 5 feet of the building if the back
flow preventer is within the building. Otherwise, a double check valve is needed to end the
PUE further from the building. This will need to be dedicated accordingly on the Final Plat.
2. Please revise the location of the fire hydrants per the discussion with Steve Smith of the
Fire Department.
3. With regard to the Fire Flow Analysis, Building "A" requires two hydrants per the discussion
with Steve Smith.
4. With regard to the Fire Flow Analysis, provide actual flow results of the closest existing
hydrant. These results should be incorporated into a model such as Mike Net or KY Pipe to
extrapolate proposed flows, pressures, velocities, etc.
5. Please provide a more detailed grading plan with proposed spot elevations, etc.
6. With regard to the TxDOT permit applications, please provide culvert sizing calculations.
7. With regard to the Drainage Report:
a. Elevations do not correlate with the Grading Plan.
b. Provide an emergency overflow spillway.
c. Page 3 has a minor typo (12").
Reviewed by: Alan Gibbs Date: 10-24-2005
NOTE: Any changes made to the plans, that have not been requested by the City of College Station, must be explained in your
next transmittal letter and"bubbled"on your plans.Any additional changes on these plans that have not been pointed out
to the City,will constitute a completely new review. 2 of 2
Cirri"
CITY OF COT T FGE STATION
Planning de Development Services
1101 Texas Avenue,P.O. Box 9960
College Station,Texas 77842
Phone 979.764.3570 / Fax 979.764.3496
MEMORANDUM
August 14,2006
TO: Steve Duncan,via fax 731-1500
FROM: Lindsay Boyer,Staff Planner
SUBJECT: VALLEY PARK CENTER(SP) - Site Plan
Staff reviewed the above-mentioned site plan as requested. The following page is a list of staff review
comments detailing items that need to be addressed. Please address the comments and submit the
following information for further staff review:
One (1) complete set of construction documents for the proposed development
with the revised site and landscaping plans attached
If there are comments that you are not addressing with the revised site plan,please attach a letter
explaining the details. If you have any questions or need additional information,please call me at
979.764.3570.
Attachments: Staff review comments
cc: David Hillman,via fax 713-355-4275
Case file #05-00500174
NOTE: Any changes made to the plans,that have not been requested by the City of College Station,must be explained in your next
transmittal letter and"bubbled"on your plans. Any additional changes on these plans that have not been pointed out to the
City,will constitute a completely new review. 1 of 2
STAFF REVIEW COMMENTS NO. 3
Project:VALLEY PARK CEN 1'ER (SP) - 05-00500174
PLANNING
1. Dumpster enclosure must be a minimum of 12 feet by 12 feet clear from all bollards or other structures.
Since the detail is not to scale, I am unable to determine if the bollard placement meets this requirement.
2. Non-Residential Architectural Review has not been completed because building elevations have not been
submitted. If these will be submitted with the building permit,please be aware, that the building permit
process may be extended for review of the exterior elevations.
3. Show bicycle parking detail as per the Site Design Standards.
Reviewed by: Lindsay Boyer, Staff Planner Date: August 14, 2006
NOTE: Any changes made to the plans,that have not been requested by the City of College Station,must be explained in your next