HomeMy WebLinkAboutCorrespondence Ginger L Urso
From: Kristan Weaver [Kweaver@cstx.gov]
Sent: Wednesday, September 28, 2005 4:50 PM
To: gingerlurso@texcon.net
Subject: Re: Castlerock Subdivision -follow-up
Ginger,
I approved Castlerock quite awhile agd. That is reflected in staff notes . I spoke with
Molly Hitchcock and she confirmed that there are no greenway issues here.
If you have any questions or need anything further, please let me know!
Kristan D. Weavers'
Greenways Program Manager
City of College Station
Phone: 979.764 .3844
Fax: 979.764 .3489
E-mail : kweaver@cstx.gov
Web: www.cstx.gov
»> "Ginger L Urso" <gingerlurso@texcon.net> 09/22/05 2 :37 PM »>
Kristan -
On April 25 of this year, we submitted a Concept Plan for your review, comment and
approval. We will be submitting this plan to the City for approval late next week, and
one item on the application requires proof that the Greenways Manager has reviewed and
approved the plan. I need to see about getting that proof from you. Please let me know
how we need to go about getting this information.
Thanks a bunch -
Ginger Urso
Texcon General Contractors
(979) 764-7743
College Station. Heart of the Research Valley.
1
Jennifer Reeves - Proposed Changes to Castlerock Concept Plan (PDD) & Preliminary Plat Page 1
From: Jennifer Reeves
To: Joe Schultz
Date: 8/4/2006 10:08:16 AM
Subject: Proposed Changes to Castlerock Concept Plan (PDD) & Preliminary Plat
Joe-Carol and I have reviewed the proposal ; (1)To divide Phase I into two phases (1A& 1B); The
Preliminary Plat would need to be revised and approved by the Planning and Zoning Commission again.
(2)The proposal for changing the Concept Plan from single family to C-3 or A-P from (PDD)Concept Plan
that was approved by Council; This will require Council action again. (FYI)Staff would not be supporting
this C-3 or A-P proposal, being that the Comprehensive Plan reflects this area to be developed as Single
Family Medium Density and due to concentration of the commercial property just to the east. Please let
me know if you have any questions or concerns.
Thanks,
Jennifer
Jennifer Reeves
Staff Planner
City of College Station
jreeves@cstx.gov
(979) 764-3570
(979) 764-3496 FAX
CC: Carol Cotter; Molly Hitchcock
7 31. OU
11,
CIVIL DEVELOPMENT Ltd.
CIVIL ENGINEERING&DESIGN-BUILD SERVICES d5 / 2
P.O. Box 11929 • College Station, Texas 77842 • Phone: 979-764-7743 • Fax: 979-764-7759 J
July 31, 2006 s �•
Jennifer Reeves
City of College Station
P.O. Box 9960
College Station, TX 77842 (c(}.P
q,[
RE: Castlerock Subdivision
College Station, Texas
Dear Ms. Reeves:
Attached is copy of a Draft Revised Concept Plan and Draft Revised Preliminary Plat for
the Castlerock Subdivision. The purpose of this submittal is to get feedback from the
staff on changing the land use from residential to non-residential on approximately 3
acres at the west end of the development. This area is bounded on the south by SH40, on
the west and north by a COE restricted area which will not be developed. The Developer
proposes a landscape buffer and concrete wall on the east boundary of this area where it
adjoins the residential development. The proposed land uses for this area would be
limited to the A-P and C-3 zoning district uses. The Developer would like vehicular
connectivity between the proposed non-residential and residential sections of Castlerock
so the residents can access the business with going on SH 40. However, we would like to
discourage "cut through" traffic to SH 40 through the non-residential area. We think this
can best be accomplished by not having any public streets in the non-residential area and
designing the driveways in such a manner as to discourage traffic entering site unless it is
their destination.
Please let me know the applications we will need to submit to proceed with these
proposed changes to this development.
Also, attached is a copy of the approved Preliminary Plat. While the above issue is being
processed, we would like to proceed with Phase 1 of the subdivision by breaking it into
Phase 1 A and Phase 1B as highlighted on the Plat. Phase lA would have 30 lots so the
second fire access would not be needed until Phase 1B. Would a revised Preliminary Plat
need to be submitted for P&Z approval for Phases 1 A and 1B or can we go ahead with a
Final Plat of Phase I A without submitting a revised Preliminary Plat.
4.
If you have any questions or need additional information, please give me a call at (979)
764-7743. We would welcome the opportunity to meet and discuss this project if you
feel it is necessary.
Sincerely Yours,
I
Jo-'Schultz, P.E.
Engineering Manager
cc: Wallace Phillips
Attachments