Loading...
HomeMy WebLinkAboutStaff Comments �—� c� Ic�r(,,4L vzi ka C`3 ltcI cib3f 65 CITY OF COLLEGE STATION Planning er Development Services 1101 Texas Avenue, P.O. Box 9960 College Station, Texas 77842 Phone 979.764.3570 / Fax 979.764.3496 MEMORANDUM September 12, 2005 TO: Mitchell and Morgan, via fax 260-3564 FROM: Lindsay Boyer, Project Manager SUBJECT: SPRING CREEK COMMONS (PP) - Preliminary Plat Staff reviewed the above-mentioned preliminary plat as requested. The following page is a list of staff review comments detailing items that need to be addressed. If all comments have been addressed and the following information submitted by Monday, September 19, 10:00 a.m., your project will be placed on the next available Planning and Zoning Commission meeting scheduled for October 6, 7:00 p.m. in the City Hall Council Chambers, 1101 Texas Avenue. Two (2) 24" x 36" copies of the revised preliminary plat; Twelve (12) 11" x 17" copies of the revised preliminary plat; One (1) Mylar original of the revised preliminary plat; and, One (1) copy of the digital file of the preliminary plat on diskette or e-mail to nmanhart@cstx.gov Upon receipt of the required documents for the Planning & Zoning meeting, your project will be considered formally filed with the City of College Station. Please note that if all comments have not been addressed, your project will be pulled from the scheduled Planning & Zoning Commission agenda. Your project may be placed on a future agenda once all the revisions have been made and the appropriate fees paid. If you have any questions or need additional information, please call me at 979.764.3570. Attachments: Staff review comments cc: Quorum 6 Green, via U.S. Mail Case file #05-00500161 Home of Texas A&M University C\--5\'‘‘,C{4 � 5 STAFF REVIEW COMMENTS NO. 1 �\ 0 (.,(et- Project: SPRING CREEK COMMONS (PP) - 05-00500161 e Rii✓pI vecr/ PLANNING/ENGINEERING -� CiQCk-- `j' L:64- 1 o Park skclekA/C k- t it buk(' ti► i-.('\� No lots may be approved that do not meet minimum lot size, and unbuildable lots may not 0,) 1r be platted. Please adjust the lot size to make this lot buildable, or incorporate it into an 12. cy adjacent lot. r e- Lot 2, Block 2 appears unbuildable as well with the 100 ft Vegetative Buffer preserved crC6j 7 through the lot. It was previously conditioned with the re-zoning that the buffer would need to remain 100 ft if was not improved by underground storm sewer, in which case the buffer could be reduced to 50 ft. This appears to be necessary to make the lot buildable and therefore the storm extension should be noted and buffer reduced accordingly on this preliminary plat. As it is currently illustrated on the plat, Lakeway is located in the 100 foot buffer. According to the conditions of the rezoning, the buffer is to remain undisturbed. Please relocate the thoroughfare out of this buffer. . Please provide a proposal of the building plot lines to be considered, otherwise this would be considered one building plot. Please note that a temporary cul-de-sac with temporary easement will need to be constructed and granted at the northern end of each of proposed, phased extensions of Lakeway Drive. Timing of the Site Plan parking may justify the use of the driveways as a means of emergency vehicle circulation in lieu of a cul-de-sac. 6. Please see TxDOT's access comments below. 7. Please note that the some of the proposed easements will need to be dedicated by . separate instruments to accommodate earlier phases. 8. FYI: Impact Fees will be required at the time of Building Permit in accordance with the meter sizing determining the Living Unit Equivalent. 9. FYI: Conceptually, the drainage report, asserting that detention is not necessary, is acceptable. The reasoning is that this site discharges into the primary system. Note that the flows cannot increase on the adjacent lots and the discharge shall be to Spring Creek and not the un-named tributary of Spring Creek to the east. Reviewed by: Lindsay Boyer/Alan Gibbs Date: September 12, 2005 ELECTRICAL 1. Developer installs conduit per city specs and design. 2. Developer provides 30' of rigid conduit for riser poles. 3. Developer pours transformer pad(s) per city specs and design. 4. Developer installs pull boxes as per city specs and design. (pull boxes provided by the city). 5. Developer provides digital AutoCAD 2000 version of plat and/or site plan. Email to bread a cstx.gov 6. Developer provides load data for project. 7. Developer covers cost of relocating utility pole(s) located at proposed Lakeway Drive. 8. Developer installs conduit along proposed Lakeway Drive for future electrical facilities. 9. Developer installs street lights per city specs and design on the Lakeway Dr extension. NOTE: Any changes made to the plans, that have not been requested by the City of College Station, must be explained in your next transmittal letter and"bubbled"on your plans.Any additional changes on these plans that have not been pointed out to the City,will constitute a completely new review. 2 of 3 10. Developer provides easements for electric infrastructure as installed for electric lines (including street lights). 11. To discuss any of the above electrical comments, please contact Tony Michalsky at 979.764.3438. Reviewed by: Brent Read Date: September 9, 2005 TxDOT 1. Proposed layout indicates Access Driveway spacing would be C-C which does not account for driveway widths. At this site the posted Speed Limit is 55 MPH which requires a spacing of 425' between Access Drives. (see attached) 2. Total distance from the center of the existing driveway (McDonalds) north to the proposed exit ramp is 1,514' with the north driveway (C) being 140' south of this ramp. (proposed layout) 3. Using the proper spacing to accommodate all three (3) proposed driveways: DT = 15'('/2McD) + 425' + 24'(A) + 425' + 30'(B) + 425' + 30'(C) = 1,374' Dp= 452' + 450' + 472' = 1,374' (Proposed) This is 140' south of the proposed exit ramp which is acceptable with the addition of a decel lane. This is necessary since Driveway C is located in the merge to 1- lane area just upstream of the exit ramp. (Same as proposed) 4. Driveway "A" shall not be constructed until the existing ramps Ca this site have been abandoned. 5. A better solution would be to close McDonald's driveway @ the proposed turn-around & have a shared driveway (cross-access) @ DW A located 425' from Greens Prairie Road. With the required spacing DW C would be located approximately 430' from the exit ramp & would probably require a shorter decel lane. Reviewed by: Jay Page Date: September 8, 2005 BTU _ �u 1. BTU has electrical lines either on or adjacent to the subject property. Please show BTU electric lines and the easements covering the portion of BTU's overhead facilities that lie within the property. If there are no easements found, a 20' easement centered on the existing lines must be granted either by plat or by separate instrument. Reviewed by: Randy Trimble Date: September 8, 2005 NOTE: Any changes made to the plans,that have not been requested by the City of College Station, must be explained in your next transmittal letter and"bubbled"on your plans.Any additional changes on these plans that have not been pointed out to the City,will constitute a completely new review. 3 of 3 MEMORANDUM To: FILE From: Jay Page Date: July 11, 2005 Subject: SH 6 East Frontage Rd. (0049-12-067) North (320') of Greens Prairie Road SPRING CREEK COMMONS College Station,Texas Access Driveway Permits COMMENTS: 1) Proposed layout indicates Access Driveway spacing would be C-C which does not account for driveway widths. At this site the posted Speed Limit is 55 MPH which requires a spacing of 425' between Access Drives. (see attached) 2) Total distance from the center of the existing driveway (McDonalds) north to the proposed exit ramp is 1,514' with the north driveway(C) being 140'south of this ramp. (proposed layout) 3) Using the proper spacing to accommodate all three (3) proposed driveways: DT = 15'(1/2McD) + 425' + 24'(A) + 425' + 30'(B) + 425' + 30'(C) = 1,374' Dp = 452' + 450' + 472' = 1,374'(Proposed) This is 140' south of the proposed exit ramp which is acceptable with the addition of a decel lane. This is necessary since Driveway C is located in the merge to 1- lane area just upstream of the exit ramp. (Same as proposed) 4) Driveway "A" shall not be constructed until the existing ramps @ this site have been abandoned. 5) A better solution would be to close McDonald's driveway @ the proposed turn-around & have a shared driveway (cross-access) @ DW A located 425' from Greens Prairie Road. With the required spacing DW C would be located approximately 430' from the exit ramp & would probably require a shorter decel lane. • Gr-ffi1511111111 CITY OF COLLEGE STATION Planning&"Development Services 1101 Texas Avenue, P.O. Box 9960 College Station, Texas 77842 Phone 979.764.3570 / Fax 979.764.3496 MEMORANDUM September 12, 2005 TO: Mitchell and Morgan, via fax 260-3564 FROM: Lindsay Boyer, Project Manager SUBJECT: SPRING CREEK COMMONS (PP) - Preliminary Plat Staff reviewed the above-mentioned preliminary plat as requested. The following page is a list of staff review comments detailing items that need to be addressed. If all comments have been addressed and the following information submitted by Monday, September 19, 10:00 a.m., your project will be placed on the next available Planning and Zoning Commission meeting scheduled for October 6, 7:00 p.m. in the City Hall Council Chambers, 1101 Texas Avenue. Two (2) 24" x 36" copies of the revised preliminary plat; Twelve (12) 11" x 17" copies of the revised preliminary plat; One (1) Mylar original of the revised preliminary plat; and, One (1) copy of the digital file of the preliminary plat on diskette or e-mail to nmanhart@cstx.gov Upon receipt of the required documents for the Planning & Zoning meeting, your project will be considered formally filed with the City of College Station. Please note that if all comments have not been addressed, your project will be pulled from the scheduled Planning & Zoning Commission agenda. Your project may be placed on a future agenda once all the revisions have been made and the appropriate fees paid. If you have any questions or need additional information, please call me at 979.764.3570. Attachments: Staff review comments cc: Quorum 6 Green, via U.S. Mail Case file #05-00500161 Home of Texas A&M University STAFF REVIEW COMMENTS NO. 1 Project: SPRING CREEK COMMONS (PP) - 05-00500161 PLANNING/ENGINEERING 1. No lots may be approved that do not meet minimum lot size, and unbuildable lots may not be platted. Please adjust the lot size to make this lot buildable, or incorporate it into an adjacent lot. 2. Lot 2, Block 2 appears unbuildable as well with the 100 ft Vegetative Buffer preserved through the lot. It was previously conditioned with the re-zoning that the buffer would need to remain 100 ft if was not improved by underground storm sewer, in which case the buffer could be reduced to 50 ft. This appears to be necessary to make the lot buildable and therefore the storm extension should be noted and buffer reduced accordingly on this preliminary plat. 3. As it is currently illustrated on the plat, Lakeway is located in the 100 foot buffer. According to the conditions of the rezoning, the buffer is to remain undisturbed. Please relocate the thoroughfare out of this buffer. 4. Please provide a proposal of the building plot lines to be considered, otherwise this would be considered one building plot. 5. Please note that a temporary cul-de-sac with temporary easement will need to be constructed and granted at the northern end of each of proposed, phased extensions of Lakeway Drive. Timing of the Site Plan parking may justify the use of the driveways as a means of emergency vehicle circulation in lieu of a cul-de-sac. 6. Please see TxDOT's access comments below. V7. Please note that the some of the proposed easements will need to be dedicated by separate instruments to accommodate earlier phases. /8. FYI: Impact Fees will be required at the time of Building Permit in accordance with the meter sizing determining the Living Unit Equivalent. 9. FYI: Conceptually, the drainage report, asserting that detention is not necessary, is acceptable. The reasoning is that this site discharges into the primary system. Note that the flows cannot increase on the adjacent lots and the discharge shall be to Spring Creek and not the un-named tributary of Spring Creek to the east. Reviewed by: Lindsay Boyer/Alan Gibbs Date: September 12, 2005 ELECTRICAL 1. Developer installs conduit per city specs and design. 2. Developer provides 30' of rigid conduit for riser poles. 3. Developer pours transformer pad(s) per city specs and design. 4. Developer installs pull boxes as per city specs and design. (pull boxes provided by the city). 5. Developer provides digital AutoCAD 2000 version of plat and/or site plan. Email to breadr�cstx.gov 6. Developer provides load data for project. 7. Developer covers cost of relocating utility pole(s) located at proposed Lakeway Drive. 8. Developer installs conduit along proposed Lakeway Drive for future electrical facilities. 9. Developer installs street lights per city specs and design on the Lakeway Dr extension. NOTE: Any changes made to the plans, that have not been requested by the City of College Station, must be explained in your next transmittal letter and`bubbled"on your plans.Any additional changes on these plans that have not been pointed out to the City,will constitute a completely new review. 2 of 3 10. Developer provides easements for electric infrastructure as installed for electric lines (including street lights). 11. To discuss any of the above electrical comments, please contact Tony Michalsky at 979.764.3438. Reviewed by: Brent Read Date: September 9, 2005 TxDOT 1. Proposed layout indicates Access Driveway spacing would be C-C which does not account for driveway widths. At this site the posted Speed Limit is 55 MPH which requires a spacing of 425' between Access Drives. (see attached) 2. Total distance from the center of the existing driveway (McDonalds) north to the proposed exit ramp is 1,514' with the north driveway (C) being 140' south of this ramp. (proposed layout) 3. Using the proper spacing to accommodate all three (3) proposed driveways: DT = 15'('/2McD) + 425' + 24'(A) + 425' + 30'(B) + 425' + 30'(C) = 1,374' Dp= 452' + 450' + 472' = 1,374' (Proposed) This is 140' south of the proposed exit ramp which is acceptable with the addition of a decel lane. This is necessary since Driveway C is located in the merge to 1- lane area just upstream of the exit ramp. (Same as proposed) 4. Driveway "A" shall not be constructed until the existing ramps Cad this site have been abandoned. 5. A better solution would be to close McDonald's driveway @ the proposed turn-around & have a shared driveway (cross-access) @ DW A located 425' from Greens Prairie Road. With the required spacing DW C would be located approximately 430' from the exit ramp & would probably require a shorter decel lane. Reviewed by: Jay Page Date: September 8, 2005 BTU 1. BTU has electrical lines either on or adjacent to the subject property. Please show BTU electric lines and the easements covering the portion of BTU's overhead facilities that lie within the property. If there are no easements found, a 20' easement centered on the existing lines must be granted either by plat or by separate instrument. Reviewed by: Randy Trimble Date: September 8, 2005 NOTE: Any changes made to the plans, that have not been requested by the City of College Station, must be explained in your next transmittal letter and"bubbled"on your plans.Any additional changes on these plans that have not been pointed out to the City,will constitute a completely new review. 3 of 3