Loading...
HomeMy WebLinkAboutStaff Comments fOrff CITY OF COLLEGE STATION Planning d'Development Services 1101 Texas Avenue, P.O. Box 9960 College Station, Texas 77842 Phone 979.764.3570 / Fax 979.764.3496 MEMORANDUM September 12, 2005 TO: Kerr Surveying via fax to 691-8904 FROM: Trey Fletcher, Project Manager SUBJECT: GRAHAM RD BUSINESS CENTER (FP) - Final Plat Staff reviewed the above-mentioned final plat as requested. The following page is a list of staff review comments detailing items that need to be addressed. 9rre24"x36" copy of the revised final plat; One (1) Mylar original of the revised final plat; and One (1) copy of the digital file of the final plat on diskette or e-mail to nmanhart@cstx.gov If you have any questions or need additional information, please call me or Carol Cotter at 979.764.3570. Attachments: Staff review comments cc: Ted &Wade Whitmer Case file #05-00500159 P--k„,,4? I ( 4) Ipt rt /LS �v t.-aQ JTC I rc.tvl;vwiv h� v�-CA"—cQ 4 cA Home of Texas AB&M University STAFF REVIEW COMMENTS NO. 1 Project: GRAHAM RD BUSINESS CENTER (FP) - 05-00500159 PLANNING / ENGINEERING / Vicinity map does not reflect correct site. 'L/ Title block should also reference "Lot 1". ✓3 Remove setback references and associated note (#4). 4. A cross access easement shall be provided to serve the parcel to the west. 5. This final plat can be processed as a minor plat being that it involves four or fewer lots fronting on an existing street and not requiring the creation of a new street or the extension of municipal facilities. VO A,A9 'A-1 `MIS/ PL i ", e„ 8c4)e- , Reviewed by: Trey Fletcher/Carol Cotter Date: 9-12-2005 ELECTRICAL 1. Developer installs conduit per city specs and design. 2. Developer provides 30' of rigid conduit for riser poles. 3. Developer pours transformer pad(s) per city specs and design. 4. Developer installs pull boxes as per city specs and design.(pull boxes provided by the city). 5. Developer provides digital AutoCAD 2000 version of plat and/or site plan. 6. email to bread@cstx.gov 7. Developer provides load data for project.. 8. To discuss any of the above electrical comments, please contact Brent Read at 979.764.5026. Reviewed by: Brent Read Date: September 9, 2005 FIRE 1. No comments Reviewed by: Steve Smith Date: 9/12/05 NOTE: Any changes made to the plans,that have not been requested by the City of College Station, must be explained in your next transmittal letter and"bubbled"on your plans.Any additional changes on these plans that have not been pointed out to the City,will constitute a completely new review. Page 2 of 2