HomeMy WebLinkAboutStaff Comments CITY OF COLLEGE STATION
Planning&Development Services
1101 Texas Avenue, P.O. Box 9960
College Station, Texas 77842
Phone 979.764.3570 / Fax 979.764.3496
MEMORANDUM
September 12, 2005
TO: Kerr Surveying via fax to 691-8904
FROM: Trey Fletcher, Project Manager
SUBJECT: GRAHAM RD BUSINESS CENTER(PP) - Preliminary Plat
Staff reviewed the above-mentioned preliminary plat as requested. The following page is a list
of staff review comments detailing items that need to be addressed.
One (1) 24" x 36" copy of the revised preliminary plat;
One (1) Mylar original of the revised preliminary plat
If you have any questions or need additional information, please call me or Carol Cotter at
979.764.3570.
Attachments: Staff review comments
cc: Ted & Wade Whitmer
Case file #05-00500158
Home of Texas A&M University
STAFF REVIEW COMMENTS NO. 1
Project: GRAHAM RD BUSINESS CENTER (PP) - 05-00500158
PLANNING / ENGINEERING
1. Vicinity map does not reflect correct site.
2. Title block should also reference "Lot 1".
3. A cross access easement shall be provided to serve the parcel to the west.
4. Preliminary plat will not require review / approval by the Planning & Zoning Commission. It
will be considered in the context of the Minor Plat as a supporting document.
Reviewed by: Trey Fletcher/ Carol Cotter Date: 9-12-2005
ELECTRICAL
1. Developer installs conduit per city specs and design.
2. Developer provides 30' of rigid conduit for riser poles.
3. Developer pours transformer pad(s) per city specs and design.
4. Developer installs pull boxes as per city specs and design. (pull boxes provided by the
city).
5. Developer provides digital AutoCAD 2000 version of plat and/or site plan.
6. email to breadcstx.qov
7. Developer provides load data for project.
8. To discuss any of the above electrical comments, please contact Brent Read at
979.764.5026.
Reviewed by: Brent Read Date: September 9, 2005
FIRE
1. No comments
Reviewed by: Steve Smith Date: 09/12/05
NOTE: Any changes made to the plans, that have not been requested by the City of College Station, must be explained in your
next transmittal letter and"bubbled"on your plans.Any additional changes on these plans that have not been pointed out
to the City,will constitute a completely new review. 2 of 2