Loading...
HomeMy WebLinkAboutStaff Comments Gr. ffi11114 CITY OF COLLEGE STATION Planning&Development Services 1101 Texas Avenue South, PO Box 9960 College Station, Texas 77842 Phone 979.764.3570 / Fax 979.764.3496 MEMORANDUM April 18, 2005 TO: Edward Froehling, via fax 774.0565 7 FROM: Bridgette George, Assistant Development Manager SUBJECT: Shenandoah Ph. 19 (FP) —Construction Documents Staff reviewed the above-mentioned engineering documents as requested. The following page is a list of staff review comments detailing items that need to be addressed. Please address the comments and submit the following information for further staff review and approval of the plans: One (1) set of revised construction documents. If you have any questions or need additional information, please call Josh Norton or myself at 764.3570. Attachments: Staff Review Comments Cc: McClure & Browne Engineering/Surveying, Inc., via fax 693.2554✓ Case file no. 05-00500046 Home of Texas AB&M University SHENANDOAH PH 19 (FP) (05-00500046) Engineering Review Comments No. 1 1. Verify limits of the structural backfill for the storm sewer line along Hunter Creek Drive? 2. Water Report: Is there a corresponding schematic for Exhibit G? 3. Drainage Report: a. (Page 2) Verify Applicable Exhibits Section b. (Page 3) Table 2 verify 50 and 100-yr event information c. (Page 4) Verify Table of Results d. (Exhibit C-3) Inlet 5B shows a velocity of 23.3 fps, which is in excess of the maximum allowed, please explain. e. Please provide the pre and post conditions for Windfree Dr. 4. (Sheet 2) Provide detail of proposed fire hydrant on Southern Plantation. 5. (Sheet 5) Existing sanitary sewer line labeled as 8in in plan and 6in in profile. 6. (Sheet 5) Run storm drain outside of pavement, instead of diagonal across Hunter Creek. 7. (Sheet 7) Please verify the use of energy dissipaters on the storm inlet into the creek at the end of Windfree Dr. is not needed. 8. (Sheet 7) Show elevation of the existing sanitary sewer line in relationship to the proposed cul-de-sac at the end of Windfree Dr. and Tiffany Trail. 9. (Sheet 13) On Tiffany Trail move sanitary sewer service connections to main (45 & 46) outside of pavement. 10. (Sheet 14) On profile view the water line material type is mislabeled. 11. (Sheet 14) A gate valve is required on the proposed water line on Hunter Creek. A gate valve is required at least every 800ft. The distance between the Bluefield and Decatur intersection with Hunter Creek is over 1000ft. 12. (Sheet 14) Verify air release valve not needed at high point on water line. 13. (Sheet 15) On profile view the water line material type is mislabeled. 14. (Sheet 15) Verify flushing valve not needed where water line dips under storm line. 15. (Sheet 16) Move water line service connections to main (21 & 22) outside of pavement. 16. (Sheet 17) on "Typical Concrete Flume Section" profile the surrounding ground grade. 17. FYI: The city is discussing possible participation in the rehabilitation of the clay sanitary sewer lines. Reviewed by: Josh Norton Date: 4-14-05 NOTE: Any changes made to the plans, that have not been requested by the City of College Station, must be explained in your next transmittal letter and "bubbled" on your plans. Any additional changes on these plans that have not been pointed out to the City of College Station will constitute a completely new review. Page 2 of 2 CITY OF COLLEGE STATION Planning 6'Development Services 1101 Texas Avenue South, PO Box 9960 College Station, Texas 77842 Phone 979.764.3570 / Fax 979.764.3496 MEMORANDUM April 12, 2005 TO: Edward Froehling, Via fax 774.0565 FROM: Bridgette George, Development Coordinator SUBJECT: SHENANDOAH PH 19 (FP) - Final Plat Staff reviewed the above-mentioned final plat as requested. The following page is a list of staff review comments detailing items that need to be addressed. If all comments have been addressed and the following information submitted by Monday, April 18, 10:00 a.m., your project will be placed on the next available Planning and Zoning Commission meeting scheduled for, May 5, 2005, 7:00 p.m. in the City Hall Council Chambers, 1101 Texas Avenue. Two hundred ($200) public hearing fee (for replat); Two (2) 24"x36" copies of the revised final plat; Ten (10) 11"x17" copies of the revised final plat; Parkland Dedication Development Fee in the amount of $20,048 ($358 x 56 lots) must be submitted prior to the filing of the final plat; One (1) Mylar original of the revised final plat; and One (1) copy of the digital file of the final plat on diskette or e-mail to nmanhart@cstx.gov Upon receipt of the required documents for the Planning & Zoning meeting, your project will be considered formally filed with the City of College Station. Please note that if all comments have not been addressed your project will not be scheduled for a Planning & Zoning Commission meeting. Your project may be placed on a future agenda once all the revisions have been made and the appropriate fees paid. If you have any questions or need additional information, please call or myself at 979.764.3570. Attachments: Staff review comments cc: McClure & Browne Engineering/Surveying, Inc., via fax 693.2554 ✓ Case file #05-00500046 Home of Texas A&M University STAFF REVIEW COMMENTS NO. 1 Project: SHENANDOAH PH 19 (FP) - 05-00500046 ENGINEERING 1. Title of Plat should be "Final Plat of Shenandoah Phase 19.... which includes a Replat of Shenandoah " You may want to look into a vacating and final plat. 2. In order to abandon the Drainage Easement on Lot 17 by Replat, it must first be established that there is nothing in the easement. In addition, an Easement Abandonment application must also be submitted. Although this will not go to Council it will need to be submitted to verify that all interested parties are in agreement with the abandonment. 3. Dedicate 20' PUE over City of Bryan easement instead of 10 feet. Since City of Bryan has first rights, it will give City of College Station room when necessary. 4. City detail shows existing PUE (V1087P817) along boundary with Phase One (Windfree, Tiffany, Windswept) and 60' PUE coinciding with 60' City if Bryan Easement. Please verify. 5. Provide volume and page of all existing easements. 6. Minimum ROW dedication for a public alley is 24ft. A variance will be required. 7. Include entire ROW dedication for Windswept Dr. alley with this plat. 8. Provide easement and pipeline information on existing pipeline, which crosses Bluefield Court and Kingsport Lane. 9. Rename Kingsport Lane to Hunter Creek. 10. According to the preliminary plat approval the floodplain information and BFEs are required on this plat. Floodplain as defined by ordinance being any land susceptible to being inundated by water from any source. 11. Storm section between Inlet 2 and 3 needs to be dedicated with this plat if it is to be public infrastructure, or separate instrument. 12. ROW for alley connecting Windswept Dr. and existing alley needs to be dedicated with this plat 13. Construction document and drainage report comments will follow in the next week, please contact us if you have any questions. Reviewed by: Carol Cotter/Josh Norton Date: April 12, 2005 PLANNING 1. Please provide an updated tax certificate for the 23-acre tract. Taxes were due on it before it was submitted to the City for final plat. 2. Please submit a survey that shows no encroachments will result with the existing residence in the replat. Reviewed by: Molly Hitchcock Date: April 7, 2005 NOTE: Any changes made to the plans, that have not been requested by the City of College Station, must be explained in your next transmittal letter and"bubbled"on your plans.Any additional changes on these plans that have not been pointed out to the City,will constitute a completely new review. Page 2 of 3 ELECTRICAL 1. Developer installs conduit per city specs and design. 2. Developer installs pull boxes, secondary pedestals and transformer pads as per city specs 3. and design.(pull boxes, secondary pedestals and transformer pads provided by the city). 4. Developer provides digital AutoCAD version 2000 of plat and/or site plan. Email 5. tosweidoc cstx.gov 6. Developer provides easements for electric infrastructure as installed for electric lines 7. (including street lights). 8. Developer installs street lights per city specs. 9. CSU will provide design and installation drawings for conduit and street lighting. 10. Offsite easement may be required for access to hwy 6. 11. To discuss any of the above electrical comments, please contact Sam Weido @ 764-6314. Reviewed by: Sam Weido Date: 4-7-05 NOTE: Any changes made to the plans,that have not been requested by the City of College Station, must be explained in your next transmittal letter and"bubbled"on your plans.Any additional changes on these plans that have not been pointed out to the City,will constitute a completely new review. 3 of 3