STORM WATER
POLLUTION PREVENTION PLAN
GENERAL NOTES
FILENAME: GeneralNotes—GenConst—PPP—BCS.dwg
GENERAL PLOTTED: 25 Jul 2004 — 4:40 pm
1. All contractor vehicles, including employee's vehicles, shall park within the
project site to minimize traffic on the public streets adjacent to the work site
entrance. Contractor will provide sufficient parking areas to accommodate his
vehicles. Any areas disturbed or destroyed by vehicular parking will be repaired
to original condition prior to completion of project.
2. Contractors shall ensure that no dirt from the project accumulates in the existing
streets. If dirt or debris from the project site accumulates on adjacent streets, the
contractor shall immediately clean those areas.
3. Contractor shall place erosion control protection at appropriate downstream
locations to minimize silt and debris from leaving the construction site and
entering the drainage system.
4. If required on the plans, the contractor shall maintain a vehicle wash down area
of sufficient size and in a location to facilitate cleaning his vehicles prior to leaving
the work site.
5. Once vegetation is well established contractor is responsible for removing all
temporary erosion control measures (i.e. silt fences, rock check dams, etc.)
6. Structural controls shall be installed as soon after clearing as practical and
maintained in good working order until the site is stabilized.
7. Alternate structural controls may be utilized if approved by Engineer.
8. The contractor shall comply with the TCEQ STORM WATER DISCHARGE PROGRAM and
is responsible for completing and filing the appropriate forms.
9. The contractor is encouraged to utilize the construction entrance at the future Lakeway Dr.
If he utilizes the second construction entrance closest to SH6,the contractor will
be responsible for any damage caused to the curbline or pavement in Greens Prairie Rd
that is a direct result from his equipment or clearing work.
When joining two or more "Silt Stop" Fences tie the
two end posts together with nylon cord.
Wooden or Metal Post,
+ .1 l i Min. 3' Length (1 1/2' exposed) Silt Fence, "Silt Stop"
"$�-- or approved equal
max 10' spacing
t
Min. 24" Overall
+ Ground Line 1
6
-r=; �- ; n
+ Bury toe of Silt Fence
" x 6 Trench
41.
6" below proposed grade— Coprevent trench
I
I
backfill to
.
Ground Line Existing Soil "washout"
l):
Existing Ground
-x-x-x-x- SILT FENCE DETAILS
NTS
Public
Existin50' Min. Right—of—Way
g -
Ground —L
Separation Geotextile 8" Min.
Fabric for Full Width
<7777��
and Length of Exit PROFILE Graded to Prevent Run—Off
from Leaving Site.
Provide Appropriate Transition
Between Stabilized Construction
Entrance and Public Right—of—Way
50' Min.
SVmhnl
Public Right
Existing of Way
Ground Or As, Shown
On Plans
Course Aggregate
PLAN..
STABILIZED CONSTRUCTION EXIT
NTS
FILENAME: construction—exit.dwg
PLOTTED: 14 May 2003 — 2:49 pm
CONSTRUCTION. NOTES:.
1. Length shall be as shown on the construction drawings, but not
less than 50' feet.
2. Thickness shall be not less than 8 inches.
3. Width shall be not less than full width of all points of ingress and
egress.
4: Stabilization for other areas -shall have the same aggregate thickness
and width requirements as the stabilized construction exit, unless
otherwise.. shown. on .the. construction drawings..
5. Stabilized area may be widened or lengthened to accommodate a
truck washing area. An outlet sediment trap must be provided for the
truck washing area.
6. Contractor to submit location of stabilized construction exit for
approval.
os -tea
�-a�-os
L
I
TATE:"
STORM WATER
POLLUTION PREVENTION PLAN
GENERAL NOTES
FILENAME: GeneralNotes—GenConst—PPP—BCS.dwg
GENERAL PLOTTED: 25 Jul 2004 — 4:40 pm
1. All contractor vehicles, including employee's vehicles, shall park within the
project site to minimize traffic on the public streets adjacent to the work site
entrance. Contractor will provide sufficient parking areas to accommodate his
vehicles. Any areas disturbed or destroyed by vehicular parking will be repaired
to original condition prior to completion of project.
2. Contractors shall ensure that no dirt from the project accumulates in the existing
streets. If dirt or debris from the project site accumulates on adjacent streets, the
contractor shall immediately clean those areas.
3. Contractor shall place erosion control protection at appropriate downstream
locations to minimize silt and debris from leaving the construction site and
entering the drainage system.
4. If required on the plans, the contractor shall maintain a vehicle wash down area
of sufficient size and in a location to facilitate cleaning his vehicles prior to leaving
the work site.
5. Once vegetation is well established contractor is responsible for removing all
temporary erosion control measures (i.e. silt fences, rock check dams, etc.)
6. Structural controls shall be installed as soon after clearing as practical and
maintained in good working order until the site is stabilized.
7. Alternate structural controls may be utilized if approved by Engineer.
8. The contractor shall comply with the TCEQ STORM WATER DISCHARGE PROGRAM and
is responsible for completing and filing the appropriate forms.
9. The contractor is encouraged to utilize the construction entrance at the future Lakeway Dr.
If he utilizes the second construction entrance closest to SH6,the contractor will
be responsible for any damage caused to the curbline or pavement in Greens Prairie Rd
that is a direct result from his equipment or clearing work.
When joining two or more "Silt Stop" Fences tie the
two end posts together with nylon cord.
Wooden or Metal Post,
+ .1 l i Min. 3' Length (1 1/2' exposed) Silt Fence, "Silt Stop"
"$�-- or approved equal
max 10' spacing
t
Min. 24" Overall
+ Ground Line 1
6
-r=; �- ; n
+ Bury toe of Silt Fence
" x 6 Trench
41.
6" below proposed grade— Coprevent trench
I
I
backfill to
.
Ground Line Existing Soil "washout"
l):
Existing Ground
-x-x-x-x- SILT FENCE DETAILS
NTS
Public
Existin50' Min. Right—of—Way
g -
Ground —L
Separation Geotextile 8" Min.
Fabric for Full Width
<7777��
and Length of Exit PROFILE Graded to Prevent Run—Off
from Leaving Site.
Provide Appropriate Transition
Between Stabilized Construction
Entrance and Public Right—of—Way
50' Min.
SVmhnl
Public Right
Existing of Way
Ground Or As, Shown
On Plans
Course Aggregate
PLAN..
STABILIZED CONSTRUCTION EXIT
NTS
FILENAME: construction—exit.dwg
PLOTTED: 14 May 2003 — 2:49 pm
CONSTRUCTION. NOTES:.
1. Length shall be as shown on the construction drawings, but not
less than 50' feet.
2. Thickness shall be not less than 8 inches.
3. Width shall be not less than full width of all points of ingress and
egress.
4: Stabilization for other areas -shall have the same aggregate thickness
and width requirements as the stabilized construction exit, unless
otherwise.. shown. on .the. construction drawings..
5. Stabilized area may be widened or lengthened to accommodate a
truck washing area. An outlet sediment trap must be provided for the
truck washing area.
6. Contractor to submit location of stabilized construction exit for
approval.