Loading...
HomeMy WebLinkAboutStaff Comments CITY OF COLLEGE STATION Planning&Development Services 1101 Texas Avenue South, PO Box 9960 College Station, Texas 77842 Phone (979) 764-3570 / Fax (979) 764-3496 MEMORANDUM Date: 01-19-05 TO: Jim Stuckey, State Farm Insurance (Via Fax) 979-693-4686 FROM: Jennifer Reeves, Project Manager SUBJECT: JIM STUCKEY - STATE FARM INSURANCE (SP) - Site Plan Staff reviewed the above-mentioned site plan as requested. The following page is a list of staff review comments detailing items that need to be addressed. Please address the comments and submit the following information for further staff review: One (1) complete set of construction documents for the proposed development with the revised site and landscaping plans attached One (1) Drainage letter/Report. Please note that the Easement Dedication Sheet and the necessary documents are required prior to the issuance of a building permit. If there are comments that you are not addressing with the revised site plan, please attach a letter explaining the details. If you have any questions or need additional information, please call me at 979.764.3570. Attachments: Staff review comments cc: M-M Design - Steve Musser or Bruce Olson (Via Fax) 979-694-7029 Chris Galindo, Engineering &Planning (Via Fax) 979-846-8868 Case file #05-00500002 Home of Texas A&M University STAFF REVIEW COMMENTS NO. 1 Project: JIM STUCKEY - STATE FARM INSURANCE (SP) — 05-00500002 PLANNING ✓1. Please be aware that our site plan applications have been updated and available on the College Station web site since November of 2004. The check list has additional requirements. Please turn the new application and check list with your next Jsubmittal. 2. Please be aware that this development is required to meet Section 7.9 of the UDO Non-Residential Architectural Standards. The Architectural plans will need to be reviewed and approved prior to site plan approval. This particular site will not be required to provide a Traffic Impact Analysis per the requirement in this section J3. A 6-inch curb will be required along the front property line along the access easement, as it is in front of Golden Keys Learning Center. J4. (FYI) All paved areas are required to be curbed. 5. Please note on the site plan that the subject property will comply with Section 7.10 of the UDO Outdoor Lighting Standards. J6. The back of the property has an existing 20-foot public drainage easement. Please delineate this easement on the site plan. 7. Please show location of the nearest fire hydrant. f8. Per the Fire Marshall's Office (Steve Smith) The existing 6-inch curb located at the west end of the shared parking and access easement that is currently painted fire lane will need to be removed. This existing curb will not allow a wide enough access drive coming into or exiting out of the fire lane that runs in front of all of theses lots. LANDSCAPING/STREETSCAPING/BUFFER (.9. Section 7.5 Landscape and Tree protection C.4 states: Every project must expend a minimum of 50% of its point total on canopy trees. Since the subject property falls within the minimum 800-point requirement you will only need to provide 250 more points with canopy trees. Ji 0. Please be aware that the shrubs in the required buffer area are required to be at least 3-feet in height at planting stage. Reviewed by: Jennifer Reeves Date: 01-13-05 ENGINEERING 1. Sealed drainage letter/report from Engineer is required to indicate storm water impact. 2. How will grading plan work with landscaping and with the sidewalk around to back of building? 3. You will need to make sure that the flow line of drainage swale at the back of the property aligns with the downstream property. Reviewed by: Carol Cotter Date: January 19, 2005 NOTE: Any changes made to the plans,that have not been requested by the City of College Station, must be explained in your next transmittal letter and"bubbled"on your plans.Any additional changes on these plans that have not been pointed out to the City,will constitute a completely new review. Page 2 of 3 • ELECTRICAL 1. Developer/ Builder installs conduit per city specs and design. 4. Developer provides digital AutoCAD 2000 version of plat and/or site plan email to tmichals(cf�cstx.gov (1 — 4 inch PVC conduit from transformer to building.) 5. Developer provides load data for project. 6. Electric Service Voltage available at site is 208/120 volt 3 phase. 7. Electric conduit will have to be extended from existing pad-mount transformer in from of Golden Keys Day Care. (Coordinate conduit extension with College Station Utilities). 8. College Station Utilities will provide an electric design plan to the developer/ builder for the installation of conduit. 9. To discuss any of the above electrical comments, please contact Tony Michalsky at 979.764.3438. Reviewed by: Tony Michalsky Date: 1-12-05 MISCELLANEOUS 1. Irrigation system must be protected by either a Pressure Vacuum Breaker, a Reduced Pressure Principle Back Flow Device, or a Double-Check Back Flow Device, and installed as per City Ordinance 2394. 2. All BackFlow devices must be installed and tested upon installation as per City Ordinance 2394. NOTE: Any changes made to the plans,that have not been requested by the City of College Station, must be explained in your next transmittal letter and"bubbled"on your plans.Any additional changes on these plans that have not been pointed out to the City,will constitute a completely new review. Page 3 of 3 (1fri. IVI CITY OF COLLEGE STATION Planning e-Development Services 1101 Texas Avenue South, PO Box 9960 College Station, Texas 77842 Phone (979) 764-3570 / Fax (979) 764-3496 MEMORANDUM February 4, 2005 TO: Jim Stuckey, State Farm Insurance (Via Fax) 979-693-4686 FROM: Bridgette George, Assistant Development Manager SUBJECT: JIM STUCKEY - STATE FARM INSURANCE (SP) - Site Plan Staff reviewed the above-mentioned site plan as requested. The following page is a list of staff review comments detailing items that need to be addressed. The next submittal will be the third and final review by staff for this round of reviews. If all items have not been addressed on the next submittal, another $200 processing fee will need to be submitted for the subsequent set of three (3) reviews. Please address the comments and submit the following information for further staff review: One (1) complete set of construction documents for the proposed development with the revised site and landscaping plans attached. If there are comments that you are not addressing with the revised site plan, please attach a letter explaining the details. If you have any questions or need additional information, please call Jennifer Reeves or Carol Cotter at 764-3570. Attachments: Staff review comments cc: M-M Design - Steve Musser or Bruce Olson (Via Fax) 979-694-7029 Chris Galindo, Engineering &Planning (Via Fax) 979-846-8868 Case file #05-00500002 Home of Texas A&M University STAFF REVIEW COMMENTS NO. 2 Project: JIM STUCKEY - STATE FARM INSURANCE (SP) - 05-00500002 PLANNING 1. As previously stated in the first review of comments: Section 7.5 Landscape and Tree protection C.4 states: Every project must expend a minimum of 50% of its point total on canopy trees. Since the subject property falls within the minimum 800-point requirement you will only need to provide 250 more points with canopy trees. It appears that you are 100 points short of meeting the 50% of canopy tree points. The subject property is small and is encumbered by mostly building and sidewalk. The addition of canopy trees in the required buffer area can count toward the required point calculation for the site. 2. A photo of the existing State Farm attached sign was submitted. The signage is not part of the Non-Residential requirements so the colors and materials are fine. A sign permit will need to be submitted separately for review and approval. (FYI) The allowable area for attached signs on a building is determined by two and half times the linear foot of frontage of the building facade. It appears from the architectural drawings that were submitted that the proposed building would be allowed approximately 112 square feet of attached signage. Please let me know if I can assist you when you get ready to submit for the sign permit. The sign permit application can be down loaded off of the city's web site at www.cstx.gov. Reviewed by: Jennifer Reeves Date: 02-01-05 ENGINEERING 1. Grading Plan is considered part of the Site Plan and needs to be submitted with it. Were there any revisions to the grading plan? 2. Please address previous comment - How will grading plan work with the sidewalk around to back of building? 3. Please address previous comment - You will need to make sure that the flow line of drainage swale at the back of the property aligns with the downstream property. Reviewed by: Carol Cotter Date: February 4, 2005 NOTE: Any changes made to the plans, that have not been requested by the City of College Station, must be explained in your next transmittal letter and "bubbled" on your plans. Any additional changes on these plans that have not been pointed out to the City,will constitute a completely new review. 2 of 3