Loading...
HomeMy WebLinkAboutStaff Comments(*Or" CITY OF COLLEGE STATION Planning d Development Services 1101 Texas Avenue, P.O. Box 9960 College Station, Texas 77842 Phone 979.764.3570 / Fax 979.764.3496 MEMORANDUM October 13, 2005 TO: Shawn Turner, 9304 Whitney Lane, College Station 77845 FROM: Molly Hitchcock, Staff Planner SUBJECT: CHADWICK ESTATES HOA (PIP)- Site Plan Staff reviewed the above-mentioned site plan as requested. The following page is a list of staff review comments detailing items that need to be addressed. Please address the comments and submit the following information for further staff review: Completed application Four (4) revised facility layout plans Sealed irrigation/plumbing plan (if applicable) Electrical plan (if applicable) Indemnity agreement from abutting fee owners and Cash or surety bond. Please note that the necessary documents are required prior to the issuance of a building permit. If there are comments that you are not addressing with the revised site plan, please attach a letter explaining the details. If you have any questions or need additional information, please call me or Alan Gibbs at 979.764.3570. Attachments: Staff review comments cc: Chadwick Homeowner's Association, c/o Garland Mcllvern, P.O. Box 11104, College Station, TX 77842 Case file #05-00500169 Home of Texas A&M University STAFF REVIEW COMMENTS NO. 1 Project: CHADWICK ESTATES HOA (PIP) – 05-00500169 PLANNING 1. The "Type of Work" section of the application has not been completed. 2. The landscaping will have to maintained by the HOA once planted. Please describe how the plantings will be irrigated. 3. If the sign will be lit, an electrical plan is needed. 4. Please provide more details regarding the neighborhood plaque. 5. FYI: All signage will require a building permit after the PIP is approved. 6. An indemnity agreement is needed. Please see the attached. 7. In the recent Legal review of our PIP ordinance, it has been determined that cash or a surety bond in a sum sufficient to cover the costs of removal of the facilities or improvements by the City or any public utility upon terms and in an amount approved by the City Engineer is needed for a complete application—that Staff does not have the ability to waive this requirement. Reviewed by: Molly Hitchcock Date: October 3, 2005 14.1cIIi•l011i1ucj 1. FYI, Please be aware that all improvements within Rights -of -Way or Public Utility Easements maybe removed by the City without replacement. So, it may be advisable to relocate the brick columns outside the ROW. Reviewed by: Alan Gibbs Date: October 13, 2005 NOTE: Any changes made to the plans, that have not been requested by the City of College Station, must be explained in your next transmittal letter and "bubbled" on your plans. Any additional changes on these plans that have not been pointed out to the City, will constitute a completely new review. Page 2 of 4 (*t/q" CITY OF COLLEGE STATION Planning & Development Services 1101 Texas Avenue, P.O. Box 9960 College Station, Texas 77842 Phone 979.764.3570 / Fax 979.764.3496 October 13, 2005 TO: Shawn Turner, 9304 Whitney Lane, College Station 77845 FROM: Molly Hitchcock, Staff Planner SUBJECT: CHADWICK ESTATES HOA (PIP)- Site Plan Staff reviewed the above-mentioned site plan as requested. The following page is a list of staff review comments detailing items that need to be addressed. Please address the comments and submit the following information for further staff review: Completed application Four (4) revised facility layout plans Sealed irrigation/plumbing plan (if applicable) Electrical plan (if applicable) Indemnity agreement from abutting fee owners and Cash or surety bond. Please note that the necessary documents are required prior to the issuance of a building permit. If there are comments that you are not addressing with the revised site plan, please attach a letter explaining the details. If you have any questions or need additional information, please call me or Alan Gibbs at 979.764.3570. Attachments: Staff review comments cc: Chadwick Homeowner's Association, c/o Garland Mcllvern, P.O. Box 11104, College Station, TX 77842 Case file #05-00500169 Home of Texas A&M University STAFF REVIEW COMMENTS NO. 1 Project: CHADWICK ESTATES HOA (PIP) – 05-00500169 PLANNING 1. The "Type of Work" section of the application has not been completed. 2. The landscaping will have to maintained by the HOA once planted. Please describe how the plantings will be irrigated. 3. If the sign will be lit, an electrical plan is needed. 4. Please provide more details regarding the neighborhood plaque. 5. FYI: All signage will require a building permit after the PIP is approved. 6. An indemnity agreement is needed. Please see the attached. 7. In the recent Legal review of our PIP ordinance, it has been determined that cash or a surety bond in a sum sufficient to cover the costs of removal of the facilities or improvements by the City or any public utility upon terms and in an amount approved by the City Engineer is needed for a complete application—that Staff does not have the ability to waive this requirement. Reviewed by: ENGINEERING Molly Hitchcock Date: October 3, 2005 1. FYI, Please be aware that all improvements within Rights -of -Way or Public Utility Easements maybe removed by the City without replacement. So, it may be advisable to relocate the brick columns outside the ROW. Reviewed by: Alan Gibbs Date: October 13, 2005 NOTE: Any changes made to the plans, that have not been requested by the City of College Station, must be explained in your next transmittal letter and "bubbled" on your plans. Any additional changes on these plans that have not been pointed out to the City, will constitute a completely new review. Page 2 of 4