HomeMy WebLinkAboutStaff Comments CITY OF COLLEGE STATION
Planning 6-Development Services
1101 Texas Avenue, P.O. Box 9960
College Station, Texas 77842
Phone 979.764.3570 / Fax 979.764.3496
MEMORANDUM
September 16, 2005
TO: Steve Arden, Edelweiss Gartens Venture, Via fax 846.0652
FROM: Bridgette George, Development Coordinator
SUBJECT: EDELWEISS GARTENS PH 9 (FP)
Staff reviewed the above-mentioned engineering documents as requested. The
following page is a list of staff review comments detailing items that need to be
addressed. Please address the comments and submit the following information for
further staff review and approval of the plans:
One (1) sets of revised construction documents.
If you have any questions or need additional information, please call Josh Norton or
myself at 764.3570.
Attachments: Staff Review Comments
Cc: McClure & Browne Engineering/Surveying, Inc., via fax 693.2554 ✓
Case file no. 05-00500157
Home of Texas A&M University
EDELWEISS GARTENS PH 9 (FP) (05-00500157)
Engineering Review
Comments No. 1
1. (Sheet 4) Will hand rails be needed at the open ditch crossing at Sta. 55+50?
2. (Sheet 4) In profile at Sta. 59+50 the inlet number is labeled incorrectly.
3. (Sheet 10) Sanitary sewer line must terminate in a manhole as there is more
than 4' of cover.
4. FYI - (Sheet 9) In profile at Sta. 115+90 should this note read " 10" D-2241
Casing ".
5. FYI - (Sheet 10) In profile at Sta. 126+60 should this note read " 10" D-2241
Casing " as on Sheet C9.
6. (Sheet 13) Move service connection (3) to the main outside of pavement.
7. (Sheet 13 & 14) Water valves are required every 800'.
8. (Sheet 14) Move service connection (21) & (22) to the main outside of pavement.
9. Please submit the updated cost estimate for this phase.
10. Does the NOI that was filled for previous phases cover this phase?
Reviewed by: Josh Norton Date: 9/16/05
NOTE: Any changes made to the plans, that have not been requested by the City of College Station, must be
explained in your next transmittal letter and "bubbled"on your plans. Any additional changes on these plans
that have not been pointed out to the City of College Station will constitute a completely new review.
Page 2 of 2