Loading...
HomeMy WebLinkAboutCost Estimate .iiaterwood Townhomes Phase b Engineer's Estimate Public Infrastructure Only General ._._. 1 Mobilization LS 1 $10,000 $10,000 Water 2 6"PVC AWWA C909 CL200 Water Line with Structural Backfill LF 920 $30 $27,600 3 3"PVC ASTM D2241-CL200 LF 39 $15 $585 4 6"x 45 MJ Bend EA 6 $350 $2,100 5 6"x 90 MJ Elbow EA 1 $350 $350 6 6"x 6"MJ Tee EA 7 $600 $4,200 7 6"MJ Gate Valve&Box EA 6 $800 $4,800 8 Connect to Existing System EA 2 $2,000 $4,000 9 Standard Fire Hydrant Assembly EA 2 $3,000 $6,000 10 Trench Safety LF 920 $4 $3,680 Contingency 15% $9,497 General Total $10,000 Water Total $53,315 Grand Total $72,812 jostroloANWAv of# . _.4 L . 4( 1// i VERONICA J.B.MORGAN i -o`: 77689 •/ i _ Ili 9FG/STEP�21F 612,1(0S 11 '5/ONA1-� , ir `,l