MEMORANDUM
August 29, 2005
TO: Rabon Metcalf, P.E. via fax to 979-690-0329
FROM: Trey Fletcher, Project Manager
SUBJECT: KM Custom Homes Office Building-Site Plan
Staff reviewed the above-mentioned site plan as requested. The following page is a Nst of
staff review comments detailing items that need to be addressed. Please address the
comments and submit the following information for further staff review:
17 One(1) revised site and landscaping plan.
If there are comments that you are not addressing with the revised site plan, please attach a
letter explaining the details. If you have any questions or need additional information, please
call me at 979.764.3570.
Attachments: Staff review comments
cc: Baker&Carnes Investments, LLC • 230 Southwest Parkway East, Suite 106, College
Station, TX 77840
Kenny Melesky, KM Custom Homes via fax to 979-846-5589
Case fie 105-00500147
STAFF REVIEW COMMENTS NO I
Project: KM CUSTOM HOMES-OFFICE BLDG (SP)—05-00500147
/PLANNING
,/North side setback shows 7.5' but building separation only 12'.
142(Discrepancies exist among the replat (2001), proposed site plan and previously approved
site plan for TC Homes regarding location of interior lot lines and dimensions.
v, Site plan shows 7.5-foot rear building setback; 15 feet is required.
' 4(Provide bike rack capable of storing a minimum of four(4) bicycles per Section 7.9.F.
Parting requirements: 9 spaces are required for each lot for a total of 27 required spaces.
This was also indicated on the previously approved, phased site plan in 2002.
. . _ •,. . i e ,o a •, •
(,3ll vide building nktene ncicolor samPts and binding elevations in conjunction with site
plan or prior to building permit approval to fulfill Section 7.9 of the UDO.
Reviewed by: Trey Fletcher Date: 8-26-2005
LANiDSCAPING/STREETSCAPING/BUFFER
0/To receive barricaded points for existing trees they must be barricaded one foot per caliper
inch. A barricade detail must be provided. Barricades must be in place prior to any activity
on the property.
Reviewed by: Trey Fletcher Date: 8-26-2005
ENGINEERING
1. Engineering is still reviewing the site plan and reports. Comments will be return in the
next week.
Reviewed by: Josh Norton Date: 8-29-05
FIRE
1.
Reviewed by: Date:
ELECTRICAL
1. Developer installs conduit per city specs and design.
2. Developer provides digital AutoCAD 2000 or later version of plat and/or site plan email to
gmartinezecstx.aov
NOTE: Any climes made to the plans,that have not been requested by the City of College Station,must be explained in your next
transmitbd letter and'bubbled'on ver dans.Any additional changes on these plans that have not been palmed out to the CIV.
3. Developer provides bad data for project.
4. Developer provides temporary blanket easement for construction purposes.
5. Developer provides easements for electric infrastructure as installed for electric lines.
6. Developer will intercept existing PVC conduit at secondary pedestal and extend to
building service location.
7. Service wire furnished and installed by CSU
8. To discuss any of the above electrical comments, please contact Gilbert Martinez at
979.764.6255.
Reviewed by: Gilbert Martinez Date: 08-23-05
MISCELLANEOUS
1. Irrigation system must be protected by a Pressure Vacuum Breaker, a Reduced Pressure
Principle Back Flow Device, or a Double-Check Back Flow Device, and installed as per City
Ordinance 2394.
2. All BackFlow devices must be installed and tested upon installation as per City Ordinance
2394.
NOTE: Any changes made to the plans,that have not been requested by the City of CoNege Station,must be explained in your next
transmittal letter and"bubbled'on your plans.Any additional changes on these plans that have not been pointed out to the City.
Grffil"
CITY OF COLLEGE STATION
Planning eir Development Services
1101 Texas Avenue, P.O. Box 9960
College Station, Texas 77842
Phone 979.764.3570 / Fax 979.764.3496
MEMORANDUM
August 29, 2005
TO: Rabon Metcalf, P.E. via fax to 979-690-0329
FROM: Trey Fletcher, Project Manager
SUBJECT: KM Custom Homes Office Building - Site Plan
Staff reviewed the above-mentioned site plan as requested. The following page is a list of staff
review comments detailing items that need to be addressed. Please address the comments
and submit the following information for further staff review:
One (1) revised site and landscaping plan.
If there are comments that you are not addressing with the revised site plan, please attach a
letter explaining the details. If you have any questions or need additional information, please
call me at 979.764.3570.
Attachments: Staff review comments
cc: Baker& Carnes Investments, LLC • 230 Southwest Parkway East, Suite 106, College
Station, TX 77840
Kenny Melesky, KM Custom Homes via fax to 979-846-5589
Case file #05-00500147
Home of Texas A&M University
STAFF REVIEW COMMENTS NO. 1
Project: KMtUSTOM HOMES -OFFICE BLDG (SP) —05-00500147
( . v.fir
-�'`� PLANNING "'
1 � �
1. North side setback shows 7.5' but building separation only 12'.
2. Discrepancies exist among the replat (2001), proposed site plan and previously approved
site plan for TC Homes regarding location of interior lot lines and dimensions.
3. Site plan shows 7.5-foot rear building setback; 15 feet is required.
4. Provide bike rack capable of storing a minimum of four (4) bicycles per Section 7.9.F.
5. Parking requirements: 9 spaces are required for each lot for a total of 27 required spaces.
This was also indicated on the previously approved, phased site plan in 2002.
Qfr ,. In reference to Civil Site Note No. 6, show dumpster location and screening.
7. Provide building material and color samples and building elevations in conjunction with site
plan or prior to building permit approval to fulfill Section 7.9 of the UDO.
Reviewed by: Trey Fletcher Date: 8-26-2005
LANDSCAPING/STREETSCAPING/BUFFER
1. To receive barricaded points for existing trees they must be barricaded one foot per caliper
inch. A barricade detail must be provided. Barricades must be in place prior to any activity
on the property.
Reviewed by: Trey Fletcher Date: 8-26-2005
ENGINEERING
1. Engineering is still reviewing the site plan and reports. Comments will be return in the
next week.
Reviewed by: Josh Norton Date: 8-29-2005
FIRE
1. Repaint Fire Lane in private street.
Reviewed by: Jerry Duffey Date: 8-29-2005
ELECTRICAL
1. Developer installs conduit per city specs and design.
2. Developer provides digital AutoCAD 2000 or later version of plat and/or site plan email to
gmartinez@cstx.gov
3. Developer provides load data for project.
NOTE: Any changes made to the plans, that have not been requested by the City of College Station, must be explained in your
next transmittal letter and"bubbled"on your plans.Any additional changes on these plans that have not been pointed out
to the City,will constitute a completely new review.
Page 2 of 3
4. Developer provides temporary blanket easement for construction purposes.
5. Developer provides easements for electric infrastructure as installed for electric lines.
6. Developer will intercept existing PVC conduit at secondary pedestal and extend to building
service location.
7. Service wire furnished and installed by CSU
8. To discuss any of the above electrical comments, please contact Gilbert Martinez at
979.764.6255.
Reviewed by: Gilbert Martinez Date: 08-23-2005
MISCELLANEOUS
1. Irrigation system must be protected by a Pressure Vacuum Breaker, a Reduced Pressure
Principle Back Flow Device, or a Double-Check Back Flow Device, and installed as per City
Ordinance 2394.
2. All BackFlow devices must be installed and tested upon installation as per City Ordinance
2394.
NOTE: Any changes made to the plans, that have not been requested by the City of College Station, must be explained in your
next transmittal letter and"bubbled"on your plans.Any additional changes on these plans that have not been pointed out
to the City,will constitute a completely new review.
Page 3 of 3
Ckff'
CITY OF COLLEGE STATION
Planning e Development Services
1101 Texas Avenue, P.O. Box 9960
College Station, Texas 77842
Phone 979.764.3570 / Fax 979.764.3496
MEMORANDUM
September 2, 2005
TO: Rabon Metcalf, RME, Via fax 690.0329 (/
FROM: Bridgette George, Development Coordinator
SUBJECT: KM CUSTOM HOMES -OFFICE BLDG (SP)
Staff reviewed the above-mentioned engineering documents as requested. The
following page is a list of staff review comments detailing items that need to be
addressed. Please address the comments and submit the following information for
further staff review and approval of the plans:
One (1) set of revised construction documents
Two (2) revised drainage reports.
If you have any questions or need additional information, please call Josh Norton or
myself at 764.3570.
Attachments: Staff Review Comments
Cc: Baker & Carnes, Interest, Inc., via fax 693.7839 I/
Case file no. 05-00500147
Home of Texas A&M University
KM CUSTOM HOMES -OFFICE BLDG (SP) (05-00500147)
Engineering Review
Comments No. 1
1. Please submit a report explaining the functionality of the proposed water meter
and 2" water line being tapped off the existing service line. Also, explain the
feasibility of placing the water meter for Lot 3C.
2. Please submit a report explaining the functionality of the proposed sewer line
being tapped off the existing service line.
3. Please use SDR26-ASTM D3034 for the sanitary sewer pipe material, not SCH
40.
4. Drainage Report:
a. Update Table #1
b. Describe what the runoff is doing on this property, where it is going and
how much
c. Provide post development calcs
Reviewed by: Josh Norton Date: 9-1-05
NOTE: Any changes made to the plans, that have not been requested by the City of College Station, must be
explained in your next transmittal letter and "bubbled" on your plans. Any additional changes on these plans
that have not been pointed out to the City of College Station will constitute a completely new review.
Page 2 of 2
CITY OF COLLEGE STATION
Planning&Development Services
1101 Texas Avenue, P.O. Box 9960
College Station, Texas 77842
Phone 979.764.3570 / Fax 979.764.3496
MEMORANDUM
September 9, 2005
TO: Rabon Metcalf, P.E. via fax to 979-690-0329
FROM: Trey Fletcher, Project Manager
SUBJECT: KM CUSTOM HOMES - OFFICE BLDG (SP) - Site Plan
Staff reviewed the above-mentioned site plan as requested. The following page is a list of staff
review comments detailing items that need to be addressed. The next submittal will be the third
and final review by staff for this round of reviews. If all items have not been addressed on the
next submittal, another $200 processing fee will need to be submitted for the subsequent set of
three (3) reviews. Please address the comments and submit the following information for
further staff review:
Six (6) complete sets of construction documents for the proposed development
with the revised site and landscaping plans attached (please submit additional
copies to be stamped for your records).
If there are comments that you are not addressing with the revised site plan, please attach a
letter explaining the details. If you have any questions or need additional information, please
call me at 764-3570.
Attachments: Staff review comments
cc: Baker& Carnes Investments, LLC • 230 Southwest Parkway East, Suite 106, College
Station, TX 77840
Kenny Melesky, KM Custom Homes via fax to 979-846-5589
Case file#05-00500147
Home of Texas A&M University
STAFF REVIEW COMMENTS NO. 2
Project: KM CUSTOM HOMES -OFFICE BLDG (SP) - 05-00500147
PLANNING
1. Amend parking requirements table to reflect true parking requirements, being 9 per lot,
based on existing, proposed and maximum allowed square footages for Lots 3A, 3B and 3C
respectively.
2. Regarding the following comments (#3 and #4), per Section 7.9.D of the UDO, all buildings
developed as a building plot shall have materials and colors that are similar and
complement each other architecturally...All buildings shall employ architectural, site, and
landscape design elements that are integrated with and common to those used on the
main/primary buildings or structures on the site. These common design elements shall
include building materials associated with the main/primary structure.
3. Elevations submitted denote materials used, provide samples.
4. Provide color sample for doors, eaves, vents and other painted surfaces.
Reviewed by: Trey Fletcher Date: 9-9-2005
ENGINEERING
1. No comments.
Reviewed by: Josh Norton Date: 9-8-2005
NOTE: Any changes made to the plans, that have not been requested by the City of College Station, must be explained in your
next transmittal letter and"bubbled"on your plans.Any additional changes on these plans that have not been pointed out
to the City,will constitute a completely new review. 2 of 2