Loading...
HomeMy WebLinkAboutStaff Comments CITY OF COLLEGE STATION Planning ea Development Services 1101 Texas Avenue, P.O. Box 9960 College Station, Texas 77842 Phone 979.764.3570 / Fax 979.764.3496 MEMORANDUM August 23 TO: Joe Courtney Homes, Inc., via fax 774.0153 FROM: Bridgette George, Development Coordinator SUBJECT: RICHARDS SUBDIVISION HAMPTON ESTATES (FP - Final Plat Staff reviewed the above-mentioned final plat as requested. The following page is a list of staff review comments detailing items that need to be addressed. If all comments have been addressed and the following information submitted by Monday, August 29, 10:00 a.m., your project will be placed on the next available Planning and Zoning Commission meeting scheduled for, September 15, 2005, 7:00 p.m. in the City Hall Council Chambers, 1101 Texas Avenue. Two (2) 24"x36" copies of the revised final plat; Twelve (12) 11"x17" copies of the revised final plat; Parkland Dedication in the amount of $4,448 must be submitted prior to the filing of the final plat; One (1) Mylar original of the revised final plat; and One (1) copy of the digital file of the final plat on diskette or e-mail to nmanhart@cstx.gov Upon receipt of the required documents for the Planning & Zoning meeting, your project will be considered formally filed with the City of College Station. Please note that if all comments have not been addressed your project will not be scheduled for a Planning & Zoning Commission meeting. Your project may be placed on a future agenda once all the revisions have been made and the appropriate fees paid. If you have any questions or need additional information, please call or myself at 979.764.3570. Attachments: Staff review comments cc: Glenda Hampton, 1311 Baseline Rd, #2149, Temple, AZ, 85283 ✓ Galindo Engineers and Planning, Inc., via fax 846.8868 Case file #05-00500145 Home of Texas A8&M University STAFF REVIEW COMMENTS NO. 1 Project: RICHARDS SUBDIVISION HAMPTON ESTATES (FP - 05-00500145) ENGINEERING 1. Please use certificate language provided in the current Appendix of the Subdivision Regulations for all certificates. 2. Provide name and address of owner of record in the title block. 3. Please add a 10' PUE to the rear of the proposed 8 lots as per Tony Michalsky. Reviewed by: Lindsay Boyer/Josh Norton Date: August 22, 2005 ELECTRICAL 1. Developer installs conduit per city specs and design. 2. Developer provides 30' of#4 rigid conduit for riser poles. Developer installs first 10'. City installs remainder. 3. Developer pours transformer pad(s) per city specs and design. 4. Developer installs pull boxes as per city specs and design.(pull boxes provided by the city). 5. Developer provides digital AutoCAD 14 version of plat and/or site plan email to gmartinezcstx.gov. / sweido@cstx.gov. / tmichals@cstx.gov. 6. Developer provides load data for project. 7. Developer provides temporary blanket easement for construction purposes. 8. Developer provides easements for electric infrastructure as installed for electric lines (including stre979.764.6314et lights). 9. To discuss any of the above electrical comments, please contact Gilbert Martinez at 979.764.6255. / Sam Weido at 979.764.6314. /Tony Michalsky at 979.764.3438. Reviewed by: Sam Weido/ Gilbert Martinez/Tony Michalsky Date: NOTE: Any changes made to the plans, that have not been requested by the City of College Station, must be explained in your next transmittal letter and"bubbled"on your plans.Any additional changes on these plans that have not been pointed out to the City,will constitute a completely new review. Page 2 of 2