1.0 INTRODUCTION & DESCRIPTION
The purpose of this report is to provide a description of the proposed waterlines to be
constructed with Spring Creek Gardens Subdivision, Phase 2 and Spring Creek
Townhomes Subdivision, Phase IB, and to provide the results of the analysis of the
waterlines under fire flow conditions. The proposed waterline to supply this site will
connect to the existing 8" lines constructed with Spring Creek Gardens, Phase 1 and Spring
Creek Townhomes, Phase 1. The water main will be constructed using 6" and 8" diameter
pipe, which will be constructed of DR-14, PVC pipe meeting the requirements of AWWA
C-909 with mechanical joint fittings
2.0 FIRE FLOW REQUIREMENTS
The flow required for fire hydrant flow for the subdivision is 1,000 gallons per minute
(gpm), for each fire hydrant proposed for this subdivision.
3.0 WATERLINE SYSTEM ANALYSIS
The waterline system was analyzed using the WaterCAD computer program developed by
Haestad Methods, Inc. Exhibit"A" is a schematic of the proposed waterline, which shows
the locations of the fire hydrant. A normal domestic use flow of 1.5 gpm was included in
the analysis for each residential lot and the future townhome lots. This results in a normal
demand of 108 gpm, which was included in the analysis. The residual pressures in the
existing 12" waterline was based on a flow of 1,500 gpm for the existing line. Exhibit"B"
has the results of a pressure/flow test from a fire hydrant connected to the existing 12"
waterline on Decatur Drive. A static pressure of 104 psi and a residual pressure of 102 psi
with the hydrant flow at 1,500 gpm were determined by City of College Station Public
Utility personnel for the fire hydrant nearest this project. The proposed waterline will also
connect to the existing 8" line in Phase 1 of the Spring Creek Townhomes. This line
connects to a 12" line on Arrington Road. To simplify the analysis, it was assumed the
proposed line is supplied only from Phase 1 of Spring Creek Gardens.
A conservative approach was taken and an assumed residual pressure of 70 psi at a flow of
1,000 gpm was used for this analysis instead of the 100+psi value determined by the flow
test.
The computer model was run with a fire flow of 1,000 gpm at each fire hydrant proposed
for this project. Exhibit"C" is a summary of the pipe system junction nodes with a fire
flow of 1,000 gpm from Fire Hydrant No. 2. The lowest residual pressure occurred in the
system at Junction J-13, which is at the connection to the existing 8" waterline in Phase 1 of
the Spring Creek Townhomes. The pressure at this point is estimated by the model to be
62.6 psi, which exceeds the minimum of 20 psi required by the TCEQ regulations.
Exhibits "D" & "E" are summaries of the pipe sections for the system under this demand
scenario. The maximum velocity for the 8" water main is 7.1 feet per second, and occurs in
Pipe P-1.
A separate analysis was run for the domestic use of 1.5 gpm per unit. The minimum
pressure for this scenario, 69.2 psi at Junction .1-3 as shown on Exhibit"F." is well above
the minimum requirement of 35 psi. Minor losses in this system were not calculated, as
they were assumed to be insignificant.
4.0 CONCLUSIONS
The waterlines proposed for this development should adequately provide the fire flow
required with acceptable values for headloss and velocity. This analysis was done assuming
adequate residual pressure in the existing 12" water main, as determined by the
pressure/flow test. Also, the connection of the proposed lines to the existing line in the
townhomes to form a loop was not included in this analysis.
Exhibits
Scenario: Base
J-1 1
•
\, A
0 J-8
J-7
FN
.16
Q"
J-9
Q" o
J-12
J-2 J-10..}} ff�
J-6
J-13
1�
LI Ae.
J-5
Qy
J-1
-4
L1 r.t
; ;-t- `'PI
I, I.:.I 1 :., 1 i t ,. 6. nlr.i i,; 1'..• .�.I I iif:i it�.�. ,I u,. FriniIt:
:I.r nt•I;it i.i,1111, tt,i 1
11/18/2004 16:22 FAX 979 764 3452 COLLEGE STATION PUB.UTL. 1001
ofCollege Station Utilities
Reliable,Affordable, Community Owned
1601 GRAHAM ROAD
COLLEGE STATION TEXAS 77845
Date: 18 NOVEMBER 2004
Number pages including cover sheet- 1
Fax to: 764-7759
Attention: JOE SCHULTZ
Company: TEXCON
From: Butch Willis Water Wastewater Division
Phone: 979-764-3435 Fax: 979-764-3452
FLOW TEST REPORT
Nozzle size: 2.5 inch
Location: ALEXANDRIA AT DECATUR
Flow hydrant number: R-048
Pitot reading: 80
(GPM): 1500
Static hydrant number: R-046
Static PSI: 104
Residual PSI: 102
E41\,.61f „B
Scenario: Base
Steady State Analysis
Junction Report
Label Elevation Zone Type Base Flow Pattern Demand Calculated Pressure
(ft) (gpm) ,Calculatedhiydraulic Grade (psi)
(gpm) (ft)
J-1 282.00 Zone Demand 0.00 Fixed 0.00 436.73 66.95
J-2 278.00 Zone Demand 12.00 Fixed 12.00 428.55 65.14
J-3 284.00 Zone Demand 9.00 Fixed 9.00 441.03 67.94
J-4 282.50 Zone Demand 9.00 Fixed 9.00 438.15 67.34
J-5 281.00 Zone Demand 9.00 Fixed 9.00 434.74 66.52
J-6 279.00 Zone Demand 9.00 Fixed 9.00 431.23 65.86
J-7 272.00 Zone Demand 0.00 Fixed 0.00 424.37 65.92
J-8 272.00 Zone Demand 0.00 Fixed 0.00 424.20 65.85
J-9 270.00 Zone Demand 0.00 Fixed 0.00 420.43 65.08
J-10 270.00 Zone Demand 1,000.00 Fixed 1,000.00 419.77 64.80
J-11 274.00 Zone Demand 10.00 Fixed 10.00 424.20 64.98
J-12 269.00 Zone Demand 30.00 Fixed 30.00 420.42 65.51
J-13 275.00 Zone Demand 20.00 Fixed 20.00 419.77 62.63
1_ t( tI
II< : 1:_II -, '.>I,fn., nb ', I ',I '. ,,.IiI IIJIIn. . , riif�,
Scenario: Base
Steady State Analysis
Pipe Report
Label Length Diameter Material Hazen- Check Minor Control Discharg®Ipstream Structdwnstream Structui@ressure Headloss
(ft) (in) Williams Valve? Loss Status (gpm) Hydraulic Grade Hydraulic Grade Pipe Gradient
C Coefficien (ft) (ft) Headloss(ft/1000f1)
(ft)
P-1 175.00 8.0 PVC 150.0 false 0.00 Open 1,108.00 444.00 441.03 2.97 16.94
P-3 173.00 8.0 PVC 150.0 false 0.00 Open 1,099.00 441.03 438.15 2.89 16.69
P-4 86.00 8.0 PVC 150.0 false 0.00 Open 1,090.00 438.15 436.73 1.41 16.44
P-5 121.00 8.0 PVC 150.0 false 0.00 Open 1,090.00 436.73 434.74 1.99 16.44
P-6 217.00 8.0 PVC 150.0 false 0.00 Open 1,081.00 434.74 431.23 3.51 16.19
P-7 168.00 8.0 PVC 150.0 false 0.00 Open 1,072.00 431.23 428.55 2.68 15.94
P-8 268.00 8.0 PVC 150.0 false 0.00 Open 1,060.00 428.55 424.37 4.18 15.61
P-9 11.00 8.0 PVC 150.0 false 0.00 Open 1,060.00 424.37 424.20 0.17 15.61
P-10 246.00 8.0 PVC 150.0 false 0.00 Open 1,050.00 424.20 420.43 3.77 15.34
P-11 45.00 8.0 PVC 150.0 false 0.00 Open 1,020.00 420.43 419.77 0.65 14.54
P-12 177.00 8.0 PVC 150.0 false 0.00 Open 10.00 424.20 424.20 0.00 0.00
P-13 84.00 6.0 PVC 150.0 false 0.00 Open 30.00 420.43 420.42 0.01 0.09
P-14 215.00 8.0 PVC 150.0 false 0.00 Open 20.00 419.77 419.77 0.00 0.01
tt i
.
Analysis Results
Scenario: Base
Steady State Analysis
Pressure Pipes @ 0.00 hr
Label Control Discharge Velocity Upstream Structure Downstream Structure Calculated Calculated Pressure Headloss
Status (gpm) (ft/s) Hydraulic Grade Hydraulic Grade Friction Minor Pipe Gradient
(ft) (ft) Headloss Headloss Headloss (ft/1000ft)
(ft) (ft) (ft)
P-1 Open 1,108.00 7.07 444.00 441.03 2.97 0.00 2.97 16.94
P-3 Open 1,099.00 7.01 441.03 438.15 2.89 0.00 2.89 16.69
P-4 Open 1,090.00 6.96 438.15 436.73 1.41 0.00 1.41 16.44
P-5 Open 1,090.00 6.96 436.73 434.74 1.99 0.00 1.99 16.44
P-6 Open 1,081.00 6.90 434.74 431.23 3.51 0.00 3.51 16.19
P-7 Open 1,072.00 6.84 431.23 428.55 2.68 0.00 2.68 15.94
P-8 Open 1,060.00 6.77 428.55 424.37 4.18 0.00 4.18 15.61
P-9 Open 1,060.00 6.77 424.37 424.20 0.17 0.00 0.17 15.61
P-10 Open 1,050.00 6.70 424.20 420.43 3.77 0.00 3.77 15.34
P-11 Open 1,020.00 6.51 420.43 419.77 0.65 0.00 0.65 14.54
P-12 Open 10.00 0.06 424.20 424.20 0.00 0.00 0.00 0.00
P-13 Open 30.00 0.34 420.43 420.42 0.01 0.00 0.01 0.09
P-14 Open 20.00 0.13 419.77 419.77 0.00 0.00 0.00 0.01
„ „
Scenario: Base
Steady State Analysis
Junction Report
Label Elevation Zone Type Base Flow Pattern Demand Calculated Pressure
(ft) (gpm) ;Calculatedl$lydraulic Grade (psi)
(gpm) (ft)
J-1 282.00 Zone Demand 0.00 Fixed 0.00 443.91 70.05
J-2 278.00 Zone Demand 12.00 Fixed 12.00 443.85 71.75
J-3 284.00 Zone Demand 9.00 Fixed 9.00 443.96 69.21
J-4 282.50 Zone Demand 9.00 Fixed 9.00 443.93 69.84
J-5 281.00 Zone Demand 9.00 Fixed 9.00 443.89 70.48
J-6 279.00 Zone Demand 9.00 Fixed 9.00 443.86 71.33
J-7 272.00 Zone Demand 0.00 Fixed 0.00 443.83 74.34
J-8 272.00 Zone Demand 0.00 Fixed 0.00 443.82 74.34
J-9 270.00 Zone Demand 0.00 Fixed 0.00 443.81 75.20
J-10 270.00 Zone Demand 0.00 Fixed 0.00 443.81 75.20
J-11 274.00 Zone Demand 10.00 Fixed 10.00 443.82 73.47
J-12 269.00 Zone Demand 30.00 Fixed 30.00 443.80 75.63
J-13 275.00 Zone Demand 20.00 Fixed 20.00 443.81 73.04
(,F ,t
r :#
11'11 f=_'. ' ;•nirr l ( n-:LI, i', I I-ric 11'-ir r I E 1 ,,I.i,,,,. I,,, c.r lliilt,
1.. ,n(:hn11r,.11C1_1111 r11sr: -I.
Design Report
Waterline Fire Flow Analysis
for
Spring Creek Gardens Subdivision — Phase 2
Spring Creek Townhomes Subdivision — Phase 1B
College Station, Texas
September 2005
Prepared By:
TEXCON General Contractors
1707 Graham Road
College Station, Texas 77845
(979) 764-7743
E�POF. T.....S I,
e* 'o N
.
0
. ...... .. .
1..JOEPH.P. .SiH, �?!I..ti
.t.w .:. ....„,
_j ' ®st
1.0 INTRODUCTION & DESCRIPTION
The purpose of this report is to provide a description of the proposed waterlines to be
constructed with Spring Creek Gardens Subdivision, Phase 2 and Spring Creek
Townhomes Subdivision, Phase JB, and to provide the results of the analysis of the
waterlines under fire flow conditions. The proposed waterline to supply this site will
connect to the existing 8" lines constructed with Spring Creek Gardens, Phase 1 and Spring
Creek Townhomes, Phase 1. The water main will be constructed using 6" and 8" diameter
pipe, which will be constructed of DR-14, PVC pipe meeting the requirements of AWWA
C-909 with mechanical joint fittings
2.0 FIRE FLOW REQUIREMENTS
The flow required for fire hydrant flow for the subdivision is 1,000 gallons per minute
(gpm), for each fire hydrant proposed for this subdivision.
3.0 WATERLINE SYSTEM ANALYSIS
The waterline system was analyzed using the WaterCAD computer program developed by
Haestad Methods, Inc. Exhibit"A" is a schematic of the proposed waterline, which shows
the locations of the fire hydrant. A normal domestic use flow of 1.5 gpm was included in
the analysis for each residential lot and the future townhome lots. This results in a normal
demand of 108 gpm, which was included in the analysis. The residual pressures in the
existing 12"waterline was based on a flow of 1,500 gpm for the existing line. Exhibit"B"
has the results of a pressure/flow test from a fire hydrant connected to the existing 12"
waterline on Decatur Drive. A static pressure of 104 psi and a residual pressure of 102 psi
with the hydrant flow at 1,500 gpm were determined by City of College Station Public
Utility personnel for the fire hydrant nearest this project. The proposed waterline will also
connect to the existing 8" line in Phase 1 of the Spring Creek Townhomes. This line
connects to a 12" line on Arrington Road. To simplify the analysis, it was assumed the
proposed line is supplied only from Phase 1 of Spring Creek Gardens.
A conservative approach was taken and an assumed residual pressure of 70 psi at a flow of
1,000 gpm was used for this analysis instead of the 100+psi value determined by the flow
test.
The computer model was run with a fire flow of 1,000 gpm at each fire hydrant proposed
for this project. Exhibit"C" is a summary of the pipe system junction nodes with a fire
flow of 1,000 gpm from Fire Hydrant No. 2. The lowest residual pressure occurred in the
system at Junction J-13,which is at the connection to the existing 8" waterline in Phase 1 of
the Spring Creek Townhomes. The pressure at this point is estimated by the model to be
62.6 psi, which exceeds the minimum of 20 psi required by the TCEQ regulations.
Exhibits"D" & "E" are summaries of the pipe sections for the system under this demand
scenario. The maximum velocity for the 8" water main is 7.1 feet per second, and occurs in
Pipe P-1.
A separate analysis was run for the domestic use of 1.5 gpm per unit. The minimum
pressure for this scenario, 69.2 psi at Junction .1-3 as shown on Exhibit "F." is well above
the minimum requirement of 35 psi. Minor losses in this system were not calculated, as
they were assumed to be insignificant.
4.0 CONCLUSIONS
The waterlines proposed for this development should adequately provide the fire flow
required with acceptable values for headloss and velocity. This analysis was done assuming
adequate residual pressure in the existing 12" water main, as determined by the
pressure/flow test. Also, the connection of the proposed lines to the existing line in the
townhomes to form a loop was not included in this analysis.
Exhibits
Scenario: Base
J-1 1
•
0) J-8
J-7
Fti
Q"
\ J-9
f �3
J-12
J-2 J-1,00
t t
Q
J-6
J-13
fi
Li
e�y �1S4 1 nc
"5
J-5
h'
' J-1
-a
3
E k;b
„ 1.•„ i f , , , „.
�.i u... I. I:. . II II.
11/18/2004 16:22 FAX 979 764 3452 COLLEGE STATION PUB.UTL. 1001
CI College station Utilities
Reliable,Affordable, Community Owned
1601 GRAHAM ROAD
COLLEGE STATION TEXAS 77845
Date: 18 NOVEMBER 2004
Number pages including cover sheet - 1
Fax to: 764-7759
Attention: JOE SCHULTZ
Company: TEXCON
From: Butch Willis Water Wastewater Division
Phone: 979-764-3435 Fax: 979-764-3452
FLOW TEST REPORT
Nozzle size: 2.5 inch
Location: ALEXANDRIA AT DECATUR
Flow hydrant number: R-048
Pitot reading: 80
(GPM): 1500
Static hydrant number: R-046
Static PSI: 104
Residual PSI: 102
Cch� bif „B. "
Scenario: Base
Steady State Analysis
Junction Report
Label Elevation Zone Type Base Flow Pattern Demand Calculated Pressure
(ft) (gpm) ,Calculatedltlydraulic Grade (psi)
(gpm) (ft)
J-1 282.00 Zone Demand 0.00 Fixed 0.00 436.73 66.95
J-2 278.00 Zone Demand 12.00 Fixed 12.00 428.55 65.14
J-3 284.00 Zone Demand 9.00 Fixed 9.00 441.03 67.94
J-4 282.50 Zone Demand 9.00 Fixed 9.00 438.15 67.34
J-5 281.00 Zone Demand 9.00 Fixed 9.00 434.74 66.52
J-6 279.00 Zone Demand 9.00 Fixed 9.00 431.23 65.86
J-7 272.00 Zone Demand 0.00 Fixed 0.00 424.37 65.92
J-8 272.00 Zone Demand 0.00 Fixed 0.00 424.20 65.85
J-9 270.00 Zone Demand 0.00 Fixed 0.00 420.43 65.08
J-10 270.00 Zone Demand 1,000.00 Fixed 1,000.00 419.77 64.80
J-11 274.00 Zone Demand 10.00 Fixed 10.00 424.20 64.98
J-12 269.00 Zone Demand 30.00 Fixed 30.00 420.42 65.51
J-13 275.00 Zone Demand 20.00 Fixed 20.00 419.77 62.63
1( 11
lulu ��� r i l'I.
., � i � .
Scenario: Base
Steady State Analysis
Pipe Report
Label Length Diameter Material Hazen- Check Minor Control DischargtJpstream StructUwnstream Structur ressure Headloss
(ft) (in) Williams Valve? Loss Status (gpm) Hydraulic Grade Hydraulic Grade Pipe Gradient
C Coefficien (ft) (ft) Headloss(ft/1000ft)
(ft)
P-1 175.00 8.0 PVC 150.0 false 0.00 Open 1,108.00 444.00 441.03 2.97 16.94
P-3 173.00 8.0 PVC 150.0 false 0.00 Open 1,099.00 441.03 438.15 2.89 16.69
P-4 86.00 8.0 PVC 150.0 false 0.00 Open 1,090.00 438.15 436.73 1.41 16.44
P-5 121.00 8.0 PVC 150.0 false 0.00 Open 1,090.00 436.73 434.74 1.99 16.44
P-6 217.00 8.0 PVC 150.0 false 0.00 Open 1,081.00 434.74 431.23 3.51 16.19
P-7 168.00 8.0 PVC 150.0 false 0.00 Open 1,072.00 431.23 428.55 2.68 15.94
P-8 268.00 8.0 PVC 150.0 false 0.00 Open 1,060.00 428.55 424.37 4.18 15.61
P-9 11.00 8.0 PVC 150.0 false 0.00 Open 1,060.00 424.37 424.20 0.17 15.61
P-10 246.00 8.0 PVC 150.0 false 0.00 Open 1,050.00 424.20 420.43 3.77 15.34
P-11 45.00 8.0 PVC 150.0 false 0.00 Open 1,020.00 420.43 419.77 0.65 14.54
P-12 177.00 8.0 PVC 150.0 false 0.00 Open 10.00 424.20 424.20 0.00 0.00
P-13 84.00 6.0 PVC 150.0 false 0.00 Open 30.00 420.43 420.42 0.01 0.09
P-14 215.00 8.0 PVC 150.0 false 0.00 Open 20.00 419.77 419.77 0.00 0.01
ct
Analysis Results
Scenario: Base
Steady State Analysis
Pressure Pipes @ 0.00 hr
Label Control Discharge Velocity Upstream Structure Downstream Structure Calculated Calculated Pressure Headloss
Status (gpm) (ft/s) Hydraulic Grade Hydraulic Grade Friction Minor Pipe Gradient
(0) (ft) Headloss Headloss Headloss (ft/1000ft)
(0) (ft) (ft)
P-1 Open 1,108.00 7.07 444.00 441.03 2.97 0.00 2.97 16.94
P-3 Open 1,099.00 7.01 441.03 438.15 2.89 0.00 2.89 16.69
P-4 Open 1,090.00 6.96 438.15 436.73 1.41 0.00 1.41 16.44
P-5 Open 1,090.00 6.96 436.73 434.74 1.99 0.00 1.99 16.44
P-6 Open 1,081.00 6.90 434.74 431.23 3.51 0.00 3.51 16.19
P-7 Open 1,072.00 6.84 431.23 428.55 2.68 0.00 2.68 15.94
P-8 Open 1,060.00 6.77 428.55 424.37 4.18 0.00 4.18 15.61
P-9 Open 1,060.00 6.77 424.37 424.20 0.17 0.00 0.17 15.61
P-10 Open 1,050.00 6.70 424.20 420.43 3.77 0.00 3.77 15.34
P-11 Open 1,020.00 6.51 420.43 419.77 0.65 0.00 0.65 14.54
P-12 Open 10.00 0.06 424.20 424.20 0.00 0.00 0.00 0.00
P-13 Open 30.00 0.34 420.43 420.42 0.01 0.00 0.01 0.09
P-14 Open 20.00 0.13 419.77 419.77 0.00 0.00 0.00 0.01
a�
Ev
��,: k
it Ir Ir i.I 4 ,,,
Scenario: Base
Steady State Analysis
Junction Report
Label Elevation Zone Type Base Flow Pattern Demand Calculated Pressure
(ft) (gpm) ;CalculatedMydraulic Grade (psi)
(gpm) (ft)
J-1 282.00 Zone Demand 0.00 Fixed 0.00 443.91 70.05
J-2 278.00 Zone Demand 12.00 Fixed 12.00 443.85 71.75
J-3 284.00 Zone Demand 9.00 Fixed 9.00 443.96 69.21
J-4 282.50 Zone Demand 9.00 Fixed 9.00 443.93 69.84
J-5 281.00 Zone Demand 9.00 Fixed 9.00 443.89 70.48
J-6 279.00 Zone Demand 9.00 Fixed 9.00 443.86 71.33
J-7 272.00 Zone Demand 0.00 Fixed 0.00 443.83 74.34
J-8 272.00 Zone Demand 0.00 Fixed 0.00 443.82 74.34
J-9 270.00 Zone Demand 0.00 Fixed 0.00 443.81 75.20
J-10 270.00 Zone Demand 0.00 Fixed 0.00 443.81 75.20
J-11 274.00 Zone Demand 10.00 Fixed 10.00 443.82 73.47
J-12 269.00 Zone Demand 30.00 Fixed 30.00 443.80 75.63
J-13 275.00 Zone Demand 20.00 Fixed 20.00 443.81 73.04
(tF „