Loading...
HomeMy WebLinkAboutStaff Comments CITY OF COLLEGE STATION Planning&Development Services 1101 Texas Avenue, P.O. Box 9960 College Station, Texas 77842 Phone 979.764.3570 / Fax 979.764.3496 MEMORANDUM DATE: 22 August 2005 TO: Dove Crossing Development—Tony Jones, Via Fax Copy to: 979.695.2941 FROM: Bridgette George, Development Coordinator SUBJECT: DOVE CROSSING PH.1A, 1B, & 1C (FP) - Final Plat Staff reviewed the above-mentioned final plat as requested. The following page is a list of staff review comments detailing items that need to be addressed. If all comments have been addressed and the following information submitted by Monday, August 29, at 10:00 a.m., your project will be placed on the next available Planning and Zoning Commission meeting scheduled for September 15, 2005, 7:00 p.m. in the City Hall Council Chambers, 1101 Texas Avenue. Two (2) 24"x36" copies of each of the revised final plats; Twelve (12) 11"x17" copies of each of the revised final plats; Parkland Dedication must be submitted prior to the filing of the final plats; One (1) Mylar original of each of the revised final plats; and One (1) copy of the digital file of each of the final plats on diskette or e-mail to nmanhart@cstx.gov Upon receipt of the required documents for the Planning & Zoning meeting, your project will be considered formally filed with the City of College Station. Please note that if all comments have not been addressed your project will not be scheduled for a Planning & Zoning Commission meeting. Your project may be placed on a future agenda once all the revisions have been made and the appropriate fees paid. If you have any questions or need additional information, please call Lance Simms or myself at 979.764.3570. Attachments: Staff review comments cc: Joe Scultz, TEXCON, Via Fax Copy to: 979.764.7759 Case file #05-00500136 Home of Texas ABM University STAFF REVIEW COMMENTS NO. 1 Project: DOVE CROSSING PH.1A, 1B, & 1C (FP) - 05-00500136 PLANNING/ENGINEERING FYI, the Oversized Participation request is being processed for Phase 1. If approved by Council, payment would not occur until the infrastructure associated with the proposed Phases 1A, 1B, and 1C is complete and accepted. Comments for Phase 1A: 1. Provide updated tax certificate reflecting current ownership information (tax certificate and ownership information on application do not match). 2. Provide additional information, via note on the plat, for the sign and landscape easement (details on uses allowed in area, maintenance responsibility, etc.) 3. The construction documents and reports are still under review and may affect the plat. 4. Twenty-four lots require Impact Fee payment of a $232.04/LUE for a total of $5,568.96 before the plat can be filed at the Court House. 5. Temporary turnarounds may be required on dead end streets (stub outs) greater than 100 feet. Comments for Phase 1B: 1. Provide updated tax certificate reflecting current ownership information (tax certificate and ownership information on application do not match). 2. Note 2D indicates the presence of a GTE Southwest easement that is not located on the plat. 3. The construction documents and reports are still under review and may affect the plat. 4. Temporary turnarounds may be required on dead end streets (stub outs) greater than 100 feet. Comments for Phase 1C: 1. Provide updated tax certificate reflecting current ownership information (tax certificate and ownership info on application do not match). 2. Provide additional information, via note on the plat, for the sign and landscape easement (details on uses allowed in area, maintenance responsibility, etc.) 3. The construction documents and reports are still under review and may affect the plat. 4. Five lots require Impact Fee payment of a $232.04/LUE for a total of $1,160.20 before the plat can be filed at the Court House. 5. Temporary turnarounds may be required on dead end streets (stub outs) greater than 100 feet. Reviewed by: Lance Simms and Alan Gibbs Date: 22 August 2005 NOTE: Any changes made to the plans,that have not been requested by the City of College Station, must be explained in your next transmittal letter and"bubbled"on your plans.Any additional changes on these plans that have not been pointed out to the City,will constitute a completely new review. Page 2 of 3 ELECTRICAL 1. Developer installs conduit per city specs and design. 2. Developer provides 30' of 2"rigid conduit for riser poles. 3. Developer pours transformer pads, secondary pedestals, and pull boxes per city specs and design. (transformer pads secondary pedestals and pull boxes provided by the city). 4. Developer provides digital AutoCAD 2000 or later version of plat and/or site plan email to sweido@cstx.gov. 5. Developer to provide a 5' easement Block 1 Lot 4 adjacent to Lot 5. 6. Developer to provide a 5' easement Block 1 Lot 8 adjacent to Lot 9. 7. Developer to provide a 5' easement Block 1 Lot 14 adjacent to Lot 13. 8. Developer to provide a 5' easement Block 1 Lot 18 adjacent to Lot 19. 9. Developer to provide a 5' easement Block 5 Lot 2 adjacent to Lot 3. 10. Developer provides easements for electric infrastructure as installed for electric lines (including street lights). 11. Developer installs street lights per city spec and design. 12. College Station Utilities will provide and electric design plan to developer for the installation of conduit and street lighting. 13. To discuss any of the above electrical comments, please contact Sam Weido at 979.764.6314. Reviewed by: Sam Weido Date: 8-19-05 FIRE 1. No comments Reviewed by: Steve Smith Date: 8/18/05 NOTE: Any changes made to the plans,that have not been requested by the City of College Station, must be explained in your next transmittal letter and"bubbled"on your plans.Any additional changes on these plans that have not been pointed out to the City,will constitute a completely new review. 3 of 3