Loading...
HomeMy WebLinkAboutCorrespondence ,r-FRa1'7 :,E7 TRAVEL _ FAX NO. :9797645686 Jul. 21 2005 11:00AM P2 • • • NYr.ttLIULAZIL/ 'rv. The City of College Station EnginnotingDePottroot Provo ptrvindbhal Patel Farvati P9tei 2007 Texts Avenue South College Station,Tam 77845 lames W,Chong,Auiloriaed Agent Celkge StatiotiiolleasanJPotiderosa,Ltd. 5005 Rivcco/ay,Suite 2,50 H6uaton,Tem 77056 • Date: July 20,3005 Jtc: Waterline lle.location CaestrUctl0 Work • Reffrenee is hereby rade to Arvu dbhai Patel and Per ti Patti(collectively,"Pete"),46 the owners of the property located at 2007 Texas Aventw South, College Staten, Brum Courny, Texas 77845, and College Station-4lollernan/POnderoak Ltd. ("Pah ota"), as the owner or the proms located 2001 Texas Avenue South,College Station,Brazos Caunt)r,Tures 77845• • • Patel;lad Ponderosa hereby approve,ttuthofI%,and permit any necessary construction wail(to be (mated out and/et located on the above-referenced propestios in canneedon with the implementation or ud construction work related is the reolocatlon of t nevi water line to serve such propanes in substantial accordance with the attacked Utility Plan dated Silly 15,2005. Emu • Ateindbhiti Patti,bidividually. Parvtti Paw ivid y ggingUiCek2 • College Sedan-HolletnanIPotaderosa,Ltd. • • lam . tenz,Atl Agent • • • 11.w I.,Iwn winb1.�mr ea ei7T terdiP/C17./J.L1 .. �0a �9Z'ON 96P2P9L6L616 F JNHHO 113NY1E NOSNHOf OS:b1 S00Zi9Z/L0 6-` 1 O . 6D+ ighl J 1Q :Y' STM 1 /x,0 &Associates \0vw STM ARCHITECTS AND ASSOCIATES,L.L.C. dba STM & ASSOCIATES Qedc� CITY OF COLLEGE STATION PLAN EXAMINING CORRECTIONS—PROJECT#-05-500042 HOLLEMAN RETAIL CENTER 2001 TEXAS AVENUE, 77840 JENNIFER PROCHAZKA S . . t Q -. ( IV( , (N_ TXscY\c*), PLANNING /FYI: no structures are permitted in the PUE, this includes foundations. Re: The foundation and the sidewalk within the P.U.E are not connected and are independent of each other. Re detail 1/A-7.1. VPlease provide the ownership and current zoning of this tract and all adjacent tracts on the site plan. (repeat comment) Re: See additional notes concerning the ownership and current zoning of this tract and all adjacent tracts on sheet A-1.0. V' The number of required parking spaces and number provided as stated on the plan are incorrect. For a 16,000 sq ft building, 64 spaces are required. You have provided 76. (repeat comment) To clarify, you are still showing 68 spaces required and 74 installed in your parking synopsis. Re: See updated parking synopsis on sheet A-1.0. VPlease provide all setbacks on the site plan, including the side and rear setback. The side street setback is 15', and not 25' as stated on the plan (side street is Holleman). (repeat comment) e: See updated information regarding building setbacks on sheet A-1.0. 5/11 . All curb must be monolithic, please remove other curb details. Re: All other non-compliant details have been removed from the set. See sheets A-1.1 and C9. 8705 Katy Freeway,Suite 202•Houston,Texas 77024•Ph:713-468-7557•Fax:713-468-7693 For every 15 ii iienor parking spaces you are required` o provide a 180 square foot interior island somewhere within the interior parking area. If the end islands (in the interior of the site)exceed their required square footage, the additional square footage can be applied to the interior island requirement. If you wish for the additional square footage of your end islands to count toward your interior island requirement, please provide the square footage of these end islands. With 43(0 32 interior parking spaces, you are required 384 square feet of interior islands. (repeat comment). No additional interior islands were added and the square n, - footages were not given. 41 Re: See sheet A-1.0 for parking island legend and square foot calculations. •• The site plan now shows a `relocated fire hydrant and appurtenances', is the hydrant(now shown in symbol, but unlabeled) at the northeast property corner . still proposed? Re: No, the hydrant shown at the northeast property corner has been removed from our plans and is not proposed. There is an existing fire hydrant on Holleman Drive, adjacent to our site that will serve our property. See drawings A-1.0 and civil drawings. . The dumpster enclosure needs to have a 24ft. opening (inside width) in order to house 2 FEL containers. Each dumpster needs a 12' clear opening for service. (repeat comment) To clarify, you are only showing a depth of 9'1". The minimum depth is 12' inside dimension. With bollards proposed, you need to insure the 12' is met before reaching the bollards. Also, the 12' minimum width is an inside dimension. With the gates open each dumpster needs 12' clear space for service. e: Dumpster drawings #'s 3 & 4 on sheet A1-0. (lit . What material are the dumpster enclosure gates made of? (repeat comment) Re: See drawing#'s 2,3 & 4 on sheet A-1.2, and drawing#3 on sheet A-1.0. LANDSC PING V The way you have determined the number of streetscape trees that are required is correct. However, the way that you have calculated the additional streetscape point requirement is incorrect. To calculate the streetscape points required, please add an additional 300 points for every 50 linear feet of frontage. (repeat comment) To clarify, you do not have to add in the additional points that you are in the first 2 steps of the calculation. Please call for further clarification. Re: See updated drawing#'s L-1 and L-2. ENGINEERING 1. As previously commented, provide water design report for fire flow. Re:Water and Fire flow report submitted. 8705 Katy Freeway,Suite 202•Houston,Texas 77024•Ph:713-468-7557•Fax:713-468-7693 2. As previously commented, you can not extend the water line from Texas\,(63.5‘. Avenue until the new 12"water line (currently under construction)is C, completed. You can extend the water line from Holleman Drive. Re: Owner is requesting to pay for change order with TXDOT,so we can tie onto waterline in Texas Avenue. 3. The water line to the fire hydrant is a public line and requires engineered construction documents and a PUE. Re: Revised,see sheet C5. 4. The TxDOT Utility permits need to be submitted through the City of College Station. Four copies of permit and supporting documents required. Re:Previously submitted to TXDOT directly. 5. Water meters are sized based upon average and peak GPM flows. Please provide flow to support 2' meter. Re: Revised,see sheet C5. 6. Master metering is an option. Please revise plans to reflect. Re: Multiple meters used,master meter will not be used.See sheet CS. 7. Construction and General Notes (Sheet C2) refer to City of Bryan requirements. Need to conform to City of College Station requirements. Re: Revised,see sheet C2. 8. A number of the construction notes listed on Shet C2 do not meet BCS Unified Design Guidelines. Please revise. Re: Revised,see sheet C2. 9. Change Title of Sheet C8 to Erosion Control Plan. Re: Revised,see sheet C8. 10.Monolithic curbing is required. Re: Revised,see sheet C10. 11.City of College Station requires 6' sidewalks placed at back of curb on 4' Re: Refer to architectural site plan for dimension of sidewalk. 12.sidewalks placed 4 feet from back of curb. Re: Revised,see sheet C4. 13. Indicate areas of heavy/light duty pavement. Re: Revised,see sheet C4. 14. Drainage Report still under review. 8705 Katy Freeway,Suite 202•Houston,Texas 77024•Ph:713-468-7557•Fax:713-468-7693 Josh Norton - Re Corner of Texas and Holleman Page 1 From: Troy Rother To: Josh Norton Date: 1/20/2005 3:14:01 PM Subject: Re: Corner of Texas and Holleman Attached is a copy of a section of the plans detailing the intersection design and there will only be slight modifications to the intersection and none of the intersection construction will impact the Olive Garden property. However, the parking spots adjacent to the ROW line will be reduced by up to 2 ft due to the construction of the roadway south of the intersection. I don't have a scanner adequate for scanning the 11x17 plan sheets for you to see, but you are welcome to stop by and look at them. Troy >>>Josh Norton 1/20/2005 2:05:00 PM >>> Troy, I have a PAC meeting coming up for the old Olive Garden site. Do you know if the reconstruction of that intersection is going to effect the southwest corner(olive garden area)of that intersection. Thanks -Josh Norton CC: Ken Fogle