FROM:Bridgette George, Development Coordinator
SUBJECT: HOLLEMAN RETAIL CENTER - Site Plan
Staff reviewed the above-mentioned site plan as requested. The following page is a list of staff
review comments detailing items that need to be addressed. Please address the comments
and submit the following information for further staff review:
Six (6) complete sets of construction documents for the proposed development
with the revised site and landscaping plans attached (please submit additional
copies to be stamped for your records).
Two (2) revised site plans; and
One (1) landscaping plan.
Easement Dedication Sheet and required documents (please allow 4 weeks to
process).
OR
One (1) revised site and landscaping plan.
$ Parkland Dedication fees prior to issuance of a building permit.
Easement Dedication Sheet and required documents.
Please note that the Easement Dedication Sheet and the necessary documents are required
prior to the issuance of a building permit. If there are comments that you are not addressing
with the revised site plan, please attach a letter explaining the details. If you have any
questions or need additional information, please call me at 979.764.3570.
Home of Texas A&M University
Attachments: Staff review comments
cc:
Case file #05-00500042
NOTE: Any changes made to the plans, that have not been requested by the City of College Station, must be explained in your
next transmittal letter and"bubbled"on your plans.Any additional changes on these plans that have not been pointed out
to the City,will constitute a completely new review.
Page 2 of 5
STAFF REVIEW COMMENTS NO. 1
Project: HOLLEMAN RETAIL CENTER — 05-00500042
PLANNING
1. Currently there are two site plans, sheet C4 and sheet A-1.0. These site plans show
different information. Please provide one site plan that has all of the required information
on it.
2. One site plan states that the sidewalk on Holleman is proposed, the other states that it is
existing. Please clarify.
3. Are off site improvements to the adjacent parking area proposed with this development. If
so, please also show it as it exists, and as it is proposed. The two site plans are different.
4. All work in current TxDOT right-of-way requires a permit.
5. Please clarify what is meant by note number 130 on sheet A-1.0. Also, will the existing sign
remain? The two site plans differ.
6. Please provide the following additional information in the title block of the site plan: address,
legal description, owner name, date of submittal, and total site area.
7. Please provide the ownership and current zoning of this tract and all adjacent tracts on the
site plan.
8. The total site area differs on the application and the landscaping plan. Please clarify.
9. The number of required parking spaces and number provided as stated on the plan are
incorrect. For a 16,000 sqft building, 64 spaces are required. You have provided 76.
10. The 'double island' that is required between every 7 parking spaces (for parking closer than
15' to the property line) is required to be 18' x 20'.
11. Please provide all setbacks on the site plan, including the side and rear setback. The side
street setback is 15', and not 25' as stated on the plan (side street is Holleman).
12. If the property is not located within a floodplain, please provide a note stating this with the
confirming FEMA/FIRM map number.
13. Please provide a curb and pavement detail.
14. For every 15 interior parking spaces you are required to provide a 180 square foot interior
island somewhere within the interior parking area. If the end islands (in the interior of the
site) exceed their required square footage, the additional square footage can be applied to
the interior island requirement. If you wish for the additional square footage of your end
islands to count toward your interior island requirement, please provide the square footage
of these end islands. With 32 interior parking spaces, you are required 384 square feet of
interior islands.
15. One site plan shows a fire hydrant, the other does not.
16. Please show all required fire lanes.
17. Please provide location of Fire Department Connection (FDC). Building must be
sprinklered.
18. The dumpster enclosure needs to have a 24ft. opening (inside width) in order to house 2
FEL containers. Each dumpster needs a 12' clear opening for service.
19. Please provide information on how the CMU dumpster enclosure will be treated or
screened. Will it be painted? What material are the gates made of?
20. Provide a general note that all roof and ground-mounted mechanical equipment shall be
screened from view or isolated so as not to be visible from any public right-of-way or
residential district within 150' of the subject lot, measured from a point five feet above
grade. Such screening shall be coordinated with the building architecture and scale to
maintain a unified appearance. Please state how this will be accomplished.
NOTE: Any changes made to the plans, that have not been requested by the City of College Station, must be explained in your
next transmittal letter and"bubbled"on your plans.Any additional changes on these plans that have not been pointed out
to the City,will constitute a completely new review.
Page 3 of 5
Gir#11111151111111111
CITY OF COLLEGE STATION
Planning 6"Development Services
1101 Texas Avenue South, PO Box 9960
College Station, Texas 77842
Phone (979) 764-3570 / Fax (979) 764-3496
MEMORANDUM
April 25, 2005
O
TO: Ned Sager, via fax 713.468.7693 V>
FROM: Jennifer Prochazka, Staff Planner
SUBJECT: HOLLEMAN RETAIL CENTER -Site Plan
Staff reviewed the above-mentioned site plan as requested. The following page is a preliminary
list of staff review comments detailing items that need to be addressed. Staff would be glad to
meet with you to review all of the comments. Please contact Bridgette George at 979.764.3570
or bgeorge(a�cstx.gov to schedule a meeting. Please address the comments and submit the
following information for further staff review:
One (1) complete set of construction documents for the proposed development
with the revised site and landscaping plans attached (does not need to include
building plans)
Easement Dedication Sheet and required documents (please allow 4 weeks to
process).
Please note that the Easement Dedication Sheet and the necessary documents are required
prior to the issuance of a building permit. If there are comments that you are not addressing
with the revised site plan, please attach a letter explaining the details. If you have any
questions or need additional information, please call Bridgette George at 979.764.3570.
Attachments: Staff review comments
cc: Ponderosa Land Development, via fax 713.8898 `-
Milton D. Schmeeckle, via fax 713.468.7693
Case file #05-00500042
Home of Texas A&M University
STAFF REVIEW COMMENTS NO. 2
Project: HOLLEMAN RETAIL CENTER - 05-00500042
PLANNING
V, FYI: no structures are permitted in the PUE, this includes foundations.
Please provide the ownership and current zoning of this tract and all adjacent tracts on the
, site plan. (repeat comment)
3! The number of required parking spaces and number provided as stated on the plan are
incorrect. For a 16,000 sqft building, 64 spaces are required. You have provided 76.
(repeat comment) To clarify, you are still showing 68 spaces required and 74 installed in
/your parking synopsis.
4! Please provide all setbacks on the site plan, including the side and rear setback. The side
street setback is 15', and not 25' as stated on the plan (side street is Holleman). (repeat
/comment)
t�./All curb must be monolithic, please remove other curb details.
V For every 15 interior parking spaces you are required to provide a 180 square foot interior
4610tisland somewhere within the interior parking area. If the end islands (in the interior of the
ry site) exceed their required square footage, the additional square footage can be applied to
the interior island requirement. If you wish for the additional square footage of your end
$k islands to count toward your interior island requirement, please provide the square footage
of these end islands. With 32 interior parking spaces, you are required 384 square feet of
10 ll: . interior islands. (repeat comment). No additional interior islands were added and the square
footages were not given.
NV) V!The site plan now shows a 'relocated fire hydrant and appurtenances,' is the hydrant (now
,,--- shown in symbol, but unlabeled) at the northeast property corner still proposed?
0(rilizi The dumpster enclosure needs to have a 24ft. opening (inside width) in order to house 2
FEL containers. Each dumpster needs a 12' clear opening for service. (repeat comment)
0V . To clarify, you are only showing a depth of 9'1". The minimum depth is 12' inside
rr��,y� dimension. With bollards proposed, you need to insure the 12' is met before reaching the
1U" I bollards. Also, the 12' minimum width is an inside dimension. With the gates open each
dumpster needs 12' clear space for service.
f.1What material are the dumpster enclosure gates made of? (repeat comment)
li,),0\1/49)6'vk 0--,\ �� Reviewed by: Jennifer Prochazka Date: 4-25-05
V Atk• * .
.1A11\4.2( *A' � CAPING
�4`�,f1. The way you have determined the number of streetscape trees that are required is correct.
u,, However, the way that you have calculated the additional streetscape point requirement is
.\ N-- incorrect. To calculate the streetscape points required, please add an additional 300 points
for every 50 linear feet of frontage. (repeat comment) To clarify, you do not have to add in
the additional points that you are in the first 2 steps of the calculation. Please call for further
clarification.
NOTE: Any changes made to the plans, that have not been requested by the City of College Station, must be explained in your
next transmittal letter and"bubbled"on your plans.Any additional changes on these plans that have not been pointed out
to the City,will constitute a completely new review. 2 of 3
Reviewed by: Jennifer Prochazka Date: 4-25-05
ENGINEERING
1. As previously commented, provide water design report for fire flow.
2. As previously commented, you cannot extend the water line from Texas Avenue until the
new 12" water line (currently under construction) is completed. You can extend the water
line from Holleman Drive.
3. The water line to the fire hydrant is a public line and requires engineered construction
documents and a PUE.
4. The TxDOT Utility permits need to be submitted through the City of College Station. Four
copies of permit and supporting documents required.
5. Water meters are sized based upon average and peak GPM flows. Please provide flow to
support 2" meter.
6. Master metering is an option. Please revise plans to reflect.
7. Construction and General Notes (Sheet C2) refer to City of Bryan requirements. Need to
conform to City of College Station requirements.
8. A number of the construction notes listed on Sheet C2 do not meet BCS Unified Design
Guidelines. Please revise.
9. Change Title of Sheet C8 to Erosion Control Plan.
10. Monolithic curbing is required.
11. City of College Station requires 6' sidewalks placed at back of curb or 4' sidewalks placed 4
feet from back of curb.
12. Indicate areas of heavy/light duty pavement.
13. Drainage Report still under review.
Reviewed by: Carol Cotter Date: April 25, 2005
NOTE: Any changes made to the plans, that have not been requested by the City of College Station, must be explained in your
next transmittal letter and"bubbled"on your plans.Any additional changes on these plans that have not been pointed out
to the City,will constitute a completely new review. 3 of 3
GrffII"
CITY OF COLLEGE STATION
Planning&Development Services
1101 Texas Avenue, P.O. Box 9960
College Station, Texas 77842
Phone 979.764.3570 / Fax 979.764.3496
MEMORANDUM
June 17, 2005
TO: Ned Sager, via fax 713.468.7693
FROM: Bridgette George, Assistant Development Manager
SUBJECT: HOLLEMAN RETAIL CENTER (SP) - Site Plan
Staff reviewed the above-mentioned site plan as requested. The following page is a list of staff
review comments detailing items that need to be addressed. Please address the comments and
submit the following information for further staff review:
$200 processing fee for the next round of three (3) staff reviews; and,
One (6) complete set of construction documents for the proposed development
with the revised site and landscaping plans attached.
If there are comments that you are not addressing with the revised site plan, please attach a
letter explaining the details. If you have any questions or need additional information, please
call me at 764-3570.
Attachments: Staff review comments
cc: P nderosa Land Development, via fax 713.888.0998
Ilton D. Schmeeckle, via fax 713.468.7693
Case file #05-00500042
ci \7( 1(AULti° -II' i'quimi ci"
Home of Texas A86M University
STAFF REVIEW COMMENTS NO. 3
Project: HOLLEMAN RETAIL CENTER (SP) - 05-00500042
PLANNING
1. You have shown the location of a new sign with this submittal. Since the location of a sign
cannot be permitted through site plan review, please either remove the new sign and note
125 that you have shown, or add an additional note that states that signs must be reviewed
and permitted separately.
2. Please remove the legend that you have added to the site plan regarding interior parking
islands. This table gave me the information that I needed to determine that you are in
compliance with the requirements, but needs to be removed since the chart itself is
incorrect.
Reviewed by: Jennifer Prochazka Date: June 9, 2005
ENGINEERING
1. The fire flow report that you submitted for this project is incorrect. I think you have it
crossed with the Texas Pavilion project. You state that the waterline is 18" and will serve a
bank and Texas Pavilion. Please rectify report.
2. The International Fire Code requires 3 fire hydrants for 2,750 gpm flow. However, the Fire
Marshall has agreed to allow the use of the hydrant across Holleman as the third hydrant.
3. The tie in to the existing water line in Texas Avenue and to the storm inlet in Holleman Drive
will require an agreement with the Contractor on the utility project currently under
construction. The copy of the agreement will need to be submitted prior to plan approval.
4. Please refer to BCS Unified Design Guidelines. A number of your construction notes on
Sheet C2 are in conflict. (Repeat comment)
5. The TxDOT Utility permits need to be submitted through the City of College Station. Four
copies of permit and supporting documents required (water line design docs and drainage
report). (Repeat comment)
6. Our paving requirement for fire lane (medium duty) is "4 @ 18" OCEW.
7. Please add note that all water and sanitary sewer construction shall be in accordance with
BCS Unified Design Guidelines, Specifications, and details.
8. Sheet C5 — Section A-A shows a 6" line, but the tap call is for an 8" line.
9. Sheet C5 - You cannot tap size on size. You will need to cut in a tee.
10. Sheet C5 —Valve requirements are one less than each leg of a tee or cross. You will not be
required to install the 8" valve on the existing main at this time, but need to include the cost
of a 12" valve in the aforementioned agreement with the contractor that is currently
constructing the new 12" water line.
11. The easement you are required to dedicate is on the adjacent property. That property
owner is the one who will need to sign the easement. The supporting documents (title
report, etc.) need to be for the adjacent property. This easement will need to be dedicated
prior to Site Plan approval.
12. Appropriate documentation will need to be provided to show that you have permission for
construction of water lines and services on adjacent property prior to Site Plan approval.
NOTE: Any changes made to the plans, that have not been requested by the City of College Station, must be explained in your
next transmittal letter and"bubbled"on your plans.Any additional changes on these plans that have not been pointed out
to the City,will constitute a completely new review. 2 of 3
13. $600 is required for public infrastructure inspection.
14. Sheet C2 states that the sidewalk will be 5' wide. As previously commented, City of College
Station requires a 6' sidewalk placed at back of curb on minor arterial streets, Holleman
Drive.
15. Please note: Regarding the driveway to be removed on Texas Avenue, the curb will need to
be saw cut and the new curb dowelled in. Any damage to the street will have to be repaired
according to City standards (no cold mix asphalt).
16. Keep in mind that the hotel cannot be without fire protection. How will the hotel have fire
protection while the fire hydrant is being relocated? The relocated fire hydrant may have to
be a new one.
Reviewed by: Carol Cotter Date: June 15, 2005
NOTE: Any changes made to the plans, that have not been requested by the City of College Station, must be explained in your
next transmittal letter and"bubbled"on your plans.Any additional changes on these plans that have not been pointed out
to the City,will constitute a completely new review. 3 of 3
(*ff. '1151111114
CITY OF COLLEGE STATION
Planning&Development Services
1101 Texas Avenue South, PO Box 9960
College Station, Texas 77842
Phone (979) 764-3570 / Fax (979) 764-3496
MEMORANDUM
April 4, 2005
TO: Ned Sager, via fax 713.468.7693
FROM: Bridgette George, Development Coordinator
SUBJECT: HOLLEMAN RETAIL CENTER - Site Plan
Staff reviewed the above-mentioned site plan as requested. The following page is a preliminary
list of staff review comments detailing items that need to be addressed. Staff would be glad to
meet with you to review all of the comments. Please contact me at 979.764.3570 or
bgeorgeCa cstx.gov to schedule a meeting. Please address the comments and submit the
following information for further staff review:
One (1) complete set of construction documents for the proposed development
with the revised site and landscaping plans attached
Easement Dedication Sheet and required documents (please allow 4 weeks to
process).
Please note that the Easement Dedication Sheet and the necessary documents are required
prior to the issuance of a building permit. If there are comments that you are not addressing
with the revised site plan, please attach a letter explaining the details. If you have any
questions or need additional information, please call me at 979.764.3570.
Attachments: Staff review comments
cc: Ponderosa Land Development, via fax 713.888.0998
Milton D. Schmeeckle, via fax 713.468.7693✓
Case file#05-00500042
Home of Texas A&M University
STAFF REVIEW COMMENTS NO. 1
Project: HOLLEMAN RETAIL CENTER —05-00500042
PLANNING
1. Currently there are two site plans, sheet C4 and sheet A-1.0. These site plans show
different information. Please provide one site plan that has all of the required information
on it.
2. One site plan states that the sidewalk on Holleman is proposed, the other states that it is
existing. Please clarify.
3. Are off site improvements to the adjacent parking area proposed with this development. If
so, please also show it as it exists, and as it is proposed. The two site plans are different.
4. All work in current TxDOT right-of-way requires a permit.
5. Please clarify what is meant by note number 130 on sheet A-1.0. Also, will the existing sign
remain? The two site plans differ.
6. Please provide the following additional information in the title block of the site plan: address,
legal description, owner name, date of submittal, and total site area.
7. Please provide the ownership and current zoning of this tract and all adjacent tracts on the
site plan.
8. The total site area differs on the application and the landscaping plan. Please clarify.
9. The number of required parking spaces and number provided as stated on the plan are
incorrect. For a 16,000 sqft building, 64 spaces are required. You have provided 76.
10. The 'double island' that is required between every 7 parking spaces (for parking closer than
15' to the property line) is required to be 18' x 20'.
11. Please provide all setbacks on the site plan, including the side and rear setback. The side
street setback is 15', and not 25' as stated on the plan (side street is Holleman).
12. If the property is not located within a floodplain, please provide a note stating this with the
confirming FEMA/FIRM map number.
13. Please provide a curb and pavement detail.
14. For every 15 interior parking spaces you are required to provide a 180 square foot interior
island somewhere within the interior parking area. If the end islands (in the interior of the
site) exceed their required square footage, the additional square footage can be applied to
the interior island requirement. If you wish for the additional square footage of your end
islands to count toward your interior island requirement, please provide the square footage
of these end islands. With 32 interior parking spaces, you are required 384 square feet of
interior islands.
15. One site plan shows a fire hydrant, the other does not.
16. Please show all required fire lanes.
17. Please provide location of Fire Department Connection (FDC). Building must be
sprinklered.
18. The dumpster enclosure needs to have a 24ft. opening (inside width) in order to house 2
FEL containers. Each dumpster needs a 12' clear opening for service.
19. Please provide information on how the CMU dumpster enclosure will be treated or
screened. Will it be painted? What material are the gates made of?
20. Provide a general note that all roof and ground-mounted mechanical equipment shall be
screened from view or isolated so as not to be visible from any public right-of-way or
residential district within 150' of the subject lot, measured from a point five feet above
grade. Such screening shall be coordinated with the building architecture and scale to
maintain a unified appearance. Please state how this will be accomplished.
Reviewed by: Jennifer Prochazka Date: April 4, 2005
NOTE: Any changes made to the plans, that have not been requested by the City of College Station, must be explained in your
next transmittal letter and"bubbled"on your plans.Any additional changes on these plans that have not been pointed out
to the City,will constitute a completely new review.
Page 2 of 4
LANDSCAPING/STREETSCAPING/BUFFER
1. All proposed landscaping must be located on site.
2. Non-canopy trees (crepe myrtles) only earn 40 points.
3. Please add a note that all non-canopy trees must meet the minimum caliper with a single
cane.
4. The way you have determined the number of streetscape trees that are required is correct.
However, the way that you have calculated the additional streetscape point requirement is
incorrect. To calculate the streetscape points required, please add an additional 300 points
for every 50 linear feet of frontage.
5. Provide a general note that 100% coverage of groundcover, decorative paving, decorative
rock, or a perennial grass is required in parking lot islands, swales and drainage areas, the
parking lot setback, rights-of-way, and adjacent property disturbed during construction.
Reviewed by: Jennifer Prochazka Date: April 4, 2005
ENGINEERING
1. Provide Water design Report for Fire Flow.
2. Provide Drainage Report for storm sewer system.
3. Fire protection and domestic water for adjacent hotel cannot be interrupted. New line will
need to be installed and accepted prior to existing line taken out of service.
4. Engineered construction documents (Plan and Profile and Engineers Estimate) are required
for public water line.
5. To extend the proposed new water line from Texas Avenue, you will need to wait for new
12" waterline to be installed which will be about 8 months, otherwise you will need to extend
the proposed water line from the existing line on Holleman.
6. Proposed meter vault cannot be located in TxDOT ROW.
7. TxDOT Utility Permit is required for utility connection in TxDOT ROW, including storm
sewer. Strom sewer inlet belongs to TxDOT.
8. Off-site Public Utility Easement required for water line. PUE will need to be dedicated over
water line. Submit easement dedication documents for PUE and, or blanket easement.
9. Infrastructure Inspection Fee required for water line.
10. Provide agreement with adjacent property for off-site construction.
11. Sidewalk will not be required on Texas Avenue due to current widening project.
12. Sheet A-1.0 calls out sidewalk on Holleman Drive as existing. It should be proposed.
13. The water demands provided do not support a 2" meters.
14. Each lease space will have to have its own water meter per TCEQ requirements.
15. Show location of irrigation meter. All meters required to be in PUE or City ROW.
16. Provide existing 2' contours. Show how proposed grades will tie into existing grades on
adjacent properties.
17. Are the retaining wall and wrought iron fence that are called out on northeast property line
existing?
18. Minimum slope on sanitary sewer service for a 6" line is 1%. Service must meet Building
Code.
19. Are you planning a grease trap for the restaurant? Show location and size.
Reviewed by: Carol Cotter Date: April 4, 2005
NOTE: Any changes made to the plans, that have not been requested by the City of College Station, must be explained in your
next transmittal letter and"bubbled"on your plans.Any additional changes on these plans that have not been pointed out
to the City,will constitute a completely new review.
Page 3 of 4
ELECTRICAL
1. Developer installs conduit per city specs and design.
2. Developer to intercept existing PVC conduit and stub up at new transformer location.
Contact Sam Weido prior to final placement of transformer pad.
3. Developer pours transformer pad(s) per city specs and design.
4. Main building disconnect must be located in front of tap box.
5. Developer provides digital AutoCAD 14 version of plat and/or site plan.
Email to sweido@cstx.gov
6. Developer provides load data for project.
7. Developer provides temporary blanket easement for construction purposes.
8. Developer provides easements for electric infrastructure as installed for electric lines
(including street lights).
9. To discuss any of the above electrical comments, please contact Sam Weido at
979.764.6314.
Reviewed by: Sam Weido Date: 3-31-05
MISCELLANEOUS
1. Irrigation system must be protected by either a Pressure Vacuum Breaker, a Reduced
Pressure Principle Back Flow Device, or a Double-Check Back Flow Device, and installed
as per City Ordinance 2394.
2. All BackFlow devices must be installed and tested upon installation as per City Ordinance
2394.
NOTE: Any changes made to the plans, that have not been requested by the City of College Station, must be explained in your
next transmittal letter and"bubbled"on your plans.Any additional changes on these plans that have not been pointed out
to the City,will constitute a completely new review.
Page 4 of 4
Reviewed by: Jennifer Prochazka Date: April 4, 2005
LANDSCAPING/STREETSCAPING/BUFFER
1. All proposed landscaping must be located on site.
2. Non-canopy trees (crepe myrtles) only earn 40 points.
3. Please add a note that all non-canopy trees must meet the minimum caliper with a single
cane.
4. The way you have determined the number of streetscape trees that are required is correct.
However, the way that you have calculated the additional streetscape point requirement is
incorrect. To calculate the streetscape points required, please add an additional 300 points
for every 50 linear feet of frontage.
5. Provide a general note that 100% coverage of groundcover, decorative paving, decorative
rock, or a perennial grass is required in parking lot islands, swales and drainage areas, the
parking lot setback, rights-of-way, and adjacent property disturbed during construction.
Reviewed by: Jennifer Prochazka Date: April 4, 2005
ENGINEERING
1. Provide Water design Report for Fire Flow.
2. Provide Drainage Report for storm sewer system.
3. Fire protection and domestic water for adjacent hotel cannot be interrupted. New line will
need to be installed and accepted prior to existing line taken out of service.
4. Engineered construction documents (Plan and Profile and Engineers Estimate) are required
for public water line.
5. To extend the proposed new water line from Texas Avenue, you will need to wait for new
12" waterline to be installed which will be about 8 months, otherwise you will need to extend
the proposed water line from the existing line on Holleman.
6. Proposed meter vault cannot be located in TxDOT ROW.
7. TxDOT Utility Permit is required for utility connection in TxDOT ROW, including storm
sewer. Strom sewer inlet belongs to TxDOT.
8. Off-site Public Utility Easement required for water line. PUE will need to be dedicated over
water line. Submit easement dedication documents for PUE and, or blanket easement.
9. Infrastructure Inspection Fee required for water line.
10. Provide agreement with adjacent property for off-site construction.
11. Sidewalk will not be required on Texas Avenue due to current widening project.
12. Sheet A-1.0 calls out sidewalk on Holleman Drive as existing. It should be proposed.
13. The water demands provided do not support a 2" meters.
14. Each lease space will have to have its own water meter per TCEQ requirements.
15. Show location of irrigation meter. All meters required to be in PUE or City ROW.
16. Provide existing 2' contours. Show how proposed grades will tie into existing grades on
adjacent properties.
17. Are the retaining wall and wrought iron fence that are called out on northeast property line
existing?
NOTE: Any changes made to the plans, that have not been requested by the City of College Station, must be explained in your
next transmittal letter and"bubbled"on your plans.Any additional changes on these plans that have not been pointed out
to the City,will constitute a completely new review.
Page 4 of 5
18. Minimum slope on sanitary sewer service for a 6" line is 1%. Service must meet Building
Code.
19. Are you planning a grease trap for the restaurant? Show location and size.
Reviewed by: Carol Cotter Date: April 4, 2005
ELECTRICAL
1. Developer installs conduit per city specs and design.
2. Developer to intercept existing PVC conduit and stub up at new transformer location.
Contact Sam Weido prior to final placement of transformer pad.
3. Developer pours transformer pad(s) per city specs and design.
4. Main building disconnect must be located in front of tap box.
5. Developer provides digital AutoCAD 14 version of plat and/or site plan.
Email to sweido@cstx.gov
6. Developer provides load data for project.
7. Developer provides temporary blanket easement for construction purposes.
8. Developer provides easements for electric infrastructure as installed for electric lines
(including street lights).
9. To discuss any of the above electrical comments, please contact Sam Weido at
979.764.6314.
Reviewed by: Sam Weido Date: 3-31-05
MISCELLANEOUS
1. Irrigation system must be protected by either a Pressure Vacuum Breaker, a Reduced
Pressure Principle Back Flow Device, or a Double-Check Back Flow Device, and installed
as per City Ordinance 2394.
2. All BackFlow devices must be installed and tested upon installation as per City Ordinance
2394.
NOTE: Any changes made to the plans, that have not been requested by the City of College Station, must be explained in your
next transmittal letter and"bubbled"on your plans.Any additional changes on these plans that have not been pointed out
to the City,will constitute a completely new review.
Page 5 of 5
APR-13-2005 14:13 From:STM-NED SAQER 7134687693 To:9797643496 P.2/6
OPSTAFF REVIEW COMMENTS NO. 1
Project: HOLLMAN RETAIL CENTER--05-00500042
PLANNING
1. Currently there are two site plans, sheet C4 and sheet A-1,0. These site plans show
diffeent information. Please provide one site plan that has all of the required information
on it.
Re: The two site drawings have been coordinated and we are removing civil
drawing No. C4 from the set.
2. One site plan states that the sidewalk on Holleman is proposed,the other states that it
is existing. Please clarify.
Re: Site drawing No. A-1.0 has been updated and the sidewalk is now noted as
"Proposed".
3, Are off site improvements to the adjacent parking area proposed with this
development. If so,please also show it as it exists,and as it is proposed. The two site
plans are different.
Re: Yes,the site improvements to the adjacent parking area,are proposed with this
development. Sec civil drawing C5.
4. All work in current TxDOT right-of-way requires a permit.
=#.0 GONr1 wow it PrfPQMM 010.44 MA%O r
5, Please clarify what is meant by note number 130 on sheet A-1..0. Also,will the
existing sign.remain? The two site plans differ. _ `4
Re: The sign is existing to remain. ,
6. Please provide the following additional information in the title block of the site plan:
address,legal description,owner name,date of submittal,and total site area.
Re: Site plan A-1.0.
7. Please provide the ownership and current zoning of this tract and all adjacent tracts on
the site plan.
SMAS ewr e.4 rm.wet 1llIsw+, J I 044 CROW
8. The total site area differs on the applicationand the landscaping plan, Please clarify
Bill Flynek.
Re: The arca calculation for the application and the drawings have been
coordinated and the correct value is noted.
9. The number of required parking spaces and number provided as stated on the plan are
incorrect, For a 16,000 sq ft building. 64 spaces are required. You have provided 76.
Re: The No.of spaces required is 64 and the No.of spaces provided is 76.See
drawing A-1..0.
APR-13-2005 14:13 From:STM-NED SAQER 7134687693 To:9797643496 P.3/6
10, The `double island'that is required between every 7 parking spaces(for parking
closer than 15' to the property line)is required to be 18' x 20'.
Re: See drawing A-1.0.
11. Please provide all setbacks on the site plan, including the side and rear setback. The
side street setback is 15',and not 25' as stated on the plan (side street is Holleman).
Re: See drawing A-1.0.
12.if the property is not located within a floodplain,please provide a note stating this
confirming FEMA.?FIRM map number.
Re: See drawing A-1..0.
13. Pleae provide a curb and pavement detail.
Re: Civil drawings C1.0.
14, For every 15 interior parking spaces you are required to provide a 180 square foot
interior island somewhere within the interior parking area. If the end islands(in the
interior of the site)exceed their required square footage,the additional square footage can
be applied to the interior island requirement. If you wish for the additional square
footage of your end islands to count toward your interior island requirement, please
provide the square footage of these end islands. With 32 interior parking spaces,you are
required 384 square feet of interior islands.
Re: See drawing A-1.0.
15. One site plan shows a fire hydrant, the other does not.
Re: See updated information at drawing A-1.0.
16. Please show all required fire lanes.
Re: See drawing A-1.0.
17, Please provide location of Fire Department Connection(FDC). Building must be
sprinklered.
Re: As per our conversation with Chris Chaver at the College Station Building
Department,we are providing a three hour fire rated partition,and thus are not
required to have the building sprinklered.
18. The dumpster enclosure needs to have a 24 ft. opening(inside width) in order to
house 2 FEL containers. Each dumpster needs a 12' clear opening for service.
Re: See drawings at sheet A-1.0.
19. Please provide information on how the CMU dumpster enclosure will be treated
or screened. Will it be painted? What material are the gates made of?
Re: See drawing#'s 2,3+4/A-2.0.
APR-13-2005 14:13 From:STM-NED SAQER 7134687693 To:9797643496 P.4,6
20. Provide a general note that all roof and ground-mounted mechanical equipment
shall be screened from view or isolated so as not to be visible fromany public Oy
right-of-way or residential district within 150' of the subject lot,measured from a 't 1
point five feet above grade. Such screening shall be coordinated with the I ,
building architecture and scale to maintain a unified appearance. Please state
how this will be accomplished. feat ;Nor liar A-42
LANDSCAPING/STREETSCAPING/EU.FI"ER
1. All proposed landscaping must be located on site.
Lot40 ebe r os, L. -s
2. Non-canopy trees(crepe myrtles)only earn 40 points.
3, Please add a note that all non-canopy trees must meet the minimum caliper with a
sin le cane.
4, The way you have determined the number of streetscape trees that are required is
correct. However,the way that you have calculated the additional streetscape point
requirement is incorrect. To calculate the streetscape points required,please add an
itional 300 points for every 50 linear feet of frontage.
5. Provide a general note that 100%coverage of groundcover, decorative paving,
decorative rock,or a perennial grass is required in parking lot islands,swales and
drainage areas,the parking lot setback,rights-of-way,and adjacent property disturbed
during construction.
ENGINEERING
1. Provide Water design Report for Fire Flow.
2, Provide Drainage Report for storm sewer system.
3. Fire protection and domestic water for adjacent hotel cannot be interrupted. New line
will need to be installed and accepted prior to existing line taken out of service.
4. Engineered construction documents(Plan and'Profile and Engineers Estimate)are
required for public water line.
5. To extend the proposed new water line from Texas Ave.you will need to wait for
new 12"waterline to be installed which will be about 8 months,otherwise you will need
to extend the proposed water line from the existing line on Holleman.
6. Proposed meter vault cannot be located in TxDOT ROW.
7. TxDOT Utility Permit is required for utility connection in TxDOT ROW, including
storm sewer. Storm sewer inlet belongs to TxDOT.
APR-13-2005 14:14 From:STM-mFD SAGER 7134687693 To:9797643496 P.5/6
8. Off-site Public Utility F.,asement required for water line. PUE will need to be
dedicated over water line. Submit easement dedication documents for PUE and, or
blanket easement,
9. Infrastructure Inspection Fee required for water line.
10. Provide agreement with adjacent property for off-site construction.
11. Sidewalk will not be required on Texas Ave. due to current widening project.
12. Sheet A-1.0 calls out sidewalk on Holleman Drive as existing, It should be proposed.
13. The water demands provided do not support a 2"meters,
1.4. Each lease space will have to have its ownwater meter. per TCEQ requirements.
15. Show location of irrigation meter. All meters required to be in PUE or City ROW.
16. Provide existing T contours. Show how proposed grades will tie into existing grades
on adjacent properties.
17.Are the retaining wall and wrought iron fence that are called out on northeast property
line existing?
1g. Minimum slope on sanitary sewer service for. a 6" line is 1%. Service must meet
Building Code.
19.Are you planning a grease trap for the restaurant? Show location and size.
ELECTRICAL
1, Developer installs conduit per city specs and design.
44.01,101!10 r Iw
2. Developer to intercept existing PVC conduit and stub up at new transformer location.
Contact Sam Weido prior to final placement of transformer pad.
. Developer pours transformer pad(s)per city specs and design..
4. Main building disconnect must be located in front of tap box.
5. Developer provides digital AutoCAD 14 version of plat and/or site plan. Email to
sweido@cstx.gov
6. Developer provides load data for. project.
. Developer provides temporary blanket easement for construction purposes.
APR-13-2005 14:14 From:STM-NED SAQER 7134687693 To:9797643496 P.6/6
8. Developer provides easements for electric infrastructure as installed for electric lines
(including street lights).
9. To discuss any of the above electrical comments,please contact Sam Weido at(979)
764.6314,
MISCELLANEOUS
1. Irrigation system must be protected by either a Pressure Vacuum Breaker,a Reduced
Pressure Principle Back Flow Device, or. a Double-Check Back Flow Device, and
installed as per City Ordinance 2194.
got
2. MI Back Flow devices must be installed and tested upon installation as per City
Ordinance 2394.
57/ 643 y(
OPSTAFF REVIEW COMMENTS NO. 1
Project: HOLLMAN RETAIL CENTER--- 05-00500042
PUNNING
vK Currently there are two site plans, sheet C4 and sheet A-1.0. These site plans show
diffeent information. Please provide one site plan that has all of the required information
on it.
Re: The two site drawings have been coordinated and we are removing civil
drawing No. C4 from the set.
One site plan states that the sidewalk on Holleman is proposed,the other states that it
is existing. Please clarify.
R • • ra • No. A-1.0 has been updated and the sidewalk is now noted as
"Proposed". --- ��--- c..tSk1 Y ? 1
k (' (o. a .c . c•-r- 4 o + lowL ,
3. Are off site improvements to the adjacent parking area proposed with this
Y development. If so,please also show it as it exists, and as it is proposed. The two site
plans are different.
Re: Yes, the site improvements to the adjacent parking area, are proposed with this
development. See civil drawing C5.
,All work in current TxDOT right-of-way requires a permit.
Re: According to the plat and right-of-way designations,the inlet is in the
Holleman right-of-way. Windrose Land Services will request TXDOT approve
for the Holleman storm inlet tie-in. Plus,Windrose Land Services will request
TXDOT approval for the SH 6 "Texas Avenue"water line tie-ins.
Please clarify what is meant by note number 130 on sheet A-1.0. Also,will the
existing sign remain? The two site plans differ.
Re: Note#130 has been removed and the sign is noted as "existing to remain". See
sheet A-1.0.
Please provide the following additional information in the title block of the site plan:
address, legal description, owner name, date of submittal, and total site area.
Re: Site plan A-1.0.
^()- Please provide the ownership and current zoning of this tract and all adjacent tracts on
AY the site plan.
Re: See attached Plat.
8. The total site area differs on the application and the landscaping plan. Please clarify
Bill Hynek.
Re: The area calculations for the application and the drawings have been
400rdinated and the correct value is noted. See sheets L-1 and L-2. 5-46I
0 c jA
yfie number of required parking spaces and number provided as stated on the plan are
incorrect. For a 16,000 sq ft building. 64 spaces are required. You have provided 76.
Re: The No. of spaces required is 64 and the No. of spaces provided is 76. See
drawing A-1.0.
U'The `double island' that is required between every 7 parking spaces (for parking
closer than 15' to the property line) is required to be 18' x 20'.
Re: See revised drawing A-1.0.
Please provide all setbacks on the site plan, including the side and rear setback. The
side street setback is 15', and not 25' as stated on the plan(side street is Holleman).
(Re: See note at drawingAl g?—' 7
kyc. ii the property is not located within a floodplain,=provide a note stating s
confirming FEMA?FIRM map number. -- aryl5-r‘. n_ S k.-Q.Q
Re: See additional information provided oh drawing A-1.0.
404-z: Y 4.U.SIt 4 Pleae provide a curb and pavement detail.
vip1r-Kilie; Civil drawings C10.
,� 1� For every 15 interior parking spaces you are required to provide a 180 square foot
d, P Yl.""c interior island somewhere within the interior parking area. If the end islands (in the
nry%6U interior of the site)exceed their required square footage,the additional square footage can
i f)1.... [5(0,rbe applied to the interior island requirement. If you wish for the additional square
footage of your end islands to count toward your interior island requirement, please
Q itt did OA provide the square footage of these end islands. With 32 interior parking spaces, you are
dtrequired 384 square feet of interior islands.
Isef,
Re: See drawing A-1.0.
One site plan shows a fire hydrant,the other does not.
Re: ee updated information at site plan drawing A-1.0.
Please show all required fire lanes.
Re: See updated information at site plan drawing A-1.0.
Please provide location of Fire Department Connection(FDC). Building must be
04" sprinklered.
Re: We are providing a three-hour fire rated partition,and thus are not required to
have the building sprinklered.
,O ti The dumpster enclosure needs to have a 24 ft. opening(inside width) in order to
house 2 FEL containers. Each dumpster needs a 12' clear opening for service.
Re: See drawings at sheet A-1.0.
•
Tease provide information on how the CMU dumpy • - I . r will be treated
1n0 or screened. Will it be painted?Tlraat material are the gates made of?
Re: See drawing#'s 2,3 & 4/A-1.2.
1/2eProvide a general note that all roof and ground-mounted mechanical equipment
shall be screened from view or isolated so as not to be visible from any public
right-of-way or residential district within 150' of the subject lot, measured from a
point five feet above grade. Such screening shall be coordinated with the
building architecture and scale to maintain a unified appearance. Please state
how this will be accomplished.
Re: See note on Site plan A-1.0.
I ANDSCAPING/STREETSCAPINGBUFFER
A. All proposed landscaping must be located on site.
Re: Landscape plan L-1.
2Non-canopy trees(crepe myrtles)only earn 40 points.
Re: Landscape plan L-1.
X Please add a note that all non-canopy trees must meet the minimum caliper with a
single cane.
Re: Landscape plan L-1.
v , The way you have determined the number of streetscape trees that are required is
correct. However,the way that you have calculated the additional streetscape point
requirement is incorrect. To calculate the streetscape points required,please add an
additional 300 points for every 50 linear feet of frontage.
Re: Landscape plan L-1.
Provide a general note that 100%coverage of groundcover, decorative paving,
decorative rock, or a perennial grass is required in parking lot islands, swales and
drainage areas, the parking lot setback, rights-of-way, and adjacent property disturbed
during construction.
Re: Landscape plan L-1.
ENGINEERING
1. Provide Water design Report for Fire Flow.
Re: John Gerdes,P.E. of Windrose Land Services and Allen Gibbs, P.E. of College
Station spoke about the water design report for fire flow and it was determined that
such a report was not required,as the system is not a proposed system. This
conversation took place at the beginning of this project back in January of this year.
The fire hydrant is to be tapped into a line that is maintained and operated by the
City of College Station. That line is designed to provide adequate flow and
pressure,as required by the State. Should the City like the report as a formality,
Windrose Land Services can provide such a report once proper readings are taken
in the field of the existing line.
2. Provide Drainage Report for storm sewer system.
Re: A drainage report has been included with this submittal.
3. Fire protection and domestic water for adjacent hotel cannot be interrupted. New line
will need to be installed and accepted prior to existing line taken out of service.
Re: Agree. This will be a part of the Construction Phasing that the Owner,
Contractor and Engineer will make sure this service is not interrupted.
4. Engineered construction documents(Plan and Profile and Engineers Estimate) are
required for public water line.
Re: There is to be no public water line to be built as part of this project. The initial
existing 12-inch water line to be field verified has been proven to be an 8-inch line.
There was never an attempt to upgrade the existing system. Therefore, plan &
profile drawings will not be provided. Plus all water lines on private property are to
remain private.
5. To extend the proposed new water line from Texas Ave. you will need to wait for
new 12"waterline to be installed which will be about 8 months, otherwise you will need
to extend the proposed water line from the existing line on Holleman.
Re: There is to be no public water line to be built as part of this project. The initial
existing 12-inch water line to be field verified has been proven to be an 8-inch line.
There was never an attempt to upgrade the existing system. Therefore, plan &
profile drawings will not be provided. Plus all water lines on private property are to
remain private.
6. Proposed meter vault cannot be located in TxDOT ROW.
Re: Agreed. A P.U.E. easement will be placed on the property by separate metes
and bounds to be recorded at the City. This is also to ensure that all water lines on
our property are to remain private.
7. TxDOT Utility Permit is required for utility connection in TxDOT ROW, including
storm sewer. Storm sewer inlet belongs to TxDOT.
Re: According to the plat and right-of-way designations,the inlet is in the Holleman
right-of-way. Windrose Land Services will request TXDOT approve for the
Holleman storm inlet tie-in. Plus,Windrose Land Services will request TXDOT
approval for the SH 6 "Texas Avenue"water line tie-ins.
8. Off-site Public Utility Easement required for water line. PUE will need to be
dedicated over water line. Submit easement dedication documents for PUE and, or
blanket easement.
Re: Please refer to Re-plat that has recently been approved and recorded by the
City. There is a 15' PUE and a 10' PUE dedicated. Please refer to answers in 4&5
and 6 if more clarification is required
9. Infrastructure Inspection Fee required for water line.
Re: Contractor and Owner to coordinate.
10. Provide agreement with adjacent property for off-site construction.
Re: Owner to provide necessary documents prior to obtaining construction permit.
11. Sidewalk will not be required on Texas Ave. due to current widening project.
Re: Sidewalk to be removed.
12. Sheet A-1.0 calls out sidewalk on Holleman Drive as existing. It should be proposed.
Re: Architect has corrected the call-out to proposed.
13a. The water demands provided do not support a 2 "meters.
Re: The water demands are a 16,000 sq retail X.000223 units/day/sq ft X 315
gpd/unit= 1,123.92 gpd. A 2-inch line at 3 fps=42,280 gpd. The 2-inch line/meter
is large enough.
13b.
Re: The water demands are a 16,000 sq restaurant X.00600 units/day/sq ft X 315
gpd/unit=30,240 gpd . A 2-inch line at 3 fps =42,280 gpd. The 2-inch line/meter is
large enough.
14. Each lease space will have to have its own water meter per TCEQ requirements.
Re: This is only if there is more than 5 tenants. Then there is always the possibility
of a master meter with sub metering. Currently,the City is researching this answer
to confirm if the City wants to maintain and read anywhere between 5 and 15
meters.
15. Show location of irrigation meter. All meters required to be in PUE or City ROW.
Re: Irrigation meter shown in P.U.E.
16. Provide existing 2' contours. Show how proposed grades will tie into existing grades
on adjacent properties.
Re: See Civil-grading plan.
17. Are the retaining wall and wrought iron fence that are called out on northeast property
line existing?
Re: Yes. Refer to Existing Survey and Demolition Plan.
18. Minimum slope on sanitary sewer service for a 6" line is 1%. Service must meet
Building Code.
Re: Correction made.
19. Are you planning a grease trap for the restaurant? Show location and size.
Re: Grease trap shown Civil sheet C5.
ELECTRICAL
1. Developer installs conduit per city specs and design.
2. Developer to intercept existing PVC conduit and stub up at new transformer location.
Contact Sam Weido prior to final placement of transformer pad.
3. Developer pours transformer pad(s)per city specs and design.
4. Main building disconnect must be located in front of tap box.
5. Developer provides digital AutoCAD 14 version of plat and/or site plan. Email to
sweido@cstx.gov
6. Developer provides load data for project.
7. Developer provides temporary blanket easement for construction purposes.
8. Developer provides easements for electric infrastructure as installed for electric lines
(including street lights).
9. To discuss any of the above electrical comments, please contact Sam Weido at(979)
764-6314.
Re: All electrical comments are accepted as written.
MISCELLANEOUS
1. Irrigation system must be protected by either a Pressure Vacuum Breaker, a Reduced
Pressure Principle Back Flow Device, or a Double-Check Back Flow Device, and
installed as per City Ordinance 2394.
2. All Back Flow devices must be installed and tested upon installation as per City
Ordinance 2394.
Re: All miscellaneous comments are accepted as written.