Loading...
HomeMy WebLinkAboutCorrespondence • From: Josh Norton To: brett@cumptonarch.com Date: 3/2/2005 4:05:42 PM Subject: 911 University East PAC - Engineering Comments Brett, This e-mail is in regards to the engineering questions from the February 28th PAC meeting. Fire Hydrant: The Comfort Suites currently under construction has proposed locating a fire hydrant at their front entrance near the Northwest corner of Lot 3F. As long as this fire hydrant provides sufficient fire coverage for the Audio Video structure as per the B/CS Unified Design Guidelines and Fire Code, no additional fire hydrants would be required. Let me know if you would like a copy of the Comfort Suites proposed infrastructure for your reference. Detention Area: An engineer designed detention facility will be required with the Audio Video development. This is required because this area is located in the Burton Creek Basin which is a mandatory detention area of the City of College Station as defined in Chapter 2 of the Drainage Policy and Design Standards manual. Please let us know if you have any further questions. Thanks-Josh Norton Josh Norton, E.I.T. Graduate Civil Engineer Public Works Department City of College Station P. 0. Box 9960 College Station, Texas 77842 Ph: (979) 764-6221 Fx: (979) 764-3496 CC: George, Bridgette; Gibbs, Alan Josh Norton Audio Video Development Page From: Josh Norton To: kwalsh@briceco.net Date: 3/3/2005 3:01:51 PM Subject: Audio Video Development Kenn, I spoke with Alan. The detention requirements only apply to the new impervious development(Audio Video). Since this area is in a mandatory detention area a drainage report and detention facility, designed by an engineer is required. The drainage report and design plan for the detention facility are typically submitted with the site plan construction documents. I'll send you the information I mentioned earlier regarding the storm sewer system that already existing on site. There is not an electronic format for it, so I'll just mail it to the address on your business card. Let me know if you need anymore information. Thanks-Josh Josh Norton, E.I.T. Graduate Civil Engineer Public Works Department City of College Station P. 0. Box 9960 College Station, Texas 77842 Ph: (979) 764-6221 Fx: (979) 764-3496 Josh Norton 911 University East PAC E ineenn9 Comments# From: Josh Norton To: brett@cumptonarch.com Date: 3/2/2005 4:05:42 PM Subject: 911 University East PAC- Engineering Comments Brett, This e-mail is in regards to the engineering questions from the February 28th PAC meeting. Fire Hydrant: The Comfort Suites currently under construction has proposed locating a fire hydrant at their front entrance near the Northwest corner of Lot 3F. As long as this fire hydrant provides sufficient fire coverage for the Audio Video structure as per the B/CS Unified Design Guidelines and Fire Code, no additional fire hydrants would be required. Let me know if you would like a copy of the Comfort Suites proposed infrastructure for your reference. Detention Area: An engineer designed detention facility will be required with the Audio Video development. This is required because this area is located in the Burton Creek Basin which is a mandatory detention area of the City of College Station as defined in Chapter 2 of the Drainage Policy and Design Standards manual. Please let us know if you have any further questions. Thanks-Josh Norton Josh Norton, E.I.T. Graduate Civil Engineer Public Works Department City of College Station P. 0. Box 9960 College Station, Texas 77842 Ph: (979) 764-6221 Fx: (979) 764-3496 CC: George, Bridgette; Gibbs, Alan From: Gina Southerland To: Gina Southerland; Lance Simms; Preapplication Conference Group Date: 2/28/2005 Time: 1:00:00 PM -2:00:00 PM Subject: 911 University East Dr. Retail Bldg Place: P&DS conference room P&DS conference room y e''- r) Contact Person : Britt Rice @ 693-4076 (Ken or Don) Lot 3A, Blk 5 80,000 sq. ft. 1° Gina Southerland . (2,6&4/t__ ___— Contact (2,6&/' (y') Customer Service Rep. City Of College Station 1101 Texas Ave. \\ 979 764-3570 `k glsoutherland@cstx.gov iii tilitligi UI„N1- Ant/ N 2_ /3 2_ l7 '"` -r. xis' #., fir' ,, � '.�*+` fir. v�;� }�x 4�+ +�+ 1%01K4.3.7:.443'.1* K�� 3 !- -fii '� 4 C' yu *t L f e� s ' . s r fir. Ota ds 'Vit?";-**11,,,; ,k..yY `-; .F r-iyc-AAAI _ SL c fLs-f- 1 Sem 44' I