HomeMy WebLinkAboutCorrespondence •
From: Josh Norton
To: brett@cumptonarch.com
Date: 3/2/2005 4:05:42 PM
Subject: 911 University East PAC - Engineering Comments
Brett,
This e-mail is in regards to the engineering questions from the February 28th PAC meeting.
Fire Hydrant:
The Comfort Suites currently under construction has proposed locating a fire hydrant at their front
entrance near the Northwest corner of Lot 3F. As long as this fire hydrant provides sufficient fire coverage
for the Audio Video structure as per the B/CS Unified Design Guidelines and Fire Code, no additional fire
hydrants would be required. Let me know if you would like a copy of the Comfort Suites proposed
infrastructure for your reference.
Detention Area:
An engineer designed detention facility will be required with the Audio Video development. This is
required because this area is located in the Burton Creek Basin which is a mandatory detention area of
the City of College Station as defined in Chapter 2 of the Drainage Policy and Design Standards manual.
Please let us know if you have any further questions.
Thanks-Josh Norton
Josh Norton, E.I.T.
Graduate Civil Engineer
Public Works Department
City of College Station
P. 0. Box 9960
College Station, Texas 77842
Ph: (979) 764-6221
Fx: (979) 764-3496
CC: George, Bridgette; Gibbs, Alan
Josh Norton Audio Video Development Page
From: Josh Norton
To: kwalsh@briceco.net
Date: 3/3/2005 3:01:51 PM
Subject: Audio Video Development
Kenn,
I spoke with Alan. The detention requirements only apply to the new impervious development(Audio
Video). Since this area is in a mandatory detention area a drainage report and detention facility, designed
by an engineer is required. The drainage report and design plan for the detention facility are typically
submitted with the site plan construction documents.
I'll send you the information I mentioned earlier regarding the storm sewer system that already existing on
site. There is not an electronic format for it, so I'll just mail it to the address on your business card. Let
me know if you need anymore information.
Thanks-Josh
Josh Norton, E.I.T.
Graduate Civil Engineer
Public Works Department
City of College Station
P. 0. Box 9960
College Station, Texas 77842
Ph: (979) 764-6221
Fx: (979) 764-3496
Josh Norton 911 University East PAC E ineenn9 Comments#
From: Josh Norton
To: brett@cumptonarch.com
Date: 3/2/2005 4:05:42 PM
Subject: 911 University East PAC- Engineering Comments
Brett,
This e-mail is in regards to the engineering questions from the February 28th PAC meeting.
Fire Hydrant:
The Comfort Suites currently under construction has proposed locating a fire hydrant at their front
entrance near the Northwest corner of Lot 3F. As long as this fire hydrant provides sufficient fire coverage
for the Audio Video structure as per the B/CS Unified Design Guidelines and Fire Code, no additional fire
hydrants would be required. Let me know if you would like a copy of the Comfort Suites proposed
infrastructure for your reference.
Detention Area:
An engineer designed detention facility will be required with the Audio Video development. This is
required because this area is located in the Burton Creek Basin which is a mandatory detention area of
the City of College Station as defined in Chapter 2 of the Drainage Policy and Design Standards manual.
Please let us know if you have any further questions.
Thanks-Josh Norton
Josh Norton, E.I.T.
Graduate Civil Engineer
Public Works Department
City of College Station
P. 0. Box 9960
College Station, Texas 77842
Ph: (979) 764-6221
Fx: (979) 764-3496
CC: George, Bridgette; Gibbs, Alan
From: Gina Southerland
To: Gina Southerland; Lance Simms; Preapplication Conference Group
Date: 2/28/2005
Time: 1:00:00 PM -2:00:00 PM
Subject: 911 University East Dr. Retail Bldg
Place: P&DS conference room P&DS conference room y e''- r)
Contact Person : Britt Rice @ 693-4076 (Ken or Don)
Lot 3A, Blk 5 80,000 sq. ft. 1°
Gina Southerland
. (2,6&4/t__ ___—
Contact
(2,6&/' (y')
Customer Service Rep.
City Of College Station
1101 Texas Ave. \\
979 764-3570 `k
glsoutherland@cstx.gov
iii tilitligi
UI„N1-
Ant/ N
2_ /3
2_ l7
'"` -r. xis' #., fir'
,, �
'.�*+` fir. v�;� }�x 4�+ +�+
1%01K4.3.7:.443'.1* K�� 3 !- -fii '� 4
C' yu *t L
f e� s ' .
s
r
fir.
Ota ds 'Vit?";-**11,,,; ,k..yY `-; .F
r-iyc-AAAI _ SL c fLs-f- 1
Sem 44' I