Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Cost Estimate
04/18/2005 09:51 2148247064 BDD 7M PAGE 02 CrP , \\, )j BROCKETTE-DAVIS-DRAKE,inc '(7 4144 N. Central Expressway,Suite 1100 consulting engineers )\ • Dallas,Texas 75204 Civil/Structural Engineering-Surveying 214-824-3647 Fax:214-824-7064 PRELIMINARY ENGINEERS CONSTRUCTION COST ESTIMATE Est.No.: Date: 04/18/04 Proj Description: Gateway Center-Phase I,College Station,Texas Job No.:004381 ITEM NO. ' DESCRIPTION QUANTITY I UNIT 1 UNIT PRICE I AMOUNT STORM '� 18"RCP 522 LF $45 $23,490 21"RCP 15 LF $50 $750 24" RCP 216 LF — $55 $11,880 36"RCP — 535 LF $80 $42,800 10'Curb Inlet 9 Ea. . $2,300 $20,700 Subtotal $99,620.00 WATER 12"x6"Tapping Sleeve .� 3 Ea. $1,500 $4,500 12"x8"Tapping Sleeve 1 Ea. $1,700 $1,700 6"Valve 5 Ea. $650 $3,250 8"Valve 4 Ea. $750 $3,000 Ductile Iron Fittings 0.465 Ton $5,000 $2,325 Stnd. Fire Hydrant 5 Ea. $1,750 $8,750 6"PVC 167 LF $30 $5,010 8"PVC 1105 LF $32 $35,360 — Subtotal $49,120.00 SANITARY SEWER 4'Diameter Manhole 2 Ea. $2,500 $5,000 6"PVC SDR 35 158 LF $32 $5,056 Subtotal $59,176 ^ TOTAL $207,916 15%Contingencies $68,052 GRAND TOTAL $276 000, 111 I / lir- */i ,'......••N •IJ to 908 o f'10�',4nat .10,ENs9 ' r' tP4, LBS