Loading...
HomeMy WebLinkAboutCorrespondence Page 1 of 2 >» "Shawndra Green" <sgreen@btutilities.com> 3/16/2005 1:53:43 PM »> Hi Mandi, I received the preliminary plat for F&B Road Addition yesterday. Josh Norton called me on Monday to see if I had reviewed it. After extensive research on the relocation of the College Station City Limit Line, I finally came up with the following comments. Can you please forward them to the appropriate party? Thanks, Shawndra 1. Please grant a 10'wide BTU electric easement along the Southwest property lines of lots 1, 2, & 3 (parallel to CS City Limit line). 3i Please show easement encompassing existing overhead line on Lot 1. Reference the volume and page number on the plat. From: Mandi Alford [mailto:Malford@cstx.gov] Sent: Monday, March 07, 2005 3:11 PM To: eabbott@arkitex.com; pcorley@bc911.org; kim@bcschamber.org; jbeard@bcsmpo.org; Randy Trimble; Shawndra Green; jimp@bvsbdc.org; clint@clarkewyndham.com; cmetest@cox-internet.com; Charles.White@cox.com; mike.lavender@cox.com; cealy@csisd.org; gmclean@csisd.org; Anne Hazen; Bridgette George; Connie Hooks; Dennis Maloney; Glenn Brown; Harvey Cargill; John Hopp; James Massey; Kelly Templin; Ron Silvia; Scott Mears; Tom Brymer; Winnie Garner; JMASCHE@dot.state.tx.us; JPAGE@dot.state.tx.us; KNELSON@dot.state.tx.us; lea@fabtexas.com; staylor@falconcompanies.com; gbrewer@fnb-bcs.com; jsalvato@fnb-bcs.com; mholmgreen@fnb-bcs.com; nthompson@fnb- bcs.com; 2460@hotel.cendant.com; eclarkson@iCaprealty.com; pwagner@jpi.com; daniel.westerheim@lynntech.com; belinda_fikes@mcgraw-hill.com; jvargol@msn.com; Newell@Newellsdesigns.com; kwinnl@oncorgroup.com; jldrews@RMDudleyConstruction.com; mdudley@RMDudleyConstruction.com; rweis@tamu.edu; dori@tca.net; john.arnold@verizon.com; Tracy.Holland@verizon.com; williams.tim@verizon.com; Ann@wicksoncreek.com Subject: New Development Week of 3/7/05 The following attachment is the list of new development projects submitted to Planning and Development Services for the deadline of 3/07/05. Thanks Mandi Alford Staff Assistant Planning and Development Services City of College Station www.cstx.gov malford®cstx.gov "Life is a book and you are its author. You determine its plot and pace and you - only you - turn the pages." - Beth Mende Conny file://C:\Documents%20and%20Settings\lboyer\Local%20Settings\Temp\GW}00001.HTM 3/16/2005 5 S Engineering & Environrre;.,al C Consultants, Inc. March 21,2005 Ms. Bridgette George,Assistant Development Manager City of College Station Development Services 1101 Texas Avenue South P. 0. Box 9960 College Station, Texas 77842 Re: Submittal of Revised Preliminary Plan for F&B road Addition Incorporating Staff Review Comments No. 1 Case File: #05-00500031 Dear Ms. George: Transmitted via this letter is CSC Engineering&Environmental Consultants, Inc.'s(CSC's)revised submittal of the preliminary plat for the above referenced project. The preliminary plat was revised in accordance with your Memorandum dated March 14,2005. More specifically,the following documents are transmitted: • two(2)24"x 36"copies of the revised preliminary plat; and • ten(10) 11"x 17"copies of the revised preliminary plat. The preliminary plat that was originally submitted has been revised to address the comments of the City of College Station staff as outlined in the previously referenced Memorandum. Following final approval of the plat we will submit the mylar and electronic copies as requested in your memorandum. We sincerely appreciate your assistance in facilitating this submittal. Please do not hesitate to call should any questions arise or if additional information is required. Kindest regards, .k1g24,1c2A: ftyt-Nj4. M. Frederick Conlin,Jr. P.E.,JD Andres Almanza Senior Engineer Designer MFC:rc Attachments via: Hand Delivery cc: Mr.Ramon Garcia via: U. S.Mail 3407 Tabor Road Phone (979) 778-2810 Bryan, Texas 77808 Fax(979) 778-0820 ? 'vow°h" Page 1 of 1 2.423/Os Rick and Andres- I spoke with an engineer and another planner to get clarification on your questions earlier this afternoon, and here is what I found out: 1. A site plan can definitely be done in phases, so there is no need to plat the back portion of the property separately and no master plan is necessary. 2. If you were to plat the back half of the property, a private access easement and a public utility easement can be concurrent. I hope this answers your questions. Please feel free to contact me if you need clarification or have any other questions. Lindsay Boyer Lindsay B. Boyer Staff Planner City of College Station 1101 Texas Avenue S. College Station, Texas 77840 (979) 764-3570 / (979) 764-3496 Fax tboyer@cstx.gov www.cstx.gov file://C:\Documents%20and%20Settings\lboyer\Local%20Settings\Temp\GW}00001.HTM 3/14/2005 xr O h Page 1 of 1 Rick and Andres- 34/05 I was able to get with Carol about your questions today and hopefully this email will answer(them. 1. On commercial property, the access to the back lot may be through a private drive. There is no length requirement, only that it must reach the lot. Rear access to the lot is not required. However, access must be a minimum of 20' paved for fire access. Also, keep in mind for site planning purposes, if the drive is over 100' there must be a turn-around provided for the fire trucks. 2. For the PUEs, the front will be necessary to accommodate the water line, and also a 20' rear PUE is required if the property backs up to unplatted property. Other PUEs may be required, but without a formal submittal, we don't know what Utilities will require for service to those lots. This may result in a PUE between lots 1 and 2 and lots 2 and 3 - 10' from each lot per the subdivision regulations (Section 8-1.2). 3. Total area to be developed would be just the area currently being considered for development. The remaining lot can be noted as"future development" 4. Parkland dedication is not required 5. Proposed land use would be the type of commercial activity that is being developed 6. Proposed phasing is not necessary. 7. The preliminary plat should include all physical structures on the property, including the house. They will not be included on the Final Plat. I hope this answers your questions. If you have further questions, please feel free to contact me for assistance. Lindsay Lindsay B. Boyer Staff Planner City of College Station 1101 Texas Avenue S. College Station, Texas 77840 (979) 764-3570 / (979) 764-3496 Fax tboyeracstx.gov www.cstx.gov file://C:\Documents%20and%20Settings\tboyer\Local%20Settings\Temp\GW}00001.HTM 3/14/2005 , rwo \s, U-i=s 3 Z Pt) Ids --Prtvtit 0.4 Lack cls. I o-�q � G` 0. U V etO'DeLl _ O ikez` ion.. Z of Gu c . L;J'.) ti\iO ! l� ar- Wl� 014es �� \a 12 Q-P deck 5 c.45,m+M2..c^eci_ o1f, tc3, \,3,Sj COI 4.Q.O,- Ce5 61,1t.L c..A.kc.)e..$) 7 Ca(wts-t- \Qv";1 cs.2. hN e ?