Loading...
HomeMy WebLinkAbout14-104_Page_4BUILDING PERMIT CITY OF COLLEGE STATION 1101 TEXAS AVENUE COLLEGE STATION, TX 77840 PHONE: (97)764-3570 FAX: (979)764-3496 http_//bpinspect.cstx.90v - -- ----- Page Application Number 14-00002234 Dae S ecial Notes and Comments TN THE IMMEDIATE VICINITY OF ALL SLEEPING AREAS/BEDROOMS *ADD CARBON MONOXIDE DETECTOR(S) IF REQUIRED *PROVIDE COMBUSTION AIR FOR GAS FIRED APPLIANCES PER CHAPTER 17, 2012 INTERNATIONAL RESIDENTIAL CODE(IF REQUIRED) *ELECTRICAL SHALL BE INSTALLED PER 2011 National Electrical CODE & LOCAL AMENDMENTS *ALL BRANCH CIRCUITS THAT SUPPLY OUTLETS IN DWELLING UNIT FAMILY ROOMS DINING ROOMS LIVING ROOMS PARLORS LIBRARIES, BhDROOMS, SUNR06MS AND SIMILAR ROOMS S{ALL BE PROTECTED BY AN ARC -FAULT CIRCUIT INTERRUPTER(S) *ALL 125 VOLT 15 AND 20 AMP. RECEPTACLES SHALL BE LISTED TAMPER RESIHANT RECEPTACLES. *ASSURE THAT PROPER GFI LOCATIONS ARE MET INCLUDING ONE WITHIN 25' OF MECHANICAL UNIT AND ALSO A hEDICATED GARAGE APPLIANCES CIRCUITS WILL NEED TO ALSO BE GFI PROTECTED' *DOUBLE LUGGING OF GROUNDS AND NUETRALS ARE NOT TO BE ALLOWED *ANY CHANGES OR ALTERATIONS TO SUBMITTED PLANS MUST BE RESUBMITTED AND APPROVED BEFORE WORK IS DONE IN ORDER TO ASSURE CODE COMPLIANCE *POST PERMIT CARD ON JOB SITE TO BE VISIBLE FROM ROAD, MUST BE IN PLACE BEFORE ANY INSPECTIONS WILL BE PERFORMED. *ALL PLUMBING ELECTRICAL, AND HVAC (mechanical) WORK MUST BE PERFORMED �Y LICENSED CONTRACTORS. CONTACT BUILDING DEPARTMENT FOR PERMITS PRIOR TO WORK, & INSPECTIONS PRIOR TO COVERING ANY WORK (979)764-3570. *IF CONNECTING TO CITY SEWER WITH A NEW HOUSE SERVICE AND A SEWER TAP ALREADY EXISTS, CONTRACTOR IS RESPONSIBLE FOR MAKING SURE THAT THE SEWER. CLEANOUT IS PROVIDED WITH A BOX ENCLOSURE PER CITY REQUIREMENTS. *ALL FRAMING SHALL COMPLY WITH 2012 INTERNATIONAL RESIDENTIAL CODE MAKE SURE TO MEET WINDBRACING *ALL SILLS AND B6TTOM PLATES IN CONTACT WITH CONRETE MUST BE TREATED OR NATURALLY RESISTANT TO INSECTS AND DECAY CONSTRUCTION ACTIVITY BETWEEN THE HOURS OF 10:00 PM AND 7:00 AM MUST COMPLY WITH THE NOISE ORDINANCE (MAX. 55 DBA) *RECESSED LIGHTING INSTALLED IN THE BUILDING ENVELOPE SHALL BE IC RATED AND SEALED TO PREVENT AIR LEAKAGE *PROVIDE SANITARY FACILITIES/PORTA-CAN FOR WORKERS ON SITE LOCATED OFF THE PUBLIC RIGHT-OF-WAY. *ALL TRASH AND DEBRI GENERATED ON THE JOB SITE SHALL BE PICKED UP AND CONTAINED IN AN APPROVED AREA WITHIN THE PROPERTY BOUNDARIES. BUILDING DEPT REPRESENTATIVE: APPLICANT: 7/03/14