Loading...
HomeMy WebLinkAboutApplication(*Or"" CITY OF COLI r..GE STATION Home of Texas AcW University' SITE PLAN APPLICATION GENERAL FOR OFFICE USE OILY CASE NO.: f��C111 DATE SUBMITTED: TIME: a Z� r STAFF: 'I3S0 GC MINIMUM SUBMITTAL REQUIREMENTS: Site Plan Application Fee. ❑ $350 Non -Residential Architectural Standards / Northgate Building Review Application Fee (if applicable). ❑ $600 (minimum) Development Permit Application / Public Infrastructure Review and Inspection Fee. Fee is 1% of acceptable Engineer's Estimate for public infrastructure, $600 minimum (if fee is > $600, the balance is due prior to the issuance of any plans or development permit). ❑ Application completed in full. This application form provided by the City of College Station must be used and may not be adjusted or altered. Six (6) folded copies of site plan. One (1) folded copy of the landscape plan. ❑ One (1) copy of the following for Non -Residential Architectural Standards building review or Northgate Building Review (if applicable). No Building elevations to scale for all buildings. A list of building materials for all facade and screening. ❑ Color samples for all buildings or list colors to be used from the approved color palette. ❑ Electronic copy of Site Plan e-mailed to csuelectdesign@cstx.gov. ❑ Two (2) copies of the grading, drainage, and erosion control plans with supporting drainage report. ❑ Two (2) copies of the Public infrastructure plans and supporting documents (if applicable). ❑ Traffic Impact Analysis or calculations of projected vehicle trips showing that a TIA is not necessary for the proposed request (if applicable). ❑ The attached Site Plan Non -Residential Architectural Standards Building Review and Northgate Building Review checklists (as applicable) with all items checked off or a brief explanation as to why they are not check off. Date of Optional Preapplication or Stormwater Management Con rence NAME OF PROJECT 40 1--X04=% r���C U ADDRESS �� l,!e�����/v y' �n�' LEGAL DESCRIPTION (Lot, Block, Subdivision) Z_/667_y cyb '(./f V 916N 1� APPLICANT/PROJECT MANAGER'S INFORMATION (Primary contact for the project): Name --� iV i cJ 1c� E-mail WCE4/J r'Q h'Iy c1'e Z ca� Ya y _ c oar/ r Street Address q00 S )C + !14, City State Zip Code 7 -2 y d Phone Number c'j 7 9 — (02 —,50 73 Fax Number PROPERTY OWN INFORMATION: Name �.f� �� E-mail Street Address C)Q 6>_)�— City CzLI��,1 i k) State 'X, Zip Code t Phone Number / Fax Number 1- Revised 4/14 Page 1 of 11 ARCHITECT OR ENGINEER'S INFORMATION: Name 'l y� G2 , �RrOwA. Street Address City &Y- y a h State 6 Zip Code 77 Y02 Phone Number OTHER CONTACTS (Please specify type of contact): Name Street Address City Phone Number Current zoning Present use of property H !�A Proposed use of property Number of parking spaces required Fax Number E-mail State Fax Number Zip Code Number of parking spaces proposed Is there Special Flood Hazard Area (Zone A or Zone AE on FEMA FIRM panels) on the property? (— Yes 00 This information is necessary to help staff identify the appropriate standards to review the application and will be used to help determine if the application qualifies for vesting to a previous ordinance. Notwithstanding any assertion made, vesting is limited to that which is provided in Chapter 245 of the Texas Local Government Code or other applicable law. Is this application a continuation of a project that has received prior City platting approval(s) and you are requesting the ,application be reviewed under previous ordinance as applicable? Yes No If yes, provide information regarding the first approved application and any related subsequent applications (provide additional sheets if necessary): Project Name: City Project Number (in known): Date / Timeframe when submitted: Revised 4/14 Page 2 of 11 CERTIFICATIONS REQUIRED FOR ALL DEVELOPMENT Owner Certification: 1. No work of any kind may start until a permit is issued. 2. The permit may be revoked if any false statements are made herein. 3. If revoked, all work must cease until permit is re -issued. 4. Development shall not be used or occupied until a Certificate of Occupancy is issued. 5. The permit will expire if no significant work is progressing within 24 months of issuance. 6. Other permits may be required to fulfill local, state, and federal requirements. Owner will obtain or show compliance with all necessary State and Federal Permits prior to construction including NOI and SWPPP. 7. If required, Elevation Certificates will be provided with elevations certified during construction (forms at slab pre - pour) and post construction. 8. Owner hereby gives consent to City representatives to make reasonable inspections required to verify compliance. 9. If, stormwater mitigation is required, including detention ponds proposed as part of this project, it shall be designed and constructed first in the construction sequence of the project. 10. In accordance with Chapter 13 of the Code of Ordinances of the City of College Station, measures shall be taken to insure that all debris from construction, erosion, and sedimentation shall not be deposited in city streets, or existing drainage facilities. All development shall be in accordance with the plans and specifications submitted to and approved by the City Engineer for the above named project. All of the applicable codes and ordinances of the City of College Station shall apply. 11. The information and conclusions contained in the attached plans and supporting documents will comply with the current requirements of the City of College Station, Texas City Code, Chapter 13 and associated BCS Unified Design Guidelines Technical Specifications, and Standard Details. All development has been designed in accordance with all applicable codes and ordinances of the City of College Station and State and Federal Regulations. 12. Release of plans to (name or firm) is authorized for bidding purposes only. I understand that final approval and relea p s and development for construction is contingent on contractor signature on approved Develop t Permit. 13. I, THE OWNER, AGRE Q9 D CERTIFY HAT STATEMENTS HEREIN, A D IN ATTACHMENTS FOR THE DEV NT PERMIT APP TIO E, TO THE BEST OF I Y KNOWLEDGE, TRUE, AND Owner(s) Engineer Certification: Date 1. The project has been designed to ensure that stormwater mitigation, including detention ponds, proposed as part of the project will be constructed first in the construction sequence. 2. 1 will obtain or can show compliance with all necessary Local, State and Federal Permits prior to construction including NOI and SWPPP. Design will not preclude compliance with TPDES: i.e., projects over 10 acres may require a sedimentation basin. 3. The information and conclusions contained in the attached plans and supporting documents comply with the current requirements of the City of College Station, Texas City Code, Chapter 13 and associated BCS Unified Design Guidelines. All development has been designed in accordance with all applicable codes and ordinances of the City of College Station and State and Federal Regulations. 4. I, THE ENGINEER, AGREE TO AND CERTIFY THAT ALL STATEMENTS HEREIN, AND IN ATTACHMENTS FOR THE DEVELOPMENT PERMIT APPLICATION, ARE, TO THE BEST OF MY KNOWLEDGE, TRUE, AND ACCURATE. Engineer Revised 4114 Date Page 4 of 11