Loading...
HomeMy WebLinkAboutApplicationCITY OF, COLLEGE, STATION Home of Texas Ad -M University' FINAL PLAT APPLICATION FOR OFFICEU E �1 Y� C) C- 1 CASE NO.: �- ' DATE SUBMITTED: ?�T TIME: (j STAFF: (Check one) ❑ Minor ❑ Amending ❑X Final ❑ Vacating ❑(R eepl) t ($700) ($700) ($932) ($932) Is this plat in the ETJ? ❑ Yes ❑ No Is this plat Commercial ❑ or Residential ❑ MINIMUM SUBMITTAL REQUIREMENTS: ❑X $700-$932 Final Plat Application Fee (see above). ❑ $233 Waiver Request to Subdivision Regulations Fee (if applicable). ❑X $600 (minimum) Development Permit Application / Public Infrastructure Review and Inspection Fee. Fee is 1% of acceptable Engineer's Estimate for public infrastructure, $600 minimum (if fee is > $600, the balance is due prior to the issuance of any plans or development permit). ❑X Application completed in full. This application form provided by the City of College Station must be used and may not be adjusted or altered. Please attach pages if additional information is provided. ❑X Fourteen (14) folded copies of plat. (A signed mylar original must be submitted after approval.) 0 Two (2) copies of the grading, drainage, and erosion control plans with supporting drainage report. ❑X Two (2) copies of the Public infrastructure plans and supporting documents (if applicable). ❑ Copy of original deed restrictions/covenants for replats (if applicable). ❑X Title report for property current within ninety (90) days or accompanied by a Nothing Further Certificate current within ninety (90) days. The report must include applicable information such as ownership, liens, encumbrances, etc. 0 Paid tax certificates from City of College Station, Brazos County and College Station I.S.D. ❑X The attached Final Plat checklist with all items checked off or a brief explanation as to why they are not. NOTE: A mylar of the approved preliminary plan must be on file before a final plat application will be considered complete. If the mylar is submitted with the final plat application, it shall be considered a submittal for the preliminary plan project and processed and reviewed as such. Until the mylar has been confirmed by staff to be correct, the final plat application will be considered incomplete. Date of Optional Preapplication or Stormwater Management Conference NAME OF PROJECT Bridgewood Subdivision, Phase 2 ADDRESS SPECIFIED LOCATION OF PROPOSED PLAT: The project is located between just north of the Castlegate and just west of William D. Fitch Parkway. APPLICANT/PROJECT MANAGER'S INFORMATION (Primary contact for the project): rfr@stylecraftbuilders.com BCS Development Co. E-mail Name elo p Street Address 4090 State Highway 6 South City College Station Phone Number 979-690-1222 State Texas Zip Code 77845 Fax Number 979-690-0348 Page 1 of 9 1/11 N PROPERTY OWNER'S INFORMATION (All owners must be identified. Please attach an additional sheet for multiple owners): E-mail drench@stylecraftbuilders.com Name BCS Development Co. Street Address 4090 State Highway 6 South College Station 77845 State Texas Zip Code City g — Phone Number 979-690-1222 Fax Number 979-690-0348 ARCHITECT OR ENGINEER'S INFORMATION: Name J. Dale Browne, Jr., P.E. /McClure & Browne Engr./Surv., Inc. E-mail daleb@mcclurebrowne.com Street Address 1008 Woodcreek Drive, Suite 103 g City College Station State Texas Zip Code 77845 Phone Number 979-693-3838 Fax Number 979-693-2554 Do any deed restrictions or covenants exist for this property? ❑ Yes ❑x No Is there a temporary blanket easement on this property? If so, please provide the Volume and Page No. Total Acreage 19.492 Total No. of Lots 73 R -O -W Acreage 2.906 Existing Use Undeveloped ed Proposed Use Single Family Residential - Number of Lots By Zoning District 73 / PDD l l Average Acreage Of Each Residential Lot By Zoning District: 0.197 / PDD Floodplain Acreage None Is there Special Flood Hazard Area (Zone A or Zone AE on FEMA FIRM panels) on the property? r" Yes Fx- No This information is necessary to help staff identify the appropriate standards to review the application and will be used to help determine if the application qualifies for vesting to a previous ordinance. Notwithstanding any assertion made, vesting is limited to that which is provided in Chapter 245 of the Texas Local Government Code or other applicable law. Is this application a continuation of a project that has received prior City platting approval(s) and you are requesting the application be reviewed under previous ordinance as applicable? F- Yes r No If yes, provide information regarding the first approved application and any related subsequent applications (provide additional sheets if necessary): Project Name: City Project Number (if known): Date / Timeframe when submitted: Page 2 of 9 1/11 r 6. (— The proposed development is within an older residential subdivision meeting the criteria in Platting and Replatting within Older Residential Subdivisions Section of the UDO., or 7. r The proposed development contains frontage on a Freeway / Expressway as designated by Map 6.6, Thoroughfare Plan - Functional Classification, in the City's Comprehensive Plan. Detailed explanation of condition identified above: NOTE: A waiver to the sidewalk requirements and fee in lieu of sidewalk construction shall not be considered at the same time by the Planning & Zoning Commission. Requested Oversize Participation Total Linear Footage of Proposed Public: 2305 Streets 4754 Sidewalks 3197 Sanitary Sewer Lines 2187 Water Lines 0 Channels 2679 Storm Sewers 0 Bike Lanes / Paths Parkland Dedication due prior to filing the Final Plat: ACREAGE: 0 No. of acres to be dedicated + $ 0 development fee 0 No. of acres in floodplain 0 No. of acres in detention 0 No. of acres in greenways OR FEE IN LIEU OF LAND: No. of SF Dwelling Units X $ _ $ (date) Approved by Parks & Recreation Advisory Board NOTE: DIGITAL COPY OF PLAT MUST BE SUBMITTED PRIOR TO FILING. The applicant has prepared this application and certifies that the facts stated herein and exhibits attached hereto are true, correct, and complete. IF THIS APPLICATION IS FILED BY ANYONE OTHER THAN THE OWNER OF THE PROPERTY, this application must be accompanied by a power of attorney statement from the owner. If there is more than one owner, all owners must sign the application or the power of attorney. If the owner is a company, the application must be accompanied by proof of authority for the company's representative to sign the application on its behalf. LIEN HOLDERS identified in the title report are also considered owners and the appropriate signatures must be provided as described above. Sign*reti 0,6 /(q /,Zo! 4 Date Page 4 of 9 CERTIFICATIONS REQUIRED FOR ALL DEVELOPMENT Owner Certification: 1. No work of any kind may start until a permit is issued. 2. The permit may be revoked if any false statements are made herein. 3. If revoked, all work must cease until permit is re -issued. 4. Development shall not be used or occupied until a Certificate of Occupancy is issued. 5. The permit will expire if no significant work is progressing within 24 months of issuance. 6. Other permits may be required to fulfill local, state, and federal requirements. Owner will obtain or show compliance with all necessary State and Federal Permits prior to construction including NOI and SWPPP. 7. If required, Elevation Certificates will be provided with elevations certified during construction (forms at slab pre - pour) and post construction. 8. Owner hereby gives consent to City representatives to make reasonable inspections required to verify compliance. 9. If, stormwater mitigation is required, including detention ponds proposed as part of this project, it shall be designed and constructed first in the construction sequence of the project. 10. In accordance with Chapter 13 of the Code of Ordinances of the City of College Station, measures shall be taken to insure that all debris from construction, erosion, and sedimentation shall not be deposited in city streets, or existing drainage facilities. All development shall be in accordance with the plans and specifications submitted to and approved by the City Engineer for the above named project. All of the applicable codes and ordinances of the City of College Station shall apply. 11. The information and conclusions contained in the attached plans and supporting documents will comply with the current requirements of the City of College Station, Texas City Code, Chapter 13 and associated BCS Unified Design Guidelines Technical Specifications, and Standard Details. All development has been designed in accordance with all applicable codes and ordinances of the City of College Station and State and Federal Regulations. 12. Release of plans to./Mc 8000%i15:� (name or firm) is authorized for bidding purposes only. I understand that final approval and release of plans and development for construction is contingent on contractor signature on approved Development Permit. 13. I, THE OWNER, AGREE TO AND CERTIFY THAT ALL STATEMENTS HEREIN, AND IN ATTACHMENTS FOR THE DEVELMENT PERMIT APPLICATION, ARE, TO THE BEST OF MY KNOWLEDGE, TRUE, AND ACCURATE. 06114 �2cfl- PropeAO ) Date Engineer Certification: 1. The project has been designed to ensure that stormwater mitigation, including detention ponds, proposed as part of the project will be constructed first in the construction sequence. 2. 1 will obtain or can show compliance with all necessary Local, State and Federal Permits prior to construction including NOI and SWPPP. Design will not preclude compliance with TPDES: i.e., projects over 10 acres may require a sedimentation basin. 3. The information and conclusions contained in the attached plans and supporting documents comply with the current requirements of the City of College Station, Texas City Code, Chapter 13 and associated BCS Unified Design Guidelines. All development has been designed in accordance with all applicable codes and ordinances of the City of College Station and State and Federal Regulations. 4. I, THE ENGINEER, AGREE TO AND CERTIFY THAT ALL STATEMENTS HEREIN, AND IN ATTACHMENTS FOR THE D_EVELOPMENT PERMIT APPLICATION, ARE, TO THE BEST OF MY KNOWLEDGE, TRUE, AND Date Page 5 of 9 1/11