HomeMy WebLinkAboutApplication (14-168)CITY OF COLII3GFS STATION
Home of Texas A&M University'
FOR OFFIC USE ONL
CASE NO.:
DATE SU MITTED:
TIME:
STAFF:
DEVELOPMENT PLAT APPLICATION
MINIMUM SUBMITTAL REQUIREMENTS:
❑X $932 Development Plat Application Fee.
$233 Waiver Request to Subdivision Regulations Fee (if applicable).
$600 (minimum) Development Permit Application / Public Infrastructure Review and Inspection Fee. Fee is
1% of acceptable Engineer's Estimate for public infrastructure, $600 minimum (if fee is > $600, the balance
is due prior to the issuance of any plans or development permit).
0 Application completed in full. This application form provided by the City of College Station must be used
and may not be adjusted or altered. Please attach pages if additional information is provided.
x Six (6) folded copies of plat. (A signed mylar original must be submitted after staff review).
Two (2) copies of the grading, drainage, and erosion control plans with supporting drainage report.
kwo (2) copies of the Public infrastructure plans and supporting documents (if applicable).
0 Title Report for property current within ninety (90) days or accompanied by a Nothing Further Certificate
current within ninety (90) days. The report must include applicable information such as ownership, liens,
encumbrances, etc.
FX Paid tax certificates from City of College Station, Brazos County and College Station I.S.D.
FX The attached Development Plat checklist with all items checked -off or a brief explanation as to why they are
not.
Date of Optional Preapplication or Stormwater Management Conference NIA
NAME OF PROJECT Tuple County Properties Management Subdivision
ADDRESS 1105 Wellborn Road
LEGAL DESCRIPTION (Lot, Block, Subdivision) Lot 1, Block 1, Tuple County Properties Management Subdivision
SPECIFIED LOCATION OF PROPOSED PLAT:
1105 Wellborn Road
APPLICANT/PROJECT MANAGER'S INFORMATION (Primary contact for the project):
Name Natalie Ruiz, IPS Group - Planning Solutions
Street Address 3204 Eart Rudder Freeway South
' City College Station
Phone Number 979.846.9259
E-mail natalie@ipsgroup.us
State Texas
Zip Code 77845
Fax Number 979.260.3564
Revised 4/14 Page 1 of 8
PROPERTY OWNER'S INFORMATION (ALL owners must be identified. Please attach an additional sheet for multiple
owners):
Name Tuple County Property Management, LLC E-mail info@tupleproperties.com
Street Address P. O. Box 5635
City Bryan State Texas Zip Code 77805
Phone Number 979.846.9259 Fax Number
ARCHITECT OR ENGINEER'S INFORMATION:
Name Glenn Jones, J4 Enginering E-mail gjones@i4engineering.com
Street Address P. O. Box 5192
City Bryan State Texas Zip Code 77805
Phone Number 979.739.0567 Fax Number
Total Acreage 0.189 acres R -O -W Acreage 0
Current zoning of subject property GC - General Commercial
Floodplain Acreage 0
Is there Special Flood Hazard Area (Zone A or Zone AE on FEMA FIRM panels) on the property? [] Yes ❑x No
Requested waiver to subdivision regulations and reason for same (if applicable):
Vo waivers are requested with this application for Development Plat.
Regarding the waiver request, explain how:
1. There are special circumstances or conditions affecting the land involved such that strict application of the
subdivision regulations will deprive the applicant of the reasonable use of his land.
2. The waiver is necessary for the preservation and enjoyment of a substantial property right of the applicant.
Revised 4/14 Page 2 of 8
The granting of the waiver will not be detrimental to the public health, safety, or welfare, or injurious to other
property in the area, or to the City in administering subdivision regulations.
The granting of the waiver will not be detrimental to the public health, safety, or welfare, or injurious to other
property in the area, or to the City in administering subdivision regulations.
Requested oversize participation None.
Total Linear Footage of
Proposed Public:
0 Streets
0 Sidewalks
0 Sanitary Sewer Lines
0 Water Lines
0 Channels
0 Storm Sewers
0 Bike Lanes I Paths
Parkland Dedication due prior to filing the Development Plat:
ACREAGE:
0 No. of acres to be dedicated + $ 0 development fee
No. of acres in floodplain
No. of acres in detention
No. of acres in greenways
OR
FEE IN LIEU OF LAND:
No. of SF Dwelling Units X $ _ $
(date) Approved by Parks & Recreation Advisory Board
NOTE: DIGITAL COPY OF PLAT MUST BE SUBMITTED PRIOR TO FILING.
The applicant has prepared this application and certifies that the facts stated herein and exhibits attached hereto are
true, correct, and complete. IF THIS APPLICATION IS FILED BY ANYONE OTHER THAN THE OWNER OF THE
PROPERTY, this application must be accompanied by a power of attorney statement from the owner. If there is more
than one owner, all owners must sign the application or the power of attorney. If the owner is a company, the
application must be accompanied by proof of authority for the company's representative to sign the application on its
behalf. LIEN HOLDERS identified in the title report are also considered owners and the appropriate signatures must be
pros desc � d above.
C—Sign4atul4hht le Date
Revised 4114 Page 3 of 8
CERTIFICATIONS REQUIRED FOR ALL DEVELOPMENT
Owner Certification:
1. No work of any kind may start until a permit is issued.
2. The permit may be revoked if any false statements are made herein.
3. If revoked, all work must cease until permit is re -issued.
4. Development shall not be used or occupied until a Certificate of Occupancy is issued.
5. The permit will expire if no significant work is progressing within 24 months of issuance.
6. Other permits may be required to fulfill local, state, and federal requirements. Owner will obtain or show
compliance with all necessary State and Federal Permits prior to construction including NOI and SWPPP.
7. If required, Elevation Certificates will be provided with elevations certified during construction (forms at slab pre -
pour) and post construction.
8. Owner hereby gives consent to City representatives to make reasonable inspections required to verify
compliance.
9. If, stormwater mitigation is required, including detention ponds proposed as part of this project, it shall be
designed and constructed first in the construction sequence of the project.
10. In accordance with Chapter 13 of the Code of Ordinances of the City of College Station, measures shall be taken
to insure that all debris from construction, erosion, and sedimentation shall not be deposited in city streets, or
existing drainage facilities. All development shall be in accordance with the plans and specifications submitted to
and approved by the City Engineer for the above named project. All of the applicable codes and ordinances of the
City of College Station shall apply.
11. The information and conclusions contained in the attached plans and supporting documents will comply with the
current requirements of the City of College Station, Texas City Code, Chapter 13 and associated BCS Unified
Design Guidelines Technical Specifications, and Standard Details. All development has been designed in
accordance with all a piicable codes and or finances of the City of College Station and State and Federal
Regulations.
12. Release of plans to a or firm) is authorized for bidding purposes
only. I understand that final approval an release of plans and development for construction is contingent on
contractor signature on approved Development Permit.
13. I, THE O`�/NER, AG TO AND CERTIFY THAT ALL STATEMENTS HEREIN, AND IN ATTACHMENTS FOR
THE DEt/ELQe&VWri3tRMIT APPLICATION, ARE, TO THE BEST OF MY KNOWLEDGE, TRUE, AND
(0Ic�
Date
Engineer Certification:
1. The project has been designed to ensure that stormwater mitigation, including detention ponds, proposed as part
of the project will be constructed first in the construction sequence.
2. 1 will obtain or can show compliance with all necessary Local, State and Federal Permits prior to construction
including NOI and SWPPP. Design will not preclude compliance with TPDES: i.e., projects over 10 acres may
require a sedimentation basin..
3. The information and conclusions contained in the attached plans and supporting documents comply with the
current requirements of the City of College Station, Texas City Code, Chapter 13 and associated BCS Unified
Design Guidelines. All development has been designed in accordance with all applicable codes and ordinances
of the City of College Station and State and Federal Regulations.
4. I, THE ENGINEER, AGREE TO AND CERTIFY THAT ALL STATEMENTS HEREIN, AND IN ATTACHMENTS
FOR THE DEVELOPMENT PERMIT APPLICATION, ARE, TO THE BEST OF MY KNOWLEDGE, TRUE, AND
ACCURATE.
Engineer
Date
Revised 4/14 Page 4 of 8
The following CERTIFICATIONS apply to development in Special Flood Hazard Areas.
Required for Site Plans, Final Plats, Construction Plans, Fill / Grading Permits, and Clearing Only
Permits:* I
A. I, Irl I certify, as demonstrated in the attached drainage study, that the
alterations or development covered by this permit, shall not:
(i) increase the Base Flood elevation;
(ii) create additional areas of Special Flood Hazard Area;
(iii) decrease the conveyance capacity to that part of the Special Flood Hazard Area that is not in the floodway
and where the velocity of flow in the Base Flood event is greater than one foot per second. This area can
also be approximated to be either areas within 100 feet of the boundary of the regulatory floodway or
areas where the depth of from the BFE to natural ground is 18 inches or greater;
(iv) reduce the Base Flood water storage volume to the part of the Special Flood Hazard Area that is beyond
the floodway and conveyance area where the velocity of flow in the Base Flood is equal to and less than
one foot per second without acceptable compensation as set forth in the City of College Station Code of
Ordinances, Chapter 13 concerning encroachment into the Special Flood Hazard Area; nor
(v) increase Base Flood velocities.
beyond those areas exempted by ordinance in Section 5.11.3a of Chapter 13 Code of Ordinances.
1T
Engineer Date
Initial
* If a platting -status exemption to this requirement is asserted, provide written justification under separate
letter in lieu of certification.
Required for Site Plans, Final Plats, Construction Plans, and Fill / Grading Permits:
B. I,
certify to the following:
(i) that any nonresidential or multi -family structure on or proposed to be on this site as part of this application is
designed to prevent damage to the structure or its contents as a result of flooding from the 100 -year storm.
Engineer Date
Additional certification for Floodway Encroachments:
C. I, , certify that the construction, improvement, or fill covered by this
permit shall not increase the base flood elevation. I will apply for a variance to the Zoning Board of Adjustments.
r�1 I A
Engineer
Date
Revised 4/14 Page 6 of 8
Required for all projects proposing structures in Special Flood Hazard Area (Elevation Certificate
required).
Residential Structures: /�
D. I, 1certify that all new construction or any substantial improvement
of any residential structure shall have the lowest floor, including all utilities, ductwork and any basement, at an
elevation at least one foot above the Base Flood Elevation. Required Elevation Certificates will be provided with
elevations certified during construction (forms at slab pre -pour) and post construction.
Engineer / Surveyor Date
Commercial Structures:
E. I, A— , certify that all new construction or any substantial improvement
of any commercial, industrial, or other non-residential structure are designed to have the lowest floor, including all
utilities, ductwork and basements, elevated at least one foot above the Base Flood Elevation
Engineer / Surveyor
OR
Date
I, 1 ( r C , certify that the structure with its attendant utility, ductwork,
basement and sanitary facilities is designed to be flood -proofed so that the structure and utilities, ductwork,
basement and sanitary facilities are designed to be watertight and impermeable to the intrusion of water in all
areas below the Base Flood Elevation, and shall resist the structural loads and buoyancy effects from the
hydrostatic and hydrodynamic conditions.
Required Elevation Certificates will be provided with elevations certified during construction (forms at slab pre -
pour) and post construction.
'i ��'
Engineer / Surveyor
Conditions or comments as part of approval:
Date
Revised 4/14 Page 6 of 8