MEMORANDUM
May 19, 2000
TO: Alton Rogers, Rogers Engineering Services, Via fax (979) 680-8841
FROM: Bridgette George, Asst. Development Coordinator~~ ~,L`,~G~1-
,~ - /1
SUBJECT: Park Meadows -Preliminary Plat ~
Staff reviewed the above-mentioned master development plan as requested but had to
stop review due to some conditions previously placed on the property. The following
page is a list of staff review comments detailing items that need to be addressed prior to
scheduling this project for a Planning and Zoning Commission meeting. Please address
the comments and submit the following information for further staff review:
Two (2) copies of the revised master development plan.
If you have any questions or need additional information, please call Jane Kee or
Sabine Kuenzel at 764-3570.
Attachments: Staff review comments
Electrical & W/WW comments
Street name concerns
Redlines (please pick up at Development Services)
cc: Hartzell Elkins, Via fax (97~) 774-7328
Case file #00-89
Home of Texas A&M University
COLLEGE STATION
P. O. Box 9960 1101 Texas Avenue College Station, TX 77842
Tel: 409 764 3500
MEMORANDUM
June 23, 2000
TO: Alton Rogers, Rogers Engineering Services, Via fax 680-8841
FROM: Bridgette George, Asst. Development Coordinator
SUBJECT: Sun Meadows Subdivision -Master Development Plan
Staff reviewed the above-mentioned master development plan as requested. The
following page is a list of staff review comments detailing items that need to be
addressed. Please address the comments and submit the following information by
Wednesday, June 28, 10:00 a.m. to be placed on the next available Planning and
Zoning Commission meeting scheduled for July 6, 2000, 7:00 p.m. in the City Hall
Council Chambers, 1101 Texas Avenue.
Ten (10) copies of the revised preliminary plat; and
The Mylar original of the revised preliminary plat.
If you have any questions or need additional information, please call me at 764-3570.
Attachments: Staff review comments
cc: Hartzell Elkins, Vta-#~a~-74-328- Z~~~'~ '~~i'~~" ~~~~St f~~~' ~ k~c,~r~n, ix ~>~2~~
Case file #00-89
-O"h
Home of Texas A&M University
COLLEGE STATION
P. O. Box 9960 1101 Texas Avenue College Station, TX 77842
Tel: 409 764 3500
MEMORANDUM
May 19, 2000
TO: Alton Rogers, Rogers Engineering Services, Via fax (979) 680-8841
FROM: Bridgette George, Asst. Development Coordinator~~~~U`~G
~~
SUBJECT: Park Meadows -Preliminary Plat
Staff reviewed the above-mentioned master development plan as requested but had to
stop review due to some conditions previously placed on the property. The following
page is a list of staff review comments detailing items that need to be addressed prior to
scheduling this project for a Planning and Zoning Commission meeting. Please address
the comments and submit the following information for further staff review:
Two (2) copies of the revised master development plan.
If you have any questions or need additional information, please call Jane Kee or
Sabine Kuenzel at 764-3570.
Attachments: Staff review comments
Electrical & W/WW comments
Street name concerns
Redlines (please pick up at Development Services)
cc: Hartzell Elkins, Via fax (97~) 774-7328
Case file #00-89
Home of Texas A&M University
STAFF REVIEW COMMENTS
No. 1
Project: PARK MEADOWS SUBDIVISION (MDP) (0-89)
There were several conditions placed upon this property as part of the rezoning
that occurred in 1996 that will need to be addressed before the Master
Development Plan can be scheduled for PNZ consideration. Due to
incomplete information, a complete review was not conducted. The following
is a partial list of items that will need to be addressed:
1. The north/south collector should be included in the platted area.
The proposal accomplishes this with the relocation of Schaffer. However,
you need to show what will happen to the existing Schaffer ROW.
2. The east/west collector should be included in the platted area.
Include all of the Arnold Road right-of--way from the new Schaffer location
east through the property. You will be required to build this portion of
Arnold Road to a minor collector standard. The existing Arnold right-of-
way west of new Schaffer can be reduced to a residential street standard
and should tie into Wild Plum. The remainder of the Arnold right-of--way
may be abandoned and any portion of it that originated from the Schaffer
property maybe included into the subdivision.
3. There should be a loop connection between Aster and Hasselt.
This loop should meet the City's residential street standard. Show how
this will be accomplished and include this loop in the platted area.
4. There should be a landscape buffer on the portion of Schaffer between the
creek and existing Arnold right-of-way.
The portion of Schaffer not needed for the loop between Aster and
Hasselt should be abandoned by the developer. Show the abandoned
portion of Schaffer that came out of the Schaffer property as a landscape
buffer.
5. There should be an emergency access connection between this development
and the existing Edelweiss Estates.
The proposed 40' right-of--way is of sufficient width, however there needs
to be a design concept submitted to show how regular vehicular access
will be discouraged and emergency vehicular access accommodated.
6. Access to Schaffer for industrial property should be maintained.
7. Lot and Block numbering is confusing.
8. Residential lots should not front onto collector roadways.
Staff Review Comments Page 1 of 1
9. Alleys should not be included as part of the lots.
10.Avoid right angle lots.
11. What is the total Schaffer Road Right-of-way and how much of it came from
the original Schaffer tract?
12. What is the total Arnold Road Right-of--way and from what tract or tracts did it
originate?
13. Before the plan will be scheduled, submit evidence of meetings with
neighborhood residents to discuss the additional property to be rezoned.
Reviewed by: '`Jane Kee and Sabine Kuenzel* Date: 16-May-00
Staff Review Comments
Page 2 of 1
• ~ ~ ~ ~a,~~ „~,~- .,~ ~- j
_ -,~-
C STAFF REVIEW COMMENTS ~""
No. 2
~~~~~z
~> ~
~~~
Slc
Project: PARK MEADOWS SUBDIVISION (MDP) (0-89)
For the sake of better organization, previous comments are included. We
are requesting clarification of some of the changes that have been made to
address those comments -new comments are shown in bold.
1. The north/south collector should be included in the platted area.
The proposal accomplishes this with the relocation of Schaffer. However,
you need to show what will happen to the existing Schaffer ROW.
Include all of Schaffer Road and Arnold Road ROW as well as any
Hasselt and Aster ROW needed to accomplish the "loop" in the
boundaries of the Master Dev't Plan.
Also, show the landscape buffer along the entire portion of Schaffer
~ adjacent to R-1.
Is Schaffer ROW width shown correctly? Does it taper down as
shown?
i`
The east/west collector should be included in the platted area.
Include all of the Arnold Road right-of--way from the new Schaffer location
east through the property. You will be required to build this portion of
Arnold Road to a minor collector standard. The existing Arnold right-of-
way west of new Schaffer can be reduced to a residential street standard
and should tie into ~Id Plum. The remainder of the Arnold right-of--way
maybe abandoned and any portion of it that originated from the Schaffer
property maybe included into the subdivision.
Include all of Schaffer Road and Arnold Road ROW as well as any
/ Hasselt and Aster ROW needed to accomplish the "loop" in the
boundaries of the Master Dev't Plan.
~~ a
~~ ~.
v ~°~
4~
Provide information regarding how the intersection of the new
Schaffer and Arnold will transition around the corner and from
Arnold to the alley section. The alley section that turns on to Wild
Plum should also transition (we suggest perhaps an "elbow" half
cul-de-sac section but other methods may be submitted).
,, n; .. ' .,..
Staff Review Comments
rl`
~~ '>> ~~~
Page 1 of 1
3. There should be a loop connection between Aster and Hasselt.
This loop should meet the City's residential street standard. Show how
this will be accomplished and include this loop in the platted area.
It does not seem that there is currently enough room to
accommodate the loop, the bike lane, and the required landscape
`~ buffer and Block 5 may therefore have to be altered.
4. There should be a landscape buffer on the portion of Schaffer between the
creek and existing Arnold right-of-way.
The portion of Schaffer not needed for the loop between Aster and
Hasselt should be abandoned by the developer. Show the abandoned
portion of Schaffer that came out of the Schaffer property as a landscape
buffer.
We have decided that no portion of Schaffer need be abandoned.
However, the entire length of Schaffer adjacent to existing R-1 needs to
include a buffer.
5. There should be an emergency access connection between this development
and the existing Edelweiss Estates.
The proposed 40' right-of--way is of sufficient width, however there needs
to be a design concept submitted to show how regular vehicular access
will be discouraged and emergency vehicular access accommodated.
The drive needs to be at least 20' wide with an overhead clearance of
„~ 14' for fire trucks. Also, the curb needs to be mountable but to
discourage regular use. Show how this will be done.
6. Access to Schaffer for industrial property should be maintained. OK
7. Lot and Block numbering is confusing. OK
8. Residential lots should not front onto collector roadways. OK
9. Alleys should not be included as part of the lots. OK
10.Avoid right angle lots. OK
11. What is the total Schaffer Road Right-of-way and how much of it came from
the original Schaffer tract? See other comments regarding Schaffer,
above.
12. hat is the total Arnold Road Right-of-way and from what tract or tracts did it
originate? What is the width of existing Arnold ROW?
13. Before the plan will be scheduled, submit evidence of meetings with
neighborhood residents to discuss the additional property to be rezoned.
We've received information that meetings have taken place. Two
Staff Review Comments Page 2 of 1
residents have visited with Staff as well, and have asked the following
be addressed:
a) They would like to see details of the landscape buffer in terms of
numbers and types of plantings.
b) They would like to know whether the buffer will be irrigated.
c) They would like a statement regarding maintenance of the buffer
area (will it be handed over to Edelweis HOA or remain with this
development's HOA?)
d) They would like to know how the existing ditch will be handled. If it
remains as is, how will the loop be accomplished? It seems that the
bike lane is shown over that ditch.
e) What is the timing of the installation of the buffer?
14 The zoning line between the R-1 and R-2 should be one line instead of
~` two. Show the line.
15. Phasing can either be shown at this stage or with the preliminary plat.
When you are ready to show phasing, keep in mind that there are
dwellings to the east that will need to be accessible at all construction
phases.
NOTE: Any changes made to the plans, that have not been requested by the
City of College Station, must be explained in your next transmittal letter and
"bubbled" on your plans. Any additional changes on these plans that have not
been pointed out to the City, will constitute a completely new review.
Reviewed by: Sabine Kuenzel Date: 06/22/00
Staff Review Comments Page 3 of 1