Loading...
HomeMy WebLinkAboutDevelopment PermitDEVELOPMENT PERMIT PERMIT NO. 500022 DP-VIATEL CS BUSINESS CTR. PHASE 3 FOR AREAS OUTSIDE THE SPECIAL FLOOD HAZARD AREA RE: CHAPTER 13 OF THE COLLEGE STATION CITY CODE SITE LEGAL DESCRIPTION: Lot 3, Block 4, College Station Business Ctr. 14.50 acres DATE OF ISSUE: May 3, 2000 OWNER: COLLEGE STATION, CITY OF ATTN: KIM FOUTZ COLLEGE STATION, TX 77842 TYPE OF DEVELOPMENT: Clearing and Grading Only SPECIAL CONDITIONS: SITE ADDRESS: 200 TECHNOLO GY WAY DRAINAGE BASIN: LICK CREE K VALID FOR 3 M ONTHS CONTRACTOR: TEXCON, IN C. JOE SCHUL TZ (979) 690-77 11 Clearing in the proposed parking lot is contingent upon installation of 3"+ c No clearing allowed in the proposed topsoil/material storage areas; Requests for clearing in areas pooposed as "future parking" will not be submitted; and, Hand clearing for sidewalk area only. Sidewalks must meander to "working The Contractor shall take all necessary precautions to prevent silt and debris from in accordance with the approved erosion control plan as well as the City of Colle; Criteria. The Owner and/or Contractor shall assure that all disturbed areas are s~ occurs prior to removal of any silt fencing or hay bales used for temporary erosion shall also insure that any disturbed vegetation be returned to its original Condit: and/or Contractor shall be responsible for any damage to adjacent properties, cit; machinery and/or equipment as well as erosion, siltation or sedimentation resulting trees in the island areas; until a final clearing plan is "the existing trees. saving the immediate construction site Station Drainage Policy and Design iden and establishment of vegetation ontrol. The Owner and/or Contractor ~n, placement and state. The Owner streets or infrastructure due to heavy rom the permitted work. Any trees required to be protected by ordinance or as part of the landscape plan must be completely fenced before any operations of this permit can begin. In accordance with Chapter 13 of the Code of Ordinances of the City of College Station, measures shall be taken to insure that debris from construction, erosion, and sedimentation shall not be deposited in city streets, or existing drainage facilities. I hereby grant this permit for development of an area outside the special flood hazard area. All development shall be in accordance with the plans and specifications submitted to and approved by the City Engineer in the development permit application for the above named project and all of the codes and ordinances of the City of College Station that apply. Administrator/Representative Owner/Agent Contractor Date Date Date