HomeMy WebLinkAboutDevelopment PermitDEVELOPMENT PERMIT
PERMIT N0. 02-67 ~
Project: STOP AND STORE MINI-STORAGE O v
FOR AREAS OUTSIDE THE SPECIAL FLOOD HAZARD AREA
RE: CHAPTER 13 OF THE COLLEGE STATION CITY CODE
SITE LEGAL DESCRIPTIG'N:
JORDON SUBDIVISION
LOT 1, BLOCK 1
DATE OF ISSUE: 7/25/02
OWNER:
PAT MAREK
2112 SOUTHWOOD DRIVE
SITE ADDRESS:
3820 HARVEY RD
DRAINAGE BASIN:
Carter's Creek
VALID FOR 6 MONTHS
CONTRACTOR:
COLLEGE STATION, TX 77840
TYPE OF DEVELOPMENT: Clearing Grading Permit
SPECIAL CONDITIONS:
All construction must be in compliance with the approved construction plans
All trees must be barricaded, as shown on plans, prior to any construction. Any trees not barricaded will not
count towards landscaping points. Barricades must be 1' per caliper inch of the tree diameter.
EROSION CONTROL MUST BE IN PLACE AND MAINTAINED
The Contractor shall take all ne
construction site in accordance ~
Drainage Policy and Design CritE
to retain all sediment onsite, it is
and Federal requirements. The C
establishment of vegetation occu
control. The Owner and/or Contr
condition, placement and state.
adjacent properties, city streets c
siltation or sedimentation resultin
Any trees required to be pro
before any operations of this
essary precautions to prevent silt and debris from leaving the immediate
th the approved erosion control plan as well as the City of College Station
a. If it is determined the prescribed erosion control measures are ineffective
e contractors responsibility to implement measures that will meet City, State
vner and/or Contractor shall assure that all disturbed areas are sodden and
prior to removal of any silt fencing or hay bales used for temporary erosion
ctor shall also insure that any disturbed vegetation be returned to its original
The Owner and/or Contractor shall be responsible for any damage to
infrastructure due to heavy machinery and/or equipment as well as erosion,
from the permitted work.
i by ordinance or as part of the landscape plan must be completely fenced
it can begin.
In accordance with Chapter 13 of the Code of Ordinances of the City of College Station, measures shall be
taken to insure that debris from construction, erosion, and sedimentation shall not be deposited in city streets,
or existing drainage facilities.
I hereby grant this permit for development of an area outside the special flood hazard area. All development
shall be in accordance with the plans and specifications submitted to and approved by the City Engineer in the
development permit application for the above named project and all of the codes and ordinances of the City of
College Station that apply.
A ministrator/Re~re ntative Date
Owner/Agent/Contractor Date
DEVELOPMENT PERMIT
PERMIT NO. 02-67
Project: STOP AND STORE MINI-STORAGE
FOR AREAS OUTSIDE THE SPECIAL FLOOD HAZARD AREA
RE: CHAPTER 13 OF THE COLLEGE STATION CITY CODE
SITE LEGAL DESCRIPTION:
JORDON SUBDIVISION
LOT 1, BLOCK 1
DATE OF ISSUE: 7/25/02
OWNER:
PAT MAREK
2112 SOUTHWOOD DRIVE
SITE ADDRESS:
3820 HARVEY RD
DRAINAGE BASIN:
Carter's Creek
VALID FOR 9 MONTHS
CONTRACTOR:
COLLEGE STATION, TX 77840
TYPE OF DEVELOPMENT: Full Development Permit
SPECIAL CONDITIONS:
All construction must be in compliance with the approved construction plans
All trees must be barricaded, as shown on plans, prior to any construction. Any trees not barricaded will not
count towards landscaping points. Barricades must be 1' per caliper inch of the tree diameter.
EROSION CONTROL MUST BE IN PLACE AND MAINTAINED
The Contractor shall take all ne
construction site in accordance v
Drainage Policy and Design Crite
to retain all sediment onsite, it is 1
and Federal requirements. The C
establishment of vegetation occur
control. The Owner and/or Contr
condition, placement and state.
adjacent properties, city streets o
siltation or sedimentation resultinc
Any trees required to be pra
before any operations of this
essary precautions to prevent silt and debris from leaving the immediate
th the approved erosion control plan as well as the City of College Station
a. If it is determined the prescribed erosion control measures are ineffective
e contractors responsibility to implement measures that will meet City, State
vner and/or Contractor shall assure that all disturbed areas are sodden and
prior to removal of any silt fencing or hay bales used for temporary erosion
ctor shall also insure that any disturbed vegetation be returned to its original
The Owner and/or Contractor shall be responsible for any damage to
infrastructure due to heavy machinery and/or equipment as well as erosion,
from the permitted work.
by ordinance or as part of the landscape plan must be completely fenced
can begin.
In accordance with Chapter 13 of the Code of Ordinances of the City of College Station, measures shall be
taken to insure that debris from construction, erosion, and sedimentation shall not be deposited in city streets,
or existing drainage facilities.
I hereby grant this permit for development of an area outside the special flood hazard area. All development
shall be in accordance with the plans and specifications submitted to and approved by the City Engineer in the
development permit application for the above named project and all of the codes and ordinances of the City of
College Station that apply.
~~
Date
Date
Owner/Agent/Contractor