Loading...
HomeMy WebLinkAboutDevelopment PermitDEVELOPMENT PERMIT PERMIT NO. 60 MARRIOTT - COURTYARD (SP) FOR AREAS OUTSIDE THE SPECIAL FLOOD HAZARD AREA RE: CHAPTER 13 OF THE COLLEGE STATION CITY CODE SITE LEGAL DESCRIPTION: DATE OF ISSUE: OWNER: November 20, 2000 VILLAGE HOTEL PARTNERS 1509 EMERALD PKWY STE 105 COLLEGE STATION TX 77845 TYPE OF DEVELOPMENT: SPECIAL CONDITIONS: SITE ADDRESS: 3939 SH 6 S DRAINAGE BASIN: LICK CREEK VALID FOR 12 MONTHS CONTRACTOR: FULL DEVELOPMENT PERMIT All construction must be in compliance with the approved construction plans All trees must be barricaded, as shown on plans, prior to any construction. Any trees not barricaded will not count towards landscaping points. Barricades must be 1' per caliper inch of the tree diameter. The Contractor shall take all necessary precautions to prevent silt and debris from leaving the immediate construction site in accordance with the approved erosion control plan as well as the City of College Station Drainage Policy and Design Criteria. The Owner and/or Contractor shall assure that all disturbed areas are sodden and establishment of vegetation occurs prior to removal of any silt fencing or hay bales used for temporary erosion control. The Owner and/or Contractor shall also insure that any disturbed vegetation be returned to its original condition, placement and state. The Owner and/or Contractor shall be responsible for any damage to adjacent properties, city streets or infrastructure due to heavy machinery and/or equipment as well as erosion, siltation or sedimentation resulting from the permitted work. Any trees required to be protected by ordinance or as part of the landscape plan must be completely fenced before any operations of this permit can begin. In accordance with Chapter 13 of the Code of Ordinances of the City of College Station, measures shall be taken to insure that debris from construction, erosion, and sedimentation shall not be deposited in city streets, or existing drainage facilities. I hereby grant this permit for development of an area outside the special flood hazard area. All development shall be in accordance with the plans and specifications submitted to and approved by the City Engineer in the development permit application for the above named project and all of the codes and ordinances of the City of College Station that apply. Administrator/Representative Date Owner/Agent/ Contractor Date DEVELOPMENT PERMIT PERMIT NO. 60 MARRIOTT - COURTYARD (SP) FOR AREAS OUTSIDE THE SPECIAL FLOOD HAZARD AREA RE: CHAPTER 13 OF THE COLLEGE STATION CITY CODE SITE LEGAL DESCRIPTION: DATE OF ISSUE: 6/20/2014 OWNER: VILLAGE HOTEL PARTNERS 1509 EMERALD PKWY STE 105 ,COLLEGE STATION TX 77845 TYPE OF DEVELOPMENT: SPECIAL CONDITIONS: SITE ADDRESS: 3939 SH 6 S DRAINAGE BASIN: Lick Creek VALID FOR 12 MONTHS CONTRACTOR: Peters Contracting 2960 Fairview Drive Owensboro, KY 42302 UTILITY DEVELOPMENT PERMIT This development permit is for the construction of the utilities only. All construction must be in compliance with the approved construction plans The drainage report must be approved by the City prior to issuance of a full building permit. All trees must be barricaded, as shown on plans, prior to any construction. Any trees not barricaded will not count towards landscaping points. Barricades must be 1' per caliper inch of the tree diameter. The Contractor shall take all necessary precautions to prevent silt and debris from leaving the immediate construction site in accordance with the approved erosion control plan as well as the City of College Station Drainage Policy and Design Criteria. The Owner and/or Contractor shall assure that all disturbed areas are sodden and establishment of vegetation occurs prior to removal of any silt fencing or hay bales used for temporary erosion control. The Owner and/or Contractor shall also insure that any disturbed vegetation be returned to its original condition, placement and state. The Owner and/or Contractor shall be responsible for any damage to adjacent properties, city streets or infrastructure due to heavy machinery and/or equipment as well as erosion, siltation or sedimentation resulting from the permitted work. Any trees required to be protected by ordinance or as part of the landscape plan must be completely fenced before any operations of this permit can begin. In accordance with Chapter 13 of the Code of Ordinances of the City of College Station, measures shall be taken to insure that debris from construction, erosion, and sedimentation shall not be deposited in city streets, or existing drainage facilities. I hereby grant this permit for development of an area outside the special flood hazard area. All development shall be in accordance with the plans and specifications submitted to and approved by the City Engineer in the development permit application for the above named project and all of the codes and ordinances of the City of College Station that apply. Administrator/Representative Date Owner/Agent/ Contractor Date